LJT DESIGNS 2010 Second Floor Remodel

22
LJT DESIGNS 2010 Second Floor Remodel

description

This second floor remodel transformed a 1960's antiquated floor plan into the 21st century. We gutted and enlarged the master bathroom and the hall bath; enlarged the master closet and added a second master walk-in closet off the bathroom. The master bedroom and hall carpet was replaced with hardwood floors and the remaining 3 bedrooms were carpeted, painted, had new light fixtures installed and all the doors and millwork was refurbished bringing this newly renovated gem into the 21st century!.

Transcript of LJT DESIGNS 2010 Second Floor Remodel

Page 1: LJT DESIGNS 2010 Second Floor Remodel

LJT DESIGNS

2010

Second Floor Remodel

Page 2: LJT DESIGNS 2010 Second Floor Remodel

Master bedroom: Before:

THE master Bathroom was enlarged by taking 34” from the back wall of the

master bedroom which included the window below thereby providing natural

light in the bath.

Page 3: LJT DESIGNS 2010 Second Floor Remodel

After...

we removed wallpaper, painted walls, installed hardwood floors

and added New bedroom furniture

Page 4: LJT DESIGNS 2010 Second Floor Remodel

before... Master bedroom Closet on left was Expanded by taking 2 feet from bedroom #3

which allowed for additional hanging space. The sliding door was

replaced with a new hinged door and shelves added for audio/tv equipment.

Page 5: LJT DESIGNS 2010 Second Floor Remodel

Before...

After...

Installed new closet system and

shelving for audio equipment and

shoes

Page 6: LJT DESIGNS 2010 Second Floor Remodel

After... Same tv wall

Page 7: LJT DESIGNS 2010 Second Floor Remodel

During... Left photo shows shelving for shoes and

equipment; right photo shows openings for equipment which

was covered by a door which matched the walls

Page 8: LJT DESIGNS 2010 Second Floor Remodel

During... Master bathroom: retrofitted new dresser as vanity

Page 9: LJT DESIGNS 2010 Second Floor Remodel

During...

installed above counter

sinks, wall mounted faucets

and sconces on mirror

which is bordered in mosaic

tiles.

Page 10: LJT DESIGNS 2010 Second Floor Remodel

During... On left: converted former bathtub/toilet area

to second walk-in closet and shower

Page 11: LJT DESIGNS 2010 Second Floor Remodel

After...

Recessed lights were

installed.

Toilet and plumbing was

relocated to immediate

right in photo next to half

wall

Page 12: LJT DESIGNS 2010 Second Floor Remodel

During and after...

Converted toilet room with tub into shower and additional walk-in closet

Page 13: LJT DESIGNS 2010 Second Floor Remodel

During... Left photo: Shower Floor. Right photo: shower

walls with intricate Mosaic and tile set at a 45 degree angle

Page 14: LJT DESIGNS 2010 Second Floor Remodel

After... shower on left and mirrored Closet door on right

Page 15: LJT DESIGNS 2010 Second Floor Remodel

During and after...

Relocated toilet next to half wall and entrance to

bath

Page 16: LJT DESIGNS 2010 Second Floor Remodel

During... created a tile ‘rug’

Page 17: LJT DESIGNS 2010 Second Floor Remodel

During... Another shot of the tile rug from opposite direction

Page 18: LJT DESIGNS 2010 Second Floor Remodel

After...

Page 19: LJT DESIGNS 2010 Second Floor Remodel

Before...

Second floor hall bath

completely gutted

Page 20: LJT DESIGNS 2010 Second Floor Remodel

after...

new vanity, mirror, toilet,

wall sconces plus

recessed cans were

installed in the ceiling

Page 21: LJT DESIGNS 2010 Second Floor Remodel

After... New floor on left – new tub and tile using a

honed/dull finished 12 x 12 tile bordered by a polished mosaic

Page 22: LJT DESIGNS 2010 Second Floor Remodel

After... Bedroom #2 pictured. all second floor bedrooms were updated with

carpet, paint, new light fixtures, and the doors and woodwork were refinished.