LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

32
LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh Mr.: Ahmed Abumsameh

Transcript of LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Page 1: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

LOGO

Link It CompanyLink It Company

Supervised By:Mr.: Ahmed AbumsamehMr.: Ahmed Abumsameh

 

Page 2: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Students

Mohamed A.Al Ashy. Mohamed A.Al Ashy. 1

Bader aldeen J.alsabeh.3

5

2

4

5

Hashem S.Humeed

Shaaban Kh.alhello

Page 3: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Planning

Page 4: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Analysis

Page 5: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Contents

IntroductionIntroduction ,Prob,Problemlem

1

The project ,ModelThe project ,Model2

Requirements , AnalysesRequirements , Analyses3

Entity Relationship ,Class Entity Relationship ,Class DiagramDiagram

4

55

USE case models ,USE case models ,Sequence Sequence DiagramsDiagrams

5

Implementation & DesignImplementation & Design5556

Page 6: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

IntroductionIntroduction

The name of software …Design an internet web application for Link IT System

Company Why are we selected this project:-Modern construction company and help this important cause

and to develop a large information system for the company.-Place the company is in the middle homes for students on the

project.-Users need like this system to reaction with it.-The company has a large system and it's important to

convert it to web application.-We have a good connection with some company members

and can help us to do like this project

Page 7: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

IntroductionIntroduction

Problem definition: the organization use the paper

systematic to archive his data and information

The advertisements which the organization made are not enough, and too cost.

Hard reaching to the information, or data, and the search function is too slow.

Page 8: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

The projectThe project

Project Definition: Project Goals:Design an internet web, connect with database. Project Scope: • The services of the project

- Saving the data and the information of the customers, and training information.

- Make the queries possible and the searching easier than before.

- Advertisement services.

• The project will be sure about some things like…..

-Decrease the errors, and loosing any information or data from the database.

- Increasing the security of the data, from any risks. Project Users: The people who will use the project

Page 9: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

model

Work Breakdown:After we did the primary study of the

project, we put the suitable work breakdown to this project, and we choose the waterfall development model.

Page 10: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

ProblemProblem

The phases of the waterfall model: The first phase " REQUIREMENTS ANALYSIS &

DIFINITION “ The second phase" SYSTEM & SOFTWARE

DESIGN“ The third phase "IMPLEMENTATION & UNIT

TESTING “ The fourth phase "INTEGRATION &SYSTEM

TESTING “ The fifth phase "OPERATION & MAINTENANCE "

Page 11: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

System and software design

Implementation and unit testing

Integration and system

Requirements definition

Operation maintenance

Page 12: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

requirementsrequirements

User requirements: System requirements:Software Requirement

-Microsoft Visio 2003

-Microsoft project 2003-DreamWaver cs4-WampServer 2.0-SmartDrow 2010-Flash 8

Page 13: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Requirements (cont…)Requirements (cont…)

None functional:-ReliabilityOur system as a website will be under manyrisks but we do the best to avoid all risks. -AvailabilityThe system will be available on 24 hour a day. -SecurityAuthentication from username and password to login to

related page….-MaintainabilityThe Manager can maintain any problem and modify any data. -Transferability/PortabilityOur system is a website so it is a platform independent and

user can explore it by any web browser.

Page 14: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Requirements (cont…)Requirements (cont…)

Functional Requirement:• Detailed in the project file.• Add ST, Delete ST, Modify ST, Add TE,

Delete TE, Modify TE, Add CO, Delete CO, Modify CO ,Report view, Login.

Page 15: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Project DevelopingProject Developing

Project Description: The project is design a web to use it in the

organization, to increase the efficiency, speed of the work and to decrease the wasting time in the data flaw.

The objectives:-Convert the paper system to computer system or

web system.-Electronic advertisement by the web.-The web will solve all the search , wasting time , and

the efficiency problems. Project Organization:The project divided into submissions, and for every

mission we have one man to do it.

Page 16: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Project DevelopingProject Developing (cont…)

no Mission name Name

1 1. Studying the last system and analyzing it to produce the new one.

2. reviewing the work done by others.3. coordinate the final version.

Mohammed Al Ashy &

Shaaban Al Hello

2 1. making reports.2. making the meeting reports.

Shaaban Al Hello

3 1. design the software Hashem humeed

4 1. design the database Hashem Humeed

5 1. programming the software2. making the power point

Bader Al Sabeh

&Hashem humeed

6 1. general coordinator Bader Al Sabeh

7 1. rational rose programmer Mohammed Al Ashy

And here you are the details with schedule time.

Page 17: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Risk AnalysisRisk Analysis

There are tow kind of risks: The first kind "the risks which face the project in general

from beginning to finish it".-The time wasn't enough to make a good project.-The employees were busy.

the second kindRisks may the customers, or users face in using the project.

And these few problems are: May the users or the manager want some modifying or some

accessories? And to solve this problem by make a maintenance contact.

At beginning, the users and customers may not use the web good. And the solution of this problem is by training.

Page 18: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Resource RequirementsResource Requirements

Hardware and software resource requirements:PART. A. Hardware Requirement -3 pc's -Scanner-PrinterPART .B. Software Requirement-Microsoft Front Page 2003-Microsoft Word 2003-Microsoft Visio 2003-Microsoft project 2003-DreamWaver cs4-WamoServer 2.0-SmartDrow 2010-Flash 8

Page 19: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

USE Case ModelsUSE Case Models

Manager

Trainer

Trainee

Update_trainee_information

Update_trainers_information

Print_report

Categonize_trainees

Create_certificate

Manage_marks

Manage_exam

Fil l_the_application_for_registration

Login

Display_report_mark

Page 20: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Sequence For Viewing Sequence For Viewing MarksMarks

: Trainee : Start Page : Main Page : View Marks : View : Classification in

D.B.

1: Enter Data

2: Verify Data

3: Select View Marks

4: View mark Page

5: Select the course

6: Select its marks

7: Select Marks

8: Results

9: Display Marks

Page 21: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Sequence For RegistrationSequence For Registration

: Trainee Verify Data : Start Page : Login Page : Registration Page Manager : Manager

: Registration

1: Enter Data

3: Select Registration Page

4: Request for Registration

5: Enter personality Data

6: Send the application

7: Save to D.B

2:

Page 22: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Entity Relationship:Entity Relationship:

courseEducating

trainee

trainer

training room

registry

Page 23: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Class Diagram:Class Diagram:

Entitymo3athsameer

ManagerLoginUpdateTraineeInformationUpdateTrainerInformation

RegistrationChickPasswordChickUsername

Login()opname()

+n

+1<<extend>>

Trainee

EnterPasswordEnterUsernameViewReport

(from Use Case View)

Trainer

EnterUsernameEnterPasswordAddMarksAddExams

(from Use Case View)+1

+0<<subscribe>>

+1n

+0

Page 24: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Implementation &Design

programming language:-Chose the programming language PHP

Chosen because it is the language of art, met all the requirements of the system, where data structures, dealing with Internet sites and this was the main reason, because the system should work on the web.

-Also convenient to control the color and form through the pages CSS, JavaScript and deal with this for the convenience of the user and good interaction with the system

Page 25: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

InterfaceInterface

Page to enter users and powers according to the type of user

Page 26: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Interface (Cont…)Interface (Cont…)

Registration page on the site

Page 27: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Interface (Cont…)Interface (Cont…)

Page of the trainee

Page 28: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

the last

It is the last stage of the project and loads the web application for services from the company itself to be the experience of the new system, the user experience of the three rules of the Director, the coach and the trainee.

Page 29: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

the last (cont…)(cont…)

The results are as follows: 1. A system (web application) the prerequisites set

by the Director and the coach and the trainee. 2. 2. has the same system requirements of

the project: 1- high-efficiency 2- easy to use 3- easy data archiving 4- speed the search for data 5- easy download advertisements on existing courses and raised courses 6- deal with the Director of trainees or students are faster and easier

Page 30: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

the last (cont…)(cont…)

The project won the admiration of both the Director and the coach and the trainee 3 and the problem faced in the training of the students in the beginning, but that problem was solved by increasing the number of trainers or supervisors on the stage of Testing.

Page 31: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

End

Page 32: LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

LOGO

Thank You!Thank You!