Transcript of Location: Glen Lyon Status: FPSO - KBR Profiles/ProjectProfile... · – Chemical injection...
Client: BP
Location: 175km West of Shetland and 15km North of the Foinaven field (Quad 204)
Scope: Pre-FEED; FEED; Detailed Engineering; Procurement Support Services
Status: Sailaway December 2015
Details:• Harsh water new-build FPSO
• Water depth: 400 metres
• KBR designed the 21,000-tonne topsides providing production capacity for 320,000 b/d of liq-uids and 220 MMSCFD/D of gas and 380,000 b/d of produced water and seawater injection.
• Storage is provided in the FPSO for at least 1.0 million barrels of crude product. Export of crude will be via shuttle tanker.
• Gas handling comprises liquid knock-out, drying and compression prior to use as gas lift gas or export through the existing West of Shetlands pipeline.
• The FPSO includes the following facilities:
– New-build hull with oil storage and machinery spaces
– Accommodation with helideck facilities
– Power generation and emergency power
– Oil processing train comprising of slug catcher and separation facilities
– Two off gas processing trains, including drying facilities
– Produced water treatment and injection
– Flare gas recovery
– Chemical injection facilities for topside and subsea
Continued on next page
Glen Lyon FPSO
West of Shetland Islands
Client: BP
Location: 175km West of Shetland and 15km North of the Foinaven field (Quad 204)
Scope: Pre-FEED; FEED; Detailed Engineering; Procurement Support Services
Status: Sailaway December 2015
Highlights:• Glen Lyon FPSO is part of the redevelopment of the Schiehallion and Loyal fields in Quad 204
• Glen Lyon FPSO is the replacement for the retired Schiehallion FPSO, which also supported a KBR topsides facility
• Glen Lyon FPSO FEED for the Hull and Topsides together with the detailed design of the topsides were completed by KBR
• Drilling in the field is being undertaken by a new-build semi-submersible Deepsea Aberdeen – whose hull was designed by KBR subsidiary GVA
Glen Lyon FPSO
West of Shetland Islands