Objective of the CHIMP
› Preventing car access into the city centre
› Settling a North-South pedestrian circuit which integrates all heritage assets
› Making the City hall-Prefecture axis more majestic, attractive and friendly
› Developing commercial activity
HerO Project Meeting in Liverpool | 16th-17th July 2009 I Page 3
GREAT AXIS OF AMENAGEMENT
HerO Project Meeting in Liverpool | 16th-17th July 2009 I Page 4
Structure and Content of the CHIMP
› Reorganisation of collective transports network in order to “irrigate” without “penetrating”
Increase the use of collective transports
› Decreasing the car use
Reorganisation of the Leclerc Place by removing the traffic from this place
Reorganisation of car traffic in loops with public car parks
Encouraging the pedestrians to re-appropriate the city centre
› Artistic intervention on public spaces
HerO Project Meeting in Liverpool | 16th-17th July 2009 I Page 5
PUBLIC TRANSPORT
HerO Project Meeting in Liverpool | 16th-17th July 2009 I Page 6
THE CAR TRAFFIC
HerO Project Meeting in Liverpool | 16th-17th July 2009 I Page 7
Settling a North-South pedestrian circuit which integrates all heritage assets
HerO Project Meeting in Liverpool | 16th-17th July 2009 I Page 8
Making the City hall-Prefecture axis more majestic, attractive and friendly
HerO Project Meeting in Liverpool | 16th-17th July 2009 I Page 9
Intended Result / Output
› Reference Plan
HerO Project Meeting in Liverpool | 16th-17th July 2009 I Page 10
Work plan / Activities to elaborate the CHIMP integrating the LSG
› Technical feasibility and implementation are launched
› Activities with shopkeepers to study the impact of the Reference plan on commercial activity
› Valorization of the culturel heritage:
- each private owner must clean his façade each ten years: it begins with the city hall façade witch is a work in progress
- artistics interventions on public areas
› Achievement by 2012
HerO Project Meeting in Liverpool | 16th-17th July 2009 I Page 11
Obstacles so far preparing / elaborating the CHIMP / integrating the LSG
› Find new commercial activities.
› Explain to the shopkeepers that no car and more pedestrians is good for them.
› Make the drivers understand not to use their car, but collective transport
› Convince the building owners to contribute to the beauty of the city by cleaning and renovating their property,