List of GT Morstroy design work approved
by Glavgosexpertiza of Russia as of 14.11.2016
No. Name of work Client Object location No. of approval, date Role Status of con-
struction 2000
1 Quay No. 29 Reconstruction Project at Trade Seaport of Odessa
Trade Seaport of Odessa
Odessa Ukrinvestexpertiza, No. 103
dated 28.12.2000
Berthing facili-ties subcontrac-
tor
The object con-structed in 2004
2002 2 Detail design for construction of cargo - pas-
senger ferry terminal in Baltysk, Kaliningrad region. 1
st construction stage.
Quay No. 1. 1st Stage
LLC “NPF “GT Inspect”
Kalinigrad region, Baltysk
Glavgosexpertiza of Kalinigrad re-
gion No. 02/325
dated 22.11.2002
Marine facilities subcontractor
The object con-structed in 2002
3 Feasibility study for construction of multi-purpose cargo-passenger automobile railway ferry line “Ust-Luga-Baltysk (Vostochy peninsula)—Germany ports”
MPA “Vyborg Vysotsk”, MPA “Kaliningrad”
Leningrad region, Ust-Luga;
Kalinigrad region, Baltysk
No. 24-4-5/17-161 dated 27.12.2002
General design-er
The object con-structed in 2006
2003 4 Construction project of cargo-passenger ferry
terminal in Baltysk, Kaliningrad region (1st
start-up complex)
LLC “NPF “GT Inspekt”
Kalinigrad region, Baltysk
Glavgosexpertiza of Kalinigrad re-
gion No. 03/84 dated 18.03.2003
Marine facilities subcontractor
The object con-structed in 2003
5 Detail design of “The offshore oil reloading complex at the south side of Mishukov cape”
JSC “Murmansk Shipping Compa-
ny”
Kola bay, to the south of Mishukov cape, outlet of
Lavna river
Departmental ex-pertise of
Murmansk region No. 110
dated 22.04.2003
General design-er
The object con-structed in 2003
2/11
2004 6 Construction project of road and railroad com-
plex at Trade Sea Port of Ust-Luga JSC “Baltysky
parom” Leningrad region,
Kingiseppsky district, Luzhskaya bay of Gulf of
Finland
No. 201-04/ GGE-1612/04
dated 26.03.2004
General design-er
Constructed: 1 Phase in 2006 ;
2 and 3 Phase —
2010
7 Construction project of train-ferry complex in the Basin No. 4
FGUP “Rosmorport”
Kaliningrad region, Baltysk
No. 214-04/ GGE-1616/04
dated 30.03.2004
General design-er
1st Phase con-structed in 2006
8 Detail design of “Offshore oil reloading com-plex in the Belokamenka village area”
CJSC “Dalnevostochnaya
morskaya kompania”
Kola Bay basin Departmental ex-pertise of
Murmansk region No. 216
dated 10.06.2004
General design-er
Object con-structed in 2004
9 Detail design of «Preparatory stage objects (dredging, land reclamation) of the 2
nd part of
Yuzhny area within Ust-Luga Trade seaport»
OJSC “Kompania Ust-Luga”
Leningrad region., Kingiseppsky district,
Luzhskaya bay of Gulf of Finland
No. 210-05/ FGGE dated 29.12.2004
General design-er
Object con-structed in 2006
2005 10 TEO for construction of Marine passenger ter-
minal at Vasilievsky island LLC “Morskoy
fasad Sankt-Peterburga”
St-Petersburg No. 206-05/ GGE-2396/04
dated 30.03.2005
General design-er
1st Phase con-structed in 2008;
2nd Phase con-structed in 2011
11 TEO (project) “Complex transport and produc-tion base” , LLC “Lukoil-Nizhnevolzhskneft”
LLC “Lukoil-Nizhnevolzhsk –
neft”
Astrakhanskaya region, Ikryaninsky district,
Ilynka
Glavgosexpertiza of Astrakhanskaya
region No. 210-01/2005 dated 29.07.2005
Berthing facili-ties subcontrac-
tor
Object con-structed in 2007
12 Construction of reloading complex based on 29-1 quay of Trade seaport of Odessa
Trade sea port of Odessa
Odessa Ukrinvestexpertiza, No. 190
dated 13.12.2005
Berthing facili-ties subcontrac-
tor
Object con-structed in 2008
3/11
2006
13 Detail design for breakwaters reconstruction in the Kaliningrad sea channel
FSUE “Rosmorport”
Kaliningrad region Glavgosexpertiza of Kaliningrad re-
gion No. 06/09
Dated 22.03.2006 г.
General De-signer
The object con-structed in 2009
14 Project adjustment, «Road and railroad complex at Ust-Luga Trade Seaport. Ferries»
FSUE “Rosmorport”
Leningrad region, Kingiseppsky district,
Luzhskaya bay of Gulf of Finland
No. 203-06/ GGE-1612/04
dated 29.03.2006
General De-signer
1 Phase con-structed in 2006;
2 and 3 Phase —
2010
15 Project adjustment for construction of railroad ferry complex in No.4 Basin
FSUE “Rosmor-port”
Kaliningrad region, Baltysk
No. 204-06/ GGE-1616/04
dated 29.03.2006
General De-signer
1 Phase con-structed in 2006;
Full developement
— 2009 2007
16 Construction project for reloading terminal of OJSC “Mining and smelting company “Norilsky nikel”
OJSC “GMK “Norilsky nikel”
Murmansk, Leninsky ad-ministrative district
Internal expertise of Murmansk re-
gion No. 51
dated 26.02.2007
General De-signer
1, 2, 8 Phases constructed
in 2011, 4, 5, 9 Phases
constructed in 2014
17 Project “Reconstruction and construction of Peterburgsky oil terminal”
CJSC “Neftekhim-project”
St-Petersburg, Coal port, Elevator site, building 32.
Glavgosexpertiza, North-West district
branch No. 094-07/ FGGE
SZFO-58 dated 05.06.2007
Marine facilities sub-contractor
Object con-structed in 2007
4/11
18 Project “Ust-Luga Trade Seaport. Yuzhny area. Multipurpose reloading complex”
OJSC “Compania Ust-Luga”
Leningrad region, Kingiseppsky districts,
Luzhskaya bay of Gulf of Finland
No. 498-07/ GGE-4385/04
dated 06.07.2007
General De-signer
1 Phase con-structed in 2008
19 Detail design «Reconstruction of approach
navigational channel from cargo and han-dling area “Economia” to the Arkhangelsk terminal quay of LLC “RN-Arkhangelsk-Nefteproduct”
LLC “RN-Arkhangelsk-Nefteprodukt”
Arkhangelsk, Northern Dvina river, Kuznechikha channel
No. 040сс-07/ SPE-68 dated 22.08.2007
General De-signer
The object con-structed in 2009
20 Project “Russian offshore oil-loading com-plex “Vistino”
LLC “Severozapadny
Alyans”
Leningradskaya region, Kingiseppsky districts, Luzhskaya bay of Gulf
of Finland, Vistino
No. 780-07/GGE-5114/02
dated 29.10.2007
General De-signer
According to Client’s plans
2008 21 Fixed security inspection complex for large-size
cargo at 3-d area of St-Petersburg seaport CJSC “Tekhno-
S.Peterburg” SPB, road to
Turukhtannye islands, 3d area of SPB Seaport
No. 061Д-08/ SPE-0112/02
dated 11.06.2008
Infrastructure subcontractor
The object con-structed in 2008
22 Project “Design and construction of a football stadium in the western part of Krestovsky island, SPb”. Construction quay
LLC “Avant” St-Petersburg, Krestovsky island, Yuzhnaya road, 25
No. 469-08/ GGE-5251/05
dated 11.07.2008
Construction quay subcon-
tractor
The object con-structed in 2008
23 Construction project of reloading complex for rolling and general cargo at Olya port
FSUE ”Rosmorport”
Astrakhanskaya region., Limansky district,
Olya village, Bakhtemir
No. 549-08/ GGE-5314/04
dated 22.08.2008
General De-signer
The object con-structed in 2010
24 Detail design «Basin formation of south area of Ust-Luga Trade Sea Port»
FSUE “Rosmorport”
Leningradskaya region, Kingiseppsky districts,
Luzhskaya bay of Gulf of Finland
No. 166-08/ SPE-0317/2
dated 16.09.2008
General De-signer
The object was constructed
in 2011
25 Construction project of container terminal at Ust-Luga Trade Sea Port
OJSC “Baltysky kontainerny termi-
nal”
Leningradskaya region, Kingiseppsky districts,
Luzhskaya bay of Gulf of Finland
No. 724-08/ GGE-4385/04
dated 07.11.2008
General De-signer
1 Phase constructed
in 2011
5/11
26 Project “Reconstruction of St-Petersburg Sea Channel. Approach channel to multipurpose offshore reloading complex “Bronka”
FSUE “Rosmorport”
Gulf of Finland, Nevskaya bay, South-
west part
No. 855-08/ GGE-5820/07
dated 24.12.2008
General De-signer
1 Phase constructed
in 2015 2 Phase
under construc-tion since
2013
2009 27 TEO (Project) “Ust-Luga Trade sea port. Bulk
cargo complex”
OJSC “Rosneftbunker”,
OJSC “Lenmorniiproject”
Leningrad region, Kingiseppsky area
No. 114-09/ SPE-0605/02
dated 25.03.2009
Infrastructure subcontractor
Constructed in 2010
28 Construction project of LPG reloading complex at Ust-Luga Trade Sea Port
LLC “Sibur-Portenergo”
Leningrad region, Kingiseppsky area
No. 308/09-GGE-5780/02
dated 20.05.2009
General De-signer
Constructed in 2013
29 Detail design “Shore protection at Malaya Nevka river”
Committee of Envi-ronmental Man-
agement of St-Petersburg Administration
St-Petersburg, Petrogradsky district,
Krestovsky island, Primorsky park Popedy
St-Petersburg State Expertise
No. 141-2009 dated 18.06.2009
General De-signer
Constructed in 2011
30 Reconstruction of southern approach channel at Ust-Luga Trade Sea Port
FSUE “Rosmorport”
Ust-Luga Trade Sea Port Glavgosexpertiza SPB Branch
No. 308-09/SPE-0317/02
dated 31.07.2009
General De-signer
Object con-structed in 2009
31 Project documentation “Multifunctional reload-ing complex “Yug-2” at Ust-Luga Trade Sea Port
OJSC “Compania Ust-Luga”
Leningrad region, Kingiseppsky district
No. 585-09/ GGE-6330/04
dated 22.09.2009
General De-signer
1 Phase com-pleted in 2008; 2 Phase com-pleted in 2010
6/11
2010 32 Reconstruction of Federal Property objects at St-
Petersburg port. Construction of berthing com-plex for icebreakers anchorage at the St-Petersburg sea port.
FSUE “Rosmorport” St-Petersburg branch
St-Petersburg, 3-rd district of the sea
port, BF, road to Turukhtannye islands
No. 058-10/ GGE-6518/04
dated 01.02.2010
General De-signer
Object con-structed in 2015
33 Basin formation of southern and northern parts of Ust-Luga trade sea port, including operational basin of container terminal in the Leningrad re-gion. Stage 5. Reconstruction of navigational safety system at external offshore approaches to Ust-Luga Trade seaport. 1- st stage.
FSUE “Rosmorport”
Leningrad region, Kingiseppsky district,
Luzhskaya bay of Gulf of Finland
No. 178-10/SPE-0317/02
dated 16.04.2010
General De-signer
Object con-structed in 2010
34 Project documentation “Ust-Luga Trade Sea-port. General cargo complex. Preparatory period objects. 1
st stage” and integrated surveys for de-
velopment of this documentation.
OJSC “Compania Ust-Luga”
Leningrad region, Kingiseppsky district,
Luzhskaya bay of Gulf of Finland
No. 207-10/ SPE-0997/02
dated 14.05.2010
General De-signer
Object con-structed in 2010
35 Project documentation “Multipurpose offshore reloading complex “Bronka”
LLC “Fenix” St-Petersburg, Lomonosov,
E. Efeta street,
No. 493-10/GGE-5820/04
dated 10.06.2010
General De-signer
1 Phase com-pleted in 2015
36 Project documentation “Basin formation of southern and northern parts of Ust-Luga trade sea port, including operational basin for contain-er terminal in Leningrad region. Stage 4. Con-struction of northern approach channel”.
FSUE “Rosmorport”
Leningrad region, Kingiseppsky district,
Luzhskaya bay of Gulf of Finland
No. 429-10/SPE-0317/02
dated 30.08.2010 г; No. 431-10/SPE-
0317/05 dated 30.08.2010
General De-signer
Object con-structed in 2011
37 Project documentation “Reconstruction of con-tainer terminal area and construction of quay No. 88”
CJSC “Pervy containerny termi-
nal”
St-Petersburg, 3-d area of the seaport, road to Turukhtanye islands
No. 993-10/GGE-7022/04
dated 18.10.2010
General De-signer
Under construc-tion since
2013
7/11
2011 38 Project documentation “Development of Ust-
Luga Trade seaport”. Port protecting structure at Yuzhny area basin of Ust-Luga Trade sea port.
FSUE “Rosmorport”
Leningrad region, Kingiseppsky district,
southern part of Luzhskaya bay of Gulf of Finland, Ust-Luga Trade
seaport, Southern port area
No. 095-11/GGE-7253/04
dated 01.02.2011; No. 119-11/GGE-
7253/10 dated 07.02.2011
General De-signer
1 Phase com-pleted in 2014 2 Phase under construction
since 2012
39 Project documentation “Basin formation of southern and northern areas at Ust-Luga Trade sea port, including operational basin of container terminal in the Leningrad region. Stage 6. Re-construction (2
nd stage) of navigational safety
system at external offshore approaches to Ust-Luga Trade seaport”.
FSUE “Rosmorport”
Leningrad region, Kingiseppsky district,
southern part of Luzhskaya bay of Gulf of
Finland
No. 080-11/SPE-0317/02
dated 05.03.11; No. 083-11/SPE-
0317/05 dated 05.03.11
General De-signer
Object con-structed in 2013
40 Project documentation “Development of Ust-Luga Trade seaport”. Service harbour fleet at Ust-Luga Trade sea port.
FSUE “Rosmorport”
Leningrad region, Kingiseppsky district,
southern part of Luzhskaya bay of Gulf of
Finland
No. 353-11/GGE-7390/04
dated 14.04.11; No. 370-11/GGE-
7390/10 dated 15.04.11
General De-signer
Berthing facili-ties constructed
in 2013
Onshore facili-ties under con-struction since
2011
2012 41 Project documentation “Construction of a river
lines complex “Morskoy fasad”
CJSC “River port “Morskoy fasad”
St-Petersburg , Nevskaya bay of Gulf of Finland
No. 424-12/GGE-7980/04
dated 18.05.2012
General De-signer
According to the plans of the Cus-
tomer
8/11
42 Project documentation “Reconstruction of St-Petersburg sea channel” (1 stage)
FSUE “Rosmorport”
St-Petersburg, Nevskaya bay of Gulf of Finland
No. 521-12/GGE-8067/04
dated 15.06.12; No. 543-12/GGE-
8067/10 dated 21.06.12
General De-signer
1.1 stage — constructed
in 2013
43 Project documentation “LPG reloading com-plex”. Adjustment”
LLC “Sibur-Portenergo”
Leningrad region, Kingiseppsky area,
Ust-Luga Trade sea port
No. 1051-12/ GGE -5780/02
dated 09.11.2012
General De-signer
Object con-structed in 2013
2013 44 Project documentation and engineering sur-
veys “Multipurpose offshore reloading com-plex “Bronka” (introduction of changes)”
LLC “Fenix” St-Petersburg, Lomonosov,
E. Efeta street
No. 326-13/GGE-5820/04
dated 16.04.2013
General De-signer
1 Phase com-pleted in 2015 2 Phase under construction
since 2013
45 The inspection of the estimated cost of the ob-ject “Reconstruction of the territory of the con-tainer terminal with the construction of berth No. 88”
CJSC “Pervy containerny termi-
nal”
St-Petersburg, 3-d area of the seaport
No. 371-13/ GGE -7022/10
dated 30.04.2013
General De-signer
Under con-struction since
2013
46 Project documentation and results of engineer-ing surveys “Development of cargo and passen-ger ro-ro ferry and rail ferry terminal in the city of Baltiysk, Kaliningrad region, including con-struction and subsequent operation of the con-tainer terminal throughput capacity of 300 thou-sand TEU per year”
LLC “Baltic stevedoring company”
Kaliningrad region, Baltysk
No. 709-13/ GGE -8677/04
dated 23.08.2013
General De-signer
1, 2, 3 Phases constructed
in 2014
9/11
47 Project documentation and results of engineer-ing surveys “Construction of the sea port facili-ties in the district of Sabetta settlement on the Yamal Peninsula, including the creation of the navigable approach channel in the Gulf of Ob”
OJSC “Yamal LNG”
Sabetta settlement, the Yamal region,
Yamalo-Nenets Autono-mous Okrug, Tyumen
region
No. 852-13/ GGE -8066/04
dated 25.09.2013 No. 853-13/ GGE
-8066/10 dated 25.09.2013
Subcontractor for the objects of the prepara-
tory period
Quay 1, 2, 3, 4 constructed
in 2015
48 Project documentation and results of engineer-ing surveys “ Installation and assemby site of the marine hydraulic facilities with a specialized waterfront. Krasnye Barrikady shipyard OJSC”
LLC “NPF “GT Inspect”
Astrakhan, Ikrianinsky district, Krasnye
Barrikady shipyard
No. 997-13/ GGE -8746/04
dated 25.10.2013
General De-signer
Under con-struction since
2013
2014 49 Project documentation and results of engineer-
ing surveys “Construction of the sea port facili-ties in the district of Sabetta settlement on the Yamal Peninsula, including the creation of the navigable approach channel in the Gulf of Ob. The amendments and additions to the project documentation”
OJSC “Yamal LNG”, OJSC
“Lenmorniiproekt”
Sabetta settlement, the Yamal region,
Yamalo-Nenets Autono-mous Okrug, Tyumen
region
No. 581-14/ GGE -8066/04
dated 30.04.2014 No. 590-14/ GGE
8066/10 dated 5.05.2014
Subcontractor on the main sea port facilities
South East ice barrier con-
structed in 2016
50 Project documentation “Development of transport hub “ Vostochnyi—Nakhodka” (Primorsky Krai). Stage II. Objects of Mari-time transport”
FGI “Rostrans-modernizatsia”
Russia, Primorsky Krai, Nakhodka urban district
in the area of port Vostochnyi,
Partizansky district
No. 1107-14/ GGE -9057/04;
No. 1108-14/ GGE -9057/10 dated
15.09.2014 г
General design engineer
of marine fa-cilities
Under con-struction since
2014
51 Project documentation and results of engi-neering surveys “Artificial land No. 2 in the water object: Baltic sea, Gulf of Finland (Nevskaya Guba), water area of The Greater port of St. Petersburg”, for placing of ob-jects of major construction work of federal significance for multifunctional sea tran-shipment complex "Bronka"
LLC “Fenix” St-Petersburg, Lomonosov,
E. Efeta street
No. 1540-14/GGE -9605/04 dated 8.12.2014
General Designer
Сonstructed in 2014
10/11
2015 52 Project documentation and results of engineer-
ing surveys “Construction of the sea port facili-ties in the district of Sabetta settlement on the Yamal Peninsula, including the creation of the navigable approach channel in the Gulf of Ob. The amendments and additions to the project documentation (2)”
OJSC “Yamal LNG”, OJSC
“Lenmorniiproekt”
Sabetta settlement, the Yamal region,
Yamalo-Nenets Autono-mous Okrug, Tyumen
region
No. 1108-15/GGE -8066/04 dated 18.08.2015;
No. 1112-15/GGE -8066/10 dated 18.08.2015;
Subcontractor objects
preparatory period
Under con-struction since
2015
2016 53 Project documentation and results of engineer-
ing surveys “Reconstruction of the root section of berth No. 9 with the installation and unfas-tening of berthing float... ”
LLC “NPP “Rosmorservice”
Murmansk region No. 77-1-4-0178-16 dated
18.07.2016
Marine facilities sub-contractor
Сommencement of construction
― 2017
54 Project documentation and results of engineer-ing surveys “Multipurpose offshore reloading complex “Bronka” (amendments)”. Stage 2
LLC “Fenix” St-Petersburg, Lomonosov,
E. Efeta street
No. 1045-16/ GGE-5820/04 dated
21.09.2016
General Designer
Under con-struction since
2013
Total as of 14.11.2016
Design work approved by Glavgosexpertiza 54
Constructed 45 Under construction 6 Prospective 3
11/11