LMP Electricity Markets: Market Operations, Market Power, and Value for Consumers EMRI Symposium...
-
Upload
stanley-watkins -
Category
Documents
-
view
220 -
download
0
Transcript of LMP Electricity Markets: Market Operations, Market Power, and Value for Consumers EMRI Symposium...
LMP Electricity Markets:Market Operations, Market Power,
and Value for Consumers
EMRI Symposium
American Public Power AssociationFebruary 5, 2007
Presented by Ezra Hausman and Robert Fagan
LMP Electricity Markets:Relatively Weak, Short-Term Price Signals
for Consumers who Can’t Respond and Producers who would Prefer Not To
EMRI Symposium
American Public Power AssociationFebruary 5, 2007
Presented by Ezra Hausman and Robert Fagan
3 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
SECTION I – LOCATIONAL MARGINAL PRICING
SECTION II – PRICE SIGNALING
SECTION III – COMPETITIVENESS AND MARKET POWER
SECTION IV – IMPACTS ON CONSUMERS
Overview of Synapse LMP Report
…how it is supposed to work
…what it is supposed to do
…who makes the money
…and who pays the price
4 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP: Single Clearing Price Markets
0
50
100
150
200
250
300
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Cumulative Capacity (MW)
Mar
gin
al C
ost
or
Off
er (
$/M
Wh
)
Instantaneous load
Clearing price for interval
Rule: Dispatch the cheap stuff first.
5 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP: Locational Clearing Price Example
B
C
A
Import limit = 300 MW
Load = 800 MW
Capacity = 300MWOffer = $50/MWhDispatch =100
Capacity = 400MWOffer = $15/MWhDispatch = 400MW
Capacity = 1000 MWOffer = $20/MWhDispatch = 300 MW
Rule: Dispatch the cheap stuff first… …subject to transmission constraints
LMP = $20/MWh
LMP = $50/MWh
6 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
Dom
inio
n
PS
EG
PE
PC
O
AE
CO
BG
E
RE
CO
JCP
L
DP
L
PE
CO
Met
-Ed
PP
L
AP
PE
NE
LEC
AE
P
Com
Ed
DA
Y
DLC
O
PJM Zone
Pri
ce (
$/M
Wh
)
2004 All-Hours
2005 All-Hours
Tier I Tier II Tier III Tier IV
7 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling
0.0
20.0
40.0
60.0
80.0
100.0
120.0
Jan-
99
Jul-9
9
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
Jul-0
4
Jan-
05
Jul-0
5
PSEG peak
BGE peak
PPL peak
PSEG off-peak
BGE off-peak
PPL off-peak
8 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling
-$5
$0
$5
$10
$15
$20
$25Ja
n-99
Ma
y-99
Sep
-99
Jan-
00
Ma
y-00
Sep
-00
Jan-
01
Ma
y-01
Sep
-01
Jan-
02
Ma
y-02
Sep
-02
Jan-
03
Ma
y-03
Sep
-03
Jan-
04
Ma
y-04
Sep
-04
Jan-
05
Ma
y-05
Sep
-05
Month
Pri
ce D
iffe
ren
ce (
$/M
Wh
)
PSEG vs. PPL On-Peak
PSEG vs. PPL Off-Peak
9 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling
Generation New Entry
Generation Retirement
Merchant Transmission
Demand Response
We reviewed the response in terms of…
10 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: New Generation
0
1000
2000
3000
4000
5000
6000
1999 2000 2001 2002 2003 2004 2005 2006
In-Service Year
MW
Ad
ded
Oil and Diesel
Hydro and Renewable
Nuclear
Coal
Gas
11 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
Dom
inio
n
PS
EG
PE
PC
O
AE
CO
BG
E
RE
CO
JCP
L
DP
L
PE
CO
Met
-Ed
PP
L
AP
PE
NE
LEC
AE
P
Com
Ed
DA
Y
DLC
O
PJM Zone
Pri
ce (
$/M
Wh
)
2004 All-Hours
2005 All-Hours
Tier I Tier II Tier III Tier IV
12 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: New Generation
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
1999 2000 2001 2002 2003 2004 2005 2006
Year
Cap
acit
y A
dd
itio
ns
(MW
)
Tier 1
Tier 2
Tier 3
Tier 4
13 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: Retirements
-4,000
-2,000
0
2,000
4,000
6,000
8,000
10,000
12,000
1999 2000 2001 2002 2003 2004 2005 2006
Year
MW
New
Retired
Cumulative net additions (MW)
Net Annual Additions (MW)
14 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: Retirements
0
100
200
300
400
500
600
1999 2000 2001 2002 2003 2004 2005 2006
Year
Cap
acit
y R
etir
emen
ts (
MW
)
Tier 1
Tier 2
Tier 3
Tier 4
15 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: Net new entry
-2,000
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
1999 2000 2001 2002 2003 2004 2005 2006
Year
Cu
mu
lati
ve N
et A
dd
itio
ns
(MW
)
Tier 1Tier 2Tier 3Tier 4
16 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: Congestion Costs
$0
$200
$400
$600
$800
$1,000
$1,200
Aug
03
Oct
03
Dec
03
Feb
04
Apr
04
Jun
04
Aug
04
Oct
04
Dec
04
Feb
05
Apr
05
Jun
05
Aug
05
Oct
05
Dec
05
Feb
06
Apr
06
Jun
06
Month
Gro
ss C
on
ges
tio
n C
ost
s($
Mil
lio
n)
Other
EAST
WYLIERID500 KV TRAN 5
WYLIERID500 KV TRAN 7
KMF
50045005
KAMMER 765 KV T200
BRANCHBU500 KV 500-1
LINE 500 KV DOU-MTS
LINE 500 KV MTS-PRU
BED-BLA
17 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: Congestion Costs
$0
$20
$40
$60
$80
$100
$120
Aug 0
3
Oct 03
Dec 0
3
Feb 0
4
Apr 0
4
Jun
04
Aug 0
4
Oct 04
Dec 0
4
Feb 0
5
Apr 0
5
Jun
05
Aug 0
5
Oct 05
Dec 0
5
Feb 0
6
Apr 0
6
Jun
06
Month
Un
hed
gab
le C
on
ges
tio
n C
ost
(Mill
ion
$ p
er M
on
th)
All Others
BRIGHTON 500 KV NO.1TR
LINE 230 KV ADA-BENX
CEDAR
JACK ME 115 KV 5 BA-S
WALDWICK 345 KV 345-2
LINE 500 KV MTS-PRU
LINE 500 KV CLO-LEX
BRANCHBU500 KV 500-1
BED-BLA
Detail area(Fig. 3.16)
18 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: Merchant Transmission
From PJM RTEP (April 2006):2.4: Merchant Transmission Activity
Once thought to offer a long-term solution to long distance transmission needs, few merchant transmission proposals have emerged. Financing has proven difficult for projects given uncertain revenue streams in part the result of insufficient subscription up front. Further, the difficulties, risks and realities associated with securing rights-of-way and environmental clearances have also had a dampening effect on the emergence of long distance proposals.
19 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: Demand Response
0
100
200
300
400
500
600
700
$0 $50 $100 $150 $200 $250
Payment for Load Reduction ($/MWh)
200
5 M
Wh
Sh
ed
per
MW
in
Pro
gra
m
20 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: Demand Response
-5.0%
-4.0%
-3.0%
-2.0%
-1.0%
0.0%
1.0%
2.0%
$0 $50 $100 $150 $200 $250
Payment ($/MWh)
Ch
ang
e in
% P
art
icip
ati
on
fro
m 2
005
to
20
06
21 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
LMP Price Signaling: Why doesn’t it work?
• Short-term and volatile nature of price signals
• More compelling reasons for choosing sites, such as access to existing infrastructure, zoning restrictions, and local opposition.
• The lumpy nature of infrastructure investments
• Investments may curtail or eliminate the price signal
• Prices reflect bids, not cost
• Free riders
• No certainty of return on investment
• Relatively Weak, Short-Term Price Signals for Consumers who Can’t Respond and Producers who would Prefer Not To
Is RPM the answer?
(RPM = Rate Payers’ Money…)
22 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
Competitiveness and Market Power in LMP RTOs
• Overview
• PJM Market Structure, Conduct, Performance
• PJM Monitoring / Mitigation
• Quantitative Analysis of Bid (Offer) Data in PJM and ISO NE
23 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
Competitiveness and Market Power in LMP RTOs - Overview
• Competitiveness– Prerequisites: low supplier concentration, ease of entry,
elastic demand, transparent information, foresight– These are not attributes of the electricity “marketplace”– Result: need for regulatory oversight, and/or mitigation
• Market Power – Supplier concentration – Demand elasticity– Product and geographic markets: energy, capacity, local
constraint relief
• Market Monitoring and Mitigation– Present in all LMP RTOs, for spot markets
24 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
Competitiveness and Market Power in LMPRTOs - PJM 2005 (after 5/1) Structural Concentration
• Low-to-moderate aggregate market concentration (low HHI), but averages mask locational, temporal, segment deviationsHHIs (PJM SOM 2005):– Energy, Aggregate, 855-1565, average=1200– Energy, by Segment (base, intermediate, peak),
717-10,000, average= 1362/2793/4437– Capacity, 896-917
• Very high concentrations in local market power areas
25 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
Competitiveness and Market Power in LMP RTOs – PJM Concentration - Select Constraints
• Supplier HHI “behind” constraint – local market power
Region or Interface Constraint HHI
PSEG Roseland-Cedar Grove 8198
Branchburg transformer 2998
Eastern interface - 1575
AECO Laurel-Woodstown 9012
PENELEC Erie West transformer 3306
PECO Chichester-Linwwood 2988
AEP Cloverdale-Lexington 1078
Kanawha R-Matt Funk 1066
Mahans Lane-Tidd 10000
AP Mitchell-Shepler Hill 10000
Mt. Storm-Pruntytown 1048
Bedington-Black Oak 1083
Western interface - 1130
26 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
Competitiveness and Market Power in LMP RTOs – PJM Conduct / Performance
• Conduct: Offer prices above marginal cost
Lerner Index
Year PJM Raw PJM Adjusted ISO NE
2002 2.0 % 11.0 %
2003 3.0 % 12.0 % 9 %
2004 3.4 % 8.4 % 3 %
2005 0.3 % 3.9 % 6 %
Sources: PJM State of the Market Reports for 2005, 2004, 2003 and 2002; ISO NE 2005 Annual Markets Report
27 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
Competitiveness and Market Power in LMP RTOs – PJM Monitoring / Mitigation
• Monitoring– Spot markets monitoring– Bilateral market: no public data akin to analysis in State
of the Market reports
• Mitigation– $1,000/MWh Offer Cap (unconstrained system)– Marginal cost + 10%, local market power (constrained
system)– Local market power: three pivotal supplier test used– Exemptions from offer cap
28 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
$0
$100
$200
$300
$400
$500
$600
$700
$800
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
Day in July 2005
Off
er P
rice
($/
MW
h)
Single Company “E1” Offer Data – PJM – by day, July 2005
29 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
0
50
100
150
200
250
300
010
0020
0030
0040
0050
0060
0070
0080
0090
00
1000
0
1100
0
1200
0
1300
0
1400
0
1500
0
1600
0
1700
0
Cumulative Capacity (MW)
Pri
ce (
$/M
Wh
)
July 6 Offers from E1
July 13 Offers from E1
Single Company “E1” Portfolio – Offer Curve Comparison
30 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
Concluding Thoughts
What elements will impact consumers?• RGGI, other state policy
– Considerably increased energy efficiency
• State level procurement changes– Greater use of long-term contracting
• Transmission Improvements– RTEP, Economic– Reduced congestion
• Locational capacity markets– Will the incentives work? Lessons from LMP
31 www.synapse-energy.com | ©2007 Synapse Energy Economics Inc. All rights reserved.
Thank you…
Invaluable assistance from Synapse staff:David White, Kenji Takahashi, Alice Napoleon, Bruce Biewald, Jennifer Kallay, and Melissa Whited
Support and feedback from APPA:Elise Caplan and John Kelly
THANK YOU!