List of Remaining Cases of 5th Consent Appraisal ... Dist. Solapur (Distillery Unit) 247.45 Crs. 1st...
Transcript of List of Remaining Cases of 5th Consent Appraisal ... Dist. Solapur (Distillery Unit) 247.45 Crs. 1st...
Sr. No. Name & Address CI (in Rs.) Applied For Section Page No
1 Utech Sugar Pvt. Ltd., G. No. 15/10, A/p. Kavthe Malkapur, Tal. Sangamener, Dist. Ahmednagar
91.33 Crs. Establish JD(WPC)
1 Shri Ramgiri Sugar Ltd., Vill Savergaon Dist-Osmanabad
190 Crs. Establish JD(WPC)
2 Jai Hind Sugar Pvt. Ltd. (Sugar & Co-generation), A/p. Acjegapm. Tal. South Solapur, Dist. Solapur
125.00 Crs. Establish (Sugar & Co-generation)
JD(WPC)
3 Baramati Agro Ltd. Kannad, Tal. Kannad, Dist. Aurangabad
183.37 Crs. Establish (Expansion)
JD(WPC)
4 Shree Vitthal SSK Ltd.. , A/p. Venunagar, Gursale, Tal. Pandharpur, Dist. Solapur
252.07 Crs. Establish (Expansion)
JD(WPC)
5 Khandala Taluka Shetkari Sah. Sakhar Karkhana Ltd , (Sugar & Co-generation) Gat No. 208 & 209 Khandala, Gat No. 643-647 A, 647-B,650 &589 Mhavashi, Tal- Khandala, Dist- Satara
149.00 Crs. Establish JD(WPC)
6 Nira Bhima SSK Ltd. ( 2 MW Cogeneration) , At-Shahajinagar,Post-Redni,Tal-Indapur
261.78 Establish with Amlgamation
JD(WPC)
7 Twenty One Sugars Ltd. Vill - Malwati, (Sugar) Dist - Latur
90.00 Establish JD(WPC)
8 Twenty One Sugars Ltd. (Sugar), Vill - Dhanora, Tal - Ahmadpur, Dist - Latur
90.00 Establish JD(WPC)
9 Sahakar Maharashi Shankarrao Mohite Patil SSK Ltd. (Distillery), Tal. Malshiras, Solapur
34.50 Crs. Establish for Modernization
JD(WPC)
10 Gangamai Industries & Construction Ltd. A/p., Najik Babhulgaon, Tal Shevgaon, Dist Ahmednagar
209.54 Crs Establish for Expansion
JD(WPC)
SectionNo. of cases
JD(APC)JD(WPC) 11
ASTRO(HQ)
Total 11
List of Remaining Cases of 5th Consent Appraisal Committee Meeting of 2013 to be submitted before 9th Consent Appraisal Committee Meeting of 2013
scheduled on 29.07.2013 at 11.00 am (Part-I Establish cases)
RESUBMISSION
FRESH AGENDA
Sr. No. Name & Address CI (in Rs.) Applied For Section Page No
1 Shree Chhatrapati Shahu SSK Kagal, Kolhapur
204.06 Crs. Operate (Expansion)
JD(WPC) 01-32
2 Sanjivani (T) SSKLtd. (Distillery Unit), Sahajanand, Tal. Kopargaon, Ahmednagar
114.14 Crs. 1st Operate (Expansion)
JD(WPC) 33-51
1 Fabtech Sugar Pvt Ltd. , (Sugar & Co-generation) Gat No.644 to 649,651 A/p Nandur Tal.Mangalwedha Dist-Solapur
143.71 1st Operate JD(WPC) 52-75
2 Shree Gurudatt Sugar Ltd. (Co-gen), Gat No. 61, A/p. Takaliwadi
159.03 Crs. 1st Operate JD(WPC) 76-92
3 Vaidyanath S.S.K. Ltd (Co-generation), Dist. Beed (C to 1st O)
80.1 Crs. 1st Operate JD(WPC) 93-104
4 Kisanveer SSK Ltd. (Mineral Water Unit), At Bhuinj, Post. Kisanveernagar, Tal. Wai. Dist. Satara
244.67 Crs. 1st Operate JD(WPC) 105-122
5 Aryan Sugar ltd., Gat No. 394/395, Dilip Nagar, At Post Khamgoan, Tal. Barshi, Dist. Solapur
78.14 Crs. 1st Operate JD(WPC) 123-142
6 Lokmangal Agro Industries Ltd., (Bio Gas Based Power Plant), Gut No. 573 to 575 A/p Bibi Darphal, Tal. North Solapur, Dist. Solapur
290.52 Crs. 1st Operate JD(WPC) 143-161
7 Jailaxmi Sugar products (Nitali) Pvt. Ltd Osmanabad
97.74 Crs 1st Operate JD(WPC) 162-177
8 Maharashtra Shetkari Sugar Ltd., Saikheda, Tq. Sonpeth, Dist. Parbhani
139.50 Crs. 1st Operate JD(WPC) 178-194
9 Bhimashankar Sakhar Karkhana Ltd., A/P. Dattatraya Nagar Pargaon, Tal. Ambegaon, Dist. Pune
136.55 Crs. 1st Operate Co-gen with Amalgamatio
n
JD(WPC) 195-216
10 Kumbhi Kasari SSK (Distillery Unit), Kuditre, Karveer, Kolhapur
6.40 Crs. & 1st Operate for
Modernization & renewal
JD(WPC) 217-244
11 Vitthalrao Shinde SSK Ltd., A/p. Gangamainagar, Tal. Madha, Dist. Solapur (Distillery Unit)
247.45 Crs. 1st operate (expansion)
& Renewal & amalgamatio
n
JD(WPC) 245-270
FRESH AGENDA
List of Remaining Cases of 5th Consent Appraisal Committee Meeting of 2013 & 9th Consent Appraisal Committee Meeting of 2013 to be submitted before CAC
scheduled on 29.07.2013 at 11.00 am (Part-II Operate cases)
RESUBMISSION
12 Vitthalrao Shinde SSK Ltd., A/p. Gangamainagar, Tal. Madha, Dist. Solapur (Sugar & Co-gen consent)
247.45 Crs. 1st Operate of
Expansion with
amalagamation to existing
consent
JD(WPC) 271-310
Section TotalJD(APC)JD(WPC) 14ASTRO(HQ)Total 14
Sr. No. Name & Address CI (in Rs.) Applied For Section Page No
1 Pad Dr. V.V. Patil SSK Ltd. (Distillery + Aceltadyde), Pravaranagar, rahata, Dist-Ahmednagar
90.35 Crs. Renewal JD(WPC)
2 Mula SSK Ltd. (Sugar), Post Sonai, Newasa, Dist. Ahmednagar.
149.52 Crs. Renewal JD(WPC)
3 Shri Ambalika Sugar Pvt. Ltd., Ambalika Nagar, Post-Jagdamba factory, Tal-Karjat, Dist-Ahmednagar.
132.83 Crs. Renewal with amalgamation
JD(WPC)
4 . Gangakhed Sugar & Energy Pvt. Ltd., Vijaynaagar, Makni, Tal. Gangakhed, Dist. Parbhani
325.20 Crs. Renewal JD(WPC)
5 Sanjivini (Takli) S.S.K. Ltd, A/p. Sahajanandnagar, Post Shingnapur, Tal. Kopergaon, Dist. Ahmednagar
223.35 Crs. Renewal (Sugar + Co-gen, Acid &
Country liquor plant)
JD(WPC)
6 Dr. B.B. Tanpure SSK Ltd., (Sugar At. Shrishivaji Nagar, PO. Rahuri, Dist. Ahmednagar)
114.40 Crs. Renewal JD(WPC)
1 Karmayogi Shankarraoji Patil SSK Ltd. (Distillery Unit) , Mahatma Phulenagar (Bijwadi), Tal- Indapur, Dist- Pune
278.42 Crs. Renewal JD(WPC)
2 Nira Bhima SSK Ltd. ( Sugar Unit ) , Gat no 303-306, 332/3/5/7/8/40/1/4//5/6/, Shanajinagar, At-Road, Tal-Indapur.
261.78 Crs. Renewal JD(WPC)
3 Purti SSK Ltd., (Distillery), Dist.- Nagpur.
268.57 Crs. Renewal JD(WPC)
4 Carlsberg India Pvt. Ltd., (Brewery Unit), Dist.- Aurangabad. ( C to R)
157.45 Crs. Renewal JD(WPC)
5 Vishwasrao Naik SSK Ltd., (Distillery unit) (C to R) Yashwantnagar A/P.Chikhali,
173.54 Crs. Renewal JD(WPC)
6 Chhatapati Shahu SSK Ltd. (Distillery), Kagae, Tal. Kagal, Kolhapur.
154.49 Crs. Renewal JD(WPC)
7 Shrigonda SSK Ltd. (Sugar), At Shrigonda, Tal. Shrigonda, Dist. Ahmednagar
77.97 Crs. Renewal JD(WPC)
RESUBMISSION
FRESH AGENDA
List of Remaining Cases of 5th Consent Appraisal Committee Meeting of 2013 to be submitted before 9th Consent Appraisal Committee Meeting of 2013 tscheduled on
29.07.2013 at 11.00 am (Part-III Renewal cases)
8 Shree Renuka Sugars Ltd., (Co.generation on Boot Basis of M/s. Ajinkyatara SSK Ltd. Tal. & Dist. Satara
99.45 Crs. Renewal JD(WPC)
9 Shree Makai SSK (Sugar), Bhillarwadi, Tal. Karmala, Dist. Solapur
57.99 Crs Renewal JD(WPC)
10 Baramati Agro Ltd. (Distillery Unit), Shetfal Gade, Tal. Indapur, Dist. Pune
196.51 Crs. Renewal JD(WPC)
11 Jakraya Sugar Ltd. (Sugar & Cogen) A/p. Watvade, Tal. Mohol, Dist. Solapur
122.16 Crs. Renewal JD(WPC)
12 Shri Vitthal SSK Ltd., (Sugar & Cogen Unit), Venunagar-Gursale, Tal. Pandharpur, Dist. Solapur
281.15 Crs. Renewal JD(WPC)
13 Privilege Industries Ltd. (Distillery), MIODC Lonanad, Khandala, Dist. Satara
158.11Crs. Renewal JD(WPC)
14 Dr. B.B. Tanpure SSK Ltd., (Distillery & Chemical), Rahuri, Dist. Ahmednagar
124.66 Crs. Renewal with Amalgamation
JD(WPC)
15 Kranti SSL Ltd. (Sugar + Co-gen) Kolhapur
151.99 Crs. Renewal JD(WPC)
16 Sonhira SSK Ltd. (Sugar + Cogen), Kadegaon, Sangali
189.74 Crs. Renewal JD(WPC)
17 Sonhira SSK Ltd. (Distillery Unit), Kadegaon, Sangali
15.65 Crs. Renewal JD(WPC)
18 Shree Tatyasaheb Kore Warana SSK (Unit-I Sugar, Waranagar, Kolhapur
175.50 Crs. Renewal JD(WPC)
19 Dudhganga Vedganga SSK Ltd., (Sugar + Cogen) Bidri, Tal. Kagal, Kolhapur
203.47 Crs. Renewal JD(WPC)
20 Vishwasrao Naik SSK Ltd. (Sugar), Yashwantraonagar, A/P. Chikhali, Sangali
159.12 Crs. Renewal JD(WPC)
21 Lokmangal Sugar Ethanol & Co-generation Industries Ltd. (Sugar & Cogen), At Bhandarkavte, Tal. South Solapur, Dist. Solapur
233.24 Crs. Renewal JD(WPC)
22 Shree Pandurang SSK Ltd. (Distillery), A/p. Shreepur, Tal. Malshiras, Dist. Solapur
41.32 Crs. Renewal JD(WPC)
23 Sahakar Shiromani Vasantrao Kale SSK Ltd., (Distillery), A/P. Bhawani, Tal. Pandarpur, Dist. Solapur
24.96 Crs. Renewal JD(WPC)
24 Shree Chhatrapati Shahu SSK, Tal-Kagal, Dist-Kolhapur
154.49 Crs. Renewal JD(WPC)
25 Ashok SSK Ltd., (distilery. Unit),Shrirampur, Ahmednagar.
148 Crs. Renewal JD(WPC)
Sr. No. Name & Address CI (in Rs.) Applied For Section Page No
26 Tilaknagar Industries Ltd., Shrirampur, Ahmednagar.
95 Crs. Renewal JD(WPC) 01-20
27 Bhima SSK Ltd., Madhukar Nagar, Patas, Tal. Daund
145.92 Crs. Renewal JD(WPC) 21-47
28 Sahakar Maharashi Shankarrao Mohite Patil SSL Ltd., Shankarganagar, Tal. Malshiras, Dist. Solapur, (Anhydrous Alcohol Plant)
421.00 Crs. Renewal JD(WPC)
48-64
29 Shri Bhogawati Sahakari Sakhar Karkhana Ltd., Shahunagar (Parite), Kolhapur
79.84 Crs. Renewal JD(WPC)65-93
30 Shri Bhogawati Sahakari Sakhar Karkhana Ltd. (Distillery), Sr. No. 295, 296, 297 & 298, A/p. Shahunagar (Parite), Kolhapur
79.84 Crs. Renewal JD(WPC)
94-121
31 Shri Siddeshwar SSK Ltd., Kamathe, A/P Tikekarwadi, Tal. North Solapur, (Kraft Board Mfg.)
Renewal JD(WPC)122-139
32 Shri Siddeshwar SSK Ltd. (20 KLPD Distillery), Kamathe, A/P Tikekarwadi, Tal. North Solapur.
80.58 Crs. Renewal JD(WPC)140-166
33 Baramati Agro Ltd. (Sugar & Co-generation), Shetphalgade, Tal. Indapur, Dist. Pune
167.36 Crs. Renewal JD(WPC)167-188
34 Ajinkyatara SSK Ltd. (Sugar Unit), A/p. Shahunagar Shendre, Tal. & Dist. Satara
89.01 Crs. Renewal JD(WPC)189-208
35 Loknete Baburao Patil Agro Industries Ltd. (Sugar & Co-generation), At Laxminagar, Angar, Tal. Mohol, Dist. Solapur (Formerly known as M/s. Loknete Baburao Patil SSL Ltd.
95.33 Crs. Renewal (Amalgamation of Sugar & Co-
generation)
JD(WPC)
209-232
36 The Shrigonda S.S.K. Ltd., A/p. & Tal. Shrigonda, Dist. Ahmednagar
77.97 Crs. Renewal JD(WPC) 233-249
37 Indreshwar Sugar Mills Ltd., Bhagwant Nagar, A/p- Upali, Tal.- Barshi, Dist.- Solapur. (Sugar & Co-generation)
85.29 Crs. Renewal JD(WPC)
250-268
38 Jay Mahesh Sugar Industries Ltd,Majalgaon, Dist. Beed.
225.3 crs. Renewal with expansion
JD(WPC) 269-292
39 Vaidyanath S.S.K. Ltd (Sugar),Pangri, tal-Parli (V), Dist. Beed
153.68 crs Renewal JD(WPC) 293-310
40 Shree Vitthal SSK Ltd.. , A/p. Venunagar, Gursale, Tal. Pandharpur, Dist. Solapur
134.08 Crs. Renewal JD(WPC)311-326
List of Remaining Cases of 5th Consent Appraisal Committee Meeting of 2013 to be submitted before 9th Consent Appraisal Committee Meeting of 2013 scheduled on
29.07.2013 at 11.00 am (Part-IV Renewal cases)
41 Shri Tatyasaheb Kore Warana SSK Ltd. (Distillery Unit), Warananagar, Tal-Panhala, Dist-Kolhapur
Renewal JD(WPC)
327-342
42 Purna S.S.K.Ltd. Basmatnagar Tq, Hingoli
141.05 Crs Renewal JD(WPC) 343-365
43 Purna SSK Ltd. (Distillery Unit) Basamat Nagar, Hingoli
131.46 Crs Renewal JD(WPC) 366-380
44 Rena Sahkari Sakhar Karkhana Ltd. (Distillery Division) Dilipnagar, Vill. Niwada, Tal. Renapur, Dist. Latur
83.00 crs Renewal JD(WPC)
381-396
45 Bhairavnath Sugar Work Ltd At Sonari Tal Paranda Dist Osmanabad
119.8 Crs Renewal JD(WPC)397-415
46 Tridhara Sugar Ltd.At. Amdapur, Post Singnapur,Tq. and Dist. parbhani
203.77 Crs Renewal JD(WPC)416-435
47 Bhaurao Chavan SSK Ltd. Laxmi Nagar, Degaon, Yelegaon, Nanded.
137.02 Crs Renewal JD(WPC)436-454
48 Pad Dr V V Patil S S K Ltd.(Sugar Unit) Post Pravaranagar, Tal. Rahata, Dist. Ahmednagar
310.76 Crs Renewal JD(WPC)455-474
49 Manjara SSK Ltd. (Sugar) Vilas nagar, Chincholi, Raowadi, Tal & Dist-Latur
140.97 Crs Renewal JD(WPC)475-496
50 Kukadi S S K Ltd. (Sugar Unit) At Post Pimpalgaon, Pisa, Tal. Shrigonda, Dist. Ahmednagar
99.28 Crs Renewal JD(WPC)497-518
51 Shri. Saikrupa Sugar & Allied Industries Ltd Hiradgaon, Shrigonda, Ahmednagar
314.09 Crs Renewal JD(WPC)519-541
52 Gangakhed Sugar & Energy Pvt. Ltd., Vijaynaagar, Makni, Tal. Gangakhed, Dist. Parbhani
70.93 Lakhs Renewal JD(WPC)542-550
53 Majalgaon SSK Ltd (Sugar), Sundernagar Talegaon, Tal Majalgaon, Dist Beed
113.06 Lakhs Renewal JD(WPC)551-564
54 Pioneer Distilleries Ltd, Mouje Balapur, Tal Dharmabad, Dist Nanded
9108 Lakhs Renewal JD(WPC) 565-572
1 Loknete Baburao Patil SSK Ltd At Laxminagar, Angar, Tal. Mohol, Dist. Solapur
Change in Name
JD(WPC)537-579
2 United Spirit Ltd, MIDC Chikalthana, Dist Aurangabad
Operation in Rainy season JD(WPC) 580-602
Section TotalJD(APC)JD(WPC) 62AST
Review Agenda
RO(HQ)Total 62
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
ESTABLISH Resubmission CAC Agenda No. 01 Name of Industry : M/s. Utech Sugar Pvt. Ltd.,
A/P. Kavthe Malkapur Tq. Sangamenr Dist. Ahmednagar.
• Applied for C To E. • Category RED/LSI. • Proposed production Capacity. • White crystal Sugar – 11500 MT/M. • Molasses - 4600 MT/M. • Press Mud - 4370 MT/M. • Bagasses - 31500MT/M. • Co-gen. – 14 MW. • C.I. of Rs. 91.33 Cr. • I.E. will be generated to the tune of 360 CMD. • D.E. will be generated to the tune of 50 CMD. • 50 acres open land available with industry. • Proposed ETP, comprising Bar Screen, O & G trap, Equalization tank, Buffer tank,
Primary Clarifier, aeration tank, secondary clarifier & SDB. • Air pollution control. • Boiler with chimney height 68.0 mtr. With ESP proposed. • SRO recommended to grant consent up to: commissioning of the unit.
Resubmitted. • The said case was discussed in CAC on 22.03.2013 & it was decided to keep in
abeyance and put up in CAC after submission of distance certificate from Executive Engineer, Irrigation Department as per RRZ policy.
• The industry has submitted river distance certificate on 2.5.2013 which was obtained from Irrigation Department Ahmednagar.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
FRESH AGENDA CAC Agenda No. 01
Name of Industry : M/s Ramgiri Sugars Ltd, Savargaon, Dist. Osmanabad.
1) Applied for Consent to establish. Proposed sugar industry of 3500TCD with Co-gen14.9 MW. Does not attract EC. 2) Proposed location from river Terna , A-II class is @ 15 Kms. Satisfy RRZ policy. 3) IE generation 205 CMD, Proposed Secondary treatment. Treated effluent will be used on land for gardening. Land available is 30 acres seems to be sufficient. 4) Proposed ESP as an APC system to bagasse fired boiler.. 5) SRO & RO recommended for grant of Consent to establish. 6) Recommended for Grant of Consent to Establish upto commissioning of Unit or Five Years whichever is earlier with B.G of Rs 5 lakhs & 2 lakhs.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 02 Name of Industry : M/s. JaiHind Sugar Pvt. Ltd., (Sugar & Co-Generation),
A/p. Achegaon, Tal.South Solapur, Dist.- Solapur.
A. Applied for C to E for Sugar & Co-generation. B. Application received at HQ on dt.26.03.2013. C. Proposed Sugar crushing capacity is 3500 TCD and bagasse based Co-
generation – 20 MW. D. Proposed C.I of the unit is Rs.125.00 Crs. E. Bhima river (A-II Class) distance is about 20 KM from the proposed unit, satisfies
the river distance criteria. (Submitted the river Distance certificate of Executive Engg. Irrigation Dept.)
F. Industrial effluent generation will be 515 CMD. G. Land available for the disposal of treated effluent is 46.15 Hectors, which seems
to be adequate. H. ETP of adequate capacity (600 CMD) is proposed with secondary treatment. I. ESP is proposed as an APC system. J. Environmental Clearance is applicable. K. RO recommended for grant of C to E with condition of obtaining EC. L. Submitted to CAC for consideration and grant of C to E with condition of
Environmental clearance if approved please.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 03 Name of Industry : M/s. Baramati Agro industries Ltd, Mahatama Phule Nagar, Kannad,
Dist. Aurangabad.
1)Applied for Consent to establish for expansion of Sugar & Co-gen. Application submitted
at SRO on 07.03.13 & received at HQ on 19.04.13
2)Existing Sugar industry is of 2500TCD having valid consent up to 31.07.14 & proposed
Sugar of 2000TCD i.e Total Sugar 4500TCD & proposed Co-gen 14.75 MW. Does not
attract EC.
3) Distance from nearest river is not mentioned in processing of SRO and RO.
4) Existing effluent generation 450 CMD Proposed IE generation 210 CMD, provided
Secondary treatment plant of capacity 450 CMD.
5) Treated effluent will be used on land for gardening total land available land is 150acres
of land which is sufficient.
6) Ind proposed modernization in the manufacturing plant by adopting new technology,
due to which effluent generation will be 450 CMD including expansion .
7) Existing boilers will be replaced & proposed new boiler for sugar & co-gen with ESP as
an APC system.
8)As per SRO report Notified river Godavari is @ 80 kms away from Site.
9)We may grant Consent to establish for expansion.We may place application in CAC as
C.I of existing Rs. 50.70 crores & proposed Rs.132.67 Crores. Total Rs.183.37 Crores.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 04 Name of Industry : Shri Vithal SSK Ltd.,
Venunagar, Gursale, Tal.- Pandharpur, Dist.- Solapur.
a. Applied for the C to E for expansion of Sugar and Co-generation unit. b. Application received at HQ on dt.10.09.2012. c. Proposed Sugar expansion is from 500 TCD to 7500 TCD and Co-generation id
from 14 MW to 33.8 MW. d. SRO reported that unit is located at 2.1 KM from Bhima River (A-II Class) e. Capacity of existing ETP is 1000 CMD, Industry has submitted the proposal for
the upgradation of the ETP. f. Proposed to provide one Boiler of 125 TPH instead of existing 3 Boilers with ESP
as an APC system. g. Environmental Clearance is required as per the EIA Notification. h. RO Pune has recommended the application. i. It is recommended to grant C to E subject to Environmental Clearance and
compliance of Interim Direction dt. 27.03.2012 for existing unit, with condition that company shall not take any effective steps towards construction of Plant and machinery till Environmental clearance is obtained.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 05 Name of Industry : Khandala Taluka Shetkari Sah. Sakhar Karkhana Ltd ,
Gat No. 208 & 209 Khandala, Gat No. 643-647 A, 647-B,650 &589 Mhavashi, Tal- Khandala, Dist- Satara.
1. Applied for C to E for the 2500 TCD Sugar and 9.5 MW Co-generation unit. 2. Application received at HQ on 09.04.2013. 3. Proposed C.I of the Unit is Rs.149.00 Crs. 4. Unit is proposed at 7.1 KMs from Nira River (A-II) class, which satisfies the river
distance criteria. 5. I.E will be 247 CMD and D. will be 28.80 CMD. 6. ETP is proposed with secondary treatment. 7. Disposal of the treated effluent will be on land and land available is about 68 Acres,
which seems to be adequate. 8. ESP is proposed as an APC system, which is as per CREP Norms. 9. As per the EIA Notification 2006 and Amendments thereto, it does not attract the
provisions of E.C. 10. It is recommended to grant C to E with condition of BG of Rs. 5.0 Lakhs for
compliance of C to E conditions.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 06 Name of Industry : M/s. Nira Bhima SSK Ltd.,
At-Shahajinagar, Post-Redni, Tal. Indapur, Dist. Pune.
1. Industry has Obtained C to E for expansion of Sugar from 1250 TCD to 3500 TCD
and Co-generation 16 MW on dt.02.08.2012. 2. Application received at HQ on 30.04.2013 3. Now applied for C to E for 2 MW Co-Generation. 4. C.I of the 2 MW Co-gen expansion is Rs.24.90 Crs. 5. Industrial effluent from 2 MW expansion will be 15 CMD. 6. SRO reported that effluent will be treated in existing ETP of the sugar unit and
industry has upgraded the ETP. 7. Wet Scrubber is provided as an APC system to the existing Boiler which will be
used. 8. Industry has submitted BG of Rs. 2.0 Lakhs against the consent condition of C to E
obtained on 02.08.2012 for the upgradation of the ETP and APC system, which is valid upto 22.09.2013.
9. Environmental Clearance is applicable as per the provision of EIA Notification and amendments thereto.
10. RO/SRO has recommended for grant of consent subject to submission of additional consent fees towards increased investment.
11. In view of above we may grant C to E for 2 MW co-generation by giving overriding effect in the C to E granted vide letter dt.02.08.2013 for Sugar Expansion and 16 MW CO-generation.
12. It is recommended to Amend exiting C to E by adding proposed 2 MW co-generation power plant to already proposed 2 MW co-gen power plant making total 18 MW with condition of obtaining Environmental Clearance and BG of Rs.3.0 Lakhs towards compliance of C to E conditions (making total BG of Rs.5.0 lakhs), instead of issuing new separate C to E for 2 MW plant. The BG shall be valid till C to E and existing BG shall also be extended till same period.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 07 Name of industry :- Twentyone Sugars Limited , Vill. Malwati, Tq. & Dist. Latur. 1) Applied for Consent to establish. Proposed sugar industry of 4800TCD with Co-gen 8
MW . Does not attract EC.Application submitted to SRO Latur on 26.04.13 & received at
HQ on14.05.13
2) As per Certificate issued by Executive Engineer Latur Minor irrigation division Latur dtd
23.03.13 the minimum aerial distance from High flood line of river Manjara from proposed
industrial site of Twenty one Sugars Ltd, at Malawati, Tq & Dist. Latur is 2100 meter.
3) IE generation 410 CMD & domestic 80 CMD , Proposed Secondary treatment. Treated
effluent will be used on land for gardening. Land available is 16.41 Acres wehich is
insufficient.
4) Proposed ESP as an APC system to bagasse fired boiler..
5) SRO reported that we may consider proposal for grant of Consent to Establish for their
lower capacity subject to expected compliances mentioned in manual processing
mentioned at particularly clarification towards RRZ and availability of land for irrigation and
consideration of future pollution load with respect to expansion of sugar, Co-gen and
distillery unit, if approved..
6) It appears that proposed sugar industry is having crushing capacity more than 5000TCD
, hence attract Environmental clearance. The certificate issued by irrigation department
mentioned about project site, but not mentioned survey no , hence regarding certification so
as to ascertain applicability of RRZ distance Criteria. Also regd. Clarification about land
availability for use of treated effluent on land for irrigation.
7) Submitted before CAC.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 08 Name of Industry : M/s. Twentyone Sugars Limited, Gut No. 44,45,48,49,50,86 Vill. Dhanora, & Gut No. 225,232,233,234,
Vill. Hipperga,Tq. Ahmedpur., Dist. Latur. 1) Applied for Consent to establish. Proposed sugar industry of 4800TCD with Co-gen 8
MW . Does not attract EC.Application submitted to SRO Latur on 26.04.13 & received at
HQ on14.05.13
2) As per Certificate issued by Executive Engineer Latur Minor irrigation division Latur dtd
23.03.13 the minimum aerial distance from High flood line of river Manjara from proposed
industrial site of Twenty one Sugars Ltd, at Malawati, Tq & Dist. Latur is 2300 meter
3) IE generation 410 CMD & domestic 80 CMD , Proposed Secondary treatment. Treated
effluent will be used on land for gardening. Land available is 35 Acres which is sufficient
for existing application.
4) Proposed ESP as an APC system to bagasse fired boiler..
5) SRO reported that we may consider proposal for grant of Consent to Establish for their lower capacity subject to expected compliances mentioned in manual processing mentioned at particularly clarification towards RRZ and availability of land for irrigation and consideration of future pollution load. 6) It appears that proposed sugar industry is having crushing capacity more than 5000TCD , hence attract Environmental clearance. The certificate issued by irrigation department mentioned about project site, but not mentioned survey no , hence regarding certification so as to ascertain applicability of RRZ distance Criteria. Also regd. Clarification about land availability for use of treated effluent on land for irrigation. 7) Submitted before CAC.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 09 Name of Industry : Sahakar Maharashi Shankarrao Mohite Patil SSK Ltd ,
Shankar Nagar Tal-Malshiras,Dist-Solapur.
1. Applied for the Consent to Establish for Modernization of the 60 KLPD Distillery unit. 2. Application received at HQ on 2.2.2013. 3. C.I of the proposed Modernization is Rs.24.00 Crs. Total C.I of the Industry is
Rs.359.72 Crs. 4. Industry has also applied for the renewal of distillery unit, which is granted
18.02.2013 for a period upto 31.07.2013. 5. SRO reported that due to Modernization there will no rise in production and
decrease in spent wash generation from 510 CMD to 286 CMD. 6. Industry has submitted the report of the VSI dt.09.11.2012 in which it is mentioned
that: a) Industry has installed 30 KLPD unit based on Batch fermentation in the year
1984. b) Second 30 KLPD distillery unit based on Biostill fermentation installed in the year
1993. c) It has been decided to modernize both the fermentation plants (i.e Batch
Fermentation and Bio still fermentation) to a single cascade continuous / fed – batch fermentation system of 60 KLPD capacity.
d) It has been also decided to modernize both the old distillation plant to a single 60 KLPD capacity Multi Pressure distillation plant.
7. Existing distillery unit has provided Biomentanization followed by composting for the Disposal of the Spent wash.
8. Compost yard of @ 10 Acres is provided as per CREP. 9. Recommended for grant of C to E for Modernization of Existing 2 Old (30 KLPD
each) units to One Single 60 KLPD with BG of Rs.5.0 Lakhs for compliance of C to E conditions and EC if agreed. Since there is change in process batch to continuous distillery it may attract Envi. Clearance. This needs to be considered in CAC meeting Page 1 & 2 OF Notification 2006).
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 10 Name of Industry : M/s. Gangamai Industries and Construction Ltd. ,
A/p. Najik Babhulgaon, Tal. Shevgaon, Dist. Ahmednagar.
- Applied for Consent to Establish for expansion in sugar plant from 2500 to 5500 TCD i.e.by 3000 TCD and co-gen plant form 12 MW to 32 MW i.e. 20 MW. - CI of industry is Rs. 135.30/- Crs (expansion)+ existing Rs. 74.24/- Crs. Total CI is Rs. 209.54/- Crs. - Existing industrial effluent is 300CMD & domestic effluent 10 CMD, for expansion it
proposed to generate industrial effluent from sugar-297 CMD and from Co-gen-23 CMD.Hence for expansion indl. Efflt will be 320 CMD & domestic- 22 CMD. Total effluent quantity after expansion will be 620 CMD & domestic-32 CMD.Industry has provided prim, secondary & tertiary treatment of 550 CMD capacity and proposed to provide additional treatment units comprises of Primary clarifier, Aeration Tank-1 No, Reaction tank-2 Nos , For 140 T capacity boiler for co-generation, industry proposes to provide ESP with stack of 76 mtrs. Height.
- SRO/RO has recommended for grant of consent to establish for expansion subject to condition of environmental clearance from Ministry of Environment and Forest, New Delhi.
- Recommended for grant of consent to establish for expansion subject to condition of EC.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
OPERATE Resubmission CAC Agenda No. 01 Name of Industry : M/s. Shree Chhtrapati Shahu SSK
Kagal, Kolhapur.
• Industry has applied for consent to Operate for Expansion for capacity from 3500 TCD to 4950 TCD (1450 TCD expansion) It is RED/LSI Unit.
• Capital Investment is 52.75 Cr. • Total Capital Investment of Industry - Rs. 204.06 Cr.
(Sugar Rs. 66.76 Cr. + Co-gen Rs. 53.63 Cr. + Distillery Rs. 16.70 Cr.) • Previous consent C to O granted by the Board vide letter no. BO/JD (WPC) EIC
No.KP-7745-11/E/CC-CAC-247 dt. 04.02.2012 valid up to 31.12.2012 • Previous consent C to E granted by the Board vide letter no. BO/JD (WPC) EIC
No.KP-7744-11/E/CC-CAC-246 dt. 04.02.2012 valid up to commissioning of unit/5 yrs.
• Proposed Water Consumption is 380 CMD. IE generation is 130 CMD industry upgraded its existing ETP comprising with Primary, Secondary and Tertiary Treatment facility.
• Domestic effluent generation will be 16 CMD & will be treated in septic tank and soak pit.
• As per SRO’s Report CREP Compliances are as follows, − Industry has provided 15 days storage tank − Provided ESP as an APC system to boiler. − Waste water generation is less than 100 lit /ton cane crushed.
• Treated effluent will be disposed on 98.8 acre land for irrigation which is sufficient.
• JVS analysis result of existing unit dt. 03.01.2012, 30.03.2012 is within consented limit.
• Industry has submitted environmental statement for year 2011-12 • Cess paid up to May 2012; assessment done up to Nov 2012. • Industry has provided ESP as APC attached to Baggase/Coal Fired Boiler having
stack height of 70 m. • Industry has paid consent fee Rs. 1,00,000/- for consent to operate for expansion. • SRO Kolhapur has recommended for consent to operate. • Applied for renewal with expansion from 3500 TCD + 1450 TDC = 4950 TCD • JVS dt. 30.03.2012 is within limit. • ESP Provided. • BG submitted 5+2 • Recommended to grant C to O with expansion.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 02
Name of Industry : M/s. Sanjivani (T), SSK. Ltd., (Distillery Unit), Sahajanand, A/P. Shingnapur ,Ahmednagar
• Applied for first consent to operate for expansion to distillery unit for (25 KLPD). • Industry Category RED/LSI. • Previous total Capital Investment of the units are as below. • C. I. of Sugar & Chemical unit Rs. 48.76 Cr. • C.I. of Country liquor unit is Rs. 2.10 Cr. • C.I. of existing Distillery unit is Rs. 6.62 Cr. • C.I. of Co-generation Plant Rs. 40.97 Cr. • C.I. of proposed Distillery unit Rs. 8.16 Cr. • Total C.I. Rs.106.61 Cr. • Existing distillery unit C.I. increased by 8.93 Cr. & Proposed unit C.I. has been
decreased by 1.40 Cr. • At present total C.I. of the units are Rs 114.14 Cr. • Earlier consent dtd. 12.03.010 valid up to: Commissioning of the unit. • I.E. effluent generation to the tune 290 CMD and D. E. generation to the tune
0.90 CMD. • ETP provided Primary & secondary treatment, disposal on land for gardening. • Earlier consent dtd. 12.03.2010 granted by Board subject to achieve zero
discharge. • Industry has not provided Bio-methanization followed by five stage multiple
evaporation & anaerobic bio -composting to achieve zero discharge. • Industry has submitted reply dtd. 17.05.2013 . to our SCN dtd. 6.04.2013 it is
noted that Co. has not done any improvement nor proposed in near future due to their financial problems.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
FRESH AGENDA CAC Agenda No. 01 Name of Industry : M/s. Fabtech Sugar Pvt Ltd. ,
Gat No.644 to 649,651 A/p Nandur, Tal-Mangalwedha ,Dist-Solapur.
1. Applied for the C to 1st Operate for 5000 TCD Sugar and 30 MW Co-generation unit in the name of M/s. Fabtech Sugar Pvt. Ltd..
2. Application received at HQ on 14.05.2013. 3. C to E is obtained in the name of M/s. Shree Renuka Sugar Ltd., for the same
premises for 10000 TCD Sugar and 30 MW Co-generation. 4. M/s. Fabtech Sugar Private Ltd., has acquired the project of M/s. Shree Renuka
Sugar Ltd., At. Post Nandur, VIll.- Katral, Tal.- Mangalwedha, Dist.- Solapur. 5. NOC of M/s. Shree Renuka Sugar Ltd., is submitted. 6. Environmental Clearance is obtained from MoEF, New Delhi, in the name of M/s.
Shree Renuka Sugar Ltd., At. Post Nandur, VIll.- Katral, Tal.- Mangalwedha, Dist.- Solapur.
7. M/s. Fabtech Sugar Pvt. Ltd., has requested MoEF, New Delhi for change of name vide letter dt.13.04.2013.
8. C.I of the unit is shown as 143.71 Crs. 9. Industrial effluent is give as 255 CMD and D.E is 40 CMD. 10. In respect to the present status of the ETP called, SRO Solapur vide email dt.
10.06.2013 has submitted that ETP work is in progress. Civil work is completed equipments installation in progress and will be completed within 10 days.
11. Land available for the disposal of the treated effluent is adequate i.e about 74 Acres. 12. Wet scrubber is provided as an APC system to the Boiler as per the CREP norms. 13. Considering above compliance it is recommended to grant C to O 1st only after
receipt of ETP compliance report from RO/SRO along with status of providing covering system to avoid ingress of Bagasse with BG of Rs. 5.) Lakhs for O & M of ETP. however the Environmental Clearance certificate is yet not issued in the name of this new company even though Company has applied for the same. We may obtain BG of Rs.2.0 lakhs for obtaining change in name in Environmental Clearance in 4 Months period.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 02 Name of Industry : M/s. Shree Gurudatta SSK Ltd.
Gat No. 61, A/P Takaliwadi, Tal – Shirol, Dist – Kolhapur
• Industry has applied for consent to first operate for Bagasse based Co-Gen plant of
15 MW capacity, amalgamation with existing sugar consent. It is RED/LSI unit. • Previous consents are, - C to E for Co-gen 15 MW was issued vide letter no MPCB/PCI-III/EIC No. -1819-
09/CC-52 dt. 30.06.2009 - Existing C to R for Sugar (2500 TCD) is valid up to 31.12.2014 - Industry has obtained EC for 2500 TPD sugar dt. 19.09.2003 - EC is exempted for 15 MW Co-Gen as per EIA notification amendment 2009
• Total CI of Co-Gen plant declared by industry Rs. 86.31 Cr. - Capital investment of the Co-Gen industry has increased from 42.21 Cr. to Rs.
65.50 Cr. - Industry has increased its CI of Rs. 20.81 Cr. due to expansion and
modernization of the project. - Total CI of Industry is Sugar 72.72 Cr. + Co-Gen Rs. 86.31 Cr. = 159.03 Cr.
• Water consumption – 3258 CMD, IE – 288 CMD, DE – 10 CMD - ETP provided with primary and secondary treatment facility. - DE is treated in septic tank followed by soak pit.
• Submitted environmental statement for 2011-2012. • Paid cess up to Jan 2013. • During visit dt. 03.04.2013 it was observed that, − Industry has installed all machinery of Co-Gen plant and ready to commission. − Industry has provided wet scrubber to boiler followed by 65 m chimney. Now
industry has provided an ESP as an APC to common stack of boiler and Co-Gen plant.
− ETP provided but was not in operation during visit. − Industry has not provided compound wall to Bagasse storage yard.
• Industry paid fees of Rs. 6,25,000/- for five years. • SRO Kolhapur has recommended to consider case subject to clarification of EC
requirement and completion of pollution control system. • As per sectoral approach this industry falls in month of July hence we may grant
consent up to July 2018 if approved. • Considering above submission, it is recommended to grant 1st C to O to Co-Gen
plant (15MW) if CAC agree that no EC is required to said project as per amended EIA notification of 2009 (by waiving EC condition specified in C to E) with BG of Rs. Five Lakhs towards O and M and PCS till four month more than consent validity.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
• Since the sugar consent is valid till 31.12.2014 our policy is to Amalgamate all the consents in that plot, so in this case we may grant 1st C to O till 31.12.2014 only may be separately or by amalgamating this 1st C to O with existing sugar consent and showing/mentioning balance consent fees for period ver and above consent validity if agreed please,
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 03 Name of industry :- M/s Vaidyanath S.S.K. Ltd (Co-gen) A/P Pangri, Tq. Parli, Dist. Beed.
1. Applied for first Consent to operate.21 MW Co-gen plant.Application submitted at
SRO parbhani 02.5.13 & received at HQ on 03.06.13
2. 2.C to E was issued on 11.02.11 with condition of E.C. Ind obtained Environmental
clearance from MOEF.
3. 3.IE generation 135 CMD i.e boiler blow down which will be treated in existing
secondary ETP.
4. 4.JVS results of existing sugar ind dtd 21.11.11 & 20.03.12 & 12.01.12 are
exceeding the consented standards. Treated effluent will be used on land for
gardening.
5. 5.Application for renewal of consent of sugar industry is submitted to Desk for
inclusion in agenda of CAC meeting. The consent fees paid by industry for two
years . We have recommended for period upto 31.07.14 as per sectorial approach.
6. We may amalganmate with renewal of Consent of Sugar ind as per our policy issued vide cicular dtd 19.01.13.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 04 Name of Industry : M/s. Kisanveer SSK Ltd.,
At:- Bhuinj, Post. Kisanveernagar, Tal. Wai, Dist.- Satara.
Applied for Consent to 1st Operate for Mineral water plant.
a. Application received at HQ on dt.04.12.2012. b. Obtained C to E on dt.19.01.2012. c. It is a Green/MSI unit, located in the premises of sugar unit. d. River Krishna A-II class is about 2 Kms as reported by SRO. e. C.I of the Unit is 2.05 Crs (Total C.I of the industry is Rs.244.67 Crs.) f. Total water consumption is 864 CMD. g. Industrial effluent generation is Nil. h. Paid fees of Rs.15000/- for a period upto 31.10.2015. i. Recommended for grant of 1st Operate upto 31.10.2015.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 05
Name of Industry : M/s. Aryan Sugar Ltd , (Sugar & Co-generation Unit) Gut No. 394/395, Dilip Nagar,
At-Po- Khamgoan, Tal. Barshi, Dist- Solapur. a. Applied for C to 1st Operate. b. Application received at HQ on dt.25.02.2013. c. C to E obtained for 2500 TCD Sugar and 10 MW Co-generation unit. d. C.I of the unit is shown as Rs.78.14 Crs. e. Satisfies the RRZ criteria, as per SRO report it is 20 KM away from Sina river. f. Industrial effluent is 375 CMD. g. SRO Vide letter dt.26.04.2013 has reported that Civil work of ETP is completed and
mechanical and electrical work will be completed within 15 to 20 days. h. Proposed to use the treated effluent on land at @ 25 Acres land, which seems to be
adequate. i. ESP is provided as an APC system, as per the CREP norms. j. Report of RO/SRO is called for the status of the completion of ETP work. Case is
recommended for grant of C to O 1st (Subject to completion of ETP based on verification report of SRO on the CAC date).
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 06
Name of Industry : M/s. Lokmangal Agro Industries Ltd.,(Bio Gas Based Power Plant) , Gut No.573 to 575 A/P Bibi Darphal, Tal. North Solapur, Dist, Solapur.
a. Applied for the C to 1st operate for the biogas based power plant 2 x 2 =4 MW. b. Application received at HQ on 06.03.2013. c. C.I of the unit is Rs.21.16 Crs (Total C.I of the Industry is Rs. 290.52 Crs Including
the Distillery C.I Rs.95.08 Crs, Proposed expansion of Distillery C.I is Rs. 120.0 Crs and Sugar C.I is Rs. 54.28 Crs).
d. Obtained Consent to Establish on dt.06.09.2011 for gas based 4 MW plant. e. Industry has installed H2S scrubber for recovery of sulphur to use purified gas for
power generation. f. The scrubbing liquid generated is about 10 CMD out of which 5 CMD is recycled
back in scrubbing activity and 4 CMD is disposed of in SDB and used for composting.
g. Domestic effluent generation is 0.8 CMD. Septic tank and soak pit is provided. h. ESP is provided to the Boiler of existing distillery unit. i. The condition of Environmental Clearance was prescribed in C to E. j. However SRO/RO recommended that captive power generation is of 4 MW hence
E.C is not required. Application is under the purview of CAC meeting. k. Recommended for issuing SCN for refusal being 1st C to O and not obtained E.C. as
per consent condition. However it is requested to CAC to discuss on this issue and applicability of E.C to power plant 4 MW Bio Gas based generated / obtained from Bio – methanization process of Distillery, before deciding the case.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 07 Name of industry :- M/s Jailaxmi Sugar Products (Nitali) Pvt. Ltd., Gat no 405 to412 &429 Village Nitali, Tq & Dist. Osmanabad.
1. Applied for first consent to Operate. 2. Sugar industry 3500 TCD. 3. Capital investment 49.43 Crores Sugar, Proposed Gogen 48.31 Crores Total 97.74 Crores 4. IE generation 320 CMD. CREP complied. 5. Provided secondary treatment. Treated effluent will be used on land for gardening. Land available for disposal 18 acres. 6. Wet scrubber provided to boiler as an air pollution control Equipment..CREP complied. 7.SRO vide letter dtd 10.04.13 reported that work of ETP is completed & commissioned ETP. 8.SRO & RO recommended case for grant of Consent to Operate. 9.We may place application in CAC as total capital investment is 97.74 Crores. (Sugar & Cogen.) 10. Recommended for First Consent to Operate. Till 31.07.14 if paid fees or otherwise upto 31.07.13 with B.G of rs 5 lakhs & 2. Lakhs for O & M of PCS & Covering of effluent carrying pipeline.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 08
Name of industry :- Maharashtra Shetkari Sugar Ltd., Saikheda , Tq. Sonpeth, Dist.Parbhani.
1. Applied for First Consent to operate. 2. Integrated project of sugar, 3500 TCD, Co gen 20MW & Distillery 30KLPD. 3. Consent to Establish was obtained in year 2010, with condition of Environmental
Clearance. 4. Obtained EC from MOEF. 5. Effluent generation 240 CMD. Complied with CREP . 6. Provided Secondary & tert, treatment for Sugar and co-gen. 7. Land available for 45 acres. 8. For Distillery provided reboiler followed by Biodigester, Volume reduction in triple
effect falling film Evaporation system followed by Bio composting. 9. SRO reported that composting yard will be as per CREP guidelines & RO
communicated that SRO has been asked on 01.01.13 to submit point wise CREP compliance.
10. RO reported that as recommended by SRO we may consider Consent to operate with bank guarantee of Rs 5.0 lack & 2.0 lacs towards O & M of ETP & compliance of CREP guidelines.
11. The application is to be placed in CAC as Total C.I of industry 139.5 Crores. 12. Report of RO/SRO for CREP compliance called being first C to O. Submitted to CAC
for consideration.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 09 Name of Industry : M/s. Bhimashankar Sakhar Karkhana Ltd.,
A/P Dattatraya Nagar ,Pargaon,Tal - Ambegaon, Dist – Pune.
1. Applied for the C to 1st Operate for 13 MW co-generation amalgamation
with existing consent of Sugar – 2500 TCD and Co-generation -6 MW. 2. Application received on 04.05.2013. 3. Obtained C to E for expansion i.e 13 MW co-generation. 4. Existing consent for Sugar – 2500 TCD and Co-generation -6 MW is valid
upto 31.07.2015. 5. Total C.I of the unit after amalgamation is Rs.136.55 Crs. 6. Obtained Environmental Clearance for 19 MW Co-generation from
Environment Dept., Govt. of Maharashtra vide letter dt.30.06.2012. 7. I.E from Sugar unit is 261.48 CMD and from Co-gen it is 50 CMD i.e Total
I.E generation is 311.48 CMD. 8. ETP of adequate capacity is provided with secondary treatment. 9. JVS analysis results dt. 28.02.2012, 22.03.2012, 27.12.2012 and
09.03.2013 are submitted which are exceeding the consented limit. 10. Land available for the disposal of the treated effluent is about 50 Acres
which is adequate. 11. Existing Boilers of sugar unit 2 Nos, provided Fly ash arrestor with
Multicyclone dust collector system as an APC system. 12. Installed new boiler for co-gen of 80 TPH with ESP as an APC system. 13. Industry has submitted following BG’s
a) BG of Rs. 3.0 Lakhs as per RO’s letter dt.12.11.2012 for upgradation of APC system valid upto 06.12.2013.
b) BG of Rs.2.0 Lakhs as per previous sugar consent condition dt.09.03.2010 for compliance of consent condition valid upto 26.02.2014.
c) AS per the latest renewal granted for the existing Sugar & Co-generation industry has submitted BG of Rs.5.0 Lakhs towards O & M of Pollution Control Systems, However as per this consent condition Industry has not submitted BG of Rs.3.0 Lakhs and Rs.2.0 Lakhs for Provision of necessary APC system and to avoid ingress of bagasse respectively.
14. As JVS are exceeding RO Pune has recommended to forfeit existing BG of Rs. 5.0 Lakhs for O & M of ETP and recommended for amalgamation of co-generation unit with existing consent by overriding effect and submission of leftover BG of Rs.2.0 Lakhs and Rs.3.0 Lakhs for avoiding ingress of Bagasse and provision of APC as per consent condition.
15. Even though company has complied with conditions of C to E for Co-gen plant, since the BG of Rs. 3 Lkahs and Rs. 2 Lkahs is not submitted as per consent condition of (Sugar plant + 6 MW Co-gene) existing consent dt.13.02.2013, it is recommended to issue ‘SCN for Refusal’ as we have to amalgamate the existing Sugar consent with this 1st C to O of Co-generation.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 10 Name of Industry : M/s. Kumbhi Kasari Distillery Kuditre, Tal – Karveer, Dist - Kolhapur.
• Applied for renewal of consent as well as for first operate for modernization of existing distillery separately. Total production remains same i.e. 30 KLPD, We may amalgamate both the applications.
• With modernization there is increase in C. I. and reduction in effluent generation due to Modernization & increase in one product i.e. ENA.
• Total CI of industry is 197.74 Cr. Sugar Rs. 54.84 Cr. Proposed expansion of Sugar & Co-Gen Rs 123.20 Cr. Existing Distillery 10.30 Cr. Proposed expansion of Distillery Rs. 6.40 Cr.
• Industry has obtained consent to Establish for modernization with no increase in pollution load certificate from VSI Consent to establish for modernization was issued on 20.03.12 as per decision of CAC dt. 20.03.2012.
• Previous consent to operate (30 KLPD) was valid up to 31.12.2012 • Water consumption - 428 CMD, IE - 360 CMD, DE - 1.5 CMD • CREP compliances as follows,
IE 303 CMD provided primary treatment as Bio digester followed by Bio Composting to achieve zero discharge.
Provided compost Yard of 8 acres as per CREP norms & CREP complied as reported by SRO.
• Submitted Environmental Statement for year 2011-12. • Cess returns submitted up to Nov 2012 & Cess paid up to 31.05.2012. • SRO recommended for grant Consent up to 31.12.2013. • Industry has paid fees of Rs. 50,100/- + 50,000/- • As per sectoral approach this industry falls in month of August, we may grant C
to R of distillery amalgamation with 1st C to O of ENA up to 31.08.2013 or we may grant consent up to 31.08.2014 after obtaining fees of 10 months from industry and by imposing BG of 5 Lakhs towards O & M if approved.
• Recommended for grant of renewal with 1st operate up to 31.08.2014 (after receipt of required fees) with BG of Rs. Two Lakh for continuous compliance of CREP and Rs. 5 lakhs towards O and M of PCS.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 11
Name of Industry : Vitthalrao Shinde SSK Ltd. (Distillery unit) , Gangamainagar, A/p - Pimpalner, Tal - Madha, Dist – Solapur.
1. Applied for the renewal of 30 KLPD Distillery unit along with first consent to Operate for expansion of 30 KLPD distillery unit. i.e for the total quantity of 60 KLPD.
2. Application received at HQ on 10.05.2013. 3. C.I of the distillery unit is Rs.44.60 Crs. 4. Obtained E.C from MoEF, New Delhi for the expansion of Distillery unit from 30
KLPD to 60 KLPD. 5. Spent was generation is 600 CMD. 6. For the treatment of the spent wash industry has provided Biomethanization, 5
Stage MEE followed by composting. 7. Provided impervious compost yard of 6 Acres, which is not adequate. 8. 30 Days storage tank for spent wash storage is provided as per CREP. 9. Spillages of the spent wash were noticed in the premises due to poor handling. 10. Steam is taken from the Boiler of the Sugar unit. 11. SRO has issued warning Notice on 21.01.2013 for the non compliances observed. 12. Industry has submitted BG of Rs. 5.0 Lakhs valid upto 15.04.2013 against C to E
granted for Expansion for compliance of CREP guidelines within 6 Months period. 13. Applied for the period upto 31.03.2014. 14. Considering above it is noted that compost yard area is not sufficient to consume
spent wash generated as per our standard thumb rule. Company proposes to develop 1.5 Acres additionally compost yard, but the work is not yet started as reported by SRO. Hence it is recommended to grant only plain renewal to existing consent and SCN for refusal for 1st Operate of 30 KLPD Distillery Expansion.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
CAC Agenda No. 12
Name of Industry : M/s. Vitthalrao Shinde SSK Ltd. (Sugar & Co- generation) , A/P- Gangamainagar, Tal- Madha,
Dist- Solapur.
1. Applied for the Consent to 1st Operate of the two expansions with amalgamation to the existing consent. i.e for the total quantity 8500 TCD Sugar and 30.5 MW Co-generation.
2. Application received at HQ on 27.12.2012. 3. Industry have three nos of consent
a) C to O for existing unit for 3500 TCD Sugar and 30.5 MW co-generation valid upto 31.08.2013.
b) C to E obtained on dt.11.05.202011 for the 2500 TCD Sugar unit. c) C to E obtained on dt.15.01.2012 for 2500 TCD Sugar and 7.5 MW Co-
generation unit. 4. Total C.I of the Industry is Rs. 247.45 Crores (Including C.I of Sugar, Co-gen and
Distillery unit). 5. Obtained E.C for 8500 TCD Sugar and 30.5 MW Cogeneration plant vide letter
dt.18.09.2012 for Sugar and dt.03.07.2010 for co-generation. 6. I.E generation is 850 CMD and D.E is 160 CMD. 7. Provided ETP of adequate capacity with secondary treatment. 8. Disposal of the treated effluent is on 70 Acres land. 9. JVS analysis results dt.17.01.2012, 05.02.2012 are submitted which are marginally
exceeding w.r.t. SS and BOD and results dt. 17.04.2012 are well within limits. 10. Industry has provided ESP to 70 TPH Boiler and Multicyclone Dust collector to three
other boilers 40 TPH (2 Nos.) and 10 TPH. 11. SRO reported that Industry has committed to replace 2 Nos of 40 TPH boilers with
one 150 TPH Boiler with ESP as an APC system. 12. Industry has submitted BG of Rs. 10 Lacs for O & M of Pollution Control Systems,
which is valid upto 05.10.2013. 13. Considering above it is noted that industry has not provided ESP to all the boilers (4
Nos) (Provided ESP to only one Boiler and Multicyclone Dust Collector to rest 3 Boilers) to the existing sugar and co-generation plant. Hence it is recommended to issue SCN for refusal if agreed please.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Establish & Operate remaining cases of 5th CAC) of CAC Meeting held on 29.7.13
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
RENEWAL CASES (PART-III) RESUBMISSION CAC Agenda No. 01
Name of Industry : M/s. Pad Dr. V.V. Patil S.S.K. Ltd., (Sugar unit), Pravaranagar Dist. Ahmednagar.
• Applied for renewal of consent to operate with same production qty.. • Category RED/LSI. • Existing consent dated 04.02.2012 valid up to: 31.12.2012. • Previous capital investment Rs. 281.00 Cr. • Enhanced capital investment Rs 29.76 Cr. • Capital Investment of Sugar Unit is Rs. 310.76 Cr. • C.I. of distillery & chemical plant is Rs. 90.35 Cr. • Total C.I. (Sugar + Distillery + chemical plant ) Rs. 401.11 Cr. • Capital investment of sugar unit increased due to replacement of old machinery/modernization
of plant. • I.E generation to the tune of 280.0 CMD. • D.E. generation to the tune of 60.0 CMD. • ETP provided, comprising Screen chamber, O & G trap, equalization tank Bio-tower, Clarifier,
aeration tank, secondary clarifier & SDB provided. • 15 days storage tank provided & covered the effluent collection system to avoid ingress of
bagasses. • JVS results exceeding the limit. • Industry has provided100 hectors land for disposal of treated effluent. • During the visit observed industry was bypassing the effluent without treatment. • ESP/Wet scrubber not provided to the boilers • Direction was issued by RO on 27.12.2012. • Environment statement submitted for the year 2011-2012. • B.G. of Rs. 5.0 Lakhs submitted, valid up to: 31.12.2013, submitted against O & M of pollution
control system. • B.G. of Rs. 2.0 Lakhs submitted valid up to: 31.12.2013 submitted against to cover the effluent
collection system. • B.G of Rs. 3.0 Lakhs not submitted against the direction issued by RO. • SRO recommended to forfeit the BG of Rs. 5.0 Lkahs & renewal of consent may granted with
suitable additional BG.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 02 Name of Industry : M/s. Mula SSK Ltd. (Sugar),
Post Sonai, Newasa, Dist. Ahmednagar.
- Applied for renewal of consent for sugar unit.
- CI of the industry is Rs. 149.52/- Cr.
- Existing consent was valid up to : 30.06.2010.
- BG Obtained against : 5 Lakhs towards compliance of the conditions of treated effluent distribution network by closed pipeline, 5/- Lakhs for upgradation of ETP and 2/- Lakhs for conduct studies for adequacy of water pollution control system. - The case was discussed in CAC meeting dtd. 08.01.2013, it was decided
to keep in abeyance and after getting report regarding closure and restart directions issued. Accordingly e-mail was sent to RO/SRO on dt.29.01.2013 and status report received from RO Nashik vide their letter dtd.01.06.2013. CD was issued vide letter dtd. 18.06.012 for following non compliances.
- Considering the compliance, it is recommended to grant renewal of consent up to July 2014 subject to submission of balanced fees Rs.151614/- (mail sent to industry on dt. 19.06.013.) and subject to obtain BG of Rs. 10+ 3 Lakhs towards O&M of pollution control system and providing ESP/wet scrubber to one boiler as CREP compliance. Also forfeit BG of Rs. 5/- Lakhs and release remaining BG of 7/- Lakhs from 12/- Lakhs since complied the directions dtd.30.03.012.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 03 Name of Industry : M/s. Shri Ambalika Sugar Pvt Ltd , Ambalika Nagar, Post.Jagdamba factory, Tal- Karjat, Dist- Ahmednagar.
- Applied for Renewal with amalgamation of two consent.
- Total CI is Rs.132.83/- Crs
- Earlier consent was valid up to 30/09/2012 (existing) & Till Operate for C2E.
- Industry has provided treatment facility comprises bar screen, O & G trap, equalization tank, anaerobic treatment mixing tank aeration tank and clarifier for generation of industrial effluent- 250 CMD. Disposal is on own land 30 Hector. Dust collector provided to boiler NO. 1 & 2 and ESP provided to boiler No. 3. CI increased by 58.87/- Crs industry has not submitted requisite consent fees Rs. 2.40/- Lakhs also clarification for increase in ci is not submitted. Industry has not submitted the information regarding cess returns, CREP compliance, form 4,HW; Envt. Statement etc.
- The case was discussed in CAC meeting dtd. 8.01.2013, as per decision SCN was issued vide letter dtd. 15.02.2013 but till date industry has not submitted the relevant reply as well as not replied to SCN.
- Since the company has not submitted reply to SCN for refusal and also not submitted relevant information called by SRO, it is recommended to issue Refusal, with directions to RO to issue Closure, after 30 days from issue of refusal & confirming that industry has not gone in appeal.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 04 Name of Industry :- Gangakhed Sugar & Energy Pvt. Ltd. ,
Vijaynagar, Makni, Tal Gangakhed, Dist. Parbhani
• Applied for renewal of Consent (Sugar & Cogen). •Total Capital Investment is 325.20 Cr. •Industrial effluent generated 1210 CMD. •Provided Seconadry & tert. Treatmemt plant.. •For co-generation plant- Neutralization & settling tank provided . •JVS results dated 28.12.1, 12.01.2012 & 14.03.12 are within limits. •Treated effluent is used on land for gardening / irrigation. 24.54 hectors land available. •1 Nos. of boiler of 150 TPH capacity provided with stack of 80 mtrs. ESP provided to Boiler to control air pollution . CREP Complied industry. •Used / Spent Oil – 25 Kg/Day generated is used a fuel in boiler. •Industry has paid Cess returns up to Sept.-2012 & paid upto Sept. 2012. •Industry has submitted Environmental Statement for year 2011-12. •As per previous consent issued dtd 13.03.12 ind has submitted Bank Guarantee of Rs 5 Lakhs & 2 lakhs. • As per CAC decision dtd 09.11.11 Bank Guarantee of rs 2.0 lkhs is firfieted for non achievement of JVS results. • Application was discussed in CAC dtd 19.03.13 & clarification regarding ID was sought from RO.Ind achieved zero discharge on land, Operating APC i.e ESP, Earlier B.G of Rs 5 lakhs & 2.o lakhs is extended upto 31.01`.14 & 21.2 14. • Recommended for renewal of consent upto 31.07.14 with necessary fees.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 05
Name of Industry : M/s. Sanjivini SSK Ltd., A/P. Sahajanandnagar, Post. Shinganapur Tq. Kopergaon Dist. Ahmednagar.
• Applied for renewal of consent for Sugar, Co-gen., Acid & Country liquor plant. • Category RED/LSI. • Crushing capacity 3500 TCD. • Existing consent dtd. 27.04.2012 valid up to: 31.12.2012. • Capital investment. • C.I. of sugar unit Rs. 128.80 Cr. • C.I. of Acid plant Rs. 29.39 Cr. • C.I. of Country liquor Plant Rs. 5.59 Cr. • C.I. of Co-gen plant Rs. 37.26 Cr. • Total C.I. of Rs. 201.04 Cr. • I.E. generation to the tune of 295 CMD. • D.E. generation to the tune of 104.35 CMD. • 50 acres land available for disposal of treated effluent. • JVS results exceeding the prescribed standards. • Air pollution control. • Boiler no.1 with chimney height 45.0 mtr. wet scrubber provided. • Boiler no. 2, 3 & 6 with chimney height 45.0 mtr. without ESP/wet scrubber. • Boiler no. 4 & 5 with chimney height 65.0 mtr. without ESP/ wet scrubber. • P.D. issued by RO on 27.12.2012.for non compliances. • Cess paid up to: 30.11.2011 & Env. Statement submitted for the period 2011- 12. • B.G. of Rs. 2.0 lacs submitted valid up to : 20.03.2013 for compliance of CREP. • B.G. of Rs. 5.0 lacs . valid up to: 17.05.2013 for O&M of ETP. • B.G. of Rs. 2.0 lacs. valid up to: 17.05.2013 for covering of effluent. • Industry has not provided adequate ETP need improvement , not provided 15 days
storage tank & ESP/wet scrubber to boilers. Not complied CREP conditions. • SRO/RO recommended to forfeit part of B.G. of Rs. 5.0 lacs. & grant conditional
consent.
While forwarding the application the C.I. of distillery unit has not included by SRO/RO. During the scrutiny M/s. Sanjivani (T), SSK. Ltd., (Distillery Unit), A/P. Shingnapur Ahemadnagar Applied for first consent to operate for expansion to distillery unit for (25 KLPD) given total C.I. of plant as below.
• C. I. of Sugar & Chemical unit Rs. 48.76 Cr. • C.I. of Country liquor unit is Rs. 2.10 Cr. • C.I. of existing Distillery unit is Rs. 6.62 Cr.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
• C.I. of Co-generation Plant Rs. 40.97 Cr. • C.I. of proposed Distillery unit Rs. 8.16 Cr. • Total C.I. Rs.106.61 Cr. • Existing distillery unit C.I. increased by 8.93 Cr. & Proposed unit C.I. has been
decreased by 1.40 Cr. • Total C.I. of the units are shown Rs 114.14 Cr. • Difference of the C.I. Rs. 201.04 - 114.14 = Rs. 86.90 Cr.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
Resubmitted
1) Earlier case was discussed in CAC on 19.03.2013 & it was decided to keep in abeyance and put up in next CAC with clarification regarding Bank Guarantee forfeiture and non compliance of consent condition (Especially in regard to ETP).
2) Mail sent to RO/SRO on 5.04.2013 to submit the requisite information as per CAC decision. 3) Regional officer Nashik has submitted information by mail on 26.04.2013 with proposal for
approval for forfeiting the BG of Rs. 5.0 /- Lakhs & clarification regarding bank guarantee forfeiture and non compliance of consent conditions.
4) The industry has submitted BG of Rs. 5.0/- Lakhs, (valid up to 16.05.2013) towards O &M of pollution control system.
5) The industry has submitted B.G. of Rs. 2.0/- Lakhs, (valid up to: 16.05.2013) towards providing necessary arrangement to cover the effluent collection system to avoid ingress of bagasse and other material within six months period.
6) Industry has provided RCC pipelines up to ETP to avoid ingress of bagasses. 7) Industry has provided ETP comprising oil & Grease trap, collection tank, Aeration tank &
Clarifier. But not provided 15 days storage tank. 8) JVS result not within limit (Parameter like BOD, COD & SS ). 9) Industry has provided 6 nos of boilers. 10) Wet scrubber provided to one boiler & multi -cyclone dust collector to another boiler. 11) 4 nos. of boilers are without pollution control system. 12) SRO recommended to forfeit the B.G. of Rs. 5.0/- as industry failed to comply the CREP
norms.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 06
Name of Industry : M/s. Dr. B.B. Tanpure SSK Ltd. (Sugar),
At. Shrishivaji Nagar, Po. Rahuri Dist. Ahmednagar.).
- Applied for renewal of consent for sugar unit. - C.I. of Industry is Rs. 114.40 Cr. - Existing consent valid up to : 31.10.2012. - ETP provided but not in operation during the visit of MPCB officials and by pass arrangement to ETP provided. - The BG of Rs. 10/- towars the compliance of ID , The BG of Rs. 5/- Lakhs + 2/-Lakhs towards towards compliance of the consent conditions & towards O & M of ETP not submitted by the industry. - Case was discussed in CAC meeting dtd. 24.12.012, as per decision SCN for refusal was issued on dt.18.02.013 and Closure directions issued by RO Nashik vide letter dtd. 06.03.013.But till date industry has not replied to SCN as well as CD. In view of this the case is recommended for refusal of consent.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
FRESH AGENDA CAC Agenda No. 01 Name of Industry : Karmayogi Shankarraoji Patil SSK Ltd. (Distillery Unit) ,
Mahatma Phulenagar (Bijwadi), Tal- Indapur, Dist- Pune.
1. Applied for the renewal of the 30 KPLD distillery unit without change in production
quantity. 2. Application received at HQ on 04.05.2013. 3. C.I of the unit is Rs.28.34 Crs. Increased by Rs.3.62 Crs against the previous C.I. 4. Spent wash generation is 270 CMD. 5. Provided Biomenthanization followed by Biocomposting to achieve zero discharge. 6. 5 days and 15 days concertized lined lagoons provided as per CREP. 7. Compost yard of 10 Acres provided with HDPE lining, leachate collection system. 8. Industry has installed one Boiler with Dust collector as an APC system. During the
crushing season the steam is used from the Boiler of the Sugar unit. 9. Industry has submitted BG of Rs. 2.0 lakhs for the CREP compliance valid upto
31.12.2013. 10. Applied for the period upto 31.03.2014, However as per the sectoral approach we may
consider the application for period upto 31.08.2014 after receipt of the requisite consent fees.
11. case is recommended for grant of consent renewal without any change except C.I increase, upto 31.08.2014 after obtaining necessary consent fees if approved and BG shall be extended upto 31.12.2014 (i.e 4 Months more than consent expiry period as discussed in CAC dt.12.06.2013) to observe continuous compliance of CREP and Consent conditions.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 02 Name of Industry : M/s. Nira Bhima SSK Ltd. ( Sugar Unit ) ,
Gat no 303-306, 332/3/5/7/8/40/1/4//5/6/, Shanajinagar, At-Road, Tal-Indapur, Dist.- Pune.
1. Applied for the renewal of consent for Sugar unit 1250 TCD without change in
production quantity. 2. Application received at HQ on 16.04.2013 3. C.I of the unit is Rs.70.13 Crs, increased by Rs.5.53 Crs. (Total C.I of the Industry is
Rs.261.78 Crs ) 4. I.E generation is 84 CMD and D.E is 15 CMD. 5. ETP is provided with secondary treatment. 6. SRO reported that Industry has upgraded the existing ETP. 7. JVS analysis results dt.19.01.2012, 22.02.2012,24.04.2012, 30.12.2012 are
exceeding the consented limits w.r.t pH, BOD, COD,& SS. However latest JVS result dt.20.02.2013 are within limit except BOD.
8. Provided 15 days storage tank as per CREP Norms. 9. Disposal of the treated effluent is on land of about 110 Acres for irrigation, which is
adequate. 10. Wet scrubber is provided as an APC system as per the previous consent condition
and also submitted BG of Rs. 2.0 lakhs valid upto 22.09.2013 towards the compliance of same.
11. Industry has submitted BG of Rs. 10.0 lakhs towards O & M of ETP. 12. RO has recommended for the renewal of consent after receipt of the fees. Industry
has applied for period upto 31.01.2014. 13. It is recommended to grant renewal upto 31.07.2014 after submission of requisite
consent fees if agreed, with extension of Rs.10.0 Lack BG for O & M of PCS and returning BG of Rs.2.0 Lakhs since APC is provided as per previous consent condition. The BG shall be extended till 30.11.2014 (4 Months more than consent validity as per CAC decision dt.12.06.2013.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 03 Name of Industry :- M/s Purti Power And Sugar Ltd. (Distillery Plant) Nagpur-Chandrapur Road, Tq. Umrer, Dist. Nagpur
1. Applied for renewal of consent, distillery. Application submitted at SRO Nagpur on
03.04.13 & received at HQ on 03.06.13
2.IE generation 550CMD. Provided Bio Methanisation followed by Composting.
3. 45 days storage tank provided.
4. Compost Yard 0f 10 acres provided achieved Zero discharge as per CREP condition.
5. Steam is obtained from sugar industry. Provided ESP as an Air pollution control
Equipment.
6. The application is to be placed in CAC as Total CI of industry is more than 75 Crores
(suagr -Cogen 195.40Crores Distillery 73.17 Crores.) Total 268.57 Crores
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 04
Name of Industry :- M/s Carlsberg India Pvt. Ltd. H-17/1/1, MIDC Waluj,
Dist. Aurangabad.
1) Applied for renewal of Consent. Manufacturing of Beer.Application submitted at SRO Abad
on 5.04.13, received at HQ on 03.06.13
2).The consent of said industry is valid till 31.05.2013.
3.The capital investment of industry is increased to the tune of 13 Crores in comparison with
earlier investment.
4.The increase in capital investment is due to installation of new PLC and automation for
increase in process efficiency..
5.Provided secondary treatment . The treated effluent is sent to CETP for further treatment &
Disposal .
6.JVS result are fluctuating within range of 7.2 mg/l to 38.5 mg/l as compared to Consented
Standards of 30 mg/l.
7.Bag filter/wet scrubber provided as an APC system.
8.Ind has submitted Envt. Statement. SRO & RO reported that Cess is paid by industry.
9.As per previous consent condition ind has submitted B.G. of Rs 5.0 lakhs for Operation &
maintenance of pollution Control systems.
10) We may renew the consent with BOD 100 Mg/ltrs for having consistent standards to all industries.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 05 Name of Industry : M/s. Vishwasrao Naik SSK Ltd. (Distillery)
A/P Chikhali, Yashwant Nagar, Tal. Shirala, Dist. Sangali
• Industry has applied for renewal of consent. It is RED/LSI unit. • Capital Investment of the distillery unit is Rs. 14.42 Cr. as per CA Certificate. • (CI of Distillery - Rs. 14.42 Cr. + CI of Sugar and Cogen Unit - Rs. 159.12 Cr. Total CI
of Industry is 173.54 Cr.) • The industry manufactures Rectified Spirit - 90 KL/M, Absolute Alcohol 600 KL/M,
Fusel Oil - 4.5 KL/M • Water consumption – 445 CMD, IE – 144 CMD, DE – 8 CMD • Industry provided ETP consisting of RO as Primary treatment and Mechanical Aerobic
Composting as secondary system for spent wash generation. • DE treated in septic tank and soak pit. • As per SRO’s report CREP Compliances are as follows,
− Industry has provided 7 acre compost yard. − Industry has provided 10 days and 5 days spent wash storage tank.
• Industry use boiler steam from parent sugar unit. • Industry has paid cess for period up to 31.10.2012 & assessment done up to April
2012 • Industry has submitted Environmental Statement for 2010-2011 • Industry has paid consent fee Rs. 60,000/- + 50,000/- for renewal of consent up to
31.03.2014 • SRO has recommended for renewal of consent up to 31.03.2014. • We may inform industry to pay additional consent fees for 4 months (April 14 – July -
14) and recommended to grant consent up to 31.07.2014 if agreed.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 06
Name of Industry : M/s. Shree Chatrapati Shahu SSK Ltd. Tal. Kagal, Dist. Kolhapur
• Applied for renewal of sugar (3500 TCD) + Cogen (12.5 MW) • Previous consent was valid up to 31.12.12 • CI of Sugar – 84.71 Cr. (CA certificate not submitted.)
− Co-Gen - 55.45 Cr. (Total Sugar + Cogen = 140.16 Cr.) − Distillery - 14.33 Cr. − Total CI of industry Sugar + Cogen + Distillery = 154.49 Cr.
• Water consumption - 725 CMD, IE - 350 CMD + 67 CMD = 417 CMD; DE - 30 CMD
• Provided ETP comprising primary, secondary & tertiary system. • Provided 48 acre of land for disposal of treated effluent. • CREP compliance as follows,
- Provided ESP for 70 ton & multi-cyclone dust collector to 35 ton boiler as an APC.
- Provided 15 days storage tank. - Wastewater generation is 100 lit/ton crush of sugar.
• Submitted Environmental Statement for 2011 -12 • Cess paid up to May 2012 • JVS dt. 23.11.2011 are exceeding • Submitted BG of Rs. 2 lakhs for ingress of Bagasse • SRO recommend to renewal up to 31.12.2013 • As per sectoral approach and uniform validity sugar consent validity falls in
month of July, we may grant renewal 31.07.2014 by acquiring requisite fees from industry and by imposing BG of 5 lakhs towards O & M of Pollution Control System.
• Considering above it is recommended to grant renewal up to 31.07.2014 (with additional fees) with BG of Rs. 5 + 4 + 3 Lakhs as per our circular dt. 19.01.2013 with forfeiture of BG of Rs. 2 Lakhs since not complied with ingress of bagasse condition.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 07 Name of Industry : M/s. The Shrigonda S S K Ltd.(Sugar),
At. Shrigonda, Tal. Shrigonda, Dist. Ahmednagar.
- Applied for Renewal of consent. - Existing CI of sugar was Rs. 48.93/- Crs. & increased by 19.80/- Crs Now it is 68.73/- For distillery of Molasses based- CI is Rs. 9.24/- Crs. Hence total CI- Rs. 77.97/- Crs. - Earlier consent was valid up to 31/12/2009. In view of non compliances like treated effluent was discharged outside the premises from
where the farmers were taking effluent for irrigation purposes and the scrapping work of kaccha lagoon No.4was not completed, RO Nashik had issued voluntary closure directions vide letter dtd.26.02.2013.
However , the complainant has filed writ petition NO 1074 OF 2012 in the Hon’ble High Court, Aurangabad. The detail report called from RO/SRO vide e-mail dtd. 23.04.2012 and 15.06.2013.
- Considering the non compliances it is noted that the industry has not complied with conditional restart directions dtd.23.11.2012, therefore it is recommended to forfeit the BG of Rs. 5.0/- Lakhs and issue SCN for refusal along with closure order if agreed.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 08 Name of Industry : Shree Renuka Sugars Ltd. (Co - generation),
Shahunagar Shendre, Tal & Dist-Satara.
1. Applied for the Renewal of Consent for 19.5 MW Co-generation plant, without change. 2. Application received at HQ on 13.05.2013. 3. The plant is in the premises of M/s. Ajinkyatara SSK Ltd.,(Sugar & Distillery Unit)
which is run on BOOT Basis by M/s. Renuka Sugars Ltd. (Co-generation). 4. C.I of the unit is Rs.99.45 Crs. 5. Industrial effluent generation is to the tune of 45 CMD. 6. Provided ETP comprising of Collection Tank, Clarifier, Ultra Filtration, RO Plant. 7. Treated effluent is recycled back in Boiler make up, cooling tower make up and
remaining for gardening. 8. ESP is provided as an APC system. 9. As per the previous consent condition and EC condition it is directed to the Industry to
provided Separate ETP for Co-generation plant or get amendment done in EC for the treatment of I.E. in existing Sugar ETP of M/s. Ajinkyatara SSK Ltd., till then industry shall treat I.E in existing Sugar ETP and Submit the BG of Rs. 5.0 Lakhs towards the compliance of Same.
10. SRO has reported that Industry has complied to the condition of the provision of ETP and submitted BG of Rs. 5.0 Lakhs valid upto 31.03.2014 towards the compliance as per the point no. 8.
11. Industry has applied for period upto 31.03.2014, However there is no provision of renewal time period in the sectoral Approach for Co-generation unit separately. Therefore we may consider the application for renewal upto 31.07.2014, as it is in the premises of Sugar unit and as it is a Bagasse base co-gen plant after receipt of the requisite consent fees.
12. Considering above compliance of previous consent to operate (i.e. provided separate ETP for Co-gene plant) it is recommended grant of renewal upto 31.07.2014 (by calling consent fees for 4 months) i.e till sugar validity, since there is no validity mentioned for only bagasse based co-generation power plant separately, by extending BG of Rs.5.0 Lakhs upto period 4 Months more than validity for O & M of PCS.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 09
Name of Industry : Shree Makai SSK Ltd., Bhillarwadi, A/p- Bhillarwadi, Tal - Karmala,
Dist. Solapur.
1. Applied for the renewal of the consent for the Sugar unit without change in production quantity 1250 TCD sugar.
2. Application received at HQ on 30.04.2013. 3. C.I of the Sugar unit is Rs.57.99 Crs, C.I is increased by Rs.12.85 Crs. 4. Industrial effluent generation is 150 CMD. 5. ETP is provided consisting of Screen Chamber, Oil skimmer, Collection tank,
Neutralization tank, Aeration tank Clarifier, SDB, Treated water tank. 6. The results of JVS analysis results of Water are exceeding the consented limits. 7. For air pollution control they have provided Multi cyclone type Fly ash arrestor, not
as per CREP. 8. Treated effluent is used for irrigation on 20 acres of land, seems to be adequate. 9. Industry has not yet provided 15 days storage tank for storage of treated effluent. 10. Submitted BG of Rs.10 Lakhs O & M of ETP and provision of ESP/Wet Scrubber to
bagasse fired Boiler and provision of the secondary treatment as per the previous consent condition for
11. RO has recommended for renewal by taking assurance from the unit about up gradation of ETP & APC & then renewal of consent to operate may be granted.
12. It is recommended for forfeiture of BG of Rs.10.0 Lakhs due to non compliance of previous consent condition no.12. Recommended to issue renewal upto 31.07.2014 with BG of Rs. 5. 0 Lakhs , Rs.2.0 Lakhs and Rs. 3.0 lakhs being first time after our circular dt.19.01.2013 and Bg of Rs.2.0 lakhs towards providing 15 days storage tank before starting coming crushing season of 2013.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 10 Name of Industry : Baramati Agro Ltd., ( Distillery Unit) , Shetfal Gade, Tal- Indapur, Dist- Pune.
1. Applied for the renewal of consent for the Distillery unit without change in production quantity.
2. Application received at HQ on 14.05.2013. 3. C.I is shown as Rs.29.15 Crs, C.I is increased by Rs.10.21 Crs. Not submitted the
explanation towards increased C.I. 4. Spent wash generation is 420 KLPD. 5. For the treatment of spent wash provided Reboilers, Biomethnization followed by
the aerobic composting. 6. Concrete Compost yard of area 11 Acres is provided with test wells and leachate
collection system. 7. Distillery unit is CREP complied. 8. Provided Wet Scrubber as an APC system to the Boiler. 9. Submitted BG of Rs. 2.0 Lakhs valid upto 27.09.2013 towards CREP compliance
as per the consent condition. 10. Applied for period upto 31.05.2015, However as per the Sectoral Approach we
may consider the application for period upto 31.08.2015 after receipt of the fees remaining period and C to E fees towards the increased C.I.
11. The case is recommended for grant of renewal upto 31.08.2015 (by calling additional fees for 3 Months) as per sectoral approach and by extending BG of Rs.2.0 Lakhs till 31.12.2015 as per CAC decision on 12.06.2013. Industry has not submitted explanation for increased in C.I by Rs.10.21 Crs needs to be considered.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 11
Name of Industry : M/s. Jakraya Sugar Ltd.(Sugar & Co-generation), Gat no. 71 to 74, A/p - Watvade, Tal. - Mohol, Dist – Solapur.
1. Applied for the renewal of consent for Sugar & Co-generation unit, without
change in production quantity. 2. Application received on 14.05.2013. 3. C.I is Shown as Rs.90.82 Crs, In respect to the previous C.I, it is increased
by Rs.15.66 Crs. 4. Industrial effluent is 430 CMD and D.E is 25 CMD. 5. ETP is provided with secondary treatment to treat Industrial effluent. 6. JVS analysis results dt.21.04.2012 & 29.12.2012 are submitted which are
exceeding the consented limits. 7. Land available for the disposal of the treated effluent is about 70 Acres,
which is adequate for the effluent quantity. 8. Wet scrubber is provided as an APC system, which is as per CREP norms. 9. Submitted BG of Rs. 5.0 Lakhs for O & M of Pollution control devices and
BG of Rs. 2.0 Lakhs for providing covering arrangement to avoid ingress of Bagasse. The BG’s are valid upto 31.03.2014.
10. RO/SRO has recommended for renewal of consent by forfeiting BG of Rs. 5.0 Lakhs towards O & M of Pollution control devices and by obtaining fresh BG.
11. Considering above submissions and our circular dt. 19.01.2013 it is recommended to grant consent subject to forfeiture of BG of Rs.5.0 Lakhs and Rs. 2.0 Lakhs since not complied and obtaining new BG of Rs.10.0 Lakhs and Rs.4.0 lakhs i.e double the amount valid upto 4 months later than validity period. The consent validity is recommended upto 31.07.2016 by calling additional fees for 4 months.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 12 Name of Industry : Shri Vitthal SSK Ltd. (Sugar & Co-gen),
Venunagar-Gursale, Tal.Pandharpur, Dist.Solapur.
1. Applied for Renewal of consent for Sugar- 5000 TCD and CO-generation-
14 MW without change. 2. Application received at HQ on 14.05.2013. 3. C.I of the unit is Rs.140.16 Crs, i.e increased by Rs.28.27 Crs than the
previous C.I. 4. Ind. Effluent generation is 643 m3/day & domestic effluent generation is 41
m3/day. 5. Provided ETP of adequate capacity with secondary treatment. 6. Disposal of the treated effluent is on land of about 125 Acres which is
adequate. 7. JVS analysis results dt.25.04.2012 & 09.05.2012 are exceeding the
consented limits. 8. SRO reported that unit WN, SCN, PD and ID issued to the industry.
However the copy of the same along with compliance is not enclosed. 9. Industry has submitted the upgradation proposal and conveyed that
upgradation will be undertaken along with projected expansion. The application for the expansion is at HQ.
10. Industry has submitted BG of Rs.10.0 Lakhs for O & M of Pollution Control Devises which is valid upto 31.12.2013.
11. 4 Nos. of Boilers – 3 Nos are provided with Multicyclone Dust Collector and 1 Boiler is provided with Wet Scrubber as an APC system. Industry has assured to replace 3 Nos of Boilers with one 125 TPH boiler along with ESP as an APC during the course of expansion.
12. SRO has recommended for grant of renewal of consent with upgradation of ETP and provision of adequate APC system.
13. Considering above submissions it is recommended to grant renewal upto 31.07.2014 (by obtaining required fees) with BG of Rs.3.0 Lakhs for APC compliance (1st Time) and by extending BG of Rs.10.0 Lakhs for O & M of PCS since the latest JVS of Last/previous season are not available. If we get these JVS then shall be decided accordingly.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 13 Name of Industry : Privilege Industries Limited (Distillery Division),
Plot No.B-1,MIDC Lonand,Tal-Khandala, Dist-Satara.
1. Applied for renewal of consent for the Distillery unit and bottling plant. 2. Application received at HQ on 14.05.2013. 3. Previous consent was valid upto 31.03.2013 for manufacturing of Distillery Unit
products - Rectified Spirit, ENA and bottling plant unit (70 % capacity) products Country liquor -150750 Cases and IMFL -150750 Cases.
4. Now applied for renewal without change in Distillery unit and with full capacity (100 %) of Bottling plant i.e for Country liquor - 205000 Cases & IMFL -205000 Cases.
5. C.I of the unit is Rs.158.11 Crs, increased by Rs.9.49 crs against the previous C.I.
6. Industry has submitted that C.I is increased due to installation of two numbers of highly efficient Hydro Jet Bottle Filling machines for better efficiency and also make a concrete yard for raw bottle.
7. Total effluent generation 615 CMD including Bottle washing effluent. Grain spent wash to the tune of 250 CMD is treated in ETP consisting of UASB, Flocculation, settling, UF followed by RO and MEE plant.
8. RO permeate is reused in cooling tower and RO reject is sent to MEE. 9. For 110 CMD of Dilute stream of distillery unit effluent secondary and tertiary
treatment provided and used on land for gardening. 10. Land available is about 14 Acres, seems to be adequate. 11. For Bottle washing effluent proposed to provide primary followed by RO, work
of RO plant 70 % completed. 12. ESP is provided as an APC system to coal fired Boiler. 13. Industry has submitted BG of Rs.2.0 Lakhs valid upto 13.08.2013 against the
previous consent condition towards the compliance of the I.D issued by the Board dt.30.11.2011; however the compliance report is not enclosed.
14. Submitted fees for period upto 31.03.2014 with fees towards increased C.I. 15. Considering above the case is recommended for the grant of renewal of the
consent upto 31.08.2014 (subject to fees) with condition of BG of Rs,5.0 Lakhs for compliance of Zero Discharge and O & M of PCS.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 14 Name of Industry : M/s. Dr. B.B. Tanpure SSK Ltd. (Distillery Unit), At. Shrishivaji Nagar Po. Rahuri Dist. Ahmednagar.).
- Applied for renewal with amalgamation of consent for Distillery unit.& ethanol unit.
- Application received at HQ- 13.03.2013
- C.I. of Distillery + absolute alcohol Industry is Rs. 10.26/- Crs & Sugar -114.40 Cr, Tota-124.66/- Crs.
- Existing consent for Distillery valid up to : 31.12.2007 and chemical distillery-31.05.2008..
- Mfg. of Rectified sprit- 1080 MT/M, Country Liquor- 500 MT/M ETP & absolute alcohol- 600 KL/M, Industry has provided biomethanisation followed by bio composting for 540 CMD effluent generation. Industry has not complied with the CREP conditions.30 days storage tank provided HDPE lined compost yard of 2.5 Acres completed out of 8 Acres. Industry has not scraped their kaccha lagoons. Multi cyclone dust collector provided to bagasse fired boiler.
- Compost area is not adequate, Kacchha lagoons are not yet scrapped, Industry has not provided ESP/wet scrubber as per CREP conditions.
- RO /SRO recommended to grant renewal of consent with suitable BG and also recommended to forfeit earlier BG of Rs. 1.5/- Lakhs.
- Considering the non compliances, it is recommended to issue SCN for refusal with forfeiture of BG of Rs. 1.5/- Lakhs.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 15
Name of Industry : M/s. Kranti SSK Ltd., A/p - Kundal, Tal – Palus, Sangali • Applied for renewal of consent sugar 4000 TCD & Co-gen 13 MW. • Previous consent was valid up to 31.12.2012 for 2500 TCD & 13 MW electricity. • Obtained C to E for 1500 TCD sugar and 6.7 MW electricity dt. 23.01.2012. • CI of sugar + Co-gen industry 151.99 Cr. • Water Consumption - 570 CMD, IE - 300 CMD, DE - 50 CMD. • Provided septic tank and soak pit for 50 CMD DE. • Provided ETP comprising primary, secondary treatment system. • Treated effluent is disposed on 98 acre land for irrigation which is sufficient. • CREP compliance is as follows,
− Provided 15 days storage tank. − Provided multicyclone fly ash arrestor and wet scrubber to 50 TPH Boiler x 2
no. & wet scrubber to 50 TPH x 1 no. Boiler as an ASP. − Wastewater generation is 75 lit/TCD. CREP Complied.
• Cess paid up to Jan 2012 & return submitted up to Sept 2012. • Submitted environmental statement for 2011-12. • JVS results dt. 22.12.2011 is exceeding. • Industry has paid fees of Rs. 60,000/- for increase in CI and paid fees for renewal
Rs. 3,04,000/- Total Rs. 3,64,000/- • SRO/RO recommended to grant consent up to 31.12.2013. • As per sectoral approach this industry falls in month August hence we may issue
consent to renewal up to 31.08.2013 or we may grant consent valid up to 31.08.2014 after obtaining requisite fees of 8 months from industry and if approved.
• It is noted that the industry applied for renewal of existing C to O with sugar and other quantities of C to E except electricity is co-gen 6.7 MW, However the C to E mentioned condition of prior Environmental clearance before C to O of this consent.
• Hence it is recommended to grant renewal to only C to O and not to additional quantities of C to E, with BG of Rs. 10 Lakhs + 4 Lakhs + 3 Lakhs as per circular dt. 19.01.2013 and forfeiture of BG Rs. 5 Lakhs and 2 Lakhs due to non compliance of C to O.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 16
Name of Industry : M/s. Sonhira SSK Ltd., A/p Wangi, Mohanrao Kadamnagar, Sangli.
• Applied for plain renewal of consent for sugar 2500 TCD and cogen 22 MW without increase in production and pollution load.
• Previous consent was valid up to 31.12.2012. • CI of sugar cogen Rs. 189.74 Cr. • CI of Distillery is Rs. 15.65 Cr. Total CI is Rs. 205.39 Cr. • Increase in CI by 41.63 Cr. And paid requisite fees of Rs. 1,80,000/- along with DPC. • Water consumption is 2242 CMD, IE 615 CMD, DE - 60 CMD. • ETP provided with primary, secondary & tertiory treatment system. • Provided septic tank and soak pit for treatment of 60 CMD DE. • Provided 75 acre land for disposal of treated effluent for irrigation. • CREP compliance is as follows, • Provided 15 days storage tank - complied. • WW generation is 100 lit /TCD - complied. • Provided ESP to 115 TPH boiler and stack height 72 meter. • Provided multi-cyclone fly ash arrestor with 52 m height stack to 32 TPH x 2 no. , 1
TPH x 1 no boiler (not in operation). • Submitted environmental statement for 2011-2012. • Paid cess up to 31 March 2012. • Paid fees of Rs. 5,59,482/- • Industry has submitted BG of Rs. 5 lakhs towards O&M of PCS valid up to
08.02.2013. • BG of 2 lakhs towards ingress of bagasse valid up to 30.06.2012 was returned. • RO/SRO recommended case to grant renewal of consent up to 31.12.2013. • As per sectoral approach this industry falls in month of July, we may grant consent up
to 30.07.2013 or we may issue renewal of consent up to 30.07.2014 after obtaining requisite fees of 7 months from the industry.
• Recommended for grant of renewal up to 31.07.2014 (with required fees) with BG of Rs. 3 Lakhs for providing APC and extension of BG of Rs. 5 Lakhs for O and M of PCS till 31.11.2014.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 17 Name of Industry : M/s. Sonhira SSK Distillery, Mohanrao Kadamnagar, Dist – Sangali.
• Applied for C to R 30 KLPD Distillery. • Previous consent was valid up to 31.10.2013. • Applied for C to R up to 30.12.2012 however consent was not C to O was not
grant. • CI of industry is distillery 15.65 Cr. + Sugar 100.05 Cr. + Co-Gen 89.22 Cr as per
gross block. • Total CI Rs. 205.38 Cr. • Water consumption 355 CMD. IE - 240 CMD, DE- 5 CMD. • Provided septic tank and soak pit for treatment of DE. • CREP compliance is as follows,
Provided reboiler Provided 30 days HDPE lined storage tank. Provided 11 acre for composting our of which 5 acres is as per CREP norm
remaining 6 acre land is not as per CREP norm even after repeated follow up. • Industry has increased CI and submitted DP charges. • Industry has paid fees of Rs. 53,600/- • SRO recommend to grant consent up to 31.10.2013 and if approved and direction
may be issued to provide concreting of remaining area of compost yard. • As per sectoral approach this industry falls in month of August, we may grant C to
R up to 31.08.2013 or we may grant consent up to 31.08.2014 after obtaining fees of 10 months from industry and by imposing BG of 5 Lakhs towards O & M and 3 Lakhs towards completion of remaining compost yard of 6 acre if approved.
• Recommended to grant renewal of unit up to 31.08.2014 (after obtaining required fees if agreed) with BG of Rs. 5 Lakhs towards O and M of PCS and Rs. 2 Lakhs towards continuous compliance of CREP.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 18
Name of Industry : M/s. Shree Tatyasaheb Kore Warana SSK Ltd., Tal - Panhala, Dist – Kolhapur.
• Industry has applied for consent to renewal Sugar • Previous consent was valid up to 31.12.2012. • CI of industry is 175.50 Cr. • Provided ETP with primary secondary and tertiary treatment. • Treated effluent disposed on 93 acres. • Applied for EC for expansion • WW generation is 800 CMD • Industry has provided 15 days storage tank. • Provided ESP to boiler • Cess paid up to March 2012 and assessment done up to Dec 2012 • Complaints for discharging treated/untreated effluent outside factory. • At time of visit effluent observed outside factory. • Industry has not submitted BG of 7.5 lakhs as per consent condition. • SRO recommended case to grant consent up to 31.12.2013 by forfeiting BG for
excess crushing and poor O and M. • As per sectoral approach and uniform validity sugar consent validity falls in month of
July, we may grant renewal 31.07.2013 or we may grant consent up to 31.07.2014 by acquiring requisite fees from industry and forfeiting BG towards excess crushing and poor O and M.
• Considering fact that industry has not submitted BG of Rs. 7.5 Lakhs as per previous consent condition (non compliance) and discharge of effluent observed outside factory giving rise to complaints and non availability of direction issued by the Board & its compliance as per non compliances observed by the CPCB on 23.11.2012 it is recommended to issue SCN for refusal of consent.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 19 Name of Industry : M/s. Dudhganga Vedganga SSK Ltd.
Bidri, Tal - Kagal, Dist - Kolhapur
• Industry has applied for consent to renewal Sugar 5000 TCD + Co-Gen 20 MW. • Previous consent was valid up to 31.10.2012 for electricity Co-gen 20 MW • Previous consent was valid up to 31.12.2012 for Sugar 5000 TCD. • CI of industry is 203.47 Cr. • Provided ETP with primary secondary and tertiary treatment. • Industry has not provided 15 days storage tank. • Provided ESP to boiler 120 TPH with 79 m height. • Cess paid up to March 2012 and assessment done up to Nov 2012 • Submitted Environmental statement for 2011-12 • BG of Rs. 5 + 2 + 2 Lakhs submitted towards O & M, provide closed pipeline and
dismantling kacchapit. • Industry has not dismantled Kaccha pit and using it for storage of treated /untreated
water. • Industry has not provided continuous air monitoring system for stack and ambient air
micro-metrological monitoring system as per consent condition. • Industry has not complied with EC conditions. • SRO recommended case to grant consent up to 31.07.2013 by forfeiting BG of 2 lakhs
towards non compliance. • As per sectoral approach and uniform validity sugar consent validity falls in month of
July, we may grant renewal 31.07.2013 or we may grant consent up to 31.07.2014 by acquiring requisite fees from industry and forfeiting BG of 2 lakhs towards non compliance.
• As considering non compliance of consent conditions as 1. Not providing 15 days storage tank. 2. Not scraped old kaccha lagoon. 3. Not provided continuous air monitoring system 4. Not complied with EC conditions (as mentioned ) by FO
• It is recommended to issue SCN for refusal of consent renewal with amalgamation with forfeiture of BG of Rs. 2 Lakhs for not scrapping kaccha lagoons.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 20 Name of Industry : M/s. Vishwasrao Naik SSK Ltd.,
Tal - Shirala, Dist – Sangali.
• Applied for renewal of consent. Sugar industry. • SRO reported that industry is in operation more than consented quantity. • IE generation is 524 CMD. • Provided Secondary treatment plant. • JVS results are within limits of 28.02.12 & 15.03.12. • Treated effluent used on land for gardening. • Land available for disposal of effluent 10.0 Hectors. • Fly ash arrester provided to Boiler. • SRO & RO recommended for renewal with amalgamation of Consent i.e sugar & Co-
Gen after submission of requisite consent fees of Rs 1,83,250/- up to 31.12.13 • Industry has submitted minutes of meeting of SEAC. • As per sectoral approach and uniform validity sugar consent validity falls in month of
July, we may grant renewal 31.07.2013 or we may grant consent up to 31.07.2014 by acquiring requisite fees from industry.
• Since ETP up-gradation is not done to accumulate additional quantity due to increase in production quantities and 1st C to O of Cogen unit not replied to queries raised by RO/SRO and not paid requisite fees as called by SRO and obtained increase in production than consented quantities complied with CREP conditions and not submitted Environmental Clearance for 1st C to O complied. It is recommend to issue SCN for Refusal if agreed please.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 21 Name of Industry : Lokmangal Sugar, Ethanol & Co-generation Industries
Ltd., At Bhandarkavate,, Tal.South Solapur, Dist.Solapur. (Sugar & Co-generation).
1. Applied for the renewal of the consent for 2500 TCD Sugar and 15 MW Co-generation unit, without change in production quantity.
2. Application received at HQ on 03.06.2013. 3. Previous consent was valid upto 30.04.2013. 4. C.I of the unit is Rs.233.24 Crs. (C.I is increased by Rs.11.43 Crs.) 5. Industrial effluent is 376 CMD and D.E is 100 CMD. 6. ETP of adequate capacity with secondary treatment is provided. 7. JVS analysis results dt.10.12.2012 and 28.02.2013 are submitted which are
exceeding. 8. Land available for the disposal of the treated effluent is about 100 acres which is
adequate. 9. CREP Compliance – Industry has provided 15 Days storage tank. 10. ESP is provided as an APC system, as per CREP Norms and stack is of height 71
mtrs. 11. Cess returns are submitted upto April 2013. Environmental Statement submitted for
period 2011-12. 12. Industry has submitted BG of Rs.10.0 Lakhs, valid upto 30.06.2013 towards
consented specific condition for compliance of ETP standards. 13. RO has recommended for grant of renewal of consent by imposing condition towards
proper O & M of ETP.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 22 Name of Industry : Shree Pandurang SSK Ltd. (Distillery) ,
A/P Shreepur, Tal- Malshiras, Dist.- Solapur.
1. Applied for the renewal of consent for 45 KLPD distillery unit, without change in
production quantity. 2. Application received at HQ on 10.06.2013 3. Previous consent was valid upto 30.04.2013. 4. C.I of the Distillery unit is Rs.41.32 Crs. C.I of the distillery unit is increased by Rs.4.8
Crs for land and site development, one molasses tank and water reservoir. Total C.I of the industry is Rs.183.32 Crs.
5. Industrial effluent generation is 167 CMD & D.E is 8.0 CMD. 6. Industry has provided Biomenthanization as a primary treatment, MEE for
concentration and reduction of spent wash followed by composting about 7.75 Acres as per CREP Norms to achieve Zero Discharge.
7. Steam is used from the Boiler of the Sugar unit and ESP is provided as an APC system to the Boiler.
8. As the total C.I of the Industry is Rs.183.32 Crs. The application is to be placed in the CAC meeting of the Board.
9. As per the sectoral approach and fees paid we may consider the application for a period upto 31.08.2015.
10. Recommended for Renewal of consent upto 31.08.2015 with BG of Rs.2.0 lakhs towards continuous compliance of CREP and Rs. 5.0 Lakhs towards O & M of PCS.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 23 Name of Industry : Sahakar Shiromani Vasantrao Kale SSK Ltd. (Distillery Unit), Chandrabhaganagar,
A/p- Bhalwani, Tal. - Pandharpur, Dist. – Solapur.
1. Applied for the renewal of the consent of 30 KLPD Distillery unit, without change in production quantity.
2. Application received at HQ on 10.06.2013. 3. Previous consent was valid upto 30.04.2013. 4. C.I of the unit is Rs.24.96 Crs. 5. Industrial effluent generation is 190 CMD. 6. Industry has provided Reboilers followed by 5 stage MEE for reduction of spent wash. 7. Industry has provided adequate compost yard of 5.5 Acres as per CREP Norms. 8. Provided impervious 30 Days storage tank. 9. Steam is taken from the Boiler of the Sugar unit and Multicyclone dust collector is
provided as n APC system. 10. SRO reported that though the Industry has taken steps for the CREP compliance, they
are found defaulter for disposing spent wash on land for ferti irrigation. 11. SRO reported considering the non compliances PD is issued by RO Pune on
02.03.2013, However the copy of the PD is not enclosed and the same is called along with compliance report from SRO.
12. As pert he sectoral approach the application is to be considered upto 31.08.2014 after receipt of the requisite consent fees.
13. Recommended for grant of Renewal upto 31.08.2014 ( after receipt of requisite consent fees) and with BG of Rs.2.0 lakhs for continuous compliance and Rs.5.0 Lakhs towards proper O & M of PCS. ( RO Shall take separate action on PD issued and compliance observed).
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 24 Name of Industry : M/s. Shree Chatrapati Shahu SSK Ltd.
Tal. Kagal, Dist. Kolhapur
• Industry has applied for renewal of distillery unit (45 KLPD) • Previous consent was valid up to 31.01.2013 • CI of industry Rs. 14.33 Cr. (CI increased by Rs. 63 lakhs but not increased in
production.) − Additional fees for increase in CI of Rs. 5510/- has been recovered from
industry. − Total CI of Industry Rs. 154.49 Cr. (Sugar 84.71 Cr. + Co-Gen 55.45 Cr. +
Distillery 14.33 Cr.) • Water Consumption - 455 CMD; IE - 450 CMD; DE - 4 CMD • Industry has provided septic tank and soak pit for disposal of DE. • Steam taken from Sugar industry. • CREP compliances
− Industry has provided reboiler − Provided aerobic composting yard of 11 acre − Provided 30 days impervious storage tank
• Submitted Environmental statement for 2011 – 2012 • Cess submitted up to Sept 2012 and paid up to 31.05.2012 • Industry has paid Fees paid Rs. 55,100/- • SRO recommended to grant renewal up to 31.01.2014 • As per sectoral approach distillery falls in month of August. Hence we may grant
consent to renewal valid up to 31.08.2014 after obtaining requisite fees from industry and with imposing BG of 5 lakhs towards O & M of Pollution Control System.
• Considering above the case is recommended for grant of renewal up to 31.08.2014 with BG of Rs. 5 Lakhs for O and M of PCS/ continuous monitoring of CREP and consent conditions after obtaining necessary fees if approved.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 25 Name of Industry : M/s. Ashok S.S.K. Ltd., (Distillery unit), A/p. Ashoknagar, Tal: Shrirampur, Dist: Ahmednagar
- Applied for renewal of consent.
- X- copy of application at HQ- 30.03.2013.
- C.I. of Distillery Rs. 10.44 Crs., Sugar ind.-138/- Crs & Co-Gen -90/- Cr.Total CI- 238.44/-
- Existing consent valid up to :28.02.2012.
- provided 2 reboiler unit for reducing spent wash generation followed by Biocomposting yard of 10 Acres land..Industry has provided 5days storage tankfor leachate collection and 30 days storage tank with 250 micro HDPE lining and brick edge and achieving Zero discharge
- Considering compliances, it is recommended to grant renewal of consent subject to extension of existing BG of Rs. 2 Lakh towards continuous compliance of CREP conditions if approved. Industry has submitted extra consent fees Rs. 168000/- instead of rs.133334/- for the consent period up to 31.08.2015, this shall be shown as balance with Board.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
Remaining Cases of 5th CAC (Part-IV) Renewal CAC Agenda No. 26 Name of Industry : M/s. Tilaknagar Industries Ltd., At Post Tilaknagar, Tal. Shrirampur, Dist. Ahmednagar.
- Applied for renewal of consent. - C.I. of Industry Molasses base Rs. 95.46/- Cr. And Grain base-120/- Crs - Existing consent valid up to : 30.06.2011.( Molasses base ) and Grain
base-30.04.2014. - Details :- provided ETP which comprises Biomethanisation followed by
RO & MEE. Industry has provided 9days storage tank with HDPE lining and brick surfacing and 30 days storage tank with 250 micro HDPE lining and RCC construction in place of existing kaccha lagoons.
- Industry has provided ESP to 45 MT co-gen boiler.and stack 60 mtr ht. and industry has proposed to scrap 2 No of boiler 1-bagges fired and 1 coal fired boiler.
- Considering compliances, it is recommended to grant renewal of consent by amalgamation of two consent for the period up 31.08.2014 subject to fees submission and with make up BG of Rs. 1 Lakh and extension of existing BG of Rs. 1 Lakh (making total Rs. 2 Lakhs) towards continuous compliance of CREP conditions if approved.
- ------------------------------------------------------------------------------ --------
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 27 Name of Industry : Bhima SSK Ltd.,(Sugar Unit), Madhukar Nagar,
Patas, Tal.- Daund, Dist.- Pune. a. Applied for the renewal of consent of Sugar Unit without change. (5000 TCD) b. Application received at HQ on dt.01.01.2013. c. Industrial effluent generation is 480 CMD against previous quantity of 707 CMD. d. RO reported that industry has made the arrangement of recycling of cooling water and
made the efforts to achieve the effluent generation 100 lit./Ton of crushing. e. JVS analysis results dt. 09.11.2012 and 31.12.2012 w.r.t pH, BOD, COD, SS,
Chlorides and TDS are exceeding. f. SRO reported that industry has started the upgradation of existing ETP. g. Dust collectors are provided as an APC system to 5 nos of boilers. h. Submitted Environmental Statement of 2011-12. i. Cess returns are submitted upto June 2012. j. Recommended for grant of renewal upto 31.07.2014 considering the efforts taken by
industry to improve ETP performance and by asking additional consent fees and forfeiting 1 year consent fees from previous application since consent renewal was refused as above.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 28 Name of Industry : Sahakar Maharashi Shankarrao Mohite Patil SSK Ltd , Shankarganagar,Tal-Malshiras,Dist-Solapur
Applied for the renewal of consent without change. a. Application received at HQ on dt.14.02.2013. b. Previous consent was valid upto 31.01.2013. c. C.I of the unit is Rs. 82.85 Lakhs. Total C.I of the industry is Rs.421.00 Crs d. Industrial effluent generation is shown as Nil against the previous consented
quantity of 5 CMD. e. Steam is used from the exiting boiler of sugar unit and ESP is provided as an APC
system. f. Cess is paid upto 31.07.2010. g. Environmental statement is submitted for period 2011-12. h. Fees is paid for a period upto 31.12.2015. i. Recommended for grant of renewal upto 31.08.2015 with balance fees for 4
months.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 29 Name of Industry : M/s. Bhogawati Sahakari Sakhar Karkhana Ltd.,
Shahunagar (Parite), Tal- Karveer, Dist – Kolhapur
• Industry has applied for consent to operate. It is RED/LSI unit. • Capital investment of the sugar industry is ` 61.96 Cr. • Capacity of the unit 3500 TCD • Total water intake is 2015 CMD; IE 450 CMD, DE – 60 CMD • For IE treatment ETP provided with primary and secondary system & for DE septic
tank and soak-pit is provided. • As per SRO report vide mail dt. 09.011.2012 of visit dt. 08.11.2012, CERP
compliances is as follows, - ETP was not in function 4 -5 days before starting of crushing season - Waste water generation is 128.5 lit/ton of cane crushed. - Industry has not provided separate bagasse storage yard and chances of
ingress of bagasse in ETP - Dust collector system to only one boiler out of five boilers. - Provided open HDPE pipeline to carry molasses up to distillery which may
cause accidental discharge - Industry provided 15 days storage tank.
• Land available for disposal of treated effluent is 120 acre which is sufficient. • Cess details not provided. • Environmental statement not provided. • Industry has paid consent fee ` 2,25,000/- • SRO recommended to issue renewal up to 31.05.2013 • We may obtain additional fees from industry and issue consent up to 31.07.2014 • Considering above non compliance recommended to issue SCN for refusal.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 30 Name of Industry : M/s. Shri Bhogawati SSK (Distillery) Sr. No. 295, 296, 297 & 298 A/P Shahunagar, (Parite), Tal – Karveer, Dist – Kolhapur Sr. No.
Condition of direction Compliance/Non Compliance reported by SRO Kolhapur
1 Entire solar evaporation pits shall be scrapped and leveled before 31.05.2007.
Industry has scrapped the solar evaporation ponds.
2 You shall scrap and level the existing kuccha lagoons by 31st May-07 so as to avoid ground water contamination in the nearby area. The quality of stored spent wash in kuccha lagoon is not fit either for ferti-irrigation or one time controlled land application, hence, should not be utilized for the said purpose.
The kaccha pit lagoons on site have been scrapped and leveled as per the directions. The photographs of the same are enclosed.
3 You shall provide 30 days storage facility in the form of impervious lagoon for storage of spent wash by 31st May-07. The design and construction of the lagoon shall be strictly as per MPCB/CPCB guidelines, which inter-alia include HDPE liner (250 micron as per BIS specifications), and pitched by brick with cement mortar so as to prevent leakages.
Industry is provided 30 days spentwash storage tank having capacity 60 MLD with 500 micron thick HDPE liner provided at site. The photographs enclosed.
4. You shall revamp/reconstruct the existing compost yard by 31st May-07, as per MPCB/CPCB guidelines, which inter-alia include HDPE liner (250 micron as per BIS specifications), leachate collection system, brick on edge, test well, fencing etc. The composting method shall be fully automatic, where auto spray of spent wash and it’s mixing shall be simultaneously carried out
The existing compost yard has been totally revamped by constructing a new 2.5 acres with 250 micron HDPE and RCC lining along with leachate management system as per CPCB norms. The photographs of the compost yard are enclosed.
5.
You shall reduced the volume of spent wash/ Rectified spirit productions commensurate with the availability of pressmud (filler material) for composting, by upgrading the existing manufacturing technology as well as reducing the spentwash volume after bio-digester by adopting various techniques like- nano filtration, concentration, etc. This shall be achieved by Nov. 2007. As the existing 15
The industry has modified the distillery set up and upgraded. There under, the previous batch type plant is changed and now a continuous fermentation process plant is installed. Also the Reboiler installed for spentwash to reduce the volume. The photographs of the changes made in the fomenters are enclosed.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
KLPD batch process plant is not viable, you should scrap the same and switch over to continuous process plant of higher capacity by 31st Dec. 2008.
6. You shall achieve zero discharge of effluent in surface water by Nov. 2007 by utilization of 100% spent wash in scientific manner
As the industry has changed the process batch to continuous type. The volume of spent wash generation will less. Industry also provided reboiler system to reduce the spentwash volume. Industry is provide RCC HDPE lining 30 days storage tank to store the spent wash and also provided RRC pacca compost yard 2.5 acres with leachet collection system. Industry has assured to achieve Zero discharge.
7. The Distillery operation shall remain closed during monsoon i:e from June 10th to September 10th every year.
Distillery is not in operation since 2008 and as per consent condition it will be closed from June 10th to September 10th every year.
8. You shall utilize the operation of bio-digester to its optimum capacity by 15th March 2007 so as to ensure the desired standard in respect of outlet BOD up to 5000 mg/l.
Industry has not provided Bio-Digester till date and will utilize the spent wash for Bio Composting. As company provided reboiler to reduce volume.
9. The industry should adopt latest technology such as evaporation, concentration, nano filtration, reverse osmosis etc. for reduction of spent wash volume.
As the industry has changed the process batch to continuous type. To reduce the volume of spent wash generation industry provided Reboiler system. Industry is provide RCC HDPE lining 30 days storage tank to store the spent wash and also provided concrete RRC pacca compost yard 2.5 acres with leachet collection system
10. You shall immediately stop Land application of spent wash.
As the distillery is not operation since 2008 and also provided RRC pacca compost yard for the Bio Composting.
11. In order to minimize the adverse effect on ground water in nearby area, practices such as rain water harvesting, fresh water injection etc. Should be adopted & proposal in this regard shall be submitted by March, 2007
Industry has not provided rain water harvesting, fresh water injection etc. techniques till date.
• Since industry has previous consent valid up to 31.12.2008 fees of Rs. 2,00,000 /- for
the years 2008-2012 is to be recovered from industry.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
• SRO Kolhapur has reported vide email dt. 05.04.2013 that industry has paid additional fees of Rs. 2,00,000/- for previous years and Rs. 50,000/- to extend consent period up to 31.12.2014.
• As per Sectoral approach circular issued by the Board, dt. 30.03.2013 for consent processing practice, this industry is distillery which falls in month of August, we may issue consent to operate up to 31.08.2014 for uniform validity with balance consent fees for four months.
• Since reboiler is provided with continuous process, bio-digester is not required. • Considering above it is recommended to grant renewal of consent up to 31.08.2014
with BG of Rs. 2 Lakhs towards continuous compliance.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 31 Name of Industry : Shri. Siddheshwar SSK Ltd. , Kamathe,
A/P Tikekarwadi, Tal- North Solapur.
a. Applied for consent to Operate renewal for the Kraft board mfg. Without chemical
pulping and with use of readymade pulp or waste paper as a raw material. b. Appllication is received at HQ on dt.24.01.2013. c. Located in the premises of Sugar and Distillery unit. d. Previous consent - Obtained C to E, applied for C to O but not obtained. e. C.I of the unit is Rs.3.9 Crs (Total C.I of the industry including the Sugar & Distillery
Unit is Rs.80.58 Crs) f. Disposal is on land g. Bagasse and biogas is used as fuel in boiler. h. Multicyclone dust collector is provided as an APC system i. Industry has paid the fees for renewal of consent upto 31.05.2013. j. RO/SRO has recommended for grant of renewal of consent. k. We may grant renewal of consent for a period upto 31.06.2014 as per the Sectoral
approach, after receipt of the requisite consent fees. l. Recommended for grant of renewal till 30.06.2014 by calling fees for one month and
BG of Rs. 5.0 Lakhs towards O & M and 100 % recycle.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 32
Name of Industry : Shri Siddheshwar SSK Ltd., (Distillery Unit),
Kamathe, Tal.- North Solapur, Dist.- Solapur.
a. Applied for renewal of consent for 20 KLPD Distillery unit. b. Application received at HQ on dt.23.01.2012. c. Application was discussed in the Consent Committee meeting dt.28.09.2012 and not
approved and it was decided to issue SCN for refusal for not complying with CREP Norms.
d. Solar pits are made empty and will be scraped in forthcoming season. e. Compost yard – concrete work with wall at both side of 6 acres is completed. f. Lagoon work as per CREP is completed. g. The work of leachate collection system is completed. h. Test wells are provided at the composting site to monitor ground water quality. i. Provision of pizzometer at the end of compost yard is completed. j. Recycling condensate water from distillation for the cooling purpose. k. Fencing is not provided, as Irrigation Dept. of Maharashtra Govt. is using roads for
transportation of material for Ujani Canal Work. After completion of canal work near compost yard, fencing will be completed.
l. Iit is recommended for renewal upto 31.08.2014 OR as per the fees to be paid by company with BG of Rs. 2.0 lacs towards continuous compliance of CREP.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 33 Name of Industry : Baramati Agro Ltd., (Sugar Unit & Co-generation Unit)
Shetphalgade, Tal.- Indapur, Dist.- Pune.
a. Applied for the renewal of the Sugar consent without change in production quantity. b. Application received at HQ on dt.24.01.2013. c. Consent of Sugar unit was valid upto 31.12.2012 and consent of Co-generation unit is
valid upto 31.10.2014. d. Total C.I of the industry is Rs.186.3 Crs (Sugar Rs.117.43 Crs, Co-gen Rs.49.93 Crs
and Distillery Rs.18.94 Crs) e. Accordingly the total water consumption of Sugar & Co-gen unit is 950 CMD f. Trade effluent is 480 CMD. g. Provided ETP of capacity 500 CMD with secondary treatment. h. Land available for the disposal of the treated effluent is @ 25 Acres which seems ot
be adequate. i. JVS analysis results dt.23.11.2011 and 19.01.2012 are exceeding w.r.t BOD and
COD. j. Common boiler for Sugar & Co-gen unit. k. Wet Scrubber is provided as an APC system. l. BG of Rs. 2.0 Lakhs submitted against the non compliances of consent conditions
which was valid upto 27.01.2013. m. Recommended for renewal of consent with amalgamation by forfeiting previous BG of
Rs. 2.0 lakhs and specifying new BG of Rs.5.0 Lakhs and Rs.2.0 lakhs as per our circular dt.19.01.2013 till 31.07.2014 (after receipt of required consent fees till this period including fees for increase in C.I).
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 34 Name of Industry : Ajinkyatara SSK Ltd. (Sugar Unit),
A/p-Shahunagar Shendre, Tal. & Dist-Satara.
a. Applied for the renewal of consent without change in production quantity. b. Application received at HQ on dt.31.01.2013. c. Industrial effluent is 310 CMD. d. ETP is provided with primary and secondary treatment. e. JVS analysis results dt.17.12.2012, 17.03.2012 and 23.04.2012 are exceeding w.r.t SS, BOD
and COD. f. Disposal of the treated effluent is on land for irrigation and gardening purpose. Land available
is @ 106 Ha, which is adequate. g. SRO reported that two boilers are provided with Multicyclone dust collector as an APC
system, but these two boilers are not in operation. h. Steam is taken from the Boiler of Co-generation unit which is run on Boot basis by M/s.
Renuka Sugars Pvt. Ltd., and ESP is provided as an APC system. i. Industry has submitted BG of Rs.5.0 Lakhs towards O & M of Pollution Control Systems as
per the previous consent condition. However industry has not submitted the BG of Rs.2.0 Lakhs.
j. Recommended for grant of renewal of consent with forfeiture of BG of Rs.5.0 Lakhs and BG of Rs.2.0 Lakhs and with new BG of Rs.10.0 Lakhs and Rs.4.0 Lakhs as per circular dt.19.01.2013 till 31.07.2014 subject to submission of additional fees for renewal till 31.07.2014 with fees for C to E towards increased C.I.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 35
Name of Industry : Loknete Baburao Patil Agro Industries Ltd., (Formerly Known as M/s. Loknete Baburao Patil SSK Ltd.,). At-Laxminagar, Angar, Tal-Mohol, Dist-Solapur.
a. Applied for the renewal of Consent for Sugar unit and co-generation unit with
amalgamation, without change in production quantities. b. Application received at HQ on dt.02.02.2013 c. Change in name Loknete Baburao Patil Agro Industries Ltd., (Formerly Known as M/s.
Loknete Baburao Patil SSK Ltd.,) d. C.I is increased by Rs.27.28 Crs. e. Total industrial effluent is shown as 315 CMD. (Previous I.E for Sugar was 240 CMD &
Co-gen was 30 CMD.) f. ETP of capacity 500 CMD is provided with secondary treatment. g. JVS analysis results dt.31.03.2012, 18.04.2012 and 9.05.2012 are exceeding the
consent limit w.r.t SS, BOD, COD and Chlorides. h. Disposal is on land at about 45 Acres, which is adequate. i. Wet scrubber is provided as an APC system. j. Submitted the BG of Rs. 2.0 Lakhs against the consent dt.09.04.2008, which is valid
upto 17.12.2013. k. Case is recommended for grant of renewal with amalgamation of Sugar and Co-
generation unit upto 31.07.2014 (with balance fees for 5 months).
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 36 Name of Industry : M/s. The Shrigonda S S K Ltd. ,
A/p.& Tal. Shrigonda, Dist. Ahmednagar.
- Applied for renewal of consent. - Application received at SRO office 01.01.2013, at HQ-05.O2.013.
For Distillery Unit-Existing- 8.21/- Crs+ addl Rs. 1.04/- Crs Total CI- Rs. 9.25/-Crs. For Sugar Unit- 68.73/- Crs. Total CI of sugar & Dist. is Rs. 77.97/- Crs.
- Envt. Statement submitted for the year-2011-12 - Assessment done up to 19.07.2012, Cess paid up to 31.05.2012 - ETP comprising bio-methanisation followed by bio-composting - 30 days capacity of pacca lagoons provided. Compost yard constructed on 5
Acres land, on another 5 acres yet not constructed. Kaccha lagoons, solar pits are not yet scraped. Industry has increased their CI 8.21 Crs to 9.24 Crs. due to revamping of biomethanation plant in 2011-12.compliance report called from RO/SRO vide e-mail dtd.23.04.013.
- SRO, Ahmednagar has recommended for renewal of consent subject to suitable BG.
- Recommended for issuing SCN for refusal of consent since not complied as above.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 37
Name of Industry : Indreshwar Sugar Mills Ltd. (Sugar & Co- generation Unit ) , Bhagwant Nagar, Uplai, Tal. Barshi, Dist. Solapur.
a. Applied for the renewal of consent without change in production quantity. b. Application received at HQ on dt.02.02.2013. c. It is a sugar unit of capacity 2500 TCD and co-generation of 12 MW. d. C.I of the unit is shown as Rs.85.29 Crs against the previous consented C.I of
Rs.69.49 Crs. i.e. increased by Rs.15.8 Crs. e. Industrial effluent is shown as 250 CMD as per the corrected water budget against the
previous consented quantity of 120 CMD. f. ETP is provided with secondary treatment. g. JVS analysis results are 05.01.2012, 14.02.2012 & 02.05.2012 are exceeding the
consented norms w.r.t SS, BOD and COD. h. Land available for the disposal of the treated effluent is 45 acres, which is adequate. i. ESP is provided as an APC system. j. Submitted Bank guarantee of Rs. 5.0 Lakhs and Rs. 2.0 Lakhs valid upto 17.10.2013. k. Not provided 15 days storage tank as per CREP guidelines. l. During visit on dt.30.11.2012 ETP was found partially in operation and stream of
effluent is found bypassed and discharged outside the factory premises. m. Warning notice has been issued by RO vide letter dt.11.05.2012 for the complaint
regarding the discharge of the effluent outside the premises and smell nuisance. n. The case is recommended for grant of renewal for sugar and co-generation upto
31.07.2014 after collecting fees till this period with C to E for increased C.I and forfeiture of BG of Rs. 5 lakhs and Rs.2 lakhs and new BG of Rs. 10.0 lakhs and Rs.4.0 lakhs as per Board circular dt.19.01.2013.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 38
Name of industry : M/s NSL sugars Ltd. (Jay Mahesh Sugar Industries
Ltd.), Tq. Majalgaon, Dist. Beed.
1. Applied for renewal with expansion consent to operate. 2. Existing sugar industry 5000 TCD & proposed 2000 TCD. Hence total 7000 TCD with
Co-gen 30 MW. 3. Consent to Establish is obtained by industry on 20.11.2009 for sugar 7500TCD,
Cogen 30MW & Distillery 100KLPD. 4. Environmental clearance is already obtained for Sugar 12000 TCD, Distillery
100KLPD & Co-gen 30 MW. 5. Previous consent was issued for 5000 TCD & was valid till 31.01.2013. 6. Effluent generation 581 CMD. CREP Complied. 7. Provided Secondary & tert, treatment. 8. JVS results dtd 26.11.12 are marginally exceeding the standards i.e BOD 110 mg/Ltr
& CD 264 mg/L as against standard 100mg/L & 250 mg/l respectively. 9. Treated effluent used on land for gardening. Land available for disposal of effluent 62
acres. 10. ESP provided as an APC system. CREP Complied. 11. Envt. Statement submitted for year 2011-12. 12. Cess Returns submitted upto Nov.2012 & paid upto 30.06.2008. 13. Bank Guarantee of Rs 5.0 lakhs submitted by is forfeited by Board as the JVS results
of last season were exceeding the standards. 14. RO recommended for renewal of consent upto 31.01.2015. 15. The application is to be placed in CAC as Total C.I of industry is 225 Crores. 16. We may grant renewal & operate for additional capacitywith amended quantities along
with Change in name since ind is complying with B.G of Rs 10. Lakhs for operation & maintenance of pollution control devices. Submitted to CAC for further consideration and disposal pls.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 39
Name of Industry :- M/s. Vaidyanath SSK Ltd., (Sugar) , A/P Pangri, Tq Parli, Dist. Beed.
• Applied for renewal of Consent . • Capital Investment is 41.46 Crores. • Industrial effluent generated 450 CMD. Non complied with CREP. • Provided secondary & tert. Treatment plant. • Treated effluent is used on land for gardening. • JVS results dtd 21.11.11 & 20.03.12 & 12.01.12 are exceeding the consented
standards. • Multi Cyclone dust collector and ventury scrubber is provided as an Air Pollution
control system. Condition of CREP complied for APC. • Environment statement, is submitted for Year 2011-12. • Cess Paid upto jan 2013. • Bank Guarantee of Rs 5.0 lakhs is forfeited by RO due to non achievement of JVS
results. • RO issued Proposed directions for non compliance of CREP guidelines. • SRO Parbhani & RO Aurangabad recommended for renewal of consent. We may
place in CAC as total C.I is 153.68 Crores. As per policy of Board, we may grant renewal of consent subject to BG of Rs 10 Lakh & 4.0 Lkh & encashment of BG of Rs 2.0 Lakhs , if agreed pls.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 40 Name of Industry : Shri . Vithal SSK Ltd. Venunagar (Distillery Unit),
Venunagar, Post.- Gursale, Tal. Pandharpur, Dist.- Solapur.
a. Applied for the renewal of consent for 30 KLPD Distillery unit without change in production quantity.
b. C.I of the Distillery unit is Rs. 22.19 Crs. against the previous consented C.I of Rs. 21.47 Crs. i.e C.I is increased by Rs. 0.72 Crs. Total C.I of the Industry is of Rs. 134.08 Crs.
c. Industrial effluent generation is 311 CMD. d. Provided compost yard of 10 acres as per CREP norms. e. Spent wash is disposed of by the way of composting to achieve zero discharge. f. Provided 30 days storage facility. g. CREP complied. h. Submitted bank guarantee of Rs.2.0 Lakhs valid upto 31.12.2012 towards compliance of
CREP guidelines. i. Steam is used from the boiler of Sugar unit. j. Industry has submitted fees Rs.50,000/- towards renewal of consent for a period upto
31.12.2013. k. As per the sector approach we may grant renewal of consent for a period upto 31.08.2014
after receipt of the requisite consent fees if approved. l. Recommended for grant of renewal till 31.08.2014 after receipt of fees till said period and with
BG period extension till validity of consent for continuous compliance of CREP conditions.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 41 Name of Industry : Shree Tatyasaheb Kore SSK (Distillery unit)
Warananagr, Tal – Panhala, Dist – Kolhapur
• Industry applied for renewal of consent of distillery unit (60 KLPD). • CI of industry is 43.14 Cr. • SRO recommended to grant case by forfeiting BG against non compliance and
obtaining fresh BG up to 31.12.2013 • Submitted before CAC
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 42 Name of Industry :- Purna SSK Ltd. (Sugar), Basmatnagar, Dist. Hingoli.
• Applied for renewal of Consent sugar and Co-gen Separately. • Capital Investment (Sugar 66.88, COgen 63.15 Crores, distillery 11.02 Crores) . Total
C.I is 141.05 Crores. • Industrial effluent generated 227 CMD & cooling tower discharge 60CMD. • Provided Secondary treatment plant. • JVS results are exceeding the standards. • Treated effluent is used on land for gardening. Land available for disposal of effluent
61. 70 Hectors. Which is sufficient. • Bagasse fired boiler provided ESP as an APC for Co-gen & Fly Ash arrester provided
as an APC for Sugar Boiler. • Bank Guarantee of Rs 5.0 lakhs was forfeited for non achievement of JVS results • Ind has submitted B.G of Rs 10 lakhs. • RO issued interim directions to ind on 05.01.2013 & asked industry to extend bank
guarantee of Rs 2.0 Lacs for aperiod of One Year. • SRO & RO recommended for renewal of consent Upto 31/12/2014 . • As per amalgamation Circular issued on 19.01.13 we may club both the applications
& submit the application in CAC as total C.I of ind is more than 100 Crores. • We may grant renewal of consent upto 31.07.14 with balance fees of Period from
01.08.14 to 31.12.14 & extension of B.G upto validity of Consent i.e upto 31.07.2014
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 43 Name of Industry : Purna SSK Ltd.(Distillery), Basmat Nagar, Dist. Hingoli.
• Applied for Renewal.(Distillery) • Total Capital Investment is 11.021 Cr. • Capital Investment (Sugar 60.55, COgen 59.89 Crores) . Total C.I is 131.46 crores. • Industrial effluent generated 240 CMD. • Primary treatment system – Reboiler 30 days storage tank HDPE Lined, after which
composting process on 8 acres of Land which is HDPE lined as per CREP Norms.. • Industry has provided 30 days spent wash storage tank with HDPE lining. • Industry has complied CREP guidelines. • Envt statement submitted for Year 2011-12. • SRO, & RO has recommended case for renewal up to 31/12/2014. • Submitted with recommendation to grant consent renewal for three years or as per
fees paid by industry with extension of BG period upto validity of Consent.(B.G of Rs 5.0 lkhs is valid as reported. Submiteed to CAC for Consideration pls.)
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 44 Name of Industry : M/s. Rena SSk Ltd.,
Dilip Nagar, Dist. Latur.
1)Applied for renewal of Consent without change. Distillery of 30KLPD. 2)Capital investment Sugar 53.69 crores & distiller 29.31 Crores . Total 83 crores. 3)Provided Biodigester followed by 5 stage multiple effect evaporation system to reduce volume of spent wash upto 60CMD. 4)Provided 30 days storage lagoon followed by compost yard of 5.5 acres as per CREP guidelines. 5)Provided multicyclone dust collector as an APC to Bagagse fire boiler.However as per previous consent condition ind was supossed to provided bag filter as APC syste. 6) SRO & RO recommended for renewal of consent upto 20.02.14. 7) Recommended for renewal of consent with B.G of Rs 5.0 lakhs with validity up to 31.08.14 on payment of fees.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 45
Name of Industry :- M/s. Bhairavnath SSK Ltd., A/P sonari, Dist. Osmanabad.
1. Applied for renewal sugar industry 2500 TCD. 2. Effluent generation 250 CMD. CREP Complied. 3. Provided Secondary & tert, treatment. 4. JVS results dtd 20.12.2011 & 27.02.12 are exceeding the standards. 5. Treated effluent used on land for gardening. Land available for disposal of effluent 100
acres. 6. Wet Scrubber provided as an APC system. CREP Complied. 7. Envt. Statement submitted for year 2011-12. 8. Cess Returns submitted upto Nov.2012. 9. Bank Guarantee of Rs 5.0 lakhs & 2,o Lakhs submitted by industry with validity
25.06.13 & 06.08.13. 10. Proposed directions were issued by RO on 21.11.12 for securing compliances of
CREP conditions. ID issued on 16.01.13. 11. During visit of SRO Latur on 30.01.12 molasses spillage was observed and being
stored in kattcha pit. 12. RO recommended for renewal of consent with forfeiting bank Guarantee of Rs 1.0
lakh & Top up by Rs 1.0 lakh. 13. The application is to be placed in CAC asSugar 45 Cr & proposed sugar expansion
20.80 Crs, proposed Cogen 32 Crores, Distillery 22 Crores . Total capital investment 119.8 crores including Co-gen & Distillery.
14. Since we don’ t have JVS reports after July 12 & no information whether the effluent channel is covered or not ,it is recommended for renewal of consent for existing capacity. We may extend above said BG of Rs 5.0 lakhs & 2.0 lakhs till further.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 46 Name of Industry :- M/s. Tridhara Sugar Ltd., At Amdapur, Post Singnapur,
Tal. & Dist. Parbhani.
1. Applied for renewal sugar industry 2500 TCD. 2. Effluent generation 400 CMD. Not complied with CREP as effluent is more than 10
liters per ton of crushing. 3. Provided Secondary & tert, treatment. 4. JVS results dtd 31.01.12 & 14.03.12 are exceeding the standards. 5. Treated effluent used on land for gardening. Land available for disposal of effluent 300
acres. 6. Multicyclone with fly ash arrester provided as an APC system. AS per CREP condition
not provided wet scrubber/ESP as an APC system. 7. Envt. Statement submitted for year 2011-12. 8. Proposed directions were issued by RO on 21.11.12 for non compliances of CREP
conditions. Ind not attended Personal Hearing. 9. RO recommended for personal hearing at HQ. • The application is to be placed in CAC as Total C.I of industry is Existing 46.80 crore
& proposed 156.97 Crores for Cogen & distillery. Total C.I including distillery & C-gen is Rs.203.77 Crores.
• Recommended for renewal with Bank Guarantee of Rs. 5+ Rs. 2 + Rs. 3 Lakhs as per policy of Board.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 47 Name of industry :- M/s. Bhaurao Chavan SSK Ltd.,
Laxmi nagar, Dist. Nanded. 1. Applied for renewal sugar industry 2500 TCD. Effluent generation 400 CMD. Not
complied with CREP as effluent is more than 10 liters per ton of crushing. 2. Provided Secondary & tert, treatment. 3. JVS results of Jan are within limits however of Feb & March 2012 are exceeding the standards in respect of BOD & COD. 4. Treated effluent used on land for gardening. Land available for disposal of effluent 60 hectres.. 5. Fly ash arrester provided as an APC system. AS per CREP condition not provided wet scrubber/ESP as an APC system. 6. Envt. Statement submitted for year 2011-12. 7. Cess returns submitted upto Sept.2012 & paid upto oct.2011 8. As per CAC decision B. G of Rs 5.0 Lakhs is forfeited for non achievements of Results. 9. Proposed directions were issued by RO on 21.11.12 for non compliances of CREP conditions. 10. RO recommended for renewal of consent after acquiring B.G. of Rs 10 Lacs. 11. The application is to be placed in CAC as Total C.I of industry is Sugar 68.48 crores, Distillery 15.08 crores, Co-gen (Proposed) 53.56 Crores Total 137.02 Crores 12. We may renew the consent with Bank Guarantee of Rs. 10 Lacs for Operation and
maintenance of PCS & 3.0 lacs for provision of APCS as per CREP guidelines Submitted for CAC for consideration pls.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 48
Name of Industry : M/s. Pad Dr. V.V. Patil S.S.K. Ltd., (Sugar unit), Pravaranagar, Dist. Ahmednagar. • Applied for renewal of consent to operate with same production qty.. • Category RED/LSI. • Existing consent dated 04.02.2012 valid up to: 31.12.2012. • Previous capital investment Rs. 281.00 Cr. • Enhanced capital investment Rs 29.76 Cr. • Capital Investment of Sugar Unit is Rs. 310.76 Cr. • C.I. of distillery & chemical plant is Rs. 90.35 Cr. • Total C.I. (Sugar + Distillery + chemical plant ) Rs. 401.11 Cr. • Capital investment of sugar unit increased due to replacement of old
machinery/modernization of plant. • I.E generation to the tune of 280.0 CMD. • D.E. generation to the tune of 60.0 CMD. • ETP provided, comprising Screen chamber, O & G trap, equalization tank Bio-tower,
Clarifier, aeration tank, secondary clarifier & SDB provided. • 15 days storage tank provided & covered the effluent collection system to avoid
ingress of bagasses. • JVS results exceeding the limit. • Industry has provided100 hectors land for disposal of treated effluent. • During the visit observed industry was bypassing the effluent without treatment. • ESP/Wet scrubber not provided to the boilers • Direction was issued by RO on 27.12.2012. • Environment statement submitted for the year 2011-2012. • B.G. of Rs. 5.0 Lakhs submitted, valid up to: 31.12.2013, submitted against O & M of
pollution control system. • B.G. of Rs. 2.0 Lakhs submitted valid up to: 31.12.2013 submitted against to cover the
effluent collection system. • B.G of Rs. 3.0 Lakhs not submitted against the direction issued by RO. • SRO recommended to forfeit the BG of Rs. 5.0 Lkahs & renewal of consent may
granted with suitable additional BG.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 49
Name of Industry :- Manjara SSK Ltd., A/P Vilas Nagar, Chincholi,
Dist. Latur.
• Applied for renewal with amalgamation i.e Sugar with Co-gen. • Sugar consent was valid till 31.12.12 & Cogen was valid till COU. • Capital investment 65.84 Crores, Distillery 28.13 crores & Co-gen 75.12 Crores.
Total C.I.of industry 169.10 crores. • Obtained Consent to establish for Co-gen, sugar . • Industrial effluent generated 150 CMD sugar & 215 CMD from cogen. • Effluent is treated in Common ETP comprises of Secondary & tert. treatment. • Treated effluent is used on land. Available land for disposal is 60 Hectres, which is
adequate. • JVS results dtd 05.05.12 is exceeding the standards. • Fly ash arrester provided to boiler of sugar industry & ESP provided to Boiler of
Cogen.. • Industry has paid cess returns till Dec-2012 & cess paid upto March 2009. • Environmental statement is submitted for the year 2011-12. • Bank guarantee of Rs 5.0 lakhs is forfeited for non achievement of JVS results • Bank guarantee of Rs 10 lakhs is not submitted by industry . • RO issued Proposed directions on 21.11.12 for compliance of CREP conditions. • SRO & RO recommended for renewal of Consent. • We May renew the Consent with B.G of Rs 3.0 lakhs for provision of APC system as
per CREP guideline within 4 months period. The consent period can be extended upto 31.07.14 if ind pays the fees or upto 31.07.13 with balance fees of five months
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 50 Name of Industry : M/s. Kukadi SSK Ltd. (Sugar Unit),
Pimpalgaon Pisa Tq. Shringonda , Dist. Ahmednagar.
• Applied for renewal of consent. • Category RED/LSI. • Existing consent dtd. 02.08.2012, valid up to: 31.12.2012. • Capacity 2500 TCD. • Earlier C.I. of Rs. 80.96 Cr. • Enhanced C.I. of Rs. 18.32 Cr. • Total C.I. of Rs. 99.28 Cr. • Industry has not given reason for increased C.I. • SRO imparted letter to industry, reply awaited. • I.E. generation to the tune of 105.0 CMD • D.E. generation to the tune of 30.0 CMD. • ETP comprising, oil skimmer, screening, collection tank, lime dosing tank, equalization
tank, aeration tank, Secondary Clarifier, Holding tank, sand filter & SDB provided. • 15 acres land available for disposal of treated effluent. • JVS result exceeding the prescribed standards. • Air pollution control, Boiler - I & II, chimney height 65.0 mtr. each with fly ash arrestor
provided. • Industry has not provided wet scrubber to boilers. • Industry has not provided 15 days storage tank. • Cess paid up to: Sept. 2012. • Environmental statement submitted for the year 2011-12. • Industry has submitted BG. of Rs. 5.0 Lakh towards O & M of ETP & APC and BG of
Rs. 2.0 Lakh towards compliance of CREP, both BG valid up to: 31.12.2013.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 51
Name of Industry : M/s. Shri Saikrupa Sugar & Allied Industries Ltd., Hiradgaon Shrigonda , Tq. Shrigonda,
Dist. Ahmednagar.
• Applied for renewal of consent (Sugar+ Co-gen.). • Category RED/LSI. • Capacity 7500 TCD. • Existing consent dtd.16.3.2012, valid up to: 30.11.2012. • C.I. of Rs. 314.09 Cr. • I.E. generation to the tune of 755 CMD. • D.E. generation76.60 CMD. • ETP provided, during the visit of Field officer observed that untreated effluent was
bypassed to ETP. • JVE results are not within limits. • RO issued SCN on 23.11.2012, industry operating without valid consent. • I. D. issued on 26.12.2012. • Air pollution control. • Boiler with chimney height 80.0 mtr, with ESP provided as APC. • Industry has not provided necessary arrangement to cover effluent collection system
to avoid ingress of bagasse. • Cess paid detail not submitted. • Environment statement not submitted. • BG of Rs. 2.0 Lakh submitted, valid up to: 10.08.2013 towards for providing
necessary arrangement to cover the effluent collection system and to avoid the ingress of bagasse.
• BG of Rs. 5.0 Lakhs submitted, valid up to: 10.08.2013 towards O & M of pollution control system.
• BG of Rs. 1.0 Lakh not submitted, towards submission of Environment statement. • RO/SRO recommended to forfeit BG of Rs. 7.0 Lakh and consent maybe refused or
may be granted subject to submission of additional BG of Rs. 15.0 Lakhs.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 52
Name of Industry : M/s. Gangakhed Sugar & Energy Pvt. Ltd. ,
Vijaynagar, Makni, Tal. Gangakhed, Dist. Parbhani
• Applied for renewal of Consent (Sugar & Cogen).
•Total Capital Investment is 325.20 Cr. •Industrial effluent generated 1210 CMD. •Provided Seconadry & tert. Treatmemt plant.. •For co-generation plant- Neutralization & settling tank provided . •JVS results dated 28.12.1, 12.01.2012 & 14.03.12 are within limits. •Treated effluent is used on land for gardening / irrigation. 24.54 hectors land available. •1 Nos. of boiler of 150 TPH capacity provided with stack of 80 mtrs. ESP provided to Boiler to control air pollution . CREP Complied industry. •Used / Spent Oil – 25 Kg/Day generated is used a fuel in boiler. •Industry has paid Cess returns up to Sept.-2012 & paid upto Sept. 2012. •Industry has submitted Environmental Statement for year 2011-12. •As per previous consent issued dtd 13.03.12 ind has submitted Bank Guarantee of Rs 5 Lakhs & 2 lakhs. • As per CAC decision dtd 09.11.11 Bank Guarantee of rs 2.0 lkhs is firfieted for non achievement of JVS results. • Application was discussed in CAC dtd 19.03.13 & clarification regarding ID was sought from RO.Ind achieved zero discharge on land, Operating APC i.e ESP, Earlier B.G of Rs 5 lakhs & 2.o lakhs is extended upto 31.01`.14 & 21.2 14. • Recommended for renewal of consent upto 31.07.14 with necessary fees.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 53 Name of Industry :- Majalgaon SSK Ltd. (Sugar Unit) ,
Sundernagar, Telgaon, Tal-Majalgaon, Dist-Beed.
1. Industry has applied for renewal of Consent . Sugar industry with change in C.I from
79.69 crores to 113.06 crores i.e Rs 33.37 crores.
2.Increase in C.I is due to automation & change of equipments.
3.Industrial effluent generated 480 CMD.
4.Provided Secondary treatment plant. Treated effluent is used on land. Available land for
disposal is 15 Hectares.
5.JVS results are not meeting the consented standards with respect to BOD & COD.
6.Provided ESP as an APC system.
7.Industry has paid cess returns till April 2013 & cess paid upto Feb 2012.
8.Environmental statement is submitted for the year 2011-12.
9.BG of Rs 10 Lakhs was valid till 31.05.13. As per ID issued ind submitted BG of Rs 3.0
lakhs for up gradation of APC system from fly ash arrester to ESP.
10.AS per report of SRO/RO ind has complied the direction & provided ESP as an APC.
SRO & RO recommended for renewal upto 31.07.14.
11 Recommended for renewal of consent with BG of Rs 20 lakhs for O & M of PCS with forfeiture of BG of Rs 3 lakhs as ind has complied directions & provided ESP as an APC System. We may forfeit BG of Rs 10 Lakhs as JVS dtd 12.12,1.13 & 2.13 are exceeding the standarads..
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 54 Name of Industry : Pioneer Distilleries Ltd.,
Mouje Balapur, Tq Dharmabad, Dist. Nanded.
1. Applied for renewal of consent of 40 KLPD distillery & bottling plant of IMFL.
2. C.I 76.08 Crores for Distillery, and Rs. 15 crores for IMFL Plant Total 91.08 Crores for
& existing Distillery 116.63 Crores. Hence Total Capital investment 207.81 Crores.
3. Provided Primary aerobic digester 3 nos, secondary five multi effect evaporation
system for spent wash generated from molasses based distillery. The effluent
generated from grain based distillery is recycled in process. Concentrate left after
MEEP is mixed with solid fuel & fired into boiler.
4. As per RO Report ind has installed MEE with dryer & trials started.
5. Provided Multi cyclone dust collector followed by Venturi scrubber as an APC to rice
husk fired boiler..
6. H2s scrubber to biometahnisation plant & Co2 recovery Plant.
7. For IMFL plant SRO reported that ind is going to use fresh bottles/prewashed bottles .
The effluent generated will be recycled/reused.
8. Ind was directed to scrap kachha lagoons . Ind has scrapped 7 lagoons out of 9
lagoons. Earlier bank guarantee of rs 1.25 lacs was forfeited for non scrapping of
lagoons.
9. Ind requested for change of name if product i.e ENA or malt Sprit.We may place application in CAC.
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
REVIEW AGENDA CAC Agenda No. 01 Name of Industry : M/s. Loknete Baburao Patil Agro Industries Ltd.,
(Formerly Known as M/s. Loknete Baburao Patil SSK Ltd.,). At Laxminagar, Angar, Tal-Mohol, Dist-Solapur.
1. Applied for the renewal of Consent for Sugar unit and co-generation unit with
amalgamation, without change in production quantities. 2. Application received at HQ on dt.02.02.2013 3. Change in name Loknete Baburao Patil Agro Industries Ltd., (Formerly Known as M/s.
Loknete Baburao Patil SSK Ltd.,) 4. C.I is increased by Rs.27.28 Crs. 5. Total industrial effluent is shown as 315 CMD. (Previous I.E for Sugar was 240 CMD &
Co-gen was 30 CMD.) 6. ETP of capacity 500 CMD is provided with secondary treatment. 7. JVS analysis results dt.31.03.2012, 18.04.2012 and 9.05.2012 are exceeding the
consent limit w.r.t SS, BOD, COD and Chlorides. 8. Disposal is on land at about 45 Acres, which is adequate. 9. Wet scrubber is provided as an APC system. 10. Submitted the BG of Rs. 2.0 Lakhs against the consent dt.09.04.2008, which is valid
upto 17.12.2013. 11. Case is recommended for grant of renewal with amalgamation of Sugar and Co-
generation unit upto 31.07.2014 (with balance fees for 5 months).
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13
CAC Agenda No. 02
MAHARASHTRA POLLUTION CONTROL BOARD
Web Agenda (Part‐III & IV cases of 5th CAC) of CAC Meeting dated 29.7.13