LIST OF PPP PROJECTS - NHAI::Welcome to · PDF fileLIST OF PPP PROJECTS. ... Madhya Pradesh 7...
Transcript of LIST OF PPP PROJECTS - NHAI::Welcome to · PDF fileLIST OF PPP PROJECTS. ... Madhya Pradesh 7...
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
1 Durg Bypass Chattisgarh 6 18 BOT 70 NHDP Phase I Mar-1999 Shakti Kumar M. Sancheti Ltd. L.R. Kadiyali & Associates 2 LANED
2 Nandigama - Vijayawada Andhra Pradesh 9 35 BOT 138.65 NHDP Phase I Aug-2001 CIDBI Malaysia LBGI 4 LANED
3 Tambaram - Tindivanam Tamil Nadu 45 93 Annuity 375 NHDP Phase I May-2002 Tambaram-Tindivanam
Express way Pvt. Ltd.
(Consortium of GMR
Consortium & UE Malaysia)
MSV International Inc 4 LANED
4 Delhi - Gurgaon Section (Access
Controlled 8/6 Lane)
Delhi[9.7]/Haryana
[18]
8 27.7 BOT 710 NHDP Phase I Apr-2002 Jaiprakash Industries Ltd. - DS
Constt. Ltd.
RITES Ltd. -Sheladia-LR Kadiyali
(JV)
8 LANED
5 Tindivanam - Ulundurpet (Pkg -VI-A) Tamil Nadu 45 72.9 BOT 480 NHDP Phase II Feb-2006 GMR Infras. Ltd. - GMR Energy
Ltd.(GMR Ulundrupet Expr.
Pvt. Ltd.)
ICT Pvt Ltd 4 LANED
6 Ulundurpet - Padalur (Pkg- VI-B) Tamil Nadu 45 93.89 BOT 460 NHDP Phase II Feb-2006 IJM - Sapoorji Pallonji (JV)
(Trichy tollway Pvt. Ltd.)
4 LANED
7 Padalur - Trichy (Pkg - VI-C) Tamil Nadu 45 38.427 BOT 320 NHDP Phase II Feb-2006 Navayuga - Indu - Abhisek
Consortium (Indu Navayuga
Infras. Pvt. Ltd.)
4 LANED
8 Panagarh - Palsit West Bengal 2 64.457 Annuity 350 NHDP Phase I Jun-2002 Gamuda Malaysia - WCT
Malaysia
Halcrow Ltd. 4 LANED
9 Palsit - Dankuni West Bengal 2 65 Annuity 432.4 NHDP Phase I Oct-2002 Consortium of Gomuda
(Malaysia) & WCT Engineering
(Malaysia)
Doreh Consultant 4 LANED
10 Vivekananda Bridge and Approach West Bengal 2 6 BOT 641 NHDP Phase I Sep-2002 SVBTG Consortium of Pacific
Alliance Inc -PBIDC - STRADEC
Inc- CES & L & T
Sclaich Bergermann and Partner 4 LANED
11 Elevated Highway from Silk board
junction to electronic city junction
Karnataka 7 9.98 BOT 450 NHDP Phase III Dec-2005 SOMA - NCC - MAYTAS
Consortium
Renardet S.A - CEG Ltd. 4 LANED
12 Ankapalli - Tuni Andhra Pradesh 5 58.947 Annuity 283.2 NHDP Phase I May-2002 GMR-Tuni-Ankapalli Express
Ltd.
DORSCH Consultants 4 LANED
13 Tuni - Dharmavaram (AP-16) Andhra Pradesh 5 47 Annuity 231.9 NHDP Phase I May-2002 Andhra Expressway Limited Zaidun Leeng - Artefact 4 LANED
14 Dharmavaram - Rajahmundry (AP-15) Andhra Pradesh 5 53 Annuity 206 NHDP Phase I May-2002 Rajahmundry Expressway Ltd.-
Gammon (JV)
Zaidun Leeng - Artefact 4 LANED
15 Nellore Bypass Andhra Pradesh 5 17.166 Annuity 143.2 NHDP Phase I Oct-2002 Consortium of Soma
Enterprises & Navayuga Engg
Co. Ltd.
Scott Wilson Kirkpatrick India
Pvt. Ltd.
4 LANED
16 Nellore - Tada (AP-7) Andhra Pradesh 5 110.517 BOT 621.35 NHDP Phase I Aug-2001 CIDBI Malaysia Louise Berger Group Inc. 4 LANED
17 Satara - Kagal Maharashtra 4 133 BOT 600 NHDP Phase I Feb-2002 MSRDC Ltd. Mumbai ICT Pvt. Ltd. 4 LANED
18 Maharastra Border-Belgaum Karnataka 4 77 Annuity 332 NHDP Phase I Jun-2002 North Karnataka Expressway
Pvt. Ltd. (Consortium of IL & FS
- Punj Lloyd - CTNL)
Sir Owen William - Frischmann-
Prabhu
4 LANED
LIST OF PPP PROJECTS
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
19 Tumkur - Neelmangala Karnataka 4 32.5 BOT 155 NHDP Phase I Jun-2002 Jas Toll Road Co. Ltd.
(Consortium of Jayaswals -
Ashoka Buildcon-SERI Intl.)
Zaidun Leeng - Artefact Projects 4 LANED
20 Mahapura (near Jaipur) - Kishangarh (6
Lane)
Rajasthan 8 90.38 BOT 644 NHDP Phase I Apr-2003 Consortium of GVK
International-BSCPL
BCEOM Freinch Engineering
Consultant
4 LANED
21 ROB at Kishangarh Rajasthan 8 1 BOT 18 NHDP Phase I Mar-1998 MSK Projects (I) Ltd. 4 LANED
22 Kosi Bridge including approaches and
Guide Bond & Afflux Bond (BR-5)
Bihar 57 10.63 Annuity 418.04 NHDP Phase II Apr-2006 Gammon india Ltd. - GIPL
Consortium
Wilbur smith associates
Inc.(USA) - WSA Pvt. Ltd. (Indian)
4 LANED
23 Lakhnadon to MP/MH Border (NS-
1/BOT/MP-2)
Madhya Pradesh 7 40.11 Annuity 263.17 NHDP Phase II Apr-2006 Navabharat - Ferro Alloys
Ltd.(Malaxmi Higyways pvt.
Ltd.)
Arvee Associates Architects
Engineers and consultant pvt.
ltd.
4 Laned
24 Jhansi to Lalitpur (NS-1/BOT/UP-2) Uttar Pradesh 25, 26 49.79 Annuity 355.06 NHDP Phase II Apr-2006 Gayatri - IDFC Consortium ICT Pvt Ltd 4 Laned
25 Farukhanagar to Kottakata (NS-2/AP-3) Telangana 7 46.16 BOT 255 NHDP Phase II Sep-2005 GMR Energy Ltd. & GMR
Infrastruture Ltd. Consortium
(GMR Jadcherla Expressways
Pvt. Ltd.)
BCEOM - BCEOM India Ltd. 4 LANED
26 Farukhanagar to Kotakatta (NS-2/AP-4) Telangana 7 55.74 BOT 302 NHDP Phase II Sep-2005 Larsen & Toubro Ltd. (L & T
Western Andhra Tollways Pvt.
Ltd.)
ICT Pvt Ltd - Feedback 4 LANED
27 Jammu - Udhampur Jammu Kashmir 1A 65 Annuity 1813.76 NHDP Phase II Apr-2010 Shaboorji & Palonji Co. Ltd. SMEC International Pvt. Ltd. In
Assoc. with SMEC Pvt. Ltd. And
RODIC Cons.
Under
Implementation
28 Srinagar to Banihal Jammu Kashmir 1A 67.76 Annuity 1100.7 NHDP Phase II Sep-2010 Ramkey Infra and JPTEG NOF- SAICPL Under
Implementation
29 Quazigund-Banihal Jammu Kashmir 1A 15.25 Annuity 1987 NHDP Phase II Apr-2010 Navyuga Engineering Co. Ltd. SMEC International Pvt. Ltd. In
Assoc. with SMEC Pvt. Ltd. And
RODIC Cons.
Under
Implementation
30 Gorakhpur Bypass Uttar Pradesh 28 32.6 Annuity 600.24 NHDP Phase II Apr-2006 Gammon india Ltd. - GIPL -
ATSL Consortium
UPHAM international
Corporation - SA infrastructure
Consultant Pvt. Ltd
4 LANED
31 Chenani-Nashri Jammu Kashmir 1A 12 Annuity 2159 NHDP Phase II May-2010 IL & FS Transportation
Networks Ltd
Euroestudios S.L. in association
with Segmental cons. And
support ser. (P)
Under
Implementation
32 Islam Nagar to Kadtal (NS-2/BOT/AP-7) Telangana 7 53.01 Annuity 546.83 NHDP Phase II Mar-2007 Patel - KNR (JV) ICT Pvt Ltd 4 LANED
33 Armur to Kadloor Yellareddy (NS-2/AP-
1) (Approved Length
60.25)
Telangana 7 59 BOT 390.56 NHDP Phase II May-2009 Navayuga KPCL Consortium Wilbur Smith Associates 4 LANED
34 Kadloor Yellareddy to Gundla
Pochampalli (NS-2/BOT/AP-2)
Telangana 7 85.74 Annuity 490 NHDP Phase II Dec-2005 GMR Infrastructure ltd - GMR
Energy Ltd. Consortium
SPAN Consultants Pvt. Ltd. 4 LANED
35 Hyderabad Bangalore section (NS-
2/BOT/AP-5)
Telangana 7 74.65 Annuity 592 NHDP Phase II Feb-2006 IL & FS CTNL Consortium
(Andhra Pradesh Expressway
Ltd.)
Aarvee Associates 4 LANED
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
36 Panipat Elevated Highway (Six lane) Haryana 1 10 BOT 270 NHDP Phase II Jun-2005 Larsen & Toubro Ltd. CES India Ltd. 4 LANED
37 Four lanning of Walayar -
Vadakkancherry section
Kerala 47 53.49 BOT 682 NHDP Phase II Aug-2012 KNR Constructions Ltd. ICT Pvt Ltd 4 Laned
38 Thrissur to Angamali (KL-I) Kerala 47 40 BOT 312.5 NHDP Phase II Sep-2005 KMC Construction Ltd. - SREI
(JV) [Guruvayoor
Infrastructure Pvt. Ltd.]
ICT Pvt Ltd- Feedback 4 LANED
39 AP/Karnatka border- Nandi Hill crossing
& Devenhalli to Meenu Kunte Village
Karnataka 7 61.38 Annuity 402.8 NHDP Phase II Apr-2006 Patel - KNR Infrasturture Pvt.
Ltd. (JV)
Aarvee Associates 4 LANED
40 Four laning from MP/Maharashtra
border to Nagpur I/C Kamptee Kanoon
and Nagpur bypass
Maharashtra 7 95 BOT 1170.52 NHDP Phase II Aug-2009 Oriental Structural Engineers
Ltd.
CEG Ltd. Under
Implementation
41 Gwalior - Jhansi Madhya
Pradesh[68.5]/Utta
r Pradesh[11.5]
75 80 Annuity 604 NHDP Phase II May-2006 DSC - Apollo consortium Grantmij Carlbro - EMA (JV) Under
Implementation
42 Gwalior Bypass (NS-1/BOT/MP-1) Madhya Pradesh 75, 3 42 Annuity 300.93 NHDP Phase II May-2006 Ramky - Era - Shriram
Consortium
EMA Uniborn India Pvt. Ltd 4 LANED
43 Lakhnadon to MP/MH Border (NS-
1/BOT/MP-3)
Madhya Pradesh 7 27.73 Annuity 407.6 NHDP Phase II Jan-2007 Sadbhav - SREI (JV) Zaidun Leeng - Artefact (JV) 4 laned
44 MH/AP border to Islam Nagar (NS-
2/BOT/AP-6)
Telangana 7 54.6 Annuity 360.42 NHDP Phase II Dec-2006 SOMA - Avinash Consortium Scott Wilson India Pvt Ltd. 4 LANED
45 Kadal to Armur (NS-2/BOT/AP-8) Telangana 7 31 Annuity 271.73 NHDP Phase II Dec-2006 Hindustan Construction
Company Ltd.
Arvee Associates Architects Eng.
& Con. Pvt Ltd.
4 LANED
46 Palanpur to Swaroopganj (Rajasthan -42
km & Gujarat-34 km )
Rajasthan[42]/Guj
arat[34]
14 76 Annuity 498 NHDP Phase II Dec-2005 Larsen & Toubro Ltd., ECC
Division
Aarvee Associates 4 LANED
47 Krishnagiri to Thopurghat (NS-2/TN1) Tamil Nadu 7 62.5 BOT 372.7 NHDP Phase II Sep-2005 Larsen & Toubro Ltd. (M/S L &
T Krishnagiri Thopurghat Toll
Road Pvt. Ltd.)
Zaidun - Artefact (JV) 4 LANED
48 Salem to Karur (NS-2/TN-2) Tamil Nadu 7 41.55 BOT 253.5 NHDP Phase II Sep-2005 MVR - MRK - JTEC (JV) [MVR
infrastructure & Tollway Pvt
Ltd.]
Span Consultant 4 LANED
49 Salem to Karur (NS-2/TN-3) Tamil Nadu 7 33.48 BOT 205.6 NHDP Phase II Sep-2005 Reliance Energy Ltd. [NK Toll
Road Ltd.]
ICT Pvt Ltd- Feedback 4 LANED
50 Karur to Madurai (TN-4) Tamil Nadu 7 68.13 BOT 327.2 NHDP Phase II Sep-2005 Madhucon Projects Ltd. - SREI
[TN(DK) Expressways Ltd.]
BCEOM (French) - BCEOM
(Indian)
4 LANED
51 Karur to Madurai (TN-5) Tamil Nadu 7 53.03 BOT 283.5 NHDP Phase II Sep-2005 Reliance Energy Ltd. [DS Toll
Road Ltd.]
BCEOM (French) - BCEOM
(Indian)
4 LANED
52 Salem to Kerala Border Section (TN-6) Tamil Nadu 47 53.54 BOT 469.8 NHDP Phase II Sep-2005 IVRCL Infrastructure Projects
Ltd. ( Salem Tollways Ltd.)
Stanley - RITES Ltd. (JV) 4 LANED
53 Salem to Kerala Border Section (TN-7) Tamil Nadu 47 48.51 BOT 379.8 NHDP Phase II Sep-2005 IVRCL Infrastructure Projects
Ltd. (Kumar Palayam Tollway
Ltd.)
Zaidun - Artefact (JV) 4 LANED
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
54 Chengapalli to Coimbatore Bypass and
End of Coimbatore Bypass to TN/Kerala
Border
Tamil Nadu 47 54.83 BOT 852 NHDP Phase II Jan-2010 IVRCL Infrastructure & Projects
Ltd
ICT in association with Theme Under
Implementation
55 Bara to Orai Uttar Pradesh 2, 25 62.8 Annuity 465 NHDP Phase II Dec-2005 NCC - KMC Consortium Wilbur Smith Associates Inc. USA
- Wilber Smith Associates Pvt.
Ltd. India
4 LANED
56 Jhansi to Lalitpur (NS-1/BOT/UP-3) Uttar Pradesh 26 49.3 Annuity 276.09 NHDP Phase II Apr-2006 Gayatri - IDFC Consortium Zaidun Leeng - Artefact (JV) 4 LANED
57 Upgradation of Hyderabad-Bangalore
Section(Upgradation on existing Six
Lane)
Karnataka 7 22.12 BOT 680 NHDP Phase VII Feb-2010 Navayuga Engg Co.Ltd LBG 6-Laned
58 New 4-Lane Elevated Road from
Chennai Port - Maduravoyal
Tamil Nadu 4 19 BOT 1655 NHDP Phase VII Jan-2009 Chennai Elevated Tollway Ltd AARVEE Associates Ltd Under
Implementation
59 Four laning of Kaithal - Rajasthan
border
Haryana 65 166.25 BOT 1393 NHDP PHASE IV IRB Infrastructure Developers
Ltd
CEG Pvt Ltd Under
Implementation
60 4-Laning of Goa/Karnataka Border-
Kundapur Section
Karnataka 17 187.24 BOT 1655.01 NHDP Phase IV Jul-2012 IRB Infrastructure Developers
Ltd.
AECOM Asian CO Ltd - M/s
Roadiac Consulatants Pvt Ltd
Under
Implementation
61 MH/ KNT Border Sangareddy Karnataka 9 145 BOT 1266.6 NHDP Phase III Nov-2011 L&T Infrasructure
Developement Projects Ltd
CDM Smith JV with Willbur
Smith
Under
Implementation
62 4-Laning of Hoskote-Dobbaspet Karnataka 207 80.02 BOT 720.69 NHDP Phase IV Mar-2012 Transstroy-OJSC Consortium M/s Aarvee Associates Under
Implementation
63 4-Laning of Khed - Sinnar Section Maharashtra 50 137.946 BOT 1348.2 NHDP Phase IV Mar-2013 IL&FS Transportation
Networks Ltd.
SA Infrastructure Consultants
Pvt Ltd - Dhruv Construction Pvt
Ltd
Under
Implementation
64 4-Laning of Solapur - Yedishi section of
NH-211
Maharashtra 211 100 BOT 972.5 NHDP Phase IV Dec-2013 IRB Infra SA Infrastructure Consultants
Pvt Ltd - Dhruv Construction Pvt
Ltd
Under
Implementation
65 Four Laning of Aurangabad - Yedishi Maharashtra 211 190.2 BOT 1871.34 NHDP Phase IV Apr-2014 IRB Infrastructure Developers
Ltd
Under
Implementation
66 Four laning of Gwalior-Shivpuri Madhya Pradesh 3 125.03 BOT 1055 NHDP Phase IV Sep-2011 Essel Infraprojects Ltd. M/s CDM Smith Indian Pvt Ltd Under
Implementation
67 Four laning of Orissa/Chattisgarh
Border - Aurang section
Chattisgarh 6 150.4 BOT 1232 NHDP Phase IV Aug-2011 BSCPL Infrastructure Limited Aarvee Associates -Architects
Engeering & Consulatnts Pvt Ltd
Under
Implementation
68 Rajkot Bypass & Gondal Jetpur (Package-
VII)
Gujarat 8B 36 BOT 388.09 NHDP Phase II Mar-2005 West Gujrat Expressway Ltd. SAI Consulting Engineers Pvt.
Ltd.
4 LANED
69 4 laning of Biaora - Dewas Madhya Pradesh 3 141.26 BOT 1583.79 NHDP Phase IV Jun-2015 M/s Oriental Structural
Engineers Pvt Ltd
Under
Implementation
70 Patna- Muzzaffarpur Bihar 19 & 77 63 Annuity 671.3 NHDP Phase III Nov-2009 Gammon Infrastructure Ltd ICT Under
Implementation
71 4 Laning of Brahampore-Faraka West Bengal 34 103 BOT 998.79 NHDP Phase III Feb-2010 Hindustan Construction
Company Ltd.
URS Scott Wilson Indian Pvt. Ltd.
In Associate with Rodic
Consultant P Ltd.
Under
Implementation
72 4 Laning of Faraka-Raiganj West Bengal 34 103 BOT 1078.84 NHDP Phase III Feb-2010 Hindustan Construction
Company Ltd.
URS Scott Wilson Indian Pvt. Ltd.
In Associate with Rodic
Consultant P Ltd.
Under
Implementation
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
73 4 Laning of Raiganj-Dalkola West Bengal 34 50 BOT 580.43 NHDP Phase III Feb-2010 Hindustan Construction
Company Ltd.
URS Scott Wilson Indian Pvt. Ltd.
In Associate with Rodic
Consultant P Ltd.
Under
Implementation
74 4-Laning of Rohtak-Jind (Approved
Length 45 Km)
Haryana 71 48.6 BOT 283.25 NHDP Phase III Dec-2011 Vijai Infrastructure Ltd. Tech Mech India Pvt Ltd Under
Implementation
75 4-Laning of Solapur - Maharashtra/
Karnatka Section
Maharashtra 9 100.06 BOT 923.04 NHDP Phase III Dec-2011 Coastal-SREI Consortium Artefact Projects Ltd. Under
Implementation
76 Four lanning of Ludhiyana- Talwandi
section
Punjab 95 78 BOT 479 NHDP Phase III Dec-2010 Essel Infra Projects Ltd.- Pan
Indian Networks Ltd.
Louis Berger Group, Inc in Asso.
With LBC Pvt. Ltd.
Under
Implementation
77 Four laning of Hospet - Chitradurga Karnataka 13 120 BOT 1388 NHDP PHASE III Mar-2015 TRIL Roads Pvt Ltd Under
Implementation
78 4 Laning of Amravati - Chikhli (PKG-I) Maharashtra 6 194 BOT 2288.18 NHDP Phase IV Jul-2015 M/s IL& FS Transporatation
Networks Ltd
Under
Implementation
79 4 Laning of Fagne - Mah-Guj Border (
PKG-3)
Maharashtra 6 140.79 BOT 1885.74 NHDP Phase IV Jul-2015 M/s IL& FS Transporatation
Networks Ltd
Under
Implementation
80 4 Laning of Guna to Biaora Madhya Pradesh 3 93.5 BOT 1012.9 NHDP Phase IV Jun-2015 M/s Dilip Buildcon Ltd Under
Implementation
81 Four Laning of Shivpuri - Guna Package -
I
Madhya Pradesh 3 97.7 BOT 830.36 NHDP Phase IV Mar-2015 IRCON International Ltd Under
Implementation
82 8 Laning of Mukarba Chowk to Panipat Haryana 1 69.84 BOT 2128.72 Misc. Projects Jul-2015 M/s Essel Infraprojects Ltd Under
Implementation
83 Four Laning of Solapur - Bijapur Maharashtra 13 109.08 BOT 1377.54 NHDP Phase III May-2015 Uniquest Infra Ventures Pvt
Ltd
Under
Implementation
84 Vadodara to Bharuch Package BOT-1
(Six lane)
Gujarat 8 83.3 BOT 660 NHDP Phase V Jul-2006 Larsen & Toubro Badodara
Bharuch Tollway Limited
Zaidun-Leeng SND BHD -
Artefact Projects (JV)
6 LANED
85 Vijayawada-Gundugolanu Section Andhra Pradesh 5 103.59 BOT 1684 NHDP Phase V Feb-2012 Gammon Infrastructure
Projects Ltd.
Louis Berger Group INC - Louis
Berger Consuliting Pvt Ltd
Under
Implementation
86 Six Laning of Nellore-Chilkaluripet Andhra Pradesh 5 183.52 BOT 1535 NHDP Phase V May-2010 KMC-BSCPL Consortium ICT Pvt. Ltd.-SNC Lavalin Pvt. Ltd. Under
Implementation
87 Varanasi-Aurangabad Bihar[135]/Uttar
Pradesh[57.4]
2 192.4 BOT 2848 NHDP Phase V Apr-2010 Isolux-Soma Consortium ICT- Rodic (JV) Under
Implementation
88 Ahmedabad to Vadodara Section Gujarat 8 102.3 BOT 2125.24 NHDP Phase V Apr-2011 IRB Infrastructure Ltd. Aarvee Associates - Architects
Engineers & Consulatants Pvt Ltd
Under
Implementation
89 Samaikhiali-Gandhidham Gujarat 8A 56.16 BOT 805.39 NHDP Phase V Jan-2010 Larsen & Toubro Ltd. Louis Berger Consulting Pvt Ltd Under
Implementation
90 Bharuch to Surat Package BOT- II (Six
lane) 48.32(Six lane completed ) 16.68
(Four lane completed)
Gujarat 8 65 BOT 492 NHDP Phase V Jul-2006 IDAA Infrastructure Pvt. Ltd. Stup Consultants Pvt. Ltd. 6 LANED
91 Six-laning of Barwa Adda-Panagarh Jharkhand[43]/We
st Bengal[79.88]
2 122.88 BOT 1665 NHDP Phase V Apr-2013 IL&FS Transportation
Networks Ltd.
SA Infrastructure Consultants
Pvt Ltd
Under
Implementation
92 Chitradurga -Tumkur Bypass(Approved
Length 145 Km)
Karnataka 4 114 BOT 839 NHDP Phase V May-2010 IRB Infrastructure Developer
Ltd
ICT Pvt Ltd 6 Laned
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
93 Chennai - Tada (Six lane) Tamil Nadu 5 43.4 BOT 353.37 NHDP Phase V Feb-2008 Larsen & Toubro Ltd. SNC LAVALIN International in
association with AARVEE
Association(JV)
Under
Implementation
94 Belgaum-Dharwad(Approved Length
111 Km)
Karnataka 4 79.36 BOT 480 NHDP Phase V May-2010 Ashoka Buildcon Grontmij Carlbro-Unihorn India
Ltd.
6 Laned
95 Indore-Dewas(Approved Length 55 Km) Madhya Pradesh 3 45.05 BOT 325 NHDP Phase V Mar-2010 DLF-Gayatri Lea Associates South Asia Pvt.
Ltd.
Under
Implementation
96 Pune – Satara(Approved Length 145) Maharashtra 4 140.35 BOT 1724.55 NHDP Phase V Jan-2010 Reliance Infrastructure Ltd -
JTEG Consortium
Aarvee Associates Under
Implementation
97 Gurgaon - Kotputli - Jaipur (Six lane) Haryana[64.3]/Raj
asthan[161.3]
8 225.6 BOT 1673.7 NHDP Phase V Feb-2008 Emirates Trading Agency LLC -
KMC Construction Ltd.
Under
Implementation
98 Six Laninig of Kishangarh – Udaipur-
Ahmedabad
Rajasthan[434.5]/
Gujrat[121]
79A, 79
,76 & 8
555.5 BOT 5387.3 NHDP Phase V Sep-2011 GMR Infrastructure Ltd. Euro Studio in Association with
.Engg.
Under
Implementation
99 Walajapet-Poonamalee Tamil Nadu 46 93 BOT 1287.95 NHDP Phase V May-2012 ESSEL Infra Projects Ltd. Artefact Projects Ltd Under
Implementation
100 Six Laning of Krishnagiri-walajhapet
section
Tamil Nadu 46 148.3 BOT 1250 NHDP Phase V Mar-2010 Larsen & Toubro Ltd. Rangton International Ltd.-
Theme Engg. Services Pvt. Ltd.
Under
Implementation
101 Surat - Dahisar (Six lane) Gujarat[118.2]/Ma
harashtra[120.77]
8 239 BOT 1693.75 NHDP Phase V Feb-2008 IRB Infrastructure Developers
Ltd.- Deutsche Bank AG
ICT Pvt Ltd Under
Implementation
102 Etawah -Chakeri (Kanpur) Uttar Pradesh 2 160.2 BOT 1573 NHDP Phase V Nov-2011 Oriental Structural Engineers
Ltd.
STUP Consultants Ltd Under
Implementation
103 Chilkaluripet - Vijayawada (Six lane) Andhra Pradesh 5 67.7 BOT 572.3 NHDP Phase V Feb-2008 IJM Corporation Berhad - IDFC
Ltd.
LOUIS BERGER GROUP INC. -
LOUIS BERGER CONSULTING
PVT LTD.
6 Laned
104 Delhi - Agra(Approved Length 180.3
Km)
Haryana[74]/Uttar
Pradesh[105.5]
2 179.5 BOT 1928.22 NHDP Phase V May-2010 Reliance Infrastructure Ltd URS Scott Wilson Pvt. Ltd. In Jv
with Rodic Consultant Pvt. Ltd.
Under
Implementation
105 Six Laning of Chandikhol-Jagatpur-
Bhubaneswar(Approved Length 61 Km)
Odisha 5 67 BOT 1047 NHDP Phase V Apr-2010 SREI-Simplex-Galfar
Consortium(Shree Jagannath
Expressway pvt.ltd.)
Nicholas-SA Infrastructure
Consultant Pvt.Ltd. (JV)
Under
Implementation
106 Panipat - Jalandhar (Six lane) Haryana[116]/Punj
ab[175.1]
1 291 BOT 2288 NHDP Phase V Feb-2008 Isolux Corsan Concesionnes Sa -
Corsan Corviam Constructions
SA - Soma Enterprise Ltd
LOUIS BERGER GROUP Under
Implementation
107 Badarpur Elevated Highways Delhi[2.7]/Haryana
[1.7]
2 4.4 BOT 340 NHDP Phase V Jun-2008 BFTL LBG Inc. in Association with LBC
Pvt Ltd.
6 LANED
108 6 laning of Agra - Etawah bypass Uttar Pradesh 2 124.5 BOT 1657.2 NHDP Phase V Jul-2015 M/s IRB Infrastructure
Developers Ltd
Under
Implementation
109 6-Laning of Dhankuni-Khargpur Section West Bengal 6 111.4 BOT 1396.18 NHDP Phase V Feb-2011 Ashoka Buildcon Ltd. Aarvee Associates Architects
Enginner & Consultant Pvt. Ltd.
Under
Implementation
110 4 Laning of Nagpur Betul Madhya
Pradesh[120]/Mah
arashtra[56.3]
69 176.3 Annuity 2498.76 NHDP Phase IV May-2010 Oriental Structural Engineers
Pvt Ltd- Continental Engineers
Ltd
Grontmij (JV) with Frischmann
Prabhu (India) Pvt. Ltd.
Under
Implementation
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
111 Muzaffarnagar - Haridwar (Approved
Length 77 )
Uttar
Pradesh[21]/Uttar
anchal[59]
58, 72 80 BOT 754 NHDP Phase III Dec-2009 ERA-SIBMOST Nicholas O'Dwyer and SA Infra Under
Implementation
112 Haridwar - Dehradun (Approved Length
69)
Uttaranchal 72 39 Annuity 478 NHDP Phase III Dec-2009 ERA - SIBMOST(JV) Intercontinental Consultants &
Technocrats Pvt. Ltd.(ICT)
Under
Implementation
113 Meerut-Muzaffarnagar Uttar Pradesh 58 79 BOT 359 NHDP Phase III Mar-2005 Nagarjuna Construction Co.
Ltd. - MAYTAS Consortium
BCEOM- NICE (JV) 4 LANED
114 Pune - Khed Maharashtra 50 30 BOT 127.6 NHDP Phase III Aug-2003 IRB - Madhujaya Consortium To be Appointed 4 LANED
115 Ghaziabad-Aligarh (Approved Length
106 )
Uttar Pradesh 91 126 BOT 1141 NHDP Phase III Dec-2009 SREI - PNC - GALFAR
Consortium
SNC-Lavalin Infrastructure Pvt.
Ltd.
Under
Implementation
116 Hyderabad-Yadgiri (Approved Length
30)
Telangana 202 35.65 BOT 388 NHDP Phase III Dec-2009 Sadbhav Engineering Ltd.
(Hyderabad-Yadgiri Tollways
Pvt. Ltd.)
Aarevee Associates Architects
Engg. & Consultants Pvt. Ltd.
4 LANED
117 Bhubneshwar-Puri(Approved Length 59
Km)
Odisha 203 67 BOT 500.29 NHDP Phase III May-2010 KSS-Valecha (Bhubneshwar
Expressway Pvt. Ltd.)
CEG Ltd. Under
Implementation
118 Tirupati -Tiruthani - Chennai(Approved
Length 125.5 Km)
Tamil
Nadu[61.47]/Andh
ra Pradesh[63.23]
205 124.7 BOT 571 NHDP Phase III Apr-2010 Transstroy -OJSC
Consortium(JV)
Wilbur Smit Associates in Jv with
Wilbur Smit Associates Pvt. Ltd.
Under
Implementation
119 Panikholi-Rimoli (Approved Length 106
Km)
Odisha 215 163 BOT 1410 NHDP Phase III Aug-2011 Gayatri Projects Ltd. Sai Consulting Engg. Pvt. Ltd. Under
Implementation
120 End of Durg Bypass - Chattisgarh /
Maharashtra Border
Chattisgarh 6 82.685 BOT 464 NHDP Phase III Dec-2006 Ashoka - IDFC Consortium Consulting Engineers Group Ltd 4 LANED
121 Amritsar - Wagha border Punjab 1 35.93 Annuity 205.88 NHDP Phase III Aug-2007 Rohan Builders Pvt. Ltd. -
Rajdeep Buildcon Pvt. Ltd. -
IDFC Ltd. Consortium
4 LANED
122 Pondicherry - Tindivanam Tamil Nadu 66 38.61 BOT 285 NHDP Phase III Mar-2007 Maytas - NCC Consortium Louis Berger 4 LANED
123 Trichy - Karur Tamil Nadu 67 79.7 BOT 516 NHDP Phase III Mar-2007 Reliance Energy Limited WSA Wilbar Smith Associates Under
Implementation
124 Kondhali - Telegaon Maharashtra 6 50 BOT 212 NHDP Phase III Aug-2005 Oriental Structural Engineers
Pvt. Ltd.- Delhi Brass
Consortium
Consulting Engineers Group Ltd -
Roughton International (JV)
4 LANED
125 Ambala - Zirakpur Haryana[6]/Punjab
[30]
21, 22 36 BOT 298 NHDP Phase III Jun-2005 GMR Energy Ltd. & GMR
Infrastruture Ltd. Consortium
Shela dia Associates INC 4 LANED
126 Panipat - Rohtak(Approved Length 73
Km)
Haryana 71A 80.858 BOT 807 NHDP Phase III Jan-2010 Sadbhav Engineering Ltd 4 LANED
127 Rohtak - Bawal(Approved Length 97
Km)
Haryana 71 83.65 BOT 650 NHDP Phase III Feb-2010 JMC-SREI(JV) URS Scott Wilson Indian Pvt. Ltd Under
Implementation
128 Hazaribagh-Ranchi Jharkhand 33 73.7 Annuity 625.07 NHDP Phase III Aug-2009 ITNL-Punj Lloyd Ltd.(JV)
(Hazaribagh Ranchi Express
way ltd)
Unihorn India Pvt.Ltd 4 LANED
129 Ranchi - Rargaon - Jamshedpur Jharkhand 33 163.5 Annuity 1479 NHDP Phase III Mar-2011 Madhucon Projects Ltd. Aarvee Under
Implementation
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
130 4-Laning of Punjab/Haryana Border-Jind Haryana 71 68 BOT 438.75 NHDP Phase III Mar-2012 Unity Infraprojects Ltd. Under
Implementation
131 Barasat - Krishnanagar West Bengal 34 84 Annuity 867 NHDP Phase III Feb-2011 Madhucon Projects Ltd. LEA Associates South Asia Pvt.
Ltd.
Under
Implementation
132 Krishnanagar - Berhampore West Bengal 34 78 Annuity 702.16 NHDP Phase III Feb-2011 SEW Infra. YJ Eng. Company Limited in
Asso. with Feedback Infra.
Services. Pvt. Ltd.
Under
Implementation
133 Jalandhar - Amritsar Punjab 1 49 BOT 263 NHDP Phase III May-2005 IVRCL Infrastructure Projects
Ltd.
CES India Ltd. 4 LANED
134 Amritsar - Pathankot (Approved Length
101Km)
Punjab 15 102.42 BOT 705 NHDP Phase III Jul-2009 IRB-MRM Pvt Ltd. ICT in asso. With MC Consulting
Eng. & Singhania & Partners
4 Laned
135 Kurali - Kiratpur Punjab 21 42.9 BOT 309 NHDP Phase III Dec-2006 BSCPL - C & C Consortium ICT Pvt Ltd 4 LANED
136 2-Laning with PS khagaria - Purnea Bihar 31 140 Annuity 664 NHDP Phase III Feb-2011 Punj Lloyd Infrastructure Ltd. Bloom Companies LLC Under
Implementation
137 Patna - Bakhtiarpur Bihar 30 50.6 BOT 574 NHDP Phase III Dec-2010 BSC-C & C (JV) CEG Under
Implementation
138 2-Laning with PS Motihari-Raxaul
(Approved Length 67 Km)
Bihar 28A 68.79 BOT 375.09 NHDP Phase III Jan-2011 Tantia-Jiangsu (JV) Frischmann Prabhu (India) Pvt.
Ltd.
Under
Implementation
139 4 Laning of Chappra-Hajipur(Approved
Length 153 Km)
Bihar 19 65 Annuity 575 NHDP Phase III May-2010 Madhucon Projects Ltd Stanly Cunsultant Inc Under
Implementation
140 2 Laning of Muzaffarpur -
Sonbarsa(Approved Length 89 Km)
Bihar 77 86 Annuity 511.54 NHDP Phase III Jul-2010 BSCPL-C&C(JV) ICT Pvt Ltd. Under
Implementation
141 2 Laning of Mokama-Munger(Approved
Length 70 Km)
Bihar 80 69.27 Annuity 351.54 NHDP Phase III May-2010 BSCPL -C & C Consortium Nicholoso'-Dwyer-Upham
Infrastructure
Under
Implementation
142 4 Laning of Belgaum-Khanpur
Section(Km 0.00 to Km 30.00) and 2
Laning with paved sholuders of khanpur-
Knt/Goa border.(Km 30.00 to Km
84.120)
Karnataka 4A 81.89 BOT 359 NHDP Phase III Jul-2010 GVR Infra Projects-RMN
Infrastructure Ltd
Lea Associates South Asia Ltd. Under
Implementation
143 Guna Bypass Madhya Pradesh 3 14 BOT 46 NHDP Phase III Feb-2005 Guna Infrastructure Ltd. Aarvee Associates 4 LANED
144 Indore-Jhabua-Gujrat/MP (Approved
Length 168)
Madhya Pradesh 59 155.15 BOT 1175 NHDP Phase III Dec-2009 IVRCL Infrastructure Projects
Ltd.
EURO Studios Feedback Venture Under
Implementation
145 Indore-Khalghat Madhya Pradesh 3 80 BOT 472 NHDP Phase III Jul-2005 Oriental Structural Engineers
Pvt. Ltd.- Delhi Brass
Consortium
Sheladia Associates INC -
Feedback Turnkey Engineers Pvt.
Ltd.
4 LANED
146 Khalghat - MP/Maharashtra Border Madhya Pradesh 3 82.8 BOT 549 NHDP Phase III Oct-2007 Navyuga Engineering Co. Ltd. Grontmij/carl Bro in JV with
EMA Uniborn India Pvt Ltd
4 LANED
147 Zirakpur - Parwanoo Haryana[20]/Hima
nchal
Pradesh[6.69]/Pun
jab[2]
22 28.69 BOT 295 NHDP Phase III Feb-2007 Jaiprakash Associates-
(Himalyan Expressways Pvt.
Ltd.)
Intercontinental Consultants &
Technocrafts Pvt. Ltd.
4 LANED
148 Dhule - Pimpalgaon Maharashtra 3 118 BOT 556 NHDP Phase III Mar-2005 IRCON-SOMA Consortium Wilbur smith associates
Inc.(USA) - WSA Pvt. Ltd. (Indian)
4 LANED
149 Pimpalgaon - Nasik - Gonde Maharashtra 3 60 BOT 940 NHDP Phase III Jan-2009 Larsen & Toubro Ltd. - ABL
Consortium
Sheldia-Theme Under
Implementation
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
150 Gonde-Vadape (Thane) Maharashtra 3 100 BOT 579 NHDP Phase III Jun-2005 Gammon India Ltd. - Sadbhav -
Billimoria Consortium
Sheladia Associates INC- Artefact
Projects Ltd
4 LANED
151 MP/Maharashtra Border-Dhule Maharashtra 3 88.79 BOT 835 NHDP Phase III Jan-2009 Hindustan Construction
Company Ltd. -Laing-Sadbhav
Consortium
Wilbur Smith Inc. 4 LANED
152 Banglore-Hoskote-Mudbagal Section Karnataka 4 79.724 BOT 565 NHDP Phase III Feb-2007 Lanco Hoskote Highway Pvt.
Ltd.
Zaidun-Leeng SDN.BHD &
Artefact Projects(JV)
4 LANED
153 Banglore - Neelamangala (Six lane) Karnataka 4 19.5 BOT 445 NHDP Phase III Mar-2007 Navyuga Engineering Co. Ltd. Aarvee Associates in JV with
Bonifica
6 LANED
154 Bijapur - Hungund Section (Approved
Length 194 Km)
Karnataka 13 97.22 BOT 748 NHDP Phase III Feb-2010 SEL-MCL Consortium 4 LANED
155 4 Laning of Mulbagal - Karnataka / AP
border-Approved Length (11 Km)
Karnataka 4 22.18 BOT 141.11 NHDP Phase III Mar-2012 J.S.R. Construction Pvt Ltd Artefact Under
Implementation
156 Hungund-Hospet (Approved Length 194
Km)
Karnataka 13 97.89 BOT 946 NHDP Phase III Feb-2010 GMR-OSE Consortium SMEC 4 Laned
157 Sambalpur-Baragarh-Chattisgarh/Orrisa
Border
Odisha 6 88 BOT 909 NHDP Phase III May-2010 Ashoka Buildcon Ltd-(Ashoka
Sambalpur Baragarh
Expressway Pvt. Ltd.)
ICT 4 Laned
158 Nagpur-Wainganga Bridge (Approved
Length - 60 Km)
Maharashtra 6 45.43 BOT 484.19 NHDP Phase III May-2011 JMC Projects India Ltd. Artefact Projects Ltd. Under
Implementation
159 Talegaon-Amravat(Approved Length
58Km)
Maharashtra 6 67.8 BOT 567 NHDP Phase III Aug-2009 IRB-MRM Consortium Wilbur Smith Associates Pvt. Ltd. Under
Implementation
160 Nagpur - kondhali Maharashtra 6 40 BOT 168 NHDP Phase III Sep-2005 Atlanta - SREI Consortium (JV) Aarvee Associates Under
Implementation
161 Gujarat/Maharashtra Border-Surat -
Hazira Port Section
Gujarat 6 132.9 BOT 1509.1 NHDP Phase III Feb-2009 Isolux-Soma Consortium (JV) Sheladia Association Inc.-
Multimedia Consultant Pvt Ltd
Under
Implementation
162 Kishangarh-Ajmer-Beawar Rajasthan 8 93.56 BOT 795 NHDP Phase III Apr-2009 Isolux-Soma Consortium Louis Barger Group, Inc USA Under
Implementation
163 4 laning of Jetpur-Somnath section of
NH-8D (approved length 127.6)
Gujarat 8D 123.45 BOT 828 NHDP Phase III Sep-2010 IDFC-PLUS Expessway Berhad
Consortium
ICT Pvt Ltd Under
Implementation
164 Pune-Sholapur Pkg-I(Approved Length
Pkg I & II 170 Km)
Maharashtra 9 110.05 BOT 1110 NHDP Phase III Feb-2009 Navinya Buildcon-Atlantia
Spa(JV)
Renardet S.A. 4 Laned
165 Chattisgarh / Maharashtra Border -
Wainganga Bridge
Maharashtra 6 80 BOT 424 NHDP Phase III Dec-2006 Ashoka - IDFC Consortium Zaidun-Leeng SDN.BHD-Artefact
Projects Ltd(JV)
4 LANED
166 Pune-Sholapur Pkg-II(Approved Length
I & II 170 Km)
Maharashtra 9 105 BOT 835 NHDP Phase III Aug-2009 IL & FS Transportation
Network Ltd
ICT Pvt. Ltd. Under
Implementation
167 Hyderabad-Vijayawada Telangana 9 181.63 BOT 1740 NHDP Phase III May-2009 GMR-Punj LLOYD
Consortium(GMR-Hyderabad
Vijayawada Expressway Pvt.
Ltd.)
ICT Pvt. Limited 4 LANED
168 Delhi/Haryana Border to Rohtak Haryana 10 63.49 BOT 486 NHDP Phase III Jul-2007 KCT - ERA consortium ICT Pvt Ltd Under
Implementation
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
169 4-Laning of Rohtak - Hissar Section Haryana 10 98.81 BOT 959.25 NHDP Phase III Mar-2013 Sadbhav Engg. Limited EPTISA Under
Implementation
170 Reengus - Sikar Rajasthan 11 43.887 Annuity 333.51 NHDP Phase III Mar-2011 G.R.Infraprojects Ltd. URS Scottwilson India Pvt Ltd Under
Implementation
171 Agra - Bharatpur Uttar
Pradesh[24.75]/Raj
asthan[20.25]
11 45 BOT 195 NHDP Phase III Jul-2005 Oriental Structural Engineers
Pvt. Ltd.- Delhi Brass
Consortium
LBG Inc 4 LANED
172 Bharatpur-Mahua Rajasthan 11 57 BOT 250 NHDP Phase III Mar-2005 Madhucon Projects Ltd. - SREI Aarvee Associates 4 LANED
173 Mahua-Jaipur Rajasthan 11 108 BOT 483 NHDP Phase III Mar-2005 JMTPL(I) Corporation Project ICT Pvt Ltd 4 LANED
174 Jaipur-Reengus(Approved Length 52.65
Km )
Rajasthan 11 54 BOT 267.81 NHDP Phase III Oct-2009 RIL-AAA- JTEG Consortium M/S Grontmij Carl Bro
(Denmark) in JV with SAI
Consulting Engineers Pvt. Lt
Under
Implementation
175 Deoli - Kota Rajasthan 12 83 BOT 593 NHDP Phase III Apr-2010 GVK Development Projects Pvt
Ltd
Scott Wilson Ltd-Scott Wilson
India(JV)
Under
Implementation
176 Jaipur-Tonk - Deoli(Approved Length
148.77 Km )
Rajasthan 12 148.92 BOT 792.06 NHDP Phase III Oct-2009 IRB-MRM Consortium M/S Aarvee Associates
Architects, Engineers & Constt.
Pvt. Ltd
Under
Implementation
177 Beawar-Pali-Pindwara (Approved
Length - 246 Km)
Rajasthan 14 244.12 BOT 2388 NHDP Phase III May-2011 L&T Infrastructure
Development Projects Ltd.
Sheladia-Aarvee Under
Implementation
178 Panvel-Indapur Maharashtra 17 84 BOT 942.69 NHDP Phase III Oct-2010 Supreme Infrastructure India
Ltd.-Mahavir Road &
Infrastructure Pvt. Ltd.-China
State Construction Engg.
Hongkong Ltd.
Yongma Engg.Co.Ltd. In Asso.
With Feedback Venture Pvt. Ltd.
Under
Implementation
179 Kundapur-Surathkal & Mangalore-
KNT/Kerala Border
Karnataka 17 90 BOT 671 NHDP Phase III Nov-2009 Navayuga - KPCL Consortium Aarvee Associates Architect
Engineers and Consultants Pvt.
Ltd.
Under
Implementation
180 Kudapa-Mydukur-Kurnool Andhra Pradesh 18 188.752 BOT 1585 NHDP Phase III Feb-2009 KMC Construction Ltd. - IVRCL
Consortium
Aarevee Associates Architects Under
Implementation
181 Muradabad-Bareily (Approved Length
112)
Uttar Pradesh 24 121 BOT 1267 NHDP Phase III Dec-2009 IL & FS Transportation Ltd. LBG Under
Implementation
182 Sitapur - Lucknow Uttar Pradesh 24 75 BOT 322 NHDP Phase III Aug-2005 Apollo(UK) - JLI(UK) -
DSC(Indian) - LOR(UK)
Consortium
Wilbur smith associates
Inc.(USA) - WSA Pvt. Ltd. (Indian)
4 LANED
183 Bareily - Sitapur(Approved Length 134
Km)
Uttar Pradesh 24 151.2 BOT 1046 NHDP Phase III Apr-2010 ERA-SIBMOST Intercontinental Consultant Pvt.
Ltd.
Under
Implementation
184 Trichy - Dindigul Tamil Nadu 45 88.273 BOT 576 NHDP Phase III Mar-2007 Reliance Energy Limited Zaidung-Leeng SDN.BND-
Artefact Projects Ltd(JV)
4 LANED
185 Madurai-Arupukottai-Tuticorin Tamil Nadu 45B 128.16 BOT 629 NHDP Phase III Feb-2006 Madhucon Projects Ltd. - SREI -
Madhucon granites Ltd (JV)
Louis Berger 4 LANED
186 2 Laning of Dindigul-Perigulam-Theni-
Kumili
Tamil Nadu 220 134 Annuity 485 NHDP Phase III May-2010 Transstroy-OJSC Consortium
Ltd
ICT Private Limited Under
Implementation
187 Aurang - Raipur Chattisgarh 6 43.485 BOT 190 NHDP Phase III Mar-2005 Apollo(UK) - JLI(UK) -
DSC(Indian) - LOR(UK)
Consortium
Renardet S.A - Feedback Turnkey
Engineers
4 Laned
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
188 Rimoli - Roxy - Rajamunda(Approved
Length 163Km)
Odisha 215 96 BOT 586 NHDP Phase III Apr-2010 MBL-SREI Unihorn India Ltd Under
Implementation
189 Devihalli-Hassan(Approved Length 73
Km)
Karnataka 48 77.23 BOT 453 NHDP Phase III Apr-2010 Larsen & Toubro Ltd. Lea Associates South Asia Pvt .
Ltd.
4 Laned
190 Neelamangala Junction on NH 4 with
NH 48 to Devihalli
Karnataka 48 81 BOT 441 NHDP Phase III Apr-2007 Lanco Devihalli Highways Pvt.
Ltd.
Consulting Engineers Group Ltd. 4 LANED
191 4 Laning of Ahmedabad to Godhara
(Approved Length 210 Km)
Gujarat 59 117.6 BOT 1008.5 NHDP Phase III Jan-2010 ESSEL Infra & CR-18
Consortium
Egis International-Egis India
Consulting Engg. Pvt. Ltd.
Under
Implementation
192 4 Laning of Godhara to Gujarat /MP
Border(Approved Length 210 Km)
Gujarat 59 87.285 BOT 785.5 NHDP Phase III Jan-2010 BSPCL Ltd Intercontinental Consultants and
Technocrats Pvt. Ltd.
Under
Implementation
193 2-Laning of Krishnagiri-Tindivanam
(Approved Length 170 Km.)
Tamil Nadu 66 176.51 Annuity 624 NHDP Phase III May-2011 Transstroy (I) Ltd. -
Corporation Transstroy OJSC
Consortium
Theme Engineering Services Pvt
Ltd
Under
Implementation
194 Two Laning of Trichy - Karaikudi and
Trichy Bypass(Approved Length 100 Km)
Tamil Nadu 210 & 67 110.372 Annuity 374 NHDP Phase III May-2010 Transstroy Ltd-OJSC
Consortium
Euroestudios, S.L. Spain In
associated with Theme Engg.
Services Pvt.Ltd.
Under
Implementation
195 Tanjore - Trichy Tamil Nadu 67 56.49 BOT 280 NHDP Phase III Feb-2006 Madhucon Projects Ltd. Louis Berger 4 LANED
196 Salem-Ulundrupet (BOT-1/TN-06) Tamil Nadu 68 136.357 BOT 941 NHDP Phase III Mar-2007 Reliance Energy Limited Technital SPA 4 LANED
197 Kandla - Mundra Port(Approved Length
73 Km)
Gujarat 8A 71.4 BOT 953.88 NHDP Phase III Jan-2010 Reliance Infra Projects Ltd. Dorsch Gruppe Under
Implementation
198 Four Laning of Kiratpur-Ner Chowk
Section
Himanchal Pradesh 21 84.32 BOT 1916.79 NHDP Phase III Feb-2012 IL & FS Transportation
Networks Ltd.
Getinsa Ingenieria S.L.Spain in
Asso. with Segmental Cons. &
Supp. Pvt. Ltd
Under
Implementation
199 4 Laning of Obedullaganj-Betul Section Madhya Pradesh 69 125 BOT 912 NHDP Phase III Feb-2012 Transstroy (India) Ltd. M/s CEG Under
Implementation
200 Bikaner - Phalodi section to Four laning
from km.4.200 to km 55.25 and Two-
lane paved shoulder from 55.25 to
km.163.500
Rajasthan 15 160.3 BOT 822.9 NHDP Phase IV Aug-2014 IRCON International Limited CEG Pvt Ltd Under
Implementation
201 2-Lane with paved shoulder with
provision of Capacity Augmentation of
Rajasthan Border-Fatehpur-Salasar
Section
Rajasthan 65 154.141 BOT 530.07 NHDP Phase IV Nov-2012 Galfar Engineering and
Contracting SAOG
Getinsa Ingenieria S.L -
Segmental consulting and
Infrastructure Pvt Ltd
Under
Implementation
202 4-Laning of Rajsamand-Gangapur-
Bhilwara
Rajasthan 758 87.25 BOT 677.79 NHDP Phase IV Nov-2012 Sadbhav Engineering Limited Artfact Projects Ltd Under
Implementation
203 4 Laning of Gomti Chauraha - Udaipur Rajasthan 8 79.31 BOT 914.5 NHDP Phase IV Mar-2012 Sadbhav Engineering Limited Aarvee Associates Under
Implementation
204 2-Laning of Shilong-Bypass Meghalaya 40 & 44 48.76 Annuity 226 SARDP-NE May-2010 GR-Chetak(JV) Scott Wilson India PVT.Ltd. i/a
with Rodic Consultant Pvt. Ltd.
2 Laned
205 Jorbat-Barapani Meghalaya 40 61.8 Annuity 536 SARDP-NE May-2010 ILFS-Ramkey Unihorn Indian Pvt.Ltd. Under
Implementation
206 Six Laning of Hosur-Krishnagiri Tamil Nadu 7 59.87 BOT 535 NHDP Phase V May-2010 Reliance Infrastructure Ltd Rangton International Ltd.-
Theme Engg. Services Pvt. Ltd.
Under
Implementation
S.No. Project Name State Name NH No Length Funded By TPC
(Rs in Crs)
NHDP_Phase_Categ
ory
LOA Date Agency Supervision Consultant Present Status
207 2-Laning with PS Agra - Aligarh Uttar Pradesh 93 81.4 BOT 250.5 NHDP Phase IV Nov-2010 JMC Project URS Scott Wilson India Pvt. Ltd.-
Rodic Consultants Pvt. Ltd.
2 LANED
208 2-Laning with PS Kanpur - Kabrai Uttar Pradesh 86 123.9 BOT 373.47 NHDP Phase IV Nov-2010 PNC 2 Laned
209 2-Laning with PS Raibariely to Allahabad Uttar Pradesh 24B 119 BOT 291.36 NHDP Phase IV Dec-2010 Vijay Infrastructure Ltd-Vijay
Construction(JV)
MSV International Inc Under
Implementation
210 2-Laning with paved shoulder of
Muzaffarpur - Barauni
Bihar 28 107.56 BOT 356.4 NHDP Phase IV Oct-2011 KNR Frischmann Prabhu (India) Pvt.
Ltd.
Under
Implementation
211 Lucknow - Raebareli Uttar Pradesh 24B 70 Annuity 635.9 NHDP Phase IV Nov-2011 Essel Infraprojects Ltd. 4 Laned
212 2-Laning with paved shoulder of
Raebareli to Jaunpur
Uttar Pradesh 231 165.5 Annuity 569.38 NHDP Phase IV Jul-2012 PNC Infratech Ltd SA Infrastructure Consultants
Pvt Ltd
Under
Implementation
213 4-Laning of Kashipur-Sitarganj Section Uttarakhand[74.0]
/Uttar
Pradesh[3.2]
74 77.2 BOT 605.84 NHDP Phase IV Nov-2012 Galfar Engineering and
Contracting SAOG
Artefacts Projects Ltd Under
Implementation
214 Six lanning of Vadakkancherry -
Thrissure section
Kerala 47 30 BOT 617 NHDP Phase II Feb-2009 KMC Construction Ltd.- CR18G
Consortium
ICT Pvt Ltd Under
Implementation