  • List of item in the agenda for 33rd REC meeting of the NRO, Chandigarh to be held on 03.07.2020

    STATE: HARYANA

    Agenda item No.

    File No.

    Online proposal no.

    Name of the proposal

    Forest land

    proposed to be diverted

    1. 9-HRC37/2020-CHA

    FP/HR/ Trans/25376/2017

    Diversion of 46.375 ha of forest land in favour of of Executive Engineer, T.S Division, HVPNL Madanpur (Panchkula) for erection of 220 KV DC lines from 400 KC sub stn. Naggal (PGCIL) to 220 KV Sub stn sector 32 Panchkula and 220 KIV sub Stn. Pinjore under Wildlife Sanctuary Khol Hi Raitan, under Forest Division Morni Pinjore and District Panchkula

    46.375 ha

    2 9-HRC038/2020-CHA

    FP/HR/ ROAD/35434/2018

    Diversion of 31.33 Hec. of forest land in favour of Executive Engineer, National Highway Division, PWD B&R Br., Jind for 4 Laning /6 Laning including Widening & Strengthening of Karnal-Meerut Road NH-709A from RD 153.700 to 168.370 (0.0 to 14.670 km) in Distt. Karnal, Haryana

    31.33 ha

    3 9-HRC039/2020-CHA

    FP/HR/IRRIG/41538/2019

    Diversion of 6.4022 ha of forest land along WJC Main branch for providing concrete side lining with paver in reach RD 96000-126415 L/s including Reconstruction/remodeling of pacca structure in Tehisl Karnal, under Forest Division and District Karnal

    6.4022 ha

    4 9-HRC040/2020-CHA

    FP/HR/Canal/ 41159/2019

    Diversion of 22.36 ha of forest land in favour of Sub Divisional Officer, Construction Sub Division No. 9, Irrigation and water Resources Deptt. Jagadhary for the Remodeling of Augmentation Canal from RD 0.00 Km (Hamida head) to 75,250 km. (sub Reach 0 to 20 Km), under Forest Division and District Yamunanagar

    22.36 ha

    5. 9-HRC042/2020-CHA

    FP/HR/ IRRIG/41469/2019

    Diversion of 39.57 ha. of forest land in favour of Executive Engineer, Karnal Water Services Division, Karnal for Remodeling of Augmentation Canal from km 0.000 to 75.250 “In Reach 58.700 km to 75.250 km ” increase the capacity of canal under forest and District Karnal, Haryana

    39.57 ha

  • 6. 9-HRC212/2007 -CHA

    Proposal for constructing flyover over the diverted land of Diversion of 13.41 ha of forest land in favour of Project Director, PIU, Chandigarh for constructon of 4 laning Zirakpur-Parwanoo road from km. 42.00 to 57.400, NH 22 n State of Haryana/PH Border, under forest divionsl Morni-Pinjore and Distrct Panchkula Haryana.

    7. 9-HRC047/2020-CHA

    FP/HR/IRRIG/41552/2019

    Diversion of 69.58 hec. Of forest land for the project of Rehabilitation of Augmentation Canal from RD 20.000 Km to 58.700 Km under Forest Division & Distt. Karnal (Haryana)

    69.58

    8. 9-HRC048/2020-CHA

    FP/HR/IRRIG/40972/2019

    Parallel Lined Channel (plc) Project From Rd 0 (Dadupur Head) To 68220 (Hamida Head) 22.94

    Any other issues with the permission of the chair

  • Government of India

    Ministry of Environment, Forest & Climate Change Northern Regional Office, Chandigarh.

    FACT SHEET OF THE PROPOSAL

    1. a) File No.

    b) Online Proposal No. c) Date of online receipt

    9-HRC037/2020-CHA FP/HR/ Trans/25376/2017 16.06.2020

    2 Name of the proposal Div of 46.375 ha of forest land in favour of of Executive Engineer, T.S Division, HVPNL Madanpur (Panchkula) for erection of 220 KV DC lines from 400 KC sub stn. Naggal (PGCIL) to 220 KV Sub stn sector 32 Panchkula and 220 KV sub Stn. Pinjore under Wildlife Sanctuary Khol Hi Raitan, under Forest Division Morni Pinjore and District Panchkula.

    3 Name of the User Agency Executive Engineer, T.S Division, HVPNL Madanpur (Panchkula)

    4 Location Naggal (PGCIL) to Sector 32, Panchkula and 220 KV sub station

    i) Name of the Forest Division Morni Pinjore ii) District Panchkula iii)State Haryana

    5 Particulars of Forest i) Forest Area involved 46.375 ha ii) Legal status Strip protected Forest iii) Vegetation density 0.3

    iv) Map of project site Uploaded under column C (iii) online

    v) Layout plan of the project site Dimension wise Area calculation of the project

    is not given.

    vi) KML file of project site Uploaded under column C(ii) online. TA(DSS) during KML /DGPS analysis observed no issue with project site.

    vii) DGPS map of project site Uploaded under column C(iv) online

  • 6 Item wise break-up of the forest area

    involved and area calculation

    Dimension wise Area calculation of the project is not given.

    5 Total Number of trees to be felled 9,913 Trees and 2,840 plants

    i) Abstract of trees Uploaded under column 4 (ii) part II ii) Enumeration List Enumeration list for felling of 9913 is

    provided by state government

    8 Violation of Act DFO’s inspection report dated 16.01.2020 uploaded under column 15 of part II informing that UA has not violated FCA.

    9 Whether area is significant form wildlife point of view/comments of CWLW

    It is part of WL sanctuary for which NBWL clearance is obtained (p-23-25/c)

    10 Compensatory Afforestation xii. Plantation site (CA and Addl CA) i) Nandla PF, Berwala Beat, Panchkula Range

    ii) R-70, C-1, Nada beat, Panchkula Range iii) R-70, C-3 Chowld Beat, panchkula Range

    xiii. Area/No. of plants to be planted 92,750 plants (92.750 ha)

    xiv. Addl CA Plantation 5,680 plants (5.680 ha) xv. Site Map Uploaded under column 13(iv) in part II

    xvi. KML file of CA site Uploaded under column 13 (i) in part II

    xvii. DGPS map of CA site Uploaded under column 13 (iii) in part II

    xviii. Comprehensive Scheme Uploaded under column 13(iv) in part II

    xix. Site suitability certificate Uploaded under column 13 (v) in part II.

    DFO infomed that these sites are suitable for undertaking planatin from management point of view and is free from all sorts of encombrances and encroachements.

    xx. Total amount for CA Rs. 13,16,84,688/-. xxi. Total amount for Addl. CA Rs.54,38,657/- xxii. Total amount for NPV Rs. 4,11,34,625/- xxiii. Whether amount of CA & NPV

    Realized from user agency

    No

  • 11 FRA certificate Original FRA certificate signed by DC is uploaded in Additional Information .

    12

    Site Inspection Report of DFO DFO’s inspection report dated 16.01.2020 uploaded under column 15 of part II .

    13 Recommendation of i) DFO ii) PCCF iii) State Govt.

    } All have recommended for approval

    14. After examining the proposal, this office sought following information from the state government on 30.06.2020:-

    i) Copy of documents in support of the competence/authority of the person making this application to make application one behalf of user agency under column A-3 (xvii) is not uploaded correctly.

    ii) Layout plan showing dimension wise area calculation of the project is not uploaded and provided.

    iii) Land suitability certificate is given of 98 ha instead of 98.430 ha (92.750 for CA and

    5.680 ha for ACA).

    iv) Administrative approval of the project by competent authority.

    v) Total length of Transmission line is not given.

    vi) Length of transmission line in forest area is not given.

    vii) Width of ROW.

    viii) DSS/ Google earth shows that the total polygon area of CA sites i.e (i) Nadla PF, Berwala beat, (ii). R 70, C-1 Nada beat and (iii) R 70 C 3 Chouki Beat is 192 ha. of it approx 72.74 ha space is available for plantation out of the target plantation of 98.430 ha. Alternate/additional CA site of 25.69 ha for plantation alongwith alongwith KML file, DGPS map, SOI toposheet and site suitability certificate be uploaded and hard copy be provided.

    15. The reply from the State government is still awaited.

    16. The proposal is put up before the REC please.

  • lLlItlH-ilily el:nillciI!l; hi: 11[1loildcd :111

  • Government of India Ministry of Environment, Forest & Climate Change

    Northern Regional Office, Chandigarh.

    FACT SHEET OF THE PROPOSAL

    1. a) File No. b) Online Proposal No. c) Date of online receipt

    9-HRC038/2020-CHA FP/HR/ ROAD/35434/2018 22.06.2020

    2 Name of the proposal Diversion of 31.33 Hec. of forest land in favour of Executive Engineer, National Highway Division, PWD B&R Br., Jind for 4/6 Laning including Widening & Strengthening of Karnal-Meerut Road (NH-709A) from RD 153.700 to 168.370 (0.0 to 14.670 km) in Distt. Karnal, Haryana

    3 Name of the User Agency Executive Engineer, National Highway Division, PWD B&R Br., Jind

    4 Location Karnal-Meerut Road (NH-709A) from RD 153.700 to 168.370 (0.0 to 14.670 km)

    i) Name of the Forest Division Karnal ii) District Karnal iii)State Haryana

    5 Particulars of Forest i) Forest Area involved 31.33 ha ii) Legal status Strip protected Forest iii) Vegetation density 0.1

    iv) Map of project site Uploaded under column C (iii) online in part I

    v) Layout plan of the project site Layout plan alongwith dimension wise area

    calculation is uploaded under Additional Information details and area calculation is found correct.

    vi) KML file of project site Uploaded under column C(ii) online. TA(DSS) during KML/DGPS analysis observed no issue with project site.

    vii) DGPS map of project site and Uploaded under column C(iv) online.

  • 6 Item wise break-up of the forest area involved and area calculation

    Dimension wise area calculation is as under: Portion of road Length x width= Area RD 0-2800 2800 x 17.64 = 49392 sqm RD2800-4700 1900x13.72= 26068 sqm RD4700-6000 1300x10.72=13936 sqm RD6000-11000 5000x13.72=68600 sqm RD11000-14670 3670x42.34=155387 sqm Total 14670x21.36 (avg) =

    313383 sqm 5 Total Number of trees to be felled 5,612 Trees and 4,450 plants i) Abstract of trees Uploaded under column 4 (ii) part II ii) Enumeration List Enumeration list for felling of 5,612 is

    provided by state government

    8 Violation of Act DFO's inspection report dated 16.03.2019 uploaded under column 15 of part II mentions no violation of FCA.

    9 Whether area is significant form wildlife point of view/comments of CWLW

    N.A

    10 Compensatory Afforestation i. Plantation site (CA and Addl CA) Non-forest land of Village Belibhur

    (Mandewala), District Yamunanagar, Haryana

    ii. Area/No. of plants to be planted 31,330 plants ( 31.33 ha) CA scheme uploaded under column 13 (ii) part II mentioned that out of total 40.23 ha of NFL (31.33 ha CA and 8.9 ha ACA) only 9 ha area is vacant where CA scheme is prepared for planting 9000 plants with 10 years maintenance and in remaining area, ie, 31.23 ha CA scheme is prepared for planting 31,230 plants with 5 years maintenance (as trimming pruning and singling of existing saplings and and trees (31,230 saplings/trees) and silvicultural operations upto five year

    iii. Addl CA Plantation 8900 plants (8.9 ha)

    iv. Site Map Uploaded under column 13(iv) in part II

  • v. KML file of CA site Uploaded under column 13 (i) in part II

    vi. DGPS map of CA site Uploaded under column 13 (iii) in part II

    vii. Comprehensive Scheme Uploaded under column 13(iv) in part II

    viii. Site suitability certificate Uploaded under column 13(v) in part II

    ix. Total amount for CA & ACA Rs. 3,42,43,296/- x. Total amount for NPV Rs. 2,77,89,710/- xi. Whether amount of CA & NPV

    Realized from user agency

    No

    11 FRA certificate Original FRA certificate signed by DC is uploaded in Additional Information .

    12

    Site Inspection Report of DFO Uploaded under column 15 of part II .

    13 Recommendation of i) DFO ii) PCCF iii) State Govt.

    } All have recommended for approval

    14. After examining the proposal, this office sought following information from the state government on 30.06.2020:-

    i) In column B-1, in proposal submitted in past, One old online corporal FP/HR/road/21791/2016 of same user agency is still pending which is shown as "in-principle'.

    ii) Mutate and transfer of non forest land in favour of Forest Department and declared it as PF/RF.

    iii) DSS/ google earth image found that proposed diversion land is violating one of Decision rule no. of DSS i.e., hydrological layer. Need to verify.

    iv) Composition of major species existing on the proposed NFL for CA and ACA with details of their nature whether planted or naturally grown.

    15. The reply from the State government is still awaited.

    16. The proposal is put up before the REC please.

  • 11 i

    "I

    'II

    Nilld \IJjHll II" III I1II Il If [In ,d I l'I'1 "II 11111\ th Ildll) III

    dll,

    IIII! 11, ,\,'1

    1\111'1 \' ,,'!.-'Iid id Illilili' 'lI'1llll,\IIIPI/II~/llIlldr I Nil Olt. ul ::1\111' 11.~l.:1 :Ig '11 '>' i~ ~HiJI jll'lllllJl ' wllll'II I': 111)\1']1 ;,~ "ill Pi illl'ip!l:'"

    ii) MIII;II' alld I1'IIIlSI' 'I' Ill' Hl'll lill!:!;1 1111111 ill I'II'our or 1,'1l1\\:1 I) 'IHII'II'1l'1l1 alld'" '1In,d il1l' I'I-/}I'lh"il'

    1I:11me wllL:I"l.:1' pl:lllleL! Ill' Illlllll'tdiv !-n'WII.

    \ TilL; L;lllllplil\l1eC III lile "bolll: 1IJ:1'y he SllbIlJlIIl.'d wilhin ~O days 1'ri1l!1 IIIL: d:llc 01' iSSlIL: 01' Ihis Idkr C,ilillg which IhL: proposal sh:i11 ilL: lillhk 10 hI,; rc,i,,:clL'd II)!' w:1I11 or illllll'lll:llioli.

    YOIII'S I':Jllhl'lIlly,

    -sd(I< 'I. Bhlllia)

    DIClF ((\:I1(ral) Copy to:

    I. The Divisiol1al Forcst Ol'liccr, hlresl Division and Dislrici Kamal Signature Not2Venfredccutivc 1':ngil1cL:r, Niliiolwi Ilighway Division, ]lWI) I~&R 1\1'., .Iilld

    ZIMPADigitally ,ji91~y K MA

    BHUTIA Date: 2020.07,01

  • Government of India

    Ministry of Environment, Forest & Climate Change Northern Regional Office, Chandigarh.

    FACT SHEET OF THE PROPOSAL

    1. a) File No.

    b) Online Proposal No. c) Date of online receipt

    9-HRC039/2020-CHA FP/HR/IRRIG/41538/2019 22.06.2020

    2 Name of the proposal Diversion of 6.4022 ha of forest land along WJC Main branch for providing concrete side lining with paver in reach RD 96000-126415 L/s including Reconstruction/remodeling of pacca structure in Tehisl Karnal, under Forest Division and District Karnal

    3 Name of the User Agency Irrigation & Water Resources Department Haryana

    4 Location WJC Main branch, RD 96000-126415 L/s

    i) Name of the Forest Division Karnal ii) District Karnal iii)State Haryana

    5 Particulars of Forest i) Forest Area involved 6.4022 ha ii) Legal status Strip protected Forest iii) Vegetation density 0.1

    iv) Map of project site Uploaded under column C (iii) online in part I

    v) Layout plan of the project site Layout plan along with dimension wise area

    calculation is uploaded under Additional Information details.

    vi) KML file of project site Uploaded under column C(ii) online. TA (DSS) during KML /DGPS analysis observed no issue with project site.

    vii) DGPS map of project site Uploaded under column C(iv) online

    6 Item wise break-up of the forest area involved and area calculation

    Area calculation is uploaded under Additional Information details. Dimension wise area calculation is as under.

  • Portion of RD Length x width= Area RD 96000- 105000 2735 x 7.0 = 19145 sqm RD 105000-116000 3314 x 7.0= 23198 sqm RD 116000- 12615 3097 x 7.0= 21679 sqm Total 9146 x 7.0 = 64022 sqm

    5 Total Number of trees to be felled 708 Trees and 3,000 plants

    i) Abstract of trees Uploaded under column 4 (ii) part II

    ii) Enumeration List Enumeration list for felling of 708 is provided by

    state government

    8 Violation of Act DFO's inspection report dated 09.10.2019, uploaded under column 15 of part II, mentions no violation of FCA.

    9 Whether area is significant form wildlife point of view/comments of CWLW

    N.A

    10 Compensatory Afforestation i. Plantation site for CA Non-forest land in Uriana Kalan and seenk - 6402

    plants

    ii. Plantation site for ACA Addl. CA is provided in 4 patches: i. NFL in Uriana Kalan and seenk- 2843 plants ii. NFL in Siwana Mall village - 1120 plants iii. RF Bassi – 2037 plants Total - 6000 plants

    iii. Area/No. of plants to be planted 6,402 plants (6.402 ha)

    iv. Addl CA Plantation 6,000 plants (6.00 ha)

    v. Site Map Uploaded under column 13(iv) in part II

    vi. KML file of CA site Uploaded under column 13 (i) in part II

    vii. DGPS map of CA site Uploaded under column 13 (iii) in part II

    viii. Comprehensive Scheme Uploaded under column 13 (ii). In part II

    ix. Site suitability certificate Uploaded under column 13 (v) in part II.

  • DFO infomed that these sites are suitable for undertaking planation from management point of view and is free from all sorts of encombrances and encroachements.

    x. Total amount for CA & ACA Rs. 76,32,336 xi. Total amount for ACA Rs.69,66,274/- xii. Total amount for NPV Rs.56,78,751/- xiii. Whether amount of CA & NPV

    Realized from user agency

    No

    11 FRA certificate Original FRA certificate duly signed by DC is uploaded in Additional Information Details .

    12

    Site Inspection Report of DFO DFO inspected report dated 09.10.2019 uploaded under column 15 of part II.

    13 Recommendation of i) DFO ii) PCCF iii) State Govt.

    } All have recommended for approval

    14. After examining the proposal, this office sought following information from the state government on 01.07.2020:-

    i) Correct copy of document in support of the competence/authority of the person making this application to make application on behalf of the user agency under column A-3(xvii) be uploaded.

    ii) Mutate and transfer of non forest land in favour of Forest Department and declared it as PF/RF.

    15. The reply from the State government is still awaited. 16. The proposal is put up before the REC please.

  • I \ I Ii Nl,dtl I 'l,t I

    111\11 I 1111 11,f11.,l[) 'II

    ed by K MA

    11

    I (I

    III

    • I til I , 'IIU I'l! ,1I1i! r~IIIIII' III 1j111 ,d

    II

    I, l t1\' 1111111 IIi III , '\lIi.1/ (,I 1\1111 JlI III' .II 'I 1111 Iii

    "'\1 11 11 ""1111' 1'\lIl'II ((""IHCI 1I111)1I)

    Ill'l ";IIl"!1I1 I', ;111lil1nll"lIl1! III ,11'1 '\1' 1I1"II1iuIWd IIIOI"",ld III"It .. ,""I' (;"V'II1II1o'III, lite 1111111\ 'Jill' Illjllrlll;III'lllhl:IIIIIV:iI""I~,111'"Iill II: 1I111"lill 10' ',Idllllilled.

    I) ('Ilrrl'ct l'llPV ul' dllcltlll'lIl III ,lIpllllll 111'111\' I'lllll) ,'I :11' '/111111'1111. 111'111,' Pl'I'S\l1I III:lkilll' lid, ;lpplic;llillll III Ill;d 'lI/,plit',lllull 'H' hd'idr III ill' 11,,\.')" II ~II;' lIIid T I"lltlllll), \lxvii) bt' "1'10011"11,

    ii) Mlil:lll' :1i1l!II'lIllsli:I'1l1' (\(111 CUlo,;:i1 Iiliid ill 1':11'11111"'(' hll'I;SI l)o,;p:IIII11l'1l1 llllll,kcl:lr~'d il :t,' I'!·/IQ",

    Tit,; Clllllpli:IIII'C III IIIl' :dll'I',' 1I1:IV [,,' ~11!"\lilt.''' willtill\() rI:IV:: 1';lilill!-: which 11ll; l)rlll){)~::t1 sh:t1111l' 11:lIlk III I,,' r"jn'krl I'lli' IV:IIII III 11I1''

    1'1'11111 Iii,' rI:tI" ''III;III'lll,

    1I1' iSSlIl' or tliis 11'11

  • Government of India Ministry of Environment, Forest & Climate Change

    Northern Regional Office, Chandigarh.

    FACT SHEET OF THE PROPOSAL

    1. a) File No. b) Online Proposal No. c) Date of online receipt

    9-HRC040/2020-CHA FP/HR/ Canal/41159/2019 23.06.2020

    2 Name of the proposal Diversion of 22.36 ha of forest land in favour of Sub Divisional Officer, Construction Sub Division No. 9, Irrigation and water Resources Deptt. Jagadhary for the Remodeling of Augmentation Canal from RD 0.00 (Hamida head) to 75.250 (sub Reach 0 to 20 Km) under Forest Division and District Yamunanagar.

    3 Name of the User Agency Sub Divisional Officer, Construction Sub Division No. 9, Irrigation and water Resources Deptt. Jagadhary

    4 Location RD 0.00 Km (Hamida head) to 75.250 km. (sub Reach 0 to 20 Km)

    i) Name of the Forest Division Yamunanagar ii) District Yamunanagar iii)State Haryana

    5 Particulars of Forest i) Forest Area involved 22.36 ha

    ii) Legal status Protected Forest

    iii) Vegetation density 0.2

    iv) Map of project site Uploaded under column C (iii) online in part I

    v) Layout plan of the project site Layout plan along with Dimension wise area

    calculation is uploaded under Additional Information details.

    vi) KML file of project site Uploaded under column C(ii) online in part I. TA(DSS) during KML/DGPS analysis observed no issue with project site.

  • vii) DGPS map of project site Uploaded under column C(iv) online in part I

    6 Item wise break-up of the forest area involved and area calculation

    Dimension wise area calculation is as under: Left side Length x width= Area A1= 280 x 14.25 = 3990 sqf A2= 150 x 11.5 = 1725 sqft A3= 6065 x 25.5 = 154657.5 sqft A4= 2719 x 27.25 = 74092.75 sqft A5= 2754 x 20.5 = 56457 sqft A6= 34520 x 19.6 = 676592 sqft A7= 7605 x 29.5 = 224347 sqft A8= 9810 x 16 = 156960 sqft Total = 1348821.75 sqft Or 12.53 ha Right side Length x width= Area A1= 600 x 8 = 4800 sqft A2= 5910 x 14.66 = 86640 sqft A3= 2650 x 16 = 42400 sqft A4= 2740 x 17.5 = 47950 sqft A5= 34450 x 17.66 = 608387 sqft A6= 7590 x 12.33 = 93584 sqft A7= 9560 x 18.33 = 175234.80 sqft Total = 1058997 sqft Or 9.83 ha Grand total 12.53 ha + 9.83 ha= 22.36 ha

    5 Total Number of trees to be felled 11,672 Trees and 16,700 plants

    i) Abstract of trees Uploaded under column 4 (ii) in part II

    ii) Enumeration List Enumeration list for felling of 11,672 is provided by state government

    8 Violation of Act DFO's inspection report dated 20.12.2019 uploaded under column 15 of part II mentioning no violation of FCA.

  • 9 Whether area is significant form wildlife point of view/comments of CWLW

    N.A

    10 Compensatory Afforestation i. Plantation site for CA Total Plants to be planted 22,360 plants.

    Non-forest land in: Aseer – 4460 plants Abushahar colony - 1000 plants Gurusar colony - 1200 plants Deshu Malkana - 900 plants Surtiya - 3400 plnats Suchan - 2000 plants Maujgarh - 1800 plants Keharwala - 1000 plants Naiwala - 1000 plants Badaguda/Dolafpur - 800 plants Deshujodha – 1600 plants Jeewannagar/Santnagar - 1600 plants Maujukhera - 800 plants Mallekhan - 800 plants Total - 22360 plants

    ii. Plantation site for ACA Total plants to be planted – 33,400 i) Degraded forest land of planting

    a) Kaluana Distry RD 60-120 L/R- 9494 plants

    The Non-forest land has vegetation and about 23, 906 plants are already existing in:

    a) Makhha b) Kaluwana c) Dukhda

    iii. Area/No. of plants to be planted 22,360 plants (22.360 ha)

    iv. Addl CA Plantation 33400 plants (33.400 ha)

    v. Site Map Uploaded under column 13(iv) in part II

    vi. KML file of CA site Uploaded under column 13 (i) in part II

    vii. DGPS map of CA site Uploaded under column 13 (iii) in part II

    viii. Comprehensive Scheme Uploaded under column 13 (ii) in part II.

  • In CA scheme, SG has not prepared ACA scheme of 23,906 plants as per para 2.4 (ix) of rule and guidelines of FC ( rule 2.4(ix) is at p-290/c). As 23,906 no. of trees/plants already existing on NFL against ACA. In scheme it is also mentioned that out of 23,906 plants which is already in existing, 14,665 are saplings of girth 10-30 cm and 9,241 are trees/poles of grith more than 30 cm. As 14,665 saplings are less that 10-30 cm , they prepared ACA scheme for 4 years maintenance to 10 years maintenance.

    ix. Site suitability certificate Uploaded under column 13 of part (v). DFO Sirsa infomed that these sites are suitable for undertaking planation from management point of view and is free from all sorts of encombrances and encroachements.

    x. Total amount for CA & ACA Rs. 3,76,62,379/- xi. Total amount for ACA Rs. 3,09,51,514/- xii. Total amount for NPV Rs. 1,98,33,320/-

    xiii. Whether amount of CA & NPV

    Realized from user agency

    No

    11 FRA certificate Original FRA certificate is not provided and uploaded.

    12

    Site Inspection Report of DFO DFO's inspection report uploaded under column 15 of part II and mentioned no violation of FCA.

    13 Recommendation of i) DFO ii) PCCF iii) State Govt.

    } All have recommended for approval } }

    14. After examining the proposal, this office sought following information from the state government on 01.07.2020:-

    i) Undertaking from U.A to pay NPV be provided.

  • ii) Mutate and transfer of non forest land in favour of Forest Department and declared it as PF/RF.

    iii) DGPS map pdf and CA site is not matching with each other. In DGPS map total CA sites are Nineteen were as KML uploaded on portal is Eighteen. The Missing KML on online portal is CA site Kaulana Distributary RD 60-120 L/R which needs to be uploaded for DSS analysis.

    iv) In Serial No. 14 under column 13(i) of part II online, three KML features are uploaded under one KML i.e., Kulwana 1, Kulwana 2, Kulwana 3, but in DGPS map Kulwana 3 geo-coordinates is missing. Revised DGPS map be uploaded.

    v) DSS/google earth shows that out of 22.360 ha as provided by the UA/SG of 14 CA sites as shown below only 19.340 ha area/space is available for CA plantation. Additional 3.020 ha is required for target plantation for CA and accordingly DGPS map, KML file, SOI toposeet of the site be provided and uploaded.

    vi) Composition of 14,665 plants, which are already exiting in the NFL, to know the major species name and its contribution in the total.

    15. The reply from the State government is still awaited. 16. The proposal is put up before the REC please.

  • __

    I J

    .J ,

    I'll'. II J l) d.d I fill f) P II Ii 11111 II pfl'l , II

    t 1111 till \'1 d II' I 1'11\ "IJIIIl'\II\ltI Iii III III 1i,l,1 11 III 'lIdli 1II1 I \I' "I I VI'IIIIlI'III ('I III1 1lIllllllllhl"lIh \,,'II1

  • II

    d III II, ".[ (,\ III I Illllpil \IIC~' I 11111 II, I' f dllll' \ hldllil.· 1""1"1 Ii II III h, . , (I( 1\111 11

    II I IliI '1,1

    I I '\ 111.,11(

    'lit' 111\'1:'11111:11 10.11 ' f (1/11 \;1 1,1 I I 1\1 Iilllllild I JI II I I 1'"111111111 I Ii 1'". :111, 1)1 j, illil II (1111 ", [ "II 111\ '1"'" ,'1I1l I 1\'1""" 1I • II "II tI' lilt! \ "\ 'I I ,11111 I I ) 'I II. .J; II' j\c! lUll

    Signature Not Verified

    DigitallY~Y K ZIMPA BHUTIA Date: 2020.07.01

    MA

  • Government of India Ministry of Environment, Forest & Climate Change

    Northern Regional Office, Chandigarh.

    FACT SHEET OF THE PROPOSAL

    1. a) File No. b) Online Proposal No. c) Date of online receipt

    9-HRC042/2020-CHA FP/HR/ IRRIG/41469/2019 27.06.2020

    2 Name of the proposal Diversion of 39.57 ha. of forest land in favour of Executive Engineer, Karnal Water Services Division, Karnal for Remodeling of Augmentation Canal from km 0.000 to 75.250 (In Reach 58.700 km to 75.250 km) to increase the capacity of canal under forest and District Karnal, Haryana

    3 Name of the User Agency Executive Engineer, Karnal Water Services Division, Karnal

    4 Location km 0.000 to 75.250 (In Reach 58.700 km to 75.250 km)

    i) Name of the Forest Division Yamunanagar ii) District Yamunanagar iii)State Haryana

    5 Particulars of Forest i) Forest Area involved 39.57 ha ii) Legal status Protected Forest iii) Vegetation density 0.2 iv) Map of project site Uploaded under column C (iii) online in part I v) Layout plan of the project site Layout plan alowngwith dimension wise area

    calculation is uploaded under Additional Information details.

    vi) KML file of project site Uploaded under column C(ii) online in part I. TA(DSS) during KML/DGPS analysis observed no issue with project site.

    vii) DGPS map of project site Uploaded under column C(iv) online in part I 

  • 6 Item wise break-up of the forest area involved and area calculation

    Dimension wise area calculation is under. Portion of road Length x width= Area RD 58700-615500 2800 x 24 = 67200 sqm RD61500-64000 2500 x28 = 70000 sqm RD64000-67000 3000 x24 =72000 sqm RD67000-68500 1500 x26 =39000 sqm RD68500-75000 6500 x22 =143000 sqm RD75000-75250 250 x18 = 4500 sqm Total area 16550x24(avg)=395700 sqm

    5 Total Number of trees to be felled

    6,649 Trees and 10,000 plants

    i) Abstract of trees Uploaded under column 4 (ii) part II ii) Enumeration List Enumeration list for felling of 6,649 is provided by state

    government

    8 Violation of Act DFO’s inspection report dated 19.06.2020 uploaded under column 15 of part II informing that UA has not violated FCA.

    9 Whether area is significant form wildlife point of view/comments of CWLW

    N.A

    10 Compensatory Afforestation i. Plantation site for CA Non-forest land in

    1 Dadhi Bana in Charkhi dadri 0.90 ha 2 Khidwali in Rohtak 2.85 ha 3 Kharak Kalan in Bhiwani 1.60 ha 4 Abondoned land of irrigation

    departent at village Kheri, Kanlna in Mahendergarh

    4.00 ha instead of 8.6 ha (Sno. 4 of 13(i) part II online

    5 Gairmunkin Canal at village Saharwa in Hisar

    3.49 ha

    6 Kharak Minor from RD 12000 to 14000 in Kaithal

    1.02 ha

    7 Kailram in Kaitahl 4.33 ha 8 Naina Dones abondoned channel

    at Kaithal- 2.26 ha

    9

    village Ladain and Dhandhlan in Jhajjar

    6.64 ha

    10 NBK link RD , Old Kachwa 8.66 ha

  • Minor, WJC Saidpura in Karnal Total 35.75 ha As per CA scheme NFL is provided of 35.75 ha instead of 39.57 ha

    ii. Plantation site for ACA PF land Indira escape

    iii. Area/No. of plants to be planted

    39,570 plants (39.57 ha)

    iv. Addl CA Plantation 20,000 plants (20.00 ha)

    v. Site Map Uploaded under column 13(iv) in part II

    vi. KML file of CA site Uploaded under column 13 (i) in part II

    vii. DGPS map of CA site Uploaded under column 13 (iii) in part II

    viii. Comprehensive Scheme Uploaded under column 13(ii) in part II

    ix. Site suitability certificate Uploaded under column 13 of part (v) in part II

    i) DFO Rohtak informed that NFL CA area in Khidwali will be done after removal of encroachment.

    ii) DFO Bhiwani informed that NFL area in village Kharak Kalan in Bhiwani range is fully invaded with Masket and plantation will be done after uprooting of Muskat. .

    iii) DFO Hisar infomred that NFL area Gairmunkin Canal at village Saharwa is not fully suitable for plantation because at present it is undulated land and highly affected by muscut.

    iv) DFO Kaihal . informed that NFL site Kharak Minor fro Rd 12000 to 14000 is suitable after removeal of old structure and leveling of land.

    v) DFO Karnal informed that NBK link RD, Old Kachwa Minor, WJC Saidpura is suitable for plantation after removal of encroachment. .

    x. Total amount for CA &

    ACA Rs. 3,37,19,142/-

    xi. Total amount for ACA Rs.3,15,40,000/-

  • xii. Total amount for NPV Rs. 3,50,98,590/-

    xiii. Whether amount of CA & NPV realized from user agency

    No

    11 FRA certificate Original FRA certificate signed by DC is uploaded in Additional Information Details .

    12

    Site Inspection Report of DFO DFO’s inspection report dated 19.06.2020 uploaded under column 15 of part II..

    13 Recommendation of i) DFO ii) PCCF iii) State Govt.

    } All have recommended for approval } }

    14. After examining the proposal, this office sought following information from the state government on 01.07.2020:-

    i) CA scheme of Dadhi Bana in Charkhidadri is not uploaded properly. Revised CA be

    uploaded under column 13 (ii) part II. ii) Land site suitability and CA scheme of Abandoned land of irrigation department at

    village Kheri, Kanlna in Mahendergarh forest division is given of 2500 plants whereas in column 13 (i) s.no 4 it is shown as 8.6 ha. Revised CA scheme, site suitability certificate of 8.6 ha be provided.

    iii) Land site suitability certificate of Jhajjar forest division is not correct. Area required for plantation on NFL land is not given;

    iv) CA scheme and Land suitability of 3 sites of Kaithal division is not correct. In Kharak Minor from RD 120000 to 14000, Land suitability certificate is given of 1.02 ha where as in CA scheme is of 0.625 ha, .In Kailram 30 ft long strip rasta, Land suitability certificate is given of 4.33 ha whereas in CA scheme it is of 2.7 ha, In Naina Dones abandoned channel, land suitability certificate is given of 2.26 ha whereas in CA scheme is of 1.4 ha;

    v) CA scheme for plantation in 8.66 ha (NFL) in Karnal forest division i.e. NBK link RD 87500 R.s (3.27 ha), Old Kachhwa Minor (3.66 ha) and WJC Saidpura (1.73 ha) is not provided.

    vi) DSS/ google image shows that out of 39.57 NFL provided by user agency for CA only 27 ha area is available for target plantation. Additional 12.57 ha NFL be provided for target plantation. And accordingly DGPS map, KML file and SOI toposheet of additional land be uploaded and provided.

    vii) Composition of major species existing on the proposed NFL for CA and ACA with details of their nature whether planted or naturally grown

    15. The reply from the State government is still awaited. 16. The proposal is put up before the REC please.

  • भा�रत सरका�रGOVERNMENT OF INDIA

    पर्या�वरण, वन एव� जलव�र्या� परिरवतन मं�त्रा�लर्याMINISTRY OF ENVIRONMENT, FOREST & CLIMATE

    CHANGEउत्तर क्षे�त्रा�र्या का�र्या�लर्या,चं�डी�गढ़ /Northern Regional Office,

    ChandigarhF. No. 9-HRC042/2020 -CHA Dated: 01.07.2020To

    The Nodal Officer-cum- Chief Conservator of Forests (FC), Govt. of Haryana, Forest Department, C- 18, Sector 6,Van Bhawan, Panchkula, Haryana

    Sub: Diversion of 39.57 ha. of forest land in favour of Executive Engineer, Karnal Water ServicesDivision, Karnal for Remodeling of Augmentation Canal from km 0.000 to 75.250 “In Reach58.700 km to 75.250 km ” increase the capacity of canal under forest and District Karnal,Haryana (Online proposal no. FP/HR/IRRIG/41469/2019).

    Ref: i) Nodal Officer, Haryana letter no. Admn-D-3-9357/26.06.2020 dated 26.06.2020 and onlineproposal received from the Nodal Officer on 27.06.2020

    Sir,I am directed to refer to online proposal forwarded by the Nodal Officer (FCA), Government of

    Haryana on the above mentioned subject seeking prior approval of the Central Government for diversion of39.57 ha of forest land for non-forestry purpose in accordance with section-2 of the Forest (Conservation) Act,1980.

    2. After careful examination of the above mentioned proposal of the State Government, the followinginformation/clarifications are still required to be submitted:

    i) CA scheme of Dadhi Bana in Charkhidadri is not uploaded properly. Revised CA be uploaded undercolumn 13 (ii) part II.

    ii) Land site suitability and CA scheme of Abondoned land of irrigation department at village Kheri,Kanlna in Mahendergarh forest division is given of 2500 plants whereas in column 13 (i) s.no 4 it isshown as 8.6 ha. Revised CA scheme, site suitability certificate of 8.6 ha be provided.

    iii) Land site suitability certificate of Jhajjar forest division is not correct. Are required for plantation onNFL land is not given;

    iv) CA scheme and Land suitability of 3 sites of Kaithal division is not correct. In Kharak Minor from RD120000 to 14000, Land suitability certificate is given of 1.02 ha where as in CA scheme is of 0.625ha, .In Kailram 30 ft long strip rasta, Land suitability certificate is given of 4.33 ha whereas in CAscheme it is of 2.7 ha, In NainaDones abandoned channel, land suitability certificate is given of 2.26 hawhereas in CA scheme is of 1.4 ha;

    v) CA scheme for plantation in 8.66 ha (NFL) in Karnal forest division i.e. NBK link RD 87500 R.s (3.27ha), Old Kachhwa Minor (3.66 ha) and WJC Saidpura (1.73 ha) is not provided.

    vi) DSS/ google image shows that out of 39.57 NFL provided by user agency for CA only 27 ha area isavailable for target plantation. Additional 12.57 ha NFL be provided for target plantation. AndaccordinglyDGPS map, KML file and SOI toposheet of additional land be uploaded and provided.

    vii) Composition of major species existing on the proposed NFL for CA and ACA with details of theirnature whether planted or naturally grown.

    3. The compliance to the above may be submitted within 30 days from the date of issue of this letterfailing which the proposal shall be liable to be rejected for want of information.

    Yours faithfully,

    -sd- (K Z Bhutia)

    DIGF (Central)Copy to:

    1. The Divisional Forest Officer, Forest Division and District Karnal2. The Executive Engineer, Karnal Water Services Division, Karnal

    File No.9-HRC042/2020-CHA

  • Government of India

    Ministry of Environment, Forest & Climate Change Northern Regional Office, Chandigarh.

    FACT SHEET OF THE PROPOSAL

    Name of the proposal

    Proposal for constructing flyover over the diverted land in respect of “Diversion of 13.41 ha of forest land in favour of Project Director, PIU, Chandigarh for constructon of 4 laning Zirakpur-Parwanoo road from km. 42.00 to 57.400, NH 22 n State of Haryana/HP Border, under Forest Division Morni-Pinjore and District Panchkula Haryana. ( F.No. 9-HRC212/2007-CHA)

    1. This is a proposal seeking permission for construction of flyover over the already

    diverted forest land in respect of diversion of 13.41 ha of forest land in favour of Project Director, PIU, Chandigarh.

    2. The proposal was accorded approval (S-II) on 30.08.2007 by NRO, Chandigarh with the condition that “7. वन भिूम का प्रयोग प्रस ् ताव म दशार्ये उ देश ् य के अलावा अन ् य िकसी उ देश ् य के िलये नही ंिकया जायेगा”

    3. The State Government on 12.06.2020 has submitted that this flyover (new construction) was not a part of the diversion proposal and has reported violation of condition no. 7 of Stage-II approval.

    4. The User Agency (NHAI) on 01.06.2020 has submitted that construction of Half VUP for Amravati Enclave at Ch. 53.550 on Zirakpur-Parwanoo Section of NH-22 (new NH-05) is sequel to the persistent public demand/VIP references and smooth traffic movement. They also affirmed that no additional forest land is required for this project as also no tree will be felled in this process.

    5. The proposed construction by NHAI is a case of ‘change of lay-out plan’ of the road without obtaining prior approval of the competent authority.

    6. The proposal is placed before the Hon’ble REC for consideration. ‐‐‐ 

     

  • List of item in the agenda for 33rd REC meeting of the NRO, Chandigarh to be held on 03.07.2020

    STATE: PUNJAB

    S.No. File Number Online Proposal No. Subject Area to diverted in ha.

    1. 9-PBC314/2020-CHA

    FP/PB/Rail/40133/2019 Diversion of 35.9767 ha. (PF Area=3.6337 ha + PLPA Area=31.8540 ha) (Area closed u/s 4 of PLPA 1900+Delisted area from PLPA 1900=0.4890 ha) of forest land in favour Indian Railway for construction of Bhanupali-BilaspurBeri new Rail Line from km. 20.00 to 23.950 on New Rail Line and from km. 92.100 to 96.200 (on existing SirhindNangal Dam Rail Line as a Part of Bhanupali Station) falling within the jurisdiction of Rupnagar Forest Division and District Rupnagar, Punjab

    35.9767 ha.

     

  • Government of India Ministry of Environment, Forests& Climate Change

    Northern Regional Office, Chandigarh.

    FACT SHEET OF THE PROPOSAL

    1. a) File No. b) Online Proposal No.

    9-PBC314/2020-CHA FP/PB/Rail/40133/2019

    2. Name of the proposal Diversion of 35.9767 ha. (PF Area=3.6337 ha + PLPA Area=31.8540 ha) (Area closed u/s 4 of PLPA 1900+Delisted area from PLPA 1900=0.4890 ha) of forest land in favour Indian Railway for construction of Bhanupali-BilaspurBeri new Rail Line from km. 20.00 to 23.950 on New Rail Line and from km. 92.100 to 96.200 (on existing SirhindNangal Dam Rail Line as a Part of Bhanupali Station) falling within the jurisdiction of Rupnagar Forest Division and District Rupnagar, Punjab

    3 Name of the User Agency Rail Vikas Nigam Limited, Chandigarh

    4. This proposal was placed in REC meeting on 28.02.2020 and after detailed deliberations, the REC approved the proposal and authorized Chiarman to accord Stage-I approval with standard conditions after the receipt of the following information:

    i) Optimizing and accommodate the entire CA of four sites into one site i.e., Garbagha Forest and accordingly revised KML file, DGPS map be provided and uploaded.

    ii) Revised Site specific CA scheme may be prepared. iii) Correction be made in details of proposal seeking prior approval of central

    government under the act for diversion of forest land for the project already submitted in the past be uploaded under column B-1 of part-I.

    iv) DFO, Rupnagar shall provide legal status of three patches falls on the proposed site

    of total 1.09 ha (0.38 ha, 0.31 ha and 0.40 ha) and if found forest, shall prepare Additional CA scheme of 1.09 ha x 2 = 2.18 ha of 3 three patches

    5. The observations of REC was informed to State Government vide this office letter dated 11.03.2020 and 05.06.2020.

    6. The State Government reply on 03.06.2020 and 26.06.2020 which are compiled as below:

    S.No Information sought from SG

    Compliance from SG

  • i) Optimize and accommodate theentire CA of four sites into one site ie., Garbagha Forest and accordingly revised KML file, DGPS map be provided and uploaded.

    Nodal officer, Punjab at p-492/c informed that DFO Rupnagar inspected Garhbagha Forest and found that the area of Govt. Forest in village Garhbagha is not much area where all CA can be taken. So they changed the CA sites. The proposed sites are as follows: CA site

    S.No CA site Area of CA 1. Khatana Forest 12.000 ha 2. Naurangpur Jhandian 59.953 ha Total 71.953 ha

    Addl CA

    Sl.No. Addl CA site for fellng of plants

    Area of CA

    1. Garbagha Forest 4.764 ha Total 4.764 ha

    ii Revised Site Specific Scheme may be prepared.

    Revised Site specific CA scheme is provided S.No CA site CA scheme 1. Khatana Forest of 12.000 ha at p-

    515- 535/c 2. Naurangpur

    Jhandian of 60 ha at p-515-535/c

    Addl CA

    S.No

    CA site CA scheme

    1. Garbagha Forest of 4.764 ha at p- 515-535/c

    iii) Correction be made in details of proposal seeking prior approval of central Govt. under the act for diversion of forest land for the project already submitted in the past be uploaded under column B-1 of part-I.

    Details of List of two proposals approved in the past were entered under B-1 of part-I online.

    Iv DFO, Rupnagar shall provde legal status of three patches falls on the proposed site of total 1.09 ha (0.38 ha, 0.31 ha and 0.40 ha) and if found forest, shall prepared Addl. CA scheme of 1.09 ha x2 = 2.18 ha of 3 patches.

    State Govt. informed that Inspection has been done by the DFO Rupnagar of these 3 patches and the Legal status of these sites are Non-forest land.

    7. DSS analysis is as under below:

  • CA sites Analysis:

    (1) Naurangpur Jhandian Forest is in Rupnagar range. The total area of KML is approx. 126 ha. out of it approx. 65 ha. vacant space available according to the Google Earth Image dated 04/06/2019 due to undulating topography with ridges.

    (2) Khatana Forest is located at Nurpurbedi range. The total area of KML is approx. 26.9 ha. out of it approx. 12 ha vacant space available according to the Google Earth Image dated plantation activity is visible. Need to verify about it from the SG/UA. Total CA vacant land available is approx.:77 ha ACA sites Analysis: Garbagha Forest is in Nurpurbedi range and total area of polygon/KML is approx. 18.2 ha out of it approx. 06 ha vacant space available according to the Google Earth image dated 04/06/2019. Total ACA vacant land available is approx.:06 ha

    8. As the legal status of three patches on the proposed site of total 1.09 ha (0.38 ha, 0.31 ha and 0.40 ha) has turned out to be Non-Forest, it shall not attract the CA /ACA. 9. The proposal is placed before REC for discussion and decision.

    *****