LLI-010 Introducing nature tourism for all / UniGreen€¦ · Roia ROJAS BAG. ROJAS . RðJÁ UBLIC...
Transcript of LLI-010 Introducing nature tourism for all / UniGreen€¦ · Roia ROJAS BAG. ROJAS . RðJÁ UBLIC...
LLI-010 "Introducing nature
tourism for all" / UniGreen
Trail along ROJA seaside
08.11.2017.
Latvia
Trails location in beach of Roja
Trail situation before renovation
Trails renovation Renovation works were started at 19.07.2017 and finished at 19.09.2017 The results of this project has been built wooden walking trail – 512,70m long and 2,00m wide, with 4 turning squares and one info stand. Constructions costs: 49 985,99 eur. Wooden trail are adapted for peoples with disabilities.
Trail renovation Things to do: Development the info plate and placement it on the info stand (november-
december) In the spring – locate the visitor counter at the trail On the info stand will be display following information: plan of Roja public beach with all available infrastructure and services; information about biotopes at the beach area and information about activities what can do and can not do in the dune area.
THANK YOU!