Transcript of Logystic in TBM Tunneling-Def1
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
Ing. Remo Grandori
THE�IMPORTANCE�OF�LOGISTYC�IN�TBM�TUNNELLING��
“ From the most remote sites to the crowded cities projects”“ From the most remote sites to the crowded cities projects”
2Ing. Remo Grandori
•TRANSPORT�TO/FROM�SITE•SITE�ASSEMBLY/DISASSEMBLY•SITE�INSTALLATIONS•TBM�OPERATION•EXTRAORDINARY�REPAIRS��AND�GEOLOGICAL�UNFORESEENS
•TRANSPORT�TO/FROM�SITE•SITE�ASSEMBLY/DISASSEMBLY•SITE�INSTALLATIONS•TBM�OPERATION•EXTRAORDINARY�REPAIRS��AND�GEOLOGICAL�UNFORESEENS
WHEN LOGYSTIC COUNTS
3Ing. Remo Grandori
TRANSPORTS��TO/FROM�SITE
•WEIGHT LIMITATIONS• SIZE LIMITATIONS•BRIDGES, TUNNELS, VILLAGES•SLOPE LIMITATIONS•NARROW CURVES•AUTHORIZATIONS
4Ing. Remo Grandori
CRITICAL ACCESS ROADS
ACCESSING�THE�HYMALAYA�WITH�KISHANGANGA�TBM
5Ing. Remo Grandori
REMOTE COUNTRIES
8�m�DSU/EPB�TBM�TRANSPORT�TO�BELES�(ETHIOPIA)
6Ing. Remo Grandori
SPECIAL TRANSPORTS
TURIN�METRO�TBM��TRANSPORTED�TO�NEXT�STATION
7Ing. Remo Grandori
CROSSING SMALL CITIES
������� �� ���������
8Ing. Remo Grandori
TBM�ASSEMBLY
CRAINES�CAPACITYCRAINES�CAPACITY
SPACE�
RESTRI
CTIONSSPA
CE�
RESTRI
CTIONS
CRAINES�POSITIONING
CRAINES�POSITIONING
ASSEMBLY
SEQUENCEASSEMBLY
SEQUENCE
SAFETY
SAFETY
NOISELIMITSNOISELIMITS
9Ing. Remo GrandoriLOS�BRONCHES�MINE�� CHILE
IN�CAVERN
10Ing. Remo GrandoriCOLLAPSIBLE�TBM�� NEW�YORK
UNDERGROUND�WITH�NO�CAVERN
11Ing. Remo Grandori
IN�LIMITED�OUTSIDE�SPACES�
S.FRANCISCO.�EQUADOR� ANDES
12Ing. Remo Grandori
IN�SHAFTS�WITH�LIMITED�SPACES�
METRO�B1�� ROME
13Ing. Remo Grandori
HEAVY�LITS�
ATHENS�METRO
14Ing. Remo Grandori
TBM�DISASSEMBLY
���������������������������������������������
15Ing. Rmo Grandori
LA�JOJACOSTARICA
DISMOUNTING�SEQUENCE�WITH�
LATERAL�DISPLACEMENT�OF�THE�TBM�
SHIELDS
IN�TRENCH�
VANCOUVER METRO
TBM DISASSEMBLY IN THE CITY CENTER
VANCOUVER METRO
TBM DISASSEMBLY IN THE CITY CENTER
IN�CONGESTED�CITIES�
17Ing. Remo Grandori
TBMS�SITE�INSTALLATIONSTBMS�SITE�INSTALLATIONS
CLIMATE
WORKSHOP
PORTAL�AREA
POWER�
MUCK�DISPOSAL
SPARES STORE
MATER.�STOCK
CAMP
WATERCRAINAGE
18Ing. Remo Grandori
REMOTE SITES
KISHANGANGA� INDIA� HYMALAYA
19Ing. Remo Grandori
SITES WITH RESTRICTED ACCESS
VAL�PASSIRIO�TUNNEL� ITALY
20Ing. Remo GrandoriLOS�BRONCHES�MINE�– CHILE�� 3400�M�ALTITUDE
SITES IN COLD CLIMATES
21Ing. Remo Grandori
TBM SITES OVER BRIDGES
BRENNER�BASIS�TUNNEL�� ITALY
22Ing. Remo Grandori
TBM SITES IN CONGESTED CITIES
SELI�DSU�TBM�SITE�IN�HONG�KONG�– TSUEN�WAN�
UMIRAY�ANGAT�TUNNELPHILIPPINES
SITE�INSTALLATIONS,�SEGMENTS�PRODUCTION�AND�TBM�OPERATION
ALL�SERVED�BY�HELICOPER
SITES WITH ONLY HELICOPTER ACCESS
24Ing. Remo Grandori
SITES WITH MULTIPLE TBMS
2�DS�TBM�10�M�DIAMETER�– PERTUS�–SPAIN�
25Ing. Remo Grandori
SPECIAL�REPAIRS/OVERHAULS
� GILGEL�GIBE�– ETHIOPIA�–TBM�DISMOUNTED�AND�TRANSPORTED�BACK�THROUGH�THE�
TUNNEL FOR REPAIR AND OVERHAUL
26
GILBE�GIBE�ETHIOPIA
SPECIAL�REPAIRS/OVERHAULS
TBM�RE�ASSEMLED�INSIDE�THE�TUNNEL
27Ing. Remo Grandori
STANDARD�TBM�DESIGN
�������
���������
�������
�����������������������
�������������������
��������������
�������������������
28Ing. Remo Grandori
SPECIAL�TBM�SYSTEM�DESIGN
COLLAPSABLE�SHIELDS�TBM
CONTAINERIZED�BACK�UP�DECKS
VERTICAL�CONVEYOR�TOWER
COMPACT�TBM�SYSTEM�– CREVOLA�PROJECT�� ITALY�
CONTAINERIZED�SITE��
INSTALLATIONS