    LEADERS IN LNG

  • 8/13/2019 LNG Brochure by FW

    2/12

  • 8/13/2019 LNG Brochure by FW

    3/12

    We are a key player in the LNG industry. We have demonstratedour ability to deliver high quality LNG facilities which meet ourclients objectives.

    We have also pushed the boundaries of LNG, pioneeringmodularization of liquefaction plants, working on ever-increasingLNG train sizes, applying creativity to solve technical challenges,

    developing innovative offshore options, overcoming environmentalissues and meeting local content requirements.

    As were also experts in onshore and offshore upstreamdevelopment, we can design and execute the entire gas fielddevelopment and monetization project, from wellhead to terminal,and from concept to start-up.

    From studies to commissioning, we add value:

    Concept development

    Front-end engineering design (FEED)

    Engineering, procurement & construction (EPC) Commissioning & start-up

    1

    We are a global EPC contractor witha proven track record of safely and

    successfully delivering world-scaleprojects, including LNG facilities.

    LEADERSIN LNG

    Image: Courtesy of Woodside Energy Ltd

    Delivering your LNG project,anywhere in the world.

    Front cover image: Courtesy of Woodside Energy Ltd

  • 8/13/2019 LNG Brochure by FW

    4/12

    Fundamental to the success of any project is the right start. We work withour clients from the earliest stages of their LNG project development to helpshape their planned LNG investment in line with their objectives. This earlydevelopment stage is where our proven study capability and extensive EPCexperience combine to add significant value.

    LNG LIQUEFACTIONConcept Development

    2

    Our specialist consultancy teams combine the skills ofour highly qualified LNG experts with the benefits of ourextensive in-house cost and schedule information andour project execution know-how based on successfuldelivery of thousands of projects around the world.

    Our experts work very closely with our clients to develop,analyze and evaluate a wide range of concepts, plantconfigurations, technologies and execution strategies toarrive at optimum solutions.

    We have executed a wide and diverse range of LNGstudies and pre-FEEDs for both onshore and offshoreplants covering most liquefaction technologies and plantconfiguration options.

  • 8/13/2019 LNG Brochure by FW

    5/123

    We have also been instrumental in developingmethodologies for early assessment of constructabilityissues to support strategic execution decisions suchas the degree of modularization and optimummodule sizing.

    We add value Feasibility and pre-FEED studies

    Configuration studies

    Technology evaluation

    Risk-management assessment

    Pioneering modularization concepts

    Real cost and schedule data benchmarks Carbon capture and storage solutions

    First CBM to LNGSantos GLNG

    AustraliaWe completed a detailed pre-FEED concept selectionstudy for a 3-4 mtpa liquefaction plant and associatedinfrastructure, planned to be one of the first LNG facilitiesin the world to use coal-bed methane as a feedstock forLNG production.

    We also executed the FEED for the extraction, collection,compression and transportation of coal-bed methane tothe transmission pipeline, and associated infrastructureand services, including power generation and watertreatment facilities.

    ModularizationPluto LNG ProjectAustraliaWe started the massive Pluto Train 1 project withfeasibility and pre-FEED studies undertaken by ourspecialist consultancy team, combining the teams LNGstudy capability with the extensive modular design andconstruction expertise of our EPC organization toimplement a modular approach. Having completed theFEED for the foundation project, we are now executingthe EPCm phase with our JV partner, and we areprogressing a FEED study for the Pluto Train 2 and

    Train 3 expansion.

    Offshore LNGBrowse LNGAustraliaWe completed detailed concept studies for a plannedfacility to produce LNG from the Browse Basin, off thecoast of Western Australia, developing a number of bothonshore and offshore concepts, including:

    input to site selection

    modularization liquefaction technology evaluation

    driver selection

    LPG extraction

    cooling media

    heat integration

    platforms and gravity-based structures

    We have optimized liquefaction plant concepts for

    hundreds of capacity and location combinations.

  • 8/13/2019 LNG Brochure by FW

    6/124

    Images: Courtesy of Woodside Energy Ltd

    LNG LIQUEFACTIONExecution & Delivery

    We enjoy a challenge! LNG liquefaction facilities are large, complexdevelopments, frequently in remote and challenging locations. Our track recorddemonstrates our ability to deliver entire liquefaction projects, including all

    offsites and infrastructure.

    With our in-depth technical expertise, global EPC experience and particularly ourproven ability to execute large and complex projects successfully and safely, weare a key player in the LNG market.

  • 8/13/2019 LNG Brochure by FW

    7/125

    World-class SafetyWe strive continuously to improve our already world-classsafety record. We have received over one hundred safety

    awards from clients, safety and industry organizations,and government bodies around the world.

    Delivering Local ContentWe have proved that we can deliver our projects in linewith our clients local content objectives, whether itinvolves local execution, local partners, local materialsand equipment supply, matching export credit needs, ortraining a local workforce.

    North West Shelf Venture Phase V Expansion

    Western AustraliaWe led the JV executing the EPC contract for theconstruction of a fifth LNG processing train of up to4.4 mtpa capacity at the Woodside-operated Karrathagas plant. Our in-depth modular design andconstruction experience was pivotal to this ground-breaking project, the first onshore liquefaction plant inthe world to be designed and built in modules. In all,there were 75 separate modular structures, the largestof which contained the majority of the liquefactionprocess equipment.

    PETRONAS MLNG DuaMalaysiaWe were FEED and EPC contractor on a debottleneckingproject to increase LNG production by 1.2 mtpa. A newextended end flash unit was added to each of the threeDua trains, the existing gas turbines upgraded and twonew Frame 5 gas turbine generators installed.

    We have a long track record with Malaysias LNGfacilities, having been project management consultantfor both the Dua and Tiga developments, whichwere two and three-train expansions at the Bintulu

    LNG facility.

    My sincere congratulations to you and your teamsin Oman for delivering a world-class project achieved through overwhelming dedication andcommitment some 17 days ahead of theguaranteed date of 34 months from contract

    award, which was itself a tough timeframe.

    Executive Director, Shell

    NLNG SevenPlusNigeriaWe delivered the FEED for a new natural gasliquefaction train, producing 8.5 mtpa of LNG, the

    largest planned LNG train in the world. The designand execution planning for this mega-train presentedunique challenges in terms of remote location and scaleof development.

    Qalhat LNGOmanWe designed and built this LNG facility, with our JVpartner, ahead of the target 34-month schedule andwithin budget. With the close co-operation of OmansMinistry of Manpower, the project achieved its localcontent Omanization target of 38%, the highest

    recorded for any construction project in the Sultanate.It also achieved a truly world-class safety performanceof 20 million manhours with no lost-time incidents.

    Located in a desert area on the coast of the Gulf ofOman, the project included marine facilities consistingof seawater inlet and outfall pipelines, seawater intakeand weir box structures.

    We set our own high benchmark. The 3.3 mtpaliquefaction train was built to the same specificationsand similar technical design and stick-built construction

    as the two existing LNG liquefaction trains, alsodesigned and built by the JV team on a fast-trackschedule, safely and with a fault-free start-up.

  • 8/13/2019 LNG Brochure by FW

    8/126

    ModularizationIn Australia, we pioneered the modularization approachto LNG plants, using all of the modularization

    experience we have gained over the last 20 years.During this time we have designed and constructedmore than 30 modular projects around the worldcomprising more than 1,500 modules.

    Train 5 has been safely and successfullycompleted on time and at a highly competitivecost in an environment of extremely constrainedresources. This remarkable achievement istestament to the focus and commitment of theproject team in delivering this additionalproduction infrastructure.Eve Howell

    Executive VP North West ShelfWoodside Energy Ltd

    Pluto LNGAustraliaWe are leading the FEED and EPCm phases for theonshore component of this 4.3 mtpa LNG facility withour JV partner. The plant has been designed and isbeing built in modular form. Around 250 modules andpre-assemblies, the largest of which contains themajority of the liquefaction process equipment, havebeen fabricated in Thailand.

    This greenfield project includes a single LNGproduction train, a fractionation unit, an acid gasrecovery unit, gas purification units, tank storagefacilities, a boil-off gas compressor, loading berths,gas turbine power generation units, utilities, a jetty,and supporting infrastructure.

    We have subsequently been awarded a FEED contractfor Trains 2 and 3 of this ground-breaking project.

    PUSHING THEBOUNDARIESFor us its not just about setting new benchmarks for cost, schedule,safety, quality and train size. Its also about developing innovative newtechnical solutions to meet our clients objectives, or to overcome thechallenges that they face.

  • 8/13/2019 LNG Brochure by FW

    9/127

    Offshore & Floating LNGBrowse LNGAustraliaThe gas fields within the Browse Basin, some 300km offthe coast of Western Australia, are located in relativelydeep water. We explored the feasibility of a groundedoffshore LNG solution and executed detailed evaluationof environmental, safety, technical, economic andconstructability aspects in order to determine a credibleoffshore LNG concept. The conceptual base caseinvolved jacket-based platforms for gas reception,utilities and accommodation. The main LNG process

    trains, associated LNG tanks and jetties would besupported by concrete gravity structures, floated to theirfinal location.

    Arctic & Remote RegionsStatoilNorwayOur study for the Snhvit LNG Train II at Melkyabrought many interesting challenges, not least that thesite was 450km north of the Arctic Circle. The worldsnorthernmost LNG plant, it has a design capacity of4.2 mtpa and processes gas transported through a143km pipeline from subsea facilities. Melkyaexperiences long periods of darkness and lowtemperatures, with storms blowing in sea spray thatfreezes as it hits structures. So our study focused onminimizing the work required on site, with maximummodularization in the fabrication yard.

    Carbon Capture & StorageWe have already worked on a wide range of plannedprojects for the capture and storage of CO2 and believewe are at the forefront of this emerging area of strongfocus for our industry.

    We have developed a real in-depth understanding ofthe many capture options, including pre-and post-combustion, and storage options, the technicalchallenges and their potential solutions.

    Images: Courtesy of Woodside Energy Ltd

  • 8/13/2019 LNG Brochure by FW

    10/12

    LNG RECEIVINGTERMINALS

    8

    We have worked with a wide range of clients around the world, delivering

    expert services for new terminals, both onshore and offshore, and forexpansions, including technical development and design, cost estimating,permitting and project execution. We have particular expertise in optimizingan entire facility, and integrating the regasification element with otherfacilities such as power generation.

    Send-Out GasFor LNG receiving terminals serving the North American

    market particularly, the C2+ content and heating valuespecifications for send-out gas are lower than mostnatural gases and most existing LNG baseload plants.

    Cost-effective management of these componentsenhances the LNG value chain, increasing flexibility insourcing LNG cargoes. Our cost-effective processdesign manages the C2+ content of send-out gas at theLNG receiving terminal, coupling Foster WheelersC2/C3 terminal extraction process with a pre-reformerthat produces a low calorific substitute natural gas forre-injecting into the LNG terminal send-out gas.

    VaporizationWe have developed a process that uses the waste heat

    from either power plant or industrial facilities for LNGvaporization. By using the LNG as both a working fueland a heat sink, this new configuration efficientlyeliminates fuel requirements while reducing oreliminating emissions and improving the plants thermalefficiency and overall profitability.

  • 8/13/2019 LNG Brochure by FW

    11/12

    Confidential ClientNorth AmericaWe were project management consultant for an LNGregasification terminal. We also provided technicaladvisory services during the detailed EPC commissioningand start-up phases.

    Polskie LNGPolandWe designed this regasification terminal for the reception

    and storage of LNG. For phase 1 of the study, up to385,000 Nm3/h LNG will be pumped out from storagetanks, vaporized and sent to a natural gas transmissionsystem. Two further expansions are planned,570,000 Nm3/h in phase 2 and 800,000 Nm3/h inphase 3. We also studied the possibility of installing acombined system to use the boil-off gas produced in theterminal as fuel gas. Following our conceptual study, weexecuted the basic design and part of the FEED.

    Castle Peak PowerHong Kong

    Our study scope included expansion of the existingLNG terminal and power plant, and integration of thenew facilities to enhance the efficiency of the combined-cycle plant.

    Singapore LNGSingaporeWe are project management consultant for Singaporesfirst LNG terminal, which will have an initial capacity of3.5 mtpa with provision for expansion to 6 mtpa. Thisprestigious project, which will help ensure the security ofSingapores energy future, is targeted to be ready for

    start-up in 2013.

    Petronet LNG

    IndiaWe were project management consultant for this new5 mtpa receiving terminal at Dahej, comprising two140,000m3 above-ground cryogenic containment tankswith associated process facilities for the storage andhandling of LNG.

    EnagsSpainWe have enjoyed a significant level of repeat businesswith Enags, carrying out three LNG terminal expansionsin Barcelona, performing basic design and EPCm, or EP,

    and civils work. In Cartagena, we have worked withEnags for more than ten years, undertaking fourexpansions, and at Palos de la Frontera, we havecompleted two expansions.

    Delivering regasification projects around the world

    REGASIFICATION FLOW SCHEME

    Vapor Return Line

    LNGTanker

    LNGUnloading Arm

    Boil-Off GasCompressor

    Recondenser

    LNGStorage Tanks

    1st StageSendoutPumps

    2nd StageSendout Pumps

    Vaporizer

    To Pipeline

    Fuel Gas

  • 8/13/2019 LNG Brochure by FW

    12/12

    contact us at:

    [email protected] www.fwc.com

    LEADERS AT EVERY STAGE

    Upstream Oil & GasGas MonetizationLNG