Corporate slide master With guidelines for corporate presentations
LITWIN Corporate Presentation Master 02
-
Upload
serban-ionescu -
Category
Documents
-
view
161 -
download
2
description
Transcript of LITWIN Corporate Presentation Master 02
Litwin 2013 1
Corporate PresentationFebruary 2013
Litwin 2013 2
Target Industries & Market Segments
OIL & GAS ENERGY INDUSTRIES
• Production
• Processing
• Transport
• Refining
• Generation
• Cogeneration
• Renewable
• Waste Management
• Flue gas treatment
• Petrochemicals
• Processing
• Fertilizers
• Chemicals
• Bio-fuels
Litwin 2013 3
Recent development
Litwin, established in 1955, has been taken over by a group of investors.
It is headed by its former CEO who successfully developed and managed this engineering firm from 2004 to 2008
Litwin 2013 4
Industry Expertise
- Oil & GasCrude Oil Production Facilities
Boosting & Pumping Stations
Crude Oil Production Facilities
Topsides
Refining Units• Crude Oil Units• Hydro treating
- Energy & EnvironmentPower Plants
Cogeneration, Tri-generation
Combined cycle
Waste to Energy Plants
Flue Gas Treatment
- Industries & ServicesPetrochemicals
Chemicals
Feasibility Studies
Industrial assessments
• Procurement• Construction• Start-up• Operation
Litwin 2013 5
Competitive Advantages
Proven track record of developing marketing in high growth regions where Litwin has a strong cultural affinity.
Expertise and skills in market segments where most of the investment are directed (Oil & Gas, Energy, Environment, Petrochemicals)
Recognized complementarities with major equipment suppliers (e.g. Siemens, ABB, etc.)
Partnership with selected Middle East and Asia international companies.
Close working relationship with its procurement specialist affiliateICARE Procurement Services.
Engineering Consultancy services provide early involvement in projects.
Recognized skills for PMC when required by clients.
Multi disciplinary in-house competencies.
State of the art engineering tools.
Strong QA/QC system.
6
Procurement
For Procurement Litwin shall use its affiliate organization, ICARE Procurement Services (IPS) as the link between Engineering and Construction by sourcing, purchasing and delivering bulk materials and equipment.
The procurement team of IPS will ensure that all materials and equipment purchased are manufactured or fabricated in accordance with engineering specifications, and delivered to the construction site on schedule.
IPS manages an extensive database of suppliers as a result of continuous feed back and quality monitoring worldwide through its Europe and Middle East offices together with its partners in Asia.
Litwin 2013
Litwin 2009 7
LITWIN has designed, produced or revamped more than 500 Refining units throughout the world, amongst them:
Crude Oil & Vacuum Distillation Units
Fluid Bed Catalytic Crackers
Hydrotreating Units
Catalytic Reformers
Hydrocrackers, Mild Hydrocrackers
LPG recovery units
“Prime G” Units
Alkylation Units
Isomerization Units
Lube Oil Plants
Sulphur Recovery Plants
Asphalt Units
Visbreaking
MTBE
Refining
Litwin 2009 8
Chlorine-caustic
Ethylbenzene
Ethylene oxide / glycol
Hexane
Isocyanates
Methanol
Methylmethacrylate
Nitric acid
Phenol
Cumene
Acrylic Esters
Acrylonitrile
Alpha Olefins
Aromatics
Bromide compounds
Carbon black
Chlorinated hydrocarbons
LITWIN has designed, produced or revamped more than 200 Petrochemical or Chemical units throughout the world, amongst them:
Process & Petrochemical Plants
9
Power Generation
Litwin 2013
LITWIN has been involved in more than 70 power projects doing EPC, revamp, services as well as design and safety studies throughout the world, amongst them:
Fossil Fuel
• Combined Cycle Power Plants
• Industrial Co-generation Plants
• District Heating Co-generation Plants
• Tri-Generation Plants
Renewable Fuel
• Waste to Energy Plants
• Biomass Plants
Nuclear Power
• Nuclear Units Effluent Treatment Solids (TES),
• Auxiliary Circuits,
• Specialized Tools and Equipment
• Nuclear Waste End Storage Solutions
• Risk Analysis & EIA Studies
10
Naphtha HDT, FCC gasoline HDT (Total RN, Ceska Kralupy)
Catalytic Reforming (Total RN, Boukhara, Polimex Gdansk, Lukoil Nijni Novgorod)
GO HDS (Total RN, Total Nangis)
FCC (Total RN)
Isomerisation (Total la Mède)
Mild hydrocracking (IES Montova)
Crude distillation / vacuum distillation (Total RN, Tupras Izmit, Midia Constanza)
Tank farm (HTTSA Tanger)
Crude and Gas treatment (Sonatrach Rhourde Nouss, Burlington/Sonatrach Berkin bassin, Mashinoimport Tenguiz)
LPG Storage (Total Cameroun)
Gas compression (GRT Gas Oscar, NIOC South Pars)
Gas underground storage (Storengy Beynes)
Engineering Strength
Litwin 2013
11
Software-Tools
PhastCFastAFT FathomPhaworksHazop mANAGERDnv ProPipenet
INDUSTRIALRISKS
PDS / PDMSSmartplant PIDSmart Plant 3D ReviewPelican Forge
PIPING CAD
DRAWING
Microstation 2D & 3DAutocad 2D & 3D
INSTRUMENTATION &CONTROL
SmartPlant Instrumentation (INtools)
ELECTRICITY
Caneco
EQUIPEMENT
HTRI/ISTMICROPOL
VESSELS
Microprotol
CIVIL ENG & STRUCTURES
Staad ProRobot MilleniumFrameWorksTriforma/Power CivilSmartPlant 3DPDMS
PIPING/PIPING ANALYSIS
Caesar II
MANAGEMENTMATERIAL/PIPING
MICROPIPE
PLANNING
PRIMAVERAMS PROJECT
MANAGEMENT ENGINEERINGDOCUMENTS
MEDOC
MANAGEMENT VENDOR/ SUPPLIER DOCUMENTS
VDCS
MAN HOURS
TRACS
ENGINEERING&
PROJECTMANAGEMENT
ESTIMATION
DEVIS
Activities control
RESPLAN
QUALITY
MANOLI
Litwin 2013
12
Software Applications for Project Management
RESPLAN - For Personnel allocation planification
MEDOC - For Engineering Document control and Physical progress measurements
VDCS - For Supplier documentation control
TRACS - To follow-up spent hours
DEVIS - To estimate man-hours budget in proposals
PRIMAVERA / MICROSOFT PROJECT - For time Schedule
Litwin 2013
13
Software for Process
• Hysis: Basic Engineering (process flow sheet, static simulation)
• Pro II: Basic Engineering (process flow sheet, static simulation)
• Thermoflow (Thermal calculation)
Software for Industrial Risk
• Phast: Process Hazard Analysis Software Tools
• Cfast: Fire Effects Evaluation in Buildings
• AFT Fathom: Hydraulic Analysis of Piping Network
• Phaworks
• Hazop Manager
• Pipenet
Litwin 2013
Software Applications for Engineering
14
Software for Instrumentation• Smartplant Instrumentation
Software for Electrical• Caneco
• PowerTools
• ARRCAD
• GroundMat
Software for Equipment• MICROPOTOL (boiler making)
• HTRI (Thermal calcs)
Litwin 2013
Engineering Tools
Software for Civil Works / Structural• STAAD PRO (calcs)
• ROBOT Millenium (calcs)
• FrameWorks Plus (Steel Structure Modeling)
• Power Civil (Road and Landscape Modeling)
15
MicroStation
AUTOCAD
ISOCAD
PDS (Piping, steel structure, equipment)
Support Modeller / Manager (PDS)
SmartPlant Review
SmartPlant PID
SmartPlant 3D
Litwin 2013
Software for Piping
ISOGEN
PDMS (Piping / Review/ PSI)
CAESAR II
Litwin 2013 16
Reference Projects
ANGOLA : • Girassol Field FPSO
• Sahna Bonbocco
ALGERIAGas Compression
POLAND : NHT/CCR, Polystyrene Plant
PORTUGAL : Trigeneration
FRANCE : F.C.C Revamp
GUADELOUP & MARTINIQUE :Tank Farm
FRANCE : 2 “Prime G”
ITALY : New MHC
FRANCE: Cogeneration
TURKEY:Distillation Units Revamp
ALGERIA : • Burlington Oilfield
dev.• “OZ2” project
CHINA:Waste to Energy
NIGERIA : • YOKRI• EHRA
CZECH REPUBLIC : New 3 cut splitter & NHT revamp
Litwin 2013 17
Most recent projects worldwide
18
France
Activities: Construction of 5 gas compressor stations
Location220 Million EurosProject value
2007-2009Project duration310 000Hours
EPCProject typeGRTgazCustomer
Activities: Construction of an oil storage terminal in the port of Tangiers
Location82 Million EurosProject value
2008-2010Project duration490 000 m3Capacity
EPCProject typeHTTSACustomer
Activities: Construction of a new mild hydro cracker
Location37 Million EurosValue project
2002-2004Project duration1 900 t/dayCapacity
LSTK EPCProject typeIESCustomer
Oil & Gas up-stream & down-stream
Activities: Construction of 1 gas compressor station
Location55 Million EurosProject value
2008-2010Project duration75 000Hours
EPCProject typeGRTgazCustomer
France
Morocco Italy
Litwin 2013
19
References in Oil & Gas
Litwin 2013
CLIENT LOCATION PROJECT DESCRIPTION TECHNO-LOGYCONTR.
TYPEE P C CM PMC
COST and/or
MANHOURS
GRT Gaz GdF France Construction of 5 Gas Compressor Station - P P P 310,000 HRS220 M€
Storengy Beynes, France Natural Gas Compression, Storage and Treatment P 160,000 HRS
GRT Gaz GdF France Construction of 1 Gas Compressor Station - P P P 75,000 HRS55 M€
HTTSA Tangiers, Morocco Construction of 490,000 m3 Tank Farm P P P 82 M€
AGIP -KCOKASHAGAN
KAZAKHSTAN KASHAGAN OIL FIELD UTILITIES - LSTK P P P 250.000 HRS
NIGC / GOHDSNIROO
IRAN5 COMPRESSORS STATIONS PART OF THE IGAT V TRUNKLINE – SOUTH PARS DEVELOPMENTS
- - P50.000 HRS
7 MM€ (TOTAL INVEST. 1B$)
BRC - SONATRACH
RHOURDE NOUSSMOROCCO
PROCESSING OF 1.800 M3/D OF CRUDE OIL, GAS PROCESSING, COMPRESSION AND RE-INJECTION
- LSTK P P P19 MM€ + 5 MM€ +
100-150 MM€ 200.000 HRS
BINA CONSULTING ENGINEERS
IRAN IGAT IV - - P -
BURLINGTON RESOURCE / SONATRACH
BERKIN BASSINALGERIA
OIL FIELD DEVELOPMENT:SEPARATION - GAS COMPRESSION DESALTING, STABILISATION, STORAGE AND PUMPING
- SERV. P P 50.000 HRS
GEIE "SPIE CAPAG SAIPEM" SONATRACH
ALGERIAPIPE LINE 34" "OZ2". 6 CRUDE OIL PUMPING STATIONS
- LS P 100.000 HRS
SONARA / TOTALLIMBECAMEROON
LPG STORAGE NEW PRESSURIZED SPHERE
- SERV. P P 10.000 HRS
SONATRACHHASSI MESSAOUDALGERIA
COMPRESSION OF ASSOCIATED GAS INGEROP P P P 60.000 HRS
BOUYGUES OFFSHORE / CPC
NOVOROSSYISK RUSSIA
OIL TERMINAL FOR CASPIAN PIPELINE CONSORTIUM
FLUOR DANIEL REIMB. & LS P 30.000 HRS
NNPCLAGOSNIGERIA
LPG STORAGE LITWIN LSTK P P P 18.6 MM$
20Litwin 2013
References in Oil & Gas
CLIENT LOCATION PROJECT DESCRIPTION TECHNO-LOGYCONTR.
TYPEE P C CM PMC
COST and/or
MANHOURS
ETPM NIGERIAEWAN PP PROJECT (CHEVRON) PIPING ENGINEERING
- LS P 4.000 HRS
ETPM NIGERIAREVAMPING OF OP, OA, ASABO PLATFORMS FOR MOBIL EKPE GAS COMPRESSION PROJECT
- LS P 15.000 HRS
ESSO REPCAZAUXFRANCE
OIL FIELD PRODUCTION FACILITIES PETROTECHNA LS P 4.000 HRS
GDF / TOTAL PORTUGAL GLN TERMINAL - - P P P STOPPEDCONTRACT
HEURTEY PETROCHEM ENGINEERING
SEVERAL SITES SKIDS ON ONSHORE FIELDS - LS P 4.000 HRS
ELF (EAP) CONGO
TCHIBOUELA FIELD CONGO
OFFSHORE PLATFORM TOP SIDE FACILITIES BASIC ENGINEERING
EAP / PETROTECHNA
LS P 12.000 HRS
SEREPT / DRESSERASHTART FIELD TUNISIA
PROCESS AUXILIARIES OF GAS LIFT COMPRESSION STATION
PETROTECHNA LSTK P P P 1.6 MM$
STATOIL NORWAY9/2 GAMMA FIELDINSTALLATION OF PRODUCTION TESTS
PETROTECHNA LS P 2.000 HRS
GEOSERVICES FRANCE SKID MOUNTED CRUDE OIL HEATER PETROTECHNA LS P 3.000 HRS
ETPM / CHEVRON ANGOLA 2 OFFSHORE PLATFORMS (PIPING ENGINEERING) CHEVRON LS P 20.000 HRS
MASHINOIMPORTTENGUIZ I, II & IIIKAZAKHSTAN
CRUDE AND GAS TREATMENT UNIT 3 X 3.000.000 T/Y
LURGI / LITWINSERV.
LS P P P 128 MM$225.000 HRS
NNPC NIGERIAESCRAVOS – LAGOS GAS PIPELINE –UGHELLI METERING STATION
- LS P 15.000 HRS
PD OMAN OMAN GAS LIFT COMPRESSION STATION PETROTECHNA LS P 8.000 HRS
21
References in Refining
Litwin 2013
CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-
LOGYCONTR.
TYPEE P C CM
COST and/or
MANHOURS
IES Montova, Italy Construction of 1,900 t/d Mild Hydro Cracker - LSTK P P P 37 M€
CESKA RAFINERSKA
KRALUPYCZECH REPUBLIC
3 CUT SPLITTER & NHT REVAMP - LSTK P P P 8 MM€30.000 HRS
SARA GUYANAEXTENSION OF THE TRUCK LOADING STATION & NEW VAPOR RECOVERY UNIT
-SERV.
LS P P 7 MM€
I.E.S.MANTOVAITALY
MILD HYDROCRACKING UNIT (MHC) MAKFINING LSTK P P P 36,5 MM€
TOTAL FINA ELFNORMANDY REFINERYFRANCE
PRIME G UNITS I.F.P. LSTK P P P 57.000 HRS
TOTAL FINA ELFNORMANDY REFINERYFRANCE
FCC REVAMP TOTALSERV.
LS P P 20.000 HRS
TOTAL SARAMARTINIQUE /GUADELOUPE
EXTENSION OF THE TRUCK LOADING STATION & NEW VAPOR RECOVERY UNIT
-SERV.
LS P P 18.000 HRS6 MM€ EACH
TOTALNORMANDY REFINERYFRANCE
REFORMING GASOLINE FRACTIONATION REVAMPING (FUEL 2000 PROJECT)
-SERV.
LS P P 12.000 HRS
TOTALFLANDRES REFINERYFRANCE
REFINERY REVAMPING (SP1) -SERV.
LS P P 22.000 HRS
TOTALLA MEDE REFINERYFRANCE
ISOMERIZATION UNIT REVAMPING -SERV.
LS P P 3.000 HRS
OCTELESSO PORT JERÔME FRANCE
CETANE BOOSTER INJECTION UNIT - LSTK P P P 180 K$
TUPRASIZMIT TURKEY
ATMOSPHERIC AND VACUUM CRUDE DISTILLATION UNITS REVAMPING (NR. 2), 1.900.000 MT/Y
LITWIN LSTK P P P 60 MM$
LUKOILNIJNI NOVGOROD (KSTOVO) RUSSIA
REFORMING NHT/CCR, 1.000.000 MT/Y UOP LS P P 75 MM$190.000 HRS
22
CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-
LOGYCONTR.
TYPEE P C CM
COST and/or
MANHOURSSOCIETE AFRICAINE DE RAFFINAGE (SAR)
DAKARSENEGAL
BUTAN LOGISTIC - LSTK P P P 5 MM$
TOTAL RAFFINAGE DISTRIBUTION
NORMANDY REFINERY FRANCE
ETBE UNIT ELECTRICAL SUBSTATION - LSTK P P P 1.8 MM$
ELFNANGIS FRANCE
REVAMPING OF GO HDS AND SULFUR RECOVERY UNITS, 1.500.000 MT/Y
LITWINSERV.
LS P P P 3.7 MM$60.000 HRS
TECHNIPBOUKHARA REFINERY OUZBAKISTAN
CCR UNIT I.F.P. LS P 28.000 HRS
TOTALLE HAVRE FRANCE
NR. 2 GO HDS UNIT REVAMPING, 4.200 T/D LITWIN LSTK P P P 2.8 MM$
TOTAL RAFFINAGE DISTRIBUTION
FLANDRES REFINERY FRANCE
INSTALLATION OF RECYCLED HYDROGEN COMPRESSOR IN HDS GAS OIL UNIT
- LS P 4.000 HRS
TUPRASIZMIT TURKEY
ATMOSPHERIC AND VACUUM CRUDE DISTILLATION UNITS REVAMPING (NR. 5), 4.000.000 MT/Y
LITWIN LSTK P P P 175.000 HRS
POLIMEXGDANSK POLAND
CCR, 600.000 MT/Y UOPSERV.
LS P P P 36 MM$85.000 HRS
SHELLPETIT COURONNE FRANCE
REVAMPING OF BITUMEN AND LUBE OIL STORAGE SHELL REIMB. P 30.000 HRS
LUBRIZOLLE HAVRE FRANCE
C4 PURIFICATION UNIT LITWIN LS 5.000 HRS
MIDIA REFINERY CONSTANZA ROMANIAATMOSPHERIC AND VACUUM CRUDE DISTILLATION UNITS REVAMPING,, FCC, 6.250.000 MT/Y
LITWIN / UOPREIMB.SERV.
LSP P P 10 MM$
14.000 HRS
SHELLPORT-HERRIOTFRANCE
STORAGE AND PUMPING FACILITIES OF VARIOUS AUTOMOTIVE FUELS AND/OR ADDITIVES (LEAP FROG AND AMADEUS PROJECTS)
- LS P 10.000 HRS
ELFGISORSFRANCE
ROAD COATING ADDITIVE UNIT, 20.000 MT/Y STYRELFSERV.
LS P P P 5 MM$16.000 HRS
COMPAGNIE RHENANE DE RAFFINAGE
REICHSTETTFRANCE
MODIFICATIONS /REVAMPING OF VARIOUS REFINING UNITS
SHELL REIMB. P 40.000 HRS
Litwin 2013
References in Refining
23
Petrochemicals & Process Industry
Activities: Construction of a phosphoric acid plant of 1,5 million t/y
Saudi ArabiaLocation400 Million EurosProject value
2007-2010Project duration550 000 Hours
LSTK EPCProject typeMA’ADENCustomer
Activities: Construction of a distillation unit
ChinaLocation6,7 Million EurosProject value
2003-2005Project duration300 000 t/yCapacity
EPTProject typeSHANXI COKING PLANTCustomer
Activities: Naphthalene purification plant
BelgiumLocation1 Million EurosProject value
2000-2001Project duration33 000 t/yearCapacity
EPTProject typeVFT RUTGERSCustomer
Activities: Revamping of a caprolactam unit- production from 65 kt/y to 156 kt/y
GermanyLocation70 Million EurosProject value
2000-2001Project duration156 kt/yCapacity
LSTK EPCProject typeDOMOCustomer
Litwin 2013
24
Petrochemicals & Process Industry
Litwin 2013
CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-
LOGYCONTR.
TYPEE P C
COST and/or
MANHOURS
Maaden Saudi Arabia Construction of Phosphoric Acid Plant 1.5 MT/d LSTK P P P 550,000 HRS400 M€
Shanxi Coking Plant
China Construction of a Destillation Unit 300,000 t/yr P P 6.7 M€
VFT Rutgers Belgium Naphthalene Purification Plant 33,000 t/yr P P 1 M€
CAPROLEUNALEUNA GERMANY
CONCENTRATION & CLEAVAGE UNITS RECONSTRUCTION DOMO LSTK P P P 20 MM$
TOTAL SOLVANTSOUDALLE FRANCE
HIGH PRESSURE HYDROGENATION UNIT (H.D.A.) 25 MT/HRTOTAL
SOLVANTSFORFAIT P 1.000 HRS
TOTALGONFREVILLEFRANCE
REVAMP OF AROMATICS EXTRACTION UNITS / PAREX UOPSERV.
LS P P P 2 MM$25.000 HRS
S.O.C.C.SHANGHAI CHINA
HYDROGENE PEROXIDE UNIT, 33.000 MT/Y OXYSYNTHESESERV.
LS P P 30.000 HRS
CAPROLEUNALEUNA GERMANY
PHENOL UNIT REVAMPING, 130.000 MT/Y, THEN 156.000 MT/Y ENICHEM LSTK P P P 55 MM$
CAPROLEUNALEUNA GERMANY
CUMENE UNIT, 180.000 MT/YMOBIL / BADGER
LSTK P P P 30 MM$
OXYSYNTHESE(ATOFINA)
LEUNA GERMANY
HYDROGENE PEROXIDE UNIT, 33.000 MT/Y OXYSYNTHESE LSTK P P P 33 MM$50.000 HRS
NORSOLOR / ELF ATOCHEM
CARLING FRANCE
STORAGE AND LOADING FACILITIES OF ACRYLIC ESTERS NORSOLOR LS P P 40.000 HRS
NORSOLORCARLING FRANCE
ACRYLIC ESTERS UNIT, 70.000 MT/Y NORSOLORREIMB.SERV. P P 80.000 HRS
ELF ATOCHEM FOS-SUR-MER FRANCE CHLORINE/CAUSTIC PLANT (MEMBRANE ELECTROLYSIS) ATOCHEM LS P P 95.000 HRS
TECHNOEXPORTNERATOVICE CZECH REPUBLIC
n-ALPHA-OLEFINS PLANT CHEVRONSERV.
LS P P P 2.5 MM$
DWORYOSWIECIM POLAND
POLYSTYRENE UNIT, 50.000 MT/Y FINASERV.
LS P P P 18 MM$110.000 HRS
EXXONCHEMICALS
FRANCEEXTENSION OF 2 RESIN PRODUCTION UNITS 44.000 T/Y
- SERV. P P P -
25
Petrochemicals & Process Industry
Litwin 2013
CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-
LOGYCONTR.
TYPEE P C
COST and/or
MANHOURS
ELF ATOCHEMFOS-SUR-MERFRANCE
VINYL CHLORIDE MONOMER PLANT REVAMPINGBADGER / ATOCHEM
SERV.LS P P P 50.000 HRS
ELF ATOCHEMGONFREVILLEFRANCE
REVAMPING OF STEAM CRACKER (HOT SECTION)STONE & WEBSTER
SERV.LS P P P 60.000 HRS
ENICHEMSEVERAL SITESFRANCE-ITALY
HIGH PRESSURE LOW DENSITY POLYETHYLENE
ENICHEM LS P 7.000 HRS
TECHMASHIMPORTVORONEJ RUSSIA
THERMOPLASTIC ELASTOMERS UNIT, 30.000 MT/Y FINASERV.
LS P P P 45 MM$180.000 HRS
CNTICFUSHUN CHINA
PMMA UNIT, 12.000 MT/Y PTISERV.
LS P P P 30 MM$FOR BOTH
ELF-ATOCHEMCARLINGFRANCE
REVAMPING OF STEAM CRACKER N°2 LUMMUS LS P 10.000 HRS
INDUSTRIEANLAGEN
SCHWEDTGERMANY
SODIUM CYANIDE COMPACTING UNIT, 8.000 MT/Y LITWIN LSTK P P P 2.1 MM$
NORSK HYDROAZOTE
BORDEAUXFRANCE
LIQUID AMMONIA ATMOSPHERIC STORAGE AND AUXILIARY FACILITIES 20 000 TONS
PETROTECHNA LSTK P P P 6,5 MM$
TOTAL SOLVANTSYANBU SAUDI ARABIA
HYDROCARBON SOLVENT PLANTTOTAL
SOVANTSREIMB. P 3.000 HRS
GRANDE PAROISSE
ROUENFRANCE
NITRIC ACID UNIT, 1.000 MT/D SCGP LS P 17.000 HRS
ELF-ATOCHEMCARLINGFRANCE
ACRYLIC ACID PLANT (DISTILLATION SECTION) REVAMPING / EXTENSION
ATOCHEM LS P 25.000 HRS
CNTICFUSHUN CHINA
MMA UNIT, 13.000 MT/Y POLYTECHNA LS P P -
OXYCHEMBECANCOURTCANADA
HYDROGEN PEROXIDE H202 ATOCHEM LS P 22.000 HRS
ATOCHEMSERQUIGNY FRANCE
POLYAMIDE UNIT 12.500 MT/Y ATOCHEMSERV.
LS P P 70.000 HRS
INDUSTRIEANLAGEN
SCHWEDT GERMANY
POLYOL STORAGE, 625 M3 IAI LSTK P P P 3,1 MM$
26
Petrochemicals & Process Industry
Litwin 2013
CLIENT LOCATION PROJECT DESCRIPTIONTECHNO-
LOGYCONTR.
TYPEE P C
COST and/or
MANHOURS
TECHNOPOLZILINASLOVAKIA
PMMA UNIT, 6 000 MT/Y PTI SERV. P P P -
APPRYLGONFREVILLEFRANCE
POLYPROPYLENE UNIT EXTENSION ATOCHEMSERV.
LS P P P 12 MM$20.000 HRS
CNTIC, DALIAN BRANDA CHINA
PMMA UNIT, 12.000 MT/Y PTISERV.
LS P P P 23.000 HRS
TECHNOEXPORTKRALUPYCZECH REPUBLIC
EXPANDABLE POLYSTYRENE CAPACITY INCREASE, 22.500 MT/Y
LITWIN / CHEMOPETROL
SERV. LS P P P 8 MM$
ROHM & HAASLAUTERBOURGFRANCE
RETROFIT OF ACRYLIC EMULSIONPOLYMERIZATION REACTOR (PIPING AND PROCESS CONTROL STUDIES)
ROOM & HAAS LS P 15.000 HRS
SOLVAYSARRALBEFRANCE
DESIGN & ENGINEERING OF MODIFIED HIGH DENSITY POLYETHYLENE LINE (RETROFIT)
SOLVAY LS P 10.000 HRS
SHELL CHIMIEBERREFRANCE
REVAMPING OF BUTADIENE RUBBER PLANT SHELL CHIMIESERV.
LS P P P 20.000 HRS
PETROKEMYAJUBAIL SAUDI ARABIA
POLYSTYRENE UNIT, 30.000 MT/Y FINA - 3.000 HRS
ELF ATOCHEMLAVERA FRANCE
POLYPROPYLENE UNIT APPRYL - 150.000 T/Y CIVIL ENGINEERING STUDIES OF STEEL/CONCRETE STRUCTURE
ATOCHEM LS P 10.000 HRS
ELF ATOCHEMGONFREVILLEFRANCE
POLYPROPYLENE COPOLYMERIZATION UNIT ATOCHEM LS P 10.000 HRS
TECHNOEXPORTKRALUPY CZECH REPUBLIC
POLYSTYRENE UNIT - 38.000 MT/Y FINA SERV. P P P 5.8 MM$
27
References in Power
Morocco
Activities: Construction of 2 steam power plants
Location32 Million EurosProject value
2006-2008Project duration2 x 32 MWeCapacity
LSTK EPCProject typeOCPCustomer
Activities: Construction of a cogeneration plant
Location22 Million EurosProject value
1999-2001Project duration40 MWeCapacity
LSTK EPCProject typeADPCustomer
Activities: Construction of a cogeneration plant
Location32 Million EurosProject value
2007-2009Project duration40 MWeCapacity
LSTK EPCProject typeSAMIRCustomer
Activities: Construction of a cogeneration plant
Location30 Million EurosProject value
2000-2002Project duration125 MWCapacity
LSTK EPCProject typeCPCUCustomer
France
Morocco France
Litwin 2013
28
References in Power
Litwin 2013
CLIENT LOCATION PROJECT DESCRIPTIONCONTR.
TYPEFEAS E P C CM START-UP COST
SLN LE NICKELNOUMEANEW CALEDONIA
COAL FIRED POWER PLANT, CIRCULATING FLUIDIZED BED BOILER, 3 x 70 MW
LSTK P PHASE 1: 3.5 MM€
MAROC PHOSPHORE(OCP GROUP)
SAFIMOROCCO
STEAM POWER PLANTS, 2 x 16 MW STEAM TURBINES (SIEMENS), SUPPLY OF 2 x 16 MW EXTRACTION CONDENSING STEAM TURBINE GENERATORS
LSTK P P P 55 MM€
GAZ DE FRANCE (COFATECH PROJIS OWNER'S ENGINEER)
SAINT BRIEUCFRANCE
PEAK POWER PLANT WITH 4 ROLLS ROYCE GAS TURBINES TRENT 60 WLE IN CONSORTIUM WITH CENTRAX GAS TURBINES (UK)
LSTK P P P 105 MM€, LITWIN PART 45 MM€
SAMIRMOHAMMEDIAMOROCCO
COGENERATION, GAS TURBINE 40 MWe (MS6001 B FROM GE), RECOVERY BOILER 70 T/H (STEIN ENERGIE)
LSTK P P P 32 MM€
OFFICE CHERIFIENS DES PHOSPHATES (OCP)
JORF LASFARMOROCCO
2 STEAM POWER PLANTS 2 x 32 MWe IN CONSORTIUM WITH SIEMENS LSTK P P P 32 MM€
ENERTHERMLA DEFENSEFRANCE
1COGEN. PLANT OF 10 MWe/30 MWTH AND 3 CONVENT. GAS FIRED SUPERHTD WATER BOILERS 2 x 60 MWTH AND 1 x 30 MWTH
LSTK P P P 15.5 MM€
CPCUVITRYFRANCE
COGENERATION, GAS TURBINE 125 MWe (9171E FROM GE), RECOVERY BOILER 400 T/H (CNIM), DEMIN. UNIT 400 T/H, ELECTR. SWITCHYARD 225 KV
LSTK P P P 30 MM€
ADP France Construction Cogeneratin Plant 40 MWe LSTK P P P 22 M€
DALKIA FRANCE COGENERATION PLANT AT ORLEANS SOUTH DISTRICT HEATING NETWORK SOCOS PROJECT GT COGENERATION 1 MARS 100
- P P S.O.F.L.E.C FRANCE
FLEURY LES AUBRAIS COGENERATION GE COGENERATION 2 x 2.000 kW GE
- P P P S.O.B.E.C. FRANCE
BOURGES URBAN HEATING COGENERATION GE COGENERATION 4 x 2.000 kW GE
- P P P CLIMAESPACO EXPO 1998
PORTUGAL TRIGENERATION FOR THE LISBON WORLD FAIR 1998 GT TRIGENERATION AND ABSORPTION AND COMPRESSION COOLING GROUPS 1 x 4.700 kW GT
LSTK P P P
AEROPORTS DE PARIS
FRANCEPROSPECTIVE STUDY FOR ENERGY DEVELOPMENT AT CHARLES DE GAULLE ENERGY MGT PLAN, 2 x 3.500 kW GT 1 x 14.000 kW GT 1 x 24.000 kW GE
- P
29
CLIENT LOCATION PROJECT DESCRIPTIONCONTR.
TYPEFEAS E P C CM START-UP
GIAT INDUSTRIES
FRANCEHEATING RESTRUCTURING STUDY FOR GIAT INDUSTRIES PLANT IN TARBES GT COGENERATION 1 x 3.500 kW GT
- P AEROPORTS DE PARIS
FRANCE DECENTRALISED COGENERATION FOR THE "AIR FRANCE - FEDEX" ZONE GT COGENERATION 1 x 4.900 kW GT
- P C.H. OF DIJON FRANCE
COGENERATION IN DIJON HOSPITAL GE COGENERATION 3 x 1.000 kW GE
- P HOECHST FRANCE
COGENERATION IN CUISE LA MOTTE ST COGENERATION 1 x 3.000 kW ST
- P P C.H. OF MANTES FRANCE
COGENERATION IN MANTES HOSPITAL GE AND DE COGENERATION 1 x 750 kW GE + 1 x 1.000 kW DE
- P P P C.H.R. OF ST. OMER
FRANCE COGENERATION IN ST. OMER HOSPITAL GE AND DE COGENERATION 1 x 1.000 kW GE + 1 x 1.400 kW DE
- P P P KOTVA POLAND
TRIGENERATION FOR KOTVA DEPARTMENT STORES 2 x 650 kW GE
- P P MERLIN GERIN FRANCE
MG COGENERATION THEORY STUDY GE COGENERATION 500, 700 and 1.000 kW GE P
CPCU-COGETHERM
FRANCE COGENERATION PLANT IN VITRY SUR SEINE COGENERETION 125 MW 1 GE 9171 E
LSTK P P P AEROPORTS DE PARIS
FRANCE COGENERATION PLANT IN ROISSY-CHARLES DE GAULLE COGENERATION 40 MW 1 LM 6.000PD
LSTK P P P
ELYO FRANCE COGENERATION PLANT AT MODO PAPER PONT SAINTE MAXENCE FACTORY - OISE COGENERATION 25 MW 1 GT 10 B2
LSTK P P P
ELF-ANTAR FRANCE COGENERATION PLANT AT DONGES OIL REFINERY - LOIRE ATLANTIQUE COGENERATION 12 MW 1 PGT 10
- P P
Litwin 2013
References in Power
30
CLIENT LOCATION PROJECT DESCRIPTION FEAS CM START-UP
BAYER ELASTOMERES
FRANCE COGENERATION ON THE BAYER ELASTOMERES SITE IN LILLEBONNE COGENERATION 40 MW 1 LM 6.000 P
GEC ALSTHOM BELGIUM COMBINED CYCLE PLANT AT BAUDOUR 350 MW COMBINED CYCLE VEGA 109 FASS P
ISERGIE FRANCE ISERGIE PROJECT COGENERATION 40 MW LM 6.000 GT P CPCU FRANCE
COGENERATION AT THE CPCU HEATING PLANT FOR LA VILLETTE COGENERATION 30 MW FRAME 6 B GT P
IBM FRANCE TRIGENERATION ON THE IBM SITE AT CORBEIL TRIGENERATION 25 MW Frame 5 P GT P
EZAC BUDA HUNGARY KUNIGUNDA HEAT RECUPERATION 25 MW FRAME 5 P GT P WESAG GERMANY THALMANN HEAT RECUPERATION 30 MW FRAME 6 B GT P P.E.E. SYRIA JANDAR 2 x 300 MW COMBINED CYCLE GROUPS W 701 GT P ELECTROLIMA PERU SANTA ROSA 1 x 165 MW COMBINED CYCLE GROUPS FT4-8C GT P P.E.E. SYRIA BANIAS 1 x 35 MW GT FRAME 6 B GT P P P P.E.E. SYRIA BANIAS 3 & 4 2 x 170 MW ST COMBUSTIBLE: HEAVY FUEL P P P P.E.E. SYRIA MEHARDEH 1 x 33 MW GT GT-9 GT P P P P.E.E. SYRIA MEHARDEH 3 & 4 2 x 165 MW ST COMBUSTIBLE: HEAVY FUEL AND GAS P P P P.L.N. INDONESIA BUKIT ASAM 2 x 65 MW ST COMBUSTIBLE: COAL P P P DEBA ARGENTINA
BAHIA BLANCA 2 x 310 MW ST COMBUSTIBLE: COAL, HEAVY FUEL AND GAS P P P
SCECO C. SAUDI ARABIA RIYADH 8 20 x 50 MW GT GT-11 GT P P P RHONE POULENC
FRANCE PONT DE CLAIX 4 x 30 MW COMBINED CYCLE GROUPS FRAME 5 P GT P E.E.A. EGYPT ABU QIR 1 x 25 MW GT FRAME 5 GT P P P P.E.E. SYRIA MEHARDEH 1 & 2 2 x 150 MW ST COMBUSTIBLE: HEAVY FUEL AND GAS P P P E.E.A. EGYPT CAIRO EAST 2 x 25 MW GT FRAME 5 GT P P P E.E.A. EGYPT EL TEBBIN 2 x 25 MW GT FRAME 5 GT P P P TAVANIR IRAN RAMIN 4 x 310 MW ST COMBUSTIBLE: HEAVY FUEL P P P
Litwin 2013
References in Power
31
CLIENT LOCATION PROJECT DESCRIPTION FEAS BASIC FEED E
ALSTOM LUXEMBURG ESCH-SUR-ALZETTE 350 MW UNIT GT 9 FA «SINGLE SHAFT» P
ALSTOM BELGIUM BAUDOUR / SAINT GHISLAIN C350 MW UNIT GT 9 FA «SINGLE SHAFT» P
GEC ALSTHOM GREECE LAVRION 550 MW UNIT VEGA 309 E PGEC ALSTHOM THAILAND MAP TA PHUT 200 MW UNIT VEGA 206 PGEC ALSTHOM TUNISIA SOUSSE200 MW UNIT VEGA 206 PDISTRICT OF CHARTRES
FRANCEW TO E OF 2 LINES 7,5 T/H EACH. STAT. MV/LV, GTA 10 MVA, GENERATING SET 1.000 KVA. POWER SUPPLY DISTRIB., CONTROL, MONITOR. AND INSTR. P
SMITRED OUESTD'ARMOR
FRANCEW TO E OF 1 LINE 7 T/H. STATION MV/LV, GTA 4 MVA, GENERATING SET 1.000 KVA. POWER SUPPLY DISTRIBUTION, CONTROL, MONITORING AND INSTR. P
EDM FRANCE INSTALLATION OF POWER PRODUCTION UNITS P
ASTRIA FRANCEUIOM 3 LINES OF 11T/H EACH. STAT. 63/20 KV - 22 MVA GTA 25 MVA. GENERATING SETS 2X1.000 KVA. TRANSF. STAT. 5X1.000 KVA. SUPERV. SYSTEM
P
GEC ALSTHOM FRANCE COMBINED CYCLE THERMAL STATION 1XSS VEGA 109 FA (350 MW) PTOTAL FRANCE ELECTRICAL STATION OF THE REFINERY SOUTH CONTROL CENTER (P1092) P P PTOTAL FRANCE
CREATION OF TRANSFORMATION STATION MV/LV AT THE REFINERY, DESIGNED TO SUPPLY POWER TO INSTRUMENTATION OF SOUTH UNITS P P P
HOECHST FRANCE INTEGRATION OF ONE COGENERATION STATION WITH ONE TURBINE 2 MW. PSERVICE DE LA NAVIGATION DE LA SEINE
FRANCE SURVEY OF 20 LOCKS AND 7 DIKES INSTALLATIONS P
CHARGES MINÉRALES DU PÉRIGORD
SAINTE CROIX DE MAREUILFRANCE
2 PRODUCTION LINES COMPR. 5 CRUSHERS EACH. SUPPLY AND TRANSF. STAT. (2.500 + 1.250 KVA) POWER SUPPLY DISTRIB. & AUTOMATIC CONTROLS. P
CIMENTS LAFARGE FRANCEELECTRIC & INSTRUMENT. ENG. INCL. AUTOMATIC CONTROL & MONITORING SYSTEMS FOR UPSTREAM & DOWNSTREAM OF 2 HEATERS & 2 MV/LV STAT. P
SIMACUR FRANCEPROJECT OF TRANSFER OF FUEL AND COAL BOILER PLANTS TO W TO E PLANT THE SITE. TOTAL CAPACITY 200 MWTH. P
KAYSERSBERG FRANCEPLANT EXTENSION STAT. 90/20 KV - 2 TRANSF. OF 30 MVA. POWER DISTRIB., CONTROL - MONITORING AND INSTR. P
Litwin 2013
References in Power
32
Environment Technologies
France
Activities: Revamping of a waste-to-energy plant
Location15 Million EurosProject value
2005-2006Project duration87 000 t/yearCapacity
LSTK EPCProject typeCURMACustomer
Activities: Revamping of a waste-to-energy plant
Location72 Million EurosProject value
2005-2010Project duration160 000 t/yearCapacity
LSTK EPCProject typeSIGIDURSCustomer
Activities: Modifications of furnaces in a waste incineration plant
Location4 Million EurosProject value
2006-2007Project duration75 000 t/yearCapacity
LSTK EPCProject typeBAYETCustomer
Activities: Construction of a waste-to-energy plant
Location27 Million EurosProject value
1998-2002Project duration365 000 t/yearCapacity
LSTK EPCMProject typeSHANGAI PUDONG MUNICIPALITY
Customer
France
France
China
Litwin 2013
33Litwin 2013
Environment Technologies
CLIENT LOCATION PROJECT DESCRIPTIONCONTR.
TYPEFEAS E P C CM PMC COST
SIGIDURSSARCELLESFRANCE
REVAMP. OF THE EXISTING WASTE INCINER. PLANT, INCLUDING NEW FURNACES AND BOILERS AND FLUE GAS TREATMENT WITH CATALYTC DENOX
LSTK P P P 72 MM€
NOVAOLPORTO CORSINIITALY
BIOFUEL PLANT LSTK P P P P 0,5 MM€
CURMA France Revamp of WTE Plant 87,000 t/yr capacity LSTK P P P 15 M€
SICTOM SUD ALLIER
BAYETFRANCE
MODIFICATION OF THE FURNACES FOR ADAPTATION TO NEW EU REGULATIONS. REPLACEMENT OF COOLING TOWER BY AIR-COOLED CONDENSER
LSTK P P P 4 MM€
SYBERTBESANCONFRANCE
MODIFICATION OF THE FURNACES FOR ADAPTATION TO NEW EU REGULATIONS, 2 LINES - 3.5 T/H, 60.000 T/Y
LSTK P P P 1 MM€
SIMACURMASSYFRANCE
REVAMPING OF THE EXISTING PLANT, INCLUDING MODIFICATIONS OF FURNACES AND BOILERS, NEW UNIT FOR FLUE GAS TREATMENT WITH DENOX SCR
LSTK P P P 13 MM€
SHANGHAI-PUDONG MUNICIPALTY
CHINAMSWI PLANT WITH 3 LINES OF 15,2 MH CAPACITY EACH 365.000 T/Y
- P P 27 M€
SIVOMMETZFRANCE
SORTING 40.000 T/Y INCINERATION 150.000 T/Y - PANGERS DISTRICT
ANGERSFRANCE
FLUE GAS TREATMENT INCLUDED DIOXINS AND FURANS CAPTATION 100.000 T/Y
- P
SMEDARROUEN FRANCE
TECHNICAL ASSISTANCE FOR A NEW WASTE TO ENERGY PLANT IN GRAND-QUEVILLY (VESTA PROJECT) 3 LINES 14,5 T/HR 315.000 T/Y
-
SMITREDCOTES D'ARMORFRANCE
TECH. ASSIST. SORTING 25.000 T/YTECH. ASSISTANCE FOR FLUE GAS TREATMENT (NOx, DIOXINS, FURANS) INCINERATION 55.000 T/Y
- PDISTRICT OF CHARTRES
EURE ET LOIRFRANCE
EVALUATION OF WASTE QUANTITY AND OF ITS EVOLUTION 110.000 T7Y
- PDISTRICT OF CHARTRES
EURE ET LOIRFRANCE
COMPARATIVE STUDY OF INCINERATION SYSTEMS (GRATE OR FLUIDIZES BED)
- P
34
CLIENT LOCATION PROJECT DESCRIPTION FEAS BASIC FEED E CM PMC
DISTRICT OF CHARTRES
EURE ET LOIRFRANCE
PROJECT MANAGEMENT & TECHNICAL ASSISTANCE FOR MWSI WITH 2 LINES 7.5 TH/HOUR PASTRIA
BÈGLESFRANCE
PROCESS ENGINEERING STUDIES AND PROJECT MANAGEMENT OF MSWI (3 LINES 11 TONS/HOUR) SORTING 30.000 T/Y INCINERATION 255.000 T/Y P
CDCAGGRENOBLEFRANCE
REVAMPING OF THE MUNICIPAL SOLID WASTE INCINERATION PLANT (MSWI) 250.000 T/Y PCDCAG
GRENOBLEFRANCE
CONSTRUCTION OF A SORTING CENTER PCDCAG
GRENOBLEFRANCE
IMPACT STUDY - SORTING CENTER PROJECT MANAGEMENT P PCDCAG
GRENOBLEFRANCE
IMPACT STUDY FOR THE MSWI - FLUE GAS TREATMENT COMPARISON 3 LINES 8 T/HR PCDCAG
GRENOBLEFRANCE
BASIC ENGINEERING AND TECHNICAL ASSISTANCE FOR HOSPITAL WASTE INCINERATION (AT LA TRONCHE) P
CDCAGGRENOBLEFRANCE
TECHNICAL ASSISTANCE FOR THE COMPOSTING PLANT (AT MURIANETTE)
PUDONG NEW AREA MUNICIPALITY
SHANGHAI / PUDONGCHINA
MSWI (3 LINES 14 T/HR) INCINERATION 315.000 T/Y PSIMACUR
MASSY-ANTONYFRANCE
MSWI FEASIBILITY STUDY 2 LINES PSIMACUR
MASSY-ANTONYFRANCE
ALL DISCIPLINE ENGINEERING - CONNECTION TO DISTRICT HEATING NETWORK 5.5 T/HR PSIMACUR
MASSY-ANTONYFRANCE
3rd LINE FEASIBILITY STUDY, 4 MW STEAM TURBINE, REFRIGERATION PLANT PSIMACUR
MASSY-ANTONYFRANCE
PROJECT MANAGEMENT OF FLUE GAS CLEANING UNIT 12 T/HR PSIMACUR
MASSY-ANTONYFRANCE
FLUID BED COAL BOILER PLANT PROJECT MANAGEMENT PSIMACUR
MASSY-ANTONYFRANCE
DISTRICT HEATING NETWORK PROJECT MANAGEMENT 2X32 MW 35 KM 135 S/STATIONS P
-BRATISLAVASLOVAKIA
WASTE TO ENERGY FACILITYWASTE VALORIZATION AND RESIDUE MANAGEMENT STUDIES WASTE COMPOSTING FACILITY
P
SITALSTRASBOURGFRANCE
TECHNICAL ASSISTANCE FOR A NON HAZARDOUS INDUSTRIAL WASTE SORTING CENTER 50.000 T/Y P
LELY EVAC ORDURESFONTAINE FRANCE
SORTING LINE 40 T/HR PMINISTRY OF ENVIRONMENT
SLOVENIA MASTER PLAN OF DOMESTIC WASTE MANAGEMENT IN SLOVENIA 40.000 T/YR P
Litwin 2013
Environment Technologies