Transcript of Lockers Unique Plumbing Fixtures Steel Stud exposed wall Abandon DWP Transformers & Equipment Murals...
FCA Survey Lessons learned
Lockers Unique Plumbing FixturesSteel Stud exposed wallAbandon DWP Transformers & EquipmentMurals on the exterior of buildingsBy Phil Ausland Maintenance Planner S1
Typical hallway book lockers in a 2 tier 24 locker configuration
Hallway seems to go on and onThis Site could easily appear to have to many lockers
Gym lockers in a double sided 3 tier combination
The same locker room
This is how Lockers are to be counted. First select
the component for 1,2,3 or 4 Tier lockers
whichever matches Your site then total the doors
Its that simple.
Stainless Steel Lavatory SinksDoes a new component need to be added?
Same for stainless ToiletThis one has a concealed flush valve. How should I account for this ?
Bank of urinals with consealed timer and solenoid/Flush valveDoes it matter or just count Urinals?
Lets review the process for adding new or unique components.
First we see something that is unique at our site. We are then to take a picture to email in for pier review and hopefully get a decision on which way we are to proceed. Timeline for this exchange ?
Lets consider the 3 photos that preceded this page. The SS Lavatory sinks couldbe swapped out for our typical cast iron sink with out much modification to existing plumbing rough-in. However in the case of the urinal and the toilet they both have a concealed flush valves which would require an extensive alteration of the Existing plumbing rough-in.
What is the main thing to consider when adding a new component? Is it the cost difference + -?Is it the volume or frequency of the item ?
Exposed steel stud wall in pipe chase what should do with this?
Abandoned DWP equipment who knows what chemicals are contained here
Additional Abandoned Equipment
IS THE ABANDON DWP EQUIPMENTA SAFETY ISSUE?
SHOULD WE MAKE NOTE OF ITS LOCATION FOR FUTURE REFERENCE?
I would like a refresher on murals do we assess them?
Generally Middle schools and Elementary schools have more Murals This will be more of an issue
Some are very simple
Others cover more area
This is very simple but do we need to mention it?
Group discussion
What are some of the comments on the preceding topics