Presentation Previewst
201
0 Project Background P j t D i ti
Pre
vent
ion
Firs Project Description
Final Product
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
Project Backgroundst
201
0
Numerous projects proposed in California
Lempert-Keene-Seastrand Oil Spill Prevention Act
Pre
vent
ion
Firs p p
gives CSLC jurisdiction
Project Commencement – 2006
Com
mis
sion
P Project Commencement – 2006
Schedule spread over 3 years due to funding
Sta
te L
ands
C
Halcrow – Prime– Aker Kvaerner (LNG systems)
Cal
iforn
ia
– Energo Engineering (fixed platforms)– Granherne Engineering (deep water mooring)– Steve Dickenson (geotechnical)Steve Dickenson (geotechnical)
Project Scopest
201
0 4 Configurations
Pre
vent
ion
Firs
Conventional Pier/Wharf
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
st 2
010
Pre
vent
ion
Firs
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
Project Scopest
201
0 4 Configurations
Pre
vent
ion
Firs
Conventional Pier/Wharf
Com
mis
sion
P
Deep Water Port (Cabrillo Port)
Sta
te L
ands
CC
alifo
rnia
st 2
010
Pre
vent
ion
Firs
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
st 2
010
Pre
vent
ion
Firs
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
Project Scopest
201
0 4 Configurations
Pre
vent
ion
Firs
Conventional Pier/Wharf
Com
mis
sion
P
Deep Water Port LNG Vessel Adjacent to Existing
Sta
te L
ands
C LNG Vessel Adjacent to Existing Platform (Clearwater Port / Grace)
Cal
iforn
ia
st 2
010
Pre
vent
ion
Firs
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
Project Scopest
201
0 4 Configurations
Pre
vent
ion
Firs
Conventional Pier/Wharf
Com
mis
sion
P
Deep Water Port LNG Vessel Adjacent to Existing Platform
Sta
te L
ands
C G esse djace t to st g at o Gravity Based Structure (GBS)
Cal
iforn
ia
st 2
010
Pre
vent
ion
Firs
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
Adriatic LNG – Offshore Italyst
201
0P
reve
ntio
n Fi
rsC
omm
issi
on P
Sta
te L
ands
CC
alifo
rnia
st 2
010
Pre
vent
ion
Firs
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
Not Coveredst
201
0 VesselsFSRUs
Pre
vent
ion
Firs – FSRUs
– LNG Tank VesselsTugs
Com
mis
sion
P – Tugs Siting
Sta
te L
ands
CC
alifo
rnia
Topicsst
201
0 Similar to MOTEMS– Structural Loading, Analysis, Performance
Pre
vent
ion
Firs Structural Loading, Analysis, Performance
– Mooring and Berthing– Geotechnical Hazards
Com
mis
sion
P – Component Structural Analysis and Design– Fire Prevention, Detection, Suppression– Piping and Pipelines
Sta
te L
ands
C – Piping and Pipelines– Mechanical / Electrical– Audits and Inspections
Cal
iforn
ia
Focus on LNG Specific Design Issues Extra Emphasis on Hazards and Risk Analyses
Project Statusst
201
0 Draft Document Completed June 2009
Pre
vent
ion
Firs
Industry Workshop Held In Houston Project Completed June 2010
Com
mis
sion
P
j p
Sta
te L
ands
CC
alifo
rnia
Challengesst
201
0 Varying Levels of CSLC Jurisdiction
Pre
vent
ion
Firs
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
st 2
010
Pre
vent
ion
Firs
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
Challengesst
201
0 Varying Levels of CSLC Jurisdiction
Pre
vent
ion
Firs
Nearshore vs. Offshore Design
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
Challengesst
201
0 Varying Levels of CSLC Jurisdiction
Pre
vent
ion
Firs
Nearshore vs. Offshore Design
Com
mis
sion
P
Seismic Design Standards
Sta
te L
ands
CC
alifo
rnia
Challengesst
201
0 Varying Levels of CSLC Jurisdiction
Pre
vent
ion
Firs
Nearshore vs. Offshore Design
Com
mis
sion
P
Seismic Design Standards– ISO vs. API
Sta
te L
ands
C SO s–Some Europeans pushing for 10,000
year RP
Cal
iforn
ia year RP
Challengesst
201
0 Varying Levels of CSLC Jurisdiction
Pre
vent
ion
Firs
Nearshore vs. Offshore Design
Com
mis
sion
P
Seismic Design Standards
Sta
te L
ands
C
New Technologies
Cal
iforn
ia
Challengesst
201
0 Varying Levels of CSLC Jurisdiction
Pre
vent
ion
Firs
Nearshore vs. Offshore Design
Com
mis
sion
P
Seismic Design Standards
Sta
te L
ands
C
New Technologies
Cal
iforn
ia
Risk Perception
LNG Riskst
201
0 Perceived by many to be comparable to nuclear power plants
Pre
vent
ion
Firs nuclear power plants
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
st 2
010
Pre
vent
ion
Firs
Com
mis
sion
PS
tate
Lan
ds C
Cal
iforn
ia
LNG Riskst
201
0 Perceived by many to be comparable to nuclear power plants
Pre
vent
ion
Firs nuclear power plants
Attempting to capture “best practice”
Com
mis
sion
P Attempting to capture best practice
Need to accept that we can’t eliminate risk
Sta
te L
ands
C Need to accept that we can t eliminate risk completely
Cal
iforn
ia
Contentsst
201
0 Chapter 1 – Intro
Pre
vent
ion
Firs
Chapter 2 – Risk Assessment– Methods of Sandia study of spill over water
Com
mis
sion
P – Methods of Sandia study of spill over water– API RP 75– API RP 14J
Sta
te L
ands
C API RP 14J– Safety critical elements, hazard identification,
consquence analysis, risk register
Cal
iforn
ia q y , g
Contentsst
201
0 Chapter 3 – Structural Design – Onshore– Same as MOTEMS
Pre
vent
ion
Firs Same as MOTEMS
– Different return periods for seismic
Com
mis
sion
P
Chapter 4 – Structural Design - Platforms– API RP 2A for structure
475 / 2475 RP th k
Sta
te L
ands
C – 475 / 2475 year RP earthquakes– API RP 2FB for Fire and Blast loading
Fatigue minimum deck elevations steel
Cal
iforn
ia – Fatigue, minimum deck elevations, steel
embrittlement from LNG spill
Contentsst
201
0 Chapter 5 – Structural Design – GBS– ISO Codes
Pre
vent
ion
Firs ISO Codes
– Concrete design per Norwegian Standards, British Standards, or DNV.
Com
mis
sion
P – ACI not as commonly used for offshore GBS
Chapter 6 Geotechnical
Sta
te L
ands
C Chapter 6 – Geotechnical– Site specific seismic hazards analysis– Dynamic soil response liquefaction slope
Cal
iforn
ia Dynamic soil response, liquefaction, slope
stability
Contentsst
201
0
Chapter 7 – Mooring and Berthing– Onshore uses MOTEMS
Fl ti API RP 2SK d OCIMF Si l
Pre
vent
ion
Firs – Floating uses API RP 2SK and OCIMF Single
Point Mooring Guides
Com
mis
sion
P
Chapter 8 – Geotechnical– Facility layout
Sta
te L
ands
C – Emergency shutdown and response– LNG spill containment
Fire and gas detection
Cal
iforn
ia – Fire and gas detection
– Fixed and passive fire protection
Contentsst
201
0 Chapter 9 – Pipelines– Cryogenic risers and subsea pipelines
Pre
vent
ion
Firs Cryogenic risers and subsea pipelines
Chapter 10 – Mechanical systems
Com
mis
sion
P – focus on LNG specific equipment and systems
Chapter 11 – Electrical and Instrumentation
Sta
te L
ands
C C ap e ec ca a d s u e a o– Includes seismic instrumentation
Ch t 12 I ti
Cal
iforn
ia Chapter 12 – Inspection
– Uses API RP 2SIM (Structural integrity management)