LNG TERMINAL ENGINEERING AND MAINTENANCE...

32
PHOTO PHOTO LNG TERMINAL ENGINEERING PHOTO AND MAINTENANCE STANDARDS (LNGTEMS) Presented by: G l Jh PHOTO Gayle Johnson PHOTO PHOTO Oakland, Ca October 19, 2010

Transcript of LNG TERMINAL ENGINEERING AND MAINTENANCE...

Page 1: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

PHOTOPHOTO

LNG TERMINAL ENGINEERING

PHOTOAND MAINTENANCE

STANDARDS (LNGTEMS)( )

Presented by:

G l J hPHOTO

Gayle Johnson

PHOTOPHOTOOakland, Ca

October 19, 2010

Page 2: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Presentation Previewst

201

0 Project Background P j t D i ti

Pre

vent

ion

Firs Project Description

Final Product

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 3: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Project Backgroundst

201

0

Numerous projects proposed in California

Lempert-Keene-Seastrand Oil Spill Prevention Act

Pre

vent

ion

Firs p p

gives CSLC jurisdiction

Project Commencement – 2006

Com

mis

sion

P Project Commencement – 2006

Schedule spread over 3 years due to funding

Sta

te L

ands

C

Halcrow – Prime– Aker Kvaerner (LNG systems)

Cal

iforn

ia

– Energo Engineering (fixed platforms)– Granherne Engineering (deep water mooring)– Steve Dickenson (geotechnical)Steve Dickenson (geotechnical)

Page 4: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Project Scopest

201

0 4 Configurations

Pre

vent

ion

Firs

Conventional Pier/Wharf

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 5: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

st 2

010

Pre

vent

ion

Firs

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 6: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Project Scopest

201

0 4 Configurations

Pre

vent

ion

Firs

Conventional Pier/Wharf

Com

mis

sion

P

Deep Water Port (Cabrillo Port)

Sta

te L

ands

CC

alifo

rnia

Page 7: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

st 2

010

Pre

vent

ion

Firs

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 8: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

st 2

010

Pre

vent

ion

Firs

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 9: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Project Scopest

201

0 4 Configurations

Pre

vent

ion

Firs

Conventional Pier/Wharf

Com

mis

sion

P

Deep Water Port LNG Vessel Adjacent to Existing

Sta

te L

ands

C LNG Vessel Adjacent to Existing Platform (Clearwater Port / Grace)

Cal

iforn

ia

Page 10: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

st 2

010

Pre

vent

ion

Firs

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 11: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Project Scopest

201

0 4 Configurations

Pre

vent

ion

Firs

Conventional Pier/Wharf

Com

mis

sion

P

Deep Water Port LNG Vessel Adjacent to Existing Platform

Sta

te L

ands

C G esse djace t to st g at o Gravity Based Structure (GBS)

Cal

iforn

ia

Page 12: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

st 2

010

Pre

vent

ion

Firs

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 13: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Adriatic LNG – Offshore Italyst

201

0P

reve

ntio

n Fi

rsC

omm

issi

on P

Sta

te L

ands

CC

alifo

rnia

Page 14: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

st 2

010

Pre

vent

ion

Firs

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 15: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Not Coveredst

201

0 VesselsFSRUs

Pre

vent

ion

Firs – FSRUs

– LNG Tank VesselsTugs

Com

mis

sion

P – Tugs Siting

Sta

te L

ands

CC

alifo

rnia

Page 16: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Topicsst

201

0 Similar to MOTEMS– Structural Loading, Analysis, Performance

Pre

vent

ion

Firs Structural Loading, Analysis, Performance

– Mooring and Berthing– Geotechnical Hazards

Com

mis

sion

P – Component Structural Analysis and Design– Fire Prevention, Detection, Suppression– Piping and Pipelines

Sta

te L

ands

C – Piping and Pipelines– Mechanical / Electrical– Audits and Inspections

Cal

iforn

ia

Focus on LNG Specific Design Issues Extra Emphasis on Hazards and Risk Analyses

Page 17: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Project Statusst

201

0 Draft Document Completed June 2009

Pre

vent

ion

Firs

Industry Workshop Held In Houston Project Completed June 2010

Com

mis

sion

P

j p

Sta

te L

ands

CC

alifo

rnia

Page 18: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Challengesst

201

0 Varying Levels of CSLC Jurisdiction

Pre

vent

ion

Firs

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 19: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

st 2

010

Pre

vent

ion

Firs

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 20: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Challengesst

201

0 Varying Levels of CSLC Jurisdiction

Pre

vent

ion

Firs

Nearshore vs. Offshore Design

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 21: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Challengesst

201

0 Varying Levels of CSLC Jurisdiction

Pre

vent

ion

Firs

Nearshore vs. Offshore Design

Com

mis

sion

P

Seismic Design Standards

Sta

te L

ands

CC

alifo

rnia

Page 22: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Challengesst

201

0 Varying Levels of CSLC Jurisdiction

Pre

vent

ion

Firs

Nearshore vs. Offshore Design

Com

mis

sion

P

Seismic Design Standards– ISO vs. API

Sta

te L

ands

C SO s–Some Europeans pushing for 10,000

year RP

Cal

iforn

ia year RP

Page 23: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Challengesst

201

0 Varying Levels of CSLC Jurisdiction

Pre

vent

ion

Firs

Nearshore vs. Offshore Design

Com

mis

sion

P

Seismic Design Standards

Sta

te L

ands

C

New Technologies

Cal

iforn

ia

Page 24: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Challengesst

201

0 Varying Levels of CSLC Jurisdiction

Pre

vent

ion

Firs

Nearshore vs. Offshore Design

Com

mis

sion

P

Seismic Design Standards

Sta

te L

ands

C

New Technologies

Cal

iforn

ia

Risk Perception

Page 25: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

LNG Riskst

201

0 Perceived by many to be comparable to nuclear power plants

Pre

vent

ion

Firs nuclear power plants

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 26: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

st 2

010

Pre

vent

ion

Firs

Com

mis

sion

PS

tate

Lan

ds C

Cal

iforn

ia

Page 27: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

LNG Riskst

201

0 Perceived by many to be comparable to nuclear power plants

Pre

vent

ion

Firs nuclear power plants

Attempting to capture “best practice”

Com

mis

sion

P Attempting to capture best practice

Need to accept that we can’t eliminate risk

Sta

te L

ands

C Need to accept that we can t eliminate risk completely

Cal

iforn

ia

Page 28: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Contentsst

201

0 Chapter 1 – Intro

Pre

vent

ion

Firs

Chapter 2 – Risk Assessment– Methods of Sandia study of spill over water

Com

mis

sion

P – Methods of Sandia study of spill over water– API RP 75– API RP 14J

Sta

te L

ands

C API RP 14J– Safety critical elements, hazard identification,

consquence analysis, risk register

Cal

iforn

ia q y , g

Page 29: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Contentsst

201

0 Chapter 3 – Structural Design – Onshore– Same as MOTEMS

Pre

vent

ion

Firs Same as MOTEMS

– Different return periods for seismic

Com

mis

sion

P

Chapter 4 – Structural Design - Platforms– API RP 2A for structure

475 / 2475 RP th k

Sta

te L

ands

C – 475 / 2475 year RP earthquakes– API RP 2FB for Fire and Blast loading

Fatigue minimum deck elevations steel

Cal

iforn

ia – Fatigue, minimum deck elevations, steel

embrittlement from LNG spill

Page 30: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Contentsst

201

0 Chapter 5 – Structural Design – GBS– ISO Codes

Pre

vent

ion

Firs ISO Codes

– Concrete design per Norwegian Standards, British Standards, or DNV.

Com

mis

sion

P – ACI not as commonly used for offshore GBS

Chapter 6 Geotechnical

Sta

te L

ands

C Chapter 6 – Geotechnical– Site specific seismic hazards analysis– Dynamic soil response liquefaction slope

Cal

iforn

ia Dynamic soil response, liquefaction, slope

stability

Page 31: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Contentsst

201

0

Chapter 7 – Mooring and Berthing– Onshore uses MOTEMS

Fl ti API RP 2SK d OCIMF Si l

Pre

vent

ion

Firs – Floating uses API RP 2SK and OCIMF Single

Point Mooring Guides

Com

mis

sion

P

Chapter 8 – Geotechnical– Facility layout

Sta

te L

ands

C – Emergency shutdown and response– LNG spill containment

Fire and gas detection

Cal

iforn

ia – Fire and gas detection

– Fixed and passive fire protection

Page 32: LNG TERMINAL ENGINEERING AND MAINTENANCE …slc.ca.gov/About/Prevention_First/2010/Marine-Proposed.pdf · ommission Deep Water Port (Cabrillo Port) State Lands California . s ...

Contentsst

201

0 Chapter 9 – Pipelines– Cryogenic risers and subsea pipelines

Pre

vent

ion

Firs Cryogenic risers and subsea pipelines

Chapter 10 – Mechanical systems

Com

mis

sion

P – focus on LNG specific equipment and systems

Chapter 11 – Electrical and Instrumentation

Sta

te L

ands

C C ap e ec ca a d s u e a o– Includes seismic instrumentation

Ch t 12 I ti

Cal

iforn

ia Chapter 12 – Inspection

– Uses API RP 2SIM (Structural integrity management)