Lohia Repair Work

download Lohia Repair Work

of 150

Transcript of Lohia Repair Work

  • 7/25/2019 Lohia Repair Work

    1/150

    Abst

    Refrence

    Description N

    2 Analysed rate

    In Boundry wall front side wall clading damaged

    11

    1

    1Long span 3

    3small 3

    2Total- A

    B:- Piller side boundry wall 2!

    2!Top 2!wall 2!

    2!small space 2!

    2!

    2!

    2!Total -B

    ":- #wimming pool and Audiotorium around $$

    $$

    $$

    $$

    $$

    $$

    MkW0 jke euksgj yksfg;k jk"Vh; fof/k fo'o

    Sr.No

    Pro%iding and fi&ing carbon steel gal%anised ' minimum coating $ micron (das) fastener '*isc)er Anc)or ma+e- ,ammerfi& -A2- *..2/$.03$( of ! mmdia double t)readed counter sun+ )ead including drilling of )ole in stone walllining on ""4Bric+ wall etc0 as per direction of 5ngineer-in-c)arge0 si6e !&!. mm

    A:- Piller7ain 8ate

  • 7/25/2019 Lohia Repair Work

    2/150

    Refrence

    Description N

    Sr.No

    top $$

    $$Total -"

    9:- BA" ;all near gym

    wall of multipurpose )all 1

    1

    1ear ,ospital 1

    1

    1"anteen 1

    1

    1

    1Total

    8rand Total A

  • 7/25/2019 Lohia Repair Work

    3/150

    ract of Cost & Bill of Quantity

    o. " # D$% Qty nit

    1 10.$ .0$ .0 #?m1 202 .0$ .0@@ #?m

    1 .0@ .0$ .01 #?m

    1 .0@$ .0$ .03 #?m

    2 101$ .0$ 3011 #?m

    2 .01 .0$ .02 #?m

    2 .0!$ .0$ 203. #?m

    2 .012 .0$ .022 #?m

    !02. #?m

    2 10@ .0$ 20.! #?m

    1 10@ 20.$ @$0@ #?m

    1 .0 .0 $0! #?m

    2 10!2 .0$ .022 #?m

    1 203 .0$ 2101 #?m

    1012 .0$ @0@$ #?m

    .012 .0$ !.03$ #?m

    .0 .0$ 2.$03 #?m

    .012 .0$ $30$ #?m

    32.103@ #?m

    2 201 .02 02. #?m

    2 102 .02 202 #?m

    1 2 .0$ @0$. #?m

    1 10! 2 1@!0.. #?m

    2 .03 .03$ 130! #?m

    .0! .03$ 022 #?m

    o|ky; ifjlj esa okg; LFkyksa dh ejEer dk dk

  • 7/25/2019 Lohia Repair Work

    4/150

    o. " # D$% Qty nit

    1 .0 .0$2 1301 #?m

    2 10 .0$ @02. #?m

    @30! #?m

    1 $! @ $220.. #?m

    1 12 @ 1.!0.. #?m

    1 1 @ 1$30.. #?m

    1 21 0$ 1$0$. #?m

    1 @0! 0$ 30$. #?m

    1 $0!$ .0@$ #?m

    1 12 0 0!. #?m

    1 0 0!. #?m

    1 12 0 0!. #?m

    1 2. 0 12!0.. #?m

    13!103$ #?m

    $.!0!. #?m

    2.330@2 #?m

    1.1.0.. os

  • 7/25/2019 Lohia Repair Work

    5/150

    Rate A'ount

    Z

  • 7/25/2019 Lohia Repair Work

    6/150

    Rate A'ount

    !.0.. !13..0..

    ()*+,,.,,

  • 7/25/2019 Lohia Repair Work

    7/150

    Abst

    Refrence

    Description N

    )

    In Boundry wall front side wall clading damaged

    1

    1

    1

    1Long span 3

    3small 3

    2Total- A

    B:- Piller side boundry wall 2!

    2!Top 2!wall 2!

    2!small space 2!

    2!

    2!

    2!

    Total -B

    ":- #wimming pool and Audiotorium around $$

    $$

    $$

    $$

    $$

    $$

    top $$$$

    Total -"

    MkW0 jke euksgj yksfg;k jk"Vh; fof/k fo'o

    Sr.No

    9#-2.1-1$0.01

    9ismantling precast concrete or stone slabs in walls partition walls etc0including stac+ing wit)in $. metres lead : T)ic+ness up to . mm

    A:- Piller7ain 8ate

  • 7/25/2019 Lohia Repair Work

    8/150

    Refrence

    Description N

    Sr.No

    9:- BA" ;all near gym

    wall of multipurpose )all 1

    1

    1ear ,ospital 1

    1

    1"anteen 1

    1

    1

    1Total

    8rand Total A

  • 7/25/2019 Lohia Repair Work

    9/150

    Refrence

    Description N

    Sr.No

    2!

    2!

    2!Total -B

    ":- #wimming pool and Audiotorium around $$

    $$

    $$

    $$

    $$

    $$top $$

    $$Total -"

    9:- BA" ;all near gym

    wall of multipurpose )all 1

    1

    1ear ,ospital 1

    1

    1"anteen 1

    1

    1

    1Total

    8rand Total A

  • 7/25/2019 Lohia Repair Work

    10/150

    Refrence

    Description N

    Sr.No

    *

    wall of multipurpose )all 1

    1

    1ear ,ospital 1

    1

    1"anteen 1

    1

    1

    1Total

    *or Le%eling and repair boundry wall of different location 1.80Total

    *or repair boundry wall of different location 2$80Total

    9#-2.1-2$02

    Pro%iding and fi&ing double scaffolding system 'cup loc+ type( ont)e e&teriorside of building4structure upto 2$ metre )eig)t abo%eground le%el includingadditional rows of scaffolding in stepped manner as per re?uirement of sitemade wit) .mm dia 70#0 tube placed 10$ metre centre to centre )ori6ontalC %ertical tubes oint wit) cup C loc+ system wit) 70#0 Tubes 70#0 tube c)allis

    70#0 clamps and staircase system in t)e scaffolding for wor+ing platform etc0and maintaining it in a ser%iceable condition for e&ecution of wor+ of cleaningand4 or pointing and4 or applying c)emical and remo%ing it t)ereafter0 T)escaffolding system s)all be stiffened wit) bracings runners connecting wit)t)e building etc w)ere%er re?uired if feasible for inspection of wor+ atre?uired locations wit) essential safety features for t)e wor+men etc0complete as per directions and appro%al of 5ngineer-in-c)arge0 Note:-'1( T)eele%ational area of t)e scaffolding s)all be measured for payment purpose0 '2(T)e payment will be made once only for e&ecution of all items for suc) wor+s09#-2.1-2$02

    DPP;9 #-

    3.$b

  • 7/25/2019 Lohia Repair Work

    11/150

    Refrence

    Description N

    Sr.No

    +

    *or rear4 c)ange of damaged tile in par+ near girls )ostel2..80Total

    /

    *or green )ouse c)ange 1

    180Total

    (

    er girls )ostel railing 1

    0

    *or repair of planters in different location .80Total

    Analysedate

    #tone tile wor+ for wall lining o%er 12 mm t)ic+ bed of cement mortar 1:3 '1cement : 3 coarse sand( and cement slurry > 303 +g4 s?m including pointing inw)ite cement complete0 ! mm t)ic+ of any colour and s)ade0

    DPP;9 #-2.1$-2!1

    Pro%iding and laying "ement concrete 1::!' 1 cementF coarse sand : !graded stone aggregate .mm0nominal si6e( including supply of all materialsGlabour and T C P etc0re?uired for proper completion of t)e wor+ and curingcompletealso including cost of formwor+ in foundation C floors0

    DPP;9 #-2.1$-2.

    #upply and fi&ing ,and rail and Balustrade modular system passi%e ##-3.grade decorati%e ailing system comprising of )and rail $.mm and 10$ mmt)ic+ and 3 o0 )ori6ontal steel pipe of 1@ mm dia and 10$mm t)ic+ of e?ualspacing wit) Balustrade of ## pipe of 3! mm and 10$mm t)ic+ > 12.. mm"4" of passi%ated and finis) t)e surface good and co%ering wit) steel s)oewit) all %isible stainless steel metel of 3. grade in stain finis) )ig)t of railingis @.. mm as per detailed specification attac)ed wit) P"0

    Analysedate

    Pro%iding and fi&ing La+) red colour granite 'polis)ed( in big slab 1! '

  • 7/25/2019 Lohia Repair Work

    12/150

    Refrence

    Description N

    Sr.No

    ),

    *or repair steps in different location of building 12.80Total

    ))

    *or repair of foot pat) in campus .Total

    )2

    In 8rean )ouse 3In 8rean )ouse 2Lawn 3Lawn 2Total

    ;5I8,T E* #teel > 0$. +g4m

    )*

    In 8rean )ouse $

    In 8rean )ouse 2Lawn

    Analysedate

    Pro%iding and fi&ing 1!'

  • 7/25/2019 Lohia Repair Work

    13/150

    Refrence

    Description N

    Sr.No

    Lawn !Total

    Gran !otal

  • 7/25/2019 Lohia Repair Work

    14/150

    ract of Cost & Bill of Quantity

    o. " # D$% Qty nit

    1 10.$ .0$ .0 #?m

    1 202 .0$ .0@@ #?m

    1 .0@ .0$ .01 #?m

    1 .0@$ .0$ .03 #?m

    2 101$ .0$ 3011 #?m

    2 .01 .0$ .02 #?m

    2 .0!$ .0$ 203. #?m

    2 .012 .0$ .022 #?m

    !02. #?m

    2 10@ .0$ 20.! #?m

    1 10@ 20.$ @$0@ #?m1 .0 .0 $0! #?m

    2 10!2 .0$ .022 #?m

    1 203 .0$ 2101 #?m

    1012 .0$ @0@$ #?m

    .012 .0$ !.03$ #?m

    .0 .0$ 2.$03 #?m

    .012 .0$ $30$ #?m

    32.103@ #?m

    2 201 .02 02. #?m

    2 102 .02 202 #?m

    1 2 .0$ @0$. #?m

    1 10! 2 1@!0.. #?m

    2 .03 .03$ 130! #?m

    .0! .03$ 022 #?m

    1 .0 .0$2 1301 #?m2 10 .0$ @02. #?m

    @30! #?m

    o|ky; ifjlj esa okg; LFkyksa dh ejEer dk dk

  • 7/25/2019 Lohia Repair Work

    15/150

    o. " # D$% Qty nit

    1 $! @ $220.. #?m

    1 12 @ 1.!0.. #?m

    1 1 @ 1$30.. #?m

    1 21 0$ 1$0$. #?m

    1 @0! 0$ 30$. #?m

    1 $0!$ .0@$ #?m

    1 12 0 0!. #?m

    1 0 0!. #?m

    1 12 0 0!. #?m

    1 2. 0 12!0.. #?m

    13!103$ #?m

    $.!0!. #?m

    1.10@ #?m

    1 10.$ .0$ .0 #?m

    1 202 .0$ .0@@ #?m

    1 .0@ .0$ .01 #?m

    1 .0@$ .0$ .03 #?m

    2 101$ .0$ 3011 #?m

    2 .01 .0$ .02 #?m

    2 .0!$ .0$ 203. #?m

    2 .012 .0$ .022 #?m

    !02. #?m

    2 10@ .0$ 20.! #?m

    1 10@ 20.$ @$0@ #?m

    1 .0 .0 $0! #?m

    2 10!2 .0$ .022 #?m

    1 203 .0$ 2101 #?m 1012 .0$ @0@$ #?m

  • 7/25/2019 Lohia Repair Work

    16/150

    o. " # D$% Qty nit

    .012 .0$ !.03$ #?m

    .0 .0$ 2.$03 #?m

    .012 .0$ $30$ #?m

    32.103@ #?m

    2 201 .02 02. #?m

    2 102 .02 202 #?m

    1 2 .0$ @0$. #?m

    1 10! 2 1@!0.. #?m

    2 .03 .03$ 130! #?m

    .0! .03$ 022 #?m

    1 .0 .0$2 1301 #?m

    2 10 .0$ @02. #?m

    @30! #?m

    1 $! @ $220.. #?m

    1 12 @ 1.!0.. #?m

    1 1 @ 1$30.. #?m

    1 21 0$ 1$0$. #?m

    1 @0! 0$ 30$. #?m

    1 $0!$ .0@$ #?m

    1 12 0 0!. #?m

    1 0 0!. #?m

    1 12 0 0!. #?m

    1 2. 0 12!0.. #?m

    13!103$ #?m

    $.!0!. #?m

    1.10@ #?m

  • 7/25/2019 Lohia Repair Work

    17/150

    o. " # D$% Qty nit

    1 $! @ $220.. #?m

    1 12 @ 1.!0.. #?m

    1 1 @ 1$30.. #?m

    1 21 0$ 1$0$. #?m

    1 @0! 0$ 30$. #?m

    1 $0!$ .0@$ #?m

    1 12 0 0!. #?m

    1 0 0!. #?m

    1 12 0 0!. #?m

    1 2. 0 12!0.. #?m

    13!103$ #?m

    2 0.. .023 .0. 10$ "um

    10$ "um

    2 10 10! 10.. #?m

    10.. #?m

  • 7/25/2019 Lohia Repair Work

    18/150

    o. " # D$% Qty nit

    1 .0 .0 20.. #?m20.. #?m

    2 3. .03 .0 1.0!. "um

    1 $. .03 .0 @0.. "um

    1@0!. "um

    1 1.0.. 1.0.. 7tr

    1 10! .03 320. #?m

    320. #?m

  • 7/25/2019 Lohia Repair Work

    19/150

    o. " # D$% Qty nit

    1 10! .03 0!. #?m

    0!. #?m

    1 20.. 10.. !.0.. #?m

    !.0.. #?m

    1 2.0.. .0.. 7etre

    1 1.0.. 2.0.. 7etre

    1 $0.. 1$0.. 7etre

    1 1$0.. 3.0.. 7etre

    12$0.. 7etre

    $20$. g

    1 2.0.. 30.. 3..0.. #?m

    1 1.0.. 102. 20.. #?m1 $0.. .0@. 20.. #?m

  • 7/25/2019 Lohia Repair Work

    20/150

    o. " # D$% Qty nit

    1 2$0.. .0. 12.0.. #?m

    10.. #?m

  • 7/25/2019 Lohia Repair Work

    21/150

    Rate A'ount

    Z

  • 7/25/2019 Lohia Repair Work

    22/150

    Rate A'ount

    1.0$$ 1.@30.$

  • 7/25/2019 Lohia Repair Work

    23/150

    Rate A'ount

    2$0.. 3$.0..

  • 7/25/2019 Lohia Repair Work

    24/150

    Rate A'ount

    1$@0@. 22.!0!

    $!$$0.. @@$!0!.

    110$. 2@0..

  • 7/25/2019 Lohia Repair Work

    25/150

    Rate A'ount

    3110.. 22!3120..

    $12.0.. 1.130..

    $...0.. $....0..

    $.0.. 1!3.!0..

  • 7/25/2019 Lohia Repair Work

    26/150

    Rate A'ount

    .0.. 3.@!0!.

    1$0.. 11$.0..

    $0@. 2@30$

  • 7/25/2019 Lohia Repair Work

    27/150

    Rate A'ount

    @30.. 3!.30..

    (/,()2.2+

  • 7/25/2019 Lohia Repair Work

    28/150

    Sr.No Refrence

    )

    2

    *

    !

    DSR-2,)*-2.+.)

    DSR-2,)*-2,.).2

    DSR-2,)*-.*.2

    DSR-2,)*-2,.+.).)

    DSR-2,)*-2,.+.).2

  • 7/25/2019 Lohia Repair Work

    29/150

    +

    /

    (

    0 PP#D SR

    ),

    DSR-2,)*-2,./.).)

    DSR-2,)*-

    2,.(.)

    DSR-2,)*-2,.0

    AnalyseRate$DSR-2,)-.*/.)

  • 7/25/2019 Lohia Repair Work

    30/150

    ))

    )2

    )* PP#D SR

    ) PP#D SR

    )

    )+

    AnalyseRate$DSR-2,)-.*/.2

    DSR-2,)*-.*.)

    DSR-2,)*-.0.

    DSR-2,)*-.0.2)

  • 7/25/2019 Lohia Repair Work

    31/150

    )/

    )(

    )0

    2,

    2)

    22

    2*

    DSR-2,)*-.0.2,

    DSR-2,)*-

    .0.+1.0.)

    DSR-2,)*-.0.0

    DSR-2,)*-.0.+

    1.0.)

    PP#DSR-*,b3

    PP#DSR-*,b31*,01*),

    PP#DSR-*,b31*,01*),

  • 7/25/2019 Lohia Repair Work

    32/150

    2

    2

    2+

    2/

    2(

    20

    *,

    DSR-2,)*-2.2

    DSR-2,)*-).*

    DSR-2,)*-

    )./.

    DSR-2,)*-).*,

    DSR-2,)*-).2/

    DSR-2,)*-).*,

    DSR-2,)*-).**

  • 7/25/2019 Lohia Repair Work

    33/150

    *)

    *2

    **

    *

    *

    *+

    */

    DSR-2,)*-).)

    DSR-2,)*-

    ).2.2

    DSR-2,)*-)..)

    DSR-2,)*-

    )..)

    AnalyseRate$DSR-2,)*-/.**.2

    DSR-2,)*-0.).2$Analy

    se rate

    AnalyseRate$DSR-

    2,)*-0.0.).)

  • 7/25/2019 Lohia Repair Work

    34/150

    *(

    *0

    ,

    )

    2

    *

    AnalyseRate$DSR-

    2,)*-).)2.)

    AnalyseRate$DSR-2,)*-).2.)

    PP#DSR-/,+1/,/

    AnalyseRate$DSR-

    2,)*-)*..)

    PP#DSR-/,(

    AnalyseRate$DSR-

    2,)*-(.2.2.2

  • 7/25/2019 Lohia Repair Work

    35/150

    +

    /

    (

    0

    ,

    AnalyseRate$DSR-2,)*-)*.(,

    AnalyseRate$DSR-

    2,)*-)*./.)

    PP#D-SR+)1+2

    PP#DSR-+/

    DSR-2,)*-)..)

    AnalyseRate 4ort5Data boo6-)+.*$2(,/

    AnalyseRate-4ort5Data boo6-)+.$2(,+

  • 7/25/2019 Lohia Repair Work

    36/150

    )

    2

    *

    +

    AnalyseRate DSR-

    2,)*-)2.).27)2.

    2.).27

    )2.2..2an)2.*.23

    AnalyseRate$DSR-

    2,)*-)/.*.).)

    AnalyseRate$ DSR-

    2,)*-)/.*(.).)3

    Analyse

    Rate$ DSR-2,)*-

    )/.*0.).)3

    AnalyseRate$ DSR-

    2,)*-)/.+.).)3

    AnalyseRate$ DSR-

    2,)*-)/./.).)3

  • 7/25/2019 Lohia Repair Work

    37/150

    /

    (

    0

    +,

    +)

    AnalyseRate$ DSR-

    2,)*-)/.*.).)3

    AnalyseRate$ DSR-

    2,)*-)2.*(.)

    AnalyseRate$DSR-

    2,)*-)/.(.)

    PP#DSR-2*)a3

    DSR-2,)*-22.+

  • 7/25/2019 Lohia Repair Work

    38/150

  • 7/25/2019 Lohia Repair Work

    39/150

    Abstract of Cost & Bill of Quan

    Impro%ement epair and reno%ation of 5" Effice of DPP;9

    Description

    i0 ksd fuekZ#k fo$kk% ds ie k (f$k )rk d

    5art) wor+ in e&ca%ation by mec)anical means ',ydraulic e&ca%ator( 4 manualmeans o%er areas 'e&ceeding 3.cm in dept)0 10$ m in widt) as well as 1. s?mon plan( including disposal of e&ca%ated eart) lead upto $. m and lift upto10$m disposed eart) to be le%elled and neatly dressed0All +inds of soil0 9#-2.13-2001

    Pro%iding dri%ing and installing dri%en cast-in-situ reinforced cement concretepiles of grade 7-2$ of specified diameter and lengt) below t)e pile cap to

    carry safe wor+ing load not less t)an specified e&cluding t)e cost of steelreinforcement but including t)e cost of s)oe and t)e lengt) of pile to beembedded in t)e pile cap etc0 all complete0 'Lengt) of pile for payment s)allbe measured from top of s)oe to t)e bottom of pile cap( :$. mm dia piles09#-2.13-2.0102

    5&tra for pro%iding ric)er mi&es at all floor le%els0 Pro%iding 7-3$ gradeconcrete instead of 7-2$ grade B7"4 7"0 'ote : "ement contentconsidered in 7-3$ is > 3$. +g4cum( 9#-2.13-$0302

    Hertical load testing of piles in accordance wit) I# 2@11 'Part IH( includinginstallation of loading platform and preparation of pile )ead or construction oftest cap and dismantling of test cap after test etc0 complete as perspecification C t)e direction of 5ngineer in-c)arge0 #ingle pile upto $. tonnecapacity Initial test0 9#-2.13-2.00101

    Hertical load testing of piles in accordance wit) I# 2@11 'Part IH( includinginstallation of loading platform and preparation of pile )ead or construction of

    test cap and dismantling of test cap after test etc0 complete as perspecification C t)e direction of 5ngineer in-c)arge0 #ingle pile upto $. tonnecapacity outine test0 9#-2.13-2.00102

  • 7/25/2019 Lohia Repair Work

    40/150

    "yclic %ertical load testing of pile in accordance wit) I# "ode of practice I#:2@11 'part IH( including preparation of pile )ead etc for0#ingle pile Dpto $.tonne capacity pile0 9#-2.13-2.00101

    Lateral load testing of single pile in accordance wit) I# "ode of practice I# :

    2@11 'Part IH( for determining safe allowable lateral load on pile : Dpto $.tonne capacity pile0 9#-2.13-2.0!01

    Integrity testing of Pile using Low #train4 #onic Integrity Test4 #onic 5c)o Testmet)od in accordance wit) I# 1!@3 including surface preparation of pile topby remo%ing soil mud dust C c)ipping lean concrete lumps etc0 and use ofcomputerised e?uipment and )ig) s+ill trained personal for conducting t)e testC submission of results all complete as per direction of 5ngineer-in-c)arge09#-2.13-2.0@

    Pro%iding and laying "ement concrete 1::! '1 cement : coarse sand : !graded stone ballast . mm0 nominal si6e( including supply of all materialslabour and TCP etc0 re?uired for proper completion of t)e wor+ and curingcomplete also including cost of formwor+ in foundation and floors0 DPP;9#-2!1

    Pro%iding and laying in position ready mi&ed 7-2$ grade concrete forreinforced cement concrete wor+ using cement content as per appro%eddesign mi& manufactured in fully automatic batc)ing plant and transported tosite of wor+ in transit mi&er for all leads )a%ing continuous agitated mi&ermanufactured as per mi& design of specified grade for reinforced cementconcrete wor+ including pumping of 070"0 from transit mi&er to site of laying e&cluding t)e cost of centering s)uttering finis)ing and reinforcementincluding cost of admi&tures in recommended proportions as per I# : @1.3 toaccelerate4 retard setting of concrete impro%e wor+ability wit)out impairingstrengt) and durability as per direction of t)e 5ngineer - in - c)arge0 'ote :-"ement content considered in t)is item is > 33. +g4cum0 5&cess4less cement

    used as per design mi& is payable4reco%erable separately(0 All wor+s uptoplint) le%el0 Analysed ate49#-2.1-$0301

  • 7/25/2019 Lohia Repair Work

    41/150

    Pro%iding and laying in position ready mi&ed 7-2$ grade concrete forreinforced cement concrete wor+ using cement content as per appro%ed

    design mi& manufactured in fully automatic batc)ing plant and transported tosite of wor+ in transit mi&er for all leads )a%ing continuous agitated mi&ermanufactured as per mi& design of specified grade for reinforced cementconcrete wor+ including pumping of 070"0 from transit mi&er to site of laying e&cluding t)e cost of centering s)uttering finis)ing and reinforcementincluding cost of admi&tures in recommended proportions as per I# : @1.3 toaccelerate4 retard setting of concrete impro%e wor+ability wit)out impairingstrengt) and durability as per direction of t)e 5ngineer - in - c)arge0 'ote :-"ement content considered in t)is item is > 33. +g4cum0 5&cess4less cementused as per design mi& is payable4reco%erable separately(0 All wor+s abo%eplint) le%el upto floor H le%el0 Analysed ate49#-2.1-$0302

    5&tra for pro%iding ric)er mi&es at all floor le%els0 Pro%iding 7-3. gradeconcrete instead of 7-2$ grade B7"4 7"0 'ote:- "ement contentconsidered in 7-3. is > 3.+g4cum( 9#-2.13-$0301

    ,#9 or iron in plain wor+ suc) as reinforced concrete or reinforced bric+wor+ 'w)en not included in o%er all rates ( wroug)t to re?uired s)ape as

    necessary including bending and also including supply of steel andwastages and o%erlapping and )oo+es re?uired for completion of t)e wor+0DPP;9 #-$.

    7ild steel or iron wor+ in )ea%y si6es suc) as trusses builts up gates doorframes records rac+s roof wor+ gates etc0 wroug)t to re?uired formincluding drilling )oles ri%etting or welding w)ere necessary and alsoincluding supply of steel bolts nuts and wastages etc0 and t)eir fi&ingre?uired for completion of t)e wor+0 DPP;9 #-$.3

    "entering and s)uttering including strutting propping etc0 and remo%al of formfor :Lintels beams plint) beams girders bressumers and cantile%ers0 9#-2.13-$0@0$

    "entering and s)uttering including strutting propping etc0 and remo%al ofsame for Lintels beams plint) beams girders bressumers and cantile%ers0wit) water proof ply 12 mm t)ic+0 9#-2.13-$0@021

  • 7/25/2019 Lohia Repair Work

    42/150

    "entering and s)uttering including strutting propping etc0 and remo%al of formfor #uspended floors roofs landings balconies and access platform0 wit)water proof ply 12 mm t)ic+0 9#-2.13-$0@02.

    "entering and s)uttering including strutting propping etc0 and remo%al of formfor "ornices and mouldings0 9#-2.13-$0@0

  • 7/25/2019 Lohia Repair Work

    43/150

    Pro%iding and fi&ing double scaffolding system 'cup loc+ type( ont)e e&teriorside of building4structure upto 2$ metre )eig)t abo%eground le%el includingadditional rows of scaffolding in stepped manner as per re?uirement of sitemade wit) .mm dia 70#0 tubeplaced 10$ metre centre to centre )ori6ontal C %ertical tubes oint wit) cup C

    loc+ system wit) 70#0 Tubes 70#0 tube c)allis 70#0 clamps and staircasesystem in t)e scaffolding for wor+ing platform etc0 and maintaining it in aser%iceable condition for e&ecution of wor+ of cleaning and4 or pointing and4 orapplying c)emical and remo%ing it t)ereafter0 T)e scaffolding system s)all bestiffened wit) bracings runners connecting wit) t)e building etc w)ere%erre?uired if feasible for inspection of wor+ at re?uired locations wit) essentialsafety features for t)e wor+men etc0 complete as per directions and appro%alof 5ngineer-in-c)arge0 Note:-'1( T)e ele%ational area of t)e scaffolding s)allbe measured for payment purpose0 '2( T)e payment will be made once onlyfor e&ecution of all items for suc) wor+s0 9#-2.13-2$02

    9emolis)ing 0"0"0 wor+ manually4 by mec)anical means including stac+ingof steel bars and disposal of unser%iceable material wit)in $. metres lead asper direction of 5ngineer - in- c)arge0 9#-2.13-1$03

    9emolis)ing bric+ wor+ manually4 by mec)anical means including stac+ing ofser%iceable material and disposal of unser%iceable material wit)in $. metreslead as per direction of 5ngineer-in-c)arge0 9#-2.13-1$00

    9ismantling ac+ arc) roofing and floors including stac+ing of ser%iceablematerial and disposal of unser%iceable material wit)in $. metres lead0 9#-2.13-1$03.

    9emolis)ing mud p)as+a in terracing and disposal of material wit)in $.metres lead0 9#-2.13-1$02

    9ismantling roofing including ridges )ips %alleys and gutters etc0 andstac+ing t)e material wit)in $. metres lead of :Asbestos s)eet0 9#-2.13-1$03.

    9ismantling wooden ballies in posts and struts including stac+ing wit)in $.metres lead0 9#-2.13-1$033

  • 7/25/2019 Lohia Repair Work

    44/150

    9ismantling cement asbestos or ot)er )ard board ceiling or partition wallsincluding stac+ing of ser%iceable materials and disposal of unser%iceablematerials wit)in $. metres lead0 9#-2.13-1$01

    9ismantling "0I0 or asbestos rain water pipe wit) fittings and clamps including

    stac+ing t)e material wit)in $. metres lead :1.. mm dia pipe0 9#-2.13-1$0202

    9ismantling "0I0 pipes including e&ca%ation and refilling trenc)es after ta+ingout t)e pipes manually4 by mec)anical means brea+ing lead caul+ed ointsmelting of lead and ma+ing into bloc+s including stac+ing of pipes C lead atsite wit)in $. metre lead as per direction of 5ngineer-in-c)arge:Dp to 1$. mmdiameter0 9#-2.13-1$0$01

    7a+ing t)e opening in bric+ masonry including dismantling in floor or walls bycutting masonry and ma+ing good t)e damages to walls flooring and ambscomplete to matc) e&isting surface i4c disposal of mulba4 rubbis) to t)enearest municipal dumping ground0*or door4 window4 clerestory window0 9#-2.13-1001

    Pro%iding and fi&ing stone ali . mm t)ic+ t)roug)out in cement mortar 1:3 '1cement : 3 coarse sand( including pointing in w)ite cement mortar 1:2 '1

    w)ite cement : 2 stone dust( wit) an admi&ture of pigment matc)ing t)e stones)ade ali slab wit)out any c)amfers etc0 ;)ite marbale stone0 Analysedate49#-2.13-03302

    #upply and fi&ing #alwood wroug)t framed and fi&ed including simplemoulding straig)t wor+ as in ")au+)at frame including supply of all materialslabour TCP etc0 re?uired for proper completion of wor+0 9#-2.13-@01024Analysed rate

    Pro%iding and fi&ing gla6ed s)utters for doors windows and clerestorywindows using mm t)ic+ float glass panes including I#I mar+ed stainlesssteel butt )inges of re?uired si6e wit) necessary screws0 #econd class tea+wood0 3$ mm t)ic+0 Analysed ate49#-2.13-@0@0101

  • 7/25/2019 Lohia Repair Work

    45/150

    9ismantling doors windows and clerestory windows 'steel or wood( s)utterincluding c)ow+)ats arc)itra%e )oldfasts etc0 complete and stac+ing wit)in $.metres lead :Ef area 3 s?0 metres and below0 Analysed ate49#-2.13-1$01201

    *i&ing c)ow+)ats in e&isting opening including embedding c)ow+)ats in floorsor walls cutting masonry for )oldfasts embedding )old fasts in cementconcrete bloc+s of si6e 1$ & 1. & 1. cm wit) cement concrete 1:3: '1 cement: 3 coarse sand : graded stone aggregate 2. mm nominal si6e( and ma+inggood t)e damages to walls and floors as re?uired complete including disposalof rubbis) to t)e dumping ground wit)in $. meters lead : 9oor c)ow+)ats0

    Analysed ate49#-2.13-10201

    9ismantling e&isting plaster including1 disposalJ of refuse as directed by t)e5ngineer-in-c)arge wit) in a distance of . metre '2..ft0( including ac+ingout oints of bric+ wor+ in cement or lime mortar to a dept) of 1 cm '34!K(including disposal of refuse as directed by t)e 5ngineer-in-c)arge wit) in adistance of . m '2..( DPP;9 #-.

  • 7/25/2019 Lohia Repair Work

    46/150

    Pro%iding and applying w)ite cement based putty of a%erage t)ic+ness 1 mmof appro%ed brand and manufacturer o%er t)e plastered wall surface toprepare t)e surface e%en and smoot) complete0 Analysed ate49#-2.13-130!.

    *inis)ing walls wit) Premium Acrylic #moot) e&terior paint wit) #iliconeadditi%es of re?uired s)ade:ew wor+ 'Two or more coats applied > 103 ltr41. s?m o%er and including priming coat of e&terior primer applied > 202. +g41. s?m(0 Analysed ate49#-2.13-13001

    Painting or %anis)ing on iron wor+s in small areas or new wood wor+ wit) onecoat of ready mi&ed priming paint C Two coat of appro%ed superior ?ualityready mi&ed paint of clear synt)etic %arnis) including supply 0of all materials

    labour and T C P etc0 re?uired for proper completion of wor+0 Paint to be useds)ould confirm to t)e I0#0I0 o0 1.3 1@$. DPP;9-# 1

  • 7/25/2019 Lohia Repair Work

    47/150

    Pro%iding and fi&ing on wall face unplasticised igid PH" rain water pipesconforming to I# : 13$@2 Type A including ointing wit) seal ring conforming toI# : $3!2 lea%ing 1. mm gap for t)ermal e&pansion All fittings li+e two osBend one no "oupler or any ot)er accessories and P4* PH" pipe clips fi&edin wall face including cutting bric+ wor+ and fi&ing in cement mortar 1:'i(

    #ingle soc+eted pipes0 11. mm diameter0 '9#-2.13-1201021202010212020$02 and 120302(

    Pro%iding and fi&ing soil waste and %ent pipes: 1.. mm dia #and cast iron#C# pipe neco 7a+e including of all materials labour and TCP etc0 re?uiredfor proper completion of t)e wor+0 Analysed ate49#-2.13-103$0101

    Pro%iding and fi&ing bend of re?uired degree wit) access door insertionrubber was)er 3 mm t)ic+ bolts and nuts complete0 1.. mm dia #and castiron #C# as per I# - 12@ ',5P 7a+e(0 Analysed ate4 '9#-2.13-103!0101(

    Pro%iding and fi&ing plain bend of re?uired degree0 1.. mm dia #and cast iron

    #C# as per I# -12@ ,5P45?ui0 Analysed ate4 '9#-2.13-103@0101(

    Pro%iding and fi&ing terminal guard0 1.. mm0 #and cast iron #C# as per I# -12@0 Analysed ate4 '9#-2.13-10$0101(

    Pro%iding and fi&ing collar 1.. mm0 #and cast iron #C# as per I# - 12@0Analysed ate4 '9#-2.13-10$0101(

  • 7/25/2019 Lohia Repair Work

    48/150

    Gran !otal

    Pro%iding and fi&ing single e?ual plain unction of re?uired degree wit) accessdoor insertion rubber was)er 3mm t)ic+ bolts and nuts complete1..&1..&1.. mm0 #and cast iron #C# as per I# - 12@0 '9#-2.13-1030101(

    Pro%iding and fi&ing 70#0 )older-bat clamps of appro%ed design to #and "astiron4cast iron 'spun( pipe embedded in and including cement concrete bloc+s1.&1.&1. cm of 1:2: mi& '1 cement : 2 coarse sand : graded stoneaggregate 2. mm nominal si6e( including cost of cutting )oles and ma+inggood t)e walls etc '1..mm dia( 9#-2.13-1203!01

    Pro%iding lead caul+ed oints to sand cast iron4centrifugally cast 'spun( ironpipes and fittings of diameter0 1.. mm0 9#-2.13-10$!01

    9isposal of 7ulba of dismanteled building construction material lead upto1.0.. m0 by mec)anicaly transport0 DPP;9 #-231'a(

    Pro%iding and laying water proofing treatment on roofs of slabs by applyingcement slurry mi&ed wit) water proofing cement compound consisting ofapplying: a( after surface preparation first layer of slurry of cement > .0!!

    +g4s?m mi&ed wit) water proofing cement compound > .02$3 +g4s?m0 b(laying second layer of *ibre glass clot) w)en t)e first layer is still green0E%erlaps of oints of fibre clot) s)ould not be less t)an 1. cm0 c( t)ird layer of10$ mm t)ic+ness consisting of slurry of cement > 102!@ +g4s?m mi&ed wit)water proofing cement compound > .0. +g4s?m and coarse sand > 102!@+g4s?m0 T)is will be allowed to air cure for )ours followed by water curing for! )ours0 T)e entire reatment will be ta+en upto 3. cm on parapet wall andtuc+ed into groo%e in parapet all around0 d( fourt) and final layer of bric+ tilingwit) cement mortar 'w)ic) will be paid for separately0 *or t)e purpose ofmeasurement t)e entire treated surface will be measured0 9#-2.13-220

  • 7/25/2019 Lohia Repair Work

    49/150

  • 7/25/2019 Lohia Repair Work

    50/150

    ity

    Qty nit Rate A'ount

    *0(. Cu' )0.*, +*((.,+

    */2.,, 4etre 2(.2, 0),.,

    0.)* Cu' )*0., (20.2,

    (.,, Nos )0)(.0, ***).2,

    (.,, Nos )(0*0.*, ))).,

    kZ $kou ds !)u u dk dk Z

  • 7/25/2019 Lohia Repair Work

    51/150

    +.,, Nos )(0*0.*, ))*+*.(,

    .,, Nos )(0*0.*, ///.2,

    ).,, Nos /0*.2, ))),.(,

    *.+/ Cu' )2,.,, )(2+,.+

    )). Cu' /)(,., (22,(.*2

  • 7/25/2019 Lohia Repair Work

    52/150

    )*/).*+ Cu' /+*., ),()0+,.(0

    ,./ Cu' +0./, *2*/.(0

    ))++*. 89 +(.0, (,*+/*2.((

    *0,/., 89 /.0, 20+/0.2

    )2.2 Cu' **+.(, )2//.(,

    2,. #?m *.(, )),+2(.*

  • 7/25/2019 Lohia Repair Work

    53/150

    2(,(.2* #?m ,*.), ))2()0.,,

    0.,, #?m (2.0, */2.0

    (,+./* #?m ),0.*, ((2(,*.**

    )/+.0, #?m ).(, 2*,().2

    *,.(* Cu' */.,, )+/*2./

    )2*.0, Cu' /0.,, /)(,,,.,

    *,.,, Cu' 0+.,, )/(0,.,,

  • 7/25/2019 Lohia Repair Work

    54/150

    2(0.* Cu' )2/(.(, */,)2.2)

    2(0.* Cu' )2/(.(, */,)2*.,(

    2+.,2 Cu' /,.*, )0/.2*

    2(0.,, S' 0)./, 2+,).*,

    (+./, Cu' *2(., 2((,.0

    ))).)) S' 20.,, *2**(.20

    ),,,.,, 4etre /., /,,.,,

  • 7/25/2019 Lohia Repair Work

    55/150

    )2,).() S' 2)., 2(*(.00

    ,.,, 4etre 2(.), ))/.,,

    00,.,, 4etre )+(./, )+/,)*.,,

    2*.2, #?m (+./, ))/).(

    ))).2, #?m 02++.,( ),*,*((.),

    2.,, "um /)(/.0, )*/0.(,

    +.*, S' *,0(.+, )+02//+.(,

  • 7/25/2019 Lohia Repair Work

    56/150

    30.. os @$0. @02.

    30.. os 320. 1!01

    122!0@ #?m $0.. [email protected]

    12!303 #?m 10$. [email protected]

    *2+./, S' (.,, 2+)*.0

    !!0!. #?m 1!0. 30@2

  • 7/25/2019 Lohia Repair Work

    57/150

    1@.$0$@ #?m !$01. 1$23$0!2

    1!1@01 #?m 1..0. 1!2$!3.0!

    +*., S' (/.,, /2(.2+

    1!210.1 #?m .,, !1@$0$

    2!01 #?m /,(.), $1$!30$!

    $..0.. #?m @!.0.. @....0..

    $..0.. +g ..0.. 3.....0..

  • 7/25/2019 Lohia Repair Work

    58/150

    3..0.. 7tr $1!0$. 1$$$$.0..

    2..0.. 7tr @0!. [email protected]..

    .0.. os .01. 330..

    2$0.. os $220. 13..0..

    2$0.. os 3.0. 1.0$.

    2$0.. os 3110.. $0..

  • 7/25/2019 Lohia Repair Work

    59/150

    2$0.. os !.0.. 2.1$0..

    3..0.. os 10!. $.3.0..

    2..0.. os 3.0. .!!.0..

    ,,.,, Cu' 22., 0,2,,.,,

    )02+. S' *(/.(, //))+.,0

    2+2**(*.0,

  • 7/25/2019 Lohia Repair Work

    60/150

  • 7/25/2019 Lohia Repair Work

    61/150

    *0la0 e+

    , -

    1 Cost of Ci;il #or6s2 A Contin9ency7 uality control c5ar9es < 2=

    3!otal

    4 Add 5stablis)ment c)arges 0!$=

    5 Labour cess @ 1%

    6 Add "ost 9epreciation on 7ac)inery > 10$=

    8 !>!A"

    9 Say A'ount in "acs

    MkW0 jke euksgj yksfg;k jkifjlj esa okg; LFkyksa dh ejEer dk dk;Z

  • 7/25/2019 Lohia Repair Work

    62/150

    lay.ud

    !13..0..

    1220..

    !2@!20..

    $.$30.

    !2@!02

    12!0.!

    0,/+/2.,

    0.,(

    Vh; fof/k fo'ofo|ky;

    yk%r 12kkkesa3

  • 7/25/2019 Lohia Repair Work

    63/150

    Abstract of Cost & Bill of

    r!"o #efrence $escrition

    1

    2

    3

    4

    5

    6

    !0i0 yksd fuekZ#k fo$kk% ds ie&k (f$k;

    $#2'13

    2!6!1

    (art) *or+ in e,ca-ation by .ec)anical .eans /0yraulic

    e,ca-ator .anual .eans o-er areas /e,ceein 3'c.in et)! 1!5 . in *it) as *ell as 1' s. on lanincluin isosal of e,ca-ate eart) lea uto 5' . anlift uto 1!5. isose eart) to be le-elle an neatlyresse!All +ins of soil

    $#2'132'!3!3

    Borin 7ro-iin an installin cast in situ sinle unerrea.e iles of secie ia.eter an lent) belo* ileca in 25 ce.ent concrete to carry a safe *or+in loanot less t)an secie e,cluin t)e cost of steelreinforce.ent but incluin t)e cost of borin *it)

    bentonite solution an t)e lent) of t)e ile to bee.bee in ile ca etc! all co.lete! /Lent) of ile foray.ent s)all be .easure uto to t)e botto. of ileca : 45' .. ia iles

    $#2'132'!6!1!1

    ;ertical loa testin of iles in accorance *it)

  • 7/25/2019 Lohia Repair Work

    64/150

    =

    8 >77?$ #

    9

    1'

    11

    12

    13

    $#2'132'!9

    77?$#3'5/bD3'9D31'

    irst Class bric+ *or+ in 1 : 4 ce.ent an coarse san.ortar in suerstructure incluin suly 6f all .aterialslabour an & 7 etc! reuire for roer co.letion oft)e *or+!

    >77?$#3'5/b

    D3'9D31'

    irst Class bric+ *or+ in 1 : 4 ce.ent an coarse san.ortar in suerstructure arc)es incluin suly 6f all

    .aterials labour an & 7 etc! reuire for roerco.letion of t)e *or+!

  • 7/25/2019 Lohia Repair Work

    65/150

    14

    15

    16

    1=

    18

    19

    2'

    21

    22

    23

    Analyse#ate

    #einforce ce.ent concrete *or+ in *alls /any t)ic+nessincluin attac)e ilasters buttresses lint) an strincourses llets colu.ns illars iers abut.ents ostsan struts etc! u to oor -e le-el e,cluin cost ofcenterin s)utterin nis)in an reinforce.ent! 1:1!5:3/1 ce.ent : 1!5 coarse san : 3 rae stone areate2' .. no.inal sie!

    $#2'135!9!6

    D5!9!14

    Centerin an s)utterin incluin struttin roin etc!an re.o-al of for. for Colu.ns 7illars 7iersAbut.ents 7osts an truts (,tra for s)utterin incircular *or+ /2'% of resecti-e centerin an s)utterinite.s

    $#2'1315!3

    $e.olis)in #!C!C! *or+ .anually by .ec)anical .eansincluin stac+in of steel bars an isosal ofunser-iceable .aterial *it)in 5' .etres lea as erirection of (nineer in c)are!

    $#2'1315!=!4

    $e.olis)in bric+ *or+ .anually by .ec)anical .eansincluin stac+in of ser-iceable .aterial an isosal ofunser-iceable .aterial *it)in 5' .etres lea as erirection of (nineerinc)are!

    $#2'1315!3'

    $is.antlin Eac+ arc) roon an oors incluin stac+inof ser-iceable .aterial an isosal of unser-iceable.aterial *it)in 5' .etres lea!

    $#2'1315!2=

    $e.olis)in .u )as+a in terracin an isosal of.aterial *it)in5' .etres lea!!

    $#2'1315!3'

    $is.antlin roon incluin ries )is -alleys anutters etc! an stac+in t)e .aterial *it)in 5' .etreslea of :Asbestos s)eet

    $#2'1315!33

    $is.antlin *ooen ballies in osts an struts incluinstac+in *it)in 5' .etres lea!

    $#2'1315!41

    $is.antlin ce.ent asbestos or ot)er )ar boar ceilinor artition *alls incluin stac+in of ser-iceable

    .aterials an isosal of unser-iceable .aterials *it)in5' .etres lea!

    $#2'1315!42!2

    $is.antlin C!

  • 7/25/2019 Lohia Repair Work

    66/150

    24

    25

    26

    2=

    28

    29

    3'

    $#2'1315!45!1

    $is.antlin C!

    $#2'1314!4!1

    a+in t)e oenin in bric+ .asonry incluinis.antlin in oor or *alls by cuttin .asonry an.a+in oo t)e a.aes to *alls oorin an Ea.bsco.lete to .atc) e,istin surface ic isosal of .ulbarubbis) to t)e nearest .unicial u.in roun!oroor *ino* clerestory *ino*

    ar+etrate

    7ro-iin an ,in .arbale stone *all esienererforate Fali as reuire in t)ic+ness of 5'..!

  • 7/25/2019 Lohia Repair Work

    67/150

    31

    32

    33

    34

    35 >77?$ #

    $#2'135!9!6

    D5!9!14

    Centerin an s)utterin incluin struttin roin etc!an re.o-al of for. for Cornices an .oulins

    $#2'135!5D>7?$

    #iHerencebit*een289 an

    288

    #einforce ce.ent concrete *or+ in arc)es arc)ribso.es -aults s)ells fole late an roofs )a-in sloe

    .ore t)an 15G u to oor -e le-el e,cluin t)e cost ofcenterin s)utterin nis)in an reinforce.ent *it)1:1!5:3 /1 ce.ent : 1!5 coarse san : 3 rae stoneareate 2' .. no.inal sie!

    $#2'135!9!9

    Centerin an s)utterin incluin struttin roin etc!an re.o-al of for. for Arc)es o.es -aults u to 6 .san

    Analyse#ate 7ro-iin an ,in lae s)utters for oors *ino*san clerestory *ino*s usin 4 .. t)ic+ oat lassanes incluin

  • 7/25/2019 Lohia Repair Work

    68/150

    36

    3=

    38

    39

    $#2'1325!2

    7ro-iin an ,in ouble scaHolin syste. /cu loc+tye ont)e e,terior sie of builinstructure uto 25.etre )ei)t abo-eroun le-el incluin aitionalro*s of scaHolin in stee .anner as er reuire.entof site .ae *it) 4'.. ia !! tubelace 1!5 .etre centre to centre )oriontal & -erticaltubes Eoint *it) cu & loc+ syste. *it) !! ubes !!

    tube c)allis !! cla.s an staircase syste. in t)escaHolin for *or+in latfor. etc! an .aintainin it ina ser-iceable conition for e,ecution of *or+ of cleaninan or ointin an or alyin c)e.ical an re.o-init t)ereafter! )e scaHolin syste. s)all be stiHene*it) bracins runners connectin *it) t)e builin etc*)ere-er reuire if feasible for insection of *or+ atreuire locations *it) essential safety features for t)e*or+.en etc! co.lete as er irections an aro-al of(nineerinc)are! "ote:/1 )e ele-ational area of t)escaHolin s)all be .easure for ay.ent urose! /2

    )e ay.ent *ill be .ae once only for e,ecution of all

    ite.s for suc) *or+s!

    Analyse#ate

    $is.antlin oors *ino*s an clerestory *ino*s /steelor *oo s)utter incluin c)o*+)ats arc)itra-e)olfasts etc! co.lete an stac+in *it)in 5' .etreslea :Jf area 3 s! .etres an belo*

    Analyse#ate

    i,in c)o*+)ats in e,istin oenin incluin e.beinc)o*+)ats in oors or *alls cuttin .asonry for )olfastse.bein )ol fasts in ce.ent concrete bloc+s of sie15 , 1' , 1' c. *it) ce.ent concrete 1:3:6 /1 ce.ent :3 coarse san : 6 rae stone areate 2' .. no.inalsie an .a+in oo t)e a.aes to *alls an oors asreuire co.lete incluin isosal of rubbis) to t)eu.in roun *it)in 5' .eters lea : $oor c)o*+)ats

    ar+et#ate

    7ro-iin an ,in u7;C *ino*oor s)utter sliintye incluin ouble trac+ oor *ino* fra.esinterloc+in arrane.ent case.ent )anle loc+to*erbolt etc co.lete in all resect incluin all .ateriallabour etc!

  • 7/25/2019 Lohia Repair Work

    69/150

    4'

    41

    42

    43

    44 >77?$ #

    45

    46

    ar+et#ate

    il steel or iron *or+ in )ea-y sies suc) as trussesbuilts u ates oor fra.es recors rac+s roof *or+ates etc! *rou)t to reuire for. incluin rillin)oles ri-ettin or *elin *)ere necessary an alsoincluin suly of steel bolts nuts an *astaes etc!an t)eir ,in reuire for co.letion of t)e *or+!

    ar+et#ate

    7ro-iin an ,in .arble stone railin on roof to sieas er reuire esin!

    >77?$#

    ='6D='=

    $is.antlin e,istin laster incluin1 isosalK of refuseas irecte by t)e (nineerinc)are *it) in a istance of6' .etre /2''ft! incluin #ac+in out Eoints of bric+*or+ in ce.ent or li.e .ortar to a et) of 1 c. /38incluin isosal of refuse as irecte by t)e (nineerinc)are *it) in a istance of 6' . /2''

    Analyse#ate 15 .. Ce.ent laster in sinle coat on rou) sie ofsinle or )alf bric+ *all for interior lasterin uto oort*o le-el incluin internal roune anles c)a.fers anroune anles not e,ceein 8' ..! in irt) annis)e e-en an s.oot)!/ 1 Ce.ent :4 coarse san

    crain ol *)ite or colour *as) incluin isosal ofrefuse as irecte by t)e (nineerinc)are *it) in aistance of 6' .etres /2''ft

    Analyse#ate

    Mranite *or+ /la+)a reany ot)er colour or)er t)an blac+an sa* cut /olis)e an .ac)ine cut of t)ic+ness 18/D2 .. for *all linin /-eneer *or+ bac+in lle *it)a rout of 12 .. t)ic+ a-erae in ce.ent .ortar 1:3 /1ce.ent : 3 coarse san incluin ointin *it) *)itece.ent .ortar 1:2 /1 *)ite ce.ent : 2 .arble ust *it)an a.i,ture of i.ent to .atc) t)e .arble s)ae /obe secure to t)e bac+in by .eans of cra.s *)ic)s)all be ai for searately! la+)a re /olis)e Area ofslab o-er '!5' s.

    Analyse#ate

    7ro-iin an alyin *)ite ce.ent base utty ofa-erae t)ic+ness 1 .. of aro-e bran an.anufacturer o-er t)e lastere *all surface to rearet)e surface e-en an s.oot) co.lete!

  • 7/25/2019 Lohia Repair Work

    70/150

    4=

    48

    49

    49

    5'

    51

    52

    53

    Analyse#ate

    inis)in *alls *it) 7re.iu. Acrylic .oot) e,terior aint*it) ilicone aiti-es of reuire s)ae:"e* *or+ /*oor .ore coats alie @ 1!43 ltr 1' s. o-er anincluin ri.in coat of e,terior ri.er alie @ 2!2'+ 1' s.

    #

    641D642

    7aintin or -anis)in on iron *or+s in s.all areas or ne*

    *oo *or+ *it) one coat of reay .i,e ri.in aint &*o coat of aro-e suerior uality reay .i,e aintof clear synt)etic -arnis) incluin suly !of all.aterials labour an & 7 etc! reuire for roerco.letion of *or+! 7aint to be use s)oul conr. to t)e

  • 7/25/2019 Lohia Repair Work

    71/150

    54

    55

    56

    5=

    58

    59

    6'

    61 >77?$ s#

    Analyse#ate

    7ro-iin an ,in ben of reuire eree *it) accessoor insertion rubber *as)er 3 .. t)ic+ bolts an nutsco.lete! 1'' .. ia an cast iron & as er

  • 7/25/2019 Lohia Repair Work

    72/150

    62

    4ra+d 5o6al

    7ay

    O

    $#2'1322!6

    7ro-iin an layin *ater roon treat.ent on roofs ofslabs by alyin ce.ent slurry .i,e *it) *ater roonce.ent co.oun consistin of alyin: a after surfacerearation rst layer of slurry of ce.ent @ '!488+s. .i,e *it) *ater roon ce.ent co.oun @'!253 +s.! b layin secon layer of ibre lass clot)*)en t)e rst layer is still reen! J-erlas of Eoints of bre

    clot) s)oul not be less t)an 1' c.! c t)ir layer of 1!5.. t)ic+ness consistin of slurry of ce.ent @ 1!289+s. .i,e *it) *ater roon ce.ent co.oun @'!6=' +s. an coarse san @ 1!289 +s.! )is *illbe allo*e to air cure for 4 )ours follo*e by *ater curinfor 48 )ours! )e entire reat.ent *ill be ta+en uto 3'c. on araet *all an tuc+e into roo-e in araet allaroun! fourt) an nal layer of bric+ tilin *it) ce.ent.ortar /*)ic) *ill be ai for searately! or t)e uroseof .easure.ent t)e entire treate surface *ill be.easure!

  • 7/25/2019 Lohia Repair Work

    73/150

    uantity

    Qty >nit #ate A.ount

    383!54 Cu. 159!3' 61'9=!92

    3=2!'' etre 2949!8' 1'9=325!6'

    8!'' "os 41918!9' 335351!2'

    8!'' "os 18939!3' 151514!4'

    6!'' "os 18939!3' 113635!8'

    4!'' "os 18939!3' =5=5=!2'

    )rk dk;kZy; $kou ds !)u;u dk dk;Z

  • 7/25/2019 Lohia Repair Work

    74/150

    14!'' "os =93!2' 111'4!8'

    35!6= Cu. 512'!'' 18263'!4'

    114!54 Cu. 6633!1' =59=55!2=

    152!25 Cu. 336!8' 512==!8'

    3'!83 Cu. 53=5!'' 165=11!25

    123!9' Cu. 5=95!'' =18'''!5'

    3'!'' Cu. 5965!'' 1=895'!''

  • 7/25/2019 Lohia Repair Work

    75/150

    386!92 Cu. =213!3' 2=9'9='!'4

    41=6!9' . 551!8' 23'4813!42

    289!43 Cu. 12=8!8' 3='123!'8

    264!'2 Cu. =4'!3' 195454!'1

    289!'' . 91!=' 265'1!3'

    86!=' Cu. 328!5' 2848'!95

    1115!11 . 29!'' 32338!19

    1'''!'' etre =!5' =5''!''

    12'1!81 . 21!5' 25838!92

    54'!'' etre 28!1' 151=4!''

  • 7/25/2019 Lohia Repair Work

    76/150

    99'!'' etre 168!=' 16='13!''

    235!2' . 486!=' 1144=1!84

    111!2' . 8'''!'' 8896''!''

    8==!98 Cu. =316!9' 6424'91!86

    254'!54 . 434!8' 11'4626!=9

    28'8!22 . 5'3!1' 1412815!48

    3=!99 Cu. 6592!8' 25'46'!4=

  • 7/25/2019 Lohia Repair Work

    77/150

    94!99 . 582!9' 55369!6=

    121!'' Cu. =693!3' 93'889!3'

    8'6!=2 . 1'94!3' 882=93!='

    364!2' . 3'98!6' 112851'!12

    1'828=!31 N 68!9' =46'995!66

  • 7/25/2019 Lohia Repair Work

    78/150

    59=5!'' . 161!6' 96556'!''

    =3!'' "os 95!4' 6964!2'

    =3!'' "os 632!=' 4618=!1'

    116!=' . ='''!'' 8169''!''

  • 7/25/2019 Lohia Repair Work

    79/150

    39'=!5' N =5!9' 2965=9!25

    232!'' etre 5'''!'' 116''''!''

    11'=2!56 . 45!'' 498265!2'

    11481!23 . 164!5' 1888662!34

    4=45!38 . 8!'' 3=963!'4

    1==!6' . =148!4' 1269555!84

    1596=!8= . 85!1' 1358865!=4

  • 7/25/2019 Lohia Repair Work

    80/150

    16211!69 . 1''!6' 163'896!'1

    5463!'3 . 8=!'' 4=5283!61

    1821!'1 . 45!'' 81945!45

    =28!4' . ='8!1' 515=8'!'4

    5''!'' . 98'!'' 49''''!''

    5''!'' . 6''!'' 3'''''!''

    6''!'' tr 518!5' 3111''!''

    5''!'' tr 966!8' 4834''!''

  • 7/25/2019 Lohia Repair Work

    81/150

    6'!'' "os 6'6!1' 36366!''

    25!'' "os 522!4' 13'6'!''

    25!'' "os 43'!=' 1'=6=!5'

    25!'' "os 311!'' ===5!''

    25!'' "os 8'=!'' 2'1=5!''

    3''!'' "os 16=!8' 5'34'!''

    2''!'' "os 3'4!4' 6'88'!''

    4''!'' Cu. 225!5' 9'2''!''

  • 7/25/2019 Lohia Repair Work

    82/150

    1926!55 . 38=!8' =4=116!'9

    ,8,9,#9

    ,8,9,#00

  • 7/25/2019 Lohia Repair Work

    83/150

    S.N. Ref.

    )

    2

    *

    :-

    DSR-2,)*-2.+.)

    DSR-2,)*-2,.2.)

    DSR-2,)*-2,.).2

    DSR-2,)*-

    .*.2

  • 7/25/2019 Lohia Repair Work

    84/150

    S.N. Ref.

  • 7/25/2019 Lohia Repair Work

    85/150

    S.N. Ref.

    +

    /

    (

    0

    DSR-2,)*-

    2,.+.).)

    DSR-2,)*-

    2,.+.).2

    DSR-2,)*-

    2,./.).)

    DSR-2,)*-2,.(.)

    DSR-2,)*-2,.0

  • 7/25/2019 Lohia Repair Work

    86/150

    S.N. Ref.

  • 7/25/2019 Lohia Repair Work

    87/150

    S.N. Ref.

    ),$)2

    DSR-2,)*-.*.)

    ))$)

    DSR-2,)*-.0.

    )2$)+

    DSR-2,)*-.0.2)

    )*$)/

    DSR-2,)*-.0.2,

    )$)(

    DSR-2,)*-.0.)/

    )$

    )0

    DSR-

    2,)*-.0.0

  • 7/25/2019 Lohia Repair Work

    88/150

    S.N. Ref.

  • 7/25/2019 Lohia Repair Work

    89/150

    S.N. Ref.

    )+$2,

    DSR-2,)*-.0.+

    1.0.)

    )/$2

    DSR-2,)*-2.2

    )($2

    DSR-2,)*-).*

  • 7/25/2019 Lohia Repair Work

    90/150

    S.N. Ref.

    )0$2+

    DSR-2,)*-)./.

  • 7/25/2019 Lohia Repair Work

    91/150

    S.N. Ref.

    2,$2/

    DSR-2,)*-).*,

    2)$2(

    DSR-2,)*-).2/

    22$20 DSR-2,)*-).2(.2

    2*$

    *,

    DSR-

    2,)*-).**

    2$*)

    DSR-2,)*-).)

    2$*2

    DSR-2,)*-

    ).2.2

  • 7/25/2019 Lohia Repair Work

    92/150

    S.N. Ref.

  • 7/25/2019 Lohia Repair Work

    93/150

    S.N. Ref.

    2+$**

    DSR-2,)*-

    )..)

    2/$*

    DSR-2,)*-)..)

    2!4@

    DSR-2,)*-

    )..)

    2@42

    DSR-2,)*-22.+

  • 7/25/2019 Lohia Repair Work

    94/150

    S.N. Ref.

  • 7/25/2019 Lohia Repair Work

    95/150

    Analysis >f Rates

    Description

    ate as per 9#-2.13-2001MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne Cu'

    ate as per 9#-2.13-2.0201MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne 4eter "ent5

    ate as per 9#-2.13-2.0102MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne 4eter "ent5

    ate as per 9#-2.13-$0302MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    0i0 yksd fuekZ#k fo$kk% ds ie&k (f$k;)rk dk;kZy; $kou ds !)

    5art) wor+ in e&ca%ation by mec)anical means ',ydraulic e&ca%ator( 4 manualmeans o%er areas 'e&ceeding 3.cm in dept)0 10$ m in widt) as well as 1. s?m onplan( including disposal of e&ca%ated eart) lead upto $. m and lift upto 10$mdisposed eart) to be le%elled and neatly dressed0All +inds of soil0 9#-2.13-2001

    Boring pro%iding and installing bored cast-in-situ reinforced cement concrete pilesof grade 7-2$ of specified diameter and lengt) below t)e pile cap to carry a safewor+ing load not less t)an specified e&cluding t)e cost of steel reinforcement butincluding t)e cost of boring wit) bentonite solution and temporary casing ofappropriate lengt) for setting out and remo%al of same and t)e lengt) of t)e pile tobe embedded in t)e pile cap etc0 all complete including remo%al of e&ca%ated eart)wit) all lifts and leads 'Lengt) of pile for payment s)all be measured upto bottom ofpile cap( 3.. mm dia pile 9#-2.13-2.0201

    Pro%iding dri%ing and installing dri%en cast-in-situ reinforced cement concrete pilesof grade 7-2$ of specified diameter and lengt) below t)e pile cap to carry safewor+ing load not less t)an specified e&cluding t)e cost of steel reinforcement butincluding t)e cost of s)oe and t)e lengt) of pile to be embedded in t)e pile cap etc0all complete0 'Lengt) of pile for payment s)all be measured from top of s)oe to t)ebottom of pile cap( :$. mm dia piles0 9#-2.13-2.0102

    5&tra for pro%iding ric)er mi&es at all floor le%els0 Pro%iding 7-3$ grade concreteinstead of 7-2$ grade B7"4 7"0 'ote : "ement content considered in 7-3$ is >

    3$. +g4cum( 9#-2.13-$0302

  • 7/25/2019 Lohia Repair Work

    96/150

    Description

    !otal Rate ?or >ne Cu'

  • 7/25/2019 Lohia Repair Work

    97/150

    Description

    ate as per 9#-2.13-2.00101MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne Pile

    ate as per 9#-2.13-2.00102MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne Pile

    ate as per 9#-2.13-2.00101MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne Pile

    ate as per 9#-2.13-2.0!01MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne Pile

    ate as per 9#-2.13-2.0@MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    Hertical load testing of piles in accordance wit) I# 2@11 'Part IH( includinginstallation of loading platform and preparation of pile )ead or construction of testcap and dismantling of test cap after test etc0 complete as per specification C t)edirection of 5ngineer in-c)arge0 #ingle pile upto $. tonne capacity Initial test0 9#-2.13-2.00101

    Hertical load testing of piles in accordance wit) I# 2@11 'Part IH( includinginstallation of loading platform and preparation of pile )ead or construction of testcap and dismantling of test cap after test etc0 complete as per specification C t)edirection of 5ngineer in-c)arge0 #ingle pile upto $. tonne capacity outine test09#-2.13-2.00102

    "yclic %ertical load testing of pile in accordance wit) I# "ode of practice I#: 2@11'part IH( including preparation of pile )ead etc for0#ingle pile Dpto $. tonnecapacity pile0 9#-2.13-2.00101

    Lateral load testing of single pile in accordance wit) I# "ode of practice I# : 2@11'Part IH( for determining safe allowable lateral load on pile : Dpto $. tonne capacitypile0 9#-2.13-2.0!01

    Integrity testing of Pile using Low #train4 #onic Integrity Test4 #onic 5c)o Testmet)od in accordance wit) I# 1!@3 including surface preparation of pile top byremo%ing soil mud dust C c)ipping lean concrete lumps etc0 and use ofcomputerised e?uipment and )ig) s+ill trained personal for conducting t)e test Csubmission of results all complete as per direction of 5ngineer-in-c)arge0 9#-

    2.13-2.0@

  • 7/25/2019 Lohia Repair Work

    98/150

    Description

    !otal

    !otal Rate ?or >ne Pile

  • 7/25/2019 Lohia Repair Work

    99/150

    Description

    ate as per 9#-2.13-$0301MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal!otal Rate ?or >ne Cu'

    ate as per 9#-2.13-$0@0$MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne S'

    ate as per 9#-2.13-$0@021MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne S'

    ate as per 9#[email protected] "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne S'

    ate as per 9#-2.13-$0@01MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne S'

    ate as per 9#-2.13-$0@0@MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    5&tra for pro%iding ric)er mi&es at all floor le%els0 Pro%iding 7-3. grade concreteinstead of 7-2$ grade B7"4 7"0 'ote:- "ement content considered in 7-3. is >3.+g4cum( 9#-2.13-$0301

    "entering and s)uttering including strutting propping etc0 and remo%al of form for:Lintels beams plint) beams girders bressumers and cantile%ers0 9#-2.13-$0@0$

    "entering and s)uttering including strutting propping etc0 and remo%al of same forLintels beams plint) beams girders bressumers and cantile%ers0 wit) water proofply 12 mm t)ic+0 9#-2.13-$0@021

    "entering and s)uttering including strutting propping etc0 and remo%al of form for#uspended floors roofs landings balconies and access platform0 wit) water proofply 12 mm t)ic+0 9#-2.13-$0@02.

    "entering and s)uttering including strutting propping etc0 and remo%al of form for"ornices and mouldings0 9#-2.13-$0@01

    "entering and s)uttering including strutting propping etc0 and remo%al of form forArc)es domes %aults up to m span0 9#-2.13-$0@0@

  • 7/25/2019 Lohia Repair Work

    100/150

    Description

    !otal Rate ?or >ne S'

  • 7/25/2019 Lohia Repair Work

    101/150

    Description

    ate as per 9#-2.13-$0@0

  • 7/25/2019 Lohia Repair Work

    102/150

    Description

    ate as per 9#-2.13-1$00MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal!otal Rate ?or >ne Cu'

    9emolis)ing bric+ wor+ manually4 by mec)anical means including stac+ing ofser%iceable material and disposal of unser%iceable material wit)in $. metres leadas per direction of 5ngineer-in-c)arge0 9#-2.13-1$00

  • 7/25/2019 Lohia Repair Work

    103/150

    Description

    ate as per 9#-2.13-1$03.MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne Cu'

    ate as per 9#-2.13-1$02MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne Cu'

    ate as per 9#-2.13-1$02!02MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne S'

    ate as per 9#-2.13-1$033MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne 4eter "ent5

    ate as per 9#-2.13-1$01MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne S'

    ate as per 9#-2.13-1$0202MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne 4eter "ent5

    9ismantling ac+ arc) roofing and floors including stac+ing of ser%iceable materialand disposal of unser%iceable material wit)in $. metres lead0 9#-2.13-1$03.

    9emolis)ing mud p)as+a in terracing and disposal of material wit)in $. metreslead0 9#-2.13-1$02

    9ismantling roofing including ridges )ips %alleys and gutters etc0 and stac+ing t)ematerial wit)in $. metres lead of :Asbestos s)eet0 9#-2.13-1$02!02

    9ismantling wooden ballies in posts and struts including stac+ing wit)in $. metres

    lead0 9#-2.13-1$033

    9ismantling cement asbestos or ot)er )ard board ceiling or partition walls includingstac+ing of ser%iceable materials and disposal of unser%iceable materials wit)in $.

    metres lead0 9#-2.13-1$01

    9ismantling "0I0 or asbestos rain water pipe wit) fittings and clamps includingstac+ing t)e material wit)in $. metres lead :1.. mm dia pipe0 9#-2.13-1$0202

  • 7/25/2019 Lohia Repair Work

    104/150

    Description

  • 7/25/2019 Lohia Repair Work

    105/150

    Description

    ate as per 9#-2.13-1$0$01MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne 4eter "ent5

    ate as per 9#-2.13-1001MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne S'

    ate as per 9#-2.13-10$01MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne S'

    ate as per 9#-2.13-220MAdd "ost Inde& 'Time Inde&-$= and 9istance Inde& for Luc+now-10410.

    !otal

    !otal Rate ?or >ne S'

    9ismantling "0I0 pipes including e&ca%ation and refilling trenc)es after ta+ing out t)epipes manually4 by mec)anical means brea+ing lead caul+ed oints melting of leadand ma+ing into bloc+s including stac+ing of pipes C lead at site wit)in $. metrelead as per direction of 5ngineer-in-c)arge:Dp to 1$. mm diameter0 9#-2.13-1$0$01

    7a+ing t)e opening in bric+ masonry including dismantling in floor or walls bycutting masonry and ma+ing good t)e damages to walls flooring and ambscomplete to matc) e&isting surface i4c disposal of mulba4 rubbis) to t)e nearestmunicipal dumping ground0*or door4 window4 clerestory window0 9#-2.13-1001

    enewing glass panes wit) putty and nails w)ere%er necessary including rac+ingout t)e old putty:*loat glass panes of t)ic+ness mm0 9#-2.13-10$01

    Pro%iding and laying water proofing treatment on roofs of slabs by applying cement slurry mi&ed wit) waterproofing cement compound consisting of applying: a( after surface preparation first layer of slurry ofcement > .0!! +g4s?m mi&ed wit) water proofing cement compound > .02$3 +g4s?m0 b( laying secondlayer of *ibre glass clot) w)en t)e first layer is still green0 E%erlaps of oints of fibre clot) s)ould not be

    less t)an 1. cm0 c( t)ird layer of 10$ mm t)ic+ness consisting of slurry of cement > 102!@ +g4s?m mi&edwit) water proofing cement compound > .0. +g4s?m and coarse sand > 102!@ +g4s?m0 T)is will beallowed to air cure for )ours followed by water curing for ! )ours0 T)e entire reatment will be ta+enupto 3. cm on parapet wall and tuc+ed into groo%e in parapet all around0 d( fourt) and final layer of bric+tiling wit) cement mortar 'w)ic) will be paid for separately0 *or t)e purpose of measurement t)e entiretreated surface will be measured0 9#-2.13-220

  • 7/25/2019 Lohia Repair Work

    106/150

    Description

    /unior 5ngineer Assistant 5ngineer 5&ecuti%e 5ngineer

    7aint09i%ision 1"i%il

    P0;090 Luc+now

  • 7/25/2019 Lohia Repair Work

    107/150

    Rate

    10$.

    120$

    )0.2

    )0.2

    120$

    120.)(./0

    )(.(,

    22103.

    1@0!

    2(.)/

    2(.2,

    12!03$

    1101

    )*0.2

    ;u dk dk;Z

  • 7/25/2019 Lohia Repair Work

    108/150

    Rate

    )*0.,

    Cont.

  • 7/25/2019 Lohia Repair Work

    109/150

    Rate

    3!$10!.33$01

    )0)(.0

    )0)(.0,

    1220$.

    1$10!

    )(0*0.2(

    )(0*0.*,

    1220$.

    1$10!

    )(0*0.2(

    )(0*0.*,

    1220$.

    1$10!

    )(0*0.2(

    )(0*0.*,

    2@0$

    30$2

  • 7/25/2019 Lohia Repair Work

    110/150

    Rate

    /0*.)/

    /0*.2,

    Cont.

  • 7/25/2019 Lohia Repair Work

    111/150

    Rate

    01$

    $0$!

    +0./*+0./,

    3.@0!.

    20@

    **+.//

    **+.(,

    ..0..

    30!2

    *.(2

    *.(,

    20!$

    .03.

    ,*.)

    ,*.),

    $302.

    0!

    (2.((

    (2.0,

    1..0$

    !0

    ),0.20

  • 7/25/2019 Lohia Repair Work

    112/150

    Rate

    ),0.*,

    Cont.

  • 7/25/2019 Lohia Repair Work

    113/150

    Rate

    $.0.

    01@)./0

    ).(,

    1!0$

    120@

    )+).0

    )+).+,

    110.

    1.202

    )2/(.(2

    )2/(.(,

  • 7/25/2019 Lohia Repair Work

    114/150

    Rate

    !10..

    $@02@

    /,.20/,.*,

    Cont.

  • 7/25/2019 Lohia Repair Work

    115/150

    Rate

    !0.

    03$

    0)./

    0)./,

    3.201$

    203.

    *2(.

    *2(.,

    20.

    2032

    20.,2

    20.,,

    0@.

    .0.

    /.,

    /.,

    1@0!.

    102

    2).2

    2).,

    2$0!$

    202$

    2(.),

    2(.),

  • 7/25/2019 Lohia Repair Work

    116/150

    Rate

    Cont.

  • 7/25/2019 Lohia Repair Work

    117/150

    Rate

    1$$02.

    130$1

    )+(./)

    )+(./,

    0.

    3!0@$

    (+.*

    (+.,

    $10.

    $01

    /,(.))

    /,(.),

    3$0$

    310.

    *(/.()

    *(/.(,

  • 7/25/2019 Lohia Repair Work

    118/150

    Rate

  • 7/25/2019 Lohia Repair Work

    119/150

    Rate Analysis

    Reference fro' CP#D Analysis of rate - 2,)*7 @ol-7 te' No.-.*/.)7 Pa9e No.-22

    l!"o! $escrition >nit Quantity #ate

    $etails of Cost for : 1!'' Cu.

    M5E:L7nit Quantity #ate

    $etails of Cost for : 1!'' .

    M5E:L7+e 7&!< :s 8-BB#,0

    Reference fro' CP#D Analysis of rate - 2,)*7 @ol-7 te' No.-0.)

    Sl.No. Description nit Qty Rate

    7aterial :-

    #al wood 1. cudm 3!0.. $2.0..

    Labour :-

    Carenter /a-erae 9ay '!=2 32@0..

    Beldar 9ay '!'= 2120..

    Total M

    Add water c)arges > 1=

    Total M

    Add for contractorJs proffit and o%er)eads >1$=

    "ost of .0.3 cum

    Rate per Cu'

    te'No.-*$*

    Pro;iin9 an fiin9 stone Eali , '' t5ic6 t5rou95out in ce'ent 'ortar ):pointin9 in 5ite ce'ent 'ortar ):2 ) 5ite ce'ent : 2 stone ust3 it5 an as5ae7 Eali slab it5out any c5a'fers etc. #5ite 'arbale stone.

    te'No.-$*+

    Supply an fiin9 Saloo rou95t fra'e an fie incluin9 si'ple 'oulincluin9 supply of all 'aterials7 labour7 !&P etc. reuire for proper co'pletio

    9etails of cost for c)ow+)at of a door2.0$&110$cm0

    2&2.0$&@0$&0.cm M.0.2!cum 1=

    Total M

    Add for contractorJs proffit and o%er)eads >1$=

    Cost of 2.)+ s'

    Rate of ) S' S5utter

    7ay :s *,+.,, per

    te'No.-$*/

    Pro;iin9 an fiin9 9lae s5utters for oors7 inos an clerestory inincluin9 S 'ar6e stainless steel butt 5in9es of reuire sie it5 necessaryt5ic6

    #tyles : &2..&@0$&30$cm M .0.2cum ails:Top C intermediate rails2&11.0$&@0$&30$cm M .0..!cumLoc+ and bottom rails2&11.0$&l@0&30$cm M .0.1$cumBeadings:2&1!01&10@&102cm M .0..1cum& 110.& 10@& 102cm M .0..2cum0

    Total M .0.$3 cum0Add for wastage > 1.= M .0..$cum08rand Total M .0.$! cum M $! cudm

    #tainless steel butt )inges ')ea%yweig)t( 1. n

    1..&.&20$ mm I# : 12!1 mar+ed

    #tainless steel butt )inges $.&3&10$ mm I#:1.12!1 mar+ed

  • 7/25/2019 Lohia Repair Work

    123/150

    Reference fro' CP#D Analysis of rate - 2,)*7 @ol-7 te' No.-).Sl.No. Description nit Qty Rate

    Details of cost for eac5.

    "abour :-

    4ason bric6 layer3 2n class 9ay '!1' 2!0..

    Belar 9ay '!18 2120..

    Blac+s.it) 2n class 9ay '!'5 3120..

    unries L0#0 1!43 10

    5o6al

    A *ater c)ares @ 1%

    otal P

    "ost of 5ac)

    $e+De :a6e =er o

    Reference fro' CP#D Analysis of rate - 2,)*7 @ol-7 te' No

    Sl.No. Description nit Qty Rate

    Details of cost for one no

    4aterial :-

    cu. '!'21 22!0$.

    cu. '!''=2 2'=9!5'

    Coarse san cu. '!'141 161=!6'

    "ement onne '!''66 1..0..

    Belar 9ay '!'2= 2120..

    Coolie 9ay '!'195 2120..

    istry 9ay '!''84 3!0..

    ason /bric+ layer 1 st class 9ay '!''18 3120..

    ason /bric+ layer 2n class 9ay '!''18 2!0..

    ate 9ay '!''12 22!0..

    #caffolding L!! 1!43 10

    L!! '!=8 10

    #undries L!! '!39 10

    "ement mortar 1: '1 cement: "oarse sand( cu. '!'1 3438!49

    "ement concrete 1:2: filled in c)ase cut L!! 24!18 10

    9isposal of mulba L!! 1!82 10ason 9ay '!5' 3120..

    Belar 9ay '!=5 2120..

    #undries L!! 2!=3 10

    te'No.-+$*(

    Dis'antlin9 oors7 inos an clerestory inos steel or oo3 s5utter ietc. co'plete an stac6in9 it5in , 'etres lea. >f area * s. 'etres an belo

    A for contractorKs rot an o-er)eas@15%

    te'No.-/$*0

    ?iin9 c5o65ats in eistin9 openin9 incluin9 e'bein9 c5o65ats in floors or alls cuttin9 'asonrybloc6s of sie ) ), ), c'7 it5 ce'ent concrete ):*:+ ) ce'ent : * coarse san : + 9rae stonea'a9es to alls an floors as reuire co'plete7 incluin9 isposal of rubbis5 to t5e u'pin9 9roun

    tone Areate /inle sie : 2' ..no.inal sie

    tone Areate /inle sie : 1' .. no.inalsie

    ,ire and running c)arges of mec)anicalmi&er

  • 7/25/2019 Lohia Repair Work

    124/150

    otal P

    A *ater c)ares @ 1%

    otal P

    Cost of ) No

    ay #s +*2./, per No

    A for contractorKs rot an o-er)eas@15%

  • 7/25/2019 Lohia Repair Work

    125/150

    Reference fro' CP#D Analysis of rate - 2,)*7 @ol-7 te' No.

    Sl.No. Description nit Qty RateDetail of cost for ), s'

    4aterial :-

    "ement mortar 1: '1 cement : coarse sand( "um .012 )0/.+0

    "abour :-

    7ason 'a%erage( 9ay .0!. 2@!0..

    "oolie 9ay .0!! 2120..

    B)isti 9ay .0@@ 2$.0..

    #caffolding C #undries L0#0 1201 10

    Total M

    Add water c)arges > 1=

    Total M

    Add for contractorJs proffit and o%er)eads >1$=

    Cost of ), S' Total M

    Cost of >ne S'

    ay #s )+., per s'

    Reference fro' CP#D Analysis of rate - 2,)*7 @ol-7 te' No.Sl.No. Description nit Qty Rate

    Details of cost for ).,, s'

    4aterial :-

    la+)a red 'polis)ed( in big slab 1! '

  • 7/25/2019 Lohia Repair Work

    126/150

    Blac+s.it) 1 st class a 9ay '!2= 3120..caHolin L0#0 26!91 10

    5o6al

    A *ater c)ares @ 1%

    5o6al

    Cost of ) S'

    A for contractorKs rot an o-er)eas@15%

  • 7/25/2019 Lohia Repair Work

    127/150

    Reference fro' CP#D Analysis of rate - 2,)*7 @ol-7 te' N

    Sl.No. Description nit Qty Rate

    9etails of cost for 1. s?m

    7aterial :-

    ;)ite cement based putty g 10$! 2@02$

    Labour :-

    ason 9ay '!45 3120..

    Beldar 9ay '!45 2120..

    caHolin an sunries L!! 4'!'' 10

    otalA *ater c)ares @ 1%

    otal

    "ost of 1$ #?m

    Rate per S'

    Reference fro' CP#D Analysis of rate - 2,)*7 @ol-7 te' No.

    Sl.No. Description nit Qty Rate

    9etails of cost for 1. s?m

    7aterial :-

    litre 103 310..

    5&terior primer g 202. .0..

    Labour :-

    7ainter 9ay '!6' 3120..

    "oolie 9ay '!3' 2120..B)isti 9ay '!'5 2$.0..

    Brus)es san aer etc! L!! =!15 10

    unries L!! 8!'6 10

    otal

    A *ater c)ares @ 1%

    otal

    "ost of 1. #?m

    Rate per S'Say

    te'No.-),$

    Pro;iin9 an applyin9 5ite ce'ent base putty of a;era9e t5ic6ness ) ''7 ot5e plastere all surface to prepare t5e surface e;en an s'oot5 co'plete.

    1.&.0..1&12@ M 102@+gAdd 2= wastageM .02@+gTotal M 10$!+g#ay 10$! +g

    A for contractorKs rot an o-er)eas@15%

    te'No.-))$

    ?inis5in9 alls it5 Pre'iu' Acrylic S'oot5 eterior paint it5 Silicone aiti'ore coats applie < ).* ltr$ ), s' o;er an incluin9 pri'in9 coat of eterio

    Premium Acrylic #moot) e&terior paint wit) #iliconeadditi%es

    A for contractorKs rot an o-er)eas@15%

  • 7/25/2019 Lohia Repair Work

    128/150

    Reference fro' Satnar Data Boo6 4>R!% te'

    Sr No Description Unit Quantity Rate Rs

    Unit = Sq m

    Taking output = 1 sqm

    Assuming thickness 25 mm

    a) Material

    Cement kg 16.00 5.84

    Graded sand cum 0.04 1617.60

    Wire mesh 50mm x 50mm size o !mm "ire kg 2.00 75.#0

    $%ox& kg 0.67 554.40

    kg 0.64 4!.48

    b) Labour

    'ate da& 0.01 228.00

    'ason da& 0.04 !12.00

    'azdoor da& 0.14 212.00

    c) Machineryhour 0.10 850.00

    (ota) *

    e) Contractor's profit @ input on (a+b+c+)

    Rate per s!" # (a+b+c++e)

    say

    te'No.-)2$,

    Gunitin9 concrete surface it5 ce'ent 'ortar applie it5 co'pressor after clit5 epoy co'plete as per !ec5nical Specification

    Acce)erator com%ound or guniting + 4 %er cent o"eight o cement

    Add 2 %er cent o cost o materia) ormisce))aneous consuma,)es )ike nozz)es- "ire,rush- cotton "aste etc.

    Com%ressor "ith guniting eui%ment a)ong "ithaccessories

  • 7/25/2019 Lohia Repair Work

    129/150

    Reference fro' Satnar Data Boo6 4>R!% te' No.-)+.-2(,+

    $%&

    poy *rout

    Unit = kg

    Taking output = 0.50 kg

    a) Material

    $%ox& inc)uding 10 %er cent "astage kg 0.55 554.40

    b) Labour

    'ate da& 0.08 228.00

    'azdoor /ki))ed da& 0.10 216.00

    'azdoor da& 0.10 212.00

    c) Machinery

    Grout %um% "ith agitator and accessories hour 0.10 #50.00

    (ota) *

    ) Contractor's profit an ,er hea

    Rate per -. # (a+b+c+)say

    te'No.-)*$)

    Sealin9 of crac6s$porous concrete by inEection process t5rou95 nipples$GroutinSpecification. poy 9rout

    Sealin. of crac-s/porous concrete by in0ection process

    throu.h nipples/*routin. co"plete as per 1echnicalSpecification&

    Admixtures /anti shrinkage com%ound + 20 %ercent o cost o e%ox&

  • 7/25/2019 Lohia Repair Work

    130/150

    *

    A.ount #ate Coe #e.ar+

    13'3!88

    ## #ate582!26

    68=!48

    192=!2' 7?$ #

    68!16 =318

    38'!4= '''4

    326!1' ''29

    163!'6 '''9

    5'!667?$ #424!''

    225!''

    24!=3 ''12

    22!88 9999

    6185!88

    61!86

    624=!=4

    93=!16

    =184!9'

    ent concrete or67 usin9 ce'ent content asorte to site of or6 in transit 'ier for all9rae for reinforce ce'ent concrete or67

    cost of centerin97 s5utterin9 finis5in9 an),* to accelerate$ retar settin9 of concrete79ineer - in - c5ar9e. Note :- Ce'ent content

    is payable$reco;erable separately3. All or6s

  • 7/25/2019 Lohia Repair Work

    131/150

    A.ount Rate Coe Re'ar6

    13'3!88

    ## #ate582!26

    68=!48

    192=!2' 7?$ #

    68!16 =318

    38'!4= '''4

    326!1' ''29

    163!'6 '''9

    5'!66

    7?$ #424!''

    225!''

    24!=3 ''1222!88 9999

    398!56 7?$ #

    6584!44

    65!84

    665'!28

    99=!54

    =64=!82

    e ce'ent concrete or67 usin9 ce'entplant an transporte to site of or6 in

    s per 'i esi9n of specifie 9rae forer to site of layin9 7 ecluin9 t5e cost ofin reco''ene proportions as per S :

    'pairin9 stren9t5 an urability as pert5is ite' is < **, 69$cu'. cess$less;e plint5 le;el upto floor @ le;el.

  • 7/25/2019 Lohia Repair Work

    132/150

    /

    A.ount Rate Coe Re'ar6

    243=!6' ar+et #ate

    36'6!8'

    >77?$ #

    1=91!4'

    142!'8 9999

    =9==!88

    =9!=8

    8'5=!66

    12'8!65

    9266!31

    .27 Pa9e No.-**

    Cost Rate Coe Re'ar6

    1@0.. 9# 2.13-Item-11@@

    230!! DPP;9 #00

    10!

    22202

    2202!

    22$.0..

    33=!5'

    2$!0$.

    /)(/.0,

    ) ce'ent : * coarse san37 incluin9'iture of pi9'ent7 'atc5in9 t5e stone

    in9 strai95t or6 as in C5au65at fra'eof or6.

  • 7/25/2019 Lohia Repair Work

    133/150

    -0.0.).)7 Pa9e No.-*+*

    Cost Rate Coe Re'ar6

    2.$0.. 9# -2.13-11@.

    3@02$ DPP;9 #00

    10.. 9# -2.13-!22.

    20.. 9# -2.13-!21!

    @0.. 9# -2.13-!211

    !0.. 9# -2.1-!21

    $.0@ DPP;9 #0$032

    1302

    101 @@@@

    $@!0@3

    $0@@

    $$$0@2

    !303@

    ++)0.*,

    *,+.0

    S'

    s usin9 '' t5ic6 float 9lass panesscres. Secon class tea6 oo. * ''

  • 7/25/2019 Lohia Repair Work

    134/150

    2.)7 Pa9e No.-(+/Cost Rate Coe Re'ar6

    28!4'

    DPP;9 #0038!16

    15!6'

    2!52 @@@@

    A-#,B

    '!82

    82!98

    12!45@$03

    89#0

    .-).2.)7 Pa9e No.-/0(

    Cost Rate Coe Re'ar6

    48!'4## #ate

    14!9=## #ate

    22!81

    4'!26 9999

    5!=2

    4!13

    2!92

    '!56

    '!51

    '!2=

    2!52 9999

    1!3= 9999

    '!69 9999

    34!38

    42!56 9999

    3!2' 9999156!''

    159!''

    4!8' 9999

    cluin9 c5o65ats7 arc5itra;e7 5olfasts.

    or 5olfasts7 e'bein9 5ol fasts in ce'ent concretea99re9ate 2, '' no'inal sie3 an 'a6in9 9oo t5e

    it5in , 'eters lea : Door c5o65ats

  • 7/25/2019 Lohia Repair Work

    135/150

    544!=3

    5!45

    55'!18

    82!53+*2./,

  • 7/25/2019 Lohia Repair Work

    136/150

    -)*..)37 Pa9e No.-/,

    Cost Rate Coe Re'ar6

    220.. Analysed rate

    23!0.

    DPP;9 #001!0$

    20$.

    2201@ @@@@

    110

    101

    13.0!2

    2102

    1$0$

    )+.,

    -(.).).27 Pa9e No.-*,Cost Rate Coe Re'ar6

    $..0..7ar+et ate

    103!Analysed rate

    210$2

    218!42

    DPP;9 #00144!=2

    142!'4142!'4

    16=!5'

    =5!24

    r interior plasterin9 upto floor to le;el(, ''. in 9irt5 an finis5e e;en an

    an 'ac5ine cut3 of t5ic6ness )( 1$-23era9e in ce'ent 'ortar ):* ) ce'ent : *

    t : 2 'arble ust3 it5 an a'iture ofns of cra'ps7 5ic5 s5all be pai for

  • 7/25/2019 Lohia Repair Work

    137/150

  • 7/25/2019 Lohia Repair Work

    138/150

    .-)*.(,7 Pa9e No.-/(0

    Cost Rate Coe Re'ar6

    20 7ar+et ate

    14'!4'DPP;9 #00

    95!4'

    ='!4' 9999

    =32!6==!33

    =39!99

    111!''!$.0@@

    (.),

    -)*./.)7 Pa9e No.-/+/

    Cost Rate Coe Re'ar6

    !03 7ar+et ate

    !!0.. .!.@

    18=!2'

    DPP;9 #0063!6'12!5'

    12!58 9999

    14!19 9999

    865!='

    8!66

    8=4!36

    131!151..$0$1

    ),,.),,.+,

    f appro;e bran an 'anufacturer7 o;er

    ;es of reuire s5ae:Ne or6 !o orr pri'er applie < 2.2, 69$ ), s'3

  • 7/25/2019 Lohia Repair Work

    139/150

    o.-)+.0-2(,/

    Cost Rs Re"ar-s/ 2nput ref&

    #!.44 W3

    64.70 ' ate

    151.80 W3

    !71.45 3201!8682

    27.8! 3201!7254

    14.18

    2.28 W3

    12.48

    2#.68

    85.00 'arket ate

    852.84

    127.#!

    #80.77

    980.00

    anin9 surface an sprayin9

  • 7/25/2019 Lohia Repair Work

    140/150

    !04.#2 3201!8682

    60.#8

    18.24

    W3 21.60

    21.20

    #5.00 'arket rate

    521.#4

    78.2#

    600.24600.00

    9 co'plete as per !ec5nical

  • 7/25/2019 Lohia Repair Work

    141/150

    B"" >? QAN!!H

    Date of Callin9 !ener : )+-,/-2,) @aliity Perio : 0, D

    Date of >penin9 !ener : ,-,(-2,) !i'e of co'pletion :

    Cost of !ener : Rs /.,, 1 @at 1 Rs. ,,.,, arnest 4oney : *+,,

    Sl. No. te' of or6 Qty. nit

    1 8''!'' .

    2 8''!'' .

    3 1'''!'' .

    855AL "E9ITIE

    1 All t)e wor+ s)all be carried out as per latest P0;090 specifications and as per instructions of engineer-in-c)arge0

    2HAT4Trade Ta& and Income Ta& labour cess s)all be deducted as per rule0

    3 T1 T2 form will be t)e part of t)e agreement

    $ 5ac) tender s)ould accompany general stamp of s0 1..4- along wit) 14- re%enue stamp pasted on enclosed preforma

    "onditional tender are liable to be reected0

    Any reco%ery purposed byT0A0" any time will be deducted from contractor bill0

    #it

    ame of ;or+ :-+?' E+e eu+sE y+sfR+ E+;S)R fof+ foKofoT+yR ic+.!S)o+?y ) eE(er + +RUA

    9ismantling precast concrete or stone slabs in walls partition walls etc0 includingstac+ing wit)in $. metres lead : T)ic+ness up to . mm

    #tone wor+ ' mac)ine cut edges %eneer wor+( for wall lining upto 1. m )eig)t bac+ingfilled wit) a grout of 12 mm t)ic+ cement mortar 1:3 '1 "ement : 3 coarse sand( andointed wit) "ement mortar 1:2 '1 cement : 2 stone dust( including rubbing andpolis)ing complete0 'To be secured to t)e bac+ing and t)e sides by means of crampsand pins w)ic) s)all be paid for separately( /aisalmer yellow stone slabs e&posed facedressed and rubbed 1$ '

  • 7/25/2019 Lohia Repair Work

    142/150

    Si9. of >fficer Si9. of >fficer Si9. of >fficer Si9. of >fficer

    Callin9 >penin9 Reco''enin9 Acceptin9

    !ener !ener !ener !ener

  • 7/25/2019 Lohia Repair Work

    143/150

    ys

    4ont5

    ,.,,

    Rate A'ount

    1'=!55 86'4'!''

    42=5!'' 342''''!''

    159!9' 1599''!''

    !otal *++0,.,,

    nd duly signed by contractor0

    i9. of Contractor

    na'e an Aress

    ElE s

    claim or compensation s)all be

    -a+s esa %

    mailto:eS@mijksDr%20fcy%20vkWQ%20DokfUVVh%20esa%20vafdr%20njksa%20ij%20njksa%20ls%20----------------------------------vadks%20esa%20%25%20-------------------------------izfr'kr%20%C2%BC'kCnks%C2%BDmailto:eS@mijksDr%20fcy%20vkWQ%20DokfUVVh%20esa%20vafdr%20njksa%20ij%20njksa%20ls%20----------------------------------vadks%20esa%20%25%20-------------------------------izfr'kr%20%C2%BC'kCnks%C2%BD
  • 7/25/2019 Lohia Repair Work

    144/150

  • 7/25/2019 Lohia Repair Work

    145/150

    B"" >? QAN!!H

    Date of Callin9 !ener : )+-,/-2,) @aliity Perio : 0, D

    Date of >penin9 !ener : ,-,(-2,) !i'e of co'pletion :

    Cost of !ener : Rs /.,, 1 @at 1 Rs. ,,.,, arnest 4oney : 2(,,

    Sl. No. te' of or6 Qty. nit

    1 18'!'' .

    2 18'!'' .

    3 2$. #?m

    4 1 "um

    5 1 #?m

    6 2 #?m

    = 1@0! "um

    ame of ;or+ :-+?' E+e eu+sE y+sfR+ E+;S)R fof+ foKofoT+yR ifElEL+y+sa ) eE(er + +RUA

    9ismantling precast concrete or stone slabs in walls partition walls etc0 includingstac+ing wit)in $. metres lead : T)ic+ness up to . mm

    #tone wor+ ' mac)ine cut edges %eneer wor+( for wall lining upto 1. m )eig)t bac+ingfilled wit) a grout of 12 mm t)ic+ cement mortar 1:3 '1 "ement : 3 coarse sand( andointed wit) "ement mortar 1:2 '1 cement : 2 stone dust( including rubbing andpolis)ing complete0 'To be secured to t)e bac+ing and t)e sides by means of crampsand pins w)ic) s)all be paid for separately( /aisalmer yellow stone slabs e&posed facedressed and rubbed 1$ '

  • 7/25/2019 Lohia Repair Work

    146/150

    Sl. No. te' of or6 Qty. nit

    8 1. 7etre

    9 32 #?m

    1' #?m

    11 !. #?m

    12 $$. g

    13 1 #?m

    14 @.. #?m

    15 $3 "um

    855AL "E9ITIE

    1 All t)e wor+ s)all be carried out as per latest P0;090 specifications and as per instructions of engineer-in-c)arge0

    2 HAT4Trade Ta& and Income Ta& labour cess s)all be deducted as per rule03

    T1 T2 form will be t)e part of t)e agreement

    $ 5ac) tender s)ould accompany general stamp of s0 1..4- along wit) 14- re%enue stamp pasted on enclosed preforma

    #upply and fi&ing ,and rail and Balustrade modular system passi%e ##-3. gradedecorati%e ailing system comprising of )and rail $.mm and 10$ mm t)ic+ and 3 o0)ori6ontal steel pipe of 1@ mm dia and 10$mm t)ic+ of e?ual spacing wit) Balustrade of## pipe of 3! mm and 10$mm t)ic+ > 12.. mm "4" of passi%ated and finis) t)esurface good and co%ering wit) steel s)oe wit) all %isible stainless steel metel of 3.grade in stain finis) )ig)t of railing is @.. mm as per detailed specification attac)edwit) P"0

    Pro%iding and fi&ing La+) red colour granite 'polis)ed( in big slab 1! '

  • 7/25/2019 Lohia Repair Work

    147/150

    Sl. No. te' of or6 Qty. nit

    "onditional tender are liable to be reected0

    Any reco%ery purposed byT0A0" any time will be deducted from contractor bill0

    #it

    Si9. of >fficer Si9. of >fficer Si9. of >fficer Si9. of >fficer

    Callin9 >penin9 Reco''enin9 Acceptin9

    !ener !ener !ener !ener

    [email protected]+s$r fcy -+?Q $o+f>;;) esa -afr nE+sa iE nE+sa ls

    mailto:eS@mijksDr%20fcy%20vkWQ%20DokfUVVh%20esa%20vafdr%20njksa%20ij%20njksa%20ls%20----------------------------------vadks%20esa%20%25%20-------------------------------izfr'kr%20%C2%BC'kCnks%C2%BDmailto:eS@mijksDr%20fcy%20vkWQ%20DokfUVVh%20esa%20vafdr%20njksa%20ij%20njksa%20ls%20----------------------------------vadks%20esa%20%25%20-------------------------------izfr'kr%20%C2%BC'kCnks%C2%BD
  • 7/25/2019 Lohia Repair Work

    148/150

    ys

    4ont5

    ,.,,

    Rate A'ount

    1'=!55 19359!''

    42=5!'' =695''!''

    1$@0@ 3@@$

    $!$$ @3!.

    110$ 2@

    311 22!312

    $12. 1.13

    esa o+R

  • 7/25/2019 Lohia Repair Work

    149/150

    Rate A'ount

    $... $....

    $. 1!1.

    . 3.11!

    1$ 11$.

    $0@ 1$

    @3 3!.3

    $ ..$..

    !.. 3...

    !otal 2//2*,.,,

    nd duly signed by contractor0

    claim or compensation s)all be

  • 7/25/2019 Lohia Repair Work

    150/150

    Rate A'ount

    i9. of Contractor

    na'e an Aress

    -a+s esa %

    mailto:eS@mijksDr%20fcy%20vkWQ%20DokfUVVh%20esa%20vafdr%20njksa%20ij%20njksa%20ls%20----------------------------------vadks%20esa%20%25%20-------------------------------izfr'kr%20%C2%BC'kCnks%C2%BDmailto:eS@mijksDr%20fcy%20vkWQ%20DokfUVVh%20esa%20vafdr%20njksa%20ij%20njksa%20ls%20----------------------------------vadks%20esa%20%25%20-------------------------------izfr'kr%20%C2%BC'kCnks%C2%BD