List of SAP Status Codes

download List of SAP Status Codes

of 19

Transcript of List of SAP Status Codes

  • 8/10/2019 List of SAP Status Codes

    1/19

    Status Code Description

    CRTD Created

    REL Released

    MSCP Capacity shortage

    MSPT Material shortageAVAC Availability control active

    ESTC Estimated costs

    PRT Printed

    PPRT Part printed

    CNF Confirmed

    PCNF Partially confirmed

    CPCK Capacity checked

    DLV Delivered

    DLT Deletion indicator

    PCST Product costedNCMP Not completed

    PRC Pre-costed

    ISSD Goods issued

    NHFD Ntwk header: final delivery

    GEN1 General list 1 printed

    GEN2 General list 2 printed

    GEN3 General list 3 printed

    GEN4 General list 4 printed

    OPL1 Activity list 1 printed

    OPL2 Activity list 2 printed

    OPL3 Activity list 3 printedOPL4 Activity list 4 printed

    SFMT Settlement fields maintained

    SETC Settlement rule created

    DSEX Date set by external system

    MLTL Multi-level: Top level

    MLBL Multi-level: Bottom level

    MLDI Multi-level: Dummy info record

    CNC Costs not current

    SORL Subordinate order released

    SOPR Subordinate order printedSOCF Subordinate order confirmed

    UMGP Rescheduled

    CONI Configuration incomplete

    PREL Partially released

    LKD Locked

    TECO Technically completed

    CLSD Closed

    ORSP Open reservations posted

    List of SAP Status CodesSAP Status Codes and Descriptions

  • 8/10/2019 List of SAP Status Codes

    2/19

    STND Standard confirmation

    MILE Milestone confirmation

    MCNF Manually confirmed

    ACAS Activity account assignment

    MSCP Capacity shortage

    RELR Release rejected

    VCAL Variances calculatedNDAT Rescheduling (Actl.) required

    CSPS Costs posted

    PLCS Planned costs

    PLLK Planning locked

    DDLK Date definition locked

    BMLK Budget management locked

    AALK Account assignment locked

    MDLK Master data locked

    APPR Approved

    BUDG Budgeted

    OSNO Outstanding notificationNOPO Notification postponed

    NOPR Notification in process

    ORAS Order assigned

    NOCO Notification completed

    NOPT Notification printed

    PDLV Partially delivered

    WDFL Withdrawal failed

    DLFL Deletion Flag

    NOLV Transaction LVMS not permitted

    COL1 Component list 1 printedCOL2 Component list 2 printed

    COL3 Component list 3 printed

    COL4 Component list 4 printed

    RESA Results analysis carried out

    PRL1 PRT list 1 printed

    PRL2 PRT list 2 printed

    PRL3 PRT list 3 printed

    PRL4 PRT list 4 printed

    NBDT Rescheduling required (Basic)

    NFDT Rescheduling required (Frcst)

    GMCO Goods movement in coll. order CFCO Confirmation in coll. order

    SPCF Sub-operation partially conf.

    SCNF Sub-operation finally conf.

    ISBD Insufficient budgeting

    RVPS Revenue posted

    MSPR PRT shortage

    RVPL Revenue planned

    FNBL Final billing

  • 8/10/2019 List of SAP Status Codes

    3/19

  • 8/10/2019 List of SAP Status Codes

    4/19

    PECR Partial economic ruin

    POCR Printout of changes required

    BTRD Block transaction data

    DIVI Division declaration

    PDIV Partial division declaration

    INMD Inspection made

    SECD Security deposit paid outIFPF Intended for portfolio

    PORT In portfolio

    TSOS Task Outstanding

    TSRL Task Released

    TSCO Task Completed

    TSSC Task successful

    OSTS Outstanding task(s) exist(s)

    ATCO All Tasks Completed

    NOTI Notification (internal)

    NOTE Notification (external)

    DEFR Defects RecordingAUC Asset in construction exists

    Cost To be costed

    Cstd Costed

    FUAC Follow-up action completed

    ARNB Notif. blocked by archiving

    ORD Created from sales order

    SHPT Created from shipment doc.

    PREP Prepared

    REJC Rejected

    NPRT PRT not ready for useCRAB Control Recipe Discarded

    ILNC Inspection lot not created

    AUSS Scrap determined

    ESTO In the warehouse

    SLOR Assigned in sales order

    EDEL Assigned in delivery note

    ESER Assigned in service contract

    ECUS At customer site

    EINS In Review

    ELOK Locked

    ETRA In transportEAUS From warehouse

    HUAS Handling Unit Assigned

    PIAC Inventory Active

    PAOR Insp. completion w/o confirm.

    PREQ Plan/specific. required

    CHCR Characterist. must be created

    SPRQ Quantity posting required

    LTIN Long-term inspection

  • 8/10/2019 List of SAP Status Codes

    5/19

    PASG Plan/specification assigned

    CCTD Insp. characteristics created

    CALC Sample calculated

    QLCH Quality level relevant

    SKIP Skip lot

    PRSI Sample drawing instr. printed

    PRII Inspection instruction printedINSP Inspection active

    RREC Results confirmed

    DEF Defects were recorded

    SSAP Object created

    STIC Short-term insp. completed

    ICCO All inspections completed

    UD Usage decision has been made

    SPST Stock posting started

    SPCO Stock posting completed

    STUP Statistics updated

    QLUP Quality level updatedIRUP Quality info record updated

    LTCA Lot canceled

    ARBL Blocked for Archiving

    ARCH Lot archived

    REO3 Lot detail data deleted

    REO2 Lot sample data deleted

    REO1 Charact. + operations deleted

    SUB Transmit to subsystem

    IRCH Q-info record changed

    MCAN Lot marked for cancellationMSUB Marked for subsystem

    MtoO Make-to-order production

    NoMP No make-to-order prod.

    HCNF Order header confirmed

    CPIS Confirmation issued components

    NOPR No PRTs

    NOCP No material components

    NOTR No trigger points

    CRCR Control recipe created

    NCHK Not checked

    NSCH Not scheduled (forecast dates)SPLT Split

    PSPL Partially split

    ASGN Assigned

    PTAS Partially assigned

    PTDS Partially dispatched

    ERTR Error creating transfer reqmnt

    ITAA Item account assignment

    CECR Check ECR

  • 8/10/2019 List of SAP Status Codes

    6/19

    CHKD ECR Checked

    ECRA ECR Approved

    ECOP ECO to be processed

    ECPC ECO partially confirmed

    ECCF ECO confirmed

    ECCM ECO completed

    ECOR ECO releasedECIR Object: insp. req. for ECR

    CCO1 Object: change possible

    CCO2 Object: change not necessary

    CCO3 Object: change not possible

    CCOB Object: to be processed

    CCOI Object: in preparation

    CCOA Object: change completed

    CCOF Object: change released

    CRFI Control recipe finished

    CCPO All objects checked

    CCFO All objects releasedWCRE Work center until release

    SUPF Setup partially finished

    PPF Processing partially finished

    TDPF Teardown partially finished

    BLLS Boycott list

    EXLS Export control

    CCSL Locked for system changes

    CCUL Locked for user changes

    ORRQ Order record required

    ORAC Order record archivedORTE Order record terminated

    ILAS Inspection lot assigned

    ICHA Planned InspCharacs. allocated

    QMDA QM data recorded

    BREQ Batch assignment required

    BASG Batch assigned

    VACT Var. activity partial conf.

    VACE Var. activity final. conf.

    CAPP CAPP calculated

    CLAS Complete Classification

    CLQM Shortterm ClassificationCUGT Copy attribute analysis

    FKTF Error when processing function

    RCKP Confirmation with personal ID

    CTCM Certif.confirmation missing

    RAOC RA data in object currency

    RAWO RA data w/o object currency

    UDRE Usage decision reset

    SRPC Secondary resource part confd

  • 8/10/2019 List of SAP Status Codes

    7/19

    SRCF Secondary resource confirmed

    VOBJ Subobject exists

    ZUOD Assigned

    REJT ECR Rejected

    ICPL ECO incomplete

    PERR ECO: processing errors

    CHER Object: errors in changeILOR Insp.lot cntd in order record

    NAVD Not available at request date

    CONC Collect. order dates not curr.

    FTC2 Control: Embargo

    FTC3 Control: Missing master data

    FTC4 Control: Permission

    TPA Transfer prices for agreements

    INAC Object Deactivated

    GMPS Goods movement posted

    APG Approval granted

    APGS Single approval grantedAPRC Based on approved recipe

    APNG Approval not granted

    PIGN Process instructions generated

    APRS Approval withdrawn

    OPGN Operation generated

    GBST Confirmed

    GBTS Counterconfirmed

    BBGT Accounted

    BUG Exercised

    BRFL ExpiredAKNI Knocked in

    AKNO Knocked out

    AO01 Availability check error

    AO02 Do availability check

    AO03 Delivery groups present

    MACM Material committed

    ASSB Assembly lock

    ECOC ECO complete

    CCRD Case created

    CBLK Case blocked for settlement

    SETT SettledCHKD Tested

    FAPP For approval

    MCRD Measure created

    RBMS Replaced by measure

    MSPL Planning for task

    REJD Rejected

    DEPS Depreciation simulation avail.

    NEWQ New quantity calculation

  • 8/10/2019 List of SAP Status Codes

    8/19

    USED Phys. sample no longer exists

    STRD Sample was stored

    APRV Approved

    PROG Progress confirmation (MST)

    CROK Certificate receipt confirmed

    LBPR Label printed

    FMAI FM account assignmt incompleteBCRQ Order to be handled in batches

    BASC Batch assignment complete

    SIG1 One dig. signature missing

    SIG2 Two dig. signatures missing

    SIG3 Three dig. signatures missing

    SIG4 Four dig. signatures missing

    POAR Part objects archived

    APIP Based on approved insp. plan

    EOPD Ext. operatn partly delivered

    EODL External operation delivered

    BRAR Batch record archivedSOAS Sales order assigned

    LOLK Lot locked for batch record

    SERM SerialNo maintenance required

    BNAS Batch not assigned

    IREP Under repair

    TREP Partially repaired

    REPA Repaired

    BDRQ Business decision required

    BDMD Business decision made

    BRRQ Batch record requiredNOCH Changes forbidden

    CEFF Effectivity parameter copied

    MADJ Manual adjustment necessary

    RlNe Release in network taken place

    QUCR Quotation created

    QUAC Quotation accepted

    INVD Invoiced

    PTBL partially billed

    CGFB Confirm./goods mvmnt forbidden

    REPR Repairs processing

    PCMN Production campaignPCC Product cost collector used

    ITG Inital tagging status

    BTG Tag

    PTAG Tag printed

    ETG Tagged

    BUG Untag

    EUG Untagged

    BTUG Untag Temporarily

  • 8/10/2019 List of SAP Status Codes

    9/19

    ETUG Temporarily Untagged

    LBNP Label not printed

    RET Return

    CNOK Credit limit check invalid

    CCOK Credit limit check successful

    PAGE Paging occurs

    ADVS Advance shipment occurredCONF Conflict

    WCM Work Clearance Management

    MANC Mat.availability not checked

    CANC Capacity avail.not checked

    PRTA PRT availability not checked

    DNEW New dummy quantity calculation

    UNT Untaggable

    EXEC Released for execution

    WOCO Work completed

    PROC Processing

    TENT Temporary entryTEST Test cycle

    BLTC Block technical completion

    PTST Test tag printed

    VBCR Batch record created

    VBAP Batch record approved

    VBPA Batch rec. partially approved

    VBAR Batch record archived

    VBPC Batch rec. partially archived

    VBDE Batch rec. contains deviations

    VBAW Batch rec.: new version existsCR Created

    CO Conference

    LO Locked

    RE Released

    HUM Handling units assigned

    CONX Fix configuration

    CHNG Change mode

    POST Postscript

    HI Historical

    AC Active

    IC InactiveOP Created

    IP In Process

    CL Closed

    DE Data Entered

    IPEX In Process Outside EH&S

    DLEX Deleted Outside EH&S

    FINV Further Investigation

    REVS Reversed

  • 8/10/2019 List of SAP Status Codes

    10/19

    PO Posted

    ACPT Order accepted

    ONHO On Hold

    EXTS Changed by external system

    NMAT No material components

    SPLT Split

    CSPL Created by splittingUNCO Ref. object under construction

    CRTC From created to tech.completed

    ADRJ Automatic deletion rejected

    MISM Mismeasurement

    NOME No Measurement

    PTME Partial Measurement

    MERR Measurement Results Recorded

    SUPP Supplement

    QUOT No material components

    QUBP Assigned in quote (bump)

    SLBP Assigned in order (bump)QUVC Assigned in quote (vers. chg.)

    SLVC Assigned in order (vers. chg.)

    SPTT License split

    QADJ Operation Quantities Adjusted

    PHEX Physically Exists

    WHSE In Warehouse

    PLND Planned

    LOAD Loaded

    UNLD Unloaded

    PPCm PPPI completeLOCK Locked

    WGHD Weighed

    RESV Reserved for PP

    PPGI PPPI reservation for GI post.

    PPSC PPPI sequence checked

    PSTD Goods Issue Posted

    DLTD Deleted

    SGPR Visually Checked

    APRQ Approval: Required

    APOK Approval: OK

    APRF Approval: RefusedCMSP CM: Object locked

    CANG CM: Created

    CBER CM: Baselining allowed

    CABG CM: Object closed

    CPER CM: Process allowed

    CBRE CM: Baseline requested

    CBAS Baselined (fixed)

    CFVE Released for distribution

  • 8/10/2019 List of SAP Status Codes

    11/19

    DRCT SU for Directly Assigned Costs

    NACO No Automatic Confirmation

    INIV In Inventory

    INVE Physically Inventoried

    OWNS Owner Settlement

    RRA Relevant to Results Analysis

    SEPO Separate Order ASIM Simulation

    AORD Order

    AVER Contract

    AKUE Notice

    AZUR To be settled

    GZBE To be confirmed

    GZER Counterconfirmation required

    AZAE Changed

    AZST Reversed

    DELD Deleted

    EXPD ExpiredINIT Initial

    AFIX Fixing

    FIXD Fixing executed

    ROLL Rollover

    PREM Premature Settlement

    IRAD Interest rate adjustment

    NOTG Notice Given

    AANG Offer

    IP In Process

    FR For ReleaseRLRQ Release Required

    RLRJ Release rejected

    MKOS Cost Collector Created

    EXPL External Conv.of Planned Order

    NC Noncritical Change

    RE Released

    IOPN IS-T: Opened

    IINP IS-T: Being processed

    ICMP IS-T: Completed

    ICLK IS-T: Complete lock

    IPLK IS-T: Partial lockIICA IS-T: Item cancelled

    IOIN IS-T: Operations interruption

    IINP IS-T: Being processed

    IACT IS-T: Active

    PROT Operational protection

    PWP Work permit printed

    VAL Valuated

    MOBI Data on Mobile Device

  • 8/10/2019 List of SAP Status Codes

    12/19

  • 8/10/2019 List of SAP Status Codes

    13/19

    LOCK Locked

    PARC To archive

    INAC Inactive

    NREL Not Released

    Pld Planned

    Rqst Requested

    App ApprovedRej Rejected

    Act Active

    Obsl Obsolete

    MvtC Reused Order

    AM00 Being Created

    AM01 In Process

    AM02 Released

    AM03 Completed

    AM04 Locked

    AM05 To Be Archived

    AM06 ArchivedAM07 To Be Approved

    AM08 Rejected

    AM09 Approved

    AM10 Deletion Flag

    AM11 Canceled

    AM12 Unplanned Audit(s)

    AM13 Question List(s) Assigned

    AM14 Download Completed

    AM15 Confirmed

    AM16 Report CreatedAM17 Signature Provided

    AM18 Outstanding Actions

    AM19 Actions Completed

    AM20 Completed w. Outstanding Actns

    AM21 Created

    AM22 Outstanding

    AM23 Forced Completion

    AM24 Valuation Executed

    SDVC Changeable copy to be checked

    SDVY Copy checked - OK

    SDVN Copy checked - not OKPLAN Planned

    APPL Requested

    RELE Released by Material Owner

    APPR Approved

    LOCK Locked

    DELP Flagged for Deletion

    DELA Deletion Requested

    OBSO Obsolete

  • 8/10/2019 List of SAP Status Codes

    14/19

    REJE Rejected

    APLA Planned

    AAPP Requested

    AAPR Approved

    ALOC Locked

    AOBS Obsolete

    AREJ RejectedDPLA Planned

    DAPP Requested

    DREL Released by Material Owner

    DAPR Approved

    DLOC Locked

    DDLP Flagged for Deletion

    DDLA Deletion Requested

    DOBS Obsolete

    DREJ Rejected

    EPLA Planned

    EAPP RequestedEREL Released by Material Owner

    EAPR Approved

    ELOC Locked

    EDLP Flagged for Deletion

    EDLA Deletion Requested

    EOBS Obsolete

    EREJ Rejected

    FPLA Planned

    FAPP Requested

    FREL Released by Material Owner FAPR Approved

    FLOC Locked

    FDLP Flagged for Deletion

    FDLA Deletion Requested

    FOBS Obsolete

    FREJ Rejected

    GPLA Planned

    GAPP Requested

    GAPR Approved

    GREJ Rejected

    GOBS ObsoleteGLOC Locked

    HPLA Planned

    HAPP Requested

    HAPR Approved

    HREJ Rejected

    HACT Active

    HOBS Obsolete

    CNEW In Process

  • 8/10/2019 List of SAP Status Codes

    15/19

    CREL Released

    CLOC Locked

    CINC Inconsistent

    CDIS Distributable

    ARCV To Archive

    NEW Trial Created

    DECL Trial Definition ClosedEXPO Trial Data Exported

    PLOR Planned Order Assigned

    MRCP Master Recipe Generated

    PROR Process Order Assigned

    RESU Results Entered/Imported

    RECF Results Confirmed

    CLOS Trial Closed

    JOB Background Processing

    CONV Trial Converted

    QMCL QM Planning Closed

    CHGD Creation of Change Docs ActiveFFUE From Follow-Up Entry

    FHNC From History New Construction

    IHNC In History New Construction

    GMDR Initial draft

    GMPR Proposal

    GMAP Application

    GMAW Award

    GMCL Closing

    GMCX Closed

    GMCA CancelledRcp0 In process

    Rcp1 Processing Closed

    Rcp2 Rejected

    Rcp3 Released

    Rcp4 Released for Scope

    Rcp5 Inactive

    Rcp6 Obsolete

    SPEC RE:Spec home

    CONT RE:Contingency order

    RESL RE: Re-Sell to new customer

    CSPT Process Order Created by SplitMRGM Process order was merged

    MRGS Process order merged an order

    RSTR Restart

    RWRK Rework Insert

    SPL Process Order was Split

    SPTM Process Order Split Multiple

    NEWO New/In Process

    RELO Released

  • 8/10/2019 List of SAP Status Codes

    16/19

    CLOS Completed

    DIST Distributable

    NEW New

    Act Active

    REL Released

    CHK For Checking

    END CompletedNEWR ECR Processible

    ACCE ECR Approved

    REVI ECR Rejected

    CLOR ECR Completed

    CREA New IP-Data

    CGAT Changed in Revision

    CGMN System Status : Change Manual

    INPR System Status : Inprocess

    CMTD System Status : Completed

    DELD Deleted in Revision

    HOLD System Status : HoldCBEX CM: Baseline exploded

    CMOB CM: Baseline obsolet

    CMBG CM: Background processing

    MEBS MEB-Controlled

    ORCR Order created by MEB

    OCRR Order creation required

    TBUS To be Used

    MDCI Master Data Creation Initiated

    MDCU Master Data Created / Updated

    MDFL Master Data Creation FailedNUSD Not Used

    BLFA Set Archive Indicator

    DFRD Deferred

    COCE Completion Certified

    CPCE Completion Partially Certified

    MDRQ Meas. Doc. Creation Required

    DOCC Document Created

    COMP Completed

    CACL Cancelled

    INPC In Process

    XR01 In ProcessXR02 Rejected

    XR03 Release for Test

    XR04 Released

    XR05 Obsolete

    XR06 Flagged for Archiving

    XR07 Archived

    XR20 Approved

    XR21 Discarded

  • 8/10/2019 List of SAP Status Codes

    17/19

    XR40 Current Signature Process

    UPNW Created

    UPSV Saved

    UPRL Released

    UPSD Distributed

    UPRC Received

    UPAP ApprovedUPRJ Rejected

    UPER Errors found

    UPPO Updated

    UPIN Partially Posted

    UPSP Partially Sent

    UPSE Error Sending Data

    INTR In transit

    CKIN Checked in

    LOST Load started

    LOPF Load partly finished

    LOCM Load completeULST Unload started

    ULPF Unload Partly finished

    ULCO Unload complete

    MVPR Move process

    WEPR Weigh process

    AVWE Available for weight

    AVLO Available for load

    AVUL Available for unload

    AVMO Available for move

    AVCO Available to check-outWACR WA-PRO: Created

    WALO WA-PRO: Locked

    WACS WA-PRO: Closed

    crea Created

    actv Active

    lega Legally Active

    inac Inactive

    calc Calculation Relevant

    WADL WA-PRO: To Be Deleted

    LRCL Land Register Closed

    PRCS Parcel Ceased to Existliqi In Liquidation

    liqd Liquidated

    OFRJ Rejected

    RELF Release Forbidden

    INIT Initial Status

    IBDE Deletion flag

    IBIN Deactivate

    IB04 Avail.

  • 8/10/2019 List of SAP Status Codes

    18/19

    IB05 Avail.

    CRE Service Entry Sheet created

    SREL Service Entry Sheet released

    CANL Service Entry Sheet cancelled

    CCIN new

    CCAK Released

    CCLO BlockedCCDL Logically Deleted

    CCAR Ready for Archiving

    INIT New

    DRFT Draft

    REVW Review

    REWK Rework

    IP In Process

    OPEN Open

    RSLV Resolved

    CLSD Closed

    REAS ReassessmentVLDT Validated

    SBMT Submitted

    Test In Process

    ATCL Auto Closed

    SHIP Shipping taken place

    TVER Partial Shipping

    KLAU Clinical Order Created

    MDIP Basic Med. Doc. in Process

    MDCP Basic Med. Doc. Complete

    MDTC Basic Med. Doc. to Be CheckedOINA Inactive

    OACT Active

    DFS Deletion flag set

    Asgd Allocated

    VNE Value does not exist

    VMSG Value missing

    VVAK Valid value

    VEST Value was estimated

    VI Value implausible

    VCHG Value entered/changed manually

    VREL Value has been releasedVLCK Value is locked

    VPRO Value is protected

    VARC Value was activated

    VEPL Value was extrapolated

    VINT Value was interpolated

    VaCh Val. Manually Chngd Externally

    VNVP Version Not In Validity Period

    RINA Route Inactive

  • 8/10/2019 List of SAP Status Codes

    19/19

    RACT Route Active

    DFLS Deletion Flag Set

    DINS Deletion Indicator Set

    RIPR Route in Processing

    HANG Waste Disposal Order Created

    HPLN Waste Disposal Order Planned

    HAUS Waste Disposal Order OutputHCOP CO Posting

    HLVM Deletion Flag for WDO Header

    PANG WDO Item Created

    PAUS WDO Item Output

    PPZM Positive Confirmation

    PNZM Negative Confirmation

    PZUR WDO Item Postponed

    PABG WDO Item Billed

    PLST Debit Memo Request Generated

    PBEH Container Transport

    PBCH Container Del/Remove/Replace.HLKZ Deletion Flag for WDO Header