CONNECTICUT
DEPARTMENT OF TRANSPORTATION
LOCAL BRIDGE PROGRAM
Fiscal Year 2017
THE HONORABLE DANNEL P. MALLOY,
GOVERNOR
JAMES REDEKER,
COMMISSIONER
About the cover: this years cover features Bridge No. 05009, June Road over the
Mianus River, in the City of Stamford. This bridge rehabilitation project was designed by
Alfred Benesch & Company, of Glastonbury, Connecticut, and was constructed by McNamee
Construction Corporation, of Lincolndale, New York.
Construction work began in August 2013, and was completed in August 2015 at a
construction cost of approximately $1.6 million. Funding was provided by the State Local
Bridge Program and the City of Stamford.
Connecticut Department of Transportation
Bureau of Engineering and Construction
Division of Bridges
Local Bridge Program 2800 Berlin Turnpike, P.O. Box 317546
Newington, Connecticut 06131-7546
Telephone: (860) 594-2078
Website: http://www.ct.gov/dot/localbridge
Program Manager:
Priti S. Bhardwaj, P.E.
Transportation Supervising Engineer
State Funded Projects
Francisco T. Fadul, P.E.
Project Engineer
Telephone: (860) 594-2078
E-mail: [email protected]
Federal Funded Projects
Marc P. Byrnes
Project Engineer
Telephone: (860) 594-3389
E-mail: [email protected]
Gustavo M. Melo
Project Engineer
Telephone: (860) 594-2888
E-mail: [email protected]
http://www.ct.gov/dot/localbridgemailto:[email protected]:[email protected]:[email protected]
Local Bridge Program Manual FY 2017
Page - I -
TABLE OF CONTENTS
TABLE OF CONTENTS I
NEW IN THIS EDITION IV
LESSONS LEARNED & OPPORTUNITIES FOR IMPROVEMENT IV
CHAPTER 1: INTRODUCTION 1
1.1 ABOUT THIS MANUAL ............................................................................................................. 1 1.2 DEFINITIONS ............................................................................................................................ 2
CHAPTER 2: BRIDGE EVALUATION 5
2.1 SUFFICIENCY RATING .............................................................................................................. 7 2.2 PRIORITY RATING .................................................................................................................. 10 2.3 PRIORITY LISTS ..................................................................................................................... 11 2.4 EMERGENCY CONDITIONS ..................................................................................................... 11
CHAPTER 3: FUNDING PROGRAMS 12
3.1 STATE LOCAL BRIDGE PROGRAM GRANT ............................................................................. 12 3.1.1 Grant Percentages ............................................................................................................... 13 3.1.2 Eligible Costs ...................................................................................................................... 15
3.1.2.1 Preliminary Engineering: ................................................................................... 15 3.1.2.2 Rights-of-Way: .................................................................................................. 15 3.1.2.3 Utilities: ............................................................................................................. 16 3.1.2.4 Construction: ...................................................................................................... 16 3.1.2.5 Construction Engineering/Incidentals to Construction: ..................................... 16
3.2 OTHER STATE GRANT PROGRAMS ........................................................................................ 17 3.3 FEDERAL FUNDS .................................................................................................................... 18
3.3.1 Off-System Bridge STBGP ................................................................................................. 18 3.3.1.1 Replacement and Rehabilitation Projects........................................................... 20 3.3.1.2 Preservation Projects .......................................................................................... 20
3.3.2 Pilot Program for 100% Design Funding ............................................................................ 22 3.3.3 Other Federal Programs ...................................................................................................... 22
CHAPTER 4: PROJECT DEVELOPMENT 22
4.1 PROJECT STEPS AND TYPICAL TIMELINE .............................................................................. 23 4.2 INITIATION/PRELIMINARY APPLICATION .............................................................................. 24 4.3 PROJECT DESIGN ................................................................................................................... 25
4.3.1 Design Standards State Funds .......................................................................................... 25 4.3.1.1 Geometrics ......................................................................................................... 26 4.3.1.2 Life Expectancy ................................................................................................. 26 4.3.1.3 Load Capacity .................................................................................................... 27 4.3.1.4 Scour Analysis ................................................................................................... 27 4.3.1.5 Hydraulics .......................................................................................................... 28 4.3.1.6 Fatigue ............................................................................................................... 29 4.3.1.7 Longitudinal Barriers ......................................................................................... 29 4.3.1.8 Environmental .................................................................................................... 29
Local Bridge Program Manual FY 2017
Page - II -
4.3.2 Design Standards Federal Funds ...................................................................................... 30 4.3.3 Permits ................................................................................................................................ 30
4.3.3.1 Flood Management Certification ....................................................................... 33 4.3.3.2 Flood Management General Certification .......................................................... 33 4.3.3.3 Stream Channel Encroachment Lines ................................................................ 41 4.3.3.4 U.S. Army Corps of Engineer Permits ............................................................... 41
4.4 SUPPLEMENTAL APPLICATION .............................................................................................. 42 4.5 AGREEMENTS ........................................................................................................................ 43 4.6 PROJECT COMPLETION .......................................................................................................... 44
CHAPTER 5: GUIDELINES FOR OBTAINING FUNDS 46
5.1 PROCEDURES FOR STATE FUNDED PROJECTS ....................................................................... 46 5.2 PROCEDURES FOR FEDERALLY FUNDED PROJECTS............................................................... 50
5.2.1 Consultant Selection............................................................................................................ 50 5.2.1.1 Negotiations ....................................................................................................... 53 5.2.1.2 Contract Monitoring .......................................................................................... 54
5.2.2 Design Tasks ....................................................................................................................... 54 5.2.2.1 Survey ................................................................................................................ 55 5.2.2.2 Preliminary Engineering .................................................................................... 56 5.2.2.3 Preliminary Design ............................................................................................ 60 5.2.2.4 Regulatory Approvals ........................................................................................ 61 5.2.2.5 Final Design ....................................................................................................... 61 5.2.2.6 Construction Advertising ................................................................................... 62
5.3 INSTRUCTIONS FOR COMPLETING THE PRELIMINARY APPLICATION .................................... 65 5.3.1 Administrative Project Info ................................................................................................. 65 5.3.2 Preliminary Cost Figures ..................................................................................................... 68 5.3.3 Financial Aid Data .............................................................................................................. 68 5.3.4 Schedule .............................................................................................................................. 69
APPENDIX 1 ELIGIBLE BRIDGES 70
APPENDIX 2 GRANT PERCENTAGES FOR MUN