LOCAL AGENCY PROGRAM A YEAR IN REVIEW
Transcript of LOCAL AGENCY PROGRAM A YEAR IN REVIEW
LOCAL AGENCY PROGRAMA YEAR IN REVIEW
COUNTY ENGINEER’S WORKSHOPFEBRUARY 6, 2020
Tracie Leix, P.E.
Ryan Doyle, P.E.
Bruce Kadzban, P.E.
Kelly Crannell, P.E.
LAP INTRODUCTIONS
MDOT Real Estate – Sharon Simon
MDOT Government Contracts – Monica Uribe
LAP Staff Engineers – Amy Zokvic
- George Masinda
TRANSITIONS
• Mark Harrison Retirement – July 31, 2020
• LAP NEPA Coordinator Vacant (Eric Costa)
• Work with Mark Harrison/Lynnette Firman
• LAP Real Estate Coordinator Vacant (India Heard)
• Work with Sharon Simon
LAP INTRODUCTIONS
MDOT Office of Economic Development
Grant Coordinators
Cathy Sampselle – Grand & North Regions
Chris Valvano – Southwest and University Regions
PROGRAM HIGHLIGHTS
• Obligation authority for FY19
• Used all non-RTF
• Carry over <$500,000 RTF
• NEPA implementation (MDOT 5323 form)
• NEPA screening tool – DEGR (via MiLogin)
• JobNet access (via MiLogin)
MDOT Webinar Feb. 13 at 1:30PM
LETTING STATS
412
LAP
$513M
LAP
340
MDOT$1.1B
MDOT
$33M
other
16
other
Does not include Force Account
LET’S BE REAL
As of January 2020 letting:
103 LA projects bid
Estimated $93.4 M
On average, as-read bids are about 2% over the estimate
LPA STAKEHOLDER
PARTNERING
• Webpage development
• Current issues
• Issues refresh
• Notice of Proposed Rulemaking
NEPA (5323) UPDATES
• Monitoring agency knowledge
• MDOT
• FHWA
• Tribal consultation
• DEGR Updates
COMMON 5323 COMMENTS
• General
• Supporting documentation
• Map
• Threatened & Endangered Species
• Follow approved process (Flow chart)
• Provide documentation from IPaC and EGLE
SHPO CONDITIONAL LETTERS
• Contact LAP staff engineer
• Local agency, MDOT LAP, FHWA signoff process
• Incorporate conditions into plans/proposal
• SP for Environmentally Sensitive Areas
MUTUAL BENEFIT
Effective for GI submittals on or after October 1, 2020
• When acquiring right of way
• Commonly used for temporary consents
• Not in compliance with Uniform Relocation Act
• Eliminate use by MDOT and local agencies
MUTUAL BENEFIT
• Real estate work will need additional time
• Property owners allowed 30 days to consider offers
• Compensation to property owner (waiver allowed)
• Cannot gap out work
MORE INFORMATION:
LTAP Webinar March 19, 2020
EGLE LEAD AND COPPER RULES
• Project impacts – Before, During, With
• ROW impacts
• Agreement language
FABRICATION INSPECTION
• CFR requirement
• Cannot write out of proposal with a unique SP
• Cannot omit during construction
BRIDGE PROGRAM
• FY23 Call for Projects
• February release; Due MAY 1
• Electronic submittal ONLY
• Asset management plans encouraged
• Innovations and increased local participation encouraged
NBIS COMPLIANCE
• 30-day posting challenges
• May 7, 2019 Bridge Advisory
Update
• BA-2019-01
• Non-compliance
UPCOMING CHANGES
• Conflict of Interest
• Total project cost in S/TIP
• Do not confuse w/ Total phase cost (25% threshold)
• Real estate certification and mutual benefit
SAFETY PROGRAM
• FY21 Call for Projects
• Selection List posted on LAP Website
• 11 of 11 Systemic Projects Selected ($1.2M)
• 25 of 25 Qualifying HRRR Projects Selected ($6.8M)
• 38 of 93 HSIP Projects Selected ($10.2M)
• FY22 Call for Projects
• Goal = March Call Letter, June Submittals, October Awards
CRA HMA VOLUMETRIC STA SP
• Pilot Status by FHWA
• Replaces 501J when used
• Single Test Acceptance with Pay Factors (Density, Air Voids, VMA, Binder C.)
• 15 Test Locations (Both Fed-Aid and Local) – 11 Currently Identified
• Lenawee: 129641 (Round Lake Hwy.), 206251 (Holloway Road, and Ridge Hwy.)
• Allegan: 129676 (Blue Star Hwy) and 207031 (30th St. to be built in FY21)
• Cheboygan: 205301 (South River Road- FY20), 205297 (South River Road -FY21)
• Antrim: 130363 (Mancelona Rd)
• Roscommon: 207257 (Maple Valley Road), 3 Local Projects
• Looking for Volunteers!
REVISED CONFLICT OF INTEREST GUIDELINES FOR LOCAL AGENCIES
• Guidelines Updated! No More Matrix!
• 4 Prohibited Scenarios
• Utilizing consultants in multiple phases addressed
• Conflict of Interest Self-Certification Form
• Required if using FAHP funds on consultant services
• Industry review comments were due 1/31/2020
• Final Draft to FHWA for Approval Soon
• New procedure will go into effect with Oct. 1 GIs
2019-2022 STRATEGIC HWY SAFETY PLAN
• Toward Zero Deaths on Michigan Roadways
• Reduce Fatalities 974 (2018) 945 (2022)
• Reduce Serious Injuries 5,586 (2018) 4,994 (2022)
• Improve Communication, Coordination, Collaboration
• 4 Emphasis Areas
• High-Risk Behaviors, At-Risk Road Users, Engineering
Infrastructure, & System Administration
LAP SUMMARY - 2019Training and Information Sharing
Participated in over 12 podcasts and webinars
Issued 19 LAP Advisories and postings
Monthly reports of Federal Fund Obligation
Program Updates –
NEPA Submittal
Updated Program Application forms
Parabolic Crowns on Roadways
LAP SUMMARY - 2019Training and Information Sharing
Participated in each Region’s Partnership meetings
Over 20 Region, TSC, and local workshops
Approximately 12 project “initial coordination meetings” for special funded projects
LAP SUMMARY - 2019Emergency Response (ER) Program
All ER events from FY 2016 and earlier are closed
Mid June 2017 – Central Michigan & June 2018 Western UP Event – nearing completion
July 2019 Lake County – documents filed with FHWA
EMERGENCY RESPONSE PROGRAMTraining and Information Sharing
Can’t predict the next one
If “it” happens, expect emails and phone calls from
MDOT’s Office of Safety and Security
MDOT LAP
WHAT'S COMING IN 2020Training and Information Sharing
Continuing with Region & TSC workshops
Continuing initial project meetings for TAP and Safe Routes to Schools projects
LAP website enhancements
Updates to each Program Application form
2020 MDOT SPEC BOOK
• Final draft with impasse results forwarded to CRA
• Training Pending
• Utilization for Oct ‘20 Letting
• Electronic Version first
• Hard copy to follow
AASHTOWARE
• MDOT trunkline pilots – 2020
• MDOT start conversion – 2021
• Local Agency pilots – possibly late 2020 or 2021
• Full AASHTOware Conversion – earliest Oct ‘22 Let
• Field Manager Help desk – 1-800-4MI-MDOT
• Local Let solution – pending thru CRA subcommittee
PROJECTWISE
• Archiving files per MDOT Retention Schedule
• Locals to retain official project records
CONSTRUCTION MANUAL UPDATES
• Local Agency Program – Division 1 Supplemental Information
• Clarify roles & responsibilities
• Set project delivery expectations
• Detail guidance specific to LAP Project administration
• Explain other MDOT/Local partnerships –
operations/maintenance/signals
• Responsible Charge– align w/CFR
CONSTRUCTION MANUAL UPDATES . . . CONTINUED
• Project Close out Process Improvements
• Final Project Review Procedures (FPR)
• Interim File Review
• Escalation of Accountability
• Certified Engineer Program – opening to Consultants
• Letter to file procedures
MATERIAL QUALITY ASSURANCE PROCEDURES (MQAP MANUAL)
• Defines ‘Basis of Acceptance’
• Cannot omit fabrication inspection w/unique SP
• Plastic pipe BOA change in 2020
• No more tested stock
• Now BOA by test or approved manufacturer
TRUNKLINE – THINGS TO KNOW
• Project .pdf delivery – 1 per TSC in 2020
• Changing paint markings from 4” to 6”
OTHER TIDBITS OF INFORMATION
• Local Program Peer Exchange
• Low-Volume Road Conference - attended Sept ’19