LOCAL GOVERNMENT INFRASTRUCTURE PLANS … · File: T:\1100 Douglas Shire Council...

12
Printed: 20 March 2018, 5:29 PM File: T:\1100 Douglas Shire Council LGIP\Drawings\SEWERAGE(D)\ 1100-200(D) SEWERAGE SCHEDULE OF DRAWINGS.dwg External References: TEC-TITLE-A3_a.dwg Trinity Engineering and Consulting LOCAL GOVERNMENT INFRASTRUCTURE PLANS for DOUGLAS SHIRE COUNCIL SCHEDULE OF PROJECT DRAWINGS (SEWERAGE TRUNK INFRASTRUCTURE) PUBLIC NOTIFICATION ISSUE ONLY

Transcript of LOCAL GOVERNMENT INFRASTRUCTURE PLANS … · File: T:\1100 Douglas Shire Council...

Prin

te

d: 2

0 M

arch

2

01

8, 5

:2

9 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

00

(D

) S

EW

ER

AG

E S

CH

ED

UL

E O

F D

RA

WIN

GS

.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering

and Consulting

LOCAL GOVERNMENT INFRASTRUCTURE PLANS

forDOUGLAS SHIRE COUNCIL

SCHEDULE OF PROJECT DRAWINGS

(SEWERAGE TRUNK INFRASTRUCTURE)

PUBLIC NOTIFICATION ISSUE ONLY

AutoCAD SHX Text
1100-200
AutoCAD SHX Text
1100-201
AutoCAD SHX Text
1100-202
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
1100-203
AutoCAD SHX Text
1100-204
AutoCAD SHX Text
SEWERAGE INFRASTRUCTURE CHARGES CATCHMENTS
AutoCAD SHX Text
EXISTING SEWERAGE TRUNK INFRASTRUCTURE KEY MAP
AutoCAD SHX Text
EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 1
AutoCAD SHX Text
EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 2
AutoCAD SHX Text
1100-205
AutoCAD SHX Text
EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 3
AutoCAD SHX Text
1100-206
AutoCAD SHX Text
EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 4
AutoCAD SHX Text
1100-207
AutoCAD SHX Text
EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 5
AutoCAD SHX Text
1100-208
AutoCAD SHX Text
EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 6
AutoCAD SHX Text
1100-209
AutoCAD SHX Text
FUTURE SEWERAGE TRUNK INFRASTRUCTURE KEY MAP
AutoCAD SHX Text
1100-210
AutoCAD SHX Text
FUTURE SEWERAGE TRUNK INFRASTRUCTURE - GRID 1
AutoCAD SHX Text
1100-211
AutoCAD SHX Text
FUTURE SEWERAGE TRUNK INFRASTRUCTURE - GRID 2

MOSSMAN (S2)

NEWELL BEACH (S4)

COOYA BEACH (S3)

WONGA BEACH/ROCKY POINT (S5)

PORT DOUGLAS (S1)

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:2

9 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

01

(D

) S

EW

ER

AG

E C

HA

RG

ES

C

AT

CH

ME

NT

S.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-201

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

SEWERAGE INFRASTRUCTURE CHARGES CATCHMENTS

D

PUBLIC NOTIFICATION ISSUE ONLY

NOT TO SCALE

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

MOSSMAN (S2)

SEWERAGE INFRASTRUCTURE

CHARGES CATCHMENT AREAS

LEGEND

PORT DOUGLAS (S1)

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

COOYA BEACH (S3)

NEWELL BEACH (S4)

WONGA BEACH/ROCKY POINT (S5)

N

1

3

2

4

5

6

1

3

2

4

5

6

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:2

9 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

02

to

2

08

(D

) E

XIS

TIN

G S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-202

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

EXISTING SEWERAGE TRUNK INFRASTRUCTURE KEY MAP

D

PUBLIC NOTIFICATION ISSUE ONLY

NOT TO SCALE

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

EXISTING SEWERAGE

TRUNK INFRASTRUCTURE

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

EFFLUENT RISING MAIN

PUMP STATION

WASTEWATER TREATMENT PLANT

GRAVITY MAIN

RISING MAIN

RME033

SPSE017

RME037

RME038

RME039

RME034

RME040

RME041

RME042

RME035

RME070

RME003

STPE003

RME036

SPSE020

RME017

RME018

RME019

SPSE002

GME015

GME029

SPSE001

NEWELL

COOYA BEACH

BONNIE DOON

MOSSMAN

MOSSMAN (S2)

COOYA BEACH (S3)

GME030

GME031

1

3

2

4

5

6

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:3

0 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

02

to

2

08

(D

) E

XIS

TIN

G S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-203

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 1

D

PUBLIC NOTIFICATION ISSUE ONLY

1:15000

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

GRID: 1

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

EXISTING SEWERAGE

TRUNK INFRASTRUCTURE

EFFLUENT RISING MAIN

PUMP STATION

WASTEWATER TREATMENT PLANT

GRAVITY MAIN

RISING MAIN

GME030

GME031

GME033

GME034

GME032

GME013

GME035

GME014

RME021

GME051

RME020

SPSE003

SPSE004

GME036

GME038

GME017

RME002

RME043

GME018

GME010

SPSE028

GME011

GME016

GME012

GME039

GME040

FINLAYVALE

GME001

GME037

MOSSMAN

MOSSMAN (S2)

1

3

2

4

5

6

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:3

0 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

02

to

2

08

(D

) E

XIS

TIN

G S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-204

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 2

D

PUBLIC NOTIFICATION ISSUE ONLY

1:15000

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

GRID: 2

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

EXISTING SEWERAGE

TRUNK INFRASTRUCTURE

EFFLUENT RISING MAIN

PUMP STATION

WASTEWATER TREATMENT PLANT

GRAVITY MAIN

RISING MAIN

RME031

GME042

SPSE005 GME041

GME052

RME032

SPSE031

RME047

RME004

RME023

SPSE014

SPSE027

SPSE013

SPSE015

SPSE025

RME046

RME045

RME044

GME046

GME045

GME004

GME019

GME020

GME009

GME008

GME044

GME043

RME050

RME022

PORT DOUGLAS

PORT DOUGLAS (S1)

1

3

2

4

5

6

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:3

0 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

02

to

2

08

(D

) E

XIS

TIN

G S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-205

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 3

D

PUBLIC NOTIFICATION ISSUE ONLY

1:7500

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

GRID: 3

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

EXISTING SEWERAGE

TRUNK INFRASTRUCTURE

EFFLUENT RISING MAIN

PUMP STATION

WASTEWATER TREATMENT PLANT

GRAVITY MAIN

RISING MAIN

SPSE036

SPSE035

SPSE033

SPSE034

SPSE032

SPSE026

STPE001

STPE002

RME016

RME075

RME076

RME077

RME013

RME055

RME073

RME072

EME007

EME008

EME018

EME006

RME074

RME015

RME048

RME049

GME005

RME054

EME020

RME053

RME001

RME052

EME005

RME051

EME004

EME009

EME019

PORT DOUGLAS

PORT DOUGLAS (S1)

RME050

RME046

RME056

EME010

1

3

2

4

5

6

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:3

0 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

02

to

2

08

(D

) E

XIS

TIN

G S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-206

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 4

D

PUBLIC NOTIFICATION ISSUE ONLY

1:7500

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

GRID: 4

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

EXISTING SEWERAGE

TRUNK INFRASTRUCTURE

EFFLUENT RISING MAIN

PUMP STATION

WASTEWATER TREATMENT PLANT

GRAVITY MAIN

RISING MAIN

SPSE011

SPSE010

SPSE016

SPSE022

SPSE023

SPSE006

SPSE021

SPSE009

SPSE024

EME003

EME010

RME014

RME057

EME011

RME056

EME002

RME024

EME012

RME029

GME006

GME047

GME048

RME028

RME008

RME007

RME006

GME007

RME005

RME067

GME053

RME078

GME050

GME003

GME049

EME013

RME059

RME009

RME010

RME060

GME028

RME061

RME025

RME058

GME022

GME021

RME011

CRAIGLIE

PORT DOUGLAS

PORT DOUGLAS (S1)

RME012

1

3

2

4

5

6

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:3

0 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

02

to

2

08

(D

) E

XIS

TIN

G S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-207

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 5

D

PUBLIC NOTIFICATION ISSUE ONLY

1:7500

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

GRID: 5

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

EXISTING SEWERAGE

TRUNK INFRASTRUCTURE

EFFLUENT RISING MAIN

PUMP STATION

WASTEWATER TREATMENT PLANT

GRAVITY MAIN

RISING MAIN

SPSE019

SPSE012

SPSE018

SPSE029

SPSE030

SPSE007

SPSE008

RME012

RME026

RME062

GME002

EME014

RME069

RME063

RME027

GME023

GME026

GME025

RME030

RME068

RME071

RME065

EME017

EME021

GME027

EME001

RME066

EME016

GME024

RME064

EME015

PORT DOUGLAS

PORT DOUGLAS (S1)

EME013

1

3

2

4

5

6

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:3

0 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

02

to

2

08

(D

) E

XIS

TIN

G S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-208

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

EXISTING SEWERAGE TRUNK INFRASTRUCTURE - GRID 6

D

PUBLIC NOTIFICATION ISSUE ONLY

1:7500

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

GRID: 6

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

EXISTING SEWERAGE

TRUNK INFRASTRUCTURE

EFFLUENT RISING MAIN

PUMP STATION

WASTEWATER TREATMENT PLANT

GRAVITY MAIN

RISING MAIN

1

2

1

2

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:3

0 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

09

to

2

11

(D

) F

UT

UR

E S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-209

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

FUTURE SEWERAGE TRUNK INFRASTRUCTURE KEY MAP

D

PUBLIC NOTIFICATION ISSUE ONLY

NOT TO SCALE

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

FUTURE SEWERAGE

TRUNK INFRASTRUCTURE

PUMP STATION

STORAGE FACILITY

RISING MAINS

EFFLUENT RISING MAINS

WASTEWATER TREATMENT PLANT

RISING MAINS (TRUNK)

EFFLUENT RISING MAINS (TRUNK)

STPF001

STPF002

COOYA BEACH

BONNIE DOON

MOSSMAN

COOYA BEACH (S3)

MOSSMAN (S2)

NEWELL BEACH (S4)

1

2

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:3

0 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

09

to

2

11

(D

) F

UT

UR

E S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-210

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

FUTURE SEWERAGE TRUNK INFRASTRUCTURE - GRID 1

D

PUBLIC NOTIFICATION ISSUE ONLY

1:20000

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

GRID: 1

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

FUTURE SEWERAGE

TRUNK INFRASTRUCTURE

PUMP STATION

STORAGE FACILITY

RISING MAINS

EFFLUENT RISING MAINS

WASTEWATER TREATMENT PLANT

RISING MAINS (TRUNK)

EFFLUENT RISING MAINS (TRUNK)

RMF068

PORT DOUGLAS

SPSF001

PORT DOUGLAS (S1)

1

2

No.

Description

Date

Approved

Reviewed

Re

visio

ns

Client

Project

Title

Prin

te

d: 2

0 M

arch

2

01

8, 5

:3

0 P

MF

ile

: T

:\1

10

0 D

ou

gla

s S

hire

C

ou

ncil L

GIP

\D

ra

win

gs\S

EW

ER

AG

E(D

)\ 1

10

0-2

09

to

2

11

(D

) F

UT

UR

E S

EW

ER

AG

E.d

wg

External References: TEC-TITLE-A3_a.dwg

Trinity Engineering and Consulting Pty Ltd

www.trinityengineering.com.au

Level 1, 10 Grafton Street | PO Box 7963

Cairns QLD 4870

Email: [email protected]

Drawing No. RevisionDrawn

Drawing is not to be used for

construction unless approved.

Scale (A3 size)

Drawing CheckDesigned Design Check RPEQ DateApproved

Trinity Engineering

and Consulting

© Trinity Engineering and

Consulting Pty Ltd

ABN 78 610 181 130

This document is and

shall remain the property

of Trinity Engineering

and Consulting Pty Ltd.

Unauthorised use of this

document in any form

whatsoever is prohibited. Ph: (07) 4040 7111

1100-211

DOUGLAS SHIRE COUNCIL

1100 DOUGLAS SHIRE COUNCIL LGIP

FUTURE SEWERAGE TRUNK INFRASTRUCTURE - GRID 2

D

PUBLIC NOTIFICATION ISSUE ONLY

1:20000

IM RR RR RR R RANKINE 20/03/18

A ISSUED FOR REVIEW

KEY MAP

GRID: 2

LEGEND

P.O. BOX 723

MOSSMAN, QLD 4873

TEL: (07) 4099 9444

FAX: (07) 4098 2902

N

FUTURE SEWERAGE

TRUNK INFRASTRUCTURE

PUMP STATION

STORAGE FACILITY

RISING MAINS

EFFLUENT RISING MAINS

WASTEWATER TREATMENT PLANT

RISING MAINS (TRUNK)

EFFLUENT RISING MAINS (TRUNK)