List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97...

440
Description of document: List of all US Army Audit Agency (USAAA) Audit Reports, 1997-2010 Requested date: 17-August-2010 Released date: 03-September-2010 Posted date: 06-September-2010 Date/date range of document: 07-February-1997 24-August-2010 Source of document: Freedom of Information Officer United States Army Audit Agency 3101 Park Center Drive, Suite 1315B Alexandria, VA 22302 Fax: 703-681-3308 Email: [email protected] The governmentattic.org web site (“the site”) is noncommercial and free to the public. The site and materials made available on the site, such as this file, are for reference only. The governmentattic.org web site and its principals have made every effort to make this information as complete and as accurate as possible, however, there may be mistakes and omissions, both typographical and in content. The governmentattic.org web site and its principals shall have neither liability nor responsibility to any person or entity with respect to any loss or damage caused, or alleged to have been caused, directly or indirectly, by the information provided on the governmentattic.org web site or in this file. The public records published on the site were obtained from government agencies using proper legal channels. Each document is identified as to the source. Any concerns about the contents of the site should be directed to the agency originating the document in question. GovernmentAttic.org is not responsible for the contents of documents published on the website.

Transcript of List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97...

Page 1: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

Description of document: List of all US Army Audit Agency (USAAA) Audit

Reports, 1997-2010

Requested date: 17-August-2010

Released date: 03-September-2010

Posted date: 06-September-2010

Date/date range of document: 07-February-1997 – 24-August-2010

Source of document: Freedom of Information Officer

United States Army Audit Agency

3101 Park Center Drive, Suite 1315B

Alexandria, VA 22302

Fax: 703-681-3308

Email: [email protected]

The governmentattic.org web site (“the site”) is noncommercial and free to the public. The site and materials

made available on the site, such as this file, are for reference only. The governmentattic.org web site and its

principals have made every effort to make this information as complete and as accurate as possible, however,

there may be mistakes and omissions, both typographical and in content. The governmentattic.org web site and

its principals shall have neither liability nor responsibility to any person or entity with respect to any loss or

damage caused, or alleged to have been caused, directly or indirectly, by the information provided on the

governmentattic.org web site or in this file. The public records published on the site were obtained from

government agencies using proper legal channels. Each document is identified as to the source. Any concerns

about the contents of the site should be directed to the agency originating the document in question.

GovernmentAttic.org is not responsible for the contents of documents published on the website.

Page 2: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

Office of Counsel

DEPARTMENT OF THE ARMY u.s. ARMY AUDIT AGENCY

Office of Counsel 3101 Park Center Drive

Aiexandria, Virginia 22302-1596

September 3,2010

This responds to your Freedom of Information Act, (FOIA), request dated 17 August 2010, for a list of all audit report produced by the U.S. Army Audit Agency. Please find attached the requested list of all Army Audit Reports contained in our system of records.

The fees for responding to your request are waived. Document shall be furnished without any charge if the disclosure of the information is in the public interest because it is likely to contribute significantly to public understanding of the operation or activities of the government and is not primarily in the commercial interest of the requester. This fee waiver does not apply to any future request. An agency's fee schedule may recover the direct cost of search, review, and duplication. if the estimated fees exceed $250, you may be required to pay the estimated fees in advance -- that is, before the records are even processed. Please direct questions to the undersigned at (703) 681-1426 or e-mail ([email protected]) and reference request number 2010-13.

Sincerely,

d~~~~ TIMOTHY S. HANKINS Paralegal

Page 3: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

Product Number Product Name Published Date

A-1997-0001-LAE

Eliminating Hazardous Material in Weapon Systems 7-Feb-97

A-1997-0002-LAE

Audit of Eliminating Hazardous Material in Weapon Systems 7-Feb-97

A-1997-0003-FAF

Army's Principal Financial Statements for Fiscal Years 1996 and 1995 Financial Reporting of Accounts Payable 27-Aug-97

A-1997-0004-FAB

Planned Construction of a Wastewater Treatment Plant at Fort Carson 27-Feb-97

A-1997-0005-FAF Audit of Accounts Payable 23-May-97

A-1997-0006-LAE

Eliminating Hazardous Material in Weapon Systems 11-Apr-97

A-1997-0007-LAE

DODIG Audit of Underground Storage Tanks 1-May-97

A-1997-0008-FAB

Review of Mevatec Corporation's Draft Technical Report on the Retained Issue of Organizational Clothing and Individual Equipment 13-May-97

A-1997-0009-FABInformation Paper Audit of Central Issue Facilities 19-May-97

A-1997-0010-FABWastewater Treatment Services 13-Jun-97

A-1997-0011-AFATermination of Contract DAAK01-92-C-0033 3-Jun-97

A-1997-0012-AFATermination of Contract DAAJ09-91-C-0687 10-Jun-97

A-1997-0013-AFATermination of Contract DAAJ09-96-C-0187 16-Jun-97

A-1997-0014-FAF

Audit of the Army's Principal Financial Statements for Fiscal Years 1996 and 1995 (Financial Reporting of Accounts Payable) 23-Jun-97

A-1997-0015-FAF

Audit of the Army's Principal Financial Statements for Fiscal Years 1996 and 1995 (Financial Reporting of Accounts Payable) 23-Jun-97

Page 4: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1997-0016-FAF

Audit of the Army's Principal Financial Statements for Fiscal Years 1996 and 1995 (Financial Reporting of Accounts Payable) 24-Jun-97

A-1997-0017-AFM

Review of Selected Financial Controls-Morale Welfare and Recreation Fund 30-Jun-97

A-1997-0018-AFATermination of Contract DAAJ09-92-C-0611 17-Jun-97

A-1997-0019-AFATermination of Contract DAAJ09-94-C-0496 17-Jun-97

A-1997-0020-AFATermination of Contract DAAJ09-91-C-1287 19-Jun-97

A-1997-0021-AFATermination of Contract DAAK01-91-C-0058 18-Jun-97

A-1997-0022-AFATermination of Contract DAAJ09-93-C-0513 12-Jun-97

A-1997-0023-AFATermination of Contract DAAJ09-94-C-0573 19-Jun-97

A-1997-0024-AFATermination of Contract DAAJ09-91-C-0623 19-Jun-97

A-1997-0025-AFATermination of Contract DAAJ09-97-C-0085 23-Jun-97

A-1997-0026-AFATermination of Contract DAAJ09-94-C-0073 24-Jun-97

A-1997-0027-AFATermination of Contract DAAJ09-92-C-0675 26-Jun-97

A-1997-0028-AFATermination of Contract DAAJ09-90-C-0382 1-Jul-97

A-1997-0029-FAP

Evaluation of the Management Control Process FY 97, US Military Academy 12-Aug-97

A-1997-0030-FAP

Evaluation of the Army Management Control Process FY 97, Army Test & Evaluation Cmd 25-Jul-97

A-1997-0031-FAP

Evaluation of the Army Management Control Process FY 97, Center for Army Analysis 22-Jul-97

A-1997-0032-FAP

Evaluation of the Management Control Process FY 97, US Army South 12-Aug-97

A-1997-0033-FAD

Army Working Capital Fund Supply Management FY 97 Financial Statements, U.S. Army Missile Command 25-Aug-97

Page 5: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1997-0034-FAP

Evaluation of the Management Control Process FY 97, Chief, Army Reserve 15-Aug-97

A-1997-0035-AFM

Selected Financial Controls-Morale Welfare and Recreation Activities 29-Aug-97

A-1997-0036-FADArmy Working Capital Fund FY 97 Financial Statements 26-Sep-97

A-1997-0037-FAP

Evaluation of the Army Management Control Process FY 97, Office of the Inspector General 9-Sep-97

A-1997-0038-LALUnit-Level Logistics System-Ground 26-Sep-97

A-1997-0039-FAP

Evaluation of the Army Management Control Process FY 97, Information Office/Army G-6 19-Sep-97

A-1997-0040-AFM Family Advocacy Program 28-May-97

A-1997-0041-AFI

Consulting Engagement on Special Funding for International Support--Humanitarian and Civic Assistance 3-Jun-97

A-1997-0042-AFI

Consulting Engagement on Special Funding for International Support--Developing Countries Combined Exercise Program 3-Jun-97

A-1998-0001-AFMManagement of Deployable Medical Systems 9-Oct-97

A-1998-0002-LALUnit-Level Logistics System-Ground 9-Oct-97

A-1998-0003-LAE

Eliminating Hazardous Materiel in Weapon Systems 10-Oct-97

A-1998-0004-FAB

Review of Contractor Claims for Additional Funds Under a Hospital Housekeeping Contract 3-Oct-97

A-1998-0005-FAP

Evaluation of U.S. Army Pacific's Army Management Control Process Responsibilities for Pacific Stars and Stripes--Information Memorandum 3-Oct-97

Page 6: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0006-FAP

Evaluation of the Army Management Control Process FY 97 3-Oct-97

A-1998-0007-LAR

Environmental Remediation, Pueblo Chemical Depot, Pueblo, Colorado 24-Nov-97

A-1998-0008-AFHDragon Hill Lodge CID Request Korea 8-Oct-97

A-1998-0009-FAP

Web Server Security, U.S. Army Aviation and Missile Command 31-Oct-97

A-1998-0010-FAP Army Web Server Security 20-Jan-98

A-1998-0011-LAL

Review of Army Suggestion AMYY910405 Remote Anti-Armor Mines Program (RAAM) Electronic Assembly (Lens) Rework 14-Oct-97

A-1998-0012-FADArmy Working Capital Fund FY 97 Financial Statements 20-Oct-97

A-1998-0013-FAP

Evaluation of the Management Control Process FY 97, G-2, Intelligence 8-Oct-97

A-1998-0014-FAP

Evaluation of the Army Management Control Process FY 97, ASA(M&RA) 21-Oct-97

A-1998-0015-LAR

Base Realignment and Closure Construction Requirements 12-Nov-97

A-1998-0016-LAR

Environmental Remediation, Fort Devens, Massachusetts 24-Oct-97

A-1998-0017-FAF

Army's Principal Financial Statement for Fiscal Years 1996 and 1995 Financial Reporting of Progress Payments 14-Nov-97

A-1998-0018-AFM

Selected Financial Controls--Morale Welfare and Recreation Activities 27-Oct-97

A-1998-0019-LAR

Environmental Remediation, U.S. Army Materials Technology Laboratory, Watertown, Massachusetts 24-Oct-97

A-1998-0020-LAR

Arvin Cadet Physical Development Center Construction Project 14-Nov-97

Page 7: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0021-FACAudit of the American Red Cross 20-Oct-97

A-1998-0022-FAP

Evaluation of the Army Management Control Process FY 97, Chief of Staff, Army 27-Oct-97

A-1998-0023-FAB Space Utilization 30-Oct-97

A-1998-0024-LAE

Eliminating Hazardous Material in Weapon Systems 30-Oct-97

A-1998-0025-AFHDragon Hill Lodge CID Request Korea 22-Oct-97

A-1998-0026-AFH Bilateral Training Exercises 18-Nov-97

A-1998-0027-AFMChild and Adult Care Food Program 7-Nov-97

A-1998-0028-FACAudit of Controls Over Computer Resources 17-Nov-97

A-1998-0029-AFIAmmunition Management (U) 3-Nov-97

A-1998-0030-AFAAchieving Efficiencies in Testing 15-Dec-97

A-1998-0031-LALTotal Asset Visibility - Operational Projects 17-Nov-97

A-1998-0032-FADArmy Working Capital Fund FY 97 Financial Statements 17-Nov-97

A-1998-0033-FAP

Review of the Army Management Control Process (Fiscal Year 1997) an Assessment for the Secretary of the Army 14-Nov-97

A-1998-0034-FAU

Review of Planning Actions for Base Closure of the Augsburg Community--Information Memorandum 12-Nov-97

A-1998-0035-LAR

Environmental Remediation, Alabama Army Ammunition Plant, Childersburg, Alabama 2-Dec-97

A-1998-0036-FAC

Audit of Automated Information Systems (Phase I) - Year 2000 21-Jan-98

A-1998-0037-FAF

Audit of the Army's FY 97 Financial Statements Financial Reporting of Missiles 13-Nov-97

A-1998-0038-FAF

Audit of the Army's FY 97 Financial Statements Financial Reporting of Munitions 13-Nov-97

Page 8: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0039-FACReview of Special Act/Service Award 14-Nov-97

A-1998-0040-AFMArmy Family Advocacy Program 9-Dec-97

A-1998-0041-AFHTransportation Motor Pool Operations 12-Dec-97

A-1998-0042-FAP Out-of-Service Debt 17-Dec-97

A-1998-0043-FAFVerification of Mission Assets, Hawaii ARNG 20-Nov-97

A-1998-0044-FAFVerification of Mission Assets, 25th ID 20-Nov-97

A-1998-0045-FABArmy's Utility Privatization Program 18-Dec-97

A-1998-0046-FAD

Army Working Capital Fund Supply Management FY 97 Statement of Financial Position 17-Dec-97

A-1998-0047-FAU

Review of Demilitarization in Country Suggestion Award 25-Nov-97

A-1998-0048-LAR

Base Realignment and Closure 1995 Construction Requirements 2-Apr-98

A-1998-0049-AFM Cash Controls 18-Dec-97

A-1998-0050-FAB

Life-Cycle Cost Comparisons Housing E-5 and E-6 Soldiers Off Post Versus in Barracks 4-Dec-97

A-1998-0051-AFM

Baseline Validation--Demonstration Project for Uniform Funding of Morale Welfare and Recreation Activities 23-Dec-97

A-1998-0052-LAR

Analysis of Present Value of Proposed Payment for the Detroit Arsenal Tank Plant Warren Michigan Economic Development Conveyance 5-Dec-97

A-1998-0053-AFAContract Termination Process 23-Dec-97

A-1998-0054-FAPFollow-up Audit of the Ammunition Supply Point 23-Dec-97

A-1998-0055-AFH

Evaluation of Economies and Efficiencies Review U.S. Army Pacific--Information Memorandum 12-Dec-97

A-1998-0056-FAPReview of Army Staff Activities Welfare Fund 15-Dec-97

A-1998-0057-FAF

Financial Reporting of Section 801 Family Housing Leases 23-Dec-97

Page 9: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0058-FAF

Closeout of Conventional Ammunition Working Capital Fund--Phase I 23-Dec-97

A-1998-0059-FAB

Unaccompanied Enlisted Personnel Housing Program 29-Dec-97

A-1998-0060-AMW

Army Working Capital Fund FY 97 Financial Statements--Work in Process 21-Jan-98

A-1998-0061-AFM

Selected Financial Controls--Morale Welfare and Recreation Activities 30-Dec-97

A-1998-0062-FAB Space Utilization 29-Dec-97

A-1998-0063-FAP

Observations for Management Consideration--Audit of the Secretary of Defense Mess Fund Financial Statements 5-Jan-98

A-1998-0064-FAPSecretary of Defense Mess Fund Financial Statements 8-Jan-98

A-1998-0065-FAP

Observations for Management Consideration--Audit of the General Officers' Mess Financial Statements 5-Jan-98

A-1998-0066-FAPGeneral Officers' Mess Fund Financial Statements 8-Jan-98

A-1998-0067-FABOutsourcing Transportation Services 17-Dec-97

A-1998-0068-FAF

Verification of Mission Assets (Aircraft Tracked Vehicles and Missile Components), 2nd ID & 17th Avn Bde 9-Dec-97

A-1998-0069-FAF

Verification of Mission Assets (Missiles), 19th TSC (6th Ord Bn) 9-Dec-97

A-1998-0070-AFM

Selected Financial Controls--Morale Welfare and Recreation Activities 16-Jan-98

A-1998-0071-AFT

Audit of Army Workload and Performance System Within U.S. Army Industrial Operations Command's Maintenance Depots 9-Jan-98

Page 10: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0072-FAF

Audit of the Army's FY 97 Financial Statements Financial Reporting of Wholesale Equipment--General Ledger Trial Balance 31-Dec-97

A-1998-0073-FAF

Audit of Financial Reporting of Wholesale Equipment--Equipment in an Unknown Condition Army FY 97 Financial Statements 31-Dec-97

A-1998-0074-FAF

Audit of Financial Reporting of Wholesale Equipment--Pricing Adjustment 31-Dec-97

A-1998-0075-FAF

Audit of the Army's FY 97 Financial Statements Financial Reporting of Wholesale Equipment--Communications-Electronics Command Equipment Balances 31-Dec-97

A-1998-0076-FAUFamily Housing Management 26-Jan-98

A-1998-0077-LALInitial Spares and Repair Parts 30-Jan-98

A-1998-0078-FAC

Contracting Policies and Procedures, St. Paul District, USACE 2-Feb-98

A-1998-0079-FADArmy Working Capital Fund FY 97 Financial Statements 23-Jan-98

A-1998-0080-FAFValidation of Mission Assets, USAREUR 12-Jan-98

A-1998-0081-FAF

Validation of Mission Assets, Army Parachute Team 12-Jan-98

A-1998-0082-FAFValidation of Mission Assets, TRADOC 12-Jan-98

A-1998-0083-FAFValidation of Mission Assets, SOCOM 12-Jan-98

A-1998-0084-AFAContract Termination Process 26-Jan-98

A-1998-0085-FAFValidation of Mission Assets, Army Reserve Cmd 13-Jan-98

A-1998-0086-FAFValidation of Mission Assets, NGB 13-Jan-98

A-1998-0087-FAFValidation of Mission Assets, FORSCOM 13-Jan-98

Page 11: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0088-FAF

Validation of Mission Assets, Kuwait/Saudi Arabia 13-Jan-98

A-1998-0089-IME

Audit of Execution of Environmental Projects, U.S. Army Garrison, Hawaii 15-Jan-98

A-1998-0090-AFMSelected Financial Controls Over Billeting Activities 30-Jan-98

A-1998-0091-AMW

Recommended Adjustments to Draft Financial Statements Audit of Army Working Capital Fund FY 97 Financial Statements 14-Jan-98

A-1998-0092-LAR Real Estate Acquisition 9-Mar-98

A-1998-0093-FACCity of Cumberland Section 202 Project 6-Feb-98

A-1998-0094-IME

Audit of Execution of Environmental Projects, U.S. Army, Pacific 20-Jan-98

A-1998-0095-FAF

Proposed Adjustments and Comments Regarding Army's Draft FY 97 Annual Financial Report 30-Jan-98

A-1998-0096-AFA Advisory Service Contracts 12-Feb-98

A-1998-0097-LAEForestry and Agricultural Outleasing Programs 3-Feb-98

A-1998-0098-FAF

Army's Principal Financial Statements for Fiscal Years 1997 and 1996--Financial Reporting of Wholesale Munitions 5-Feb-98

A-1998-0099-FAU

Sustainment Requirements for the Army Prepositioned Stock Program 23-Feb-98

A-1998-0100-FAC

Year 2000 Audit Status Update to LTG William H. Campbell Director of Information Systems for Command Control Communications and Computers 23-Jan-98

A-1998-0101-AFM Financial Controls 17-Feb-98

Page 12: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0102-LAR

Analysis of Present Value of Proposed Payment for the U.S. Army Materials Technology Laboratory Watertown Massachusetts--Information Memorandum 27-Jan-98

A-1998-0103-FAF

Closeout of the Conventional Ammunition Working Capital Fund--Phase II 17-Feb-98

A-1998-0104-FAF

Army's Principal Financial Statements for Fiscal Years 1997 and 1996--Auditor's Report 13-Feb-98

A-1998-0105-AFTCost Reimbursement for Contingency Operations 16-Mar-98

A-1998-0106-LAR

Environmental Remediation, Fort Ord, California 23-Mar-98

A-1998-0107-FAC

Audit of U.S. Army Europe and Seventh Army's Year 2000 Action Plan 3-Mar-98

A-1998-0108-FAC

Corps of Engineers Financial Management System 13-Feb-98

A-1998-0109-IME

Audit of Execution of Environmental Projects, Eighth Army, Korea 6-Feb-98

A-1998-0110-AMW

Army Working Capital Fund FY 97 Financial Statements--Property Plant and Equipment 3-Mar-98

A-1998-0111-AMW

Army Working Capital Fund Principal Financial Statements for Fiscal Year 1997--Auditor's Report 13-Feb-98

A-1998-0112-FACFY 97 Financial Statements Opinion Reports 19-Feb-98

A-1998-0113-FAF

Audit of the Army's Principal Financial Statements for Fiscal Years 1997 and 1996 (Financial Reporting of Fund Balances with Treasury) 10-Feb-98

A-1998-0114-AFH Telephone Costs 2-Mar-98

A-1998-0115-FAC

Audit of Automated Information Systems--Year 2000 19-Feb-98

Page 13: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0116-FAC Year 2000 Assist - Korea 11-Feb-98

A-1998-0117-AFA

Audit of the Acquisition Research and Development Management Decision Packages 23-Feb-98

A-1998-0118-FAC

Audit of Automated Information Systems--Year 2000 19-Feb-98

A-1998-0119-AFAAudit of Planning for Software Support 13-Feb-98

A-1998-0120-FAC

Audit of Automated Information Systems-Year 2000 Forward Area Air Defense Command and Control System 13-Feb-98

A-1998-0121-LAR

Review of U.S. Military Entrance Processing Command's Bold Venture Lease Initiatives 24-Feb-98

A-1998-0122-FAC

Audit of Standard Army Retail Supply System Year 2000 25-Feb-98

A-1998-0123-FAP

Information Assurance for the Army's Segment of the Defense Civilian Personnel Data System 3-Mar-98

A-1998-0124-AMW

Army Working Capital Fund Principal Financial Statements for Fiscal Year 1997--Report on Internal Controls and Compliance with Laws and Regulations 19-Mar-98

A-1998-0125-FAD

Army Working Capital Fund Supply Management Statement of Financial Position as of 30 September 1997 20-Mar-98

A-1998-0126-FAC

Upper Baker Additional Flood Control Agreement Multilocation Audit of Power Generation Operations 23-Feb-98

A-1998-0127-FAC

Audit of Automated Information Systems-Year 2000 Advanced Field Artillery Tactical Data System 24-Feb-98

A-1998-0128-FAC

Audit of Automated Information Systems-Year 2000 Global Command and Control System-Army 24-Feb-98

Page 14: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0129-FAU

Disposition of Track Vehicles Excess to U.S. Army Europe Requirements 26-Feb-98

A-1998-0130-AFT

Implementation of the Workload-Based Manpower Requirements Program 16-Mar-98

A-1998-0131-FAB

Follow-on-Review of Contractor Billings for Computer and Other Information Management-Related Services, 48th MP Detachment, CID 27-Feb-98

A-1998-0132-FAB

Follow-on Review of Contractor Billings for Computer and Other Information Management-Related Services, Fort Carson, CO 27-Feb-98

A-1998-0133-IMH

Reengineering Overhead Support for Morale Welfare and Recreation Activities, Fort Sill 18-Mar-98

A-1998-0134-LAE

Management of Underground Storage Tanks 16-Mar-98

A-1998-0135-FAB

Reengineering Organizational Clothing and Individual Equipment and Central Issue Facility Operations 30-Mar-98

A-1998-0136-LAR

Military Traffic Management Command Base Realignment and Closure 1995 Construction Requirements 20-Mar-98

A-1998-0137-LAR

Audit of the Military Traffic Management Command Site Selection Process 9-Mar-98

A-1998-0138-FAUArmy Prepositioned Stock Program 31-Mar-98

A-1998-0139-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Stewart Directorate of Public Works Commercial Activities Study 5-May-98

Page 15: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0140-AFT

Audit of Army Workload and Performance System Within U.S. Army Industrial Operations Command's Maintenance Depots 6-Mar-98

A-1998-0141-AFM

Assets and Liabilities of Army Morale Welfare and Recreation Test Sites 30-Mar-98

A-1998-0142-IME

Audit of Execution of Environmental Projects, INSCOM 16-Mar-98

A-1998-0143-IME

Audit of Execution of Environmental Projects, NGB 16-Mar-98

A-1998-0144-FAF

Army's Principal Financial Statements for Fiscal Year 1997 and 1996--Financial Reporting of Accounts Receivable 30-Mar-98

A-1998-0145-AFARotary Wing Aircraft Flight Simulators Army 17-Apr-98

A-1998-0146-FAFValidation of Mission Assets, AMC 13-Mar-98

A-1998-0147-AMW

Army Working Capital Fund FY 97 Financial Statements--Fund Balance with Treasury 1-May-98

A-1998-0148-AFT

Implementation of the Workload-Based Manpower Requirements Program 30-Mar-98

A-1998-0149-LAR

Base Realignment and Closure 1995 Construction Requirements 16-Apr-98

A-1998-0150-AMW

Army Working Capital Fund FY 97 Financial Statements--Accounts Receivable Federal 10-Apr-98

A-1998-0151-AFAAudit of Planning for Software Support 19-Mar-98

A-1998-0152-LAE

Eliminating Hazardous Material in Weapon Systems 15-Apr-98

A-1998-0153-IME

Audit of Execution of Environmental Projects, Space & Missile Defense Cmd 31-Mar-98

A-1998-0154-IME

Audit of Execution of Environmental Projects, TRADOC 31-Mar-98

Page 16: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0155-AFT

Review of Title XI Support to the Total Army School System 22-Apr-98

A-1998-0156-FAF

Army's Principal Financial Statements for Fiscal Years 1997 and 1996--Financial Reporting of Wholesale Equipment--Follow-up Issues 31-Mar-98

A-1998-0157-FABReview of Dining Facility Contract at Fort Myer 24-Mar-98

A-1998-0158-FAU

Review of Selected Aspects of the Army Prepositioned Stock Program in Europe 27-Mar-98

A-1998-0159-LAR

Base Realignment and Closure 1995 Construction Requirements 16-Apr-98

A-1998-0160-AFI

Logistical Systems in Support of Special Programs (U) 1-Apr-98

A-1998-0161-AFIAcquisition Planning - Phase III (U) 7-Apr-98

A-1998-0162-AMW

Army Working Capital Fund FY 97 Financial Statements--Unearned Revenue 1-May-98

A-1998-0163-IME

Audit of Execution of Environmental Projects, AMC 3-Apr-98

A-1998-0164-AMIYear 2000 Compliance for Special Programs (U) 2-Apr-98

A-1998-0165-LAR

Environmental Remediation, Camp Bonneville, Vancouver, Washington 30-Apr-98

A-1998-0166-FAC

Audit of Automated Information Systems for Year 2000 31-Mar-98

A-1998-0167-AFI Ammunition Management 17-Apr-98

A-1998-0168-IMT

U.S. Army Audit Agency's Review of the Final Draft Performance Work Statement for the Fort Bragg Logistics Division Commercial Activity Study 9-Apr-98

A-1998-0169-LALUnit-Level Logistics System-Ground 29-Apr-98

Page 17: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0170-FAF

Army's Principal Financial Statements for Fiscal Years 1997 and 1996--Report on Internal Controls and Compliance with Laws and Regulations 9-Apr-98

A-1998-0171-FAF

Army's Principal Financial Statements for Fiscal Years 1997 and 1996--Accountability for Army Mission Equipment 4-May-98

A-1998-0172-FAF

Army's Principal Financial Statements for Fiscal Years 1997 and 1996--Financial Reporting of Environmental Liabilities 11-May-98

A-1998-0173-FAF

Army's Principal Financial Statements for Fiscal Years 1997 and 1996--Financial Reporting of Real Property Natural Resources and Leases 11-May-98

A-1998-0174-FAC

Audit of Automated Information Systems--Year 2000 26-Mar-98

A-1998-0175-FAC

Audit of Automated Information Systems--Year 2000 Army Training Requirements and Resources System 30-Mar-98

A-1998-0176-FFB

Follow-on Audit of Information Systems Security, CECOM 9-Apr-98

A-1998-0177-FFB

Follow-on Audit of Information Systems Security, Fort Drum 9-Apr-98

A-1998-0178-FFB

Follow-on Audit of Information Systems Security, Army Signal Cmd 9-Apr-98

A-1998-0179-FFB

Follow-on Audit of Information Systems Security, Fort Huachuca 9-Apr-98

A-1998-0180-FFB

Follow-on Audit of Information Systems Security, Fort Detrick 9-Apr-98

A-1998-0181-FFB

Follow-on Audit of Information Systems Security, Fort Hood 9-Apr-98

A-1998-0182-FFB

Follow-on Audit of Information Systems Security, Fort Bragg 9-Apr-98

Page 18: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0183-FFB

Follow-on Audit of Information Systems Security, Fort Lewis 9-Apr-98

A-1998-0184-AFH Aviation Maintenance 4-May-98

A-1998-0185-IME

Audit of Execution of Environmental Projects, TSG 17-Apr-98

A-1998-0186-LALProject Manager-Owned Assets 27-Apr-98

A-1998-0187-AFM

Army and Air Force Civilian Welfare Fund--Auditor's Report 27-Apr-98

A-1998-0188-AFT

Audit of the Army Operations Manpower and Training Management Decision Packages 15-Apr-98

A-1998-0189-FFPCamp Casey Sewage Treatment Plant 23-Apr-98

A-1998-0190-AFA

Review of Army Suggestion AMPP970003 Shipment of Foreign Military Sales Materiel to Customer Nations 15-Apr-98

A-1998-0191-AML

Open Local Purchase Transactions with Requests for Cancelation 20-Apr-98

A-1998-0192-AFA

Using Tank Weapon Gunnery Simulation System/Precision Gunnery System for Force-on-Force Training 11-May-98

A-1998-0193-FAC

Audit of Corps of Engineers Financial Management System - Year 2000 16-Apr-98

A-1998-0194-IME

Audit of Execution of Environmental Projects, Army Reserve Cmd 17-Apr-98

A-1998-0195-FAC FY 97 Financial Statements 1-May-98

A-1998-0196-FAC

Audit of Automated Information Systems-Year 2000 21-Apr-98

A-1998-0197-AMW

Army Working Capital Fund FY 97 Financial Statements--Inventory Net - Process of Assembly/Disassembly 8-May-98

A-1998-0198-AMIYear 2000 Compliance for Special Programs (U) 6-May-98

A-1998-0199-AMIYear 2000 Compliance for Special Programs (U) 24-Jun-98

Page 19: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0200-AMIYear 2000 Compliance for Special Programs (U) 15-Jun-98

A-1998-0201-AFTDepot-Level Maintenance Workload Reporting 1-Jun-98

A-1998-0202-IME

Audit of Execution of Environmental Projects, COE 29-Apr-98

A-1998-0203-IME

Audit of Execution of Environmental Projects, MEDCOM 29-Apr-98

A-1998-0204-LAR

Base Realignment and Closure 1995 Construction Requirements 29-May-98

A-1998-0205-AFA Foreign Military Sales 10-Sep-98A-1998-0206-AFA Service Contracts 29-May-98

A-1998-0207-AMIYear 2000 Compliance for Special Programs (U) 19-May-98

A-1998-0208-AFIFunding for Sensitive Contracts (U) 29-May-98

A-1998-0209-AFAContract Termination Process 10-Jun-98

A-1998-0210-AMW

Army Working Capital Fund FY 97 Financial Statements--Advances and Prepayments Non-Federal 30-Jun-98

A-1998-0211-FAC

Audit of Automated Information Systems Year 2000--DA Functional Proponent Year 2000 Oversight Programs, ASA(ALT) 20-May-98

A-1998-0212-FAC

U.S. Army Audit Agency Assessment of U.S. Naval Forces Europe's Year 2000 Program 30-Jun-98

A-1998-0213-FAC

Audit of Automated Information Systems Year 2000--DA Functional Proponent Year 2000 Oversight Programs, ASA(M&RA) 20-May-98

A-1998-0214-FAC

Audit of Automated Information Systems Year 2000--DA Functional Proponent Year 2000 Oversight Programs, ASA(FM&C) 20-May-98

Page 20: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0215-FAC

Audit of Automated Information Systems Year 2000--DA Functional Proponent Year 2000 Oversight Programs, ACSIM 20-May-98

A-1998-0216-FAC

Audit of Automated Information Systems Year 2000--DA Functional Proponent Year 2000 Oversight Programs, DCS G-4 20-May-98

A-1998-0217-FAC

Audit of Automated Information Systems Year 2000--DA Functional Proponent Year 2000 Oversight Programs, DCS G-1 20-May-98

A-1998-0218-FAC

Audit of Automated Information Systems Year 2000--DA Functional Proponent Year 2000 Oversight Programs, DCS G-2 20-May-98

A-1998-0219-FAC

Audit of Automated Information Systems Year 2000--DA Functional Proponent Year 2000 Oversight Program, Program Analysis & Evaluation 20-May-98

A-1998-0220-FAC

Audit of Automated Information Systems Year 2000--DA Functional Proponent Year 2000 Oversight Programs, DCS G-3 20-May-98

A-1998-0221-AFA

Audit of Implementing Acquisition Reform Initiatives in Base Operations Contracting 11-May-98

A-1998-0222-LAE Farming Operation 22-May-98

A-1998-0223-LAR

Environmental Remediation, Fort Sheridan, Illinois 29-May-98

A-1998-0224-LALRequirements for Unit-Level Logistics System 1-Jun-98

A-1998-0225-LAL

Audit of Standard Army Retail Supply System-Objective (SARRS O) 11-May-98

Page 21: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0226-FAC

Audit of Automated Information Systems Year 2000, National Guard Bureau 7-Apr-98

A-1998-0227-AMLOpen Local Purchase Transactions 12-May-98

A-1998-0228-AMW

Army Working Capital Fund FY 97 Financial Statements--Allowance for Unrealized Holding Gains and Losses 12-Jun-98

A-1998-0229-IME

Follow-on Review of Underground Storage Tanks 29-May-98

A-1998-0230-LAL

Review of Workload and Costs to Sustain Legacy Retail Logistics Systems 28-May-98

A-1998-0231-FAP

Use of Activity-Based Costing in Developing Reimbursable Rates 16-Jun-98

A-1998-0232-IME

Audit of Execution of Environmental Projects, US Military Academy 21-May-98

A-1998-0233-IME

Audit of Execution of Environmental Projects, MDW 21-May-98

A-1998-0234-IME

Audit of Execution of Environmental Projects, FORSCOM 21-May-98

A-1998-0235-IME

Audit of Execution of Environmental Projects, MTMC 21-May-98

A-1998-0236-IME

Audit of Execution of Environmental Projects, Army Environmental Center 21-May-98

A-1998-0237-AFM

Audit of Military Health System Utilization Management Program at Medical Centers 22-May-98

A-1998-0238-AFIAcquisition Planning - Phase IV (U) 27-May-98

A-1998-0239-FAU

Audit of Theater Excess Management Program for Major Items 28-May-98

A-1998-0240-FAF

Audit of the Army's FY 98 Financial Statements--Financial Reporting of Accounts Receivable 28-May-98

A-1998-0241-AMA Probe Data Adjustments 19-Jun-98

A-1998-0242-AFA

Implementing Acquisition Reform Initiatives in Base Operations Contracting 19-Jun-98

Page 22: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0243-IMT

Interim Review of the Performance Work Statement Template 10-Jun-98

A-1998-0244-FABReview of Outsourcing Transportation Services 3-Jun-98

A-1998-0245-IMH

Reengineering Overhead Support for Morale Welfare and Recreation Activities, Aberdeen Proving Ground 12-Jun-98

A-1998-0246-AFHManagement Controls Dragon Hill Lodge 16-Jun-98

A-1998-0247-FAC

FY 97 Financial Statements Report on Internal Controls and Compliance with Laws and Regulations 29-Jun-98

A-1998-0248-FAC

Audit of Corps of Engineers FY 97 Financial Statements Lessons Learned from the Audit of the Southwestern Division 12-Jun-98

A-1998-0249-LAL Initial Spares 30-Jul-98

A-1998-0250-LAEReusing Tank-Automotive Items 19-Jun-98

A-1998-0251-AFM

Follow-up Audit of Psychiatry Services Contract 19-Jun-98

A-1998-0252-AFAPlanning for Software Support 30-Jun-98

A-1998-0253-AMLOpen Local Purchase Transactions 3-Aug-98

A-1998-0254-AFM

FY 97 Validation--Demonstration Project for Uniform Funding of Morale Welfare and Recreation Activities 26-Jun-98

A-1998-0255-AMW

Army Working Capital Fund FY 97 Financial Statements--Accounts Payable Federal and Non-Federal 30-Jun-98

A-1998-0256-AMW

Army Working Capital Fund FY 97 Financial Statements--Follow-up Issues 30-Jun-98

A-1998-0257-AFT

Army Workload and Performance System in Maintenance Depots 31-Jul-98

Page 23: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0258-AMW

Army Working Capital Fund FY 97 Financial Statements--Inventory - Government-Furnished Material 30-Jun-98

A-1998-0259-AMLInterim Report on Open Wholesale Transactions 22-Jun-98

A-1998-0260-AFAFollow-up Audit Savings from Acquisition Reform 31-Jul-98

A-1998-0261-FFC

Audit of FY 98 Civil Works Financial Statements Lessons Learned 29-Jun-98

A-1998-0262-AFM The Army Ten-Miler 24-Jun-98

A-1998-0263-FAC

Corps of Engineers Financial Management System 30-Jun-98

A-1998-0264-LALSecurity of Total Asset Visibility 30-Jun-98

A-1998-0265-AFM

Army and Air Force Civilian Welfare Fund--Auditor's Report 30-Jun-98

A-1998-0266-AFT

Audit of the Total Army School System--Equipment and Facilities 30-Jun-98

A-1998-0267-LAR

Base Realignment and Closure 1995 Construction Requirements 30-Jun-98

A-1998-0268-LAR

Base Realignment and Closure 1995 Construction Requirements 30-Jun-98

A-1998-0269-LAEU.S. Geological Survey Support 29-Jun-98

A-1998-0270-AFIUtilization of Secure Facilities 13-Jul-98

A-1998-0271-AFACombining Armor Simulator Capability 23-Jul-98

A-1998-0272-AMIInformation Systems Security 16-Jul-98

A-1998-0273-IMT

U.S. Army Audit Agency's Review of the Draft Performance Work Statement for the Fort Drum Directorate of Logistics Commercial Activities Study 14-Jul-98

A-1998-0274-FFPFollow-Up Audit of Aviation Maintenance Workload 14-Jul-98

Page 24: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0275-FFB

Review of the Army Management Control Process FY 98, Missouri Army National Guard 24-Jul-98

A-1998-0276-AFA

Program Objective Memorandum 98-03 Efficiencies--Consolidating Contracting Offices 31-Jul-98

A-1998-0277-AFHReview of Proposed FY 99 Room Rates 16-Jul-98

A-1998-0278-AFTTables of Organization and Equipment 26-Aug-98

A-1998-0279-AFAContract Termination Process 11-Aug-98

A-1998-0280-IMT

Review of Government Costs of Transition Assistance Offices 23-Jul-98

A-1998-0281-FAP

Program Objective Memorandum Efficiency for Debt Avoidance 18-Aug-98

A-1998-0282-AFAReforming Ammunition Procurement--Phase II 27-Aug-98

A-1998-0283-FAB

USAAA Review of the Most Efficient Organization Dated 17 April 1998 for the Fort Carson Directorate of Logistics Commercial Activity Study 24-Jul-98

A-1998-0284-IMH

Emergency Room Operations, Ireland Army Community Hospital, Fort Knox, KY 10-Aug-98

A-1998-0285-IMH

Emergency Room Operations, Moncrief Army Community Hospital, Fort Jackson, SC 10-Aug-98

A-1998-0286-FFCInitial Assessment of Lessons Learned 30-Jul-98

A-1998-0287-FACPower Generations Operations 11-Aug-98

A-1998-0288-FAC

U.S. Southern Command's Management of the Year 2000 31-Jul-98

A-1998-0289-FAC

U.S. European Command's Management of the Year 2000 30-Jul-98

A-1998-0290-FAPCloseout Plans--Republic of Panama 24-Aug-98

Page 25: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0291-IMH

Emergency Room Operations, Evans Army Community Hospital, Fort Carson, CO 10-Aug-98

A-1998-0292-FAU Barracks Requirements 10-Sep-98

A-1998-0293-AML

Supply Transactions Without Obligations in the Financial System 29-Jul-98

A-1998-0294-FFB

Evaluation of the Army Management Control Process FY 98, COE-Detroit District 28-Jul-98

A-1998-0295-FAUAudit of Barracks Requirements 3-Aug-98

A-1998-0296-FFB

Review of the Army Management Control Process FY 98, Fort Campbell 3-Aug-98

A-1998-0297-LAK

Audit of the Maintenance Management Decision Packages 6-Aug-98

A-1998-0298-FAB

Review of Government Costs for the Fort Carson Directorate of Logistics Commercial Activities Study 7-Aug-98

A-1998-0299-AFTTracking Efficiencies--Power Projection Platforms 2-Sep-98

A-1998-0300-FAB

Schedule of Adjustments to the Cost Comparison Form Directorate of Logistics 7-Aug-98

A-1998-0301-IMT

U.S. Army Audit Agency's Review of the Final Draft Management Study & the Draft Technical Performance Plan for the Fort Bragg Logistics Division Commercial Activity Study 12-Aug-98

A-1998-0302-IMH

Reengineering Overhead Support for Morale Welfare and Recreation Activities, Fort Stewart 25-Aug-98

A-1998-0303-FFC

Statement of Budgetary Resources Cycle Memorandum, USACE 15-Sep-98

A-1998-0304-AMLAudit of Retail Supply Operations, Fort Polk 21-Aug-98

A-1998-0305-FABTracking Efficiencies--Paid Parachutist Authorizations 28-Aug-98

Page 26: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0306-FAC

Audit of Automated Information Systems--Year 2000 (Phase IV); Assessment of Selected Mission Critical Systems at the U.S. Army Reserve Command 13-Aug-98

A-1998-0307-FAC

Audit of Automated Information Systems--Year 2000 (Phase IV); Assessment of Selected Mission Critical Systems at the Office of the PEO STAMIS (Later became Enterprise Information Systems) 13-Aug-98

A-1998-0308-FFB

Audit of Automated Information Systems--Year 2000 (Phase IV); Assessment of Selected Army Air Traffic Control Mission Critical Systems 13-Aug-98

A-1998-0309-AMIYear 2000 Compliance for Special Programs (U) 25-Aug-98

A-1998-0310-IMT

U.S. Army Audit Agency's Rev of the Draft Performance Work Statement for Aberdeen Test Center's Admin & Test Supt Services Commercial Activities Study 24-Aug-98

A-1998-0311-FAB

Review of Planned Privatization of the Logistics System Support Center 17-Aug-98

A-1998-0312-AML

Procedures for Identifying Available Obligation Authority Related to Invalid Local Purchase Transactions 11-Sep-98

A-1998-0313-FFB

Review of the Army Management Control Process FY 98, Idaho Army National Guard 20-Aug-98

A-1998-0314-LAL

Review of Army Logistics Management Decision Packages 31-Aug-98

A-1998-0315-AFIAmmunition Management (U) 27-Aug-98

A-1998-0316-AFI Ammunition Management 8-Sep-98

Page 27: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0317-FFB

Audit of Automated Info Systems--Year 2000 (Phase 1v); Assessmnt of Selctd Mission Critical Systems at the Ofc of the PEO for Cmd Cntrl & Comm Systms 25-Aug-98

A-1998-0318-FFB

Audit of Automated Information Systems--Year 2000 (Phase 1v); Assessment of Selected Mission Critical Systems at U.S. Army Reserve Personnel Command 25-Aug-98

A-1998-0319-AFHFamily Housing Requirements 22-Sep-98

A-1998-0320-FFB

Evaluation of the Army Management Control Process FY 98, COE-Fort Worth District 26-Aug-98

A-1998-0321-FFB

Review of the Army Management Control Process FY 98, Fort McPherson 25-Aug-98

A-1998-0322-IMH

Audit of Morale Welfare and Recreation Year 2000 Management Information Systems 26-Aug-98

A-1998-0323-IMH

Audit of Morale Welfare and Recreation Year 2000 Management Information Systems 2-Sep-98

A-1998-0324-IMH

Audit of Morale Welfare and Recreation Year 2000 Management Information Systems 1-Sep-98

A-1998-0325-FFB

Review of the Army Management Control Process FY 98, FORSCOM 1-Sep-98

A-1998-0326-FFB

Audit of Automated Info Systems--Year 2000 (Phase IV); Assessmnt of Selctd Mission Critical Systems at the Ofc of the PEO for Cmd Cntrl & Comm Systms 3-Sep-98

Page 28: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0327-FFB

Audit of Automated Information Systems--Year 2000 (Phase IV); Assessment of Selected Mission Critical Systems at the Office of the Chief Army Reserve 23-Sep-98

A-1998-0328-FFB

Review of the Army Management Control Process FY 98, Army Reserve Cmd 22-Sep-98

A-1998-0329-AMLAudit of Retail Supply Operations, Fort Stewart 15-Sep-98

A-1998-0330-IMH

Audit of Morale Welfare and Recreation Year 2000 Management Information Systems 22-Sep-98

A-1998-0331-IMT

Review of Draft Performance Work Statement 7-Aug-98

A-1998-0332-IMT

Review of Draft Performance Work Statement 21-Aug-98

A-1998-0333-AFM

Review of Army and Air Force Exchange Service External Contract Oversight 10-Sep-98

A-1998-0334-AMLAudit of Retail Supply Operations, Fort Campbell 18-Sep-98

A-1998-0335-IMT

Observations and Lessons Learned on A-76 Cost Competition Studies 22-Sep-98

A-1998-0336-AMLAudit of Retail Supply Operations, Fort Drum 17-Sep-98

A-1998-0337-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Darnall Army Community Hospital 21-Sep-98

A-1998-0338-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Brooke Army Medical Center 9-Sep-98

A-1998-0339-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Tripler Army Medical Center 18-Sep-98

Page 29: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0340-IMH

Review of Medical Command's Year 2000 Action Plans for Facilities and Infrastructure Systems, Madigan Army Medical Center 15-Sep-98

A-1998-0341-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Evans Army Community Hospital 11-Sep-98

A-1998-0342-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Winn Army Community Hospital 23-Sep-98

A-1998-0343-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, William Beaumont Army Medical Center 18-Sep-98

A-1998-0344-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Eisenhower Army Medical Center 17-Sep-98

A-1998-0345-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Patterson Army Health Center 23-Sep-98

A-1998-0346-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Fox Army Health Center 15-Sep-98

A-1998-0347-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Reynolds Army Community Hospital 24-Sep-98

A-1998-0348-IMH

Audit of Morale Welfare and Recreation Year 2000 Management Information Systems 17-Sep-98

Page 30: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0349-IMH

Audit of Morale Welfare and Recreation Year 2000 Management Information Systems 17-Sep-98

A-1998-0350-IME

Results of Follow-up--DODIG Report No. 97-208 Management of Underground Storage Tanks at Fort Bragg 16-Sep-98

A-1998-0351-AFA

Program Objective Memorandum 98-03 Efficiencies--Workload Benchmarking and Electronics Contracting 18-Sep-98

A-1998-0352-AFA

Program Objective Memorandum 98-03 Efficiencies--Using Credit Cards 18-Sep-98

A-1998-0353-FFCReview of Selected CFO Issues 15-Sep-98

A-1998-0354-FFB

Evaluation of the Army Management Control Process FY 98, COE-Southwestern Division 18-Sep-98

A-1998-0355-AFI New Worth - Gregg 21-Sep-98

A-1998-0356-IMT

Information Paper Audit of Commercial Activity--Directorate of Public Works 21-Aug-98

A-1998-0357-FAC

Audit of U.S. Army Europe and Seventh Army's Progress Towards Year 2000 Compliance 22-Sep-98

A-1998-0358-IMT

Information Paper Audit of Commercial Activity Study--Directorate of Public Works 22-Sep-98

A-1998-0359-FFB

Review of the Army Management Control Process FY 98, National Guard Bureau 22-Sep-98

A-1998-0360-FFB

Audit of Automated Information Systems--Year 2000 (Phase IV); Assessment of the Arlington National Cemetery's Year 2000 Oversight Program 23-Sep-98

Page 31: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0361-FFB

Audit of Automated Info Systms--Year 2000 (Ph 4); Assessmnt of Selectd Mission Criticl Systms at Ofc of Prg Exec Oficr for Stndrd Army Mgt Info Systms 23-Sep-98

A-1998-0362-LAL

Interim Results on the Audit of Inventory-Related Logistics Efficiencies 2-Jul-98

A-1998-0363-FFB

Information Assurance Audit Brief for U.S. Army Signal Command 25-Sep-98

A-1998-0364-FFB

Information Assurance Audit Brief to the C2 Protect Council of Colonels 29-Sep-98

A-1998-0365-LAE

Results of Reviews--Underground Storage Tanks (UST's) Compliance with Statutory Deadline 16-Oct-97

A-1998-0366-FAU

Process Analysis of Personal Property Shipping Operations, U.S. Army, Europe and Seventh Army 15-Oct-97

A-1998-0367-AFT

Review of Workload and Workforce Staffing at Red River Army Depot--Information Memorandum 6-Oct-97

A-1998-0368-LAE

Limited Assessment of the U.S. Army Corps of Engineers' Formerly Used Defense Sites Public and Regulatory Participation Program 15-Oct-97

A-1998-0369-LAR

Analysis of Revised Scope for Arvin Physical Development Center Project United States Military Academy--Information Memorandum 4-Nov-97

A-1998-0370-LAR

Review of Facility Construction Requirements for U.S. Army Space Command Consulting Memorandum 20-Oct-97

A-1998-0371-AFAReview of Prices of Consumables 29-Oct-97

A-1998-0372-AFH Review of Recycling Issues 7-Nov-97

Page 32: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0373-FAF

Review of Army National Guard Methodology to Develop State-Level General Ledger Crosswalks 17-Nov-97

A-1998-0374-FAP

Consulting Rev of the U.S. Army Military District of Washington's Rev of Arlington National Cemetery's Unliquidated Obligations for FY 96 & Prior Yrs 13-Nov-97

A-1998-0375-FAP Activity-Based Costing 5-Dec-97

A-1998-0376-LAR

Review of Economic Planning Analysis for a New Headquarters Facility, U.S. Army Space Command 18-Nov-97

A-1998-0377-LAE

Results of Review of Integration of the Environmental Process Into the Chemical Demilitarization Program 18-Dec-97

A-1998-0378-LAL

Selected Management Operations 20th Support Center (CMMC) 22-Dec-97

A-1998-0379-AFHReview of Leased Military Family Housing 23-Jan-98

A-1998-0380-LARBackpay for Firefighters--Allen et al. V. United States 26-Jan-98

A-1998-0381-FAP Telecommunications Costs 27-Jan-98

A-1998-0382-AFA

Follow-up Review of Armament Retooling and Manufacturing Support Program 22-Jan-98

A-1998-0383-AFT

Review of Civilian Personnel Regionalization Baseline Data for North Central Region 29-Jan-98

A-1998-0384-AFT

Review of Civilian Personnel Regionalization Baseline Data for South Central Region 29-Jan-98

A-1998-0385-FAB

Consulting Review of Costs Associated with the Use of Inmate Labor 3-Feb-98

A-1998-0386-LAE

Results of Review of Office of the Secretary of Defense Transfer of Functions to the Army 2-Feb-98

Page 33: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0387-AFT

Review of Civilian Personnel Regionalization Baseline Data for West Region 5-Feb-98

A-1998-0388-FAC

Review of the U.S. Army Corps of Engineers' 90-Day Report to Congress on the Formerly Utilized Sites Remedial Action Program 23-Feb-98

A-1998-0389-AFAReview of Global Command and Control System - Army 13-Mar-98

A-1998-0390-FAP

Review of Interchangeability and Substitutability Relationships of Supply Items, III Corps and Fort Hood 26-Mar-98

A-1998-0391-AFTSurvey of Drug and Alcohol Operations 30-Mar-98

A-1998-0392-AFHReview of Army Family Housing Appropriation 20-Mar-98

A-1998-0393-AFTCivilian Manpower Efficiencies 10-Apr-98

A-1998-0394-FAP

Validation of NGB's Material Weakness Corrective Actions - Conversion of NG Personnel, Army, Inactive Duty Training Centrally Managed Allotment(Open) to a Decentralized Allotment(Specific) 3-Apr-98

A-1998-0395-AFT

Review of Civilian Personnel Regionalization Baseline Data for Northeast, Southeast and Southwest Regions 10-Apr-98

A-1998-0396-LAL

Metrics for Single Stock Fund and Batteries Efficiencies 28-Apr-98

A-1998-0397-LARReview of Heating Alternatives at Fort Drum 11-May-98

A-1998-0398-LARReview of Leased Housing U.S. Southern Command 11-May-98

A-1998-0399-LAL Army's Single Stock Fund 19-May-98

A-1998-0400-FAU

Review of the Reimbursable Program for Base Operations Support 29-May-98

A-1998-0401-AFI CMI (Assist CID) (U) 6-May-98

Page 34: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0402-FAP

Doing Activity-Based Management at a Child Care Center 12-Jun-98

A-1998-0403-AFH

Summary of Interviews Functions and Responsibilities, USACE, Pacific Ocean Division 26-May-98

A-1998-0404-FAPBase Operations Requirements 16-Jun-98

A-1998-0405-FAU

Efficiency Review of Selected Marshall Center Functions 19-Jun-98

A-1998-0406-FAPReview of FY 98 Base Operations Budget 24-Jun-98

A-1998-0407-AFH

Review of Organizational Structure, USACE, Pacific Ocean Division 26-Jun-98

A-1998-0408-FAF

Consulting Engagement on U.S. Treasury Check Reconciliations 22-Jun-98

A-1998-0409-AFA

Review Cost to Operate the Army's Single Manager for Conventional Ammunition Mission 24-Jun-98

A-1998-0410-LAR

Review of Data Values Used in Reuse Analysis for Old Brooke Army Medical Center 25-Jun-98

A-1998-0411-FAU

Consulting Review of Property Accountability at the U.S. National Support Element Taszar, Hungary 29-Jun-98

A-1998-0412-FAU

Review of Task Force Able Sentry Operations in the Former Yugoslav Republic of Macedonia 30-Jun-98

A-1998-0413-LAR

Review of Economic Analysis for Tactical Missile Depot Maintenance 23-Jun-98

A-1998-0414-AFI Net Worth (Assist CID) 26-Jun-98

A-1998-0415-IMO

Review of Family Housing Requirements at Fort Stewart and Hunter Army Airfield 30-Jun-98

A-1998-0416-IMOReview of Family Housing Requirements at Fort Irwin 30-Jun-98

A-1998-0417-IMOReview of Family Housing Requirements at Fort Hood 30-Jun-98

Page 35: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0418-LAR

Analysis of the Present Value of the Proposed Payment Plan for Vint Hill Farms Station Economic Development Conveyance 30-Jun-98

A-1998-0419-IMO

Review of Family Housing Requirements at Fort Leonard Wood 30-Jun-98

A-1998-0420-IMO

Military Postal Service Agency Response to Naval Audit Service Recommendations 9-Jun-98

A-1998-0421-AFA

Review of Maintaining Computer Generated Forces Simulations 7-Jul-98

A-1998-0422-FAPTelecommunications Costs, Fort Meade, MD 30-Jul-98

A-1998-0423-FAP

Review of the Direct Support Repair Parts Decision Process 9-Jul-98

A-1998-0424-IMOReview of Proposed Memorandum of Agreement 10-Jul-98

A-1998-0425-AFT

Audit of Tracking Efficiencies - National Training Center Blue Force 20-Jul-98

A-1998-0426-FAP

Review of Residential Telecommunications Operating Costs 30-Jul-98

A-1998-0427-FAPManaging Telecommunications Costs 5-Aug-98

A-1998-0428-LARReview of Leased Housing, Camp Shelby, MS 24-Jul-98

A-1998-0429-AFH

Cost Validation of A-76 Study--Forensic Toxicology Drug Testing Laboratory 13-Aug-98

A-1998-0430-LALReview of Apache Prime Vendor Support Contract 17-Aug-98

A-1998-0431-FAP

Review of Information Technology Activity-Based Costing Information Technology Business Center 10-Aug-98

A-1998-0432-FAPReview of Contracting Management Controls 14-Aug-98

A-1998-0433-AFH

Flowcharts of Selected Functions, USACE, Pacific Ocean Division 18-Aug-98

Page 36: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1998-0434-LARReview of Real Property Management 19-Aug-98

A-1998-0435-IMO

Rev of Army Construction Engineering Research Laboratories Spec Rept 98/Drft-Apr 98 Technical Rev of Economic Devlopmnt Conveyance for Letterkenny AD 26-Aug-98

A-1998-0436-IMO

Review of Family Housing Requirements at Fort George G. Meade 2-Sep-98

A-1998-0437-FFC

Audit of U.S. Army Corps of Engineers Financial Management System (CEFMS) - Phase III 27-Aug-98

A-1998-0438-FFB

Review of Activity-Based Management for the Directorate of Environment and Safety 2-Sep-98

A-1998-0439-AFH

Consulting Review: U.S. Army's Utilization of the Master Labor Contract Employees in Japan--Civilian Personnel Office Issues 2-Sep-98

A-1998-0440-FAP

Army Installation Management-Headquarters Information System 16-Sep-98

A-1998-0441-LAR

Review of the Army's Plan for Revitalization of Family Housing by FY 2010 22-Sep-98

A-1998-0442-FFB

Activity-Based Management in the Directorate of Logistics 16-Sep-98

A-1998-0443-AFH

U.S. Army's Utilization of Master Labor Contract Employees in Japan 23-Sep-98

A-1998-0444-AFM

Consulting Review of Certification of Year-End Financial Reporting 23-Sep-98

A-1998-0445-FAUReview of Management Controls at the Nahe Club 29-Sep-98

A-1999-0001-AMAMateriel Packaging and Preservation 15-Oct-98

A-1999-0002-AMA

Program Objective Memorandum 98-03 Efficiencies--Management Control and Oversight 13-Oct-98

Page 37: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0003-AMA

Program Objective Memorandum 98-03 Efficiencies--Program Executive Office Reorganization 13-Oct-98

A-1999-0004-FFCFollow-Up Audit of Corps Dredging 15-Oct-98

A-1999-0005-FFB

Information Systems Security Program Phase II Follow-on Validation 15-Oct-98

A-1999-0006-AML

U.S. Army Materiel Command Efficiency--Integrated Sustainment Maintenance 15-Oct-98

A-1999-0007-IME Command Overhead Costs 9-Nov-98

A-1999-0008-IMH

Morale Welfare and Recreation Activities--Financial Controls 15-Oct-98

A-1999-0009-AMIInformation Systems Security 2-Oct-98

A-1999-0010-FFPPublic Works Construction Contracts 13-Nov-98

A-1999-0011-IMU

Army and Air Force Exchange Service Transportation Charges in Support of Operation Joint Endeavor/Joint Guard 13-Nov-98

A-1999-0012-IMH

Morale Welfare and Recreation Activities' Year 2000 Action Plans 14-Dec-98

A-1999-0013-IMH

Review of Medical Year 2000 Action Plans for Facilities and Infrastructure Systems, Raymond W. Bliss Army Health Center 8-Oct-98

A-1999-0014-IMH

Reengineering Overhead Support for Morale Welfare and Recreation, Fort Lewis 7-Oct-98

A-1999-0015-AMIInformation Systems Security - ASAS (U) 9-Oct-98

A-1999-0016-IMH

Reengineering Overhead Support for Morale Welfare and Recreation Activities, Fort Belvoir 8-Oct-98

A-1999-0017-FFC

Corps of Engineers Financial Management System 6-Nov-98

Page 38: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0018-IMH

Reengineering Overhead Support for Morale Welfare and Recreation, Fort Benning 13-Oct-98

A-1999-0019-IMH

Reengineering Overhead Support for Morale Welfare and Recreation, Fort Bragg 13-Oct-98

A-1999-0020-FFF

Audit of the Army Workload and Performance Systems' Ammunition Prototype at Letterkenny Army Depot 9-Oct-98

A-1999-0021-FFB

Audit of FY 98 MX5T Research Development Test and Evaluation Funds for Communications Security Equipment 23-Oct-98

A-1999-0022-AMA

Program Objective Memorandum 98-03 Efficiencies--Science and Technology 10-Nov-98

A-1999-0023-IMH

Reengineering Overhead Support for Morale Welfare and Recreation, Fort Jackson 20-Oct-98

A-1999-0024-IMH

Reengineering Overhead Support for Morale Welfare and Recreation, Fort Campbell 21-Oct-98

A-1999-0025-IME

Lessons Learned--Chemical Stockpile Disposal Project 9-Nov-98

A-1999-0026-FFPReview of Chief Financial Officers Act Issues 19-Oct-98

A-1999-0027-FFB

Audit of Automated Information Systems--Year 2000 (Phase IV); Assessment of the U.S. Army Air Traffic Control Activity 16-Oct-98

A-1999-0028-FFB

Audit of Automated Info Systems--Year 2000 (Phase IV); Assessmnt of Selctd Mission Critical Systems at the Ofc of the PEO for Cmd Cntrl & Comm Systms 16-Oct-98

Page 39: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0029-FFB

Audit of Automated Information Systems--Year 2000 (Phase IV); Assessment of Selected Army Legacy Air Traffic Control Mission Critical Systems 16-Oct-98

A-1999-0030-IMH

FY 98 Semiannual Validation--Demonstration Project for Uniform Funding of Morale Welfare and Recreation Activities 6-Nov-98

A-1999-0031-IMH

Reengineering Overhead Support for Morale Welfare and Recreation, Fort Monmouth 28-Oct-98

A-1999-0032-IMH

Reengineering Overhead Support for Morale Welfare and Recreation Activities, Picatinny Arsenal 19-Nov-98

A-1999-0033-FFCAudit of the American Red Cross 20-Oct-98

A-1999-0034-AMW

Army Working Capital Fund FY 97 Financial Statements--Materiel Returns 3-Dec-98

A-1999-0035-AMW

Army Working Capital Fund FY 97 Financial Statements--Inventory, Net 29-Dec-98

A-1999-0036-AMW

Army Working Capital Fund FY 97 Financial Statements--Accounting Support 25-Nov-98

A-1999-0037-AMMDistribution of Depot-Maintenance Workload 16-Nov-98

A-1999-0038-FFG

Audit of the Army's Principal Financial Statements for Fiscal Years 1998 and 1997 (Statement of Budgetary Resources) 30-Oct-98

A-1999-0039-FFG

Audit of the Army's Principal Financial Statements for Fiscal Years 1998 and 1997 (Statement of Budgetary Resources) 30-Oct-98

Page 40: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0040-FFG

Audit of the Army's Principal Financial Statements for Fiscal Years 1998 and 1997 (Statement of Budgetary Resources) 30-Oct-98

A-1999-0041-FFB

Observations for Management Consideration--Audit of the Secretary of Defense Mess Fund Financial Statements 13-Nov-98

A-1999-0042-FFBSecretary of Defense Mess Fund Financial Statements 20-Nov-98

A-1999-0043-FFB

Review of the Army Management Control Process (Fiscal Year 1998) 5-Nov-98

A-1999-0044-FFGAccountability for Real Property, Fort A.P. Hill 6-Nov-98

A-1999-0045-AMIAmmunition Management (Summary) (U) 22-Dec-98

A-1999-0046-FFG

Audit of the Army's Principal Financial Statements for Fiscal Years 1998 and 1997 (Statement of Budgetary Resources) 5-Nov-98

A-1999-0047-FFG

Audit of the Army's Principal Financial Statements for Fiscal Years 1998 and 1997 (Statement of Budgetary Resources) 5-Nov-98

A-1999-0048-IMOLeased Family Housing Issues 18-Dec-98

A-1999-0049-FFB

Information Assurance Audit Brief for Mr. David Borland Vice Director of Information Systems for Command Control Communications and Computers 12-Nov-98

A-1999-0050-AML

Audit of Interservice Availability of Multiservice Used Items, AMCOM 16-Nov-98

A-1999-0051-AML

Audit of Interservice Availability of Multiservice Used Items, TACOM 1-Dec-98

A-1999-0052-AML

Audit of Interservice Availability of Multiservice Used Items, CECOM 16-Nov-98

Page 41: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0053-FFG

Audit of the Army's Principal Financial Statements for Fiscal Years 1998 and 1997 (Statement of Budgetary Resources) 16-Nov-98

A-1999-0054-FFGAccountability for Real Property, Fort Sam Houston 13-Nov-98

A-1999-0055-FFB

Evaluation of the Army Management Control Process FY 98, Corps of Engineers 24-Nov-98

A-1999-0056-FFB

Evaluation of the Army Management Control Process FY 98, DCSLOG 30-Nov-98

A-1999-0057-FFB

Review of the Army Management Control Process FY 98, DCSOPS 19-Nov-98

A-1999-0058-FFB

Review of the Army Management Control Process FY 98, ASA(ALT) 20-Nov-98

A-1999-0059-AMI

Year 2000 Compliance for Special Programs--Summary (U) 19-Nov-98

A-1999-0060-FFB

Observations for Management Consideration--Audit of the General Officers' Mess Financial Statements 9-Dec-98

A-1999-0061-FFBGeneral Officers' Mess Fund Financial Statement 21-Dec-98

A-1999-0062-IMTInterim Report Review of the Army Hunter Test 30-Nov-98

A-1999-0063-AMM

Audit of Process for Determining Source of Depot Level Repairs 19-Nov-98

A-1999-0064-FFB

Observations for Management Consideration Audit of the National Science Center's Special Fund Financial Statement 1-Dec-98

A-1999-0065-FFB

National Science Center Special Fund Financial Statement 14-Dec-98

A-1999-0066-FFP

Audit of Flood Damage Assessment (Phase I--FY 98 Costs) 20-Nov-98

Page 42: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0067-FFF

Security and Accountability of Small Arms Ammunition and Explosives 14-Dec-98

A-1999-0068-IMHMedical Facility Year 2000 Action Plans 9-Dec-98

A-1999-0069-AMM

Request for Audit of Army Ideas of Excellence Program (AIEP) Suggestion ERNU930012--Rotor Smoothing for AH 64 Helicopters 24-Nov-98

A-1999-0070-FFP Audit of Design Services 2-Dec-98

A-1999-0071-IMHEmergency Room Operations 7-Dec-98

A-1999-0072-FFF

Overhead Management and Contractor Logistics Support 30-Dec-98

A-1999-0073-IMT

USAAA Review of the Draft Performance Work Statement (DAAD05-98-R-0565) for the Aberdeen Proving Ground Whole Base Commercial Activities Study 30-Nov-98

A-1999-0074-IMT

USAAA Review of the Draft Performance Work Statement (DAAD05-98-R-0566) for the Aberdeen Proving Ground Whole Base Commercial Activities Study 30-Nov-98

A-1999-0075-FFG

Accountability for Real Property, 81st Regional Support Cmd 4-Dec-98

A-1999-0076-AMM

Review of Army Suggestion AMYY910730 Remote Anti-Armor Mines Program (RAAM) Projectile Lot Rework 3-Dec-98

A-1999-0077-FFP Year 2000 Follow-Up Assist 9-Dec-98

A-1999-0078-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Stewart Directorate of Public Works Commercial Activities Study 7-Dec-98

Page 43: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0079-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement Directorate of Public Works 7-Dec-98

A-1999-0080-FFP

Directorate of Logistics Performance Work Statement 3-Dec-98

A-1999-0081-FFGAccountability for Real Property, Fort Eustis 16-Dec-98

A-1999-0082-IMT

Army Audit Agency Rev of the Performance Work Statement for the Fort Leavenworth Directorates of Logistics & Public Works Commercial Activities Study 16-Dec-98

A-1999-0083-FFG

Review of FY 98 General Fund Real Property, U.S. Army, Europe 15-Dec-98

A-1999-0084-IMTPerformance Work Statement 21-Dec-98

A-1999-0085-AML

Survey Report on the Army's Materiel Release Process 10-Dec-98

A-1999-0086-AMA

Global Command and Control System-Army Program 22-Jan-99

A-1999-0087-IME

Management of Underground Storage Tanks--Follow-up 14-Dec-98

A-1999-0088-AMIInformation Systems Security (U) 15-Jan-99

A-1999-0089-AMI

Information Systems Security - National Ground Intelligence Center (U) 3-Mar-99

A-1999-0090-AMIAudit of Bosnia Travel Payments 16-Dec-98

A-1999-0091-FFC

Program Objective Memorandum 98-03 Efficiencies 12-Feb-99

A-1999-0092-IMT

AAA Rev of the Management Study for the Aberdeen Proving Ground Installation Operations & Community & Family Activities Commercial Activities Study 15-Dec-98

Page 44: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0093-IMT

U.S. Army Audit Agency Review of the Management Study for the Aberdeen Proving Ground Information Management Commercial Activities Study 15-Dec-98

A-1999-0094-IMT

AAA Review of the Government Costs for the Aberdeen Proving Ground Installation Operations & Community & Family Activities Commercial Activities Study 17-Dec-98

A-1999-0095-IMT

U.S. Army Audit Agency Review of Government Costs for the Aberdeen Proving Ground Information Management Commercial Activities Study 16-Dec-98

A-1999-0096-IMERecycling Contaminated Metal 31-Dec-98

A-1999-0097-IMEManagement of Commodity Licenses 31-Dec-98

A-1999-0098-IMTPerformance Work Statement 31-Dec-98

A-1999-0099-AML

Closeout Audit of Selected Inventory-Related Logistics Efficiencies 23-Dec-98

A-1999-0100-IMO

Base Realignment and Closure 1995 Construction Requirements--Post Exchange Renovation 31-Dec-98

A-1999-0101-FFF

Tracking Efficiencies--Training AIDS Devices Simulators and Simulations (TADSS) Trade-Off 25-Jan-99

A-1999-0102-IMT

U.S. Army Audit Agency Rev of the Management Study for the Aberdeen Test Center's Administrative & Test Support Services Commercial Activities Study 18-Dec-98

A-1999-0103-IMUAudit of European Region Payroll Operations 7-Jan-99

A-1999-0104-FFGAccountability for Real Property, Fort Bragg 16-Dec-98

Page 45: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0105-IMT

Review of Government Costs for the Aberdeen Test Center's Administrative and Test Support Services Commercial Activities Study 18-Dec-98

A-1999-0106-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Financial Reporting of Wholesale Ammunition 31-Dec-98

A-1999-0107-FFG

Army's Principal Financial Statements for Fiscal Years 1998 and 1997--Financial Reporting of Equipment Reportable Item Control Codes 31-Dec-98

A-1999-0108-AMA

Program Objective Memorandum 98-03 Efficiencies--Test and Evaluation 22-Jan-99

A-1999-0109-FFB

Directorate of Public Works--Walter Reed Army Medical Center 16-Apr-99

A-1999-0110-OER

Review of Environment Safety and Chemical Management Decision Packages 6-Jan-99

A-1999-0111-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Financial Reporting of Equipment Follow-up Issues 15-Jan-99

A-1999-0112-FFGAccountability for Real Property, Pine Bluff Arsenal 8-Jan-99

A-1999-0113-FFG

Accountability for Real Property, Riverbank Army Ammunition Plant 8-Jan-99

A-1999-0114-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Centralized Disbursing 27-Jan-99

A-1999-0115-FFCFinal Assessment of Lessons Learned 6-Jan-99

A-1999-0116-IMU

Follow-on Audit of Year 2000 Issues Within U.S. European Command's Area of Responsibility 8-Jan-99

Page 46: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0117-IMT

AAA Rev of the Performance Work Statement for the Fort Hood G-3 Range Div; Range Operations Maintenance & Supt Services Commercial Activities Study 11-Jan-99

A-1999-0118-OERReview of Medical/Morale and Welfare Division 12-Jan-99

A-1999-0119-IMT

Tracking Initiatives--Competitive Sourcing and U.S. Army Materiel Command Reshape 25-Jan-99

A-1999-0120-FFB

Audit of Mission Critical Systems--Year 2000 (Phase V); Assessment of the Apache Attack Helicopter at the Ofc of the Prog Exec Officer for Aviation 8-Jan-99

A-1999-0121-FFB

Audit of Mission Critical Systems--Year 2000 (Ph V); Assessment of the Patriot Missile Sys at the Ofc of the Prog Exec Ofcr for Air & Missile Defense 8-Jan-99

A-1999-0122-IMT

AAA Rev of Commercial Activities Installation Operations & Community & Family Activities--Schedule of Adjustments U.S. Army Aberdeen Proving Ground 15-Jan-99

A-1999-0123-IMT

U.S. Army Audit Agency Review of Commercial Activities Information Management--Schedule of Adjustments U.S. Army Aberdeen Proving Ground 15-Jan-99

A-1999-0124-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Financial Reporting of Budgetary Resources 3-Feb-99

A-1999-0125-FFFTracking Efficiencies--Offset to Training Modernization 9-Feb-99

A-1999-0126-AMIInformation Systems Security 4-Jun-99

A-1999-0127-AMIInformation Systems Security 7-May-99

Page 47: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0128-FFG

Desktop Resource for Real Property Ownership Code Errors 14-Jan-99

A-1999-0129-FFP

Workload Analysis of Morale Welfare and Recreation Activities 15-Jan-99

A-1999-0130-FFF

Survey of Internal Controls Over the Army Advertising Contract 20-Jan-99

A-1999-0131-FFG

Accountability for Real Property, Defense Distribution Depot, San Joaquin 22-Jan-99

A-1999-0132-IMT

U.S. Army Audit Agency's Review of Aberdeen Test Center's Administrative & Test Support Services Commercial Activities Study--Schedule of Adjustments 22-Jan-99

A-1999-0133-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Fort Riley Directorate of Public Works Commercial Activities Study 27-Jan-99

A-1999-0134-FFG

Accountability for Real Property, 63rd Regional Support Cmd 22-Jan-99

A-1999-0135-FFG

Accountability for Real Property, 89th Regional Support Cmd 24-Jan-99

A-1999-0136-FFG

Accountability for Real Property, 99th Regional Support Cmd 24-Jan-99

A-1999-0137-FFP Service Contracts 12-Feb-99

A-1999-0138-AMW

Recommended Adjustments to Draft Financial Statements Audit of Army Working Capital Fund FY 98 Financial Statements 28-Jan-99

A-1999-0139-IMTPerformance Work Statement--Fort Eustis 12-Feb-99

A-1999-0140-IMT

Review of Government Costs for the U.S. Army Forces Command Administrative Services Division Commercial Activities Study 27-Jan-99

Page 48: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0141-IMT

Review of Commercial Activities Study Administrative Services Division U.S. Army Forces Command 27-Jan-99

A-1999-0142-FFP

Results of Follow-Up Review on U.S. Army Audit Agency Report WR94-16 Mattress and Boxspring Renovation Contract Fort Shafter, Hawaii 29-Jan-99

A-1999-0143-FFP

Results of Follow-Up Review on U.S. Army Audit Agency Report WR95-761 Space Utilization U.S. Army Garrison Hawaii 29-Jan-99

A-1999-0144-FFP

Results of Follow-Up Review on U.S. Army Audit Agency Report AA96-161 Work Management System U.S. Army Garrison Hawaii 4-Feb-99

A-1999-0145-FFG

Accountability for Real Property, 90th Regional Support Cmd 3-Feb-99

A-1999-0146-AMADigitization of the Battlefield: Tactical Internet 15-Mar-99

A-1999-0147-OED

Results of Follow-Up Review of Deputy Chief of Staff for Operations and Plans Recommendations 11-Feb-99

A-1999-0148-AMWReporting of Fund Balances with Treasury Transactions 12-Feb-99

A-1999-0149-AMWReporting Fund Balance with Treasury Transactions 12-Feb-99

A-1999-0150-OED

Results of Follow-Up Review of Army Materiel Command Audit Recommendations at the U.S. Army Communications-Electronics Command 27-Jan-99

A-1999-0151-AMA

Review of Suggestion Awards for the Longbow Hellfire Missile Program Proposals AMTT 940120 and AMTT 940074 10-Feb-99

Page 49: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0152-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report WR95-202 Real Property Leases 10-Feb-99

A-1999-0153-FFFManpower Requirements Determination System 1-Mar-99

A-1999-0154-IMEChemical Agent Inventory Controls 17-Feb-99

A-1999-0155-IMU

Reducing Travel Voucher Turnaround Time and Implementation of Travel Manager 8-Feb-99

A-1999-0156-FFC FY 98 Financial Statements 8-Feb-99

A-1999-0157-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Summary Audit Report 18-Feb-99

A-1999-0158-FFPLong Haul Communications-Defense Switched Network 4-Mar-99

A-1999-0159-AMW

Army Working Capital Fund Principal Financial Statements for Fiscal Year 1998--Auditor's Opinion 19-Feb-99

A-1999-0160-AMW

Army Working Capital Fund Principal Financial Statements for Fiscal Year 1998--Report on Internal Controls and Compliance with Laws and Regulations 12-Feb-99

A-1999-0161-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report SR95-202 Program Execution 10-Feb-99

A-1999-0162-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement 10-Feb-99

A-1999-0163-FFP

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report AA96-41 Contract Award Procedures Eighth U.S. Army 12-Feb-99

A-1999-0164-IMEAudit of Hazardous Waste Disposal Costs 22-Feb-99

Page 50: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0165-OED

Results of Follow-Up Review of Army Materiel Command Audit Recommendations at the U.S. Army Simulation Training and Instrumentation Command 11-Feb-99

A-1999-0166-OED

Results of Our Follow-Up Review of Army Materiel Command Audit Recommendations at the U.S. Army Test and Evaluation Command 11-Feb-99

A-1999-0167-AMA

Using Credit Cards for Intragovernmental Purchases 6-Apr-99

A-1999-0168-FFB

Audit of Automated Information Systems--Year 2000 (Phase V); Assessment on Positive Response Year 2000-1 (PRY2K-1) Mobilization Exercise (4-8 Feb 99) 26-Feb-99

A-1999-0169-IMU

Level II Validation of Year 2000 Fixes for U.S. Army Europe and Seventh Army's Command-Unique Systems in Germany 22-Feb-99

A-1999-0170-FFBAudit of Telecommunications Switch 18-Feb-99

A-1999-0171-IMELow-Level Radioactive Waste Disposal Program 4-Mar-99

A-1999-0172-FFP

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report WR95-754 Procurement Strategies Eighth U.S. Army 19-Feb-99

A-1999-0173-FFBAudit of Telecommunications Switch 24-Feb-99

A-1999-0174-FFBAudit of Telecommunications Switch 24-Feb-99

A-1999-0175-OED

Results of Follow-Up Review of Army Materiel Command Audit Recommendations Addressed to the Commander U.S. Army Materiel Command 22-Feb-99

Page 51: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0176-IMU

Follow-up Review of Implemented Recommendations on U.S. Army Audit Agency Reports 3-Mar-99

A-1999-0177-FFG

Accountability for Real Property, 88th Regional Support Cmd 24-Feb-99

A-1999-0178-FFG

Accountability for Real Property, U.S. Army Reserve Cmd 25-Feb-99

A-1999-0179-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report SR94-702 Civilian Workforce Reductions 23-Feb-99

A-1999-0180-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization Central Heating Plant 30-Mar-99

A-1999-0181-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report SR94-210 Criminal Investigation Practices 16-Mar-99

A-1999-0182-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization Central Heating Plants 8-Apr-99

A-1999-0183-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization Central Heating Plants 2-Apr-99

A-1999-0184-FFP

Results of Follow-Up Review on U.S. Army Audit Agency Report AA97-042 Plant Operations Johnston Atoll Chemical Disposal System 2-Mar-99

A-1999-0185-IMEFormerly Used Defense Sites 19-Apr-99

A-1999-0186-FFC Survey of Army Leases 15-Mar-99

A-1999-0187-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization Central Heating Plant 31-Mar-99

Page 52: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0188-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization Central Heating Plant 31-Mar-99

A-1999-0189-FFF

Audit of the Military Training Specific Allotment Process, Fort Bliss 1-Apr-99

A-1999-0190-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Supplemental Stewardship Reporting of National Defense Equipment 26-Mar-99

A-1999-0191-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Financial Reporting of Army General Equipment 26-Mar-99

A-1999-0192-IMH

FY 98 Annual Validation--Demonstration Project for Uniform Funding of Morale Welfare and Recreation Activities 15-Mar-99

A-1999-0193-AMA

U.S. Army Audit Agency Audits of the POM 98-03 and 99-03 Efficiencies 12-Mar-99

A-1999-0194-FFP

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report WR94-208 Facilities Engineering Activities Eighth U.S. Army 15-Mar-99

A-1999-0195-FFC

Corps of Engineers Financial Management System 5-Apr-99

A-1999-0196-FFF

Deputy Chief of Staff for Personnel Efficiencies--Program Objective Memorandum 98-03 13-Apr-99

A-1999-0197-IMHAudit of Army and Air Force Exchange Service Profits 15-Mar-99

A-1999-0198-IMT

AAA Rev of the Govt Costs & Most Efficient Organization for the Fort Hood G-3 Range Div Range Opns Maint & Supt Svcs Commercial Activities Study 19-Mar-99

Page 53: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0199-FFF

Audit of the Army Workload and Performance System's Predictive Staffing Model 17-Mar-99

A-1999-0200-OED

Results of Follow-Up of Army Materiel Command Audit Recommendations at the U.S. Army Industrial Operations Command 17-Mar-99

A-1999-0201-FFB

Audit of Mission Critical Weapon Systems--Year 2000 (Ph V); Assessmnt of Close Combat Anti-Armor Weapon Systms at Ofc of the PEO for Tactical Missiles 31-Mar-99

A-1999-0202-FFB

Audit of Mission Critical Weapon Systems--Year 2000 (Ph V); Assessment of the Multiple Launch Rocket System at Ofc of the PEO for Tactical Missiles 31-Mar-99

A-1999-0203-FFB

Audit of Mission Critical Systems--Year 2000 (Ph V); Assessmnt of the Air-to-Ground Missile Systems at Ofc of the Prog Exec Ofcr for Tactical Missiles 31-Mar-99

A-1999-0204-FFB

Audit of Mission Critical Systems--Year 2000 (Ph V); Assessment of the Army Tactical Missile System at Ofc of the Prog Exec Ofcr for Tactical Missiles 31-Mar-99

A-1999-0205-FFB

Audit of Mission Critical Weapon Systems--Year 2000 (Ph V); Assessmnt of the Javelin Missile System at Ofc of the Prog Exec Ofcr for Tactical Missiles 31-Mar-99

A-1999-0206-FFB

Audit of Mission Critical Systems--Year 2000 (Ph V); Assessment of Scout Attack Weapon Systems at the U.S. Army Aviation and Missile Command 30-Mar-99

Page 54: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0207-FFB

Audit of Mission Critical Systems--Year 2000 (Ph V); Assessment of the Short Range Air Defense Systems at the U.S. Army Aviation and Missile Command 30-Mar-99

A-1999-0208-FFB

Audit of Mission Critical Systems--Year 2000 (Ph V); Assessment of Fixed Wing Aircraft at the U.S. Army Aviation and Missile Command 30-Mar-99

A-1999-0209-FFB

Audit of Mission Critical Systems--Year 2000 (Ph V); Assessment of the Dragon at the U.S. Army Aviation and Missile Command 30-Mar-99

A-1999-0210-FFB

Audit of Mission Critical Systms--Year 2000 (Ph V); Assessmnt of Blackhawk (UH-60A/L/Q) & Huey (UH-1) Utility Helicoptrs at USA Aviation & Missile Cmd 30-Mar-99

A-1999-0211-AMW

Review of Selected Aspects of Army Retail Supply Operations at Fort Hood 30-Apr-99

A-1999-0212-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Financial Reporting of Liabilities 5-Apr-99

A-1999-0213-OED

Results of Follow-Up Review of Army Materiel Command Audit Recommendations at the U.S. Army Tank-Automotive and Armaments Command 23-Mar-99

A-1999-0214-IMU

Review of Paid Army and Air Force Exchange Service Transportation Charges in Support of Operation Joint Endeavor/Joint Guard 24-Mar-99

A-1999-0215-FFF

Audit of the Military Training Specific Allotment Process, Fort Carson 5-May-99

Page 55: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0216-FFF

Audit of the Military Training Specific Allotment Process, Fort Leonard Wood 20-Apr-99

A-1999-0217-FFF

Audit of the Military Training Specific Allotment Process, Fort Stewart 5-May-99

A-1999-0218-OED

Results of Follow-Up Review of Army Materiel Command Audit Recommendations at the Watervliet Arsenal 25-Mar-99

A-1999-0219-FFP

Refuse Collection Contract - DAPC50-98-C-0017 Survey of Contracting Functions 26-Mar-99

A-1999-0220-IME

Chemical Stockpile Emergency Preparedness Program 16-Apr-99

A-1999-0221-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Financial Reporting of Real Property and Leases 12-Apr-99

A-1999-0222-FFP

Nonappropriated Fund Activities' Use of IMPAC Cards 29-Apr-99

A-1999-0223-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization Central Heating Plants 19-Apr-99

A-1999-0224-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization Central Heating Plant 7-May-99

A-1999-0225-IMU

Reconciliation of Army and Air Force Exchange Service Transportation Charges in Support of Operation Joint Endeavor/Joint Guard 31-Mar-99

A-1999-0226-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Drum Directorate of Public Works Commercial Activities Study 31-Mar-99

Page 56: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0227-FFG

Army's Principal Financial Statements for Fiscal Year 1998--Reliability of Source Information for the Financial Reporting of Real Property 20-Apr-99

A-1999-0228-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement 2-Apr-99

A-1999-0229-AMIManagement of Controlled Cryptographic Items 23-Apr-99

A-1999-0230-AMIManagement of Controlled Cryptographic Items 11-May-99

A-1999-0231-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization Central Heating Plant 7-May-99

A-1999-0232-FFF

Modification Tables of Organization and Equipment 30-Jun-99

A-1999-0233-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Drum Readiness Business Center Commercial Activities Study 2-Apr-99

A-1999-0234-IMEAffirmative Procurement Program 20-Apr-99

A-1999-0235-FFB

Audit of Mission Critical Systems--Year 2000 (Phase VI); Assessment of the Chinook Cargo Helicopter (CH-47D) at the Office of the PEO for Aviation 14-Apr-99

A-1999-0236-OED

Results of Follow-Up Review of Army Materiel Command Audit Recommendations at the Aviation and Missile Command 9-Apr-99

A-1999-0237-FFB

Audit of Mission Critical Weapon Systems--Year 2000 (Phase VI); Assessment of the Joint Tactical Ground Station at the Ofc of the PEO for Air/Misl Def 30-Apr-99

Page 57: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0238-FFB

Mission Criticl Weapon Systms--Year 2000 (Ph VI); Assessmnt of Sys Mgd by Dep for Sys Acquis AMCOM and PEO's for Tactcl Msls; Air/Msl Def; & Aviation 14-Apr-99

A-1999-0239-AMW

Receipt Storage and Issue Operations at Retail Activities 24-Jun-99

A-1999-0240-FFP

Unliquidated Obligations for Maintenance and Repair of Aliamanu Military Reservation Family Housing Units Survey of Contracting Functions 20-Apr-99

A-1999-0241-AMW

Review of Property Plant and Equipment (Audit of Army Working Capital Fund FY 98 Financial Statements), Rock Island Arsenal 3-May-99

A-1999-0242-AMW

Review of Property Plant and Equipment (Audit of Army Working Capital Fund FY 98 Financial Statements), Sierra Army Depot 3-May-99

A-1999-0243-AMW

Review of Property Plant and Equipment (Audit of Army Working Capital Fund FY 98 Financial Statements), Pine Bluff Arsenal 3-May-99

A-1999-0244-AMW

Review of Property Plant and Equipment (Audit of Army Working Capital Fund FY 98 Financial Statements), Watervliet Arsenal 3-May-99

A-1999-0245-IME

Open Burning and Open Detonation Site Restorations 7-May-99

A-1999-0246-FFP

Audit of Flood Damage Assessment (Phase 2--FY 99 Requirements) 22-Apr-99

A-1999-0247-IMT

U.S. Army Audit Agency's Review of Government Costs for the Fort Drum Directorate of Logistics Commercial Activities Study 22-Apr-99

Page 58: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0248-IMT

U.S. Army Audit Agency's Review of Fort Drum's Directorate of Logistics Commercial Activities Study--Schedule of Adjustments 22-Apr-99

A-1999-0249-OER

Review of Corps of Engineers' Civil Works and Military Construction Programs 30-Apr-99

A-1999-0250-IMT

Army Audit Agency Review of the Management Study for the Fort Lee Directorate of Logistics and Directorate of Public Works Commercial Activities Study 26-Apr-99

A-1999-0251-AMI Bosnia Travel Payments 18-Jun-99

A-1999-0252-OED

Results of Follow-Up Review of Deputy Chief of Staff for Logistics Audit Recommendations 27-Apr-99

A-1999-0253-FFP

Review of Commander's Areas of Concern Survey of Contracting Functions 6-May-99

A-1999-0254-FFCFY 98 Financial Statements Significant Matters 2-Jun-99

A-1999-0255-AMIManagement of Controlled Cryptographic Items 21-May-99

A-1999-0256-FFCReal Property Cycle Memorandum 14-May-99

A-1999-0257-IMT

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report CR95-752 Dining Facility Contract Requirements 30-Apr-99

A-1999-0258-IMU Finance Operations 7-Jun-99

A-1999-0259-IMT

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report AA97-236 Management of Hazardous Material 10-May-99

A-1999-0260-AMICover Support Plan - Material Weakness (U) 6-May-99

Page 59: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0261-IME

Audit of the Execution of the Installation Restoration Program, FORSCOM 10-May-99

A-1999-0262-IME

Audit of the Execution of the Installation Restoration Program, Fort Drum 10-May-99

A-1999-0263-IME

Audit of the Execution of the Installation Restoration Program, Fort Campbell 10-May-99

A-1999-0264-AMI

Follow-Up Audit of Property Accountability (Report AA96-085) 7-May-99

A-1999-0265-FFCTotal Environmental Restoration Contracts 25-Jun-99

A-1999-0266-IMT

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report WR94-6 Management of Repair Parts Tools and Equipment 11-May-99

A-1999-0267-AMI

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report SR94-6 Materiel Development 25-May-99

A-1999-0268-OEDFollow-Up of AMC Audit Recommendations 13-May-99

A-1999-0269-OEDFollow-Up of SAAL Audit Recommendations 14-May-99

A-1999-0270-AMIManagement of Controlled Cryptographic Items 22-Jun-99

A-1999-0271-FFB

Audit of Positive Response Year 2000-2 (PRY2K-2) Deputy Chief of Staff for Logistics (DCSLOG) Deployment and Redeployment Exercise (3-7 May 1999) 28-May-99

A-1999-0272-FFF

Audit of the Army Workload and Performance System's Predictive Staffing Model 14-May-99

A-1999-0273-IME

Audit of the Execution of the Installation Restoration Program, TRADOC 13-May-99

Page 60: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0274-IME

Audit of the Execution of the Installation Restoration Program, Fort Eustis 13-May-99

A-1999-0275-IME

Audit of the Execution of the Installation Restoration Program, MDW 13-May-99

A-1999-0276-IME

Audit of the Execution of the Installation Restoration Program, Fort Meade 13-May-99

A-1999-0277-IME

Audit of the Execution of the Installation Restoration Program, AMC 13-May-99

A-1999-0278-IME

Audit of the Execution of the Installation Restoration Program, Picatinny Arsenal 13-May-99

A-1999-0279-IME

Audit of the Execution of the Installation Restoration Program, Aberdeen Proving Ground 13-May-99

A-1999-0280-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Corpus Christi Army Depot Base Operations Commercial Activities Study 17-May-99

A-1999-0281-FFB

Audt of Mission Criticl Weapon Sys--Year 2000 (Ph VI); Assessmnt of the Paladin Self-Propelled Howitzer (M109A6) at Army Tank-Automotive/Armaments Cmd 16-Jun-99

A-1999-0282-FFB

Audit of Mission Critical Weapon Sys--Year 2000 (Phase VI); Assessment of the Hercules Recovery Vehicle (M88A2) at Army Tank-Automotive/Armaments Cmd 16-Jun-99

Page 61: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0283-IMT

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report AA97-118 Reparable Exchange Items 14-May-99

A-1999-0284-AMABest Practices for Clothing Alteration 28-Jun-99

A-1999-0285-IMT

Folwup Rev of Implementd Recmendations for AAA Rpts NR95-004 Reconstitution of Army Units Returning Fr Somalia & WR95-201 Building Accountbilty/Use 19-May-99

A-1999-0286-IMT

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report AA96-248 Reengineering Tactical Equipment Maintenance 20-May-99

A-1999-0287-FFP

Specific Contract Issues Survey of Contracting Functions 20-May-99

A-1999-0288-FFPSurvey of Contracting Functions 20-May-99

A-1999-0289-FFB

Audit of Mission Critical Weapon Systms--Year 2000 (Ph VI); Assessmnt of the Bradley Fighting Vehicle Systems at Ofc of PEO for Grnd Combt/Supt Systms 16-Jun-99

A-1999-0290-FFFMaintenance and Repair of the Prepositioned Fleet 15-Jun-99

A-1999-0291-IMT

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report AA97-164 Troop and Family Housing Furnishings 25-May-99

A-1999-0292-IMURecoupment of Value-Added Taxes Downrange 10-Jun-99

A-1999-0293-AMLAudit of the Army's Materiel Release Process, TACOM 24-May-99

A-1999-0294-IME Environmental Training 8-Jun-99

Page 62: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0295-IMT

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report AA96-205 Utility Services 26-May-99

A-1999-0296-IMODOD Support to the NATO Summit 16-Aug-99

A-1999-0297-FFPFollow-Up Audit of Aviation Maintenance 30-Jun-99

A-1999-0298-IME

Audit of Hazardous Waste Disposal Volumes and Costs, Fort Bliss 1-Jun-99

A-1999-0299-IMU Retail Supply Management 30-Jun-99

A-1999-0300-AML

Logistics Efficiencies--Administrative and Production Lead Time 18-Jun-99

A-1999-0301-IMUTelecommunications Support Downrange 13-Jul-99

A-1999-0302-FFP

Review of Unique Item Tracking Transactions--Retail Supply System 10-Jun-99

A-1999-0303-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report AA97-003 Selected Installation Support and WR94-018 Contracting Operations 14-Jun-99

A-1999-0304-AMLAudit of the Army's Materiel Release Process, AMCOM 7-Jun-99

A-1999-0305-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report WR94-203 Third Party Collection Program 8-Jun-99

A-1999-0306-OED

Results of Follow-Up Review on U.S. Army Audit Report WR94-204 Third Party Collection Program 8-Jun-99

A-1999-0307-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report SR94-214 Third Party Collection Program 8-Jun-99

Page 63: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0308-OED

Results of Follow-Up Reviews on U.S. Army Audit Agency Reports WR94-203, WR94-204, and SR94-214 Third Party Collection Program 8-Jun-99

A-1999-0309-IME

Audit of Hazardous Waste Disposal Volumes and Costs, Fort Bragg 8-Jun-99

A-1999-0310-AMWAudit of Inventory Allowance Accounts 14-Jun-99

A-1999-0311-AMWAudit of Inventory Allowance Accounts 14-Jun-99

A-1999-0312-AMWAudit of Inventory Allowance Accounts 14-Jun-99

A-1999-0313-AMW

Audit of Reporting of Fund Balance with Treasury Transactions 14-Jun-99

A-1999-0314-AMWAudit of Reporting of Fund Balance with Treasury 14-Jun-99

A-1999-0315-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Tooele Army Depot Base Operations Commercial Activities Study 14-Jun-99

A-1999-0316-AMA

Audit of Program Executive Office Funding of Task Force XXI 14-Jun-99

A-1999-0317-AML Cost of Spares Efficiency 30-Jun-99

A-1999-0318-AMIManagement of Controlled Cryptographic Items 9-Jul-99

A-1999-0319-AML

Inventory-Related Logistics Efficiencies Operating and Support Cost Reduction Program 30-Jun-99

A-1999-0320-IME

Audit of Hazardous Waste Disposal Volumes and Costs, Anniston Army Depot 15-Jun-99

A-1999-0321-AMW

Army Working Capital Fund FY 98 Financial Statements--Statement of Net Cost and Statement of Changes in Net Position 30-Jun-99

A-1999-0322-OEQResults of External Quality Control Peer Review 9-Aug-99

Page 64: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0323-OEQ

Point Sheet--Observations on the Results of the External Quality Control Peer Review 9-Aug-99

A-1999-0324-AMW

Army Working Capital Fund FY 98 Financial Statements--Inventory and Related Property, Net 30-Jun-99

A-1999-0325-AMI

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report HQ95-201 Installation Security Support 13-Aug-99

A-1999-0326-IMT

Army Audit Agency Review of the Draft Performance Work Statement for the Fort Riley Directorate of Information Management Commercial Activities Study 22-Jun-99

A-1999-0327-AMMWorkload Survey Report Field-Level Maintenance 5-Aug-99

A-1999-0328-FFP

Validation of Housing Market and Economic Analyses--Camp Humphreys 28-Jun-99

A-1999-0329-FFB

Audit of Mission Critical Weapon Systems--Year 2000 (Phase VI); Assessment of Heavy Tactical Vehicles at U.S. Army Tank-Automotive & Armaments Cmd 29-Jun-99

A-1999-0330-FFB

Audt of Mission Critical Weapon Systms--Year 2000 (Ph VI); Assessmnt of Deployable Universal Combat Earthmover at Army Tank-Automotive & Armaments Cmd 29-Jun-99

A-1999-0331-FFB

Audit of Mission Critical Weapon Sys--Year 2000 (Ph VI); Assessmnt of High Mobility Multipurpose Wheeled Vehicle at Army Tank-Automotive/Armaments Cmd 29-Jun-99

Page 65: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0332-IMO

Facility Upgrade for Tactical Missile Guidance Workload Tobyhanna Army Depot Audit of Selected BRAC Reviews Phase 4 30-Jul-99

A-1999-0333-IMT

Review of Government Costs for the Fort McPherson Directorate of Installation Support Commercial Activities Study 28-Jun-99

A-1999-0334-AMM

Workload Survey Report Supply and Maintenance Operations 6-Aug-99

A-1999-0335-FFB

Audit of Mission Critical Weapon Systems--Year 2000 (Ph VI); Assessment of the Abrams Tank System at Ofc of the PEO for Ground Combat & Support Systms 29-Jun-99

A-1999-0336-FFB

Audit of Mission Critical Weapon Sys--Year 2000 (Ph VI); Assessment of Medium Tactical Vehicles at Ofc of the PEO for Ground Combat & Support Systms 29-Jun-99

A-1999-0337-FFB

Audit of Mission Critical Weapon Systems--Year 2000 (Phase VI); Assessment of the Medium Recovery Vehicle at U.S. Army Tank-Automotive & Armaments Cmd 29-Jun-99

A-1999-0338-AMW

Army Working Capital Fund Cycle Memorandum--Fund Balance with Treasury 30-Jun-99

A-1999-0339-OED

Results of Follow-Up Review of National Guard Bureau Audit Recommendations Addressed to Chief National Guard Bureau 30-Jun-99

A-1999-0340-IME

Audit of Hazardous Waste Disposal and Costs, Aberdeen Proving Ground 7-Jul-99

Page 66: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0341-AML

Army's FY 98 Billings to the Multinational Force and Observers 30-Jun-99

A-1999-0342-IMHAudit of Golf Course Operations 13-Jul-99

A-1999-0343-OED

Results of Follow-Up on AAA Rpts NR94-209 Mgt of Faciltes at Bases Being Closd/Realignd; AA96-280 Transient Housng Svc Chgs & AA96-247 Dera Prjcts 2-Jul-99

A-1999-0344-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report SR94-702 Civilian Workforce Reductions 2-Jul-99

A-1999-0345-IMH

Review of MWR Utilization Support and Accountability Funding Practice 9-Jul-99

A-1999-0346-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Fort Rucker Directorate of Engineering & Logistics Commercial Activities Study 14-Jul-99

A-1999-0347-IMTReview of the Management Study 14-Jul-99

A-1999-0348-IMH

Audit of the Impact of Military Treatment Facility Downsizing on Army Installations 15-Jul-99

A-1999-0349-FFB

Audit of Mission Critical Weapon Systems--Year 2000 Assessment of the Firefinder Weapon Systems at the U.S. Army Communications-Electronics Command 19-Jul-99

A-1999-0350-FFB

Audt of Mission Criticl Weapn Systms--Year 2000 Assessmnt of Standalone Airborne & Cargo Utility Globl Positioning Sys Receivrs at Army Comm-Elect Cmd 19-Jul-99

Page 67: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0351-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Fort McPherson Directorate of Installation Support Commercial Activities Study 2-Aug-99

A-1999-0352-FFP

Aliamanu Military Reservation Maintenance and Repair Contracts Audit of Interservice Support Costs and Reimbursements 19-Jul-99

A-1999-0353-FFFAudit of the Military Training Specific Allotment Process 24-Aug-99

A-1999-0354-FFP

Review of Unique Item Tracking Transactions--Category I (Non-Nuclear Missiles and Rockets) 23-Jul-99

A-1999-0355-FFG

Army's Principal Financial Statements--Statement of Changes in Net Position Cycle Memorandum 13-Aug-99

A-1999-0356-FFG

Army's Principal Financial Statements--Statement of Net Cost Cycle Memorandum 25-Aug-99

A-1999-0357-FFG

Army's Principal Financial Statements--Statement of Financing Cycle Memorandum 31-Aug-99

A-1999-0358-IMH

Audit of Impact of Medical Treatment Facility Downsizing on Army Installations 23-Jul-99

A-1999-0359-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization-Central Heating Plants 12-Aug-99

A-1999-0360-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization-Central Heating Plants 12-Aug-99

A-1999-0361-AMLAudit of the Army's Materiel Release Process, CECOM 26-Jul-99

A-1999-0362-AMIManagement of Controlled Cryptographic Items 13-Sep-99

Page 68: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0363-AML

Interim Audit Report Audit of Selected Aspects of FORSCOM Materiel Management Center Operations 27-Jul-99

A-1999-0364-FFF

Audit of the Army Workload and Performance System's Ammunition Function at Anniston, Letterkenny, and Red River Army Depots 9-Aug-99

A-1999-0365-AMI

Validation of Material Weakness Corrective Actions--Foreign Liaison Officer Program 27-Jul-99

A-1999-0366-AMI

Performance Evaluation of Technology-Based Special Access Programs (U) 23-Aug-99

A-1999-0367-IMO

Program Objective Memorandum 98-03 Efficiencies--Leases and Disposal of Non-Operation and Maintenance Army Excess 31-Aug-99

A-1999-0368-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Directorate of Installation Support 2-Aug-99

A-1999-0369-AMA

Commentary on Network Managers for the Digitized Battlefield 19-Aug-99

A-1999-0370-FFP

Billed Office Address Codes Audit of Interservice Support Costs and Reimbursements 4-Aug-99

A-1999-0371-AML

Managing Local Purchase Requisitions in the Standard Army Retail Supply System-Objective (SARSS-O)--a Guide for Installations Etc. (Advisory Report) 28-Sep-99

A-1999-0372-IMU Billeting Operations 17-Aug-99

A-1999-0373-FFB

Audt of Mission Criticl Systms--Year 2000; Assessmnt of Trojan Classic & Trojan Spec Purpose Integratd Remote Intellignce Terminl (Spirit) II at CECOM 11-Aug-99

Page 69: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0374-AMW

Army Working Capital Fund Cycle Memorandum Inventory Allowance Accounts 24-Sep-99

A-1999-0375-OED

Results of Follow-Up Review on U.S. Army Audit Agency Reports AA97-163 and AA97-166 Audits of Linen Management and Troop and Family Housing Furnishings 4-Aug-99

A-1999-0376-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report AA96-87 Engineering Proving Ground - Contract Management 4-Aug-99

A-1999-0377-OED

Results of Follow-Up Review of Audit Recommendations at the U.S. Army Corps of Engineers on U.S. Army Audit Agency Reports 4-Aug-99

A-1999-0378-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report AA96-87 Engineer Proving Ground - Contract Management 4-Aug-99

A-1999-0379-OED

Results of Follow-Up Review on U.S. Army Audit Agency Report WR95-206 Acquisition and Maintenance Strategies for Mobile Land Plant 4-Aug-99

A-1999-0380-FFG

Audit of Implementation of the Defense Property Accountability System 17-Aug-99

A-1999-0381-IMHBilling and Accounting Practices 2-Sep-99

A-1999-0382-IMT

Independent Review of the Performance Work Statement for the Directorate of Logistics Fort Riley Commercial Activities Study 10-Aug-99

Page 70: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0383-FFB

Audit of Mission Critical Systems--Year 2000; Assessment of Systems Managed by the Program Manager for Chemical Demilitarization 18-Aug-99

A-1999-0384-IMH

Morale Welfare and Recreation Activities--Financial Controls 25-Aug-99

A-1999-0385-IME

Joint Audit of Hazardous Waste Disposal Volumes and Costs 12-Aug-99

A-1999-0386-FFF

Use of Army Workload and Performance System in the Total Army Analysis 07 Process 30-Sep-99

A-1999-0387-FFFProtocol and Public Affairs Efficiencies 29-Sep-99

A-1999-0388-IMT

U.S. Army Audit Agency Review of the Cost Comparison for the Fort Lee Directorate of Logistics and Directorate of Public Works 18-Aug-99

A-1999-0389-FFB

Audt of Mission Criticl Weapn Systms--Year 2000; Assessmnt of Hunter Unmanned Aerial Vehicle at Ofc of PEO for Intelignce Elctronic Warfare & Sensors 17-Aug-99

A-1999-0390-FFB

Audt of Mission Criticl Weapn Systms--Year 2000; Assessmnt of Guardrail Common Sensor Systms at Ofc of PEO for Intelignce Elctronic Warfare & Sensors 17-Aug-99

A-1999-0391-IMU

Level II Validation of Year 2000 Fixes for U.S. Army Europe and Seventh Army Command-Unique Systems 19-Aug-99

A-1999-0392-AMW

Army Working Capital Fund FY 98 Financial Statements--Follow-up Issues 7-Sep-99

A-1999-0393-IMOCost-Benefit Study for Libby Range 8-Sep-99

Page 71: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0394-AMW

Follow-Up Rev of Problems Identified in AAA Report: AA99-322 FY 98 Army Working Capital Fund Financial Statements--Net Cost & Changes in Net Position 19-Aug-99

A-1999-0395-AMM

Audit of Contracts for Field-Level Maintenance of Tactical Equipment 20-Aug-99

A-1999-0396-IMO

Program Objective Memorandum 98-03 Efficiencies--Utilities Modernization-Central Heating Plants 2-Sep-99

A-1999-0397-AML Retail Supply Operations 10-Sep-99

A-1999-0398-FFP

Laundry Service Requirements Audit of Interservice Support Costs and Reimbursements 14-Sep-99

A-1999-0399-FFB

Validation of the National Guard's Corrective Actions to Eliminate the U.S. Property and Fiscal Officer's Rating Chain Material Weakness 21-Sep-99

A-1999-0400-IMO

Report on the Audit of Personnel Management Director(ATE) of Military Support 24-Aug-99

A-1999-0401-AMA

Audit of High Level Architecture for Simulation Systems, Tank-automotive & Armaments Cmd 25-Aug-99

A-1999-0402-AMA

Audit of High Level Architecture for Simulation Systems, Armament Research, Development & Engineering Center 26-Aug-99

A-1999-0403-AML Retail Supply Operations 15-Sep-99

A-1999-0404-AMA

Audit of High Level Architecture for Simulation Systems, Communications-Electronics Cmd 1-Sep-99

A-1999-0405-IMH

Review of MWR Utilization Support and Accountability Funding Practice 1-Sep-99

Page 72: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0406-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Directorates of Public Works and Information Management Dated 29 June 1999 13-Sep-99

A-1999-0407-AMA

Audit of High Level Architecture for Simulation Systems, Simulation, Training & Instrumentation Cmd 3-Sep-99

A-1999-0408-AML Materiel Release 30-Sep-99

A-1999-0409-FFB

Validation of Material Weakness Civilian Retirement Claims Processing 21-Sep-99

A-1999-0410-FFG

Audit of the Army's FY 99 General Fund Financial Statements Accounts Receivable, DFAS-Indianapolis 8-Sep-99

A-1999-0411-FFG

Audit of the Army's FY 99 General Fund Financial Statements Accounts Receivable, DFAS-Rock Island 13-Sep-99

A-1999-0412-IMT

Review of Performance Work Statement for the Fort Benning Directorates of Public Works and Logistics 21-Sep-99

A-1999-0413-IMHBilleting Financial Operations 29-Sep-99

A-1999-0414-IME

Audit of National Guard Bureau Environmental Programs--Remediation 20-Sep-99

A-1999-0415-IMH Billeting Requirements 30-Sep-99

A-1999-0416-AMA

Audit of High Level Architecture for Simulation Systems, PEO-Ground Combat & Support Systems 14-Sep-99

A-1999-0417-AMW

Army Working Capital Fund FY 98 Financial Statements--Property Plant and Equipment 30-Sep-99

Page 73: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0418-FFB

Audit of Mission Critical Weapon Systems--Year 2000; Assessment of Mobile Subscriber Equipment at the U.S. Army Communications-Electronics Command 20-Sep-99

A-1999-0419-FFB

Audit of Mission Critical Weapon Systms--Year 2000; Assessment of Forward Area Air Defense Cmd & Cntrl Systm at Ofc of PEO for Cmd & Cntrl Comm Systms 20-Sep-99

A-1999-0420-FFB

Audit of Automated Information Systems--Year 2000; Assessment of Selected Mission Critical Systems at the U.S. Army Reserve Personnel Command 22-Sep-99

A-1999-0421-FFG

Audit of the Army's FY 99 General Fund Financial Statements - Financial Reporting of Munitions, Hawthorne Army Depot 20-Sep-99

A-1999-0422-FFG

Audit of the Army's FY 99 Financial Statements - Financial Reporting of Munitions, Iowa Army Ammunition Plant 20-Sep-99

A-1999-0423-FFG

Audit of the Army's FY 99 General Fund Financial Statements, Financial Reporting of Munitions, Eighth Army, Korea 15-Sep-99

A-1999-0424-FFB

Audit of Mission Critical Weapon Systems--Year 2000; Assessment of the Improved Guardrail V System at the U.S. Army Communications-Electronics Command 20-Sep-99

A-1999-0425-FFB

Audit of Mission Critical Weapon Systems--Year 2000; Assessment of Tactical Radio Communications Systems at Ofc of PEO for Cmd Cntrl & Comm Systems 20-Sep-99

Page 74: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0426-FFB

Review of the Army Management Control Process for FY 99, Fort Belvoir Garrison 30-Sep-99

A-1999-0427-FFB

Review of the Army Management Control Process for FY 99, Fort Eustis Garrison 30-Sep-99

A-1999-0428-FFB

Review of the Army Management Control Process for FY 99, Fort Leavenworth Garrison 30-Sep-99

A-1999-0429-FFB

Review of the Army Management Control Process for FY 99, Fort Lee Garrison & CASCOM 30-Sep-99

A-1999-0430-FFB

Review of the Army Management Control Process for FY 99, Fort Myer Garrison 30-Sep-99

A-1999-0431-FFB

Review of the Army Management Control Process for FY 99, PEO-Ground Combat Support Systems 30-Sep-99

A-1999-0432-FFB

Review of the Army Management Control Process for FY 99, PEO, Aviation 30-Sep-99

A-1999-0433-AMA

Audit of High Level Architecture for Simulation Systems, Field Artillery Center & Fort Sill 28-Sep-99

A-1999-0434-AML

Standing Operating Procedures for Billing the Multinational Force and Observers Audit of Army FY 98 Billings to the Multinational Force and Observers 16-Sep-99

A-1999-0435-FFB

Review of the Army Management Control Process for FY 99, HQ, CID & 701st Mil Police Gp 30-Sep-99

A-1999-0436-FFB

Review of the Army Management Control Process for FY 99, HQ, INSCOM & 902d Mil Intell Gp 30-Sep-99

Page 75: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0437-FFB

Valdation of Matrl Weaknes Corectiv Action-Cnversion of Nat Gd Persnel Army Inactiv Duty Trng Centrly Managd Alot (Opn) to Decentrlzd Alot (Specifc) 21-Sep-99

A-1999-0438-FFB

Validation of Material Weakness Processing of Reported Potential Violations of the Antideficiency Act 21-Sep-99

A-1999-0439-IMT

USAAA Review of the Cost Comparison Form for the Fort Lee Directorate of Logistics and Directorate of Public Works Commercial Activities Study 24-Sep-99

A-1999-0440-IMHReview of Classification of Transient Lodging Facilities 29-Sep-99

A-1999-0441-IMH

Review of Army and Air Force Exchange Service External Contract Oversight 24-Sep-99

A-1999-0442-FFC

Directorate of Public Works/U.S. Army Corps of Engineers (USACE) and U.S. Army Materiel Command (AMC) Partnering Test 9-Oct-98

A-1999-0443-IMOReview of Military Postal Service Agency 6-Oct-98

A-1999-0444-IMOReview of Family Housing Requirements 6-Oct-98

A-1999-0445-IMOReview of Family Housing Requirements 6-Oct-98

A-1999-0446-IMOReview of Family Housing Requirements 6-Oct-98

A-1999-0447-FFFTracking Efficiencies--Flying Hour Program 23-Oct-98

A-1999-0448-AMAReview of Software Development Costs 20-Oct-98

A-1999-0449-IMOReview of Family Housing Requirements at Fort Polk 19-Oct-98

A-1999-0450-FFB

Development and Implementation of Activity-Based Costing 21-Oct-98

A-1999-0451-FFB Activity-Based Management 9-Nov-98

Page 76: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0452-FFC

Review of U.S. Army Corps of Engineers Transatlantic Program Center Reproduction Services 23-Oct-98

A-1999-0453-FFF

Consulting Review of the Caddo Parish School District Career Academy Program 30-Oct-98

A-1999-0454-IME

Audit of Controls Over Shell Oil Company's Allocable Costs at Rocky Mountain Arsenal 30-Oct-98

A-1999-0455-AMM

Procedures for Depot Maintenance Workload Reporting 10-Nov-98

A-1999-0456-FFB

Activity-Based Management for the Directorate of Community Activities and Services 13-Nov-98

A-1999-0457-IMHArmed Forces Sports Program 30-Nov-98

A-1999-0458-IMOReview of Base Operation Costs 20-Nov-98

A-1999-0459-IMUConsulting Review of Self Service Supply Operations 24-Nov-98

A-1999-0460-IMOReview of Family Housing Requirements 22-Dec-98

A-1999-0461-FFB

Audit of Automated Info Systems--Year 2000 (Phase IV); Assessmnt of Selctd Mission Critical Systems at the Ofc of the PEO for Cmd Cntrl & Comm Systms 22-Dec-98

A-1999-0462-FFB

Audit of Automated Information Systems--Year 2000 (Phase IV); Assessmnt of Selectd Mission Critical Systms at the Joint Prog Ofc for Biological Defnse 22-Dec-98

A-1999-0463-FFB

Audit of Automated Information Systems--Year 2000 (Phase IV); Assessment of the Counter Narcotics Command and Management System 22-Dec-98

Page 77: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0464-FFB

Audit of Automated Info Systems--Year 2000 (Phase IV); Assessment of Selected Mission Critical Systems at Ofc of the PEO Standrd Army Mgmt Info Systms 22-Dec-98

A-1999-0465-FFB

Audit of Automated Info Systems--Year 2000 (Phase IV); Assessment of Selected Mission Critical Systems at the PEO Reserve Component Automation System 22-Dec-98

A-1999-0466-IMO

Compilation of Family Housing Maintenance Expenditures 3-Feb-99

A-1999-0467-IMUReview of Costs for Base Operations Support 4-Feb-99

A-1999-0468-AMACommentary on Dining Facility Contracts 5-Feb-99

A-1999-0469-IMO

Review of Proposed Maximum Allowable Housing Cost 19-Mar-99

A-1999-0470-IMO

Proposed Payment Plan for Fitzsimons Army Medical Center Aurora, Colorado Economic Development Conveyance 20-Feb-99

A-1999-0471-AMA

Review of the A-76 Waiver Package for Apache Prime Vendor Support 22-Feb-99

A-1999-0472-FFC

Review of Fiscal Yearend Civil Works Accruals and Controls Over Travel Vouchers 1-Mar-99

A-1999-0473-IME

FY 99 Cost Estimates for the Assembled Chemical Weapons Assessment Program 3-Mar-99

A-1999-0474-FFF

Consulting Review of Tracking Efficiencies--Explosive Ordnance Disposal 5-Mar-99

A-1999-0475-AMA

Review of the Best Case Government Cost to Support the Apache 16-Mar-99

Page 78: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0476-IMO

Computation of the Present Value of the Proposed Payment Plan for Fitzsimons Army Medical Center Aurora, Colorado Economic Development Conveyance 18-Mar-99

A-1999-0477-IMOConsulting Review of the Special Events Operations 19-Mar-99

A-1999-0478-IMO

Review of Requests for Resources to Support the NATO Summit 24-Mar-99

A-1999-0479-FFBThe Army's Training Resource Model 19-Apr-99

A-1999-0480-IMO

Analysis of the Present Value for the Proposed Payment Plan for Red River Army Depot Texarkana, Texas Economic Development Conveyance 31-Mar-99

A-1999-0481-IMUFunding Benefits from Logistics Activities 19-Apr-99

A-1999-0482-FFBReview of Draft FY 99 Campaign Plan 6-Apr-99

A-1999-0483-FFF

Audit of Tracking Efficiencies - Military Training Specific Allotment 23-Apr-99

A-1999-0484-AMA

Foreign Military Sales Administrative Fund, International Development & Security Assistance Directorate 6-May-99

A-1999-0485-AMA

Foreign Military Sales Administrative Fund, Army Security Assistance Training Field Activity 30-Apr-99

A-1999-0486-AMA

Foreign Military Sales Administrative Fund, Army Security Assistance Cmd 24-May-99

A-1999-0487-AMA

Foreign Military Sales Administrative Fund, Army Aviation & Missile Cmd 28-May-99

A-1999-0488-OERReview of Strategic Plan and Performance Measures 23-Jul-99

Page 79: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0489-IMO

Analysis of the Present Value for the Proposed Payment Plan for Defense Distribution Depot Ogden, Utah Economic Development Conveyance 22-Apr-99

A-1999-0490-IMO

Review of Requests for Resources to Support the NATO Summit 22-Apr-99

A-1999-0491-FFF

Ready Reserve Mobilization Income Insurance Program Appeals 17-May-99

A-1999-0492-FFF

Review of Tracking Efficiencies--Multinational Force and Observers 28-May-99

A-1999-0493-AMA

Information Paper Unfunded Requirements for the Apache Program 11-May-99

A-1999-0494-FFC

Directorate of Public Works U.S. Army Corps of Engineers (USACE) and U.S. Army Materiel Command (AMC) Partnering Test 30-Jun-99

A-1999-0495-IMU

Follow-up Review of Property Accountability at the U.S. National Support Element Taszar, Hungary 27-May-99

A-1999-0496-IMO

Review of Closeout Procedures for the NATO Summit 28-May-99

A-1999-0497-FFB

Debt Management Task Force's Review of the Army's Out-of-Service-Debt 22-Jun-99

A-1999-0498-AML

Decision Paper AAA Consulting Effort Independent Validation/Verification of the Standard Army Financial Inventory Acctng/Reptng System-Modernization 1-Jun-99

A-1999-0499-IMT

Objective Data for Evaluating High-Grade Civilian Positions at Fort Lewis 3-Jun-99

A-1999-0500-IMT

Review of the Range Transfer Process--Republic of Panama 20-Nov-98

Page 80: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0501-IMTAudit of Military Closeout Plans--Republic of Panama 21-May-99

A-1999-0502-IMT

Cost of the Directorate of Logistics Competitive Sourcing Study--Phase I 30-Jun-99

A-1999-0503-AMA

Review of Streamlining the Science and Technology Engineering and Test and Evaluation Infrastructure 19-Jul-99

A-1999-0504-AMA

Review of the Effect of Apache Prime Vendor Support Contract on the Army Working Capital Fund 25-Jun-99

A-1999-0505-FFBReview of Telecommunications Costs 30-Jun-99

A-1999-0506-AMA

Audit of Funding for Unmanned Aerial Vehicle Systems 23-Jun-99

A-1999-0507-IMO

Consulting Review of Funding for Utility Privatization 23-Jun-99

A-1999-0508-AMI PRY2K-3 (U) 28-Jun-99

A-1999-0509-IMO

Review of Facility Requirements for Command and General Staff College Instructional Facility 30-Jul-99

A-1999-0510-FFB

Assistant Secretary of the Army (Financial Management and Comptroller) Strategic Plan and Performance Metrics 30-Jul-99

A-1999-0511-AMAReview of Non-Toxic Ammunition 22-Jul-99

A-1999-0512-FFG

Consulting Review of the Defense Joint Accounting System Operations at the Ballistic Missile Defense Organization 9-Aug-99

A-1999-0513-IMU

Review of Property Accountability Over Office Automation Equipment Downrange 13-Aug-99

Page 81: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-1999-0514-FFF

Rev of the International Merchant Purchase Authorization Card Use at the North Central & National Capital Region Civilian Personnel Operations Centers 25-Aug-99

A-1999-0515-FFP Budget Consolidation 26-Aug-99

A-1999-0516-AMAReview of Funding Spiral Development Programs 26-Aug-99

A-1999-0517-IMTReview of Military Closeout Plans--Republic of Panama 26-Aug-99

A-1999-0518-FFBActivity-Based Costing Models 20-Sep-99

A-1999-0519-FFBReview of Telecommunications Costs 21-Sep-99

A-1999-0520-FFBReview of Telecommunications Costs 21-Sep-99

A-1999-0521-FFF

Consulting Review of U.S. Army Reserve Chief Information Office and Information Technology Contracts 10-Sep-99

A-1999-0522-AML

Afteraction Report Independnt Validation & Verification of Standard Army Financial Invntory Accountng & Reportng System-Modernization (Starfiars-Mod) 28-Sep-99

A-2000-0001-FFB

Information Assurance-Phase III: Funding and Performance Measures 14-Dec-99

A-2000-0003-FFFHeadquarters DA Redesign Efficiency 4-Nov-99

A-2000-0004-AMM

Repair of Secondary Items, 3d Infantry Division (Mech) and Fort Stewart 29-Oct-99

A-2000-0005-FFB

Audit of Automated Information Systems--Year 2000; Assessment of the Resource Information System Engineer Reserve (RISER) System at Office of the Chief, Army Reserve 15-Oct-99

A-2000-0006-IMH The Army Ten-Miler 4-Oct-99

Page 82: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0007-FFB

Audit of Positive Response Year 2000-4 (PRY2K-4) Sustainment Exercise and Unit Mobilization and Individual Deployment Exercises) (5 Aug to 3 Sep 1999) 15-Oct-99

A-2000-0008-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement, U.S. Army Training Center and Fort Jackson 5-Oct-99

A-2000-0010-IMHReview of MWR Utilization Support and Accountability 7-Oct-99

A-2000-0011-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Fort Drum Readiness Business Center Commercial Activities Study 7-Oct-99

A-2000-0012-FFB

Audit of Mission Critical Weapon Systems--Year 2000; Assessment of Selected Mission Critical Systems at the U.S. Army Criminal Investigation Command 15-Oct-99

A-2000-0013-FFB

Audit of Mission Critical Weapon Systems--Year 2000; Assessment of the Mobile Subscriber Equipment at the Office of the PEO for Command Control & Comunications Systems 15-Oct-99

A-2000-0014-IMT

USAAA Review of the Government Cost Comparison Form for the Fort Drum Readiness Business Center Commercial Activities Study--Schedule of Adjustments 7-Oct-99

A-2000-0015-FFB

Review of the Army Management Control Process for FY 99, HQ, TRADOC 29-Oct-99

Page 83: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0016-AMA

Tank Training Devices for National Guard Units, TRADOC 1-Nov-99

A-2000-0017-FFP

Utility Rate Computations Audit of Interservice Support Costs and Reimbursements 12-Oct-99

A-2000-0018-IMHBarnes Post Restaurant Fund 29-Oct-99

A-2000-0019-AMW

Army Working Capital Fund FY 98 Financial Statements--Fund Balance with Treasury 15-Oct-99

A-2000-0020-FFB

Review of the Army Management Control Process for FY 99, HQ, MDW 29-Oct-99

A-2000-0021-FFB

Expenditures for Aviation Fuel, 12th Aviation Battalion, Fort Belvoir, VA 16-Nov-99

A-2000-0022-FFB

Audit of Automated Information Systems--Year 2000; Assessment of Selected Army Air Traffic Control Mission Critical Systems 15-Oct-99

A-2000-0023-AMA

Audit of High Level Architecture for Simulation Systems, Center for Army Analysis 15-Oct-99

A-2000-0024-IMTLessons Learned from the Army's Hunter Pilot Project 28-Oct-99

A-2000-0025-AMAFunding for Unmanned Aerial Vehicles 5-Nov-99

A-2000-0026-FFB

Audt of Automated Information Systms--Year 2000; Assessmnt of Selected Mission Critical Systms at U.S. Army Simulation Training & Instrumentation Cmd 22-Oct-99

A-2000-0027-AML

Integrated Logistics Analysis Program Efficiency, ODCS Logistics 8-Nov-99

Page 84: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0028-FFF

Use of International Merchant Purchase Authorization Cards (IMPAC), Civilian Personnel Operations Center Management Agency, Aberdeen Proving Ground, MD 12-Nov-99

A-2000-0029-FFF

Use of International Merchant Purchase Authorization Cards (IMPAC), Northeast Civilian Personnel Operations Center, Aberdeen Proving Ground, MD 10-Nov-99

A-2000-0030-IMH

Billeting Financial Operations, III Corps and Fort Hood 4-Nov-99

A-2000-0031-IMH

Financial Controls Over Morale, Welfare and Recreation Activities, Fort Benning Military Community 4-Nov-99

A-2000-0032-AMIArmy Foreign Language Program Requirements 14-Feb-00

A-2000-0033-AMI

Technology Transfers for Classified and Sensitive Information, ODCS Intelligence 20-Dec-99

A-2000-0034-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Directorate of Logistics, Fort Leonard Wood, MO 25-Oct-99

A-2000-0035-AMA

Audit of High Level Architecture for Simulation Systems, Space & Missile Defense Cmd 25-Oct-99

A-2000-0036-AMI

Audit of Limited Competition Contracts in Special Access Programs, U.S. Army Aviation and Missile Command 27-Oct-99

A-2000-0037-AMI

Audit of Limited Competition Contracts in Special Access Programs, U.S. Army Communications-Electronics Command 27-Oct-99

Page 85: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0038-AMI

Audit of Limited Competition Contracts in Special Access Programs, U.S. Army Tank-automotive and Armaments Command 27-Oct-99

A-2000-0039-AMI

Audit of Limited Competition Contracts in Special Access Programs, U.S. Army Space and Missile Defense Command 27-Oct-99

A-2000-0040-AMI

Audit of Limited Competition Contracts in Special Access Programs, U.S. Army Corps of Engineers 27-Oct-99

A-2000-0041-AMI

Audit of Limited Competition Contracts in Special Access Programs (U) 27-Oct-99

A-2000-0042-AMI

Audit of Limited Competition Contracts in Special Access Programs (U) 27-Oct-99

A-2000-0043-AMI

Audit of Limited Competition Contracts in Special Access Programs (U) 27-Oct-99

A-2000-0044-FFBAudit of the American Red Cross 29-Oct-99

A-2000-0045-AML

Audit of Global Combat Support System-Army Incorporating Requirements for the Integrated Logistics Analysis Program Into the Global Combat Support System-Army 27-Oct-99

A-2000-0046-FFB

Audit of Year 2000 Facility Infrastructure (Non-Information Technology); Assessment of the U.S. Army Training and Doctrine Command 10-Nov-99

A-2000-0047-FFB

Review of the Army Management Control Process for FY 99, Army Human Resources Cmd 15-Oct-99

A-2000-0048-AMW

Army Working Capital Fund FY 98 Financial Statements--Statement of Budgetary Resources 29-Oct-99

Page 86: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0049-AMI

Follow-Up Review of Implemented Recommendations for U.S. Army Audit Agency Report of the Intelligence Oversight Program Material Weakness 28-Oct-99

A-2000-0050-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement, Redstone Arsenal Support Activity 1-Nov-99

A-2000-0051-FFB

Suggestions for Management's Consideration--Audit of the Army Executive Dining Facility Fund Financial Statements 4-Jan-00

A-2000-0052-FFB

Suggestions for Management's Consideration--Audit of the Secretary of Defense Mess Fund Financial Statements 6-Jan-00

A-2000-0053-FFBSecretary of Defense Mess Fund Financial Statements 6-Jan-00

A-2000-0054-FFB

Audit of Automated Information Systems--Year 2000; Assessment of Selected Mission Critical Systems at the National Guard Bureau PEO for Info Systems 29-Nov-99

A-2000-0055-IMU

Review of Army and Air Force Exchange Service Transportation Charges in Support of Operation Joint Guard for March 1998 Through April 1999 2-Nov-99

A-2000-0056-IMT

USAAA Rev of the Government Costs and Most Efficient Organization for the Fort Riley Directorate of Information Management Commercial Activities Study 13-Jan-00

Page 87: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0057-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Fort Riley Directorate of Public Works Commercial Activities Study 16-Nov-99

A-2000-0058-FFB

Review of the Army Management Control Process (Fiscal Year 1999)--an Assessment for the Secretary of the Army 4-Nov-99

A-2000-0059-FFB

Audit of Automated Information Systems--Year 2000; Assessment of Range and Training Land Program-Automated System 8-Nov-99

A-2000-0060-IMT

Review of Government Costs for the Fort Stewart Directorate of Public Works Commercial Activities Study 9-Nov-99

A-2000-0061-IMT

Lessons Learned in the Review of the Management Study and in-House Cost Estimate Directorate of Public Works Fort Stewart 9-Nov-99

A-2000-0062-FFB

Review of the Army Management Control Process for FY 99, ASA(AL&T) 8-Nov-99

A-2000-0063-AMW

Army Working Capital Fund FY 98 Financial Statements--Inventory Allowance Accounts 17-Nov-99

A-2000-0064-FFB

Review of the Army Management Control Process for FY 99, DCS, G-1 17-Nov-99

A-2000-0065-FFB

Review of the Army Management Control Process for FY 99, Space & Missile Def Cmd 21-Dec-99

A-2000-0066-FFB

Review of the Army Management Control Process for FY 99, Admin Asst to the Sec of Army 21-Dec-99

Page 88: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0067-FFB

Review of the Army Management Control Process for FY 99, Army Broadcasting Svc (Under the Admin Asst to the Sec of Army) 21-Dec-99

A-2000-0068-IMH

Reengineering Overhead Support for Morale Welfare and Recreation Activities, U.S. Army Community and Family Support Center 30-Nov-99

A-2000-0069-FFB

Audit of Year 2000 Facility Infrastructures (Non-Information Technology); Assessment of the U.S. Army Europe and Seventh Army 22-Dec-99

A-2000-0070-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for Tooele Army Depot Base Operations Commercial Activities Study 17-Nov-99

A-2000-0071-AMA

Audit of High Level Architecture for Simulation Systems, Aviation & Missile Cmd 16-Nov-99

A-2000-0072-IME

Audit of National Guard Bureau Environmental Programs--Remediation 17-Nov-99

A-2000-0073-FFB

Audit of Automated Information Systems--Year 2000; Assessment of Distributive Training Technology Project at the National Guard Bureau PEO for Information Systems 18-Nov-99

A-2000-0074-FFB

Audit of Automated Information Systems--Year 2000; Assessment of the Unit Level Logistic System-Aviation at the Office of the PEO for Standard Army Management Information Systems 17-Nov-99

Page 89: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0075-FFB

Audit of Automated Information Systems--Year 2000; Assessment of the Army Authorization Document System at U.S. Army Force Management Support Agency 24-Nov-99

A-2000-0076-AMM

Process for Determining Source of Depot Level Maintenance, U.S. Army Communications-Electronics Command 14-Dec-99

A-2000-0077-AMM

Process for Determining Source of Depot Level Maintenance, U.S. Army Tank-automotive and Armaments Command 14-Dec-99

A-2000-0078-IMT

AAA Rev of Government Mgmt Study & Cost Comparison Form for the Red River Army Depot Directorates of Public Works & Info Mgmt Commercial Activity Study 22-Nov-99

A-2000-0079-IMT

USAAA Review of the Government Cost Comparison Form for the Tooele Army Depot Base Operations Commercial Activities Study - Schedule of Adjustments 19-Nov-99

A-2000-0080-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Charles E. Kelly Support Facility Dated 18 November 1999 23-Nov-99

A-2000-0081-FFG

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Financial Reporting of Fund Balance with Treasury, U.S. Army Corps of Engineers Finance Center 19-Nov-99

Page 90: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0082-FFB

Audit of Mission Critical Weapon Systems--Year 2000; Assessment of the Paladin Self-Propelled Howitzer (M109A6) at U.S. Tank-Automotive & Armaments Cmd 29-Nov-99

A-2000-0083-FFB

Audit of Year 2000 Facility Infrastructure (Non-Information Technology) at Fort Campbell 30-Nov-99

A-2000-0084-FFB

Audit of Year 2000 Facility Infrastructure (Non-Information Technology) at Fort Stewart 30-Nov-99

A-2000-0085-FFB

Audit of Year 2000 Facility Infrastructure (Non-Information Technology), U.S. Army Forces Command 10-Dec-99

A-2000-0086-AML Audit of Battery Efficiency 23-Nov-99

A-2000-0087-IMT

U.S. Army Audit Agency Review of the Management Study of the Directorates of Engineering and Logistics 16-Dec-99

A-2000-0088-IMT

Independent Review Services for the U.S. Army Test Measurement and Diagnostic Equipment Activity Commercial Activities Study 30-Nov-99

A-2000-0089-FFG

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Statement of Budgetary Resources, Missouri Army National Guard 23-Nov-99

A-2000-0090-FFB

Lessons Learned--Year 2000 Audit/Consultation Effort 24-Nov-99

A-2000-0091-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Fort Drum Public Works Support Services Commercial Activities Study 1-Dec-99

Page 91: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0092-IMT

USAAA Rev of the Government Cost Comparison Form for the Fort Drum Public Works Support Services Commercial Activities Study--Schedule of Adjustments 3-Dec-99

A-2000-0093-FFG

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Statement of Budgetary Resources, DFAS Rome 29-Nov-99

A-2000-0094-FFP

U.S. Army Japan Issues Audit of Interservice Support Costs and Reimbursements 30-Nov-99

A-2000-0095-FFG

Audit of the Army's FY 99 Principal Financial Statements--Real Property, Fort Richardson 6-Dec-99

A-2000-0096-FFP

Flood Damage Assessment, Eighth U.S. Army, Korea 20-Jan-00

A-2000-0097-FFG

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Statement of Budgetary Resources, DFAS Orlando 1-Dec-99

A-2000-0098-IMT

Lessons Learned in the Review of the In-House Cost Estimate 6-Dec-99

A-2000-0099-IME

Audit of National Guard Environmental Programs--Remediation 1-Dec-99

A-2000-0100-FFG

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Statement of Budgetary Resources, Corps of Engineers - Finance Center 3-Dec-99

A-2000-0101-FFG

Audit of the Army's FY 99 Principal Financial Statements--Real Property, Hawaii Army National Guard 14-Dec-99

Page 92: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0102-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for Blue Grass Army Depot Base Operations Commercial Activities Study 16-Dec-99

A-2000-0103-IMT

USAAA Review of the Government Cost Comparison Form for the Blue Grass Army Depot Base Operation Commercial Activities Study--Schedule of Adjustments 16-Dec-99

A-2000-0104-FFB

Observations for Management Consideration--Review of the Army Management Control Process for FY 99 21-Dec-99

A-2000-0105-IMH

Utilization Support and Accountability Funding Practice for the Army Morale Welfare and Recreation Program 20-Dec-99

A-2000-0106-FFF

Validation of Automated Requirements Model - Guard 26-Jan-00

A-2000-0107-AMM

Process for Determining Source of Depot Level Maintenance 3-Jan-00

A-2000-0108-FFG

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Statement of Budgetary Resources, DFAS Indianapolis Center 9-Dec-99

A-2000-0109-IMT

USAAA Review of the Draft Performance Work Statement for the Installation Operation Services Commercial Activities Study Dated 17 August 1999, Armaments Research, Development and Engineering Center, Picatinny Arsenal, NJ 14-Dec-99

A-2000-0110-IMEHazardous Waste Disposal Volumes and Costs 27-Dec-99

Page 93: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0111-AMM

Process for Determining Source of Depot Level Maintenance, PEO Ground Combat and Support Systems 20-Jan-00

A-2000-0112-AMM

Process for Determining Source of Depot Level Maintenance, PEO Command, Control and Communications Systems 24-Apr-00

A-2000-0113-IMT

USAAA Review of the Draft Performance Work Statement for the Public Works and Information Technology Commercial Activities Study Dated 25 August 1999, Tobyhanna Army Depot 14-Dec-99

A-2000-0114-IMT

Review of Government Costs for the Anniston Army Depot's Information Management Commercial Activities Study 13-Jan-00

A-2000-0115-IMT

Lessons Learned in the Review of the Management Study and In-House Cost Estimate for Information Management 21-Jan-00

A-2000-0116-FFB

Installation Telecommunication Switches 20-Jan-00

A-2000-0117-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Carlisle Barracks 17-Dec-99

A-2000-0118-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Aberdeen Proving Ground 17-Dec-99

A-2000-0119-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Fort Lewis 17-Dec-99

A-2000-0120-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Redstone Arsenal 22-Dec-99

Page 94: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0121-FFG

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Statement of Budgetary Resources, DFAS St Louis 15-Dec-99

A-2000-0122-IMEExecution of Environmental Projects 30-Dec-99

A-2000-0123-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Directorate of Support Services, Fort McCoy, WI 20-Dec-99

A-2000-0124-IMU

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Financial Reporting of Changes to Real Property Accounts, USAREUR 17-Dec-99

A-2000-0125-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Fort Bragg 19-Jan-00

A-2000-0126-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Fort Detrick 21-Jan-00

A-2000-0127-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Fort Meade 21-Jan-00

A-2000-0128-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Fort Dix 16-Feb-00

A-2000-0129-FFG

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Statement of Budgetary Resources, DFAS Rock Island 20-Dec-99

A-2000-0130-FFB

Army Executive Dining Facility Fund Financial Statements 4-Jan-00

A-2000-0131-AML

Demilitarization of Conventional Ammunition, U.S. Army Industrial Operations Command 4-Feb-00

Page 95: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0132-FFB

Audit of Mission Critical Systems--Year 2000; Assessment of Systems Managed by the Program Manager for Chemical Demilitarization 7-Jan-00

A-2000-0133-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Fort Jackson 14-Jan-00

A-2000-0134-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Fort McPherson 21-Jan-00

A-2000-0135-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Hunter Army Airfield 14-Jan-00

A-2000-0136-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Fort Huachuca 21-Jan-00

A-2000-0137-IMT

Independent Review of the Revised Most Efficient Organization and In-House Cost Estimate for the Directorate of Logistics Commercial Activities Study 7-Jan-00

A-2000-0138-IMT

U.S. Army Audit Agency Review of the Management Study of the Directorates of Engineering and Logistics 10-Jan-00

A-2000-0139-IMU

Review of U.S. Army Europe and Seventh Army's Interagency Fleet Management System Fuel Billings 18-Jan-00

A-2000-0140-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Custodial Services Commercial Activities Study Dated 14 October 1999, U.S. Military Academy, West Point, NY 13-Jan-00

Page 96: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0141-AMITechnology Transfers in Special Programs (U) 18-Jan-00

A-2000-0142-IMT

Review of Government Costs for the Anniston Army Depot's Installation Support Services Commercial Activities Study 21-Jan-00

A-2000-0143-IMT

Lessons Learned in the Review of the Management Study and In-House Cost Estimate for Installation Support Services 21-Jan-00

A-2000-0144-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for Fort Leavenworth's Directorates of Logistics and Public Works 21-Jan-00

A-2000-0145-IMT

Review of Commercial Activities Directorates of Logistics and Public Works 21-Jan-00

A-2000-0146-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Fort Myer 27-Jan-00

A-2000-0147-FFF

Manpower Requirements Criteria - Maintenance and Support Personnel 22-Mar-00

A-2000-0148-FFG

Audit of the Army's FY 99 Principal Financial Statements--Real Property, Eighth Army, Korea 14-Feb-00

A-2000-0149-IMT

Costing Issues Concerning One-Time Conversion Costs 31-Jan-00

A-2000-0150-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Fort Riley Directorate of Logistics Commercial Activities Study 8-Feb-00

Page 97: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0151-IMT

USAAA Review of the Government Costs and Most Efficient Organization for the Fort Riley Directorate of Logistics Commercial Activities Study 8-Feb-00

A-2000-0152-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Directorates of Public Works and Logistics, U.S. Army Air Defense Artillery Center and Fort Bliss 8-Feb-00

A-2000-0153-FFF

Material Weakness Plan for the Manpower Requirements Determination System, ASA(M&RA) 15-Feb-00

A-2000-0154-IMT

Review of the Performance Work Statement for the Fort Polk Whole Base Commercial Activities Study 31-Jan-00

A-2000-0155-IMTReview of the Management Study 31-Jan-00

A-2000-0156-IMT

USAAA Review of the Draft Performance Work Statement for the Garrison Directorate of Logistics Commercial Activities Study Dated 5 November 1999, Fort Monmouth, NJ 3-Feb-00

A-2000-0157-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, 88th Regional Readiness Cmd 17-Feb-00

A-2000-0158-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Texas Army National Guard 15-Feb-00

A-2000-0159-FFG

Audit of FY 99 Real Property Additions Deletions and Modifications, Presidio of Monterey 15-Feb-00

Page 98: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0160-IMH

Military Treatment Facility Downsizing and Healthcare for Soldiers in Remote Locations, U.S. Army Medical Command 18-Feb-00

A-2000-0161-IMHExecution of the Army Ten-Miler 2-Feb-00

A-2000-0162-FFF

Audit of Use of Rail Cars for Transporting Equipment to Combat Training Centers 2-Feb-00

A-2000-0163-FFP

Program Assessment and Execution-FY 99 Flood Damage Funds, Eighth U.S. Army, Korea 24-Feb-00

A-2000-0164-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Directorate of Base Operations Support, U.S. Army Armor Center and Fort Knox 3-Feb-00

A-2000-0165-IMT

USAAA Review of the Draft Performance Work Statement for the Directorate of Public Works Commercial Activities Study Dated 28 January 2000, U.S. Army Field Artillery Center and Fort Sill 4-Feb-00

A-2000-0166-AMA

Benchmarking Study of Information Technology Military Workforce: Recruitment and Retention Implications 27-Mar-00

A-2000-0167-AMI

Workload Survey Intelligence and Security Activities 8-Mar-00

A-2000-0168-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 1999--Summary Audit Report 9-Feb-00

A-2000-0169-FFP

U.S. Army Audit Agency Review of the Management Study for the Directorate of Logistics 8-Feb-00

Page 99: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0170-FFP

U.S. Army Audit Agency Review of the Cost Comparison Form for the Directorate of Logistics (4 February 2000) 8-Feb-00

A-2000-0171-FFP

Adjustments to Cost Comparison Form Directorate of Logistics 8-Feb-00

A-2000-0172-IMT

Review of Government Costs for the Fort Rucker Directorate of Engineering and Logistics Commercial Activities Study 10-Feb-00

A-2000-0173-IMT

Lessons Learned in the Review of the Management Study and In-House Cost Estimate Directorate of Engineering and Logistics 24-Feb-00

A-2000-0174-IMEExecution of the Installation Restoration Program 28-Feb-00

A-2000-0175-AMI

Army Foreign Language Program Training and Proficiency (Phase I) 15-Mar-00

A-2000-0176-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Logistics Division Commercial Activities Study 15-Feb-00

A-2000-0177-AMW

Army Working Capital Fund Principal Financial Statements for Fiscal Year 1999--Auditor's Report 10-Feb-00

A-2000-0178-AMW

Army Working Capital Fund Principal Financial Statements for Fiscal Year 1999--Internal Controls and Compliance with Laws and Regulations 17-Feb-00

A-2000-0180-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Directorate of Information Management Dated 1 December 1999, III Corps and Fort Hood, 1114 Signal Battalion 14-Feb-00

Page 100: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0181-FFF

Audit of the Army Workload and Performance System's Ammunition Function at Blue Grass, Tooele, and Sierra Army Depots 15-Feb-00

A-2000-0182-FFG

Consulting Review of the Defense Property Accountability System (DPAS) Financial Transactions Procedures Manual (Draft) Dated 10 December 1999 14-Feb-00

A-2000-0183-AMW

Review of Property Plant and Equipment (Audit of Army Working Capital Fund FY 99 Financial Statements), Corpus Christi Army Depot 29-Feb-00

A-2000-0184-AMW

Review of Property Plant and Equipment (Audit of Army Working Capital Fund FY 99 Financial Statements), McAlester Army Ammunition Plant 29-Feb-00

A-2000-0185-AMMIntegrated Sustainment Maintenance Program 8-Mar-00

A-2000-0186-FFC

FY 99 Financial Statements, U.S. Army Corps of Engineers, Civil Works 18-Feb-00

A-2000-0187-IMT

Review of the Management Study for the Directorate of Public Works Commercial Activities Study Dated 21 January 2000 18-Feb-00

A-2000-0188-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Redstone Arsenal Support Activity Dated 10 February 2000 23-Feb-00

A-2000-0189-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Redstone Arsenal Support Activity 23-Feb-00

A-2000-0190-AMW

Unexpended Appropriations--Army Working Capital Fund FY 99 Financial Statements 28-Feb-00

Page 101: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0191-FFCPoint Paper #1 - Construction in Progress 28-Feb-00

A-2000-0192-FFC Point Paper #2 - Outgrants 28-Feb-00

A-2000-0193-AMW

Statement of Financing Cycle Memorandum--Army Working Capital Fund 10-Mar-00

A-2000-0194-AMI

Equipment Purchased Through Contracts, U.S. Army Special Operations Command, Ft Bragg, NC 28-Apr-00

A-2000-0195-FFC

Payroll, U.S. Army Corps of Engineers (Cycle Memorandum) 1-Mar-00

A-2000-0196-FFC

Expense and Disbursements, U.S. Army Corps of Engineers (Cycle Memorandum) 1-Mar-00

A-2000-0197-FFC

Revenue and Receipts, U.S. Army Corps of Engineers (Cycle Memorandum) 1-Mar-00

A-2000-0198-AMLSurvey of Second Destination Transportation 2-Mar-00

A-2000-0199-AMM

Contracts for Field-Level Maintenance of Tactical Equipment, 101st Airborne Division (Air Assault) and Fort Campbell 14-Mar-00

A-2000-0200-FFG

Army's General Fund Principal Financial Statements for the Fiscal Year 1999--Financial Reporting of Army General Equipment 4-Apr-00

A-2000-0201-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 1999--Selected Controls for Wholesale Munitions 4-May-00

A-2000-0202-AMW

Internal Controls Over Selected Revenue Expense and Equity Accounts, Anniston Army Depot 22-Mar-00

A-2000-0203-AML

Audit of Repair Parts Disposal Policy and Procedures 13-Mar-00

Page 102: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0204-AMA

Foreign Military Sales, U.S. Army Aviation and Missile Command 6-Apr-00

A-2000-0205-IME

Military Interdepartmental Purchase Requests, Program Manager for Chemical Demilitarization 27-Mar-00

A-2000-0207-IMT

Review of the Fort Monroe Directorate of Public Works and Directorate of Logistics In-House Cost Estimate 28-Mar-00

A-2000-0208-AMICash Controls for Special Mission Units (U) 19-Apr-00

A-2000-0209-IMT

Review of Updated Government Costs for the Fort Drum Readiness Business Center Commercial Activities Study 16-Mar-00

A-2000-0211-FFF

Civilian Personnel Regionalization, Pacific Region, Ft Richardson, AK 11-Apr-00

A-2000-0212-IMT

USAAA Review of the Update to the Fort Hood G-3 Range Division; Range Operations Maintenance and Support Services Cost Comparison Form 22-Mar-00

A-2000-0213-FFG

Army's General Fund Principal Financial Statements for FY 1999--Management of Controls Over Army Corps of Engineers Military Construction in Progress, Corps of Engineers 20-Apr-00

A-2000-0214-FFB

Summary of Year 2000 Audit Coverage--Lessons Learned 31-Mar-00

A-2000-0215-IMT

Rev Most Efficient Orgnization & Gov't Costs for Commercial Activtes Study of Opration/Maint of 5 Gov't-Ownd Locks & Dams Locatd on Red River Waterway 30-Mar-00

Page 103: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0216-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form for the Red River Locks and Dams Commercial Activities Study 30-Mar-00

A-2000-0217-AML

Velocity Management/Standard Army Retail Supply System-Objective Efficiency, ODCS Logistics 10-Apr-00

A-2000-0218-AMW

Internal Controls Over Obligations Disbursements Orders Received and Collected, Fort Gordon 29-Mar-00

A-2000-0219-AMWAudit of Defense Supply Service-Washington 31-Mar-00

A-2000-0220-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 1999--Financial Reporting of Liabilities 21-Apr-00

A-2000-0221-IMO

Base Realignment and Closure 1995 Reserve Component Enclave 14-Apr-00

A-2000-0222-AMW

Internal Controls Over Obligations Disbursements Orders Received and Collections, Fort Knox 25-Apr-00

A-2000-0223-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 1999--Financial Reporting of Budgetary Resources 28-Apr-00

A-2000-0224-FFB

Implementing Activity-Based Costing and Activity-Based Management 10-Apr-00

A-2000-0225-IMEEnvironmental Workload Analysis Study 17-Apr-00

A-2000-0226-FFF

Civilian Personnel Regionalization, North Central Region, Rock Island, IL 1-May-00

Page 104: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0227-IMT

U.S. Army Audit Agency's Rev of the Management Study and Cost Comparison Form for the Directorate of Base Operations Support Schedule of Adjustments 13-Apr-00

A-2000-0228-IMH

Improving the Profitability of Golf Course Operations, I Corps and Fort Lewis 24-Apr-00

A-2000-0229-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Directorate of Base Operations Support 13-Apr-00

A-2000-0230-IMT

Rev of Most Efficient Organization & Government Costs for the Commercial Activities Study of the Fort Benning Directorates of Public Works & Logistics 13-Apr-00

A-2000-0231-IMT

Lessons Learned in the Review of the Management Study and In-House Cost Estimate Directorates of Public Works and Logistics 14-Apr-00

A-2000-0232-AML

Embedded Training for the Global Combat Support System-Army 5-May-00

A-2000-0233-AMAInterim Audit Report Audit of Digitized Light Forces 19-Apr-00

A-2000-0234-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Base Operations Commercial Activities Study Dated 22 March 2000, Watervliet Arsenal 20-Apr-00

A-2000-0235-AMA

Homestation Instrumented Training System, HQ TRADOC 5-May-00

Page 105: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0236-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Directorates of Logistics and Information Technology, U.S. Army Operations Support Command (Provisional) and Rock Island Arsenal 8-May-00

A-2000-0237-IMT

U.S. Army Agency Review of the Management Study of the Directorate of Public Works 28-Apr-00

A-2000-0238-IMT

Review of the Fort Eustis Directorate of Public Works In-House Cost Estimate 28-Apr-00

A-2000-0239-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Directorate of Installation Public Works Dated 25 April 2000 26-Apr-00

A-2000-0240-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Directorate of Installation Public Works 28-Apr-00

A-2000-0241-IMUUse of Representation Funds TFF-F (Kosovo) 1-Oct-99

A-2000-0242-IMUProperty Book Operations TFF-F (Kosovo) 22-Nov-99

A-2000-0243-IMUTelecommunications Support TFF-F (Kosovo) 24-Nov-99

A-2000-0244-IMUFollow-on Property Book Operations TFF-F (Kosovo) 9-Nov-99

A-2000-0245-IMUReview of Class V Operations TFF (Kosovo) 16-Dec-99

A-2000-0246-IMU

TFF Audit Cell Accomplishments Report (Kosovo) 14-Jan-00

A-2000-0247-IMUAudit Plan for 2000 (Kosovo) 11-Jan-00

A-2000-0248-IMUSSA Operations TFF-F (Kosovo) 30-Jan-00

A-2000-0249-IMUJCC Operations TFF-F (Kosovo) 8-Mar-00

A-2000-0250-IMUReview of Furniture Purchase (Kosovo) 7-Mar-00

Page 106: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0251-IMUProcurement of Radio Devices (Kosovo) 17-Mar-00

A-2000-0252-IMUReview of JARB Process TFF-F (Kosovo) 20-Mar-00

A-2000-0253-IMUReview of ISSO Workload TFF-F (Kosovo) 28-Mar-00

A-2000-0254-IMUReview of Contracting Operations (Kosovo) 31-Mar-00

A-2000-0255-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Test Support Services Commercial Activities Study Dated 13 December 1999, Aberdeen Test Center 27-Apr-00

A-2000-0256-IME

Review of Suggestion Award for the Permeable Infiltration Unit for Remediation of Old O-Field Proposal AMRA 01095 28-Apr-00

A-2000-0257-IMH

Interim Report on the Audit of the Linen Services Contract, Madigan Army Medical Center, WA 28-Apr-00

A-2000-0258-IMT

Review of Updated Government Costs for the Fort McPherson Directorate of Installation Support 1-May-00

A-2000-0259-AMA

Audit of Integrated Systems Control (ISYSCON) - Time Sensitive Issues, PEO Command, Control, and Communications Systems, Ft Monmouth, NJ 10-May-00

A-2000-0260-AMW

Internal Controls Over Obligations Disbursements Orders Received and Collections, TACOM 26-May-00

A-2000-0261-AMW

Review of Inventory and Related Property Net, Fort Knox 16-May-00

A-2000-0262-AMW

Review of Inventory and Related Property Net, Defense Distribution Depot-Anniston 16-May-00

Page 107: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0263-AMW

Review of Inventory and Related Property Net, Defense Distribution Depot-Tobyhanna 16-May-00

A-2000-0264-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Stewart Directorate of Readiness Commercial Activities Study 8-May-00

A-2000-0265-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Base Operations Commercial Activities Study Dated 24 September 1999, Letterkenny Army Depot 12-May-00

A-2000-0266-AML

Incorporating Legacy Engineering Change Proposal Requirements Into the Global Combat Support System-Army 15-Jun-00

A-2000-0267-FFF

Funding of Aviation Training, U.S. Army Aviation Center and Fort Rucker 12-Jun-00

A-2000-0268-AML

Selected Aspects of U.S. Army Forces Command Materiel Management Center Operations 6-Jun-00

A-2000-0269-IMT

USAAA Independent Review of the Performance Work Statement for the Directorate of Corporate Information Commercial Activities Study Dtd 17 April 2000, CECOM and Fort Monmouth 18-May-00

A-2000-0270-AMW

Internal Controls Over Selected Revenue Expense and Equity Accounts, TACOM 1-Jun-00

A-2000-0271-FFP

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Directorate of Logistics 12 May 2000, U.S. Army Garrison, Alaska 5-Jun-00

Page 108: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0272-IMHArmy Civilian Welfare Fund--Auditor's Report 2-Jun-00

A-2000-0273-AMI

Information Security for the Future Scout Cavalry System 24-May-00

A-2000-0274-IMH

Healthcare for DA Civilians Stationed Overseas, U.S. Army Medical Command 2-Jun-00

A-2000-0275-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 1999--Updating Financial Information in Army Real Property Databases 9-Jun-00

A-2000-0276-AML

Interim Audit Results for Global Combat Support System-Army Council of Colonels Audit of Global Combat Support System-Army 24-May-00

A-2000-0277-IMU

CID Review-Crime Prevention Survey TFF (Kosovo) 29-Mar-00

A-2000-0278-IMU

Review of Brown and Root Maintenance Procedures for Units (Kosovo) 31-Mar-00

A-2000-0279-IMU

Review of Non-Depot Level Repairable Expenditures A5T TFF-F (Kosovo) 21-May-00

A-2000-0280-IMU

TFF-F Resource Management Operations (Kosovo) 21-May-00

A-2000-0281-AMW

Internal Controls Over Obligations Disbursements Orders Received and Collections, AMCOM 6-Jun-00

A-2000-0282-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Directorate of Public Works Dated 24 May 2000 25-May-00

A-2000-0283-IMT

Review of Commercial Activities Directorate of Public Works 25-May-00

A-2000-0284-IMT

Revisions to the In-House Cost Estimate After the Initial Estimate Has Been Sealed, ACSIM 25-May-00

Page 109: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0285-FFPInterservice Support Costs and Reimbursements 12-Jun-00

A-2000-0286-FFB

Information Assurance Phase IV: Reporting Process and Vulnerability Assessment Results 30-Jun-00

A-2000-0287-FFB

Information Assurance-Phase V: Information Assurance Vulnerability Alert (IAVA) Process 30-Jun-00

A-2000-0288-AMA

Review of Army Suggestion AMTT960067 Production Site for Brilliant Anti-Armor Submunition 26-May-00

A-2000-0289-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Directorate of Logistics and Engineering Commercial Activities Study 5-Jun-00

A-2000-0290-IMH

Follow-up Review of Audit Recommendations (AA 97-257), II Corps and Fort Hood 5-Jun-00

A-2000-0291-AML

Audit of Retail Supply Operations--Phase II, XVIII Airborne Corps and Fort Bragg 5-Jun-00

A-2000-0292-IMH

Billing and Accounting Practices, William Beaumont Army Medical Center, TX 16-Jun-00

A-2000-0293-AMW

Selected Internal Controls and Compliance with Regulations Over Inventory--Army Working Capital Fund 24-Jul-00

A-2000-0294-IMU

Supply Support Activity Operations at TFF-Forward (Kosovo) 26-May-00

A-2000-0295-IMU

U.S. Army Audit Agency Review of the Performance Work Statement for the 98th Area Support Group Competitive Sourcing Study 19-Jun-00

Page 110: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0296-IMT

U.S. Army Audit Agency Review of the Apache Sustainment Performance Work Statement Dated 27 January 2000 13-Jun-00

A-2000-0297-IMU

Unit Property Accountability - Task Force Falcon Medical (Kosovo) 19-May-00

A-2000-0298-IMU

Review of DOD Civilian Time and Attendance (TFF) (Kosovo) 23-May-00

A-2000-0299-AMI

Secure Environment Contracting, U.S. Army Intelligence Center and Fort Huachuca 28-Jun-00

A-2000-0300-AMA

Follow-up Review of Audit Recommendations (AA 98-243), III Corps and Fort Hood 14-Jun-00

A-2000-0301-AMAReforming Ammunition Procurement--Phase III 28-Jun-00

A-2000-0302-IMO

Base Closure 1995 Ammunition Transfer Point/Holding Area at Pelham Range, Fort McClellan, AL 26-Jun-00

A-2000-0303-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Campbell Public Works Business Center Commercial Activities Study 13-Jun-00

A-2000-0304-FFF

Master Cooperative Agreements, U.S. Virgin Islands National Guard 28-Jun-00

A-2000-0306-FFF

Accountability of Computer and Related Technology Equipment, U.S. Virgin Islands National Guard 9-Aug-00

A-2000-0307-AMW

Inventory and Financial Management, Defense Supply Service - Washington 30-Jun-00

A-2000-0308-IMT

U.S. Army Audit Agency's Review of the Government Technical Performance Plan for the Logistics Division Commercial Activities Study 15-Jun-00

Page 111: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0309-FFP

Audit of Army Pre-Positioned Stock Program, Eighth U.S. Army, Korea 27-Jun-00

A-2000-0310-IME

Environmental Remediation, Rocky Mountain Arsenal, Colorado 11-Jul-00

A-2000-0311-IMH

Audit of Medical Decision Support Systems Great Plains Regional Medical Command 22-Jun-00

A-2000-0313-AMW

Selected Liabilities--Army Working Capital Fund FY 99 Financial Statements 23-Jun-00

A-2000-0314-AMI

Information Systems Security for Classified and Sensitive Systems (U) 30-Jun-00

A-2000-0315-FFCPoint Paper #FY 00-01 - Project Relocation Costs 23-Jun-00

A-2000-0316-IME

Audit of Remedial Activities at the Linde/Praxair Site Tonanwanda New York 23-Jun-00

A-2000-0317-IME

Follow-up Review of Audit Recommendations (AA 97-095), Fort Riley 23-Jun-00

A-2000-0318-IMH

Audit of Medical Decision Support Systems North Atlantic Regional Medical Command 3-Jul-00

A-2000-0319-FFCPoint Paper #3 - Network Accreditation 27-Jun-00

A-2000-0320-FFCPoint Paper #4 - Service Continuity 27-Jun-00

A-2000-0321-FFCPoint Paper #5 - Access Controls 27-Jun-00

A-2000-0322-FFC Point Paper #6 - Audit Trails 27-Jun-00

A-2000-0323-FFP

Review of Army Ideas for Excellence Program Proposal "Battery Management and Cost Savings for the Total Army" 6-Jul-00

A-2000-0324-FFC

Audit of the U.S. Army Corps of Engineers FY 99 Financial Statements Civil Works (Financial Reporting) 30-Jun-00

Page 112: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0325-FFC

Audit of Corps of Engineers Financial Management System, Finance Center, Millington, TN 30-Jun-00

A-2000-0326-FFC

Audit of Corps of Engineers Financial Management System, New Orleans ED 30-Jun-00

A-2000-0327-FFC

Audit of Corps of Engineers Financial Management System, Vicksburg ED 30-Jun-00

A-2000-0328-FFC

Audit of Corps of Engineers Financial Management System, Los Angeles ED 30-Jun-00

A-2000-0329-FFC

Audit of Corps of Engineers Financial Management System, Engr R&D Ctr, Vicksburg 30-Jun-00

A-2000-0330-FFC

Audit of Corps of Engineers Financial Management System, NW Div, No Pacific, Portland, OR 30-Jun-00

A-2000-0331-IMU

Follow-up Review of Audit Recommendations, USAREUR 11-Jul-00

A-2000-0332-IME

Environmental Compliance Assessment System Program 24-Jul-00

A-2000-0333-IME

Review of Draft Environmental Assessment for Fort Hood's Grazing Outlease 14-Jul-00

A-2000-0334-IMU

Review of the 104th Area Support Group Base Support Contract 14-Jul-00

A-2000-0335-AMW

Compilation of Army Working Capital Fund FY 99--Statement of Financing 31-Jul-00

A-2000-0336-FFF

Total Army Training System Courseware (TATS-C) Development 18-Aug-00

Page 113: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0337-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the U.S. Military Academy Custodial Services Commercial Activities Study 20-Jul-00

A-2000-0338-IMHSurvey of Nonappropriated Fund Payroll 21-Jul-00

A-2000-0339-AMA High Level Architecture 14-Aug-00

A-2000-0340-IMT

USAAA Independent Review of the Performance Work Statement for the Directorate of Information Technology Commercial Activities Study Dated 31 May 2000 28-Jul-00

A-2000-0341-AMAFollow-up Review of Audit Recommendations 31-Jul-00

A-2000-0342-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Campbell Readiness Center Commercial Activities Study 31-Jul-00

A-2000-0343-IMHJoint Support Agreement for Healthcare Services 14-Aug-00

A-2000-0344-IME

Engineering Change Process for the Chemical Stockpile Disposal Project 14-Aug-00

A-2000-0345-IMT

U.S. Army Audit Agency's Review of the U.S. Military Academy Custodial Services Commercial Activities Study--Schedule of Adjustments 2-Aug-00

A-2000-0346-AMW

Recommended Adjustments to the Army Working Capital Fund FY 99 Financial Statements 21-Aug-00

A-2000-0347-IMT

Review of Fort Lee DPW and DOL Appeals Board Results - Appeal of Initial Cost Comparison Determination Under Request for Proposal No. DABT-60-98-R-007 7-Aug-00

Page 114: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0348-IMT

U.S. Army Audit Agency Rev of the Draft Performance Requirements Document for the Fort Myer Military Community Whole Base Commercial Activities Study 8-Aug-00

A-2000-0349-AML

Audit of Establishment of Unique Item Tracking (UIT) Repository for Category I Missiles Review of Potential Army Material Weaknesses 10-Aug-00

A-2000-0350-IMT

U.S. Army Audit Agency Review of the Government Management Study and Cost Comparison Form for the Fort Bliss Directorate of Public Works and Logistics 10-Aug-00

A-2000-0351-IMT

USAAA Review of the Management Study and Government Cost Comparison Form for the Directorates of Public Works and Logistics - Schedule of Adjustments 10-Aug-00

A-2000-0352-IMO

Base Closure Account Expenditures to Relocate U.S. Army Aviation and Troop Command 21-Aug-00

A-2000-0353-FFPQuartermaster Laundry Service--Korea 23-Aug-00

A-2000-0354-IMO

Base Closure 1995 Construction Requirements for the Alabama Army National Guard Enclave 25-Aug-00

A-2000-0355-IMT

U.S. Army Audit Agency's Review of the Government Technical Performance Plan for the Fort Drum Directorate of Logistics Commercial Activity Study 9-Aug-00

A-2000-0356-IMEFollow-up Review of Audit Recommendations 24-Aug-00

A-2000-0357-IMH

Review of Army and Air Force Exchange Service External Contract Oversight 10-Aug-00

Page 115: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0358-IMEHazardous Materials Information System 30-Aug-00

A-2000-0359-AMW

Internal Controls Over Selected Revenue Expense and Equity Accounts--Army Working Capital Fund FY 99 Financial Statements 11-Sep-00

A-2000-0360-AMMDepot Maintenance Workload Reporting FY 99 31-Aug-00

A-2000-0361-AMM

Depot Maintenance Workload Reporting FY 00 - FY 04 11-Sep-00

A-2000-0362-IMT

Review of the Government Management Study and Cost Comparison Form for the Central Issue Facility Commercial Activities Study 18-Aug-00

A-2000-0363-IMT

Review of Commercial Activities Central Issue Facility 18-Aug-00

A-2000-0364-AMMUse of Funds for Maintenance Contracts 7-Sep-00

A-2000-0365-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Directorate of Information Management 22-Aug-00

A-2000-0366-IMURequirements for Nontactical Vehicles 1-Sep-00

A-2000-0367-IMT

U.S. Army Agency's Review of the Government Technical Performance Plan for the Fort Drum Public Works Support Services Commercial Activities Study 25-Aug-00

A-2000-0368-AMLFollow-up Review of Audit Recommendations 24-Aug-00

A-2000-0369-AMLFollow-up Review of Audit Recommendations 24-Aug-00

A-2000-0370-FFG

Point Paper #1 - Supplementary Stewardship Missile Reporting 28-Aug-00

A-2000-0371-FFG

Audit of the Army's FY 00 General Fund Financial Statements-Stewardship Reporting 29-Aug-00

Page 116: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0372-AMAFollow-up Review of Audit Recommendations 29-Aug-00

A-2000-0373-AMAFollow-up Review of Audit Recommendations 29-Aug-00

A-2000-0374-AMAFollow-up Review of Audit Recommendations 29-Aug-00

A-2000-0375-AMAFollow-up Review of Audit Recommendations 29-Aug-00

A-2000-0376-AMAFollow-up Review of Audit Recommendations 29-Aug-00

A-2000-0377-AMAFollow-up Review of Audit Recommendations 29-Aug-00

A-2000-0378-AMIFollow-Up Review of Audit Recommendations 31-Aug-00

A-2000-0379-AMIFollow-Up Review of Audit Recommendations 31-Aug-00

A-2000-0380-AMIFollow-Up Review of Audit Recommendations (U) 31-Aug-00

A-2000-0381-AMIFollow-Up Review of Audit Recommendations 31-Aug-00

A-2000-0382-FFFArmy National Guard Bonus Programs 18-Sep-00

A-2000-0383-FFC

Audit of the U.S. Army Corps of Engineers FY 99 Financial Statements Civil Works (Hydropower Project Assest) 12-Sep-00

A-2000-0384-AMISecure Environment Contracting 29-Sep-00

A-2000-0385-IMOFollow-Up Review of Audit Recommendations 31-Aug-00

A-2000-0386-AMW

Compilation of Selected Army Working Capital Fund FY 99 Financial Statements 25-Sep-00

A-2000-0387-IMT

U.S. Army Audit Agency Review of the Management Study of the Public Works Business Center 21-Sep-00

A-2000-0388-FFF

Validation of the Automated Requirements Model--Reserve 28-Sep-00

A-2000-0390-AMASurvey of Batteries and Power Sources 11-Sep-00

A-2000-0391-IMT

U.S. Army Audit Agency's Review of the Revised Cost Comparison Form Logistics Division Commercial Activities Study Readiness Business Center 7-Sep-00

Page 117: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0392-IMT

Review of Updated Government Costs for the Commercial Activities Study of the Fort Stewart Directorate of Public Works 18-Sep-00

A-2000-0393-AML

Follow-up Review of Audit Recommendations in Audit Report: AA97-1 12-Sep-00

A-2000-0394-FFC

Audit of the U.S. Army Corps of Engineers FY 99 Financial Statements Civil Works (Investments) 27-Sep-00

A-2000-0395-IMU

Unit Property Accountability at Task Force Falcon (Kosovo) 28-Jun-00

A-2000-0396-IMU

Review of Mantech Computer Support Contract at Task Force Falcon (Kosovo) 17-Jul-00

A-2000-0397-IMU

Observations of Joint Acquisition Review Board Meetings - Task Force Falcon (Forward) (Kosovo) 21-Jul-00

A-2000-0398-IMU

Review of Task Force Falcon Stewardship Program (Kosovo) 5-Aug-00

A-2000-0399-IMU

Accountability Over Theater Seats in Task Force Falcon (Kosovo) 15-Aug-00

A-2000-0400-IMU

Review of Task Force Falcon Transportation Motor Pool External Standard Operating Procedures (Kosovo) 16-Aug-00

A-2000-0401-IMU

Cost Analysis for Task Force Falcon Storage Requirements (Kosovo) 16-Aug-00

A-2000-0402-IMU

Review of Container Management in Task Force Falcon (Kosovo) 4-Sep-00

A-2000-0403-AMW

Compilation of Army Working Capital Fund FY 99 Statement of Budgetary Resources 29-Sep-00

A-2000-0404-AMW

Property Plant and Equipment--Army Working Capital Fund FY 99 Financial Statements 29-Sep-00

A-2000-0405-IMHFollow-up Review of Audit Recommendations 15-Sep-00

A-2000-0406-IMHFollow-up Review of Audit Recommendations 15-Sep-00

Page 118: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0407-IMHCommercial Audit Solicitation 15-Sep-00

A-2000-0408-AMA

Conventional Ammunition Working Capital Fund Closeout--Financial Operations 29-Sep-00

A-2000-0409-IMOFollow-up Review of Audit Recommendations 19-Sep-00

A-2000-0410-FFF

Audit of Institutional Training of Reserve Component Soldiers to Meet Qualification Goals 22-Sep-00

A-2000-0411-FFC

2000 Fund Balance with Treasury Cycle (Cycle Memorandum) 29-Sep-00

A-2000-0412-FFC2000 Expense Cycle (Cycle Memorandum) 29-Sep-00

A-2000-0413-FFC2000 Budget Cycle (Cycle Memorandum) 29-Sep-00

A-2000-0414-AMLFollow-up Review of Audit Recommendations 25-Sep-00

A-2000-0415-AMW

Internal Controls Over Obligations Disbursements Orders Received and Collections--Army Working Capital Fund 26-Sep-00

A-2000-0416-AMAFollow-up Review of Audit Recommendations 21-Sep-00

A-2000-0417-IMT

U.S. Army Audit Agency Review of the Adjutant General Draft Performance Work Statement 29-Sep-00

A-2000-0418-FFF

Consulting Report Material Weakness Plan - Manpower Requirements Determination System 28-Oct-99

A-2000-0419-IME

Review of the Environmental Budgeting Process for the U.S. Army Research Laboratory 1-Oct-99

A-2000-0420-IMO

Review of Planning for DOD Support to the 2001 Presidential Inaugural 18-Oct-99

A-2000-0421-AML

Review of Workload and Costs to Sustain Legacy Retail Logistics Systems 12-Oct-99

A-2000-0422-AMA

Review of the Apache Prime Vendor Support--Cash-Flow Analysis 19-Oct-99

Page 119: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0423-AMLCost Benefit Analysis for the Single Stock Fund 5-Nov-99

A-2000-0424-IMTReview of Management Practices 8-Nov-99

A-2000-0425-FFBReview of the Armed Forces Retirement Homes 15-Dec-99

A-2000-0426-IMOReview of the Army Energy Program 16-Nov-99

A-2000-0427-FFB

Review of the Army Materiel Command's Negative Unliquidated Obligations 27-Jun-00

A-2000-0428-FFC

Validation of Real Estate Management Information System Database 16-Nov-99

A-2000-0429-AMAReview of Big Crow Program 9-Dec-99

A-2000-0430-IMOEstimated Retirement Benefits 10-Dec-99

A-2000-0431-FFBReview of Telecommunications Costs 29-Feb-00

A-2000-0432-FFBReview of Negative Unliquidated Obligations 19-Jun-00

A-2000-0433-FFF

Feasibility of Transferring the U.S. Military Entrance Processing Command Mission to the Selective Service System 21-Dec-99

A-2000-0434-AMIReimbursables by Non-Army Agency 12-Jan-00

A-2000-0435-IMEReview of Most Efficient Organization 7-Feb-00

A-2000-0436-AMM

Depot Production Planning and Quality Assurance Procedures 29-Feb-00

A-2000-0437-FFP

Review of Eighteenth Medical Command's Organizational Structure and Business Practices 18-Feb-00

A-2000-0438-IMO

Review of Contingency Funding for Military Construction 29-Feb-00

A-2000-0439-FFBReview of Telecommunications Costs 29-Feb-00

A-2000-0440-FFBReview of Telecommunications Costs 6-Apr-00

A-2000-0441-FFBReview of Telecommunications Costs 30-Mar-00

Page 120: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0442-FFBActivity-Based Costing Project 22-Mar-00

A-2000-0443-FFP

Management Study for the Directorate of Community Activities 27-Mar-00

A-2000-0444-FFBReview of Commercial Carrier Payment Process 11-May-00

A-2000-0445-IMO

Review of the Directorate of Military Support--Phase I--Organization 23-Mar-00

A-2000-0446-FFBEvaluation of the Meal Ticket/Check Initiative 24-Mar-00

A-2000-0447-FFB

Activity-Based Costing Project Directorate of Community Activities 10-Apr-00

A-2000-0448-IME

U.S. Army Audit Agency Review of the Engineering Operations of the Chemical Demilitarization Program 29-Mar-00

A-2000-0449-IME

Review of the Imaging System at the Directorate of Logistics 31-Mar-00

A-2000-0450-FFB

Survey of Resource Management Information Systems 31-Mar-00

A-2000-0451-FFB

Army Signal Command's Payments for Disconnected Circuit Bundling Initiative Circuits 10-Apr-00

A-2000-0452-FFBReview of Telecommunications Costs 10-Apr-00

A-2000-0453-FFB

Financial Analysis of Longhorn Saloon and Cafe Business Operations Directorate of Community Activities 1-May-00

A-2000-0454-IMO

Review of U.S. Military Funding Requirements - Funding for Military Construction 24-Apr-00

A-2000-0455-IMO

Review of the U.S. Military Academy's Unfunded Operation and Maintenance Army Issues 24-Apr-00

A-2000-0456-FFBReview of Defense Switched Network 11-May-00

A-2000-0457-IMO

Review of Planning for DOD Support to the 2001 Presidential Inaugural 26-May-00

A-2000-0458-FFBReview of Negative Unliquidated Obligations 19-Jun-00

Page 121: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0460-FFGReview of Army National Guard Discharges 6-Jun-00

A-2000-0461-IMOEstimated Retirement Benefits 6-Jun-00

A-2000-0462-AML

Interim Results Consulting Review of Expenditure of Global Combat Support System-Army Program Funds 13-Jun-00

A-2000-0463-AMASurvey of Quality of Spare Parts 12-Jun-00

A-2000-0464-IMU

Review of Acquisition and Cross-Servicing Agreements 14-Jun-00

A-2000-0465-IMU

Review of Acquisition and Cross-Servicing Agreements 14-Jun-00

A-2000-0466-IMU

Review of Acquisition and Cross-Servicing Agreements 14-Jun-00

A-2000-0467-IMT

Lessons Learned--Panama Canal Treaty Implementation--Republic of Panama 26-Jun-00

A-2000-0468-FFBReview of Telecommunications Costs 21-Jun-00

A-2000-0469-FFBReview of Telecommunications Costs 21-Jun-00

A-2000-0470-AMLReview of Pricing and Cataloging 22-Jun-00

A-2000-0471-FFBReview of Telecommunications Costs 20-Jun-00

A-2000-0472-IMU

Observation of Morale Welfare and Recreation Inventory 23-Jun-00

A-2000-0473-AMLReview of Pricing and Cataloging 22-Jun-00

A-2000-0474-AMLReview of Pricing and Cataloging 22-Jun-00

A-2000-0475-FFG

Review of Army Chief Financial Officers Strategic Plan (General Fund) 21-Jun-00

A-2000-0476-AMI

Evaluation of the Total Army Language Program Model 20-Jun-00

A-2000-0477-FFB

Observation for Management Consideration--Least-Cost Routing 25-Sep-00

Page 122: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0478-AML Pricing and Cataloging 28-Jun-00

A-2000-0479-AML

Engagement Status U.S. Army Audit Agency Consulting Effort Wholesale Logistics Modernization Program 28-Jun-00

A-2000-0480-AMA

Review of Conventional Ammunition Working Capital Fund Closeout 31-Jul-00

A-2000-0481-FFG

Review of Summary Evaluation of the Army Medical Department Property Accounting System (AMEDDPAS) Chief Financial Officer Act Initiative 14-Jul-00

A-2000-0482-IMUConsulting Review of Air Bills 24-Jul-00

A-2000-0483-IMH

Alcohol and Drug Abuse Prevention and Control Program 3-Aug-00

A-2000-0484-AMI

Review of Credit Card Purchases Deputy Chief of Staff Information Management 10-Jul-00

A-2000-0485-AMI

Review of Credit Card Purchases Headquarters and Headquarters Company 10-Jul-00

A-2000-0486-AMI

Review of Credit Card Purchases Deputy Chief of Staff Special Operations Aviation 10-Jul-00

A-2000-0487-AMI

Review of Credit Card Purchases Deputy Chief of Staff Operations 10-Jul-00

A-2000-0488-AMI

Review of Credit Card Purchases Secretary General Staff 11-Jul-00

A-2000-0489-AMI

Review of Credit Card Purchases Public Affairs Office 11-Jul-00

A-2000-0490-AMI

Review of Credit Card Purchases Deputy Chief of Staff Logistics 11-Jul-00

A-2000-0491-AMIReview of Credit Card Purchases Surgeon 11-Jul-00

A-2000-0492-AMI

Review of Credit Card Purchases History Archives Library and Museums Office 12-Jul-00

Page 123: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0493-AMI

Review of Credit Card Purchases Deputy Chief of Staff Engineer 12-Jul-00

A-2000-0494-AMIReview of Credit Card Purchases Safety Office 12-Jul-00

A-2000-0495-AMI

Review of Credit Card Purchases Inspector General 12-Jul-00

A-2000-0496-AMIReview of Credit Card Purchases Internal Review 12-Jul-00

A-2000-0497-AMI

Review of Credit Card Purchases Equal Opportunity Office 14-Jul-00

A-2000-0498-AMIReview of Credit Card Purchases 14-Jul-00

A-2000-0499-FFGEstablishing a Baseline for General Equipment 4-Aug-00

A-2000-0500-AMW

Audit of Self-Service Supply Activity Room 1E700 the Pentagon 2-Aug-00

A-2000-0501-AMM

Cost Benefit Analysis for the National Maintenance Program 28-Aug-00

A-2000-0502-FFBActivity-Based Costing Project 31-Aug-00

A-2000-0503-IMT

U.S. Army Audit Agency's Review of Fort Drum's Recycling Program 21-Aug-00

A-2000-0504-IMO

Review of Programming Administration and Execution System 22-Aug-00

A-2000-0505-IMO

Review of Advanced Training Technology Support Facility 25-Aug-00

A-2000-0506-IMUReview of Limited Conversion to Division XXI 25-Aug-00

A-2000-0507-IMT

U.S. Army Audit Agency's Review of the Army Museum Project 15-Sep-00

A-2000-0508-AMA

Review of Government-Furnished Equipment--Interim Armored Vehicle Program 5-Sep-00

A-2000-0509-IMOEstimated Retirement Benefits 7-Sep-00

A-2000-0510-IMH

Review of the Assistant Secretary of the Army (Installations and Environment) Organization 27-Sep-00

A-2000-0511-IMOReview of Energy Policy Development 22-Sep-00

Page 124: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2000-0512-IMU

Contracts for Maintenance of Tactical Equipment in the Field 4-Apr-00

A-2000-0513-IMU

Army Working Capital Fund FY 99 Financial Statements--Inventory Controls 22-Sep-00

A-2000-0514-IMU

Review of the Army Management Control Process for FY 99 4-Oct-99

A-2000-0515-IMU

Audit of the Army's Principal Financial Statements for Fiscal Year 1999 Financial Reporting of Fund Balance with Treasury 7-Oct-99

A-2000-0516-FFP

Survey Guide Replies for Audit of Non-Appropriated Fund Payroll, Eighth U.S. Army, Korea 20-Jun-00

A-2000-0517-FFP

Survey of Non-Appropriated Fund Payroll, U.S. Army Garrison, Hawaii 14-Jun-00

A-2000-0518-FFPHealth Care for DA Civilians Stationed Overseas 3-Mar-00

A-2000-0519-IMU

Review of the Army's Alcohol and Drug Abuse Prevention and Control Program in Europe 24-May-00

A-2000-0520-IMUContracts for Chemical Agent Resistant Coating 3-Apr-00

A-2001-0001-IME

Matrix Support Requirements for the Chemical Demilitarization Program 2-Oct-00

A-2001-0002-AMISecure Environment Contracting 25-Oct-00

A-2001-0003-FFB

Review of the Army Management Control Process for FY 00, Army Research Laboratory 2-Oct-00

A-2001-0004-FFB

Review of the Army Management Control Process for FY 00, Communications-Electronics Cmd 2-Oct-00

A-2001-0005-FFB

Review of the Army Management Control Process for FY 00, Tobyhanna Army Depot 2-Oct-00

Page 125: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0006-FFB

Review of the Army Management Control Process for FY 00, MEDDAC, Fort Jackson 2-Oct-00

A-2001-0007-FFB

Review of the Army Management Control Process for FY 00, Army Operational Test Cmd 2-Oct-00

A-2001-0008-FFB

Review of the Army Management Control Process for FY 00, Southeast Regional Medical Cmd 2-Oct-00

A-2001-0009-FFB

Review of the Army Management Control Process for FY 00, Transportation Engineering Agency 2-Oct-00

A-2001-0010-FFB

Review of the Army Management Control Process for FY 00, Army Developmental Test Cmd 2-Oct-00

A-2001-0011-FFB

Review of the Army Management Control Process for FY 00, SDDC Operations Center (Formerly Deployment Support Cmd) 2-Oct-00

A-2001-0012-FFB

Review of the Army Management Control Process for FY 00, Center for Army Analysis 2-Oct-00

A-2001-0013-FFB

Review of the Army Management Control Process for FY 00, Military Surface Deployment & Distribution Cmd (Formerly Military Traffic Mgmt Cmd) 2-Oct-00

A-2001-0014-FFP

Validation of Housing Market and Economic Analysis 3-Oct-00

A-2001-0015-IMT

Review of Updated Government Costs for the Fort Drum Logistics Support Services Commercial Activities Study 2-Oct-00

Page 126: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0016-IMT

Review of the Government Management Study and Cost Comparison Form for Base Operations Commercial Activities Study 5-Oct-00

A-2001-0017-IMT

Review of Commercial Activities Base Operations Study 5-Oct-00

A-2001-0018-FFB

Army Management Control Process FY 00 Annual Review, 25th ID & U.S. Army Garrison, Hawaii 19-Oct-00

A-2001-0019-FFB

Army Management Control Process FY 00 Annual Review, U.S. Army, Pacific 23-Oct-00

A-2001-0020-FFB

Army Management Control Process FY 00 Annual Review, U.S. Army, Alaska 2-Oct-00

A-2001-0021-FFB

Review of the Army Management Control Process for FY 00 (Summary of Rpts AA01-19 20 & 21) 23-Oct-00

A-2001-0022-AMASimulation Based Acquisition Program 8-Nov-00

A-2001-0023-FFP

USAAA Review of the Revised Most Efficient Organization and in-House Cost Estimate for the Directorate of Logistics Commercial Activities Study 20-Oct-00

A-2001-0025-AMWFollow-up Review of Audit Recommendations 6-Oct-00

A-2001-0026-IMT

Review of Updated Government Costs for the Fort Drum Public Works Support Services Commercial Activities Study 17-Oct-00

A-2001-0027-FFB

Closure of the Army's Year 2000 Computer Problem Material Weakness 23-Oct-00

A-2001-0028-FFC2000 Payroll Cycle (Cycle Memorandum) 16-Oct-00

Page 127: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0029-FFC

Audit of U.S. Army Corps of Engineers FY 00 Financial Statements Internal Controls Testing--Payroll Cycle 16-Oct-00

A-2001-0030-FFBAudit of the American Red Cross 20-Oct-00

A-2001-0031-FFCFollow-up Review of Audit Recommendations 13-Oct-00

A-2001-0033-IMT

U.S. Army Audit Agency Review & Recertification of the In-House Cost Estimate for the Directorate of Installation Public Works Dated 16 October 2000 16-Oct-00

A-2001-0034-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Benning Adjutant General Commercial Activities Study 25-Oct-00

A-2001-0035-AMLSustainment Systems Technical Support 3-Nov-00

A-2001-0036-AMM

Contracts for Maintenance of Tactical Equipment in the Field 3-Nov-00

A-2001-0037-IMT

USAAA Review of the Draft Performance Work Statement Dated 30 June 2000 for the Fort Rucker Adjutant General Commercial Activities Study 26-Oct-00

A-2001-0038-AMW

Follow-up Issues--Army Working Capital Fund FY 99 Financial Statements 20-Oct-00

A-2001-0039-FFG

Audit of the Army's FY 00 General Fund Financial Statements--Employer Entity Liabilities 31-Oct-00

A-2001-0040-FFC2000 Revenue Cycle (Cycle Memorandum) 26-Dec-00

A-2001-0041-FFB

Review of the Army Management Control Process for FY 00, Deputy Chief of Staff, G-6 (Formerly DISC4) 31-Oct-00

A-2001-0042-FFB

Review of the Army Management Control Process for FY 00, Judge Advocate General 31-Oct-00

Page 128: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0043-FFB

Review of the Army Management Control Process for FY 00, ASA(M&RA) 23-Oct-00

A-2001-0044-FFB

Review of the Army Management Control Process for FY 00, Army Environmental Center 23-Oct-00

A-2001-0045-IMT

U.S. Army Audit Agency Review of the Draft Performance Requirements Document for the Fort Hamilton Whole Base Commercial Activities Study 24-Oct-00

A-2001-0046-AML

Management of Ammunition in Support of Army Pre-Positioned Sets 7-Nov-00

A-2001-0047-IMT Ammunition Supply Point 9-Nov-00

A-2001-0048-FFG

Audit of the Army's FY 00 General Fund Financial Statements--Construction in Progress 2-Nov-00

A-2001-0049-FFB

Peer Review of the Army's Internal Review Program for FY 00, Fort Drum 11-Jan-01

A-2001-0050-AMA

Audit of Rechargeable Batteries and Chargers--Special Report on Contracting for Rechargeable Batteries 27-Oct-00

A-2001-0051-AMM

Contracts for Maintenance of Tactical Equipment in the Field 9-Nov-00

A-2001-0052-AML

Reliability Maintainability and Supportability Efficiency 1-Dec-00

A-2001-0053-FFB

Suggestions for Management's Consideration--Audit of the Army Executive Dining Facility Fund Financial Statements 20-Nov-00

A-2001-0054-FFB

Army Executive Dining Facility Fund Financial Statements 20-Nov-00

A-2001-0055-FFB

Review of the Army Management Control Process (Fiscal Year 2000)--an Assessment for the Secretary of the Army 6-Nov-00

Page 129: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0056-IMT

U.S. Army Audit Agency Post-Most Efficient Organization Review of the Missile Maintenance A-76 Study 31-Oct-00

A-2001-0057-IMT

Review of Updated Government Costs for the Fort Drum Public Works Support Services Commercial Activities Study 30-Oct-00

A-2001-0058-IMH

Review of Selected Aspects of Bingo Operations at Fort Stewart and Hunter Army Airfield 31-Oct-00

A-2001-0059-IMT

Review of the Draft Performance Work Statement Dated 12 May 2000 for the Yakima Training Center Commercial Activities Study 31-Oct-00

A-2001-0060-FFB

Review of the Army Management Control Process for FY 00, Office of the Chief of Chaplains 20-Dec-00

A-2001-0061-FFB

Review of the Army Management Control Process for FY 00, Army Materiel Cmd 20-Dec-00

A-2001-0062-FFB

Review of the Army Management Control Process for FY 00, ACSIM 20-Dec-00

A-2001-0063-IMT

USAAA Rev of the Draft Performance Work Statement Dtd 9 Aug 2000 for the U.S. Army Garrison Fort Sam Houston Whole Base Commercial Activities Study 8-Nov-00

A-2001-0064-AMI New Equipment Testing 18-Dec-00

A-2001-0065-AMISecure Environment Contracting 7-Dec-00

A-2001-0066-FFP

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Directorate of Public Works 8-Nov-00

Page 130: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0067-IMT

Lessons Learned from the Fort Lee Directorate of Public Works and Directorate of Logistics Commercial Activities Study Administrative Appeals Process 21-Nov-00

A-2001-0068-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for Base Support (Logistics) 21-Nov-00

A-2001-0069-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for Base Support (Logistics) 21-Nov-00

A-2001-0070-IMO

Review of Energy Savings Performance Contract DADA10-96-D-0018 9-Nov-00

A-2001-0071-IMO

Review of Energy Savings Performance Contract DADA10-96-D-0017 9-Nov-00

A-2001-0072-IMO

Review of Energy Savings Performance Contract DACA87-94-C-0008 22-Nov-00

A-2001-0073-IMT

U.S. Army Audit Agency Review of the Updated Government Costs for the Directorate of Logistics and Engineering Commercial Activities Study 9-Nov-00

A-2001-0074-FFB

Peer Review of the Army's Internal Review Program for FY 00, Tulsa Engineer District 15-Dec-00

A-2001-0075-FFP

Morale Welfare and Recreation Acquisition Practices 29-Nov-00

A-2001-0076-AMI Acquisition Oversight (U) 7-Dec-00

A-2001-0077-IMT

USAAA Review & Recertification of the in-House Cost Estimate Dtd 7 Nov 2000 for the Directorate of Public Works at Charles E. Kelly Support Facility 15-Nov-00

A-2001-0078-FFF

Use of Rail Cars for Transporting Equipment to Combat Training Centers 30-Nov-00

Page 131: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0079-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Eustis Adjutant General Commercial Activities Study 16-Nov-00

A-2001-0080-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Gordon Adjutant General Commercial Activities Study 28-Nov-00

A-2001-0081-AMWInternal Controls Over Inventory 5-Jan-01

A-2001-0082-IMT

Recertification of the Cost Comparison Form for Tooele Army Depot Base Operations Commercial Activities Study 15-Nov-00

A-2001-0083-FFB

Peer Review of the Army's Internal Review Program for FY 00, Michigan Army National Guard 15-Dec-00

A-2001-0084-FFB

Peer Review of the Army's Internal Review Program for FY 00, Indiana Army National Guard 15-Dec-00

A-2001-0085-AMAOne Semi-Automated Forces 1-Dec-00

A-2001-0086-AMAResponse to DODIG Hotline 69268/DIH 98-8366 1-Dec-00

A-2001-0087-FFG

Audit of the Army's FY 00 General Fund Financial Statements-Stewardship Reporting 22-Nov-00

A-2001-0088-FFG

Audit of the Army's FY 00 General Fund Financial Statements-Stewardship Reporting 22-Nov-00

A-2001-0089-FFB

Suggestions for Management Consideration--Audit of the Secretary of Defense Mess Fund Financial Statements 18-Jun-01

A-2001-0090-FFBSecretary of Defense Mess Fund Financial Statements 20-Nov-00

A-2001-0091-IMEManagement of Training Ammunition 7-Dec-00

Page 132: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0092-FFG

Audit of the Army's FY 00 General Fund Financial Statements-Stewardship Reporting 5-Dec-00

A-2001-0093-AMW

Expense Revenue and Reporting Processes-Statement of Net Cost--Army Working Capital Fund (Formal Memo) 29-Dec-00

A-2001-0094-FFF

Audit of Funding of the Junior Reserve Officers' Training Corps Program 4-Dec-00

A-2001-0095-AMLAudit of Retail Supply Operations--Phase III 6-Dec-00

A-2001-0096-FFB

Review of the Army Management Control Process for FY 00, Army Test & Evaluation Cmd 18-Dec-00

A-2001-0097-FFB

Review of the Army Management Control Process for FY 00, U.S. Military Academy 18-Dec-00

A-2001-0098-FFB

Review of the Army Management Control Process for FY 00, U.S. Army Medical Cmd 18-Dec-00

A-2001-0099-FFG

Audit of the Army's FY 00 General Fund Financial Statements--General Equipment 6-Dec-00

A-2001-0100-IMT

U.S. Army Audit Agency Review of Reported Baseline Workyears for the Installation Support Service Center Commercial Activities Study at Fort McPherson 12-Dec-00

A-2001-0101-IMT

Rev Updatd Costs Directd by the Administrative Appeals Bd for the Ft Rucker Commercial Activities Study of the Directorates of Public Works/Logistics 5-Dec-00

A-2001-0102-AMW

Contents and Reporting-Statement of Changes in Net Position--Army Working Capital Fund (Formal Memo) 29-Dec-00

A-2001-0103-FFB

Peer Review of the Army's Internal Review Program for FY 00, Tobyhanna Army Depot 22-Dec-00

Page 133: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0104-FFB

Peer Review of the Army's Internal Review Program for FY 00, Picatinny Arsenal 22-Dec-00

A-2001-0105-IMT

Rev Ft Eustis Dir of Public Works Appeals Bd Results--Appeal of Initial Cost Comparison Determination Under Request for Proposal No. DABT 60-99-R-009 12-Dec-00

A-2001-0106-FFFCivilian Personnel Regionalization 12-Feb-01

A-2001-0107-FFB

Peer Review of the Army's Internal Review Program for FY 00, Alaska Engineer District 22-Dec-00

A-2001-0108-FFF

Institutional Training of Reserve Component Soldiers to Meet Qualification Goals 27-Dec-00

A-2001-0109-AMM

Contracts for Maintenance of Tactical Equipment in the Field 31-Jan-01

A-2001-0110-IMU

Review of Mantech Automation Support (Kosovo) 2-Oct-00

A-2001-0111-IMU

Review of Non-Tactical Vehicles in Task Force Falcon (Kosovo) 19-Oct-00

A-2001-0112-IMU

Review of Shuttle Bus Services in Task Force Falcon (Kosovo) 20-Oct-00

A-2001-0113-IMUReview of Cappuccino Bar Operations (Kosovo) 30-Oct-00

A-2001-0114-IMUInventory of Disbursing Office Assets (Kosovo) 17-Nov-00

A-2001-0115-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Directorate of Logistics Commercial Activities Study at Fort Carson 15-Dec-00

A-2001-0116-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Readiness Business Center Commercial Activities Study at Fort Drum 13-Dec-00

Page 134: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0117-IMT

U.S. Army Audit Agency Review of the Final Decision Report for the Aberdeen Test Center Commercial Activities Study at Aberdeen Proving Ground 13-Dec-00

A-2001-0118-IMT

U.S. Army Audit Agency Review of the Final Decision Report for the Information Services Commercial Activities Study at Aberdeen Proving Ground 13-Dec-00

A-2001-0119-AMI

Financial Management of the Kinetic Energy Anti-Satellite Program 20-Dec-00

A-2001-0120-AMW

Accounting Adjustments Defense Finance and Accounting Service-St. Louis Operating Location 29-Dec-00

A-2001-0121-AMITechnology Transfers in Special Programs (U) 13-Dec-00

A-2001-0122-AMITechnology Transfers in Special Programs (U) 13-Dec-00

A-2001-0123-AMITechnology Transfers in Special Programs (U) 15-Dec-00

A-2001-0124-IMEAudit of Management of Chemical Stockpile Sites 18-Dec-00

A-2001-0125-IMT

U.S. Army Audit Agency Rev of the Reported Baseline Workyears for the Firing Range Operations and Maintenance Commercial Activities Study at Fort Hood 20-Dec-00

A-2001-0126-AMA Integrated System Control 29-Jan-01

A-2001-0127-AMAReusing and Disposing of Missile Munitions Phase I 22-Jan-01

A-2001-0128-FFF

Audit of Use of Rail Cars for Transporting Equipment to Combat Training Centers 20-Dec-00

A-2001-0129-IME

Financial Management of the Chemical Demilitarization Program 4-Jan-01

A-2001-0130-FFB

Peer Review of the Army's Internal Review Program for FY 00, III Corps & Fort Hood 22-Dec-00

Page 135: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0131-AMA

Joint Contingency Force Advanced Warfighting Experiment 29-Jan-01

A-2001-0132-IMH

Req for Audit Asst (CID Case #0138-00-CID122): Investigation of Allegations of Mismanagement Diversion of Gov't Funds & Fraud Against Rev Wm Hartgen 3-Jan-01

A-2001-0133-IMO

Review of Energy Savings Performance Contract DACA87-97-D0069 9-Jan-01

A-2001-0134-FFB

U.S. Army Audit Agency Peer Review of the Army's Internal Review Program, COE-Pacific Ocean Division 5-Jan-01

A-2001-0135-IMHAudit of Nonappropriated Fund Payroll 9-Jan-01

A-2001-0136-IMHAudit of Nonappropriated Fund Payroll 9-Jan-01

A-2001-0137-IMT

USAAA Rev of the Draft Performance Work Statement for the Fort Rucker Directorate of Information Management Commercial Activities Study Dtd 9 Nov 2000 17-Jan-01

A-2001-0138-FFBThe Discontinue Research Process 31-May-01

A-2001-0139-FFB

Peer Review of the Army's Internal Review Program for FY 00, Fort Polk 11-Jan-01

A-2001-0140-FFB

Peer Review of the Army's Internal Review Program for FY 00, Fort Riley 11-Jan-01

A-2001-0141-FFB

Peer Review of the Army's Internal Review Program for FY 00, Army Soldier & Biological Chemical Cmd 11-Jan-01

A-2001-0142-FFB

Peer Review of the Army's Internal Review Program for FY 00, Sacramento Engineer District 11-Jan-01

A-2001-0143-IMT

Review of the Management Study for the Directorate of Logistics Commercial Activities Study 11-Jan-01

A-2001-0144-FFB

Peer Review of the Army's Internal Review Program for FY 00, Fort Detrick 11-Jan-01

Page 136: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0145-FFB

Peer Review of the Army's Internal Review Program for FY 00, North Atlantic Regional Medical Cmd 11-Jan-01

A-2001-0146-FFB

Peer Review of the Army's Internal Review Program for FY 00, Deputy Chief of Staff, G-3/5/7 11-Jan-01

A-2001-0147-FFB

Peer Review of the Army's Internal Review Program for FY 00, Deputy Chief of Staff, G-2 22-Mar-01

A-2001-0148-FFB

Peer Review of the Army's Internal Review Program for FY 00, Washington Army National Guard 11-Jan-01

A-2001-0149-FFF

National Science Center Special Fund Financial Statement 25-Sep-01

A-2001-0150-FFF

Issues for Management Consideration - Audit of the National Science Center Special Fund Financial Statement 25-Sep-01

A-2001-0151-AMWReview of Period Costs and Repair Expenses 16-Jan-01

A-2001-0152-AMW

Recommended Adjustments to the Army Working Capital Fund FY 00 Financial Statements Version Two 14-May-01

A-2001-0153-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Lee Adjutant General Commercial Activities Study 11-Jan-01

A-2001-0154-FFB

Peer Review of the Army's Internal Review Program for FY 00, Fort Campbell 11-Jan-01

A-2001-0155-FFF Recruiter Productivity 12-Feb-01

A-2001-0156-FFP

U.S. Army Audit Agency Review of the Management Study for the Directorate of Public Works 16-Feb-01

A-2001-0157-IMH Linen Services Contract 29-Jan-01

A-2001-0158-IMT

Review of the Cost Comparison Form for the Directorate of Logistics Commercial Activities Study 18-Jan-01

Page 137: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0159-IMT

Review of the Directorate of Logistics Commercial Activities Study 18-Jan-01

A-2001-0160-FFP

U.S. Army Audit Agency Review of the Cost Comparison Form for the Directorate of Public Works 14 February 2001 16-Feb-01

A-2001-0161-IME

Workload Survey Report Environment Safety and Chemical Issues 29-Jan-01

A-2001-0162-IMU

Review of the Second Draft Management Study for the 98th Area Support Group 23-Jan-01

A-2001-0164-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000--Financial Reporting of Military Pay and Benefits 31-Jan-01

A-2001-0165-FFP

Validation of Housing Market and Economic Analyses 30-Jan-01

A-2001-0166-IMEAudit of Management of Chemical Stockpile Sites 30-Jan-01

A-2001-0167-AMABest Practices for Using Award Fees 20-Feb-01

A-2001-0168-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000--Summary Audit Report 7-Feb-01

A-2001-0169-FFF

Trainees Transients Holdees and Students Account 23-Feb-01

A-2001-0170-IMT

USAAA Review of the Draft Performance Work Statement for the Fort Gordon Directorate of Information Management Commercial Activities Study 2-Feb-01

A-2001-0171-FFG

Audit of the Army's FY 00 General Fund Financial Statements--Construction in Progress 28-Feb-01

Page 138: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0172-FFG

Army's Generl Fund Principal Financial Stmnts for FY 2000--Controls Over the Financial Reporting of Construction in Progress Costs for the Army Nat Gd 26-Feb-01

A-2001-0173-AMW

Army Working Capital Fund Principal Financial Statements for Fiscal Year 2000--Summary Audit Report 9-Feb-01

A-2001-0174-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Whole Base Commercial Activities Study Dated 8 November 2000 7-Feb-01

A-2001-0175-IMT

Review of Calculation Methodology for Computing the Annual Savings from Cost Competition Studies 10-May-01

A-2001-0176-IMHThe Army Lodging Success Program 26-Feb-01

A-2001-0177-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Logistics Division Readiness Business Center Commercial Activities Study 12-Feb-01

A-2001-0178-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Fort Campbell Public Works Business Center 14-Feb-01

A-2001-0179-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form, Public Works Business Center 14-Feb-01

A-2001-0180-IMT

USAAA Review of the Government Technical Performance Plan for the Fort Campbell Public Works Business Center Commercial Activities Study 14-Feb-01

Page 139: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0181-IMO

Review of Energy Savings Performance Contract SP0600-99-D-8003 Energy Conservation Measure 11 17-Jul-01

A-2001-0182-FFP Bingo Operations 24-Jul-01

A-2001-0183-AML

Interim Report on Demonstration Readiness Review of Single Stock Fund 9-Oct-00

A-2001-0184-AML

Interim Report on Independent Evaluation of the Single Stock Fund Demonstration 13-Oct-00

A-2001-0185-FFCFiscal Year 2000 Financial Statements 14-Feb-01

A-2001-0186-AMW

Review of Accounts Receivable and Other Assets at the U.S. Army Tank-Automotive and Armaments Command-Warren Business Center 16-Feb-01

A-2001-0187-IMT

Review of the Draft Performance Work Statement Dated 27 September 2000 for the Base Operations Support Commercial Activities Study 21-Feb-01

A-2001-0188-IMT

USAAA Rev of the Government Management Study & Cost Comparison Form for the Watervliet Arsenal Base Operations Supt Svcs Commercial Activities Study 20-Feb-01

A-2001-0189-IMT

U.S. Army Audit Agency's Review of the Watervliet Arsenal Base Operations Support Services Commercial Activities Study--Schedule of Adjustments 20-Feb-01

A-2001-0190-IMT

U.S. Army Audit Agency's Review of the Government Technical Performance Plan for the Watervliet Arsenal Base Operations Commercial Activities Study 20-Feb-01

A-2001-0191-IMEAudit of Management of Chemical Stockpile Sites 20-Feb-01

Page 140: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0192-AMW

Review of Accounts Receivable and Other Assets at U.S. Army Tank-Automotive and Armaments Command-Rock Island Business Center 28-Feb-01

A-2001-0193-AMW

Review of Accounts Receivable and Other Assets at U.S. Army Aviation and Missile Command 27-Feb-01

A-2001-0194-IMH

Observations for Management Consideration--Audit of Nonappropriated Fund Payroll 26-Feb-01

A-2001-0195-IMT

U.S. Army Audit Agency Review of the Final Decision Report for the Directorates of Engineering and Logistics 7-Mar-01

A-2001-0196-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Base Support (Logistics) Commercial Activities Study 16-Mar-01

A-2001-0197-IMT

USAAA Rev of Management Study & Cost Comparison Form for the Base Support (Information Technology) Commercial Activities Study--Schedule of Adjustments 16-Mar-01

A-2001-0198-AML

Independent Evaluation of the Single Stock Fund Demonstration Milestones 1 and 2 26-Mar-01

A-2001-0199-IMHNonappropriated Fund Payroll 9-Mar-01

A-2001-0200-AMIReview of Foreign Military Sales to Taiwan 27-Feb-01

A-2001-0201-AMW

Review of Accounts Receivable and Other Assets at U.S. Army Soldier and Biological Chemical Command 28-Feb-01

Page 141: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0202-IMT

USAAA Review of the Management Study and Cost Comparison Form for the Fort Riley Directorate of Information Management Commercial Activities Study 1-Mar-01

A-2001-0203-IMT

Review of the Management Study and Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 1-Mar-01

A-2001-0204-FFB

Peer Review of the Army's Internal Review Program for FY 00, Fort Sam Houston 16-Apr-01

A-2001-0205-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Directorate of Corporate Information Commercial Activities Study 1-Mar-01

A-2001-0206-IMT

U.S. Army Audit Agency's Review of the Directorate of Corporate Information Commercial Activities Study--Schedule of Adjustments 5-Mar-01

A-2001-0207-IMT

U.S. Army Audit Agency's Review of the Government Technical Performance Plan for the Directorate of Corporate Information Commercial Activities Study 1-Mar-01

A-2001-0208-IMT

Review of the Management Study and Technical Performance Plan for the Yakima Training Center Commercial Activities Study 28-Feb-01

A-2001-0209-AMW

Audit of the Army Working Capital Fund for FY 00 Accounts Payable 5-Mar-01

A-2001-0210-FFF

Audit of the Delivery of the Apache Longbow Crew Trainer 7-Mar-01

Page 142: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0211-IMT

Review of the Cost Comparison Form for the Yakima Training Center Commercial Activities Study 2-Mar-01

A-2001-0212-IMT

Review of the Yakima Training Center Commercial Activities Study 2-Mar-01

A-2001-0213-IMHMedical Decision Support Systems 15-Mar-01

A-2001-0214-IMT

U.S. Army Audit Agency's Rev of the Management Study and Cost Comparison Form for the Base Support (Information Technology) Commercial Activities Study 16-Mar-01

A-2001-0215-AMW

Review of Accounts Receivable and Other Assets at U.S. Army Communications-Electronics Command 14-Mar-01

A-2001-0216-FFB

Peer Review of the Army's Internal Review Program for FY 00, Darnall Army Community Hospital 16-Apr-01

A-2001-0217-IMT

Review of the Draft Performance Work Statement Dated 30 August 2000 for the Adjutant General Commercial Activities Study 14-Mar-01

A-2001-0218-IMT

Review of the Draft Performance Work Statement Dated 29 August 2000 for the Adjutant General Commercial Activities Study 15-Mar-01

A-2001-0219-IMO225th Army Birthday/Spirit of America 26-Mar-01

A-2001-0220-AMM

Maintenance Management Systems Audit of Staffing & Capacity of Tables of Distribution & Allowances (TDA) Maintenance Activities Time Sensitive Rept 30-Mar-01

Page 143: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0221-IMT

Congressional Request--Review of the Fort Leonard Wood Directorate of Logistics Commercial Activities Study 19-Mar-01

A-2001-0222-IMT

USAAA Review of the Management Study and Government Technical Performance Plan for the Fort Gordon Adjutant General Commercial Activities Study 27-Mar-01

A-2001-0223-FFG

Audit of the Army's Inventory and Control of Military Equipment 6-Apr-01

A-2001-0224-IMU

Review of the Army Ideas for Excellence Program--Cash Award in Excess of $10000 for Adopted Idea ERHD950013 26-Mar-01

A-2001-0225-IMUReview of Transportation Motor Pool (Kosovo) 21-Dec-00

A-2001-0226-IMUFood Service Operations (Kosovo) 5-Feb-01

A-2001-0227-IMUCamps Bondsteel and Montieth (Kosovo) 25-Feb-01

A-2001-0228-IMUTFF Shuttle Bus Operations (Kosovo) 21-Mar-01

A-2001-0229-IMT

USAAA Review of the Management Study and Cost Comparison Form for the Fort Riley Directorate of Information Management Commercial Activities Study 27-Mar-01

A-2001-0230-FFC

Audit of the U.S. Army Corps of Engineers FY 00 Financial Statements Civil Works (Financial Reporting) 11-May-01

A-2001-0231-IMT

USAAA Review of the Updated Government Cost Comparison Form for the Watervliet Arsenal Base Operations Support Services Commercial Activities Study 28-Mar-01

A-2001-0232-FFC

Fiscal Year 2000 Real Property Cycle (Cycle Memorandum) 25-May-01

A-2001-0233-FFP

Replacement Options for the Fort Shafter Army Education Center 20-Apr-01

Page 144: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0234-IMT

U.S. Army Audit Agency Review of the Updated Government Cost Comparison Form for the Directorate of Corporate Information Commercial Activities Study 29-Mar-01

A-2001-0235-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000--Wholesale Munitions Reporting Follow-up Issues 3-May-01

A-2001-0236-IMH

Review of Controlled Substances at Madigan Army Medical Center 30-Mar-01

A-2001-0237-AMA

Administering Service Contracts--Contract DAAH03-00-D-0004 3-Apr-01

A-2001-0238-AMA

Administering Service Contracts--Contract DAAH03-00-C-0001 3-Apr-01

A-2001-0239-AMA

Administering Service Contracts--Contract DAAH03-00-D-0001 3-Apr-01

A-2001-0240-IMT

USAAA Rev of Reportd Baseline/Most Efficient Organization Workyears for the Directorate of Information Mgmt Commercial Activities Study at Anniston AD 2-Apr-01

A-2001-0241-IMT

USAAA Rev of Reportd Baseline & Most Efficient Organization Workyears for the Installation Support Services Commercial Activities Study at Anniston AD 2-Apr-01

A-2001-0242-IMERemedial Activities at the Linde Site 16-Apr-01

A-2001-0243-IMT

USAAA Rev of the Government Management Study & Cost Comparison Form for the Tobyhanna Public Works & Information Technology Commercial Activities Study 6-Apr-01

Page 145: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0244-IMT

USAAA Review of the Government Technical Performance Plan for the Tobyhanna Public Works and Information Technology Commercial Activities Study 6-Apr-01

A-2001-0245-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Directorate of Information Technology Commercial Activities Study 6-Apr-01

A-2001-0246-IMT

USAAA Review of the Government Technology Performance Plan for the Directorate of Information Technology Commercial Activities Study 6-Apr-01

A-2001-0247-AMAAudit of Travel Expenses--Product Manager Platforms 5-Apr-01

A-2001-0248-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Carlisle Barracks Chief Information Office Commercial Activities Study 10-Apr-01

A-2001-0249-AMA

Appeal Contracting Officer Decision Claim for Nondisclosure/Breach of Contract No. DABT31-94-D-0009 by Internat'l Maint Resources Inc. ASBCA No. 50162 10-Apr-01

A-2001-0250-AMA

Appeal Contracting Officer Decision Claim for Nondisclosure/Breach of Contract No. DABT31-94-D-0009 by Internat'l Maint Resources Inc. ASBCA No. 50162 10-Apr-01

A-2001-0251-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000--Progress in Correcting Real Property Reporting & Internal Control Weaknesses 1-May-01

A-2001-0252-AMWReview of Inventory and Related Property 12-Apr-01

Page 146: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0253-AMITechnology Transfers in Special Programs 31-May-01

A-2001-0254-IME

Financial Management of the Assembled Chemical Weapons Assessment Program 3-May-01

A-2001-0255-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000-Supplemental Stewardship Reporting of National Defense Equipment 10-May-01

A-2001-0256-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000--Financial Reporting of Army General Equipment 22-May-01

A-2001-0257-IMT

U.S. Army Audit Agency Rev of the Final Decision Report for the Installation Operations Commercial Activities Study at Charles E. Kelly Supt Facility 23-Apr-01

A-2001-0258-IMHAudit of Pharmaceutical Management 17-Apr-01

A-2001-0259-IMHAudit of Pharmaceutical Management 17-Apr-01

A-2001-0260-FFPAudit of SECO Transportation Charges 23-Mar-01

A-2001-0261-IMT

U.S. Army Audit Agency's Review of the Tobyhanna Public Works and Information Technology Commercial Activities Study--Schedule of Adjustments 18-Apr-01

A-2001-0262-IMT

U.S. Army Audit Agency's Review of the Directorate of Information Technology Commercial Activities Study--Schedule of Adjustments 18-Apr-01

A-2001-0263-IMEAudit of Management of Chemical Stockpile Sites 19-Apr-01

Page 147: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0264-AML

Stockage of Prescribed Load List Parts in Supt of Initial Ready Company Surv of Stockage Policies for Prescribed Load Lists/Authorized Stockage Lists 20-Apr-01

A-2001-0265-IMH

Morale Welfare and Recreation Activities--Financial Controls 1-May-01

A-2001-0266-IMT

U.S. Army Audit Agency Review of the Final Decision Report for the Directorates of Engineering and Logistics Commercial Activities Study 26-Apr-01

A-2001-0267-IMT

USAAA Preliminary Review of the Management Study and Technical Performance Plan for the Fort Rucker Adjutant General Commercial Activities Study 26-Apr-01

A-2001-0268-AMW

Consigned Inventory--Army Working Capital Fund FY 00 Financial Statements 14-May-01

A-2001-0269-IMO

Base Closure and Realignment Implementation--Stratford Army Engine Plant 9-May-01

A-2001-0270-IMT

Interim Report on USAAA's Assistance to the U.S. Army Criminal Investigation Command Investigation of Contractor-Operated Bingo Operations 8-May-01

A-2001-0271-IMHAudit of Pharmaceutical Management 7-May-01

A-2001-0272-AMW Accounts Payable 23-Jul-01

A-2001-0273-AMW

Accounts Payable Process-Supply Management Army Wholesale Division--Army Working Capital Fund (Cycle Memorandum) 23-Jul-01

A-2001-0274-IMEAlternative Fuel Vehicle Program 23-May-01

Page 148: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0275-AMI

Technology Transfers of Classified and Sensitive Information 18-May-01

A-2001-0276-FFC

Fiscal Year 2000 Personal Property Cycle (Cycle Memorandum) 28-May-01

A-2001-0277-IMT

Review of the Draft Performance Work Statement Dated 14 March 2001 for the Adjutant General Commercial Activities Study 11-May-01

A-2001-0278-FFF

Planning Survey for Army Transformation--Forces and Manpower Management 18-May-01

A-2001-0279-FFG

Audit of the Army's General Fund Principal Financial Statements for FY 00--Financial Reporting of Liabilities: Data Collection and Compilation 18-May-01

A-2001-0280-AMW

Revenue Cycle Memorandum Supply Management Army Wholesale Division--Army Working Capital Fund 25-May-01

A-2001-0281-IMT

U.S. Army Audit Agency Review of the Management Study Team Response to the Source Selection Authority 10-May-01

A-2001-0282-FFBWorkload Survey for Information Technology 31-May-01

A-2001-0283-FFF

Distance Learning Facilities and Hardware Acquisition Structure 29-Jun-01

A-2001-0284-FFF

Financial Management of the Army's Distance Learning Program 20-Jun-01

A-2001-0285-IME

Audit of DOD Wastewater Systems, U.S. Army Materiel Command 14-May-01

A-2001-0286-IME

Audit of DOD Wastewater Systems, Fort Monmouth Garrison 15-May-01

A-2001-0287-IME

Audit of DOD Wastewater Systems, National Guard Bureau 15-May-01

Page 149: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0288-IME

Audit of DOD Wastewater Systems, North Carolina Army National Guard 15-May-01

A-2001-0289-IME

Audit of DOD Wastewater Systems, U.S. Army Training & Doctrine Command 15-May-01

A-2001-0290-IME

Audit of DOD Wastewater Systems Fort Eustis Garrison (Includung Fort Story) 15-May-01

A-2001-0291-IME

Audit of DOD Wastewater Systems, U.S. Army Forces Command 14-May-01

A-2001-0292-IME

Audit of DOD Wastewater Systems, Fort Stewart Garrison (Including Hunter Army Airfield) 15-May-01

A-2001-0293-IME

Audit of DOD Wastewater Systems, U.S. Army Reserve Command 15-May-01

A-2001-0294-IME

Audit of DOD Wastewater Systems, 81st Regional Support Command 15-May-01

A-2001-0295-IME

Audit of DOD Wastewater Systems, 63rd Regional Support Command 15-May-01

A-2001-0296-IME

Audit of DOD Wastewater Systems, Fort Hunter Liggett 15-May-01

A-2001-0297-FFB

Army Internal Review Quality Control Program, Army Materiel Cmd 29-Jun-01

A-2001-0298-FFB

Army Internal Review Quality Control Program, Army Corps of Engineers 29-Jun-01

A-2001-0299-FFB

Army Internal Review Quality Control Program, Army Forces Cmd 29-Jun-01

A-2001-0300-FFB

Army Internal Review Quality Control Program, Army Medical Cmd 29-Jun-01

A-2001-0301-FFB

Army Internal Review Quality Control Program, National Guard Bureau 29-Jun-01

A-2001-0302-AMA

Administering Service Contracts--Contract DAAH01-00-C-0006 (Patriot Weapon System) 22-May-01

Page 150: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0303-AMA

Administering Service Contracts--Contract DAAH01-99-C-0138 (Hawk Missile Maintenance and Repair) 22-May-01

A-2001-0304-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Central Issue Facility at Fort Lewis 23-May-01

A-2001-0305-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 16-May-01

A-2001-0306-IMT

Schedule of Adjustment from the Review of the Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 16-May-01

A-2001-0307-AMW

Internal Controls Over Selected Equity Accounts--Army Working Capital Fund FY 00 Financial Statements 8-Jun-01

A-2001-0308-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000--Fund Balance with Treasury and Statement of Budgetary Resources 19-Jun-01

A-2001-0309-AML

Data Integrity Review of the Retail Demands Module Audit of Logistics Integrated Database 25-May-01

A-2001-0310-IMUContractors on Task Force Falcon (Kosovo) 30-Apr-01

A-2001-0311-AMA

Audit of Funding for Command and Control Systems 25-May-01

A-2001-0312-FFF

National Guard Bureau Dedicated Fiber Optics Network Project 5-Jun-01

Page 151: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0313-IMT

Rev of Revisd Most Efficient Organization/Gov't Costs for CA Study of Operation/Maintenance of Five Gov't-Owned Locks & Dams on the Red River Waterway 12-Jun-01

A-2001-0314-IME

Workload Survey Report--Chemical and Biological Defensive Readiness and Support 1-Jun-01

A-2001-0315-AMI Army Space Program Office 24-May-01

A-2001-0316-FFC

Construction in Progress Property Plant and Equipment (Cycle Memorandum) 25-Jun-01

A-2001-0317-FFC

Corps of Engineers Financial Management System--General and Application Controls 26-Jun-01

A-2001-0318-FFF

Audit of The Army Workload and Performance System's Ammunition Function at Crane Army Ammunition Activity and McAlester Army Ammunition Plant 24-May-01

A-2001-0319-FFCFiscal Year 2001 Entity Profile 28-Jun-01

A-2001-0320-AMA

Audit of Recapitalization of Legacy Systems - Workload Survey 30-May-01

A-2001-0321-IMT

Review of the Draft Performance Work Statement Dated 2 March 2001 for the Directorate of Public Works Commercial Activities Study 29-May-01

A-2001-0322-IMT

Review of the Draft Performance Work Statement Dated 3 April 2001 for the Directorate of Planning Training & Mobilization Commercial Activities Study 29-May-01

Page 152: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0323-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Information Technology Business Center Commercial Activities Study 29-May-01

A-2001-0324-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Readiness Business Center Training Division Commercial Activities Study 29-May-01

A-2001-0325-FFPNonappropriated Fund Payroll for Local Nationals 28-Jun-01

A-2001-0326-FFG

Audit of The Army's FY 01 General Fund Financial Statements - National Defense Equipment Expenditures 31-May-01

A-2001-0327-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000--Adjustments to Financial Information at DFAS-St. Louis 29-Jun-01

A-2001-0328-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Directorate of Logistics Cataloging Commercial Activities Study 4-Jun-01

A-2001-0329-IMT

U.S. Army Audit Agency's Review of the Government Technical Performance Plan for the Directorate of Logistics Cataloging Commercial Activities Study 4-Jun-01

A-2001-0330-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000--Financial Reporting of Liabilities: Data Collection and Compilation 29-Jun-01

A-2001-0331-FFPArmy Stationing and Installation Plan 29-Jun-01

Page 153: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0332-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Directorate of Logistics Commercial Activities Study 5-Jun-01

A-2001-0333-AML

Establishment of Unique Item Tracking Repository for Category I Munitions 18-Jun-01

A-2001-0334-IMT

U.S. Army Audit Agency Review of the Management Study Dated 11 May 2001 for the Directorate of Logistics Commercial Activities Study 6-Jun-01

A-2001-0336-IMT

U.S. Army Audit Agency's Review of the Directorate of Logistics Cataloging Commercial Activities Study--Schedule of Adjustments 6-Jun-01

A-2001-0337-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Base Operations Commercial Activities Study at Tooele Army Depot 8-Jun-01

A-2001-0338-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form Dated 15 May 2001 for the Directorate of Logistics Commercial Activities Study 8-Jun-01

A-2001-0339-AML

Global Combat Support System-Army Program Contracts 22-Jun-01

A-2001-0340-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Dated 15 May 2001 for the Directorate of Logistics Commercial Activities Study 8-Jun-01

Page 154: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0341-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Fort Bliss Adjutant General Commercial Activities Study 8-Jun-01

A-2001-0342-IMT

Review of the Management Study and Cost Comparison Form for the Fort Bliss Adjutant General Commercial Activities Study 8-Jun-01

A-2001-0343-IMT

U.S. Army Audit Agency Review of the Revised Cost Comparison Form for the Redstone Arsenal Support Activity 13-Jun-01

A-2001-0344-FFC

Audit of the U.S. Army Corps of Engineers FY 00 Financial Statements Civil Works (Construction in Progress) 28-Jun-01

A-2001-0345-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000 Follow-up on Recording Recoveries at U.S. Army Corps of Engineers Finance Ctr 28-Jun-01

A-2001-0346-IMT

USAAA Review of the Reported Baseline and Most Efficient Organization Workyears for the Directorate of Public Works Commercial Activities Study 28-Jun-01

A-2001-0347-AMMElectronic Technical Manuals 29-Jun-01

A-2001-0348-FFP Fuel Point Operations 29-Jun-01

A-2001-0349-FFPAudit of Fuel Point Operations 28-Jun-01

A-2001-0350-IMT

U.S. Army Audit Agency Review of the Fort Detrick Garrison Draft Performance Work Statement 27-Jun-01

Page 155: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0351-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Fort Huachuca Adjutant General Commercial Activities Study 15-Jun-01

A-2001-0352-IMT

Schedule of Adjustments from the Rev of the Management Study & Cost Comparison Form for the Fort Huachuca Adjutant General Commercial Activities Study 15-Jun-01

A-2001-0353-FFB

Army Internal Review Quality Control Program (Year Ended 31 March 2000) 29-Jun-01

A-2001-0354-FFG

Evaluation Phase Review of the Supply Property Module for Financial Management System Compliance 27-Jun-01

A-2001-0355-FFF

Army Modernization Training (New Equipment Training) 29-Jun-01

A-2001-0356-FFG

Audit of the Integrated Facilities System for Financial Management System Compliance 27-Jun-01

A-2001-0357-FFC

Audit of the U.S. Army Corps of Engineers FY 00 Financial Statements Civil Works (Property Plant and Equipment) 28-Jun-01

A-2001-0358-AMM

Depot Maintenance Workload Reporting FY 00 and Outyears 12-Jul-01

A-2001-0359-AML

Stockage of Prescribed Load List Parts in Supt of Initial Ready Company Rev of Stockage Policies for Prescribed Load Lists/Authorized Stockage Lists 17-Aug-01

A-2001-0360-FFB

Internet Access for Selected Standard Army Management Information Systems 29-Jun-01

Page 156: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0361-FFPSpace Utilization of Storage and Warehouse Facilities 31-Jul-01

A-2001-0362-IMT

USAAA Rev of the Mgmt Study & Gov't Technical Performance Plan for the Fort Gordon Directorate of Information Management Commercial Activities Study 2-Jul-01

A-2001-0363-AMW

Review of Standing Operating Procedures for Preparing the 1307 Accounting Report 2-Jul-01

A-2001-0364-AMA

Administering Service Contracts--Contract DAAH03-97-C-0025 (Dining Facility) 3-Jul-01

A-2001-0365-IMU

AFEES Pricing: Giessen Surcharge and Transportation Costs (Kosovo) 22-Jun-01

A-2001-0366-IMT

Review of the Management Study and Cost Comparison Form for the Adjutant General Commercial Activities Study 28-Jun-01

A-2001-0367-IMT

Schedule of Adjustments for the Review of the Management Study and Cost Comparison Form for the Fort Sill Adjutant General Commercial Activities Study 28-Jun-01

A-2001-0368-FFC

Audit of Corps of Engineers Financial Management System 29-Jun-01

A-2001-0369-FFC

Audit of Corps of Engineers Financial Management System 29-Jun-01

A-2001-0370-FFC

Audit of Corps of Engineers Financial Management System 29-Jun-01

A-2001-0371-FFPArmy Stationing and Installation Plan 27-Jul-01

A-2001-0372-FFP

Space Utilization of Classroom and Training Facilities 30-Jul-01

Page 157: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0373-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Fort Belvoir Garrison Commercial Activities Study 9-Jul-01

A-2001-0374-AMISecure Environment Contracting 16-Jul-01

A-2001-0375-AMA

Administering Service Contracts--Contract DAAH03-00-D-0003 (Custodial Services) 17-Jul-01

A-2001-0376-AMA

Administering Service Contracts--Contract DAAH01-97-C-0218 (Command and Control Systems) 18-Jul-01

A-2001-0377-IMT

Review of the Management Study Technical Performance Plan and Cost Comparison Form for the Fort Benning Adjutant General Commercial Activities Study 2-Aug-01

A-2001-0378-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Fort Gordon Adjutant General Commercial Activities Study 6-Aug-01

A-2001-0379-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form Dated 23 April 2001 for the Adjutant General Division Commercial Activities Study 16-Jul-01

A-2001-0380-AMA

Administering Service Contracts--Contract DAAH03-99-D-0005 (Grounds Maintenance) 31-Jul-01

A-2001-0381-AMA

Administering Service Contracts--Contract DAAH03-99-D-0007 (Base Operations) 5-Sep-01

Page 158: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0382-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Directorate of Public Works Commercial Activities Study at Fort Drum 18-Jul-01

A-2001-0383-AML

Analysis of Logistics Integrated Database User Questionnaire Responses Audit of Logistics Integrated Database 6-Aug-01

A-2001-0384-AMWFollow-up Review of Audit Recommendation 18-Jul-01

A-2001-0385-AMWFollow-up Review of Audit Recommendation 18-Jul-01

A-2001-0386-IMT

U.S. Army Audit Agcy Rev of the Draft Performance Work Statement for the Fort Belvoir Garrison Quality Assurance Evaluation Commercial Activity Study 23-Jul-01

A-2001-0387-IMEAudit of Halon 1301 Projected Supply and Use 18-Jul-01

A-2001-0388-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Dated 23 April 2001 for the Adjutant General Division Commercial Activities Study 18-Jul-01

A-2001-0389-IMT

U.S. Army Audit Agency Review of the Management Study Dated 30 November 2000 for the Adjutant General Division Commercial Activities Study 19-Jul-01

A-2001-0390-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Directorate of Logistics and Engineering 20-Jul-01

A-2001-0391-IMT

Report on U.S. Army Audit Agency's Assistance to the Criminal Investigation Command Investigation of Contractor-Operated Bingo Operations 23-Jul-01

A-2001-0392-FFP Customer-Wait-Time 10-Aug-01

Page 159: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0393-IMOEnergy Savings Performance Contracts 14-Sep-01

A-2001-0394-AML

Stockage Criteria for Prescribed Load Lists Review of Stockage Policies for Prescribed Load Lists and Authorized Stockage Lists. 1-Aug-01

A-2001-0395-FFF

Validation of Material Weakness Corrective Actions - Individual Augmentation for Contingency Operations and Exercise Deployments 1-Aug-01

A-2001-0396-FFPSpace Utilization of Storage and Warehouse Facilities 13-Aug-01

A-2001-0397-FFPSpace Utilization of Administrative Facilities 17-Aug-01

A-2001-0398-AMW

Internal Controls Over Selected Equity Accounts Wholesale Supply Operations--Army Working Capital Fund FY 00 Financial Statements 10-Aug-01

A-2001-0399-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Directorate of Public Works Commercial Activities Study at Fort Sill 26-Jul-01

A-2001-0400-AMW

Internal Controls Over Selected Equity Accounts Depot Maintenance and Ordnance--Army Working Capital Fund FY 00 Financial Statements 13-Aug-01

A-2001-0401-FFB

Audit of the Army's Implementation of the Government Information Security Reform Act 2-Aug-01

A-2001-0402-AMI

Classified Contracting Support for the Army Space Program Office 31-Jul-01

A-2001-0403-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for Fort Drum's Directorate of Logistics Commercial Activities Study 31-Jul-01

Page 160: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0404-IMT

Review of the Most Efficient Organization and Government Costs for the Fort Polk Whole Base Commercial Activities Study 13-Aug-01

A-2001-0405-IMT

U.S. Army Audit Agency's Review of the Government Technical Performance Plan for the Fort Polk Whole Base Commercial Activities Study 1-Aug-01

A-2001-0406-IMT

Lessons Learned in the Review of the Management Study and In-House Cost Estimate Fort Polk Whole Base Commercial Activities Study 1-Aug-01

A-2001-0407-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Adjutant General Commercial Activities Study 2-Aug-01

A-2001-0408-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Public Works Business Center Commercial Activities Study 6-Aug-01

A-2001-0409-FFCFiscal Year 2001 General Risk Analysis 5-Sep-01

A-2001-0410-IME

Audit of Funding for Installation Environmental Compliance Assist to the DA Inspector General 6-Aug-01

A-2001-0411-AML

Data Integrity Review of Logistics Integrated Database's Readiness Module Audit of Logistics Integrated Database 9-Aug-01

A-2001-0412-FFBFollow-up Review of Audit Recommendations 15-Aug-01

A-2001-0413-FFBFollow-up Review of Audit Recommendations 15-Aug-01

A-2001-0414-IME

Quarterly Review of Unliquidated Obligations for the Chemical Demilitarization Program 29-Aug-01

Page 161: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0415-IMT

Rev of Mgmt Study Technical Performance Plan & Cost Comparison Form for the Fort Rucker Directorate of Information Mgmt Commercial Activities Study 20-Aug-01

A-2001-0416-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Directorate of Information Management Commercial Activities Study 20-Aug-01

A-2001-0417-AMM

Review of Cost Comparison for Air Force Maintenance Contract 9-Aug-01

A-2001-0418-IME Army Forestry Program 22-Aug-01

A-2001-0419-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Adjutant General Commercial Activities Study 22-Aug-01

A-2001-0420-IMH

Review of Time and Attendance Records for Pharmacy Civilian Employees at Madigan Army Medical Center 10-Aug-01

A-2001-0421-AMW

Compilation Process FY 00 Statement of Financing--Army Working Capital Fund 27-Aug-01

A-2001-0422-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Fort Rucker Adjutant General Commercial Activities Study 14-Aug-01

A-2001-0423-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Adjutant General Commercial Activities Study 14-Aug-01

A-2001-0424-IMU

Review of Recurring Base Camp Maintenance - Custodial Services (Kosovo) 11-Aug-01

A-2001-0425-AMLFollow-up Review of Audit Recommendations 15-Aug-01

Page 162: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0426-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Adjutant General Commercial Activities Study 14-Aug-01

A-2001-0427-AML

Workload Survey of U.S. Army Operations Support Command Time-Sensitive Issue Ammunition Automated Identification Technology - Expansion 17-Aug-01

A-2001-0428-FFPFollow-Up Review of Audit Recommendations 20-Aug-01

A-2001-0429-IMHAudit of Pharmaceutical Management 28-Aug-01

A-2001-0430-FFP

Review of Revised Performance Work Statement as of 20 August 2001 Directorate of Logistics 22-Aug-01

A-2001-0431-IMHAudit of Pharmaceutical Management 23-Aug-01

A-2001-0432-IMEAudit of Implementation of the Military Munitions Rule 23-Aug-01

A-2001-0433-IMHAudit of Pharmaceutical Management 24-Aug-01

A-2001-0434-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Fort Gordon Directorate of Information Management Commercial Activities Study 29-Aug-01

A-2001-0435-AMA

Initial Brigade Combat Team Materiel Requirements 21-Sep-01

A-2001-0436-AMW

Compilation of Army Working Capital Fund FY 00 1307 Accounting Report 17-Sep-01

A-2001-0437-IMT

U.S. Army Audit Agency Review of the Revised Technical Performance Plan and Management Study Public Works Business Center 27-Aug-01

Page 163: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0438-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Fort Campbell Public Works Business Center 28-Aug-01

A-2001-0439-IMT

Rev Updatd Costs Directd by the Administrative Appeals Bd for the Ft Benning Commercial Activities Study of the Directorates of Public Works/Logistics 30-Aug-01

A-2001-0440-IMH

Review of Army and Air Force Exchange Service's Internal Audit Report on the Diamond Procurement Process 28-Aug-01

A-2001-0441-FFFArmy Workload and Performance - Ammunition 21-Sep-01

A-2001-0442-FFG

Audit of the Army's FY 01 General Fund Financial Statements--Accuracy of Real Property Data Reported in the Real Property Systems 10-Sep-01

A-2001-0443-IMEAudit of Halon 1301 Projected Supply and Use 5-Sep-01

A-2001-0444-FFG

Audit of the Army's FY 01 General Fund Financial Statements--Accuracy of Real Property Data Reported in the Real Property Systems 10-Sep-01

A-2001-0445-FFG

Audit of the Army's FY 01 General Fund Financial Statements--Accuracy of Real Property Data Recorded in the Real Property Systems 10-Sep-01

A-2001-0446-IME

Review of Funding for Installation Environmental Compliance 5-Sep-01

A-2001-0447-FFG

Audit of the Army's FY 01 General Fund Financial Statements-General Equipment 27-Sep-01

A-2001-0448-FFG

Audit of the Army's FY 01 General Fund Financial Statements--Accuracy of Real Property Data Reported in the Real Property Systems 10-Sep-01

Page 164: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0450-FFFFollow-up Review of Audit Recommendations 19-Sep-01

A-2001-0451-FFFFollow-up Review of Audit Recommendations 19-Sep-01

A-2001-0452-FFFFollow-up Review of Audit Recommendations 19-Sep-01

A-2001-0453-IMT

U.S Army Audit Agency Review of the Reported Baseline Workyears for the Directorates of Public Works and Logistics Commercial Activities Study 12-Sep-01

A-2001-0455-FFG

Audit of the Army's FY 01 General Fund Financial Statements--Accuracy of Real Property Data Reported in the Real Property Systems 10-Sep-01

A-2001-0456-IMOEnergy Savings Performance Contracts 20-Sep-01

A-2001-0457-FFB

Review of the Army Management Control Process for FY 01, Norfolk Engineer District 21-Sep-01

A-2001-0458-FFB

Review of the Army Management Control Process for FY 01, Army Reserve Personnel Command 21-Sep-01

A-2001-0459-FFB

Review of the Management Control Process for FY 01, Engineering & Support Center, Huntsville 21-Sep-01

A-2001-0460-FFB

Review of the Management Control Process for FY 01, U.S. Army Garrison-Miami 21-Sep-01

A-2001-0461-IMOEnergy Savings Performance Contracts 24-Sep-01

A-2001-0462-IMEAudit of Implementation of the Military Munitions Rule 12-Sep-01

A-2001-0466-FFB

Review of the Management Control Process for FY 01, U.S. Army Garrison, Fort Buchanan, Puerto Rico 21-Sep-01

Page 165: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0467-IMT

Review of the Management Study Technical Performance Plan and Cost Comparison Form for the Directorate of Readiness Commercial Activities Study 14-Sep-01

A-2001-0468-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Directorate of Readiness Commercial Activities Study 14-Sep-01

A-2001-0469-IMHNonappropriated Fund Payroll 25-Sep-01

A-2001-0470-FFPRenovation Work at Command Post Oscar 27-Sep-01

A-2001-0471-FFPFollow-Up Review of Audit Recommendations 26-Sep-01

A-2001-0472-FFB

Review of the Army Management Control Process for FY 01, U.S. Army South 21-Sep-01

A-2001-0473-IMT

Rev of the Management Study Technical Performance Plan and Cost Comparison Form for the Directorate of Support Services Commercial Activities Study 21-Sep-01

A-2001-0474-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Directorate of Support Services Commercial Activities Study 21-Sep-01

A-2001-0478-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Adjutant General Commercial Activities Study 20-Sep-01

A-2001-0479-AMI

Follow-Up Review of Implemented Recommendations in USAAA Audit Report AA99-252 Bosnia Travel Payments 20-Sep-01

A-2001-0480-IMUFY 01 Follow-up Review of Audit Recommendations 20-Sep-01

Page 166: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0481-FFP

U.S. Army Audit Agency Review of the Revised Management Study and Technical Performance Plan for the Directorate of Logistics 24-Sep-01

A-2001-0482-FFP

U.S. Army Audit Agency Review of the Revised Cost Comparison Form for the Directorate of Logistics 24-Sep-01

A-2001-0483-AMI

Follow-Up Review of Recommendations in USAAA Audit Report AA99-369 Performance Evaluation for Technology-Based Special Access Programs 25-Sep-01

A-2001-0484-IMT

Review of the Revisions to the Management Study and Technical Performance Plan for the Public Works Business Center Commercial Activities Study 25-Sep-01

A-2001-0485-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Fort Sam Houston Whole Base Commercial Activities Study 27-Sep-01

A-2001-0486-IMT

Review of the Management Study and Cost Comparison Form for the Fort Sam Houston Whole Base Commercial Activities Study 27-Sep-01

A-2001-0487-FFBFollow-up Review of Audit Recommendations 26-Sep-01

A-2001-0488-AMAFollow-up Review of Audit Recommendations 27-Sep-01

A-2001-0489-IMUFY 01 Follow-up Review of Audit Recommendations 28-Sep-01

A-2001-0490-AMAFollow-up Review of Audit Recommendations 28-Sep-01

A-2001-0491-AMAFollow-up Review of Audit Recommendations 28-Sep-01

A-2001-0492-IMTFY 01 Follow-up Review of Audit Recommendations 27-Sep-01

A-2001-0493-FFCFollow-up Review of Audit Recommendations 28-Sep-01

Page 167: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0494-FFBReview of Telecommunications Costs 23-Oct-00

A-2001-0495-FFBReview of Negative Unliquidated Obligations 19-Jun-01

A-2001-0496-AML

Expenditures for the Global Combat Support System--Army Program 18-Oct-00

A-2001-0497-AMLSesame Research Summary 3-Oct-00

A-2001-0498-AMW

Audit of Self-Service Supply Center Room 1E700 the Pentagon 5-Oct-00

A-2001-0499-FFBReview of Telecommunications Costs 27-Oct-00

A-2001-0500-FFBReview of Telecommunications Costs 27-Oct-00

A-2001-0501-IMOReview of Integrated Facilities System 16-Oct-00

A-2001-0502-FFBReview of Telecommunications Costs 23-Oct-00

A-2001-0503-FFB

Review of the Army Congressional Budget Liaison Office's Organization and Operation and Congressional Perceptions of the Army 23-Oct-00

A-2001-0504-IMO

Report of Survey of the Directorate of Military Support Phase III--Guidance and Regulations 19-Oct-00

A-2001-0505-IMO

Review of the Directorate of Military Support Phase II--Organizational Implementation 19-Oct-00

A-2001-0506-IMOReview of the Installation Status Report 25-Oct-00

A-2001-0507-AML

Consulting Effort--Wholesale Logistics Modernization Program 24-Oct-00

A-2001-0508-IMU

Review of the Automated Logistical Specialist Military Occupation Specialty 25-Oct-00

A-2001-0509-IMT

Reasons for Absence of Contractor Proposals on Three A-76 Studies 13-Nov-00

Page 168: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0510-IMO

Review of Planning for DOD Support to the 2001 Presidential Inaugural 1-Nov-00

A-2001-0511-FFBActivity-Based Costing/Management 9-Nov-00

A-2001-0512-IMOAudit of Energy Saving Performance Contracts 25-Jan-01

A-2001-0513-IMO

Follow-on Review of Advanced Training Technology Support Facility 4-Dec-00

A-2001-0514-AMA

Review of Documentation for Milestone II Decision Interim Armored Vehicle Program 30-Nov-00

A-2001-0515-IMOEstimated Retirement Benefits 5-Dec-00

A-2001-0516-IMOEstimated Retirement Benefits 6-Dec-00

A-2001-0517-IMOEstimated Retirement Benefits 6-Dec-00

A-2001-0518-IMOEstimated Retirement Benefits 7-Dec-00

A-2001-0519-FFG

Status of Army Compliance with Federal Financial Accounting Standards 15-Dec-00

A-2001-0520-IMOEstimated Retirement Benefits 15-Dec-00

A-2001-0521-IMOEstimated Retirement Benefits 18-Dec-00

A-2001-0522-IMHManagement Review of CSFC Organization 19-Dec-00

A-2001-0523-IMOEstimated Retirement Benefits 19-Dec-00

A-2001-0524-IMHFinancial Controls - Fort Riley Golf Course 4-Dec-00

A-2001-0525-IMO

Validation of Savings for the Base Operations Contract with the Presidio Municipal Services Agency 27-Dec-00

A-2001-0526-IMOEstimated Retirement Benefits 5-Jan-01

A-2001-0527-AMAReview of Travel Trends of Program Executive Officers 9-Jan-01

A-2001-0528-FFB

Review of the Administrative Obligation of Army Funds 30-Jan-01

A-2001-0529-IMHBest Practices for Uniform Business Office Operations 29-Jan-01

Page 169: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0530-IMT

Cost of the Directorate of Logistics Competitive Sourcing Study--Phase II 29-Jan-01

A-2001-0531-IMOEstimated Retirement Benefits 16-Jan-01

A-2001-0532-IMOEstimated Retirement Benefits 17-Jan-01

A-2001-0533-IMOEstimated Retirement Benefits 18-Jan-01

A-2001-0534-IMT

U.S. Army Audit Agency's Review of Fort Drum's Job Order Contracting Process 30-Jan-01

A-2001-0535-IMOEstimated Retirement Benefits 25-Jan-01

A-2001-0536-IMOEstimated Retirement Benefits 31-Jan-01

A-2001-0537-FFB

Cost Management/Activity-Based Costing in U.S. Army Europe and Seventh Army 12-Feb-01

A-2001-0538-FFP

Projected Unit Costs for Laundry and Dry-Cleaning Done by the Quartermaster Laundry in Yongsan 8-Feb-01

A-2001-0539-IMOEstimated Retirement Benefits 13-Feb-01

A-2001-0540-FFBReview of Telecommunications Costs 12-Mar-01

A-2001-0541-FFG

Review of the Army Medical Department Property Accounting System (AMEDDPAS) for Financial Management System Compliance 23-Feb-01

A-2001-0542-FFG

Review of the Standard Installation/Division Personnel System for Compliance with the Federal Financial Management Improvement Act 23-Feb-01

A-2001-0543-IMOEstimated Retirement Benefits 22-Feb-01

A-2001-0544-IMOEstimated Retirement Benefits 22-Feb-01

Page 170: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0545-FFB

Activity-Based Costing Pilot at U.S. Army Space and Missile Defense Command's Deputy Chief of Staff Strategic Planning and Analysis 1-Mar-01

A-2001-0546-IMOEstimated Retirement Benefits 2-Mar-01

A-2001-0547-FFPWorkforce Assessment U.S. Army Hawaii 16-Mar-01

A-2001-0548-FFPWorkforce Assessment U.S. Army Alaska 16-Mar-01

A-2001-0549-FFPWorkforce Assessment U.S. Army Japan 16-Mar-01

A-2001-0550-FFPWorkforce Assessment U.S. Army Pacific 13-Apr-01

A-2001-0552-IMO

In-Kind Compensation for Leases of Historic Properties--Old Brooke Army Medical Center Facilities 8-Mar-01

A-2001-0553-IMOEstimated Retirement Benefits 7-Mar-01

A-2001-0554-IMO

Report on the Review of the Director of Military Support Phase III--Guidance and Regulations 6-Mar-01

A-2001-0555-IMO

U.S. Army Criminal Investigation Command Request Fort Irwin Geographical Bachelors Housing 6-Mar-01

A-2001-0556-IMOEstimated Retirement Benefits 7-Mar-01

A-2001-0557-AML

Review of Informal Contractor Claim Audit of Global Combat Support System-Army 12-Mar-01

A-2001-0558-IMO After-action Review 9-Mar-01

A-2001-0559-IME

Review of Environmental Assessment for Grazing Outlease at Fort Hood 12-Mar-01

A-2001-0560-AMA

Review of Family of Medium Tactical Vehicles Counterclaim Costs 14-Mar-01

A-2001-0561-IMOEstimated Retirement Benefits 13-Mar-01

A-2001-0562-IMOEstimated Retirement Benefits 26-Mar-01

A-2001-0563-IMOEstimated Retirement Benefits 29-Mar-01

Page 171: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0564-AMA

Follow-up Review of Family of Medium Tactical Vehicles Counterclaim Costs 28-Mar-01

A-2001-0565-IMOReview of the Installation Status Report 27-Mar-01

A-2001-0566-IMOReview of the Installation Status Report 27-Mar-01

A-2001-0567-FFB

Cost Management/Activity-Based Costing in 30th Signal Battalion/Directorate of Information Management 6-Apr-01

A-2001-0568-IMOEstimated Retirement Benefits 5-Apr-01

A-2001-0569-IMOEstimated Retirement Benefits 5-Apr-01

A-2001-0570-IMOEstimated Retirement Benefits 16-Apr-01

A-2001-0571-IMOEstimated Retirement Benefits 23-Apr-01

A-2001-0572-IMOEstimated Retirement Benefits 27-Apr-01

A-2001-0573-IMHBacklog of Instrumentation Modernization and Repair 4-May-01

A-2001-0574-IMOEstimated Retirement Benefits 30-Apr-01

A-2001-0575-FFBReview of Telecommunications Costs 30-Apr-01

A-2001-0576-FFBReview of Telecommunications Costs 30-Apr-01

A-2001-0577-IMOEstimated Retirement Benefits 2-May-01

A-2001-0578-IMU

Timecard Review of Directorate of Community Activities 3-May-01

A-2001-0579-IMOEstimated Retirement Benefits 9-May-01

A-2001-0580-IMT

Cost of Directorate of Logistics Competitive Sourcing Study--Phase III 23-May-01

A-2001-0581-IMOReview of the Installation Status Report 11-May-01

A-2001-0582-FFBReview of Telecommunications Costs 31-May-01

A-2001-0583-FFBReview of Telecommunications Costs 31-May-01

Page 172: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0584-IMEReview of Local Transportation at Fort Lewis 17-May-01

A-2001-0585-FFF

Barriers to Integration of 7th Infantry Division and Army National Guard Enhanced Separate Brigades 22-Jun-01

A-2001-0586-FFP

Management Study for the Directorate of Community Activities U.S. Army Alaska 7-Jun-01

A-2001-0587-FFBReview of Telecommunications Costs 31-May-01

A-2001-0588-IMU

Review of Fuel Coupon Accountability at the 29th Support Group 5-Jun-01

A-2001-0589-IMOEstimated Retirement Benefits 14-Jun-01

A-2001-0590-IMOEstimated Retirement Benefits 14-Jun-01

A-2001-0591-IMH

Financial Controls--Elkhorn Catering and Conference Center 20-Jun-01

A-2001-0592-FFB

Interface Opportunities Between the Information Technology Business Center's Remedy System and the Activity-Based Costing Model 18-Jun-01

A-2001-0593-IMOEstimated Retirement Benefits 15-Jun-01

A-2001-0594-IMOEstimated Retirement Benefits 15-Jun-01

A-2001-0595-IMOEstimated Retirement Benefits 18-Jun-01

A-2001-0596-IMO

Review of the No-Cost Economic Development Conveyances Process 2-Jul-01

A-2001-0597-FFBReview of Telecommunications Costs 27-Jun-01

A-2001-0598-IMOEstimated Retirement Benefits 21-Jun-01

A-2001-0599-IMOEstimated Retirement Benefits 22-Jun-01

A-2001-0600-IMO

Base Realignment Execution--Army Research Laboratory 10-Jul-01

A-2001-0601-FFBReview of Telecommunications Costs 29-Jun-01

Page 173: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0602-IMH

Review of Health Insurance Company Reimbursements for Medical Claims Filed by Darnall Army Community Hospital 3-Jul-01

A-2001-0603-IMOEstimated Retirement Benefits 3-Jul-01

A-2001-0604-IMOEstimated Retirement Benefits 3-Jul-01

A-2001-0605-IMOEstimated Retirement Benefits 3-Jul-01

A-2001-0606-FFP

U.S. Army Audit Agency Consulting Review of the Implementation of Activity Based-Costing Principles 17-Jul-01

A-2001-0607-FFPStreamlining the Acquisition of Automated Equipment 9-Aug-01

A-2001-0608-IMU

Review of the 104th Area Support Group Pre-contract Cost Comparison Study 10-Jul-01

A-2001-0609-IMOReview of the Installation Status Report 16-Jul-01

A-2001-0610-IMOEstimated Retirement Benefits 17-Jul-01

A-2001-0611-IMU

Review of the 104th Area Support Group Total Maintenance Contract 20-Jul-01

A-2001-0612-IMOEstimated Retirement Benefits 23-Jul-01

A-2001-0613-IMOEstimated Retirement Benefits 26-Jul-01

A-2001-0614-IMO

Review of the Property Screening Process at Fort Ritchie, Maryland 27-Jul-01

A-2001-0615-IMOEstimated Retirement Benefits 26-Jul-01

A-2001-0616-IMOReview of Energy Savings Performance Contract 1-Aug-01

A-2001-0617-IMOEstimated Retirement Benefits 6-Aug-01

A-2001-0618-IMOEstimated Retirement Benefits 6-Aug-01

A-2001-0619-IMT

Organizational Review of the Office of the Assistant Deputy Under Secretary of the Army for International Affairs (International Policy) 13-Aug-01

A-2001-0620-AMAReview of Army Staff Contracting 22-Aug-01

Page 174: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0621-IMOReview of the Installation Status Report 23-Aug-01

A-2001-0622-IMOEstimated Retirement Benefits 28-Aug-01

A-2001-0623-IMOEstimated Retirement Benefits 28-Aug-01

A-2001-0624-IMOEstimated Retirement Benefits 28-Aug-01

A-2001-0625-FFBReview of Telecommunications Costs 31-Aug-01

A-2001-0626-IMOEstimated Retirement Benefits 4-Sep-01

A-2001-0627-IMOEstimated Retirement Benefits 4-Sep-01

A-2001-0628-IMOEstimated Retirement Benefits 4-Sep-01

A-2001-0629-IMHFinancial Controls--Turkey Creek Recreation Area 17-Sep-01

A-2001-0630-IMOEstimated Retirement Benefits 6-Sep-01

A-2001-0631-IMOEstimated Retirement Benefits 13-Sep-01

A-2001-0632-AMA

Review of Risk Management Program Interim Armored Vehicle Program 18-Sep-01

A-2001-0633-IMOReview of the Installation Status Report 20-Sep-01

A-2001-0634-IMOEstimated Retirement Benefits 20-Sep-01

A-2001-0635-IMH

Review of Health Insurance Company Reimbursements for Medical Claims Filed by William Beaumont Medical Center 25-Sep-01

A-2001-0636-IMOEstimated Retirement Benefits 24-Sep-01

A-2001-0637-IMOEstimated Retirement Benefits 24-Sep-01

A-2001-0638-IMU

Review of Recurring Base Camp Maintenance - Costs of New and Recurring Gravel and/or Sand Requirements (Kosovo) 17-Sep-01

A-2001-0639-IMUArmy Foreign Language Program--Outsourcing 31-Jan-01

A-2001-0640-IMUValidation of Installation Status Report 21-Mar-01

Page 175: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0641-IME

Audit of Administering Service Contracts--Contract DAKF48-97-F-0292 (Warehouse Services) 20-Sep-01

A-2001-0642-IME

Audit of Administering Service Contracts--Contract DAKF48-00-F-0141 (Environmental Training) 20-Sep-01

A-2001-0643-IME

Audit of Administering Service Contracts--Contract DAKF48-98-D-0021 (Noncommissioned Officers Leadership Education and Development) 20-Sep-01

A-2001-0644-IME

Audit of Administering Service Contracts--Contract DAKF48-99-F-0157 (Dining Facility Attendants) 6-Sep-01

A-2001-0645-IME

Audit of Administering Service Contracts--Contract DAKF48-98-C-0001 (Hospital Custodial Services) 6-Sep-01

A-2001-0646-IME

Audit of Administering Service Contracts--Contract DAKF48-99-D-0009 (Archeological Services) 12-Sep-01

A-2001-0647-IME

Audit of Administering Service Contracts--DAKF48-98-D-0017 (Grounds Maintenance) 12-Sep-01

A-2001-0648-IME

Audit of Administering Service Contracts--Contract DAKF48-98-M-0144 (Hospital Shuttle Service) 13-Sep-01

A-2001-0649-IMU

Management of Ammunition in Support of Army Pre-Positioned Sets in Europe 23-Oct-00

A-2001-0650-IMU

Review of the Army Management Control Process for FY 00 16-Oct-00

Page 176: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2001-0651-FFP

Internet Access for Selected U.S. Army Program Executive Office Standard Army Management Information Systems in Korea 19-Jun-01

Product Lookup ResultsHome > Product Lookup > Product Lookup Results

Results Where: Agency Product? (PRODUCT) = (equal) Yes and Product FY (PRODUCT) >=(greater or equaRecords Returned: 3162

Product Number Product Name Published Date

A-2002-0001-AMI

Technology Transfers of Classified and Sensitive Information, Special Forces Command AA02-1 9-Oct-01

A-2002-0002-FFF

Delayed Entry Program Management, U.S. Army Recruiting Command 31-Oct-01

A-2002-0003-FFC

Workload Survey of the U.S. Army Corps of Engineers Civil and Military Programs 19-Dec-01

A-2002-0004-AMAContract Administration at Army Ammunition Plants 5-Nov-01

A-2002-0005-FFB

Review of the Army Management Control Process for FY 01, Humphreys Engineer Center 22-Oct-01

A-2002-0006-FFB

Review of the Army Management Control Process for FY 01, Baltimore Engineer District 6-Nov-01

A-2002-0007-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2000--Financial Reporting of Civilian Accrued Annual Leave 28-Nov-01

A-2002-0008-FFF

Follow-up Review of Audit Recommendations, AA 99-073 16-Oct-01

A-2002-0009-FFF

Follow-up Review of Audit Recommendations, AA 00-276 26-Oct-01

A-2002-0010-AMW

Follow-up Review of Audit Recommendations, AA 99-35 5-Oct-01

Page 177: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0011-AMW

Follow-up Review of Audit Recommendations, AA 99-240 3-Oct-01

A-2002-0012-FFG

Review of the U.S. Army Materiel Command's FY 01 National Defense Equipment Chief Financial Officer Stewardship Report Mid-Year Exercise 25-Oct-01

A-2002-0013-FFG

Follow-up Review of Audit Recommendations, AA 99-191 1-Nov-01

A-2002-0014-FFG

Review of the Army's FY 01 General Fund Financial Statements--National Defense Equipment (In-Transits) 26-Oct-01

A-2002-0015-FFG

Follow-up Review of Audit Recommendations, AA 98-174 24-Oct-01

A-2002-0016-AMI

Army Foreign Language Program Requirements Followup 15-Oct-01

A-2002-0017-AMI Reimbursable Transactions 1-Oct-01

A-2002-0018-IMT

USAAA Review of the Draft Performance Work Statement for the Fort Monroe Garrison Directorate of Information Management Commercial Activities Study 2-Oct-01

A-2002-0019-IMT

USAAA Review of the Reported Baseline Workyears for the Directorate of Logistics Commercial Activities Study at U.S. Army Garrison Alaska 9-Oct-01

A-2002-0020-FFB

Review of the Army Management Control Process for FY 01, Mobile Engineer District 18-Oct-01

A-2002-0021-FFFU.S. Army Reserve Full-Time Support Program 19-Nov-01

A-2002-0022-IMH

Review of Army and Air Force Exchange Service External Contract Oversight 9-Oct-01

A-2002-0023-FFP

Follow-up Review of Audit Recommendations, AA 00-355 19-Oct-01

Page 178: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0024-IMT

USAAA Review of the Government Management Study and Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 10-Oct-01

A-2002-0025-IME

Follow-up Review of Audit Recommendations, AA 98-24 and AA 99-246 10-Oct-01

A-2002-0026-FFBAudit of the American Red Cross 24-Oct-01

A-2002-0027-IMT

Review of the Management Study Technical Performance Plan and Cost Comparison Form for the Adjutant General Commercial Activities Study 11-Oct-01

A-2002-0028-IMT

Schedule of Adjustments from the Review of the Cost Comparison Form Adjutant General Commercial Activities Study 11-Oct-01

A-2002-0032-AML

Follow-up Review of Audit Recommendations, AA 98-99 18-Oct-01

A-2002-0033-FFP

Review of Army Ideas for Excellence Program Proposal "Elimination of Self-Service Supply Centers in Korea" 29-Oct-01

A-2002-0034-FFB

Review of the Army Management Control Process for FY 01, U.S. Army South 17-Oct-01

A-2002-0035-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Base Operations Commercial Activities Study at Watervliet Arsenal 15-Oct-01

A-2002-0037-IMT

U.S. Army Audit Agency Review of the Management Study Received 6 August 2001 for the Public Works Business Center Commercial Activities Study 25-Oct-01

Page 179: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0038-IMT

Schedule of Adjustments from the Rev of the Cost Comparison Form Dated 6 August 2001 for the Public Works Business Center Commercial Activities Study 25-Oct-01

A-2002-0039-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form Dated 6 August 2001 for the Public Works Business Center Commercial Activities Study 25-Oct-01

A-2002-0040-IMH

Financial Controls--Golf Course Operations, Aberdeen Proving Ground, MD 1-Nov-01

A-2002-0041-IMH

Morale Welfare and Recreation Activities--Financial Controls, Christopher's Club, Ft Carson, CO 1-Nov-01

A-2002-0042-IMT

U.S. Army Audit Agency Review of the Management Plan for the Fort Carson Directorate of Training Plans and Mobilization Commercial Activities Study 16-Oct-01

A-2002-0043-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Directorate of Public Works Commercial Activities Study, Ft Eustis, VA 29-Nov-01

A-2002-0044-FFB

Review of the Army Management Control Process for FY 01, Charleston Engineer District 2-Nov-01

A-2002-0045-IME Army Wastewater Systems 9-Nov-01

A-2002-0046-AML

Follow-up Review of Audit Recommendations in Audit Report: AA98-135 24-Oct-01

A-2002-0047-IMT

U.S. Army Audit Agency's Review of the Fort Lee Adjutant General Commercial Activities Study--Schedule of Adjustments 26-Nov-01

Page 180: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0048-FFB

Review of the Army Management Control Process for FY 01, South Atlantic Engineer Division 2-Nov-01

A-2002-0049-IMT

USAAA Review of the Management Study Received 27 August 2001 for the Readiness Business Center Training Division Commercial Activities Study 25-Oct-01

A-2002-0050-IMT

USAAA Review of the Cost Comparison Form Dated 27 August 2001 for the Readiness Business Center Training Division Commercial Activities Study 25-Oct-01

A-2002-0051-IMT

Schedule of Adjustments from Rev of the Cost Comparison Form Dtd 27 Aug 2001 for the Readiness Business Ctr Training Div Commercial Activities Study 25-Oct-01

A-2002-0052-AMA

Rechargeable Batteries for Communications and Electronic Systems 9-Nov-01

A-2002-0053-AMAFunding for Command and Control Systems 8-Nov-01

A-2002-0054-IMEAudit of Halon 1301 Projected Supply and Use 30-Oct-01

A-2002-0055-IMO

Follow-up Review of Audit Recommendations: AA 99-181, AA 99-188, AA 99-189, AA 99-224, AA 99-232, AA 99-362 29-Oct-01

A-2002-0056-IMT

U.S. Army Audit Agency Review of the Management Study for the Directorate of Information Management Commercial Activities Study 30-Oct-01

A-2002-0057-AMA

System Acceleration, Restructuring and Divestiture 31-Oct-01

A-2002-0058-FFB

Selected Aspects of FY 01 Budget and Execution, Network Infrastructure Services Agency, Pentagon 28-Dec-01

Page 181: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0060-AMM

Review of Methodology for Determining Contract Maintenance Requirements 31-Oct-01

A-2002-0061-FFB

Review of the Army Management Control Process for FY 01, Deputy Chief of Staff, G-2 2-Nov-01

A-2002-0062-IMT

U.S. Army Audit Agency Rev of the Management Study Received 27 August 2001 for the Information Technology Business Center Commercial Activities Study 1-Nov-01

A-2002-0063-IMT

U.S. Army Audit Agency Rev of the Cost Comparison Form Dtd 27 August 2001 for the Information Technology Business Center Commercial Activities Study 1-Nov-01

A-2002-0064-IMT

Schedule of Adjustments from Review of Cost Comparison Form Dtd 27 Aug 2001 for the Information Technology Business Center Commercial Activities Study 1-Nov-01

A-2002-0065-FFB

Review of the Army Management Control Process for FY 01, North Atlantic Engineer Division 2-Nov-01

A-2002-0066-AMA

Administering Service Contracts, U.S. Army Aviation & Missile Command 20-Nov-01

A-2002-0067-IME

Support for Non-medical Chemical and Biological Defensive Equipment, Aberdeen Proving Ground, MD 9-Nov-01

A-2002-0068-AMWInventory and Related Property Net 19-Nov-01

A-2002-0069-IMT

Review of the Performance Work Statement for the Training Support Center Commercial Activities Study 6-Nov-01

Page 182: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0070-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Directorate of Plans Training Security and Mobilization, U.S. Army Garrison, Alaska 7-Nov-01

A-2002-0071-IMT

Review of the Management Study Technical Performance Plan and Cost Comparison Form for the Training Support Center Commercial Activities Study 8-Nov-01

A-2002-0072-IMT

Review of the Management Study and Cost Comparison Form--Schedule of Adjustments for the Training Support Center Commercial Activities Study 8-Nov-01

A-2002-0073-FFP

Review of the Army Management Control Process for FY 01, 18th Medical Command 9-Nov-01

A-2002-0074-FFP

Review of the Army Management Control Process for FY 01 9-Nov-01

A-2002-0075-FFP

Review of the Army Management Control Process for FY 01 9-Nov-01

A-2002-0076-FFB

Review of the Army Management Control Process for FY 01, PEO-Air & Missile Defense 27-Nov-01

A-2002-0077-FFB

Review of the Army Management Control Process for FY 01, Chief, Army Reserve 9-Nov-01

A-2002-0078-FFB

Review of the Army Management Control Process for FY 01, PEO-Tactical Missiles 28-Nov-01

A-2002-0079-AMICash Controls for Special Mission Units 8-Nov-01

A-2002-0080-AMW

Accounts Receivable and Other Assets--Supply Management Army Wholesale Division--Army Working Capital Fund 26-Nov-01

Page 183: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0081-IMEAudit of Halon 1301 Projected Supply and Use 13-Nov-01

A-2002-0083-AML

Follow-up Review of Audit Recommendations in Audit Report AA98-250 15-Nov-01

A-2002-0084-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Fort Bliss Adjutant General Commercial Activities Study 15-Nov-01

A-2002-0085-IMT

USAAA Review of the Management Study and Cost Comparison Form for the Fort Huachuca Directorate of Information Management Commercial Activities Study 16-Nov-01

A-2002-0086-IMT

Schedule of Adjustments from Rev of the Management Study & Cost Comparison Form for the Fort Huachuca Dir of Information Mgmt Commercial Activities Study 16-Nov-01

A-2002-0087-FFB

Review of the Army Management Control Process for FY 01, Chief, Army Reserve 28-Nov-01

A-2002-0088-AML Workload Survey Logistics 27-Nov-01

A-2002-0089-IMHFollow-up Review of Audit Recommendations 20-Nov-01

A-2002-0090-IMT

U.S. Army Audit Agency Review of the Labor Costs for Commercial Activities Studies 21-Nov-01

A-2002-0091-IMT

U.S. Army Audit Agency's Review of the Cost Comparison Form for the Yakima Training Center Commercial Activities Study 26-Nov-01

A-2002-0092-FFP

Review of the Army Management Control Process for FY 01 30-Nov-01

Page 184: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0093-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Material Management Center Commercial Activities Study 29-Nov-01

A-2002-0094-AMW

Audit of Progress Payments - Supply Management Army Working Capital Fund 29-Nov-01

A-2002-0095-IMEAudit of Halon 1301 Projected Supply and Use 29-Nov-01

A-2002-0096-AMW

Accounts Receivable Bills--Supply Management Army Wholesale Division--Army Working Capital Fund 19-Dec-01

A-2002-0097-AMW

Audit of the Army Working Capital Fund FY 01 Accounts Payable 12-Dec-01

A-2002-0098-IMOEnergy Savings Performance Contracts 14-Dec-01

A-2002-0099-IME

The Army Installation Conservation Program--Outleasing 19-Dec-01

A-2002-0100-IMT

USAAA Rev of the Draft Performance Work Statements for Public Works Information Management Services and Installation Support Services CA Studies 11-Dec-01

A-2002-0101-AMM

Review Plans for Interactive Electronic Technical Manuals for the UH 60 Series Utility Helicopter 11-Dec-01

A-2002-0102-IMT

Review of the Updated Government Costs for the Red River Locks and Dams Commercial Activities Study 14-Dec-01

A-2002-0103-AMW Worker's Compensation 28-Jan-02

A-2002-0104-AMW

Audit of the Army Working Capital Fund FY 01 Accounts Payable 21-Dec-01

Page 185: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0105-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Information Technology Commercial Activities Study at Fort Drum 12-Dec-01

A-2002-0106-AML

Audit of Repair Parts Support to Initial Deploying Forces 19-Dec-01

A-2002-0107-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Directorate of Public Works Commercial Activities Study 18-Dec-01

A-2002-0108-IMT

Schedule of Adjustments from the Review of the Management Study & Cost Comparison Form for the Directorate of Public Works Commercial Activities Study 17-Dec-01

A-2002-0109-FFFCivilian Personnel Regionalization 10-Jan-02

A-2002-0110-IMHPlanning for the 2001 Army Ten-Miler 18-Dec-01

A-2002-0111-IMT

Review of the Reported Baseline Workyears for the Directorate of Public Works Commercial Activities Study at Fort Riley 18-Dec-01

A-2002-0112-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Directorate of Logistics and Engineering Commercial Activities Study 19-Dec-01

A-2002-0113-AMI

Follow-up Rev of Implemented Recommendations for U.S. Army Audit Agency Report AA00-33 Technology Transfers for Classified and Sensitive Information 19-Dec-01

A-2002-0114-AMA

Weapon System Requirements--Thermal Sight 23-Jan-02

Page 186: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0115-AMA

Weapon System Requirements--Gimbal Assembly 23-Jan-02

A-2002-0116-IMT

USAAA Review of the Management Study and Cost Comparison Form for the Directorate of Plans Training and Mobilization Commercial Activities Study 9-Jan-02

A-2002-0117-IMT

Schedule of Adjustments from the Review of the Management Study & Cost Comparison Form for the Directorate of Plans Training & Mobilization CA Study 9-Jan-02

A-2002-0118-AMISecure Environment Contracting 20-Dec-01

A-2002-0119-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Fort Lee Directorate of Information Management Commercial Activities Study 27-Dec-01

A-2002-0120-AMM

Review of Depot-Level Maintenance Workload Reporting for Fiscal Year 2001 PEO, Aviation 8-Jan-02

A-2002-0121-IMT

U.S. Army Audit Agency Review of the Final Decision Report for the Directorate of Public Works & Directorate of Logistics Commercial Activities Study 15-Jan-02

A-2002-0122-AMWWorker's Compensation--Army Working Capital Fund 24-Jan-02

A-2002-0123-FFB

Review of the Army Management Control Process (Fiscal Year 2001)--an Assessment for the Secretary of the Army 8-Jan-02

A-2002-0124-IMT

U.S. Army Audit Agency's Rev of the Government Management Study and Cost Comparison Form for the Garrison Support Services Commercial Activities Study 8-Jan-02

Page 187: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0125-IMHPharmaceutical Management 25-Jan-02

A-2002-0126-FFP

Army Audit Agency Response to Pacific Support Group Appeal Dated 13 December 2001 of the U.S. Army Garrison Hawaii DPW A-76 Study Tentative Decision 16-Jan-02

A-2002-0127-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 28-Jan-02

A-2002-0128-IME

Review of Funding for Installation Environmental Compliance 29-Jan-02

A-2002-0129-IME

Review of Funding for Installation Environmental Compliance 29-Jan-02

A-2002-0130-IME

Review of Funding for Installation Environmental Compliance 30-Jan-02

A-2002-0131-IME

Review of Funding for Installation Environmental Compliance 30-Jan-02

A-2002-0132-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 30-Jan-02

A-2002-0134-AMAReusing and Disposing of Missile Munitions Phase II 25-Feb-02

A-2002-0135-AML

Audit of Repair Parts Support to Initial Deploying Forces 8-Feb-02

A-2002-0136-IMT

Review of the Updated Government Costs for the Fort Jackson Adjutant General Commercial Activities Study 6-Feb-02

A-2002-0137-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Directorate of Corporate Information Commercial Activities Study 6-Feb-02

Page 188: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0138-IME

Overhead and General and Administrative Costs on Environmental Subcontracts 21-Feb-02

A-2002-0139-AMADivision Capstone Exercise Phase I 4-Oct-01

A-2002-0140-IMO

Review of Fair Market Value for Privatized Electrical Distribution Systems 29-Oct-01

A-2002-0141-IMOEstimated Retirement Benefits 9-Oct-01

A-2002-0142-FFP Contract Quality Assurance 11-Oct-01

A-2002-0143-FFB

Update on Activity-Based Management Efforts Within the Deputy Chief of Staff Strategic Planning and Analysis 23-Oct-01

A-2002-0144-FFBReview of Telecommunications Costs 17-Oct-01

A-2002-0145-FFF

Consulting Review of the Contractor Manpower-Reporting Requirement 17-Oct-01

A-2002-0146-IMUReview of Logistics Automation Support 17-Oct-01

A-2002-0147-IMOEstimated Retirement Benefits 23-Oct-01

A-2002-0148-IMOEstimated Retirement Benefits 23-Oct-01

A-2002-0149-IMOEstimated Retirement Benefits 24-Oct-01

A-2002-0150-FFF

Review of U.S. Army Cadet Command's Expenditures for FY 01 Audiovisual 1-Nov-01

A-2002-0151-AMA

Review of Risk Management Program Interim Armored Vehicle Program 31-Oct-01

A-2002-0152-IMOEstimated Retirement Benefits 31-Oct-01

A-2002-0153-IMOReview of Unit Relocation Cost Model 1-Nov-01

A-2002-0154-IMOEstimated Retirement Benefits 13-Nov-01

Page 189: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0155-IMO

Rev Certified Financial Statements for Year Ended 30 June 2000 for the Ogden City Local Redevelopment Authority's No-Cost Economic Devlpmt Conveyance 5-Nov-01

A-2002-0156-IMO

Review of Optimal Stationing of Army Forces Model 6-Nov-01

A-2002-0157-FFB

Review of Schedules of Revenues and Expenses for the 2001 Army Birthday Ball 20-Dec-01

A-2002-0158-FFBReview of Telecommunications Costs 6-Nov-01

A-2002-0159-IMO

Review of the Fort Ritchie Lease and Cooperation Agreement 7-Nov-01

A-2002-0160-IMOReview of the Installation Status Report 15-Nov-01

A-2002-0161-IMOReview of the Installation Status Report 19-Nov-01

A-2002-0162-AMM

Review of Repair of Components (Class IX Items) 27-Nov-01

A-2002-0163-IMO

Review of Army Family Housing Maintenance Contracts 29-Nov-01

A-2002-0164-IMOEstimated Retirement Benefits 3-Dec-01

A-2002-0165-IMOEstimated Retirement Benefits 29-Nov-01

A-2002-0166-IMOEstimated Retirement Benefits 3-Dec-01

A-2002-0167-IME

Review of Back Pay Calculations for Asbestos Arbitration 4-Dec-01

A-2002-0168-IMOEstimated Retirement Benefits 3-Dec-01

A-2002-0169-IMOEstimated Retirement Benefits 3-Dec-01

A-2002-0170-IMOEstimated Retirement Benefits 3-Dec-01

A-2002-0171-IMO

Review of Mass Transportation Fringe Benefit Program Outside the National Capital Region 4-Dec-01

A-2002-0172-IMUReview of Personal Property Shipments 11-Dec-01

Page 190: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0173-IMOEstimated Retirement Benefits 12-Dec-01

A-2002-0174-AMAReview of Secretariat Contracting 14-Jan-02

A-2002-0175-IMOEstimated Retirement Benefits 27-Dec-01

A-2002-0176-IMOEstimated Retirement Benefits 17-Dec-01

A-2002-0177-IMU

Consulting Review of Baumholder Fitness Center Passes 18-Dec-01

A-2002-0178-AMA

Review of Protecting Competition Sensitive Data -Family of Medium Tactical Vehicles 9-Jan-02

A-2002-0179-IMOEstimated Retirement Benefits 28-Dec-01

A-2002-0180-IME

Review of Aviation Maintenance Contract Services 14-Jan-02

A-2002-0181-IMOEstimated Retirement Benefits 10-Jan-02

A-2002-0182-IMOEstimated Retirement Benefits 15-Jan-02

A-2002-0183-AMADivision Capstone Exercise Phase II 24-Jan-02

A-2002-0184-IMT

U.S. Army Audit Agency's Review of Contract Administration for the Contract for Operation of the Training Service Center 22-Jan-02

A-2002-0185-IMH

Consulting Review of Billing Practices at Uniform Business Office 13-Feb-02

A-2002-0186-IMH

Consulting Review of Billing Practices at Uniform Business Office 31-Jan-02

A-2002-0187-IMOEstimated Retirement Benefits 28-Jan-02

A-2002-0188-IMOEstimated Retirement Benefits 28-Jan-02

A-2002-0189-IMOEstimated Retirement Benefits 28-Jan-02

A-2002-0190-IMO

Review of Requirements for Furniture Fixtures and Equipment-Military Construction Projects for Library and Multipurpose Academic Building 31-Jan-02

Page 191: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0191-IMT

U.S. Army Audit Agency Review of Contract Administration for the Oskosh Vehicle Field Service Representative Task Order DAKF11-99-D0013 12-Feb-02

A-2002-0192-IMOEstimated Retirement Benefits 6-Feb-02

A-2002-0193-IMOEstimated Retirement Benefits 7-Feb-02

A-2002-0194-IMOEstimated Retirement Benefits 12-Feb-02

A-2002-0195-IMOEstimated Retirement Benefits 13-Feb-02

A-2002-0196-IMOEstimated Retirement Benefits 13-Feb-02

A-2002-0197-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Fort Hamilton Whole Base Commercial Activities Study (Directorate of Public Works) 19-Feb-02

A-2002-0198-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Fort Hamilton Whole Base Commercial Activities Study (Military Personnel Directorate) 19-Feb-02

A-2002-0199-FFG

Army Management Staff College, Office of Education Services, Fort Belvoir, Virginia 6-Mar-02

A-2002-0200-IMT

Review of Most Efficient Organization and Government Costs for the Commercial Activities Study of the Fort Campbell Readiness Business Center 21-Feb-02

A-2002-0201-IMT

Consulting Review of Dining Facility Attendant Service Contract 12-Mar-02

Page 192: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0202-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Directorate of Plans, Training, Security and Mobilization Commercial Activities Study 20-Feb-02

A-2002-0203-IMT

Schedule of Adjustments for the Review of the Management Study and Cost Comparison Form for the Directorate of Plans, Training, Security and Mobilization Commercial Activities Study 20-Feb-02

A-2002-0204-IMO

Review of the Mass Transportation Fringe Benefit Program Outside the National Capital Region 20-Feb-02

A-2002-0205-AMM Army Oil Analysis Program 6-Mar-02

A-2002-0206-IMH

Consulting Review of Billing Practices at Uniform Business Office, Walter Reed Army Medical Center, Washington, DC 21-Feb-02

A-2002-0207-IMOEstimated Retirement Benefits 20-Feb-02

A-2002-0208-IMOReview of Installation Status Report 20-Feb-02

A-2002-0209-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Directorate of Public Works Commercial Activities Study 21-Feb-02

A-2002-0210-AMAWholesale Level Spare Parts with Zero Balances 12-Mar-02

A-2002-0211-AMITechnology Transfers, Secretary of the Army 21-Feb-02

A-2002-0212-IMOEstimated Retirement Benefits 21-Feb-02

A-2002-0213-AMMMaintenance Management Systems 11-Mar-02

Page 193: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0214-IMT

U.S. Army Audit Agency Review of Updated Cost Comparison Form for the Fort Lee Adjutant General Commercial Activities Study 21-Feb-02

A-2002-0215-FFB

Review of Workload Changes from Implementing the Defense Travel System 24-May-02

A-2002-0216-FFP

Consulting Review of Billing Practices at Uniform Business Office 25-Feb-02

A-2002-0217-FFB

Review of the Army Management Control Process for FY 01, U.S. Army Corps of Engineers 9-Apr-02

A-2002-0218-FFB

Review of the Army Management Control Process for FY 01, Office of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) 9-Apr-02

A-2002-0219-IMH

Consulting Review of Billing Practices at Uniform Business Office 15-Feb-02

A-2002-0220-AMW

Review of Lessons Learned (Program Objective Memorandum 98-03 Efficiencies) 14-Feb-02

A-2002-0221-IMERemedial Activities at the St. Louis Area Sites 19-Feb-02

A-2002-0222-AML

Audit of Repair Parts Support to Initial Deploying Forces, 82nd Airborne Division 12-Feb-02

A-2002-0223-FFGAudit of Civilian Pay-Personnel Interface 12-Feb-02

A-2002-0224-AMM

Staffing and Capacity of Tables of Distribution and Allowances Maintenance Activities, U.S. Training and Doctrine Command 18-Mar-02

A-2002-0225-FFB

Cost Management/Activity-Based Costing in the Army Medical Research Institute of Infectious Diseases 13-Feb-02

A-2002-0226-FFB

Review of the Army Management Control Process for FY 01, U.S. Army Corps of Engineers 31-Jan-02

Page 194: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0227-FFB

Review of the Army Management Control Process for FY 01, Office of the Assistant Secretary of the Army (Acquisition, Logistics, & Technology) 31-Jan-02

A-2002-0228-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Rock Island Arsenal Base Operations Commercial Activities Study at Rock Island Arsenal, Illinois 8-Feb-02

A-2002-0229-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Directorate of Logistics Commercial Activities Study 7-Feb-02

A-2002-0230-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Directorate of Logistics/Directorate of Public Works Commercial Activities Study at Fort Leavenworth, Kansas 13-Feb-02

A-2002-0231-IMOEstimated Retirement Benefits 13-Feb-02

A-2002-0232-IME

Follow-on Information for Audit of Overhead, and General and Administrative Costs on Environmental Subcontracts 14-Feb-02

A-2002-0233-AMI

Financial Management of Special Access Programs - JLENS Project Office 5-Mar-02

A-2002-0234-AMI

Technology Transfers of Classified and Sensitive Information, U.S. Army Special Operations Command, Fort Bragg, North Carolina 25-Feb-02

A-2002-0235-IMOEstimated Retirement Benefits 4-Mar-02

A-2002-0236-AMARisk Management, Interim Armored Vehicle Program 6-Mar-02

A-2002-0237-IMOEstimated Retirement Benefits 5-Mar-02

Page 195: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0238-FFG

Audit of The Army's FY 01 General Fund Financial Statements-General Equipment, U.S. Army Materiel Command 13-Mar-02

A-2002-0239-IMOEstimated Retirement Benefits 6-Mar-02

A-2002-0240-IMOEstimated Retirement Benefits 7-Mar-02

A-2002-0241-IMOEstimated Retirement Benefits 7-Mar-02

A-2002-0242-AMM

Review of Depot-Level Maintenance Workload Reporting for Fiscal Year 2001 FORSCOM 11-Mar-02

A-2002-0243-AMM

Review of Depot-Level Maintenance Workload Reporting for Fiscal Year 2001 NGB 14-Mar-02

A-2002-0244-AMM

Review of Depot-Level Maintenance Workload Reporting for Fiscal Year 2001 AMC 10-Apr-02

A-2002-0245-FFP

Space Utilization of Classroom and Training Facilities 5-Apr-02

A-2002-0246-FFC

Fiscal Year 2001 Financial Statements, U.S. Army Corps of Engineers, Civil Works 8-Feb-02

A-2002-0247-IMHFollow-up Review of Audit Recommendations 11-Mar-02

A-2002-0248-FFC

Audit of Corps of Engineers Financial Management System 13-Mar-02

A-2002-0249-FFC

Audit of Corps of Engineers Financial Management System 13-Mar-02

A-2002-0250-FFC

Audit of Corps of Engineers Financial Management System 13-Mar-02

A-2002-0251-FFC

Audit of Corps of Engineers Financial Management System 13-Mar-02

A-2002-0252-IMOEstimated Retirement Benefits 12-Mar-02

A-2002-0253-FFF

U.S. Army's Audit Agency Review of the Development of the Force Management System 19-Apr-02

Page 196: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0254-FFG

Army's General Fund Principal Financial Statements for Fiscal Year 2001, Accuracy of Real Property Data Reported in the Real Property Systems 22-Apr-02

A-2002-0255-AMM

U.S. Army Aviation Hydraulic System Contamination Program 26-Mar-02

A-2002-0256-AMAReview of Program Executive Office Tax 14-Mar-02

A-2002-0257-IMT

Updated Government Costs for the Fort Jackson Adjutant General Commercial Activities Study 14-Mar-02

A-2002-0258-IMT

Updated Government Costs for the Fort Jackson Adjutant General Commercial Activities Study--Schedule of Adjustments 14-Mar-02

A-2002-0259-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Fort Campbell Public Works Business Center 18-Mar-02

A-2002-0260-AMLCauses for Financial Discrepancies 29-Mar-02

A-2002-0262-AML

Global Combat Support System-Army Program Lessons Learned 2-Apr-02

A-2002-0263-PMO

Quality Assurance Report on U.S. Army Audits Agency's Fiscal Year 01 Follow-up Review of Audit Recommendations 15-Mar-02

A-2002-0265-IMT

Lessons Learned in the Review of the Management Study and In-house Cost Estimate for the Fort Campbell Readiness Business Center 11-Apr-02

A-2002-0266-AMW

Depot Maintenance Procurement Expense Cycle Memorandum, Army Working Capital Fund 11-Apr-02

Page 197: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0267-IMT

Review of the Methodology for Calculating the Military Buyback for Cost Competition Studies 20-Mar-02

A-2002-0268-IMOEstimated Retirement Benefits 19-Mar-02

A-2002-0269-IMOEstimated Retirement Benefits 19-Mar-02

A-2002-0270-IMOEstimated Retirement Benefits 19-Mar-02

A-2002-0271-PMO

Quality Assurance Report on Review of Establishing the Reliability of Computer Data 19-Mar-02

A-2002-0272-FFC

Construction in Progress Cycle--Property, Plant, and Equipment 3-Sep-02

A-2002-0273-FFC

Fiscal Year 2001 Real Property Cycle--Property, Plant, and Equipment 3-Sep-02

A-2002-0274-FFB

Secretary of Defense Executive Dining Facility Fund FY 01 Financial Statements 25-Apr-02

A-2002-0275-FFB

Suggestions for Management's Consideration--Audit of the Secretary of Defense Executive Dining Facility Fund Financial Statements 10-May-02

A-2002-0276-FFB

The Army Executive Dining Facility Fund FY 01 Financial Statements 12-Apr-02

A-2002-0277-FFB

Suggestions for Management Consideration--Audit of the Army Executive Dining Facility Fund FY 01 Financial Statements 10-May-02

A-2002-0278-IMT

Review of the Updated Government Costs for the Fort Benning Adjutant General Commercial Activities Study 22-Mar-02

A-2002-0279-IMT

U.S. Army Audit Agency Review of the Management Study Team Response to the Source Selection Authority 22-Mar-02

Page 198: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0280-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Redstone Arsenal Support Activity 28-Mar-02

A-2002-0281-IMOEstimated Retirement Benefits 21-Mar-02

A-2002-0282-IMOEstimated Retirement Benefits 22-Mar-02

A-2002-0283-PMOQuality Assurance Review of Consulting Engagements 25-Mar-02

A-2002-0284-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the U.S. Military Academy Custodial Services Commercial Activities Study 26-Mar-02

A-2002-0285-IMU

Review of Fiscal Stewardship Over Funds Provided to U.S. Army Materiel Command for Support of Contingency Operations 26-Mar-02

A-2002-0286-AMI

Financial Management of Special Access Program - Project Manager for Information Warfare 25-Mar-02

A-2002-0287-IMOEstimated Retirement Benefits 26-Mar-02

A-2002-0288-IMO

Energy Savings Performance Contracts, U.S. Army Military District of Washington, Ft. McNair 24-Jul-02

A-2002-0289-IMOEnergy Savings Performance Contracts 23-May-02

A-2002-0290-IMOEstimated Retirement Benefits 26-Mar-02

A-2002-0291-IMT

Audit of the Updated Government Costs for the Adjutant General Commercial Activities Study 28-Mar-02

A-2002-0292-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 1-Apr-02

Page 199: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0293-IMO

Review of the Treatment of Cost Accounting Standards in Privatized Utilities Contracts 13-May-02

A-2002-0294-IMOEstimated Retirement Benefits 28-Mar-02

A-2002-0295-IMUFamily Housing Leasing-Data Analysis 1-Apr-02

A-2002-0297-IMOEstimated Retirement Benefits 1-Apr-02

A-2002-0298-IMOEstimated Retirement Benefits 1-Apr-02

A-2002-0299-IME

Controls Over Unit Morale, Welfare and Recreation Funds 396th Combat Support Hospital 1-Apr-02

A-2002-0300-IMT

Review of the Revised Technical Performance Plan for the Public Works Business Center Commercial Activities Study 1-Apr-02

A-2002-0301-IMOEstimated Retirement Benefits 2-Apr-02

A-2002-0302-IMOEstimated Retirement Benefits 2-Apr-02

A-2002-0303-IMOEstimated Retirement Benefits 2-Apr-02

A-2002-0304-AMW

Selected Internal Controls Over Inventory, Army Working Capital Fund 19-Apr-02

A-2002-0305-IMHFinancial Controls--Rod and Gun Club 17-Apr-02

A-2002-0306-FFP

Morale, Welfare and Recreation Use of Appropriated Funds 24-Apr-02

A-2002-0307-FFPAppeals Board Response Number 2 10-Apr-02

A-2002-0308-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Tobyhanna Public Works and Information Technology Commercial Activities Study 8-Apr-02

A-2002-0309-IMT

U.S. Army Audit Agency Post-Most Efficient Organization Review of the Administrative and Test Support Services Commercial Activities Study 10-Apr-02

Page 200: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0311-IMT

U.S. Army Audit Agency Review of the Updated Cost Comparison Form Dated 13 March 2002 for the Readiness Business Center, Training Division Commercial Activities Study 8-Apr-02

A-2002-0312-IMT

Schedule of Adjustments From the Review of the Updated Cost Comparison Form Dated 13 March 2002 for the Readiness Business Center, Training Division Commercial Activities Study 8-Apr-02

A-2002-0313-IMUNonappropriated Fund Payroll 26-Apr-02

A-2002-0314-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Director of Information Management Commercial Activities Study 25-Apr-02

A-2002-0315-IMT

Review of the Updated Government Costs for the Fort Riley Directorate of Information Management Commercial Activities Study 10-Apr-02

A-2002-0316-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Adjutant General Commercial Activities Study 12-Apr-02

A-2002-0317-IMT

Review of the Updated Government Costs for the Directorate of Plans, Training, Security and Mobilization Commercial Activities Study 10-Apr-02

A-2002-0318-IMOEstimated Retirement Benefits 10-Apr-02

A-2002-0319-IMT

Review of the Updated Government Costs for the Fort Gordon Adjutant General Commercial Activities Study 17-Apr-02

Page 201: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0320-IMT

Review of the Management Study Team Response to the Source Selection Authority 12-Apr-02

A-2002-0321-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Garrison Support Services Commercial Activities Study, Picatinny Arsenal, New Jersey 16-Apr-02

A-2002-0322-AMM

Review of Depot-Level Maintenance Workload Reporting for FY 00 and FY 01 CECOM 12-Apr-02

A-2002-0323-IMOEstimated Retirement Benefits 12-Apr-02

A-2002-0324-IMOEstimated Retirement Benefits 12-Apr-02

A-2002-0325-IMOEstimated Retirement Benefits 12-Apr-02

A-2002-0326-IMOEstimated Retirement Benefits 12-Apr-02

A-2002-0327-IMT

U.S. Army Audit Agency Review of the Updated Cost Comparison Form Received 8 April 2002 for the Public Works Business Center Commercial Activities Study 16-Apr-02

A-2002-0328-IMT

Schedule of Adjustments From the Review of the Updated Cost Comparison Form Received 8 April 2002 for the Public Works Business Center Commercial Activities Study 16-Apr-02

A-2002-0329-IMOEstimated Retirement Benefits 16-Apr-02

A-2002-0330-IMOEstimated Retirement Benefits 16-Apr-02

A-2002-0331-IMT

Review of the Initial Draft Management Study for the Fort Knox Directorate of Information Management Commercial Activities Study 23-Apr-02

A-2002-0332-IMH

Audit of Contract Administration of Service Contracts 30-Oct-01

Page 202: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0333-AMLLogistics Integrated Database 7-May-02

A-2002-0334-AMA

Benchmarking Review Report, Audit of Planning and Preparation for Army Transformation Experiment 2002 18-Apr-02

A-2002-0335-IMU

Review of Nonappropriated Fund Payroll--Sunday Premium Pay 13-Nov-01

A-2002-0336-IME

Audit of Administering Service Contracts--Contract DAKF48-99-C-0005 (Logistics Support Services-Central Issue Facility) 15-Oct-01

A-2002-0337-IME

Audit of Administering Service Contracts--Contract DAKF48-98-D-0006 (Transportation Motor Pool) 11-Oct-01

A-2002-0338-IME

Audit of Administering Service Contracts--Contract DAKF48-98-D-0008 (Installation Custodial Services) 11-Oct-01

A-2002-0339-IME

Audit of Administering Service Contracts--Contract DAKF48-00-D-0008 (Training Support Center) 11-Oct-01

A-2002-0340-IMT

Review of the Updated Government Costs for the Fort McCoy Directorate of Support Services Commercial Activities Study 17-Apr-02

A-2002-0341-IMH

Commercial Audit Solicitation NAFBA1-02-R-0024 18-Apr-02

A-2002-0342-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Fort Hamilton Whole Base Commercial Activities Study (Directorate of Public Works) 19-Apr-02

Page 203: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0343-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Fort Hamilton Whole Base Commercial Activities Study (Military Personnel Directorate) 19-Apr-02

A-2002-0344-FFC

U.S. Army Corps of Engineers FY 01 Financial Statements, Civil Works (Accounts Payable--Progress Payments) 23-Aug-02

A-2002-0345-FFC

U.S. Army Corps of Engineers FY 01 Financial Statements, Civil Works (Accounts Payable--Accruals) 23-Aug-02

A-2002-0346-FFC

U.S. Army Corps of Engineers FY 01 Financial Statements, Civil Works (Payroll Cycle) 23-Aug-02

A-2002-0347-FFC

U.S. Army Corps of Engineers FY 01 Financial Statements, Civil Works (Accounts Payable--Credit Card Purchases) 23-Aug-02

A-2002-0348-FFC

U.S. Army Corps of Engineers FY 01 Financial Statements, Civil Works (Compilation and Adjustments) 23-Aug-02

A-2002-0349-IMT

U.S. Army Audit Agency Review of the Updated Government Costs for the Fort Stewart Directorate of Readiness Commercial Activities Study 22-Apr-02

A-2002-0350-IMT

U.S. Army Audit Agency's Review of the Management Study Team's Responses to the Source Selection Authority's Questions, Directorate of Readiness Commercial Activities Study 22-Apr-02

A-2002-0351-IMU

Review of the 221st Base Support Battalion Contract for Vacant Quarters Maintenance 22-Apr-02

Page 204: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0352-FFG

Audit of the Supply Property Module Software Qualification and Acceptance Tests 14-May-02

A-2002-0353-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Fort Belvoir Garrison Commercial Activities Study 22-Apr-02

A-2002-0354-AMM

Depot-Level Maintenance Workload Reporting for FY 00 and FY 01 PEO IEWS 22-Apr-02

A-2002-0355-AMM

Depot-Level Maintenance Workload Reporting for Fiscal Year 2001 22-Apr-02

A-2002-0356-IMT

Review of the Initial Draft Management Study for the Fort Knox Adjutant General Commercial Activities Study 23-Apr-02

A-2002-0357-IMULaundry and Dry Cleaning Services 10-May-02

A-2002-0358-IMEAudit of Biological Defense Systems and Capabilities 24-Apr-02

A-2002-0359-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Fort Lee Adjutant General Commercial Activities Study 23-Apr-02

A-2002-0360-IMT

U.S. Army Audit Agency Review of the Government Management Study and Cost Comparison Form for the Whole Base Commercial Activities Study 3-May-02

A-2002-0361-AMWGovernment Purchase Cards 13-May-02

A-2002-0362-IMT

Review of the Updated Government Costs for the Fort Rucker Adjutant General Commercial Activities Study 1-May-02

A-2002-0363-IMOEstimated Retirement Benefits 29-Apr-02

A-2002-0364-IMOEstimated Retirement Benefits 29-Apr-02

Page 205: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0365-AMW

Compilation of Army Working Capital Fund FY 01 1307 Accounting Report 13-May-02

A-2002-0366-AMI

Reimbursements for Materiel Provided Through the Army Sensitive Support Program, Technology Management Office 6-May-02

A-2002-0367-AMWMateriel Returns, Army Working Capital Fund 22-May-02

A-2002-0368-IMT

U.S. Army Audit Agency Review of the Waste Services Contract at the U.S. Army Transportation Center and Fort Eustis 2-May-02

A-2002-0369-IMT

U.S. Army Audit Agency's Review of the Revised Management Study and Technical Performance Plan for the Fort Polk Whole Base Commercial Activities Study 8-May-02

A-2002-0370-IMT

Review of the Updated Government Costs for the Fort Polk Whole Base Commercial Activities Study 8-May-02

A-2002-0371-IMT

U.S. Army Audit Agency Independent Review of the Performance Work Statement for the Directorate of Information Technology Commercial Activities Study 2-May-02

A-2002-0372-IMT

Review of the Updated Government Costs for the Adjutant General Commercial Activities Study 8-May-02

A-2002-0373-IMT

Review of the Updated Government Costs for the Fort Rucker Directorate of Information Management Commercial Activities Study 8-May-02

A-2002-0374-FFZ

Attestation of Savings Related to Army Business Initiative Council Initiative: MP-A-02-01 (Army Prison System) 6-May-02

Page 206: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0375-FFZ

Attestation of Savings Related to Army Business Initiative Council Initiative: RM-A-02-04 (Reserve Component Reimbursement Authority) 6-May-02

A-2002-0376-AMWAccounting for Real Property 22-May-02

A-2002-0377-IMU

Controls Over Morale, Welfare and Recreation Equipment Downrange (Bosnia and Kosovo) 17-May-02

A-2002-0378-IMOEstimated Retirement Benefits 7-May-02

A-2002-0379-FFGAudit of Identification of Soldiers in Deserter Status 11-Jun-02

A-2002-0380-FFZ

Attestation of Savings Related to Army Business Initiative Council Initiative: IT-A-02-01 (Elimination of Pre-Printed Letterhead) 7-May-02

A-2002-0381-IME Transportation Motor Pool 17-May-02

A-2002-0382-IMEManagement of Chemical Stockpile Sites 24-May-02

A-2002-0383-IMT

U.S. Army Audit Agency Review of the Updated Management Study Received 6 May 2002 and the Cost Comparison Form Revised 7 May 2002 for the Directorate of Public Works Commercial Activities Study 8-May-02

A-2002-0384-IMT

Schedule of Adjustments From the Review of the Updated Cost Comparison Form Revised 7 May 2002 for the Directorate of Public Works Commercial Activities Study 8-May-02

A-2002-0385-IMU

Review of Non-tactical Vehicle Management Options 8-May-02

A-2002-0386-IMOEstimated Retirement Benefits 8-May-02

A-2002-0387-IMOEstimated Retirement Benefits 8-May-02

A-2002-0388-IMOEstimated Retirement Benefits 8-May-02

Page 207: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0389-FFZ

Attestation of Savings Related to Army Business Initiative Council Initiative: IT-A-02-04 (Automated Systems Integration Management Intelligence Database) 8-May-02

A-2002-0390-IMT

U.S. Army Audit Agency Review of the Management Study and Cost Comparison Form for the Directorate of Public Works Commercial Activities Study 10-May-02

A-2002-0391-IMT

Schedule of Adjustments for the Review of the Management Study and Cost Comparison Form for the Directorate of Public Works Commercial Activities Study 10-May-02

A-2002-0392-IMT

Review of the Battelle Service Contract for Fort Leonard Wood, Missouri 9-May-02

A-2002-0393-AMM

Review of Depot-Level Maintenance Workload Reporting for FY 02 Through FY 06 13-May-02

A-2002-0394-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Directorate of Information 28-May-02

A-2002-0395-IMOElectrical Distribution System Contract 23-May-02

A-2002-0396-AMA

Joint Venture Directorate Reorganization Report, Audit of Planning and Preparation for Army Transformation Experiment 2002 14-May-02

A-2002-0397-FFP

DOD/Veterans Affairs Joint Physical Examination Program 28-Jun-02

A-2002-0398-IMOEstimated Retirement Benefits 15-May-02

A-2002-0399-IMOEstimated Retirement Benefits 15-May-02

A-2002-0400-IMEArmy Acquisition Pollution Prevention Support Office 16-May-02

Page 208: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0401-IMO

Review of Mass Transportation Fringe Benefit Program Outside the National Capital Region 20-May-02

A-2002-0402-AMM

Review of Depot-Level Maintenance Reporting for FY 02 Through FY 06 20-May-02

A-2002-0403-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Directorate of Public Works Commercial Activities Study 23-May-02

A-2002-0404-AMICover Support Program, Site D 16-May-02

A-2002-0405-FFG

Audit of the Planning Resource Infrastructure for Development and Evaluation for Financial Management System Compliance 28-May-02

A-2002-0406-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Letterkenny Army Depot Base Operations Commercial Activities Study 20-May-02

A-2002-0407-IMT

U.S. Army Audits Agency's Review of the Government Technical Performance Plan for the Letterkenny Army Depot Base Operations Commercial Activities Study 20-May-02

A-2002-0408-IMU

Audit of Budgetary Functions in the 7th Army Training Command and 100th Area Support Group 20-May-02

A-2002-0409-IMO

Review of the Certified Financial Statements for the Year Ended June 30, 2001 for the Ogden City Local Redevelopment Authority's No-Cost Economic Development Conveyance 20-May-02

A-2002-0410-IMOEstimated Retirement Benefits 20-May-02

Page 209: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0411-FFC

Audit of the U.S. Army Corps of Engineers, Civil Works Accounts Receivable-Jacksonville District 4-Sep-02

A-2002-0412-FFC

Audit of the U.S. Army Corps of Engineers, Civil Works Accounts Receivable-Huntington District 4-Sep-02

A-2002-0413-FFC

Audit of the U.S. Army Corps of Engineers, Civil Works Accounts Receivable-Little Rock District 4-Sep-02

A-2002-0414-FFC

Audit of the U.S. Army Corps of Engineers, Civil Works Accounts Receivable-Omaha District 4-Sep-02

A-2002-0415-FFC

Audit of the U.S. Army Corps of Engineers, Civil Works Accounts Receivable-Philadelphia District 4-Sep-02

A-2002-0416-FFC

Audit of the U.S. Army Corps of Engineers, Civil Works Accounts Receivable-Sacramento District 4-Sep-02

A-2002-0417-FFC

Audit of the U.S. Army Corps of Engineers, Civil Works Accounts Receivable-Savannah District 4-Sep-02

A-2002-0418-AMW

Accounts Payable, Corpus Christi Army Depot, Army Working Capital Fund 10-Jun-02

A-2002-0419-IMOEstimated Retirement Benefits 21-May-02

A-2002-0420-IMOEstimated Retirement Benefits 21-May-02

A-2002-0421-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Adjutant General, Military Human Resources Commercial Activities Study 23-May-02

A-2002-0422-AMIArmy Foreign Language Program 12-Jun-02

Page 210: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0423-AMLRepair Parts Support to Alert Forces 7-Jun-02

A-2002-0424-IMT

U.S. Army Audit Agency Independent Review of the Performance Work Statement for the Directorate of Information Technology Commercial Activities Study 23-May-02

A-2002-0425-IMT

Review of the Updated Government Costs for the Fort Gordon Directorate of Information Management Commercial Activities Study 29-May-02

A-2002-0426-IMOReview of Installation Status Report 23-May-02

A-2002-0427-FFGAudit of Soldier Out-of-Service Debt Avoidance 3-Jul-02

A-2002-0428-AMM

Review of Depot-Level Maintenance Workload Reporting for Fiscal Year 2001 and Outyears 23-May-02

A-2002-0429-IMT

U.S. Army Audit Agency Review of the Management Study for the Directorate of Information Management Commercial Activities Study 28-May-02

A-2002-0430-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 28-May-02

A-2002-0431-IMT

Review of the Management Study and Cost Comparison Form for Directorate of Information Management Commercial Activities Study 29-May-02

A-2002-0432-IMT

Schedule of Adjustments From the Review of the Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 29-May-02

Page 211: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0433-IMU

Audit of Budgetary Functions in the 21st Theater Support Command 29-May-02

A-2002-0434-IMT

U.S. Army Audit Agency Review of the Updated Government Costs for the Adjutant General Commercial Activities Study 29-May-02

A-2002-0435-IMOEstimated Retirement Benefits 29-May-02

A-2002-0436-IMO

Review of the Delivery Order Proposal for the Energy Savings Performance Contract 30-May-02

A-2002-0437-IMT

Audit of Federal Oversight Over the Army National Guard, California Army National Guard 5-Jun-02

A-2002-0438-IMOEstimated Retirement Benefits 30-May-02

A-2002-0439-IMOEstimated Retirement Benefits 30-May-02

A-2002-0440-AMIEarned Value Management System 31-May-02

A-2002-0441-FFP

Trucks Refurbished by Depot Support Activity Far East for Distribution to Foreign Countries 18-Jun-02

A-2002-0442-IMT

Congressional Request--Review of Fort Riley Directorate of Logistics Direct and General Support Maintenance 3-Jun-02

A-2002-0443-AMAExecuting The Army''s Recapitalization Program 20-Jun-02

A-2002-0444-AMAFormulating the Army's Recapitalization Program 30-Aug-02

A-2002-0445-AMWAccounting for Real and Personal Property 1-Jul-02

A-2002-0446-AMW

Reduction of the Army Working Capital Fund FY 01 Cash Balance 24-Jun-02

A-2002-0447-FFG

Review of Environmental and Legal Liabilities Submitted Through the Manual Data Collection Process 27-Jun-02

A-2002-0448-FFC

Fiscal Year 2001 Personal Property Cycle--Property, Plant, and Equipment 3-Sep-02

Page 212: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0449-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the Fort Detrick Garrison Commercial Activities Study 7-Jun-02

A-2002-0450-IMT

Review of the Management Study and Cost Comparison Form for the 58th Transportation Battalion Commercial Activities Study 6-Jun-02

A-2002-0451-IMT

Schedule of Adjustments From the Review of the Cost Comparison Form for the 58th Transportation Battalion Commercial Activities Study 6-Jun-02

A-2002-0452-FFG

Military Pay and Benefits: The Army's Contribution to the Military Retirement Trust Fund 14-Aug-02

A-2002-0453-AMM

Review of Depot-Level Maintenance Workload Reporting for FY 02 Through FY 06 11-Jun-02

A-2002-0454-AMM

Review of Depot-Level Maintenance Reporting for FY 02 Through FY 06 11-Jun-02

A-2002-0455-AMM

Review of Depot-Level Maintenance Workload Reporting for FY 00 and FY 01 11-Jun-02

A-2002-0456-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the United States Military Academy Logistics Support Services Commercial Activities Study 17-Jun-02

A-2002-0457-IMT

U.S. Army Audit Agency Review of the Updated Government Costs for the Directorate of Information Management Commercial Activities Study 12-Jun-02

A-2002-0458-IMUReview of the Resource Management Function 12-Jul-02

Page 213: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0459-IMO

Review of the Financial Statements for the Year Ended 30 June 2000 for the Fort Pickett Local Redevelopment Authority's No-Cost Economic Development Conveyance 13-Jun-02

A-2002-0460-IMUFollowup Audit of the Reserve Storage Activity 28-Jun-02

A-2002-0461-FFFComputer-Based Training for Information Technology 3-Jul-02

A-2002-0462-IMT

Review of the Updated Government Costs for the Directorate of Information Management Commercial Activities Study as Directed by the Administrative Appeals Board 13-Jun-02

A-2002-0463-IMOEstimated Retirement Benefits 13-Jun-02

A-2002-0464-AMA

Test and Evaluation - Nuclear, Biological and Chemical Systems 3-Jul-02

A-2002-0465-AMW

Accounts Payable, Depot Maintenance and Ordnance Activity Groups, Army Working Capital Fund 2-Jul-02

A-2002-0466-FFGAudit of Identification of Soldiers in Deserter Status 3-Jul-02

A-2002-0468-IMT

Review of the Management Study and Cost Comparison Form for the Directorate of Information Management Commercial Activities Study 24-Jun-02

A-2002-0470-IMOEstimated Retirement Benefits 19-Jun-02

A-2002-0471-IMOEstimated Retirement Benefits 19-Jun-02

A-2002-0472-IMOEstimated Retirement Benefits 19-Jun-02

A-2002-0473-IMT

Review of the Government Costs for the Information Technology Commercial Activities Study 19-Jun-02

A-2002-0474-IMOEstimated Retirement Benefits 20-Jun-02

Page 214: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0475-FFFControls Over Operating Tempo Funds 15-Jul-02

A-2002-0476-IMU

Ammunition Accountability--Reserve Storage Activity, Miesau 12-Jul-02

A-2002-0477-IMEAdministering Service Contracts 8-Jul-02

A-2002-0478-IMOEstimated Retirement Benefits 25-Jun-02

A-2002-0479-FFBReview of Telecommunications Costs 28-Jun-02

A-2002-0480-IMT

U.S. Army Audit Agency Review of Contract Administration for the Command Maintenance Evaluation Team Task Order 27-Jun-02

A-2002-0482-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Redstone Arsenal Support Activity 27-Jun-02

A-2002-0483-IMT

U.S. Army Audit Agency Review of the Fort Knox Unit Maintenance Performance Work Statement Dated 8 May 2002 27-Jun-02

A-2002-0484-IMU

Execution of Morale, Welfare and Recreation Funding for Family Support Programs 18-Jul-02

A-2002-0485-FFG

Follow-up Issues Reported in the Audit of the Supply Property Module Software Qualification and Acceptance Tests 3-Jul-02

A-2002-0486-IME

Unit-Level Training for Chemical and Biological Defense 10-Jul-02

A-2002-0487-IMOEstimated Retirement Benefits 1-Jul-02

A-2002-0488-IMU Child Care Operations 24-Jul-02

A-2002-0489-IMT

U.S. Army Audit Agency Review of the Updated Cost Comparison Form Received 25 June 2002 for the Fort Sam Houston Whole Base Commercial Activities Study 8-Jul-02

Page 215: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0490-IMT

Schedule of Adjustments From the Review of the Updated Cost Comparison Form Received 25 June 2002 for the Fort Sam Houston Whole Base Commercial Activities Study 8-Jul-02

A-2002-0491-AMWGovernment Purchase Cards 25-Jul-02

A-2002-0492-AMW

Government Purchase Cards, Army Working Capital Fund 26-Jul-02

A-2002-0493-IMOEstimated Retirement Benefits 3-Jul-02

A-2002-0494-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form (Contract Management Support Services) for the Fort Belvoir Garrison Commercial Activities Study 9-Jul-02

A-2002-0495-IMUOperation of Stored Value Card Downrange 18-Jul-02

A-2002-0496-IMT

Updated Costs Directed by the Administrative Appeals Board for the Fort Bragg Public Works Business Center Commercial Activities Study 9-Jul-02

A-2002-0497-IMOEstimated Retirement Benefits 9-Jul-02

A-2002-0498-IMT

Review of the Updated Government Costs for the Fort Knox Visual Information Production Activity Commercial Activities Study 10-Jul-02

A-2002-0499-AMW Accounting Adjustments 26-Jul-02

A-2002-0500-IMEProjected Supply and Use of Halon 1301 16-Aug-02

A-2002-0501-FFFReserve Component Mobilization Process 2-Aug-02

A-2002-0502-IMOEstimated Retirement Benefits 11-Jul-02

A-2002-0503-IMOEstimated Retirement Benefits 11-Jul-02

Page 216: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0504-IMT

Review of the Updated Government Costs for the Fort Riley Directorate of Information Management Commercial Activities Study as Directed by the Administrative Appeals Board 12-Jul-02

A-2002-0505-FFPManaging Automated Equipment 19-Sep-02

A-2002-0506-IMOEstimated Retirement Benefits 15-Jul-02

A-2002-0507-IMOEstimated Retirement Benefits 15-Jul-02

A-2002-0508-IMOEstimated Retirement Benefits 15-Jul-02

A-2002-0509-FFP Contract Trend Analyses 17-Jul-02A-2002-0510-FFP Personnel Practices 20-Sep-02

A-2002-0511-IMTReview of Battle Simulation Center Contract 22-Jul-02

A-2002-0512-IMU Stored Value Card 26-Jul-02

A-2002-0513-IMUTravel Claims, Logistics Assistance Group-Europe 29-Jul-02

A-2002-0514-AMA Common Missile Program 7-Aug-02

A-2002-0515-FFGAudit of Soldier Out-of-Service Debt Avoidance 3-Sep-02

A-2002-0516-FFP

Validating the Program and Budget for Headquarters Activities 30-Aug-02

A-2002-0517-IME

Chemical and Biological Support for Forward Stationed DA Civilians and Contractors 2-Aug-02

A-2002-0518-AMI

Financial Management of Special Access Programs - ORDAIN QUEST Project Office 24-Jul-02

A-2002-0519-IMO

Review of Mass Transportation Fringe Benefit Program Outside the National Capital Region, Washington, DC 24-Jul-02

A-2002-0520-IMT

Status of the Commercial Activities Study on Unit Maintenance 26-Jul-02

A-2002-0521-IMU

Review of Mission Rehearsal Exercises for Stabilization Force 30-Jul-02

A-2002-0522-IMOEstimated Retirement Benefits 25-Jul-02

A-2002-0523-IMOEstimated Retirement Benefits 25-Jul-02

Page 217: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0524-AMW

Standard Army Retail Supply System Inventory Process--Army Working Capital Fund 30-Jul-02

A-2002-0525-AMW

Army Materiel Command Installation Supply System Inventory Process--Army Working Capital Fund 30-Jul-02

A-2002-0526-AMW

Distribution Standard System, Inventory Process--Army Working Capital Fund 30-Jul-02

A-2002-0527-IMOPrivatization of Family Housing 9-Aug-02

A-2002-0528-IMU

U.S. Army Audit Agency Response to Secretary of Defense Inquiry--OCLL#20704078 ROBERT SCHAAD (A.O. Paul Shigeta) 31-Jul-02

A-2002-0529-AMW

Depot Maintenance Indirect Expense Cycle Memorandum, Army Working Capital Fund 31-Jul-02

A-2002-0530-AMIArmy Cover Program, Site E 2-Aug-02

A-2002-0531-IMOEstimated Retirement Benefits 1-Aug-02

A-2002-0532-IMOEstimated Retirement Benefits 1-Aug-02

A-2002-0533-IMOEstimated Retirement Benefits 1-Aug-02

A-2002-0534-IMT

Review of Final Updated Costs Directed by the Administrative Appeals Board for the Fort Bragg Public Works Business Center Commercial Activities Study 7-Aug-02

A-2002-0535-IMU

Controls for the International Merchant Purchase Authorization Card Program 21-Aug-02

A-2002-0536-IMUMilitary Interdepartmental Purchase Requests 21-Aug-02

A-2002-0537-IMUReview of Pricing Proposals for the Livorno Laundry 9-Aug-02

Page 218: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0538-IMT

U.S. Army Audit Agency Review of the Performance Work Statement for the Aberdeen Proving Ground Garrison Commercial Activities Study 7-Aug-02

A-2002-0539-IMU Budgetary Function 13-Aug-02

A-2002-0540-FFP

Government Information Security Reform Act Requirement 30-Aug-02

A-2002-0541-IMT

Review of the Updated Costs Directed by the Administrative Appeals Board for the Fort Campbell Commercial Activities Study of the Public Works Business Center 14-Aug-02

A-2002-0542-AMA

Audit of U.S. Army Materiel Command's Support to the U.S. Army Contracting Agency 20-Aug-02

A-2002-0543-FFP

Review of Military Cost of Living Allowance and Reimbursement for Winterization Expenses 26-Aug-02

A-2002-0544-AMA

Review of Suggested Award for the Economic Lot Procurement of Multiple Launch Rocket System M77 Submunitions, Army Ideas for Excellence Program Suggestion Number AMTT 940095 21-Aug-02

A-2002-0545-FFP

Resource Sharing Agreement with the Department of Veterans Affairs 9-Sep-02

A-2002-0546-IMT

Review of the Most Efficient Organization and Government Costs for the Commercial Activities Study of the Fort Knox Adjutant General 27-Aug-02

A-2002-0547-IMT

Review of the Most Efficient Organization and Government Costs for the Commercial Activities Study of the Fort Knox Directorate of Information Management 27-Aug-02

Page 219: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0548-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Commercial Activities Study of Fort George G. Meade Garrison 27-Aug-02

A-2002-0549-FFC

Audit of the U.S. Army Corps of Engineers, Civil Works Accounts Receivable-Detroit District 4-Sep-02

A-2002-0550-IMT

U.S. Army Audit Agency Review of the Final Decision Report for the Public Works and Information Technology Commercial Activities Study at Tobyhanna Army Depot 27-Aug-02

A-2002-0551-AMAImplementing HQDA Realignment 3-Sep-02

A-2002-0552-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Fort Campbell Readiness Business Center 28-Aug-02

A-2002-0553-IMT

U.S. Army Audit Agency Review of the Final Decision Report for the Directorate of Logistics Cataloging Commercial Activities Study at Fort Monmouth, New Jersey 27-Aug-02

A-2002-0554-IMOEstimated Retirement Benefits 27-Aug-02

A-2002-0555-FFFAdvanced Individual Training Courses 16-Sep-02

A-2002-0556-IMT

U.S. Army Audit Agency Review of the Final Decision Report for the Directorate of Corporate Information Commercial Activities Study at Fort Monmouth 28-Aug-02

A-2002-0557-IMOEstimated Retirement Benefits 29-Aug-02

A-2002-0558-IMOEstimated Retirement Benefits 30-Aug-02

A-2002-0559-FFC

Letter of Comments on the 2002 External Quality Control Peer Review of the Naval Audit Service 30-Aug-02

Page 220: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0560-FFC

Opinion Report on the 2002 External Quality Control Peer Review of the Naval Audit Service 30-Aug-02

A-2002-0561-AMMAudit of the Work Order Logistics File 12-Sep-02

A-2002-0562-IMHManagement Controls for Reimbursable Orders 16-Sep-02

A-2002-0563-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Walter Reed Army Medical Center Commercial Activities Study 4-Sep-02

A-2002-0565-IMT

Review of the Management Study and Cost Comparison Form for the 577th Engineer Battalion Commercial Activities Study 12-Sep-02

A-2002-0566-IMH

Follow-up Issues, Morale, Welfare and Recreation Activities - Financial Controls, Fort Bliss Centennial Club 23-Sep-02

A-2002-0567-IME

Workload Survey Report, Nuclear Surety, Safety and Remediation Issues 12-Sep-02

A-2002-0568-AMIFinancial Management of SAPS - Cactus Bandit 16-Sep-02

A-2002-0569-AMI

Financial Management of SAPS - Secretary of the Army 6-Sep-02

A-2002-0570-IMT

Audit of Implementation of Commercial Activities Studies 4-Sep-02

A-2002-0571-IMOEstimated Retirement Benefits 9-Sep-02

A-2002-0572-IMOEstimated Retirement Benefits 5-Sep-02

A-2002-0573-AML Operational Projects 24-Sep-02

A-2002-0577-IMHFinancial Controls--Golf Course Operations 27-Sep-02

A-2002-0578-IME

Management of the Impact Area Groundwater Study Program, Camp Edwards, Massachusetts 23-Sep-02

A-2002-0580-AMAManaging Service Contracts 23-Sep-02

Page 221: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0581-FFF

Follow-up Review of Audit Report: AA01-286, Financial Management of The Army's Distance Learning Program 12-Sep-02

A-2002-0582-FFC

Workload Survey of the Everglades Restoration Program 26-Sep-02

A-2002-0583-FFG

Review of Government Purchase Card Transactions at The Army Reserve Readiness and Training Center 17-Sep-02

A-2002-0584-FFG

Management Controls Over the Exchange or Sale of Nonexcess Property 16-Sep-02

A-2002-0585-FFFManning Priorities for Army Transformation 30-Sep-02

A-2002-0586-FFP Government Credit Cards 20-Sep-02

A-2002-0587-FFB

The Army's Implementation of the Government Information Security Reform Act--Lessons Learned 30-Sep-02

A-2002-0588-FFBBudget Model for Civilian Personnel Requirements 30-Sep-02

A-2002-0589-PMO

Universal Service Fund at Department of Defense, Dependent Schools on Army Installations 17-Sep-02

A-2002-0590-IMOEstimated Retirement Benefits 17-Sep-02

A-2002-0591-IMOEstimated Retirement Benefits 17-Sep-02

A-2002-0592-IMOEstimated Retirement Benefits 19-Sep-02

A-2002-0593-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Adjutant General, Military Human Resources Services Commercial Activities Study 25-Sep-02

Page 222: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0594-IMT

Schedule of Adjustments From the Review of the Management Study and Cost Comparison Form for the Adjutant General, Military Human Resources Services Commercial Activities Study 25-Sep-02

A-2002-0595-FFBTelecommunications Handbook, G-6 30-Sep-02

A-2002-0596-IMUWorkload Plan and Risk Analysis 24-Sep-02

A-2002-0597-IMOEstimated Retirement Benefits 23-Sep-02

A-2002-0598-IMH

Review of Army and Air Force Exchange Service External Contract Oversight 24-Sep-02

A-2002-0599-IMUReview of Security Guard Contract 26-Sep-02

A-2002-0600-AMI

Information Technology Acquisition Workload Management 27-Sep-02

A-2002-0602-FFF

Validation of Actions Taken to Correct Material Weakness--Customer Service Call Center Call Backlog 25-Sep-02

A-2002-0603-FFB

Joint Telecommunications Task Force--Lessons Learned 30-Sep-02

A-2002-0604-IMOEstimated Retirement Benefits 27-Sep-02

A-2002-0605-IMOEstimated Retirement Benefits 27-Sep-02

A-2002-0606-FFC2001 Collections and Deposits Cycle 27-Sep-02

A-2002-0607-FFB

Observation for Management Consideration--Documentation for Testing Key Management Controls 27-Sep-02

A-2002-0608-FFB

Workload Survey for Financial Management Issues 30-Sep-02

A-2002-0609-FFC

U.S. Army Corps of Engineers, Civil Works Accounts Receivable 30-Sep-02

Page 223: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2002-0610-FFC

Corps of Engineers Financial Management System--General and Application Controls 30-Sep-02

A-2003-0001-IMH

Third Party Claims, Martin Army Community Hospital, Fort Benning, Georgia 22-Oct-02

A-2003-0002-IMH

Third Party Claims, Madigan Army Medical Center, Tacoma, Washington 1-Oct-02

A-2003-0003-IMU

Overhead and Layering in Morale, Welfare and Recreation Activities, U.S. Army, Europe and Seventh Army 31-Oct-02

A-2003-0004-AMAArmy Transformation Experiment 2002 3-Feb-03

A-2003-0005-AMA

Follow-up Audit of Audit Recommendations (AA99-168) 1-Oct-02

A-2003-0006-IMU

Followup Audit of Recommendation E-1, Audit Report: AA98-138, U.S. Army Field Support Command, Rock Island, Illinois 2-Apr-03

A-2003-0007-IMU

Attestation of Supporting Documentation for Army and Air Force Exchange Service Report of Audit 2002-01 2-Oct-02

A-2003-0008-IMT

U.S. Army Audit Agency Review of the Updated Cost Comparison Form for the Directorate of Plans, Training and Mobilization Commercial Activities Study, Fort Carson, Colorado 3-Oct-02

A-2003-0009-FFG

Identification of Soldiers in Deserter or Absentee Status 13-Nov-02

A-2003-0010-FFGHeadquarters, DA Service Contracts 17-Oct-02

A-2003-0011-PMO

Quality Assurance Review of Memorandum Audit Reports 9-Jan-03

A-2003-0012-IMOEstimated Retirement Benefits 2-Oct-02

A-2003-0013-IMOEstimated Retirement Benefits 3-Oct-02

Page 224: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0015-FFG

Observations for Management Consideration, Audit of Headquarters, DA Service Contracts 18-Oct-02

A-2003-0016-FFB

FY 01 Follow-up Review of Audit Recommendations, Audit of Information Assurance Phase IV: Reporting Process and Vulnerability Assessment Results 11-Oct-02

A-2003-0017-IMOEstimated Retirement Benefits 15-Oct-02

A-2003-0018-IMT

U.S. Army Audit Agency's Review of the Updated Government Costs for the Directorate of Information Management Commercial Activities Study, U.S. Army Intelligence Center and Fort Huachuca, Arizona 15-Oct-02

A-2003-0019-FFPPersonnel Assignment History 18-Oct-02

A-2003-0020-IMU

Review of Costs of Mission Rehearsal Exercise for Stabilization Force 12 17-Oct-02

A-2003-0021-IMU

Review of Mission Rehearsal Exercise for Stabilization Force Rotation 12--Property Accountability 17-Oct-02

A-2003-0022-IMU

Review of Mission Rehearsal Exercises for Stabilization Force 28-Oct-02

A-2003-0023-IMOEstimated Retirement Benefits 17-Oct-02

A-2003-0024-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Commercial Activities Study of the Directorate of Information Management, U.S. Military Academy, West Point 17-Oct-02

A-2003-0025-IMOFollowup Review of Audit Recommendations 21-Oct-02

A-2003-0026-IMUFunding Execution, Task Force Sinai 14-Nov-02

Page 225: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0027-IMH

Analysis of the FYs 01-02 Income Statements for the Fort Hood Golf Course 30-Oct-02

A-2003-0028-IMH

Financial Controls--Golf Course Operations, Fort Lesley J. McNair, Washington, DC 29-Nov-02

A-2003-0029-IMH

Financial Controls--Bowling Operations, Fort Bliss, Texas 24-Jan-03

A-2003-0030-AMIFollowup Audit of Audit Recommendation 21-Oct-02

A-2003-0031-IMO

Review of the Financial Statements for the Period Ended August 31, 2001 for the Fort Ord Reuse Authority's No-Cost Economic Development Conveyance 22-Oct-02

A-2003-0032-FFGAuditors Opinion of Audit of Amercian Red Cross 30-Oct-02

A-2003-0033-IMOEstimated Retirement Benefits 24-Oct-02

A-2003-0034-IMOEstimated Retirement Benefits 24-Oct-02

A-2003-0035-AMM

Followup Audit of Audit Recommendations Addressed to U.S. Army Forces Command in Audit Report AA01-111 25-Oct-02

A-2003-0036-IMT

Review of the Most Efficient Organization and Government Costs for the Commercial Activities Study of the Fort Knox Unit Maintenance Activity 30-Oct-02

A-2003-0037-FFP

Potential Funding Violation, Audit of Government Purchase Card Management Controls, U.S. Army Contracting Command Korea 29-Oct-02

A-2003-0038-AMA

Tracking Resources for HQDA Realignment, Army Force Management Agency 28-Oct-02

A-2003-0039-IMOEstimated Retirement Benefits 30-Oct-02

A-2003-0040-AMA

Execution of Army Transformation Experiment 2002 12-Nov-02

Page 226: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0041-IMU

Living Quarters Allowance, U.S. Army, Europe and Seventh Army 20-Nov-02

A-2003-0042-IMOEstimated Retirement Benefits 31-Oct-02

A-2003-0043-AMAFollowup to High Level Architecture Report 19-Nov-02

A-2003-0044-AMA

Review of Implementation of Realignment of Major Army Commands and Field Operating Agencies 6-Nov-02

A-2003-0045-IMOEstimated Retirement Benefits 5-Nov-02

A-2003-0046-FFP

The Conversion to Single Stock Fund and Its Impact on Eighth U.S. Army 20-Nov-02

A-2003-0047-FFP

Survey of the Conversion to the Single Stock Fund and It's Impact on Eighth U.S. Army 15-Nov-02

A-2003-0048-IMT

Review of the Management Study and Cost Comparison Form for the Directorate of Logistics Commercial Activities Study, Fort Riley, Kansas 7-Nov-02

A-2003-0049-IMT

Schedule of Adjustments From the Review of the Cost Comparison Form for the Directorate of Logistics Commercial Activities Study, Fort Riley, Kansas 7-Nov-02

A-2003-0050-IMH

Financial Controls--Golf Course Operations, Fort Belvoir, Virginia 22-Nov-02

A-2003-0051-IMT

U.S. Army Audit Agency Review of the Fort Drum Reimbursable Program 12-Nov-02

A-2003-0052-IMT

Aviation Maintenance Business Practices, Fort Drum, New York 20-Nov-02

A-2003-0053-AMM

Mobile Subscriber Equipment, U.S. Army Communications-Electronics Command, Fort Monmouth, New Jersey 6-Dec-02

Page 227: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0054-FFG

Review of The Army Management Control Process (Fiscal Year 2002)--An Assessment for the Secretary of The Army 13-Nov-02

A-2003-0055-AMW

Audit of Aviation Unserviceable Major Components 13-Nov-02

A-2003-0056-IMOEstimated Retirement Benefits 12-Nov-02

A-2003-0057-IMOEstimated Retirement Benefits 13-Nov-02

A-2003-0058-AMI

Information Management Systems for Special Access Programs 15-Nov-02

A-2003-0059-IMOEstimated Retirement Benefits 14-Nov-02

A-2003-0060-IMEPollution Prevention Material Weakness 29-Nov-02

A-2003-0061-IMOEstimated Retirement Benefits 18-Nov-02

A-2003-0062-AMA

Tracking Resources for HQDA Realignment, Deputy Chief of Staff, G-2 19-Nov-02

A-2003-0063-IME

Management of Installation Environmental Programs, U.S. Army Air Defense Artillery Center and Fort Bliss, Texas 29-Nov-02

A-2003-0064-IMO

Privatization of Family Housing, Fort Lewis, Washington 29-Nov-02

A-2003-0065-IMO

Review of Base Operations Contracting--Environmental and Natural Resource Division, Fort Belvoir, Virginia 20-Nov-02

A-2003-0066-IMOEstimated Retirement Benefits 20-Nov-02

A-2003-0067-IMOEstimated Retirement Benefits 20-Nov-02

A-2003-0068-IMOEstimated Retirement Benefits 20-Nov-02

A-2003-0069-IMOEstimated Retirement benefits 21-Nov-02

A-2003-0070-IMEImplementation of the Military Munitions Rule 2-Dec-02

A-2003-0071-IMT

Congressional Request--Review of the Fort Polk Whole base Commercial Activities Study 22-Nov-02

Page 228: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0072-FFG

Government Purchase Card Program, U.S. Army Reserve Readiness and Training Center, Fort McCoy, Wisconsin 27-Dec-02

A-2003-0073-FFG

Requirements Review of Logistics Modernization Program 27-Nov-02

A-2003-0074-IMUReview of Macedonian Railways Billings 2-Dec-02

A-2003-0075-IMH

Third Party Collection Program, Womack Army Medical Center, Fort Bragg, North Carolina 16-Dec-02

A-2003-0076-IMOEstimated Retirement Benefits 27-Nov-02

A-2003-0077-FFB

Cost Management/Activity-Based Costing in U.S. Army Soldier Systems Center, Natick, Massachusetts 3-Dec-02

A-2003-0078-IMO

Review of the Financial Statements for the Period Ended September 30, 2001 for the Fort McClellan Joint Powers Authority's No-Cost Economic Development Conveyance 27-Nov-02

A-2003-0079-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Whole Base Commercial Activities Study--Reserve Forces Training Area, Devens, Massachusetts 3-Dec-02

A-2003-0080-IMOEstimated Retirement Benefits 3-Dec-02

A-2003-0081-IMT

Property Accountability Procedures, White Sands Missile Range, New Mexico 16-Dec-02

A-2003-0082-IMOEstimated Retirement Benefits 4-Dec-02

A-2003-0083-AMM

Observations for Management Consideration--Audit of Staffing and Capacity of Full-Time Support Maintenance Activities, Army National Guard, National Guard Bureau 9-Dec-02

Page 229: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0084-AMI

Information Technology Acquisition Workload Questionaire 10-Dec-02

A-2003-0085-AMI

Audit of Intelligence Contingency Funds - Combined Task Force, Fervent Archer 12-Dec-02

A-2003-0086-FFB

Review of Activity-Based Costing Models, U.S. Army Medical Research and Materiel Command 16-Jan-03

A-2003-0087-IMOEstimated Retirement Benefits 9-Dec-02

A-2003-0088-IMOEstimated Retirement Benefits 9-Dec-02

A-2003-0089-AMA

Tracking Resources for HQDA Realignment, Deputy Chief of Staff, G-4 13-Dec-02

A-2003-0090-AMA

Tracking Resources for HQDA Realignment, Office of the Administrative Assistant 6-Feb-03

A-2003-0091-AMI

Information Technology Management Systems for Special Access Programs 11-Dec-02

A-2003-0092-IME

Disposal Actions at Formerly Utilized Sites, U.S. Army Corps of Engineers 19-Dec-02

A-2003-0093-FFFStation Missioning, U.S. Army Recruiting Command 15-Jan-03

A-2003-0094-IMOEstimated Retirement Benefits 12-Dec-02

A-2003-0095-IMOEstimated Retirement Benefits 12-Dec-02

A-2003-0096-FFC

Consulting Services for the U.S. Army Corps of Engineers Consolidated Departmental Overhead Test 10-Jan-03

A-2003-0097-IMU

Audit of Operational Project Stock Requirements--Aircraft Matting, U.S. Army, Europe and Seventh Army 20-Dec-02

A-2003-0098-IMH

Audit of Use of Appropriated Funds for Morale, Welfare, Recreation and Family Programs, U.S. Army Forces Command 19-Dec-02

Page 230: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0099-IMH

Audit of Use of Appropriated Funds for Morale, Welfare, Recreation and Family Programs, U.S. Army Training and Doctrine Command 19-Dec-02

A-2003-0100-IMOEstimated Retirement Benefits 16-Dec-02

A-2003-0101-AMW

Aged Accounts--Army Working Capital Fund, U.S. Army Tank-automotive and Armaments Command 24-Jan-03

A-2003-0102-IMT

Review of the Management Study and Cost Comparison Form for the Directorate of Training, Mobilization and Security Commercial Activities Study, Fort McCoy, Wisconsin 17-Dec-02

A-2003-0103-IMT

Schedule of Adjustments From the Review of the Cost Comparison Form for the Directorate of Training, Mobilization and Security Commercial Activities Study, Fort McCoy, Wisconsin 17-Dec-02

A-2003-0104-IMOEstimated Retirement Benefits 18-Dec-02

A-2003-0105-IMU

General Support Maintenance Program, U.S. Army, Europe and Seventh Army 31-Dec-02

A-2003-0106-AMLMethodology for Computing Authorized Stockage Lists 31-Dec-02

A-2003-0107-IMT

Review of the Management Study and Cost Comparison Form for the Materiel Management Center Commercial Activities Study, Fort Irwin, California 20-Dec-02

Page 231: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0108-IMT

U.S. Army Audit Agency Review of the Government Management Study and Cost Comparison Form for the Aberdeen Proving Ground Garrison Commercial Activities Study, Aberdeen Proving Ground, Maryland 19-Dec-02

A-2003-0109-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Base Operations Commercial Activities Study, U.S. Army Garrison, Fort Hunter Liggett 19-Dec-02

A-2003-0110-IMU

Logistics Civil Augmentation Program, Camp Stronghold Freedom, Uzbekistan 31-Dec-02

A-2003-0111-IMU

Audit of Operational Project Stock Requirements--Collective Support Systems, U.S. Army, Europe and Seventh Army 23-Dec-02

A-2003-0112-IMH

Followup Audit of Morale, Welfare and Recreation Sustainment Repair and Maintenance, Fort Belvoir, Virginia 6-Jan-03

A-2003-0113-AMACombined Arms Tactical Trainer 28-Jan-03

A-2003-0114-AML

Independent Evaluation of the Single Stock Fund Milestone 3 Verification of Initial Operating Capability 28-Jan-03

A-2003-0115-FFC

Dredging Operations in the Pacific Region, U.S. Army Corps of Engineers 3-Jan-03

A-2003-0116-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Fort Detrick Garrison Commercial Activities Study 6-Jan-03

A-2003-0117-PMO

Quality Assurance Review of Selected Aspects of Planning and Reporting Standards 7-Jan-03

Page 232: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0118-IMU

Audit of Operational Project Stock Requirements--Hot and Cold Weather Clothing, U.S. Army, Europe and Seventh Army 8-Jan-03

A-2003-0119-FFB

Activity-Based Costing/Management, Fort McPherson, Georgia 6-Feb-03

A-2003-0120-IMEFollowup Review of Audit Recommendations 8-Jan-03

A-2003-0121-IMEFollowup Review of Audit Recommendations 8-Jan-03

A-2003-0122-IME

Observations Related to the Security and Maintenance of Deactivated Reactor Sites 7-Jan-03

A-2003-0123-IMOEstimated Retirement Benefits 8-Jan-03

A-2003-0124-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Sierra Base Operations Commercial Activities Study, Sierra Army Depot, California 8-Jan-03

A-2003-0125-IMOEstimated Retirement Benefits 8-Jan-03

A-2003-0126-IMOEstimated Retirement Benefits 8-Jan-03

A-2003-0127-FFG

National Science Center Special Fund Financial Statement's, Augusta, Georgia 28-Jan-03

A-2003-0128-IMU

Review of Depot-Level Maintenance Workload Reporting for FY 02, U.S. Army, Europe and Seventh Army 14-Jan-03

A-2003-0129-IMEFollowup Review of Audit Recommendations 15-Jan-03

A-2003-0130-IMU

Audit of Operational Project Stock Requirements--Receiving, Staging, Onward Movement and Integration, U.S. Army, Europe and Seventh Army 14-Jan-03

A-2003-0131-IMOEstimated Retirement Benefits 14-Jan-03

A-2003-0132-IMOEstimated Retirement Benefits 14-Jan-03

Page 233: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0133-AMA

Tracking Resources for HQDA Realignment, ASA(FM&C) 16-Jan-03

A-2003-0134-AMA

Tracking Resources for HQDA Realignment, ASA(CW) 16-Jan-03

A-2003-0135-AMA

Tracking Resources for HQDA Realignemnt, Deputy Chief of Staff, G-8 16-Jan-03

A-2003-0136-IMT

Followup Review of Accounting Controls and Processes for Reimbursable Orders, Fort Drum Aviation Maintenance Facility 27-Jan-03

A-2003-0137-IMU

Army Communities of Excellence Program, U.S. Army Installation Management Agency, Europe Region 31-Jan-03

A-2003-0138-IMU

Army Family Housing Leasing in Germany, U.S. Army Installation Management Agency, Europe Region 13-Feb-03

A-2003-0139-FFG

National Defense Equipment Reporting, Deputy Chief of Staff, G-4 6-Feb-03

A-2003-0140-FFG

Validation of Property Book and Unit Supply Enhanced System, Version 3.4.1 25-Mar-03

A-2003-0141-IMODOD Support to the 2001 Presidential Inaugural 31-Jan-03

A-2003-0142-IMOEstimated Retirement Benefits 27-Jan-03

A-2003-0143-IMOEstimated Retirement Benefits 27-Jan-03

A-2003-0144-IMH

Third Party Collection Program, Walter Reed Army Medical Center 14-Feb-03

A-2003-0145-FFB

Secretary of Defense Executive Dining Facility Fund FY 02 Financial Statements, Office of the Secretary of Defense 28-Feb-03

A-2003-0146-FFB

Secretary of Defense Executive Dining Facility Fund-Internal Controls, Office of the Secretary of Defense 19-May-03

A-2003-0147-IMOEstimated Retirement Benefits 29-Jan-03

Page 234: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0148-IMOEstimated Retirement Benefits 29-Jan-03

A-2003-0149-IMOEstimated Retirement Benefits 29-Jan-03

A-2003-0150-IMOEstimated Retirement Benefits 30-Jan-03

A-2003-0151-AMA

Risk Management Program -Stryker Vehicle System, Office of the Project Manager Brigade Combat Team 6-Mar-03

A-2003-0152-IMOEstimated Retirement Benefits 30-Jan-03

A-2003-0153-AML

Army Surcharge Process, U.S. Army Tank-automotive and Armaments Command 17-Mar-03

A-2003-0154-AML

Army Surcharge Process, U.S. Army Aviation and Missile Command 19-Mar-03

A-2003-0155-IMOEstimated Retirement Benefits 3-Feb-03

A-2003-0156-AML

Small Purchases of Supplies and Equipment, North Carolina Army National Guard, Raleigh, North Carolina 21-Feb-03

A-2003-0157-FFB

Cost Estimate for the Army's Top Level Architecture--Redesign, Chief Information Office/G-6 6-Feb-03

A-2003-0158-IMOEstimated Retirement Benefits 4-Feb-03

A-2003-0159-IMOEstimated Retirement Benefits 6-Feb-03

A-2003-0160-IMOEstimated Retirement Benefits 6-Feb-03

A-2003-0161-IMT

Attestation of Subcontract Costs for the Radar Signal Detecting Set at Tobyhanna Army Depot 6-Feb-03

A-2003-0162-FFF

Workload Survey Results: Army Weapons of Mass Destruction Program 7-Feb-03

A-2003-0163-IMT

U.S. Army Audit Agency's Review of the Management Study and Cost Comparison Form for the Directorate of Public Works Commercial Activities Study 11-Feb-03

Page 235: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0164-IMT

Schedule of Adjustments from the Review of the Management Study and Cost Comparison Form for the Directorate of Public Works Commercial Activities Study 11-Feb-03

A-2003-0165-IMT

U.S. Army Audit Agency Review of the Government Management Study and Cost Comparison Form for the Public Works and Information Management Support Services Commercial Activities Study 14-Feb-03

A-2003-0166-FFF

Courseware Development for Distance Learning, U.S. Army Training and Doctrine Command 2-May-03

A-2003-0167-FFP

Follow-up Review of Audit Recommendations for Fuel Point Operations, Camp Humphreys, Korea 14-Mar-03

A-2003-0168-FFG

Financial Controls-Secretary of Defense/Joint Staff Welfare and Recreation Association Fund 15-May-03

A-2003-0169-FFG

Independent Auditor's Opinion-Secretary of Defense/Joint Staff Welfare and Recreation Association Fund--Financial Statements 1-Apr-03

A-2003-0170-FFG

Review of Army Management Control Process (Fiscal Year 2002), Department of the Army Inspector General 31-Mar-03

A-2003-0171-FFG

Review of Army Management Control Process (Fiscal Year 2002), U.S. Army Space and Missile Defense Command 28-Mar-03

A-2003-0172-FFG

Review of Army Management Control Process (Fiscal Year 2002), 7th Infantry Division and Fort Carson 26-Mar-03

Page 236: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0173-FFG

Review of Army Management Control Process (Fiscal Year 2002), 24th Infantry Division (Mechanized) and Fort Riley 28-Mar-03

A-2003-0174-IMH

Followup Audit of Morale, Welfare and Recreation Sustainment Repair and Maintenance, Fort Lewis, Washington 20-Feb-03

A-2003-0175-IME

Ground Equipment Contract Maintenance Support, I Corps and Fort Lewis, Washington 7-Mar-03

A-2003-0176-FFF

Audit Tasker Results: Meal Rate at Fort Lee, Audit of Military Training Service Support (MTSS) Pilot Test 3-Mar-03

A-2003-0177-IMOEstimated Retirement Benefits 24-Feb-03

A-2003-0178-IMOEstimated Retirement Benefits 24-Feb-03

A-2003-0179-IMOEstimated Retirement Benefits 24-Feb-03

A-2003-0180-PMO

Quality Assurance Review of the Agency's Fiscal Year 02 Followup Review of Audit Recommendations 10-Apr-03

A-2003-0181-FFP

Reported Baseline Workyears for Directorate of Public Works' Commercial Activities Study, U.S. Army Garrison, Hawaii 5-May-03

A-2003-0182-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Directorate of Information Management Commercial Activities Study, Fort Monroe, Virginia 26-Feb-03

A-2003-0183-IMOEstimated Retirement Benefits 26-Feb-03

A-2003-0184-IMOEstimated Retirement Benefits 26-Feb-03

A-2003-0185-IMH

Third Party Collection Program, U.S. Army Medical Command 10-Mar-03

Page 237: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0186-IMO

Attestation Review of the Financial Statements for the Period Ended December 31, 2001 for the Fort Chaffee Redevelopment Authority's No-Cost Economic Development Conveyance 27-Feb-03

A-2003-0187-IMT

Observations and Lessons Learned From the Reviews of the Commercial Activities Studies of the Adjutant General, Directorate of Information Management and Unit Maintenance Activity at Fort Knox 4-Mar-03

A-2003-0188-IMOEstimated Retirement Benefits 4-Mar-03

A-2003-0189-IMH

Followup Audit of Morale, Welfare and Recreation Sustainment Repair and Maintenance, Fort Sill, Oklahoma 19-Mar-03

A-2003-0190-IMH

Followup Audit of Morale, Welfare and Recreation Sustainment Repair and Maintenance, Fort Stewart, Georgia 21-Mar-03

A-2003-0191-IMOEstimated Retirement Benefits 5-Mar-03

A-2003-0192-AML

Development and Integration of Automatic Identification Technology Into Logistics Processes 21-Mar-03

A-2003-0193-AMA

Tracking Resources for HQDA Realignment, ASA(I&E) and ACSIM 11-Mar-03

A-2003-0194-IMT

U.S. Army Audit Agency Review of the Government Management Study and Cost Comparison Form for the Fort Myer Garrison Commercial Activities Study 10-Mar-03

A-2003-0195-AMIInformation Technology for Special Access Programs 12-Mar-03

A-2003-0196-AMI

Information Technology for Special Access Programs - GRADIENT ORBIT/LAPIDARY ART 12-Mar-03

Page 238: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0197-IMH

Followup Audit of Morale, Welfare and Recreation Sustainment Repair and Maintenance, Fort Benning, Georgia 10-Mar-03

A-2003-0198-IMT

Review of the Updated Costs Directed by the Administrative Appeals Board for the Fort Knox Commercial Activities Study of the Directorate of Information Management 11-Mar-03

A-2003-0199-IMOEstimated Retirement Benefits 11-Mar-03

A-2003-0200-AMW

Stock Funded Depot Level Reparable Credit Policy, Office of the Program Executive Officer, Tactical Missiles 3-Apr-03

A-2003-0201-IMOEstimated Retirement Benefits 12-Mar-03

A-2003-0202-IMT

U.S. Army Audit Agency Review of the Management Study and Cost Comparison Form for the Base Operations Commercial Activities Study, U.S. Army Garrison, Fort Hunter Liggett 19-Mar-03

A-2003-0203-IMT

Schedule of Adjustments From the Review of the Management Study and Cost Comparison Form for the Base Operations Commercial Activities Study, U.S. Army Garrison, Fort Hunter Liggett 19-Mar-03

A-2003-0204-IMH

Followup Audit of Morale, Welfare and Recreation Sustainment Repair and Maintenance, Fort Monmouth, New Jersey 13-Mar-03

A-2003-0205-AMI Intelligence Funds 18-Mar-03

A-2003-0206-AMM

Depot-Level Maintenance Workload Reporting - FY 01 and Outyears 3-Apr-03

Page 239: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0207-IMT

Audit of Contract Administration for the Transportation of Dependent School Children Contract (DAKF40-97-D-0017), Fort Bragg, North Carolina 19-Mar-03

A-2003-0208-IMOEstimated Retirement Benefits 17-Mar-03

A-2003-0209-IMT

Review of the Revised Cost Comparison Form for the Directorate of Information Management Commercial Activities Study, Fort Monroe, VA 19-Mar-03

A-2003-0210-IMH

Use of Appropriated Funds for Morale, Welfare, Recreation and Family Programs 28-Mar-03

A-2003-0211-IMOEstimated Retirement Benefits 24-Mar-03

A-2003-0212-IMOEstimated Retirement Benefits 24-Mar-03

A-2003-0213-FFG

Review of the Army Management Control Process (Fiscal Year 2002), US Army Intelligence and Security Command, Fort Belvoir, Virginia 8-Apr-03

A-2003-0214-FFG

Review of the Army Management Control Process (Fiscal Year 2002), US Army Criminal Investigation Command 9-Apr-03

A-2003-0215-IMO

Attestation Review of the Financial Statements for the Period Ended December 31, 2001 for the Philadelphia Authority for Industrial Development No-Cost Economic Development Conveyance 27-Mar-03

A-2003-0216-IMO

Privatization of Utility Distribution Systems, Fort Hamilton, New York 11-Apr-03

Page 240: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0217-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Contract Management Support Services Commercial Activities Study at Fort Belvoir, Virginia 28-Mar-03

A-2003-0218-IMOEstimated Retirement Benefits 28-Mar-03

A-2003-0219-IMOEstimated Retirement Benefits 28-Mar-03

A-2003-0220-IMU

Army Family Housing Leasing Outside Germany, U.S. Army Installation Management Agency, Europe Region 15-Apr-03

A-2003-0221-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Whole Base Commercial Activities Study at Fort Belvoir, Virginia 2-Apr-03

A-2003-0222-IMH

Followup Audit of Morale, Welfare and Recreation Sustainment Repair and Maintenance, Fort Jackson, South Carolina 2-Apr-03

A-2003-0223-AMA

Criteria Used to Stock Repair Parts in The Army's Wholesale Supply System 30-Apr-03

A-2003-0224-AML

Followup Audit of Selected Aspects of U.S. Army Forces Command Materiel Management Center Operations, U.S. Army Forces Command, Fort McPherson, Georgia 21-Apr-03

A-2003-0225-IMOReview of Municipal Waste Landfills 3-Apr-03

A-2003-0226-FFG

Review of Army Management Control Process (Fiscal Year 2002), Office of the Chief of Staff, Army 18-Apr-03

A-2003-0227-AMW

Fiscal Year 2002 Followup of Audit Recommendations--Army Working Capital Fund 21-Apr-03

A-2003-0228-IMOEstimated Retirement Benefits 7-Apr-03

Page 241: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0229-IMOEstimated Retirement Benefits 7-Apr-03

A-2003-0230-AMI

Information Technology for Special Access Programs-CENTRA TIGER 9-Apr-03

A-2003-0231-FFP

Planning for the Implementation of Single Stock Fund Milestone 3, Eighth U.S. Army 10-Apr-03

A-2003-0232-FFP

Workload Survey of the Republic of Korea's Cost Sharing Agreements 9-Apr-03

A-2003-0233-IMOEstimated Retirement Benefits 9-Apr-03

A-2003-0234-IMOEstimated Retirement Benefits 9-Apr-03

A-2003-0235-IMOEstimated Retirement Benefits 10-Apr-03

A-2003-0236-FFB

Resource Transfers for U.S. Army Network Enterprise Technology Command, Deputy Under Secretary of The Army; Chief Information Officer/G-6 25-Apr-03

A-2003-0237-IMO

Review of Transformation of Installation Management Phases 1 and 2 17-Apr-03

A-2003-0238-AMW

Stock Funded Depot Level Reparable Credit Policy, Office of the Project Manager, Utility Helicopters 25-Apr-03

A-2003-0239-AMMInteractive Electronic Technical Manuals 9-May-03

A-2003-0240-FFF

Audit of U.S. Army Reserve 99th Regional Support Command's Travel, Leave, Pay, and Contract Transactions 17-Apr-03

A-2003-0241-IMO

Attestation Review of the Financial Statements for the Periods Ended June 30, 2001 & 2002 for the Depot Redevelopment Corporation of Memphis & Shelby County's No-Cost Economic Development Conveyance 21-Apr-03

Page 242: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0242-FFG

Review of the Army Management Control Process (Fiscal Year 2002), U.S. Garrison, Fort Belvoir 18-Apr-03

A-2003-0243-FFG

Validation of the Transportation Financial Management System-Military Traffic Management Command 22-Apr-03

A-2003-0244-IMO

Attestation Review of the Financial Statements for the Period Ended June 30, 2002 for the Massachusetts Development Finance Agency's No-Cost Economic Development Conveyance--Fort Devens 21-Apr-03

A-2003-0245-AMM

Followup on Contracts for Maintenance of Tactical Equipment in the Field 30-Apr-03

A-2003-0246-IMOEstimated Retirement Benefits 21-Apr-03

A-2003-0247-FFC

Corps of Engineers Financial Management System - Electronic Signature Controls, U.S. Army Corps of Engineers 25-Apr-03

A-2003-0248-IMOEstimated Retirement Benefits 23-Apr-03

A-2003-0249-IMOEstimated Retirement Benefits 24-Apr-03

A-2003-0250-IMOEstimated Retirement Benefits 24-Apr-03

A-2003-0251-IMOEstimated Retirement Benefits 25-Apr-03

A-2003-0252-IMOPrivatization of Family Housing, Fort Hood, Texas 8-May-03

A-2003-0253-IMOEstimated Retirement Benefits 28-Apr-03

A-2003-0254-AML

U.S. Army Audit Agency's Consulting Review of the Logistics Modernization Program--Phase IV 6-May-03

A-2003-0255-AMM

Work Order Logistics File, Maintenance Data Integration 12-May-03

A-2003-0256-AMMWork Order Logistics File, Accuracy and Use 30-May-03

Page 243: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0257-IMT

U.S. Army Audit Agency Review of the Government Management Study and Cost Comparison Form for the Fort George G. Meade Garrison Commercial Activities Study, Fort George G. Meade, Maryland 1-May-03

A-2003-0258-IMOEstimated Retirement Benefits 30-Apr-03

A-2003-0259-IMOEstimated Retirement Benefits 30-Apr-03

A-2003-0260-FFG

Review of The Army Management Control Process (Fiscal Year 2002), U. S. Army Garrison, Fort George G. Meade 20-May-03

A-2003-0261-AMIArmy Cover Program - Special Access Programs 7-May-03

A-2003-0262-IMOEstimated Retirement Benefits 1-May-03

A-2003-0263-IMH

Followup Audit of Morale, Welfare and Recreation Sustainment Repair and Maintenance, Fort Bragg, North Carolina 7-May-03

A-2003-0264-IMH

Followup Audit of Morale, Welfare and Recreation Sustainment Repair and Maintenance, Picatinny Arsenal, New Jersey 6-May-03

A-2003-0265-FFGArmy Criminal and Civil Fraud Recovery Process 21-May-03

A-2003-0266-IMO

Base Realignment and Closure Open Burn/Open Detonation Project, Seneca Army Depot Activity, New York 20-May-03

A-2003-0267-IMO

Attestation Review of the Financial Statements for the Periods Ended September 30, 2000 and 2001 for the Red River Redevelopment Authority No-Cost Economic Development Conveyance 15-May-03

A-2003-0268-AMA

Tracking Resources for HQDA Realignment, Office of the Chief, Army Reserve 14-May-03

Page 244: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0269-AMW

Contract Compliance, Audit of Aviation Tracked Components 12-May-03

A-2003-0270-IMT

Management Control Process, California Army National Guard 21-May-03

A-2003-0271-IME

Controls Over Unit Morale, Welfare and Recreation Funds, 396th Combat Support Hospital, Vancouver Barracks, Washington 23-May-03

A-2003-0272-IMOEstimated Retirement Benefits 14-May-03

A-2003-0273-AML

Army Surcharge Process, U.S. Army Materiel Command 16-May-03

A-2003-0274-IME

Management of Installation Environmental Programs, U.S. Army Yuma Proving Ground, Yuma, Arizona 23-May-03

A-2003-0275-FFG

Review of The Army Management Control Process (Fiscal Year 2002), U.S. Army Virginia National Guard 28-May-03

A-2003-0276-IMEWorkload Survey Report--Environmental Contracts 15-May-03

A-2003-0277-IME

Review of Cash Controls at the American Lake Club, Fort Lewis, Washington 27-May-03

A-2003-0278-AMI

Headquarters, U.S. Army Europe and Seventh Army Intelligence Contingency Fund 19-May-03

A-2003-0279-AML

Operational Project Stocks - Phase II (Collective Support Project) 27-May-03

A-2003-0280-AMWAuthorized Stockage Lists Roundout Repair Parts 9-Jun-03

A-2003-0281-AMIIntelligence Support to Special Access Programs 21-May-03

A-2003-0282-FFC

Workload Survey Corps of Engineers Program and Project Management, Corps of Engineers 23-May-03

A-2003-0283-FFB

Selected Aspects of Information Assurance, Fort Lewis, Washington 30-May-03

Page 245: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0284-FFG

Review of The Army Management Control Process (Fiscal Year 2002), Military District of Washington 6-Jun-03

A-2003-0285-IMOEstimated Retirement Benefits 27-May-03

A-2003-0286-IMH

Contracting for Medical Goods and Services, Contract DADA10-01-C-0010, U.S. Army Medical Command 5-Jun-03

A-2003-0287-FFB

Selected Aspects of Information Assurance, Fort Knox, Kentucky 5-Jun-03

A-2003-0288-AMW

Stock Funded Depot Level Reparable Credit Policy, Office of the Project Manager, Aviation Electronic Systems 10-Jun-03

A-2003-0289-AML Asset Status Transactions 13-Jun-03

A-2003-0290-IMT

U.S. Army Audit Agency Review of the Draft Performance Work Statement for the Walter Reed Army Medical Center Commercial Activities Study 30-May-03

A-2003-0291-AMATracking Resources for HQDA Realignment 29-May-03

A-2003-0292-FFPFederal Oversight of the Hawaii National Guard 12-Jun-03

A-2003-0293-IMO

Attestation Rev of Financial Statements for the Periods Ended September 30, 2001 & 2002 for the Anniston-Calhoun County Fort McClellan Joint Powers Authority's No-Cost Economic Development Conveyance 29-May-03

A-2003-0294-IMU

Audit of Operation Enduring Freedom--Property Accountability 2-Jun-03

A-2003-0295-AML

U.S. Army Audit Agency's Consulting Review of the Logistics Modernization Program - Phase IV Readiness Assessment 29-May-03

Page 246: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0296-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Fort George G. Meade Garrison Commercial Activities Study, Fort George G. Meade, Maryland 30-May-03

A-2003-0297-AMW

Stock Funded Depot Level Reparable Credit Policy, Office of the Project Manager, Bradley Fighting Vehicles System 13-Jun-03

A-2003-0298-AMI

Information Technology Acquisition - Reimbursable Fees (Technology Applications Office) 2-Jul-03

A-2003-0299-IMU

Management of Channel Flight Requirements and Payment Processes, U.S. Army, Europe and Seventh Army 17-Jun-03

A-2003-0300-IMOEstimated Retirement Benefits 2-Jun-03

A-2003-0301-IMU

Administrative Burden on Units, 1st Infantry Division, U.S. Army, Europe and Seventh Army 27-Jun-03

A-2003-0302-IMU

Reimbursable Workorders, U.S. Army Base Operations Maintenance Center-Europe 25-Jun-03

A-2003-0303-AMLArmy Total Asset Visibility Capability 18-Jun-03

A-2003-0304-AMW

Stock Funded Depot Level Reparable Credit Policy, Office of the Project Manager, Cargo Helicopters 16-Jun-03

A-2003-0305-AMM

Staffing and Capacity of Tables of Distribution and Allowances Maintenance Activities 17-Jun-03

A-2003-0306-FFP

Workers' Compensation, U.S. Army Pacific, Fort Shafter, Hawaii 16-Jun-03

A-2003-0307-FFG

Review of The Army Management Control Process (Fiscal Year 2002), U.S. Army Garrison, Fort Drum 11-Jun-03

Page 247: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0308-FFFDistance Learning Facilities and Hardware 24-Jun-03

A-2003-0309-FFG

Review of Army Management Control Process (Fiscal Year 2002), U.S. Army Forces Command 11-Jun-03

A-2003-0310-AMW

Stock Funded Depot Level Reparable Credit Policy, Office of the Product Manager, Aviation Mission Equipment 18-Jun-03

A-2003-0311-IMT

U.S. Army Audit Agency Review of the Cost Comparison Form for the Material Management Center, Fort Irwin, California 9-Jun-03

A-2003-0312-AMA

Projected Personnel Savings, U.S. Army Contracting Agency 30-Jun-03

A-2003-0313-AMW

Aged Accounts--Army Working Capital Fund U.S. Army Aviation and Missile Command 20-Jun-03

A-2003-0314-IMH

Controls Over the Army and Air Force Exchange Service--Cash Discounts 10-Jun-03

A-2003-0315-FFP

Reported Baseline Workyears for the Directorate of Logisitics' Commercial Activities Study, U.S. Army Garrison, Hawaii 13-Jun-03

A-2003-0316-AMIIntelligence Support to Special Access Programs 11-Jun-03

A-2003-0317-AMIIntelligence Support to Special Access Programs 11-Jun-03

A-2003-0318-AMIIntelligence Support to Special Access Programs 11-Jun-03

A-2003-0319-FFG

Review of The Army Management Control Process (Fiscal Year 2002), U.S. Army National Guard 13-Jun-03

A-2003-0320-IME

Management of Installation Environmental Programs, III Corps and Fort Hood, Texas 25-Jun-03

A-2003-0321-IMOEstimated Retirement Benefits 12-Jun-03

A-2003-0322-IMOEstimated Retirement Benefits 12-Jun-03

Page 248: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0323-FFP

Operational Project Stock Requirements, U.S. Army, Pacific 25-Jun-03

A-2003-0324-FFF

Mobilization and Pay Record Discrepancies in the Reserve Component 30-Jun-03

A-2003-0325-AMA

The Army's Purchase Card Program, U.S. Army Soldier and Biological Chemical Command Natick/Soldier Systems Center 8-Jul-03

A-2003-0326-AMW

Stock Funded Depot Level Reparable Credit Policy, Office of the Product Manager, Scout/Attack Helicopters 27-Jun-03

A-2003-0328-FFB

Secretary of The Army Executive Dining Facility Fund, Office of the Administrative Assistant to the Secretary of The Army 9-Jun-03

A-2003-0329-FFBWorkers' Compensation Program 26-Jun-03

A-2003-0330-AMW

Stock Funded Depot Level Reparable Credit Policy, Office of the Project Manager, Apache Attack Helicopter 30-Jun-03

A-2003-0331-AMI

Information Systems Security, 75th Ranger Regiment (Airborne), Fort Benning, Georgia 30-Jun-03

A-2003-0332-IMT

U.S. Army Audit Agency's Review of the Government Management Study and Cost Comparison Form for the United States Military Academy Directorate of Information Management Commercial Activities Study 20-Jun-03

A-2003-0333-AMA

Army Quality Deficiency Reporting Program, Office of the Deputy Chief of Staff, G-4 30-Jun-03

A-2003-0334-AMIIntelligence Funds, INSCOM 27-Jun-03

A-2003-0335-IME

Management of Installation Environmental Programs, Fort Lewis, Washington 3-Jul-03

Page 249: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0336-FFP

Third Party Claims, Tripler Army Medical Center, Honolulu, Hawaii 26-Jun-03

A-2003-0337-IMO

Electrical Distribution System Contract, Virginia Army National Guard Maneuver Training Center, Fort Pickett, Virginia 27-Jun-03

A-2003-0338-FFGValidation of Logistics Modernization Program 15-Jul-03

A-2003-0339-AML

Operational Project Stocks - Phase II (CONUS Replacement Centers) 26-Jun-03

A-2003-0340-IMOEstimated Retirement Benefits 26-Jun-03

A-2003-0341-IMOEstimated Retirement Benefits 26-Jun-03

A-2003-0342-FFP

Energy Savings Performance Contract, U.S. Army Garrison, Alaska 16-Jul-03

A-2003-0343-IMOEstimated Retirement Benefits 30-Jun-03

A-2003-0344-AMA

Selected Purchases, The Army's Purchase Card Program, Fort Monmouth Resident Agency (U.S. Army Criminal Investigation Command) 28-Jul-03

A-2003-0345-AMI

Reimbursable Processes for Information Technology Support - Sensitive Programs 3-Jul-03

A-2003-0346-FFBFunding Policies for Multiple-Component Units 1-Jul-03

A-2003-0347-IMT

Review of the Updated Government Costs for the Fort McCoy Directorate of Training and Mobilization Commercial Activities Study 2-Jul-03

A-2003-0348-IMOEstimated Retirement Benefits 2-Jul-03

A-2003-0349-AMA

Requirements for Models and Simulations, Office of the Program Manager, Future Combat Systems 29-Jul-03

Page 250: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0350-IMT

Review of the Updated Government Costs for the Base Operations Commercial Activities Study, U.S. Army Garrison, Fort Hunter Liggett 8-Jul-03

A-2003-0351-AMWDepreciation Charges, Rock Island Arsenal 28-Jul-03

A-2003-0352-IMH

Unpaid Medical Claims for FYs 99-00 at Madigan Army Medical Center, U.S. Army Medical Command 17-Jul-03

A-2003-0353-IMU

Operational Project Stock Requirements for Bridging, U.S. Army, Europe and Seventh Army 10-Jul-03

A-2003-0354-IMU

Operational Projects in Europe, U.S. Army, Europe and Seventh Army 10-Jul-03

A-2003-0355-IMU

U.S. Army Base Operations Maintenance Center-Europe, U.S. Army Installation Management Agency, Europe Region 18-Jul-03

A-2003-0356-IMOEstimated Retirement Benefits 10-Jul-03

A-2003-0357-IMOEstimated Retirement Benefits 10-Jul-03

A-2003-0358-IMOEstimated Retirement Benefits 10-Jul-03

A-2003-0359-FFP

Operational Project PYA (Aircraft Matting), Eighth U.S. Army 17-Jul-03

A-2003-0360-FFG

Validation of the Deployable Disbursing System - Defense Finance and Accounting Service 21-Jul-03

A-2003-0362-IMT

Contract Administration for the Directorate of Installation Support Contract, Fort McPherson, Georgia 29-Jul-03

A-2003-0363-IMOEstimated Retirement Benefits 16-Jul-03

A-2003-0364-IMT

Review of the Revised In-House Cost Estimate and Cost Comparison Form for the Red River Locks and Dams Commercial Activities Study 18-Jul-03

Page 251: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0365-IMO

Attestation Review of the Financial Statements for the Period Ended September 30, 2002 for the Bayonne Local Redevelopment Authority No-Cost Economic Development Conveyance 18-Jul-03

A-2003-0366-FFB

The Army's FY 01 Response to DOD for the Government Information Security Reform Act 5-Aug-03

A-2003-0367-IMU

Followup of Recommendations From Audit of Logistics Civil Augmentation Program 21-Jul-03

A-2003-0368-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Fort Myer Garrison Commercial Activities Study, Fort Myer, Virginia 22-Jul-03

A-2003-0369-IMH

Unpaid Medical Claims for FY 01 at Madigan Army Medical Center, U.S. Army Medical Command 22-Jul-03

A-2003-0370-IMU

Audit of Operation Enduring Freedom--In-Transit Visibility 24-Jul-03

A-2003-0371-IMU

Operation Enduring Freedom--Use of Identification Technology for In-Transit Visibility 24-Jul-03

A-2003-0372-FFP

Review of Government Purchase Card Activities, Camp Casey Golf Course 25-Jul-03

A-2003-0373-AMA

High Mobility Artillery Rocket System Program, Office of the Product Manager 3-Aug-03

A-2003-0374-FFC

Audit of Operations and Maintenance Requirements and Maintenance Backlog--Conversion of Operations and Maintenance Data to P2 29-Jul-03

Page 252: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0375-IMO

Attestation Review of the Financial Statements for the Period Ended September 30, 2002 for the Red River Redevelopment Authority No-Cost Economic Development Conveyance 2-Sep-03

A-2003-0376-AMI

Intelligence Contingency Funds, U.S. European Command 28-Jul-03

A-2003-0377-AMI

Intelligence Contingency Funds, 650th Military Intelligence Group 14-Aug-03

A-2003-0378-IMOEstimated Retirement Benefits 28-Jul-03

A-2003-0379-IMT

U.S. Army Audit Agency Review of the Government Management Study and Cost Comparison Form for the Installation Support Services Commercial Acivities Study 29-Jul-03

A-2003-0380-IME

Remediation and Disposal Strategies for Inactive Reactors, U.S. Army Corps of Engineers, Washington, DC 4-Aug-03

A-2003-0381-IMOEstimated Retirement Benefits 29-Jul-03

A-2003-0382-IMOEstimated Retirement Benefits 29-Jul-03

A-2003-0383-IMOEstimated Retirement Benefits 1-Aug-03

A-2003-0384-IMEFollowup Review of Audit Recommendation 1-Aug-03

A-2003-0385-AML

Audit of Reporting Combat/Tactical System Usage, XVIII Airborne Corps and Fort Bragg, Fort Bragg, North Carolina 4-Aug-03

A-2003-0386-AMI

Intelligence Support to Special Access Programs, Site E 6-Aug-03

A-2003-0387-IMOEstimated Retirement Benefits 5-Aug-03

A-2003-0388-IMOEstimated Retirement Benefits 5-Aug-03

A-2003-0389-IMEManagement of Installation Environmental Programs 7-Aug-03

Page 253: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0390-IMU

Followup of Recommendations From Audit Report: A-2003-0026-IMU, Funding Execution--Task Force Sinai 6-Aug-03

A-2003-0391-FFPNon-Tactical Vehicles, U.S. Army Garrison, Japan 8-Aug-03

A-2003-0392-AMMDepot-Level Maintenance Workload Reporting - FY 02 11-Aug-03

A-2003-0393-IMOEstimated Retirement Benefits 7-Aug-03

A-2003-0394-AMM

Review of Depot-Level Maintenance Workload Reporting for FY 02, Program Executive Officer, Ground Combat Systems 15-Aug-03

A-2003-0395-AMM

Review of Depot-Level Maintenance Workload Reporting for FY 02, Program Executive Officer for Combat Support and Combat Service Support 15-Aug-03

A-2003-0396-AMM

Review of Depot-Level Maintenance Workload Reporting for FY 02, U.S. Army Tank-automotive and Armaments Command 15-Aug-03

A-2003-0397-AMW

Aged Accounts--Army Working Capital Fund, U.S. Army Communications-Electronics Command 15-Aug-03

A-2003-0398-IMOEstimated Retirement Benefits 14-Aug-03

A-2003-0399-IMU

Followup on Implementation of Recommendation in Audit Report A-2002-0460-IMU 15-Aug-03

A-2003-0400-IMU

Audit of Operation Enduring Freedom--Class IX Aviation Spare Parts 19-Aug-03

A-2003-0401-AML

Small Purchases of Supplies and Equipment, South Carolina Army National Guard, Columbia, South Carolina 12-Sep-03

Page 254: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0402-AMI

Information Systems Security, 160th Special Operations Aviation Regiment (Airborne), Fort Campbell, Kentucky 17-Sep-03

A-2003-0403-AMA

Common Hardware Systems Notebook Computers 3-Sep-03

A-2003-0404-FFGAudit of Nonappropriated Fund Collateral 20-Aug-03

A-2003-0405-FFB

Disbursements Without Obligations, Assistant Secretary of the Army (Financial Management and Comptroller) 22-Aug-03

A-2003-0406-IMH

Followup Issues-Administrative Controls Over Sensitive Drugs, Madigan Army Medical Center, Tacoma, Washington 21-Aug-03

A-2003-0407-FFB

Disbursements Without Obligations, XVIII Airborne Corps and Fort Bragg 30-Sep-03

A-2003-0408-FFB

Disbursements Without Obligations, Headquarters 3d Infantry Division (Mechanized) and Fort Stewart 30-Sep-03

A-2003-0409-FFB

Disbursements Without Obligations, U.S. Army Garrison, Fort George G. Meade 30-Sep-03

A-2003-0410-FFB

Disbursement Without Obligations, U.S. Army Aviation Center and Fort Rucker 30-Sep-03

A-2003-0411-FFB

Disbursements Without Obligations, U.S. Army Tank-automotive and Armament6s Command 30-Sep-03

A-2003-0412-FFB

Disbursements Without Obligations, U.S. Army Special Operations Command 30-Sep-03

A-2003-0413-FFB

Disbursements Without Obligations, U.S. Army Acquisition, Logistics, and Technology Enterprise Systems and Services 30-Sep-03

A-2003-0414-IMOEstimated Retirement Benefits 20-Aug-03

Page 255: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0415-FFF

Advanced Individual Training Courses, U.S. Army Air Defense Artillery School, Fort Bliss, Texas 27-Aug-03

A-2003-0416-AMI

Information Technology for Special Access Programs (Summary) 25-Aug-03

A-2003-0417-FFB

Attestation of U.S. Army South Visual Information Workload 22-Aug-03

A-2003-0418-AML

Audit of Reporting Combat/Tactical Systems Usage Data, 3rd Infantry Division (Mechanized) and Fort Stewart 25-Aug-03

A-2003-0419-PMO

Quality Assurance Post Audit Review of the Audit of Dredging Operations in the Pacific Region 4-Sep-03

A-2003-0420-PMO

Quality Assurance Post Audit Review of the Audit of Aviation Maintenance and Business Practices 4-Sep-03

A-2003-0422-AMLOperational Project Stocks - Phase II 28-Aug-03

A-2003-0423-FFB

Joint Telecommunications Task Force - Armywide Issues, Chief Information Officer/G-6 5-Sep-03

A-2003-0424-IMO

Audit of Garrison/Mission Workload at the National Training Center and Fort Irwin 28-Aug-03

A-2003-0425-FFC

Audit of Recreation Facility Financial and Contract Management, Fort Worth District 12-Sep-03

A-2003-0426-AML

Audit of Reporting Combat/Tactical Systems Usage, U.S. Army Field Artillery Center and Fort Sill, Fort Sill, Oklahoma 27-Aug-03

A-2003-0427-AMI

Intelligence Support to Special Access Programs, Office of the Secretary of the Army 28-Aug-03

A-2003-0428-AMAThe Unit Set Fielding Process 17-Sep-03

A-2003-0429-PMO

Quality Assurance Review of Potential Monetary Benefits 25-Aug-03

A-2003-0430-IMOEstimated Retirement Benefits 2-Sep-03

Page 256: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0431-AML

U.S. Army Audit Agency's Consulting Review of the Logistics Modernization Progam - Phase IV 10-Sep-03

A-2003-0432-IMOEstimated Retirement Benefits 3-Sep-03

A-2003-0433-FFF

Military Training Service Support-Pilot Test, Fort Lee, Virginia 29-Sep-03

A-2003-0434-IME Range Sustainment 9-Sep-03

A-2003-0435-IMT

U.S. Army Audit Agency Review of the Updated Cost Comparison Form for the Public Works and Information Management Support Services Commercial Activities Study 5-Sep-03

A-2003-0436-AMMNational Maintenance Progam Standards 10-Sep-03

A-2003-0438-IMOEstimated Retirement Benefits 9-Sep-03

A-2003-0439-AMA

The Army's Purchase Card Program, U.S. Army Communications-Electronics Command, Fort Monmouth, New Jersey 26-Sep-03

A-2003-0440-AML

Audit of Reporting Combat/Tactical Systems Usage, 24th Infantry Division (Mechanized) and Fort Riley, Kansas 9-Sep-03

A-2003-0441-AML

Audit of Reporting Combat/Tactical Systems Usage, III Corps and Fort Hood, Texas 9-Sep-03

A-2003-0442-AML

Audit of Reporting Combat/Tactical Systems Usage, I Corps and Fort Lewis 9-Sep-03

A-2003-0443-FFFMobilization Deployment Integration System 30-Sep-03

A-2003-0444-FFP

Review of Organizational Clothing and Individual Equipment Transactions, Camp Humphreys 25-Sep-03

A-2003-0445-AMAIndustrial Preparedness Planning for Ammunition 26-Sep-03

A-2003-0446-AMA

The Army's Purchase Card Program, U.S. Army Aviation and Missile Command 24-Sep-03

Page 257: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0447-FFP

Operational Projects--Project PEH (Bridging), Eighth U.S. Army, Korea 18-Sep-03

A-2003-0448-AMW

Aviation Tracked Components, U.S. Army Aviation and Missile Command, For the Deputy Chief of Staff, G-4 29-Sep-03

A-2003-0449-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Directorate of Installation Operations Commercial Activities Study, Aberdeen Proving Ground, Maryland 22-Sep-03

A-2003-0450-AMWDepreciation Charges, Anniston Army Depot 23-Sep-03

A-2003-0451-IMH

Attestation Review of Army and Air Force Exchange Service External Contract Oversight 25-Sep-03

A-2003-0452-FFGStored Value Card--Joint Task Force Bravo 30-Sep-03

A-2003-0453-IMT

U.S. Army Audit Agency Review of the Revised Cost Comparison Form for the Logistics Directorate Commercial Activities Study, Fort Riley, Kansas 19-Sep-03

A-2003-0454-AMWStock Funded Depot Level Reparable Credit Policy 22-Sep-03

A-2003-0455-AMW

Reviewing Aged Accounts Payable, In-Transits, and Unliquidated Obligations, Supply Management, Army Activity Group--Army Working Capital Fund 23-Sep-03

A-2003-0456-FFGArmy Government Purchase Card 30-Sep-03

A-2003-0457-FFP

Operational Projects--Project PYT and PYX (Mortuary Affairs), Eighth U.S. Army 25-Sep-03

A-2003-0458-IMOEstimated Retirement Benefits 23-Sep-03

A-2003-0459-AMA

The Army's Purchase Card Program, Fort Eustis and Fort Monroe, Virginia 25-Sep-03

Page 258: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0460-AMW

Followup Review of Government Purchase Cards, Anniston Army Depot 24-Sep-03

A-2003-0461-IMO

Attestation Engagement on Utility Privatization Alternatives 24-Sep-03

A-2003-0462-FFC

Attestation of Chief Financial Officers Act Self-Assessment, Issue 4--Project Relocation Costs 30-Sep-03

A-2003-0463-AMW

Aviation Spare Parts Requirements, U.S. Army Aviation and Missile Command 25-Sep-03

A-2003-0464-AMA

The Army's Purchase Card Program, Alabama Army National Guard 25-Sep-03

A-2003-0465-IMOEstimated Retirement Benefits 25-Sep-03

A-2003-0466-FFF Travel Issues 29-Sep-03

A-2003-0467-FFF

Selected Management Controls Over Use of Military Aircraft 29-Sep-03

A-2003-0468-IMOEstimated Retirement Benefits 25-Sep-03

A-2003-0469-FFC

Attestation of Chief Financial Officers Act Self-Assessment, Issue 5-Management of Accounts Receivable 30-Sep-03

A-2003-0470-FFC

Attestation of Chief Financial Officers Act Self-Assessment, Issue 3-Abnormal General Ledger Balances 30-Sep-03

A-2003-0471-IMOEstimated Retirement Benefits 25-Sep-03

A-2003-0472-AMW

Army Working Capital Fund Followup--Statement of Budgetary Resources Journal Voucher Guidance, Defense Finance and Accounting Service 26-Sep-03

A-2003-0473-AMW

Army Working Capital Fund Followup--Statement of Financing, Defense Finance and Accounting Service 29-Sep-03

Page 259: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2003-0474-FFP

Review of Government Purchase Card Activities, Transportation Motor Pool, Camp casey 30-Sep-03

A-2003-0475-AMW

Aged Accounts, Supply Management, Army Activity Group, Army Working Capital Fund 29-Sep-03

A-2003-0476-IMOEstimated Retirement Benefits 29-Sep-03

A-2003-0477-AMWRecognition of Expense Upon the Sale of Inventory 30-Sep-03

A-2003-0479-FFC

Attestation of Chief Financial Officers Act Self-Assessment, Issue 1-Asset Cost Table Reconciliation 30-Sep-03

A-2003-0480-AMW

Followup Report--Inventory and Financial Management, Defense Supply Service Washington 30-Sep-03

A-2003-0481-IMOEstimated Retirement Benefits 30-Sep-03

A-2003-0482-IMOEstimated Retirement Benefits 30-Sep-03

A-2003-0483-IMO

Attestation Review of the Financial Statements for the Period Ended June 30, 2002 for the City of Sacramento Former Sacramento Army Depot Operations No-Cost Economic Development Conveyance 30-Sep-03

A-2003-0484-IMOEstimated Retirement Benefits 30-Sep-03

A-2004-0001-IMH

Financial Controls--Golf Course Operations, Fort George G. Meade, Maryland 1-Oct-03

A-2004-0002-IMH

Followup Issues, Joint Support Agreement for Healthcare Services, William Beaumont Army Medical Center, El Paso, Texas 1-Oct-03

A-2004-0003-FFP

Operational Projects--Project PLU (Inland Petroleum Distribution System), Eighth U.S. Army 8-Oct-03

Page 260: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0004-FFP

Operational Projects--Projects PBO/PCH (Hot/Cold Weather Clothing), Eighth U.S. Army 8-Oct-03

A-2004-0005-IME

Management of Active Army Reactor Facilities, U.S. Army Test and Evaluation Command 3-Oct-03

A-2004-0006-FFGGeneral Fund Followup Issues 29-Oct-03

A-2004-0007-FFF

Legal Review of Test Procedures, Audit of Military Training Service Support Pilot Test 9-Dec-03

A-2004-0008-FFC

Attestation of Chief Financial Officers Act Self-Assessment, Issue 6--Accumulated Depreciation 9-Oct-03

A-2004-0009-IMT

U.S. Army Audit Agency Review of the Government Management Study and Cost Comparison Form for the Housekeeping Services Commercial Activities Study 6-Oct-03

A-2004-0010-FFG

Asset Visibility of Apache Helicopters A/D-Models During Conversions, U.S. Army Aviation and Missile Command 23-Oct-03

A-2004-0011-FFF

Family Support for Reserve Component Soldiers in Extended Deployments 17-Oct-03

A-2004-0012-IMOEstimated Retirement Benefits 6-Oct-03

A-2004-0013-IMU

Audit of Operation Enduring Freedom--Class IX Aviation Spare Parts 7-Oct-03

A-2004-0014-AMAG-2 Foreign Intelligence Support to Acquisition 31-Oct-03

A-2004-0015-IME

Followup Review of Audit Recommendation From Audit Report: AA-110 7-Oct-03

A-2004-0016-IMOEstimated Retirement Benefits 8-Oct-03

A-2004-0017-IMOEstimated Retirement Benefits 8-Oct-03

Page 261: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0018-IMO

Attestation Review of the Financial Statements for the Period Ended December 31, 2002 for the Chaffee Redevelopment Authority No-Cost Economic Development Conveyance 9-Oct-03

A-2004-0019-FFC

Attestation of Chief Financial Officers Act Self-Assessment, Issue 8--Proper Recording of Accounts Payable/Accruals 15-Oct-03

A-2004-0020-IMOEstimated Retirement Benefits 9-Oct-03

A-2004-0021-IMOEstimated Retirement Benefits 9-Oct-03

A-2004-0022-AMA

Followup Audit of Rechargeable Batteries for Communications and Electronics Systems 31-Oct-03

A-2004-0023-AMWDepreciation Charges, Blue Grass Army Depot 30-Oct-03

A-2004-0024-IMO

Privatization of Family Housing--Reinvestment Strategy, Fort Carson, Colorado 16-Oct-03

A-2004-0025-IMOEstimated Retirement Benefits 14-Oct-03

A-2004-0026-AMA

The Army's Purchase Card Program, Headquarters, III Corps and Fort Hood, Fort Hood, Texas 21-Oct-03

A-2004-0027-IMOEstimated Retirement Benefits 16-Oct-03

A-2004-0028-IMOEstimated Retirement Benefits 16-Oct-03

A-2004-0029-IMOEstimated Retirement Benefits 16-Oct-03

A-2004-0030-AMA

The Army's Purchase Card Program, U.S. Army Contracting Agency, Northern Region, Directorate of Contracting, Fort Lewis, Washington 29-Oct-03

A-2004-0031-FFG

Independent Auditors' Report--American Red Cross Opinion 27-Oct-03

Page 262: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0032-FFB

Attestation of Investment and Cost Avoidance Estimates for the Forms Content Management Program 31-Oct-03

A-2004-0033-IMUManagement of Resources, Army Forces-Turkey 23-Oct-03

A-2004-0034-IMU

Consolidation of Maintenance Activities, U.S. Army Installation Management Agency, Europe Region 5-Dec-03

A-2004-0035-IMOEstimated Retirement Benefits 20-Oct-03

A-2004-0036-FFC

Attestation of Chief Financial Officers Act Self-Assessment, Issue 8--Proper Recording of Accounts Payable/Accruals 21-Oct-03

A-2004-0037-IMOEstimated Retirement Benefits 23-Oct-03

A-2004-0038-IMOEstimated Retirement Benefits 24-Oct-03

A-2004-0039-IMOEstimated Retirement Benefits 24-Oct-03

A-2004-0040-FFG

Review of the Army Management Control Process (Fiscal Year 2003)--An Assessment for the Secretary of The Army 29-Oct-03

A-2004-0041-AMW

Followup Report--Inventory and Financial Management, Internal Review Directorate, Office of the Administrative Assistant to the Secretary of the Army 29-Oct-03

A-2004-0042-FFC

Attestation of Chief Financial Officers Act Self-Assessment, Issue 10--Real Property 21-Nov-03

A-2004-0043-AMA

The Army's Purchase Card Program, Dwight D. Eisenhower Army Medical Center and Southeast Regional Contracting Office 25-Nov-03

A-2004-0044-AMWAviation Acquisition Planning Process 24-Nov-03

A-2004-0045-AMIIntelligence Contingency Funds, Forces Command 12-Dec-03

Page 263: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0046-IMT

U.S. Army Audit Agency's Review of the Reported Baseline Workyears for the Adjutant General Commercial Activities Study at Fort Huachuca, Arizona 6-Nov-03

A-2004-0047-FFC

Audit of Recreation Facility Financial and Contract Management, Fort Worth District - Canyon Lake Contract Fee Collector 12-Dec-03

A-2004-0048-IMOEstimated Retirement Benefits 4-Nov-03

A-2004-0049-IMU

Allocation of Army Lodging Fund Common Overhead Support, 104th Area Support Group, Hanau, Germany 5-Dec-03

A-2004-0050-IMH

Contracting for Medical Goods and Services, Contract DADA10-02-F-0223, U.S. Army Medical Command Health Care Acquisition Activity 3-Dec-03

A-2004-0051-IMOEstimated Retirement Benefits 4-Nov-03

A-2004-0052-FFP

Operational Projects--Projects PLF, PCJ, and PF7 (Receiving, Staging, Onward Movement and Integration; Containerized Chapels; and Collective Support Systems), Eighth U.S. Army 19-Nov-03

A-2004-0053-IMU

Operation Enduring Freedom--Management of Class I Supplies 5-Dec-03

A-2004-0054-IMO

Audit of the Financial Statements for the Period Ended June 30, 2002 for the Ogden City Local Redevelopment Authority No-Cost Economic Development Conveyance 10-Nov-03

A-2004-0055-AMW

Army Working Capital Fund Followup--Statement of Budgetary Resources Journal Vouchers, Defense Finance and Accounting Service 2-Dec-03

Page 264: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0056-IMH

Aircraft Maintenance and Repair Contract, Fort Bliss, Texas 4-Dec-03

A-2004-0057-IMH

Propriety of Fund Use--Aircraft Maintenance and Repair Contract, Fort Bliss, Texas 4-Dec-03

A-2004-0058-IMOEstimated Retirement Benefits 10-Nov-03

A-2004-0059-IMOEstimated Retirement Benefits 12-Nov-03

A-2004-0060-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the United States Military Academy Logistics Support Services Commercial Activities Study, West Point, New York 20-Nov-03

A-2004-0061-IMOEstimated Retirement Benefits 13-Nov-03

A-2004-0062-AMA

The Army's Purchase Card Program, Darnall Army Community Hospital and U.S. Army Dental Activity, Fort Hood, Texas and Great Plains Regional Contracting Office, Fort Sam Houston, Texas 28-Nov-03

A-2004-0063-AMA

The Army's Purchase Card Program, Office of the United States Property and Fiscal Officer, Texas Army National Guard 28-Nov-03

A-2004-0064-PMOQuality Assurance Review of Reporting Standards 4-Dec-03

A-2004-0065-PMO

Quality Assurance Review of Reporting Standards for Audit Report: A-2003-0236-FFB, Resource Transfers for U.S. Army Network Enterprise Technology Command 15-Dec-03

A-2004-0066-IMU

Operation Enduring Freedom--Management and Use of Shipping Containers 9-Dec-03

Page 265: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0067-AML

Audit of Operational Project Stocks--Phase II, U.S. Army Forces Command and Third U.S. Army 24-Nov-03

A-2004-0068-FFP

Lessons Learned from an Energy Savings Performance Contract, U.S. Army Garrison, Alaska 10-Dec-03

A-2004-0069-FFCPermit Process for Central and South Florida 3-Dec-03

A-2004-0070-IMOEstimated Retirement Benefits 25-Nov-03

A-2004-0071-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Garrison Support Services Commercial Activities Study, Picatinny Arsenal, New Jersey 2-Dec-03

A-2004-0072-AMAFollowup Audit of Integrated System Control 29-Dec-03

A-2004-0073-FFFOperational Facility Requirements Rules 15-Jan-04

A-2004-0074-IMO

Attestation Review of the Financial Statements for the Period Ended June 30, 2002 for the Fort Ord Reuse Authority No-Cost Economic Development Conveyance 3-Dec-03

A-2004-0075-FFG

Validation of Property Book and Unit Supply Enhanced System 5-Dec-03

A-2004-0076-IMHControls Over the Army and Air Force Exchange Service 19-Dec-03

A-2004-0077-FFF

Validation of Material Weakness - Automated Mobilization System, National Guard Bureau 16-Dec-03

A-2004-0078-AML

Reporting Combat and Tactical Systems Usage, U.S. Army Forces Command, Fort McPherson, Georgia 19-Dec-03

A-2004-0079-AML

Audit of Reporting Combat/Tactical Systems Usage Data, Office of the Deputy Assistant Secretary of the Army (Cost and Economics) 8-Dec-03

Page 266: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0080-AML

Audit of Reporting Combat/Tactical Systems Usage Data, Office of the Chief of Staff, G-4 8-Dec-03

A-2004-0081-IMT

Pay and Travel Operations, U.S. Property and Fiscal Office for California 10-Dec-03

A-2004-0082-IMT

Financial and Accounting Operations, U.S. Property and Fiscal Office for California 10-Dec-03

A-2004-0083-FFC

Sponsor Contributions Central and South Florida Projects, U.S. Army Corps of Engineers U. S. Army Engineer District, Jacksonville 17-Dec-03

A-2004-0084-IMOEstimated Retirement Benefits 5-Dec-03

A-2004-0085-FFF

Military Training Service Support-Pilot Test, Fort Gordon, Georgia 18-Dec-03

A-2004-0086-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the United States Military Academy Directorate of Information Management Commercial Activities Study 9-Dec-03

A-2004-0087-IMH

Army Lodging Overhead Costs, Fort Sam Houston, Texas 18-Dec-03

A-2004-0088-IMH

Army Lodging Overhead Costs, Fort Gordon, Georgia 15-Dec-03

A-2004-0089-IMT

Contract Administration for the Directorate of Public Works Contract, Fort Stewart, Georgia 11-Dec-03

A-2004-0090-IMH

Requested Followup--Morale, Welfare and Recreation Sustainment, Restoration and Modernization, U.S. Army Community and Family Support Center 18-Dec-03

A-2004-0091-FFF

Followup Audit of Funding of Aviation Training, U.S. Army Aviation Center and Fort Rucker 15-Jan-04

Page 267: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0092-FFFTraining-Base and First-Term Soldier Attrition 8-Jan-04

A-2004-0093-IME

Installation Preparedness for Weapons of Mass Destruction 16-Dec-03

A-2004-0094-IMOEstimated Retirement Benefits 15-Dec-03

A-2004-0095-AML

Attestation Review of the Plan for Disposition of Excess Property 15-Dec-03

A-2004-0096-PMO

Quality Assurance Post Audit Review of the Audit of Unpaid Medical Claims for FY 01 at Madigan Army Medical Center 20-Jan-04

A-2004-0097-AMA

The Army's Purchase Card Program, U.S. Army Infantry Center and Fort Benning, Fort Benning, Georgia 31-Dec-03

A-2004-0098-IMOEstimated Retirement Benefits 16-Dec-03

A-2004-0099-AMM

Attestation Review of Army Ideas for Excellence Program, Idea No. AMTT 980056 17-Dec-03

A-2004-0100-AMM

Tactical Software Maintenance, Office of the PEO for Command, Control and Communications (Tactical) and Office of the PEO for Intelligence, Electronic Warfare and Sensors 23-Dec-03

A-2004-0101-AMI

Information Systems Security, U.S. Army Special Operations Command, Fort Bragg, North Carolina 27-Feb-04

A-2004-0103-AMLAudit of Recapitalization Program Efficiency 18-Dec-03

A-2004-0104-AMLAudit of the Direct Support Plus Conversion Program 22-Mar-04

A-2004-0105-FFG

Review of the Army Management Control Process (Fiscal Year 2003), Deputy Chief of Staff, G-1 12-Jan-04

A-2004-0106-IMOEstimated Retirement Benefits 18-Dec-03

Page 268: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0107-IMOEstimated Retirement Benefits 19-Dec-03

A-2004-0108-AML

Operational Project Stocks - Phase II, Headquarters, Department of the Army 12-Feb-04

A-2004-0109-AMW

Aviation Spare Parts Requirements, Supply Control Studies, U.S. Army Aviation and Missile Command 31-Dec-03

A-2004-0110-FFBFederal Oversight of the National Guard 12-May-04

A-2004-0111-AMA

Army Watercraft Program, Office of the Deputy Chief of Staff, G-4 and Office of the Deputy Chief of Staff, G-8 22-Jan-04

A-2004-0112-IMOEstimated Retirement Benefits 31-Dec-03

A-2004-0113-IMOEstimated Retirement Benefits 5-Jan-04

A-2004-0115-FFB

Review of the Management Control Process (Fiscal Year 2002), Colorado Army National Guard 19-Feb-04

A-2004-0116-PMO

Audit of the Agency's Accountability for Agency for Mobile Information Technology Property 25-Feb-04

A-2004-0117-IMOEstimated Retirement Benefits 7-Jan-04

A-2004-0118-FFG

Review of Army Management Control Process (Fiscal Year 2003), Office of the Administrative Assistant to the Secretary of the Army, Headquarters, DA 21-Jan-04

A-2004-0119-FFG

Review of Army Management Control Process (Fiscal Year 2003), Deputy Chief of Staff, G-3 22-Jan-04

A-2004-0120-PMO

Quality Assurance Post Audit Review of the Audit of Reimbursable Processes for Information Technology Support-Special Programs 11-Feb-04

Page 269: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0121-FFF

Followup Audit of Advanced Individual Training Courses, U.S. Army Signal Center, Fort Gordon, Georgia 3-May-04

A-2004-0122-IMOEstimated Retirement Benefits 8-Jan-04

A-2004-0123-IMOEstimated Retirement Benefits 8-Jan-04

A-2004-0124-IMOEstimated Retirement Benefits 12-Jan-04

A-2004-0125-AMW

Aviation Tracked Components, U.S. Army Aviation and Missile Command 28-Jan-04

A-2004-0126-IMOEstimated Retirement Benefits 12-Jan-04

A-2004-0127-IMU

Allocation of Army Lodging Fund Common Overhead Support Costs, 26th Area Support Group, Heidelberg, Germany 21-Jan-04

A-2004-0128-IMOEstimated Retirement Benefits 13-Jan-04

A-2004-0129-IMEFollowup Review of Audit Recommendations 13-Jan-04

A-2004-0130-AMI

Attestation of a Reported $80,000 Central Funding Vault Discrepancy 13-Jan-04

A-2004-0131-FFP

Government Purchase Card Management Controls, U.S. Army Contracting Command, Korea, Seoul, Korea 19-Feb-04

A-2004-0132-IMOEstimated Retirement Benefits 13-Jan-04

A-2004-0133-FFC

Security of Civil Works Water Resources Infrastructure, U.S. Army Engineer District, Little Rock 12-Jan-04

A-2004-0134-IMOEstimated Retirement Benefits 14-Jan-04

A-2004-0135-IMOEstimated Retirement Benefits 14-Jan-04

A-2004-0136-FFFResponse to Inspector General Action Request 16-Jan-04

A-2004-0137-IMO

Audit of Military Construction National Environmental Policy Act Administrative Costs 23-Jan-04

A-2004-0138-IMOEstimated Retirement Benefits 15-Jan-04

Page 270: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0139-AMA

Attestation Review of Army Ideas for Excellence Program, Idea No. AMTT 020051 15-Jan-04

A-2004-0140-IMOEstimated Retirement Benefits 15-Jan-04

A-2004-0141-AMM

Sustainment Planning for Maintenance Support - Comanche 28-Jan-04

A-2004-0142-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Directorate of Information Management Commercial Activities Study, United States Military Academy, West Point, New York 20-Jan-04

A-2004-0143-IMH

Army Lodging Overhead Costs, Fort Leonard Wood, Missouri 21-Jan-04

A-2004-0144-IMOEstimated Retirement Benefits 20-Jan-04

A-2004-0145-IMOEstimated Retirement Benefits 20-Jan-04

A-2004-0146-IMO

Privatization of Family Housing, Fort Meade, Maryland 28-Jan-04

A-2004-0147-AMM

Specialized Repair Authority, U.S. Army Training and Doctrine Command 9-Feb-04

A-2004-0148-AMM

Specialized Repair Authority, U.S. Army Forces Command 13-Feb-04

A-2004-0149-FFG

Review of the Army Management Control Process (Fiscal Year 2003), U. S. Army Infantry Center, Fort Benning, Georgia 4-Feb-04

A-2004-0150-IMO

DOD Support to the 2002 Olympic and Paralympic Winter Games 20-Feb-04

A-2004-0151-IMOEstimated Retirement Benefits 28-Jan-04

A-2004-0152-IMOEstimated Retirement Benefits 28-Jan-04

A-2004-0153-AMWDepreciation Charges, U.S. Army Materiel Command 31-Mar-04

A-2004-0154-IMOEstimated Retirement Benefits 30-Jan-04

Page 271: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0155-IMH

Followup Issues--Linen Services Contract, Madigan Army Medical Center, Tacoma, Washington 6-Feb-04

A-2004-0156-IMU

Operation Enduring Freedom--Logistics Civil Augmentation Program 27-Feb-04

A-2004-0157-IMH

Contracting for Medical Goods and Services, Contract DADA10-01-C-0007, U.S. Army Medical Command 26-Feb-04

A-2004-0158-AMM

Specialized Repair Authority, U.S. Army Communications-Electronics Command 4-Feb-04

A-2004-0159-IMOEstimated Retirement Benefits 2-Feb-04

A-2004-0160-AMM

Attestation Review of Army Ideas for Excellence Program, Idea No. NGIN04003M 5-Feb-04

A-2004-0161-IMU

Followup Review of Recommendations From Audit Report: AA00-368, Requirements for Nontactical Vehicles, U.S. Army, Europe and Seventh Army 10-Feb-04

A-2004-0162-AMW

Aviation Spare Parts Requirements, Compressor Blade, U.S. Army Aviation and Missile Command 20-Feb-04

A-2004-0163-AMM

Specialized Repair Authority, U.S. Army Aviation and Missile Command 20-Feb-04

A-2004-0164-AMM

Specialized Repair Authority, U.S. Army Tank-automotive and Armaments Command 23-Feb-04

A-2004-0165-FFG

Review of the Army Management Control Process (Fiscal Year 2003), U.S. Army Signal Center, Fort Gordon, Georgia 10-Feb-04

A-2004-0166-IMOEstimated Retirement Benefits 9-Feb-04

A-2004-0167-IMOEstimated Retirement Benefits 9-Feb-04

Page 272: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0168-AMAThe Army's Purchase Card Program 27-Feb-04

A-2004-0169-IMOEstimated Retirement Benefits 10-Feb-04

A-2004-0170-AMI

Information Systems Security in the Army Special Operations Forces Community, Office of the Secretary of the Army 27-Feb-04

A-2004-0171-FFG

U.S. Debit Card Pilot Program, U.S. Southern Command, Miami, Florida 26-Feb-04

A-2004-0172-AMW

Selected Stock Funded Depot Level Reparable Requisitions, Office of the Project Manager, Apache Attack Helicopter 27-Feb-04

A-2004-0173-IME

Land Use Controls and Monitoring at Formerly Used Defense Sites, U.S. Army Corps of Engineers, Baltimore District 19-Feb-04

A-2004-0174-IMOEstimated Retirement Benefits 13-Feb-04

A-2004-0175-IMOEstimated Retirement Benefits 13-Feb-04

A-2004-0176-IMOEstimated Retirement Benefits 17-Feb-04

A-2004-0177-IMOEstimated Retirement Benefits 17-Feb-04

A-2004-0178-IMT

U.S. Army Audit Agency's Review of the Updated Cost Comparison Form for the Housekeeping Services Commercial Activities Study, Walter Reed Army Medical Center, Washington, DC 18-Feb-04

A-2004-0179-AMMSpecialized Repair Authority 19-Mar-04

A-2004-0180-IMOEstimated Retirement Benefits 19-Feb-04

A-2004-0181-IMU

Followup Review of Recommendation B-1 From Audit Report: A-2002-0488-IMU, Child Care Operations, U.S. Army, Europe and Seventh Army 19-Feb-04

Page 273: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0182-IMU

Followup Review of Recommendations From Audit Report: A-2003-0105-IMU, General Support Maintenance Program, U.S. Army, Europe and Seventh Army 23-Feb-04

A-2004-0183-AMA

Generators, Office of the Project Manager, Mobile Electric Power 12-Mar-04

A-2004-0184-IMT

Review of Online Data Collection Tool: Process Controls 20-Feb-04

A-2004-0185-IMT

U.S. Army Audit Agency Review of the Reported Baseline and Most Efficient Organization Workyears for the Directorate of Engineering and Logistics Commercial Activities Study, Fort Lee, Virginia 26-Feb-04

A-2004-0186-IMO

Potable Water and Wastewater Utility Systems Contract, Aberdeen Proving Ground, Maryland 27-Apr-04

A-2004-0187-IMH

Followup Audit of Management Controls for Reimbursable Orders, U.S. Army Garrison, Fort Sam Houston, Texas 26-Feb-04

A-2004-0188-AMM

Followup on Process for Determining Source of Depot Level Maintenance 22-Mar-04

A-2004-0189-IME

Followup Review of Audit Recommendation From Audit Report: AA00-332 25-Feb-04

A-2004-0190-AMA

Realignment Phase 2 Field Operating Agencies, Army National Guard Readiness Center 12-Mar-04

A-2004-0191-IMOEstimated Retirement Benefits 25-Feb-04

A-2004-0192-AMW

Followup Review of Consigned Inventory, Army Working Capital Fund 11-Mar-04

A-2004-0193-IMOEstimated Retirement Benefits 27-Feb-04

Page 274: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0194-IMT

Review of Medical Research Cooperative Agreement DAMD17-98-2-8018, Fort Detrick, Maryland 1-Mar-04

A-2004-0195-AMIFollow Up Information System Security 1-Mar-04

A-2004-0196-AMLTraining Resource Model Efficiencies Process 17-Mar-04

A-2004-0197-IMT

Review of the Revised Management Study, Technical Performance Plan and Government Costs for the Commercial Activities Study at the Fort Campbell Readiness Business Center 3-Mar-04

A-2004-0198-IMOEstimated Retirement Benefits 2-Mar-04

A-2004-0199-AMA Joint Simulation System 16-Mar-04

A-2004-0200-IMOEstimated Retirement Benefits 4-Mar-04

A-2004-0201-IMOEstimated Retirement Benefits 4-Mar-04

A-2004-0202-AMA

Interceptor Body Armor, Office of the Inspector General 17-Mar-04

A-2004-0203-IMOEstimated Retirement Benefits 12-Mar-04

A-2004-0204-IMOEstimated Retirement Benefits 8-Mar-04

A-2004-0205-FFG

Validation of Completed Tasks for Interest Payable--Army Chief Financial Officers Strategic Plan 6-Apr-04

A-2004-0206-IMT

Schedule of Adjustments From the Review of the Cost Comparison Form for the Commercial Activities Study of the Fort Campbell Public Works Business Center 10-Mar-04

A-2004-0207-IMT

Distribution and Allocation of Funds, U.S. Army White Sands Missile Range, New Mexico 16-Mar-04

A-2004-0208-FFP

Audit of Government Purchase Card Activities, Project OLR-Korea, Camp Humphreys 25-Mar-04

Page 275: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0209-FFF

Management Controls Over Travel, Leave, and Pay Transactions, U.S. Army Reserve 99th Regional Support Command 24-Mar-04

A-2004-0210-IMO

No-Cost Economic Development Conveyance Financial Statements, Massachusetts Development Finance Agency, Devens, Massachusetts 12-Mar-04

A-2004-0211-FFF

Army Working Capital Fund Supply Management Staffing Model Prototype, U.S. Army Aviation and Missile Command 7-May-04

A-2004-0212-FFB

Education Services Obligation Practices, Colorado Army National Guard 18-Mar-04

A-2004-0213-IMT

Performance of the Post-Competition Most Efficient Organization for the Directorate of Logistics and Engineering, Fort Jackson, South Carolina 17-Mar-04

A-2004-0214-IMO

Attestation Review of the Financial Statements for the Years Ended June 30, 2002, 2001 and 2000 for the Fort Pickett Local Redevelopment Authority No-Cost Economic Development Conveyance 16-Mar-04

A-2004-0215-IMU

Nontactical Vehicle Damages, U.S. Army Installation Management Agency, Europe Region 19-Mar-04

A-2004-0216-FFB

Information Systems Security Material Weakness, Chief Information Officer/G-6 8-Apr-04

A-2004-0217-FFB

Army Knowledge Management Goal 1 Resource Control Process for Non-Programmed Information Technology Investments, Chief Information Officer/G-6 22-Mar-04

A-2004-0218-IMORecycling Operations, Fort Hood, Texas 31-Mar-04

Page 276: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0219-IMOEstimated Retirement Benefits 18-Mar-04

A-2004-0220-IMOEstimated Retirement Benefits 18-Mar-04

A-2004-0221-FFBBiometrics Management Office Contracts 23-Apr-04

A-2004-0222-AMA

Ammunition Pricing Practices, Office of the Program Executive Officer, Ammunition, Picatinny Arsenal, New Jersey and U.S. Army Joint Munitions Command, Rock Island Arsenal, Illinois 2-Apr-04

A-2004-0223-FFG

Asset Visibility of Bradley Vehicles During Conversion Programs, U.S. Army Tank-automotive and Armaments Command 30-Mar-04

A-2004-0224-FFPOperational Projects--Summary, Eighth U.S. Army 8-Apr-04

A-2004-0225-AMW

Attestation Review of Selected Army Chief Financial Officers Strategic Plan Tasks--Army Working Capital Fund 8-Apr-04

A-2004-0226-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Public Works and Information Management Support Services Commercial Activities Study, Fort Dix, New Jersey 25-Mar-04

A-2004-0227-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Installation Support Services Commercial Activities Study, Fort Dix, New Jersey 25-Mar-04

A-2004-0228-IMOEstimated Retirement Benefits 25-Mar-04

A-2004-0229-AMM

Organization and Funding, U.S. Army Priority Air Transport Detachment, Andrews Air Force Base, Maryland 5-Apr-04

Page 277: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0230-IMOEstimated Retirement Benefits 26-Mar-04

A-2004-0231-IMOEstimated Retirement Benefits 26-Mar-04

A-2004-0232-AMA

FY 03 Followup of Administering Service Contracts - Dining Facility (Audit Report AA 01-366), U.S. Army Aviation and Missile Command, Redstone Arsenal, Alabama 1-Apr-04

A-2004-0233-AMM

Fixed-Wing Aircraft Maintenance Contracts, U.S. Army Priority Air Transport Detachment, Andrews Air Force Base, Maryland 4-May-04

A-2004-0234-FFF Contract Issues 7-Apr-04

A-2004-0235-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Fort Detrick Garrison Commercial Activities Study, Fort Detrick, Maryland 31-Mar-04

A-2004-0236-FFG

Review of the Army Management Control Process (Fiscal Year 2003), U.S. Army Training and Doctrine Command 5-May-04

A-2004-0237-AML

Followup Audit of Recommendation in Audit Report A-2002-0423-AML 8-Apr-04

A-2004-0238-AML

Followup Review of Recommendations in Audit Report AA 00-266 6-Apr-04

A-2004-0239-AML

Followup Review of Recommendations in Audit Report AA 01-53 6-Apr-04

A-2004-0240-IMOEstimated Retirement Benefits 5-Apr-04

A-2004-0241-IMT

Contract Administration for the Directorate of Engineering and Logistics Contract, Fort Rucker, Alabama 26-Apr-04

A-2004-0242-IMOEstimated Retirement Benefits 6-Apr-04

A-2004-0243-IMU

Operation Enduring Freedom--Base Camp Construction and Master Plan 15-Apr-04

Page 278: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0244-FFB

Information Technology Agency Contract Management 25-May-04

A-2004-0245-FFGSystem Requirements--Installation Status Report 13-Apr-04

A-2004-0246-IMH

Followup Audit of Reengineering Overhead Support for Morale, Welfare and Recreation Activities, U.S. Army Community and Family Support Center 14-Apr-04

A-2004-0247-IMOEstimated Retirement Benefits 8-Apr-04

A-2004-0248-AMA

FY 03 Followup of Closed Audit Recommendations - Best Practices for Using Award Fees (Audit Report AA 01-169), AMCOM; Ofc of the PEO, Tactical Missiles; and Ofc of the PEO, Air and Missile Defense 14-Apr-04

A-2004-0249-IMT

U.S. Army Audit Agency Review of the Reported Baseline Workyears for the Whole Base Commercial Activities Study, Devens Reserve Forces Training Area, Devens, Massachusetts 9-Apr-04

A-2004-0250-AMM

Tactical Software Maintenance, Office of the Program Executive Officer, Tactical Missiles and U.S. Army Aviation and Missile Research, Development and Engineering Center, Redstone Arsenal, Alabama 19-Apr-04

A-2004-0251-IMT

U.S. Army Audit Agency Review of the Government Management Study and Cost Comparison Form for the Walter Reed Army Medical Center Base Operation Support Services Commercial Activities Study 14-Apr-04

A-2004-0252-IMOEstimated Retirement Benefits 13-Apr-04

Page 279: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0253-IMOEstimated Retirement Benefits 13-Apr-04

A-2004-0254-IMOEstimated Retirement Benefits 13-Apr-04

A-2004-0255-IMOEstimated Retirement Benefits 14-Apr-04

A-2004-0256-IMH

Followup Issues--Military Treatment Facility Downsizing and Healthcare for Soldiers at Remote Locations, U.S. Army Medical Command 15-Apr-04

A-2004-0257-IMOEstimated Retirement Benefits 14-Apr-04

A-2004-0258-IMOEstimated Retirement Benefits 14-Apr-04

A-2004-0259-IMT

Solicitation DABJ45-03-R-003, USAAA Rev of the Government's Updated Cost Estimate for the Commercial Activities Study of the Dir of Info Mgmt in Response to the Final Ruling by the Admin Appeals Board 14-Apr-04

A-2004-0260-IMOEstimated Retirement Benefits 16-Apr-04

A-2004-0261-FFG

Management Controls for Wholesale Munitions Inventories, Integration of Automatic Identification Technology 18-May-04

A-2004-0262-IMOEstimated Retirement Benefits 20-Apr-04

A-2004-0263-AMW

Followup of Selected Audit Recommendations--Army Working Capital Fund 21-Apr-04

A-2004-0264-AML

Use of Accommodation Checks, South Carolina Army National Guard, Columbia, South Carolina 29-Apr-04

A-2004-0265-AMA

Realignment Phase 2, Field Operating Agencies, Office of the Chief of Legislative Liaison 26-Apr-04

A-2004-0266-IMOEstimated Retirement Benefits 21-Apr-04

Page 280: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0267-IMO

Attestation Review of the Financial Statements for the Period Ended December 31, 2002 for the Philadelphia Authority for Industrial Development No-Cost Economic Development Conveyance 23-Apr-04

A-2004-0268-AMW

Followup Review, Aged Accounts, U.S. Army Tank-automotive and Armaments Command--Army Working Capital Fund 26-Apr-04

A-2004-0269-IMT

Ammunition and Small Arms, California Army National Guard 30-Apr-04

A-2004-0270-IMT

Contract Administration for the Directorate of Base Operations Support Contract, Fort Knox, Kentucky 5-May-04

A-2004-0271-IMU

Observations of Mine Clearing Operations Made at Bagram Airfield, Afghanistan 3-May-04

A-2004-0272-FFF

Followup Audit of Army National Guard Bonus Programs 25-May-04

A-2004-0273-AMI

Intelligence Contingency Funds, United States Forces Central Command 4-May-04

A-2004-0274-IMOEstimated Retirement Benefits 30-Apr-04

A-2004-0275-IMOEstimated Retirement Benefits 3-May-04

A-2004-0276-AMIDepartment of the Army Support Program 5-May-04

A-2004-0277-IMOEstimated Retirement Benefits 3-May-04

A-2004-0278-FFP

Planning Survey - Army Force Protection Program in Hawaii 7-May-04

A-2004-0279-AMW

Army Working Capital Fund, Spare Parts Budget Development Process 27-May-04

A-2004-0280-FFFWorkload Survey Report: Digital Training 22-Jul-04

A-2004-0281-IMHArmy Lodging Overhead Costs, Fort Lee, Virginia 7-May-04

A-2004-0282-IMO

DOD Support to the 2001 National Boy Scout Jamboree 7-May-04

Page 281: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0283-AMA

Realignment Phase 2, Field Operating Agencies, U.S. Army War College 7-May-04

A-2004-0284-IMOEstimated Retirement Benefits 5-May-04

A-2004-0285-IMOEstimated Retirement Benefits 5-May-04

A-2004-0286-IMOEstimated Retirement Benefits 5-May-04

A-2004-0287-IME

Maneuver Area Training Equipment Site, Texas Army National Guard 13-May-04

A-2004-0288-IMU

Dental Services Contracting in Europe, Europe Regional Dental Command 28-Sep-04

A-2004-0289-IMOEstimated Retirement Benefits 5-May-04

A-2004-0290-AMM

Followup Review of Audit Recommendations in Audit Report: A-2003-0245-AMM 14-May-04

A-2004-0291-FFC

Security of Civil Works Water Resources Infrastructure, U.S. Army Engineer District, Seattle 14-May-04

A-2004-0292-AMA

Validating the Business Council Initiative on Rechargeable Batteries 11-May-04

A-2004-0293-AMA

Realignment Phase 2 Field Operating Agencies, Office of The Judge Advocate General 11-May-04

A-2004-0294-AMA

Realignment Phase 2 Field Operating Agencies, U.S. Army Test and Evaluation Command 14-May-04

A-2004-0295-AMI

Coordinating Requirements for Special Access Programs, Site A 12-May-04

A-2004-0296-AMI

Coordinating Requirements for Special Access Programs, Site B 12-May-04

A-2004-0297-IMOEstimated Retirement Benefits 13-May-04

A-2004-0298-AMA

Realignment Phase 2, Field Operating Agencies, U.S. Army Logistics Transformation Agency 14-May-04

A-2004-0299-IMOEstimated Retirement Benefits 13-May-04

A-2004-0300-IMOEstimated Retirement Benefits 17-May-04

Page 282: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0301-AMI

Intelligence Contingency Funds, U. S. Army Intelligence and Security Command 28-May-04

A-2004-0302-IMH

Termination of Audit of Funding Practices for Medical Education and Training Contracts, U.S. Army Medical Department Center and School 18-May-04

A-2004-0303-IMOEstimated Retirement Benefits 18-May-04

A-2004-0304-IMOEstimated Retirement Benefits 18-May-04

A-2004-0305-FFG

Time Sensitive Report, Audit of Vested and Seized Assets, Operation Iraqi Freedom 18-May-04

A-2004-0306-IMOEstimated Retirement Benefits 19-May-04

A-2004-0307-IMOEstimated Retirement Benefits 19-May-04

A-2004-0308-IMTAudit of the Military Value Analyzer Model 20-May-04

A-2004-0309-IMTAudit of Optimal Stationing of Army Forces Model 20-May-04

A-2004-0310-IMOEstimated Retirement Benefits 20-May-04

A-2004-0311-IMOEstimated Retirement Benefits 21-May-04

A-2004-0312-IMOEstimated Retirement Benefits 21-May-04

A-2004-0313-FFP

Acquisition Management Controls, Eighth U.S. Army, U.S. Army Contracting Command-Korea, and U.S. Army Contracting Agency 3-Jun-04

A-2004-0314-AMI

Reporting Items for Special Operations Forces Reserve Units Under the Unique Item Tracking Program, U.S. Army Civil Affairs and Psychological Operations Command, Fort Bragg, North Carolina 27-May-04

A-2004-0315-AMI

Followup Audit of Recommendation in U.S. Army Audit Agency Report AA02-118, Secure Environment Contracting 17-Jun-04

Page 283: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0316-IMO

Attestation Review of the Financial Statements for the Period Ended June 30, 2003 for the Fort Ord Reuse Authority No-Cost Economic Development Conveyance 26-May-04

A-2004-0317-FFGArmy Civilian Welfare Fund, Auditor's Report 13-Aug-04

A-2004-0318-FFGArmy Civilian Welfare Fund, Internal Controls 20-Sep-04

A-2004-0319-FFP

Attestation of Eighth U.S. Army General Ledger Account Code 1810 4-Jun-04

A-2004-0320-IMOEstimated Retirement Benefits 27-May-04

A-2004-0321-AMW

Army Working Capital Fund Budgeting and Operating Force Spare Parts Budgeting 9-Jun-04

A-2004-0322-IMOEstimated Retirement Benefits 1-Jun-04

A-2004-0323-IMOEstimated Retirement Benefits 1-Jun-04

A-2004-0324-AMA

Realignment Phase 2 Field Operating Agencies, Office of the Chief of Public Affairs 1-Jun-04

A-2004-0325-IMOEstimated Retirement Benefits 2-Jun-04

A-2004-0326-IMOEstimated Retirement Benefits 3-Jun-04

A-2004-0327-IMOEstimated Retirement Benefits 4-Jun-04

A-2004-0328-IMOEstimated Retirement Benefits 4-Jun-04

A-2004-0329-IMOEstimated Retirement Benefits 4-Jun-04

A-2004-0330-IMOEstimated Retirement Benefits 7-Jun-04

A-2004-0331-IMOEstimated Retirement Benefits 7-Jun-04

A-2004-0332-IMOEstimated Retirement Benefits 7-Jun-04

A-2004-0333-AMLSelected Asset Holding Projects 8-Jun-04

A-2004-0334-AMA

Realignment Phase 2, Field Operating Agencies, U.S. Army Center of Military History 25-Jun-04

Page 284: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0335-IME

Land Use Controls and Monitoring at Formerly Used Defense Sites, U.S. Army Corps of Engineers Savannah District 10-Jun-04

A-2004-0336-IMH

Followup Audit of Financial Controls--Golf Course Operations, Fort Sam Houston, Texas 10-Jun-04

A-2004-0337-IMT

Performance of the Post-Competition Most Efficient Organization for the Directorate of Logistics, Fort Drum, New York 14-Jun-04

A-2004-0338-IMH

Army Lodging Overhead Costs, Fort Jackson, South Carolina 9-Jul-04

A-2004-0339-FFB

Army's Implementation of DOD Enterprise Software Initiative 25-Jun-04

A-2004-0340-IMOEstimated Retirement Benefits 8-Jun-04

A-2004-0341-IMOEstimated Retirement Benefits 8-Jun-04

A-2004-0342-AMA

Fee Arrangement Plan for System Development and Demonstration--Future Combat Systems, Office of the Program Manager, Unit of Action 21-Jun-04

A-2004-0343-IMOEstimated Retirement Benefits 14-Jun-04

A-2004-0344-IMOEstimated Retirement Benefits 15-Jun-04

A-2004-0345-IMOEstimated Retirement Benefits 15-Jun-04

A-2004-0346-FFG

Validation of Completed Tasks for Advances and Prepayments--Army Chief Financial Officers Strategic Plan 25-Jun-04

A-2004-0347-AMM

Tactical Software Maintenance, Office of the Program Executive Officer, Ground Combat Systems, Warren, Michigan 29-Jun-04

A-2004-0348-IMU

Third Party Collection Program, Europe Regional Medical Command 18-Jun-04

Page 285: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0349-AMA

Realignment Phase 2 Field Operating Agencies, Office of the Deputy Chief of Staff, G-3 25-Jun-04

A-2004-0350-IMOEstimated Retirement Benefits 17-Jun-04

A-2004-0351-IMOEstimated Retirement Benefits 17-Jun-04

A-2004-0352-IMOEstimated Retirement Benefits 17-Jun-04

A-2004-0353-FFP

Review of Organizational Clothing and Individual Equipment Inventories at Camp Carroll and Camp Casey 25-Jun-04

A-2004-0354-PMO

Audit of the Agency Accountability for Mobile Information Technology Property - Part II 28-Jun-04

A-2004-0355-IMO

Attestation Review of the Financial Statements for the Period Ended September 30, 2003 for the Bayonne Local Redevelopment Authority No-Cost Economic Development Conveyance 17-Jun-04

A-2004-0356-AMI

Property Accountability in Special Operations Forces Reserve Units, 450th Civil Affairs Battalion (Airborne), Riverdale, Maryland 30-Jun-04

A-2004-0357-IMU

Ammunition Accountability, U.S. Army, Europe and Seventh Army 9-Jul-04

A-2004-0358-IMOEstimated Retirement Benefits 23-Jun-04

A-2004-0359-FFG

Review of Army Management Control Process (FY 03), U.S. Army Intelligence Center, Fort Huachuca 29-Jun-04

A-2004-0360-IMT

Validation of Data for Base Realignment and Closure 2005, U.S. Army Test and Evaluation Command 28-Jun-04

Page 286: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0361-AMA

Realignment Phase 2 Field Operating Agencies, U.S. Army Acquisition Support Center and U.S. Army Simulation, Training and Instrumentation Command 26-Jul-04

A-2004-0362-IMOEstimated Retirement Benefits 24-Jun-04

A-2004-0363-IMOEstimated Retirement Benefits 24-Jun-04

A-2004-0364-AMI Army Support Program 24-Jun-04

A-2004-0365-FFP

Energy Savings Performance Contract-Lighting Retrofit, U.S. Army Garrison, Alaska 2-Jul-04

A-2004-0366-IMT

Validation of Data for Base Realignment and Closure 2005, Schofield Barracks 29-Jun-04

A-2004-0367-IMOEstimated Retirement Benefits 28-Jun-04

A-2004-0368-IMOEstimated Retirement Benefits 28-Jun-04

A-2004-0369-AMW

Obligations for Requisitions, Standard Operations and Maintenance Army Research and Development System (SOMARDS) 30-Jun-04

A-2004-0370-IMU

Attestation Review of the Army's Purchase Card Program, U.S. Army, Europe and Seventh Army 9-Jul-04

A-2004-0371-IMH

Attestation Review of the Army Optical Fabrication Production Cost Estimate, U.S. Army Medical Command 6-Jul-04

A-2004-0372-IMOEstimated Retirement Benefits 29-Jun-04

A-2004-0373-IMOEstimated Retirement Benefits 29-Jun-04

A-2004-0374-IMOEstimated Retirement Benefits 29-Jun-04

A-2004-0375-IMOEstimated Retirement Benefits 29-Jun-04

A-2004-0376-IMT

Validation of Data for Base Realignment and Closure 2005, Fort McCoy 29-Jun-04

Page 287: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0377-IMT

Validation of Data for Base Realignment and Closure 2005, Aberdeen Proving Ground 29-Jun-04

A-2004-0378-AMA

Realignment Phase 2 Field Operating Agencies, U.S. Army Inspector General Agency 30-Jun-04

A-2004-0379-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Shafter 29-Jun-04

A-2004-0380-IMT

Validation of Data for Base Realignment and Closure 2005, Tripler Army Medical Center 29-Jun-04

A-2004-0381-IMT

Validation of Data for Base Realignment and Closure 2005, Tobyhanna Army Depot 30-Jun-04

A-2004-0382-FFP

Funding for the Operation and Maintenance of the Okinawa Pipeline, U.S. Army, Japan 13-Jul-04

A-2004-0383-IMT

Validation of data for Base Realignment and Closure 2005, Corpus Christi Army Depot 30-Jun-04

A-2004-0384-IMT

Validation of Data for Base Realignment and Closure 2005, Picatinny Arsenal 30-Jun-04

A-2004-0385-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Drum 30-Jun-04

A-2004-0386-IMT

Validation of Data for Base Realignment and Closure 2005, Detroit Arsenal 30-Jun-04

A-2004-0387-IMO

Attestation Review of the Financial Statements for the Years Ended June 30, 2002 and 2003 for the Holabird Local Redevelopment Authority No-Cost Economic Development Conveyance 1-Jul-04

A-2004-0388-AMW

Army Workload and Performance System--Logistics Interface, U.S. Army Materiel Command 1-Jul-04

A-2004-0389-FFPArmy Travel Card Program, Eighth U.S. Army 20-Jul-04

Page 288: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0390-IMO

Disposition Plans and Costs for the Old U.S. Disciplinary Barracks, Fort Leavenworth, Kansas 9-Jul-04

A-2004-0391-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Eustis, Virginia 12-Jul-04

A-2004-0392-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Gordon, Georgia 12-Jul-04

A-2004-0393-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Campbell, Kentucky 12-Jul-04

A-2004-0394-IMT

Performance of the Post-Competition Most Efficient Organization for the Directorates of Logistics and Public Works, Fort Leavenworth, Kansas 19-Jul-04

A-2004-0395-IMOEstimated Retirement Benefits 13-Jul-04

A-2004-0396-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Lee, Virginia 13-Jul-04

A-2004-0397-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Bragg, North Carolina 13-Jul-04

A-2004-0398-IMT

Validation of Data for Base Realignment and Closure 2005, Blue Grass Army Depot, Kentucky 13-Jul-04

A-2004-0399-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Stewart, Georgia 13-Jul-04

A-2004-0400-AMA

Followup on the Audit of Controls for the International Merchant Purchase Authorization Card Program, U.S. Army Tank-automotive and Armaments Command 23-Jul-04

A-2004-0401-AMICash Controls for Special Mission Units - Followup 23-Jul-04

A-2004-0402-IMT

Validation of Data for Base Realignment and Closure 2005, U.S. Army Tank Plant, Lima, Ohio 15-Jul-04

Page 289: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0403-IMOEstimated Retirement Benefits 16-Jul-04

A-2004-0404-IMT

Validation of Data for Base Realignment and Closure 2005, Redstone Arsenal, Alabama 16-Jul-04

A-2004-0405-IMT

Validation of Data for Base Realignment and Closure 2005, McAlester Army Ammunition Plant, Oklahoma 19-Jul-04

A-2004-0406-IMT

Validation of Data for Base Realignment and Closure 2005, Red River Army Depot, Texas 19-Jul-04

A-2004-0407-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Hood, Texas 19-Jul-04

A-2004-0408-IMOEstimated Retirement Benefits 19-Jul-04

A-2004-0409-IMH

Attestation Review of the Estimated of Prospective Private Sector Unit Prices for Military Eyewear , U.S. Army Medical Command 20-Aug-04

A-2004-0410-AMW

Acquisition and Financial File Reconciliations, Office of the Program Executive Officer, Aviation 28-Jul-04

A-2004-0411-IMT

Validation of Data for Base Realignment and Closure 2005, Anniston Army Depot, Alabama 20-Jul-04

A-2004-0412-IMT

Validation of Data for Base Realignment and Closure 2005, U.S. Army Human Resources Command 20-Jul-04

A-2004-0413-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Lewis, Washington 20-Jul-04

A-2004-0414-IMOEstimated Retirement Benefits 20-Jul-04

A-2004-0415-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Huachuca, Arizona 20-Jul-04

A-2004-0416-IMO

Revenues and Expenses for the 2003 Army Birthday Ball 21-Jul-04

Page 290: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0417-IMOEstimated Retirement Benefits 21-Jul-04

A-2004-0418-IMT

Validation of Data for Base Realignment and Closure 2005, Radford Army Ammunition Plant, Virginia 21-Jul-04

A-2004-0419-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Rucker, Alabama 23-Jul-04

A-2004-0420-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Benning, Georgia 23-Jul-04

A-2004-0421-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Sam Houston, Texas 22-Jul-04

A-2004-0422-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Bliss, Texas 26-Jul-04

A-2004-0423-IMOEstimated Retirement Benefits 26-Jul-04

A-2004-0424-IMOEstimated Retirement Benefits 26-Jul-04

A-2004-0425-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Belvoir, Virginia 27-Jul-04

A-2004-0426-IMU

Audit of Base Camp Commercial Communications 28-Jul-04

A-2004-0427-IMOEstimated Retirement Benefits 27-Jul-04

A-2004-0428-ALOEstimated Retirement Benefits 27-Jul-04

A-2004-0429-IMOEstimated Retirement Benefits 30-Jul-04

A-2004-0430-AMI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Intelligence and Security Command 11-Aug-04

A-2004-0431-AMW

Validation of the Army's Fund Balance With Treasury, Defense Finance and Accounting Service Columbus Center 3-Aug-04

Page 291: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0432-AMI

Attestation Review of Validation of Base Realignment and Closure 2005, U.S. Army Special Operations Command 12-Aug-04

A-2004-0433-AMW

Logistics Modernization Program--Production Support Processes, U.S. Army Materiel Command 30-Jul-04

A-2004-0434-AMI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Field Support Command/Joint Munitions Command 9-Aug-04

A-2004-0435-AMI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Communications-Electronics Command 12-Aug-04

A-2004-0436-AMI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Tank-automotive and Armaments Command 2-Aug-04

A-2004-0437-PMO FY 03 Follow-up Report 30-Jul-04

A-2004-0438-AML

Definitization of Task Orders - Audit of Logistics Civil Augmentation Program 12-Aug-04

A-2004-0439-IMO

Barracks Requirements at Fort Carson, Fort Carson, Colorado 6-Aug-04

A-2004-0440-IMOEstimated Retirement Benefits 4-Aug-04

A-2004-0441-IMT

Validation of Army Installation Capacity Data for Base Realignment and Closure 2005, Medical Joint Cross-Service Group 5-Aug-04

A-2004-0442-IMOEstimated Retirement Benefits 5-Aug-04

A-2004-0443-AMAUnit Set Fielding Oversight and Guidance 1-Sep-04

Page 292: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0444-AMM

Sustainment Planning for Maintenance Support, U.S. Army Communications-Electronics Command and Office of the Product Manager, Warfighter Information Network - Tactical 10-Aug-04

A-2004-0445-AMA

Realignment Phase 2 Field Operating Agencies, U.S. Army Contracting Agency 20-Aug-04

A-2004-0446-FFG

Preliminary Investigation of Potential Antideficiency Act Violation at the Army National Guard, Case 02-31 13-Aug-04

A-2004-0447-FFF

Followup Audit of Delayed Entry Program Management, U.S. Army Recruiting Command, Fort Knox, Kentucky 24-Sep-04

A-2004-0448-IME

Land Use Controls and Monitoring at Formerly Used Defense Sites, U.S. Army Corps of Engineers, Charleston District 18-Aug-04

A-2004-0449-IMH

Followup Audit of Nonappropriated Fund Payroll, U.S. Army Community and Family Support Center 25-Aug-04

A-2004-0450-IMOEstimated Retirement Benefits 13-Aug-04

A-2004-0451-IMOEstimated Retirement Benefits 13-Aug-04

A-2004-0452-AMW

Unliquidated Obligations, Office of the Project Manager, Cargo Helicopters 19-Aug-04

A-2004-0453-IMT

Validation of Army Installation Capacity Data for Base Realignment and Closure 2005, Supply and Storage Activity Joint Cross-Service Group 16-Aug-04

A-2004-0454-AMI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Space and Missile Defense Command 18-Aug-04

Page 293: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0455-AMI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Aviation and Missile Command 18-Aug-04

A-2004-0456-IMT

Validation of Army Installation Capacity Data for Base Realignment and Closure 2005, Education and Training Joint Cross-Service Group 17-Aug-04

A-2004-0457-FFB

FY 01 and FY 02 Potential Antideficiency Act Violations, Colorado Army National Guard 10-Sep-04

A-2004-0458-AMW

Unliquidated Obligations, Office of the Project Manager, Apache Attack Helicopter 26-Aug-04

A-2004-0459-IMT

Validation of Army Industrial Capacity Data for Base Realignment and Closure 2005, Industrial Joint Cross-Service Group 24-Aug-04

A-2004-0460-IMO

Audit of Barracks Requirements, Fort Carson--Impact of 10th Special Forces Group, Fort Carson, Colorado 24-Aug-04

A-2004-0461-AMI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Research, Development and Engineering Command 23-Aug-04

A-2004-0462-AML

Audit of Logistics Services Contracts, 81st Regional Readiness Command, Birmingham, Alabama 23-Aug-04

A-2004-0463-FFCFY 03 Supplemental Funds and Cash Flow 27-Aug-04

A-2004-0464-AMI

Army Foreign Language Program - Training and Proficiency - Army Reserve 24-Aug-04

A-2004-0465-AMM

Sustainment Planning for Maintenance Support, Office of the Program Manager, Unit of Action 27-Aug-04

Page 294: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0466-FFG

Logistics Modernization Program - Requirements Followup 2-Sep-04

A-2004-0467-IMOEstimated Retirement Benefits 24-Aug-04

A-2004-0468-IMT

Audit of Reserve Component Process Action Team, Headquarters, DA 24-Aug-04

A-2004-0469-IMH

Followup Audit of Recommendations in Audit Report: A-2003-0001-IMH, Martin Army Community Hospital, Fort Benning, Georgia 27-Aug-04

A-2004-0470-IMH

Followup Audit of Recommendations in Audit Report: A-2003-0286-IMH, Martin Army Community Hospital, Fort Benning, Georgia 27-Aug-04

A-2004-0471-FFF

Management of Reserve Component's Non-Participants 9-Sep-04

A-2004-0472-IMU

Medical Services Billing, Europe Regional Medical Command 31-Aug-04

A-2004-0473-FFG

Property Book and Unit Supply Enhanced System--Requirements Followup 8-Sep-04

A-2004-0475-IMT

Validation of Data for Base Realignment and Closure 2005, Radford Army Ammunition Plant, Virginia 30-Aug-04

A-2004-0476-IMT

Validation of Army Installation Capacity Data for Base Realignment and Closure 2005, Technical Joint Cross-Service Group 30-Aug-04

A-2004-0477-AML

Followup Audit of Recommendations in Audit Report: A-2002-0333-AML 31-Aug-04

A-2004-0478-IMOEstimated Retirement Benefits 31-Aug-04

A-2004-0479-IMO

Army Business Initiative Council (ABIC) Initiative IL-A-02-07, Outsource Household Goods Management 27-Sep-04

A-2004-0480-IMOEstimated Retirement Benefits 31-Aug-04

Page 295: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0481-AMW

Followup Review of Government Purchase Cards, Tobyhanna Army Depot 31-Aug-04

A-2004-0482-FFG

Secretary of Defense Executive Dining Facility Fund FY 03 Financial Statements, Office of the Secretary of Defense 15-Sep-04

A-2004-0483-IMOEstimated Retirement Benefits 2-Sep-04

A-2004-0484-IMT

Validation of Army Capacity Data for Base Realignment and Closure 2005, Headquarters and Support Activities Joint Cross-Service Group 2-Sep-04

A-2004-0485-IMH

Followup Audit of Recommendation in Audit Report: A-2003-0002-IMH, Madigan Army Medical Center, Tacoma, Washington 9-Sep-04

A-2004-0486-FFC

Followup Audit of Corps of Engineers Financial Management System, General Application Controls 9-Sep-04

A-2004-0487-IMOEstimated Retirement Benefits 8-Sep-04

A-2004-0488-IMOEstimated Retirement Benefits 8-Sep-04

A-2004-0489-AMI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Materiel Command 8-Sep-04

A-2004-0490-IMT State Sales Taxes 9-Sep-04

A-2004-0491-IMT

Contract Administration for the Logistics Support Services Contract, Fort Bragg, North Carolina 10-Sep-04

A-2004-0492-IMO

Garrison Utilities and Energy Services, Fort Lewis, Washington 14-Sep-04

A-2004-0493-FFC

Selected U.S. Army Corps of Engineers Civil Works Financial Statements, U.S. Army Corps of Engineers, Louisville District 17-Sep-04

Page 296: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0494-FFC

Selected U.S. Army Corps of Engineers Civil Works Financial Statements, U.S. Army Corps of Engineers, Philadelphia District 30-Sep-04

A-2004-0495-FFC2004 Expense Cycle, U.S. Army Corps of Engineers 24-Sep-04

A-2004-0496-FFC2004 Budget Cycle, U.S. Army Corps of Engineers 24-Sep-04

A-2004-0497-FFC2004 Revenue Cycle, U.S. Army Corps of Engineers 29-Sep-04

A-2004-0498-FFC2004 Payroll Cycle, U.S. Army Corps of Engineers 29-Sep-04

A-2004-0499-FFB

Resource Control Process for Programmed Information Technology Investments 29-Sep-04

A-2004-0500-AMW

Unliquidated Obligations, Office of the Project Manager, Utility Helicopters 21-Sep-04

A-2004-0501-IMOEstimated Retirement Benefits 10-Sep-04

A-2004-0502-IMH

Followup Audit of Recommendations in Audit Report: A-2003-0075-IMH, Womack Army Medical Center, Fort Bragg, North Carolina 10-Sep-04

A-2004-0503-AMW

Followup Report, U.S. Army Audit Agency Report: AA 02-103, Workers' Compensation, Rock Island Arsenal 14-Sep-04

A-2004-0504-AMW

Selected Financial Management Issues, Pine Bluff Arsenal, Arkansas 21-Sep-04

A-2004-0505-IMOEstimated Retirement Benefits 13-Sep-04

A-2004-0506-IMT

Cooperative Agreements, California Army National Guard and the U.S. Property and Fiscal Office for California 24-Sep-04

A-2004-0507-IMOEstimated Retirement Benefits 13-Sep-04

A-2004-0508-AMI

Followup Army Foreign Language Program Requirements 14-Sep-04

Page 297: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0509-IMT

Validation of Data for Base Realignment and Closure 2005, Tobyhanna Army Depot 14-Sep-04

A-2004-0510-AMW

Selected Reimbursable Costs, Pine Bluff Arsenal, Arkansas 17-Sep-04

A-2004-0511-AML

Training Resource Model Inputs (Price and Credit), U.S. Army Tank-automotive and Armaments Command--Warren, Michigan 24-Sep-04

A-2004-0512-AML

Training Resource Model Inputs (Price and Credit), U.S. Army Tank-automotive and Armaments Command, Rock Island, Illinois 24-Sep-04

A-2004-0513-IMU

Army Management Control Process (FY 04), U.S. Army, Europe and Seventh Army 16-Sep-04

A-2004-0514-FFC

Security of Civil Works Water Resources Infrastructure, U.S. Army Engineer District, Nashville 27-Sep-04

A-2004-0515-IMU

Army Management Control Process (FY 04), U.S. Army, North Atlantic Treaty Organization 21-Sep-04

A-2004-0516-AMI

Followup Review of Recommendation in USAAA Report: AA01-2, Secure Environment Contracting, Threat Systems Management Office 21-Sep-04

A-2004-0517-FFG

Preliminary Investigation of Potential Antideficiency Act Violation at the Army National Guard, Case 04-02 30-Sep-04

A-2004-0518-IMOEstimated Retirement Benefits 21-Sep-04

Page 298: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0519-AMA

Managing the Army's Ammunition Mission, Office of the Program Executive Officer, Ammunition, Picatinny Arsenal, New Jersey and U.S. Army Joint Munitions Command, Rock Island Arsenal, Illinois 30-Sep-04

A-2004-0520-AMM

Time-Sensitive Issue, Potential Antideficiency Act Violation 22-Sep-04

A-2004-0521-IMT

Validation of Data for Base Realignment and Closure 2005, U.S. Army Research Office, Raleigh, North Carolina 23-Sep-04

A-2004-0522-IMT

Validation of Data for Base Realignment and Closure 2005, Lone Star Army Ammunition Plant, Texas 24-Sep-04

A-2004-0523-IMOEstimated Retirement Benefits 24-Sep-04

A-2004-0524-IMT

Validation of Data for Base Realignment and Closure 2005, McAlester Army Ammunition Plant, Oklahoma 27-Sep-04

A-2004-0525-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Eustis, Virginia 27-Sep-04

A-2004-0526-FFF

Operational Facility Requirements Rules and Modification Tables of Organization and Equipment Authorizations 30-Sep-04

A-2004-0527-AML

Training Resource Model Inputs (Price and Credit, Missile Items), U.S. Army Aviation and Missile Command, Redstone Arsenal, Alabama 27-Sep-04

A-2004-0528-AML

Training Resource Model Inputs (Price and Credit, Aviation Items), U.S. Army Aviation and Missile Command, Redstone Arsenal, Alabama 27-Sep-04

Page 299: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0529-FFG

Asset Visibility Of Military Equipment During Conversions, U.S. Army Communications-Electronics Command 30-Sep-04

A-2004-0530-AMAContract Advisory and Assistance Services 30-Sep-04

A-2004-0531-IMT

U.S. Army Audit Agency Review of the Updated Cost Comparison Form for the Housekeeping Services Commercial Activities Study, Walter Reed Army Medical Center, Washington, DC 28-Sep-04

A-2004-0532-IMT

Contract Administration for the Directorate of Engineering and Logistics Support Contract, Fort Lee, Virginia 29-Sep-04

A-2004-0533-IMT

U.S. Army Audit Agency Review of the Updated Cost Comparison Form for the Base Operations Support Services Commercial Activities Study, Walter Reed Army Medical Center, Washington, DC 28-Sep-04

A-2004-0534-IMU

Followup Review of Recommendations From the Audit of Logistics Civil Augmentation Program 28-Sep-04

A-2004-0535-IMOEstimated Retirement Benefits 28-Sep-04

A-2004-0536-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Campbell, Kentucky 29-Sep-04

A-2004-0537-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Stewart, Georgia 29-Sep-04

A-2004-0538-AMM

Maintenance Issues Impacting Training Resource Model Inputs 29-Sep-04

A-2004-0539-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Hood, Texas 29-Sep-04

A-2004-0540-IMOEstimated Retirement Benefits 29-Sep-04

Page 300: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2004-0541-IMOEstimated Retirement Benefits 30-Sep-04

A-2004-0542-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Huachuca, Arizona 30-Sep-04

A-2004-0543-IMT

Validation of Data for Base Realignment and Closure 2005, Fort Lee, Virginia 30-Sep-04

A-2004-0544-IMT

Cost of Base Realignment Action (COBRA) Model, The Army Basing Study 2005 30-Sep-04

A-2004-0545-AMI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Intelligence Community 30-Sep-04

A-2005-0001-FFG

Secretary of Defense Executive Dining Facility Fund Internal Controls 8-Jul-05

A-2005-0002-FFF

Followup Audit of Recruiter Productivity, U.S. Army Recruiting Command, Fort Knox, Kentucky 24-Nov-04

A-2005-0003-ALA

Realignment Phase 2 Field Operating Agencies, Office of the Administrative Assistant to the Secretary of the Army 4-Nov-04

A-2005-0008-ALT

Validation of Data for Base Realignment and Closure 2005, Anniston Army Depot, Anniston, Alabama 4-Oct-04

A-2005-0009-ZBI

Coordinating Requirements for Special Access Programs, Site D 6-Oct-04

A-2005-0010-ALT

Validation of Data for Base Realignment and Closure 2005, Corpus Christi Army Depot, Texas 5-Oct-04

A-2005-0011-ALT

Validation of Data for Base Realignment and Closure 2005, Aberdeen Proving Ground, Maryland 5-Oct-04

Page 301: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0012-ALO

Attestation Review of the Financial Statements for the Years Ended June 30, 2002 and 2003 for the Depot Redevelopment Corporation of Memphis and Shelby County's No-Cost Economic Development Conveyance 8-Oct-04

A-2005-0013-ALT

Validation of Data for Base Realignment and Closure 2005, Redstone Arsenal, Alabama 5-Oct-04

A-2005-0014-ALT

Validation of Data for Base Realignment and Closure 2005, Fort Belvoir, Virginia 7-Oct-04

A-2005-0015-ALA

Theater Support Vessel Program, Office of the Product Manager, Army Watercraft Systems 13-Oct-04

A-2005-0016-ALA

Followup on the Audit of Formulating the Army's Recapitalization Program 18-Oct-04

A-2005-0017-ALA

FY 04 Followup of Combined Arms Tactical Trainer (Audit Report: A-2003-0113-AMA), Office of the Deputy Chief of Staff, G-3 1-Nov-04

A-2005-0018-FFG

Validation of Completed Tasks for Loan Guarantees--Army Chief Financial Officers Strategic Plan 2-Mar-05

A-2005-0019-FFG

Validation of Completed Tasks for Accounts Payable--Army Chief Financial Officers Strategic Plan 28-Apr-05

A-2005-0020-FFG

Validation of Completed Tasks for Accounts Receivable--The Army Chief Financial Officers Strategic Plan 4-Mar-05

A-2005-0021-ALT

Validation of Data for Base Realignment and Closure 2005, Fort Sam Houston, Texas 13-Oct-04

A-2005-0022-ALT

Validation of Data for Base Realignment and Closure 2005, Fort Rucker, Alabama 14-Oct-04

Page 302: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0023-ALT

Validation of Data for Base Realignment and Closure 2005, Fort Lewis, Washington 13-Oct-04

A-2005-0024-FFHArmy Lodging Overhead Costs, Fort Bliss, Texas 28-Oct-04

A-2005-0025-FFH

Financial Controls--Club Stewart, Fort Stewart, Georgia 29-Oct-04

A-2005-0026-FFH

Morale, Welfare and Recreation Club System, Fort Sam Houston, Texas 19-Oct-04

A-2005-0027-ALA

Environmental/Explosive Safety Requirements for Weapon Systems, Ofcs of the Asst Secretary of the Army (ALT) and Asst Secretary of the Army (ALT) 18-Oct-04

A-2005-0028-ZBI

Property Accountability in Special Operations Forces Reserve Units, 305th Psychological Operations Company, Upper Marlboro, Maryland 25-Oct-04

A-2005-0029-FFH

Selected Acquisition Processes, Office of The Surgeon General 28-Oct-04

A-2005-0030-FFC

Operations and Maintenance and Maintenance Backlog, U.S. Army Corps of Engineers, Norfolk District 23-Nov-04

A-2005-0031-ALM

Tactical Software Maintenance, Office of the Program Executive Officer, Aviation, and U.S. Army Aviation and Missile Research, Development and Engineering Center, Redstone Arsenal, Alabama 18-Oct-04

A-2005-0032-ALM

Tactical Software Maintenance, Office of the Program Executive Officer, Air, Space & Missile Defense and U.S. Army Aviation & Missile Research, Development & Engineering Ctr, Redstone Arsenal, Alabama 18-Oct-04

Page 303: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0033-ALT

U.S. Army Audit Agency Review of the Revised Cost Comparison Form for the Logistics Directorate Commercial Activities Study, Fort Riley, Kansas 21-Oct-04

A-2005-0034-FFE

Land Use Controls and Monitoring at Formerly Used Defense Sites, U.S. Army Corps of Engineers Wilmington District 29-Oct-04

A-2005-0035-ALA

Force XXI Battle Command, Brigade and Below, Fort Monmouth, New Jersey 5-Nov-04

A-2005-0036-ALA

Selected Aspects of Performance Requirements--Stryker, Office of the Project Manager, Brigade Combat Team 5-Nov-04

A-2005-0037-ALA

Followup Audit of the Risk Management Program - Stryker Vehicle System, Office of the Project Manager, Brigade Combat Team 1-Nov-04

A-2005-0038-ALEAudit of Bosnia Restructure Plan 28-Oct-04

A-2005-0039-FFH

Attestation Review--Fort Bragg Golf Course Operations, Fort Bragg, North Carolina 30-Nov-04

A-2005-0040-FFI Server Consolidation 5-Nov-04

A-2005-0041-FFP

Fort Richardson's Security Fencing Project, Audit of Force Protection - Army Commands in the Pacific 4-Nov-04

A-2005-0042-ALO

No-Cost Economic Development Conveyance Financial Statements, Massachusetts Development Finance Agency, Devens, Massachusetts 4-Nov-04

A-2005-0043-ALE

Logistics Civil Augmentation Program in Kuwait, U.S. Army Field Support Command 24-Nov-04

A-2005-0044-FFG

Fund Control Module System, Requirements Review 16-Nov-04

Page 304: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0045-PMO

Quality Assurance Review of Selected Aspects of Survey, Execution and Reporting Standards 4-Nov-04

A-2005-0046-FFC

Planning Survey, Army Military Construction Program 21-Dec-04

A-2005-0047-FFG

Army Environmental Database - Restoration System Requirements Review 18-Nov-04

A-2005-0048-FFP

Controls Over Leave, Overtime, and Compensatory Time by Army Commands in Hawaii 19-Nov-04

A-2005-0049-ALOAudit of Services to General and Flag Officer Quarters 18-Nov-04

A-2005-0050-FFFMeals and Lodging Contracts 10-Dec-04

A-2005-0051-ZBI

Property Accountability in Special Operations Forces Reserve Units, 312th Psychological Operations Company, Upper Marlboro, Maryland 17-Nov-04

A-2005-0052-ALS

Validation of Material Weakness--In-transit Visibility Policies and Standards, Office of the Deputy Chief of Staff, G-4 23-Nov-04

A-2005-0053-FFH

Attestation Review of External Contract Oversight for Army and Air Force Exchange Service 23-Nov-04

A-2005-0054-ZBI

Coordinating Requirements for Special Access Programs, Site C 23-Nov-04

A-2005-0055-ALOReimbursables for Non-Army Customers 30-Nov-04

A-2005-0056-ALTArmy Capacity Data, The Army Basing Study 2005 30-Nov-04

A-2005-0057-FFC

Attestation Review of Army Ideas for Excellence Program, Idea No. CEWL-03-0007 1-Dec-04

A-2005-0058-ALS

Training Resource Model Inputs (Price and Credit), U.S. Army Materiel Command 14-Dec-04

Page 305: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0059-FFG

Time Sensitive Report, Validation of the Statement of Accountability Attestation of Disbursing Station Symbol Number 8551 2-Dec-04

A-2005-0060-FFE

Requirements for Civilian Pilot and Aircrew Safety, U.S. Army Aviation Center and Fort Rucker 9-Dec-04

A-2005-0061-FFG

Independent Auditors Report for FY 04 American Red Cross Financial Statements 2-Dec-04

A-2005-0062-FFP

Observations of Annual Antiterrorism Exercise, Audit of Force Protection - Army Commands in the Pacific 7-Dec-04

A-2005-0063-ALE

Review of 60th Anniversary Commemoration of World War II, U.S. Army, Europe and Seventh Army 7-Dec-04

A-2005-0064-ALT

Performance of the Post-Competition Most Efficient Organizations 9-Dec-04

A-2005-0065-ZBI

Attestation Review of Validation of Intelligence Data for Base Realignment and Closure 2005, U.S. Army Space and Missile Defense Command 6-Dec-04

A-2005-0066-ZBI

Followup Review of Recommendation B-02 in Audit Report A-2002-0286-AMI 6-Dec-04

A-2005-0067-FFH

Followup Audit of Financial Controls--Golf Course Operations, Aberdeen Proving Ground, Maryland 13-Jan-05

A-2005-0068-FFP

Public Works Operations Camp Casey, U.S. Army Installation Management Agency, Korea Region Office 20-Jul-05

A-2005-0069-ALA

Attestation Review on Funding Improvements to the Army's Ammunition Industrial Base 10-Dec-04

Page 306: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0070-ALO

Followup Audit of Recommendation A-6 From Audit Report AA 01-466 9-Dec-04

A-2005-0071-ALO

Followup Audit of Recommendation A-1 From Audit Report A-2002-0395-IMO 9-Dec-04

A-2005-0072-ZBI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Intelligence and Security Command 16-Dec-04

A-2005-0073-FFG

Independent Auditors Report, Secretary of Defense/Joint Staff Welfare and Recreation Association Fund 21-Dec-04

A-2005-0074-ZBI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Tank-automotive and Armaments Command 10-Dec-04

A-2005-0075-ZBI

Attestation Review of Validation of Intelligence Data for Base Realignment and Closure 2005, U.S. Army Special Operations Command 11-Jan-05

A-2005-0076-ALO

Attestation Review of the Financial Statements for the Period Ended September 30, 2003 for the Red River Redevelopment Authority No-Cost Economic Development Conveyance 14-Dec-04

A-2005-0077-ALO

Followup Audit of Recommendation A-3 From Audit Report AA 01-471 13-Dec-04

A-2005-0078-FFGCoalition Provisional Authority Travel Process 2-Mar-05

A-2005-0079-ZBI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Field Support Command 13-Dec-04

Page 307: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0080-FFG

Office of the Secretary of Defense/Joint Staff Welfare and Recreation Association Fund, Internal Controls 13-Apr-05

A-2005-0081-FFF

Individual Ready Reserve and Individual Mobilization Augmentee Soldiers, U.S. Army Human Resources Command, Alexandria, Virginia 3-Feb-05

A-2005-0082-ALOAudit of Enhanced Use Lease Authority 16-Dec-04

A-2005-0083-ALT

Army Military Value Data, The Army Basing Study 2005 21-Dec-04

A-2005-0084-ALA

Earned Value Management, Program Executive Office, Aviation 21-Dec-04

A-2005-0085-FFC

Selected U.S. Army Corps of Engineers Civil Works Financial Statements, U.S. Army Corps of Engineers 7-Jan-05

A-2005-0086-ZBI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Aviation and Missile Command 21-Dec-04

A-2005-0087-ZBI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Communications-Electronics Command 14-Jan-05

A-2005-0088-ALM

Depot Level Maintenance for Secondary Items, Phase I - Repair Versus Procurement Decisions, U.S. Army Communications-Electronics Command 11-Jan-05

A-2005-0089-ALT

Followup Audit of Aviation Maintenance Business Practices, Fort Drum, New York 11-Jan-05

A-2005-0090-ALM

Followup on Mobile Subscriber Equipment, U.S. Army Communications-Electronics Command 6-Jan-05

Page 308: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0091-ALO

Review of Revenues and Expenses for the 2004 Army Birthday Ball 25-Jan-05

A-2005-0092-FFP

Followup Audit of Third Party Claims, Tripler Army Medical Center, Honolulu, Hawaii 7-Jan-05

A-2005-0093-FFP

Logistics Cost Sharing Program, U.S. Forces Korea and Eighth U.S. Army 12-Jan-05

A-2005-0094-ZBI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Research, Development and Engineering Center 14-Jan-05

A-2005-0095-FFGVested and Seized Assets, Operation Iraqi Freedom 16-Feb-05

A-2005-0096-FFH

Army Lodging Overhead Costs, U.S. Army Community and Family Support Center 20-Jan-05

A-2005-0097-PMO

Quality Assurance Post Review of Management Controls Over Travel, Leave, and Pay Transactions 18-Jan-05

A-2005-0098-FFH

Medical Funding for the Global War on Terrorism, U.S. Army Medical Command 2-Feb-05

A-2005-0099-FFGManagement Controls of Wholesale Munitions 4-Feb-05

A-2005-0100-ALO

Attestation Review of the Financial Statements for the Period Ended December 31, 2003 for the Fort Chaffee Redevelopment Authority No-Cost Economic Development Conveyance 28-Jan-05

A-2005-0101-FFH

Community Club Renovation Project, Fort Buchanan, Puerto Rico 23-Feb-05

A-2005-0102-ALA

The Army's Purchase Card Program, U.S. Army Armor Center, Garrison Command and Partners in Excellence, Fort Knox, Kentucky 7-Feb-05

Page 309: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0103-FFGCargo and Billing System, Requirements Validation 3-Mar-05

A-2005-0104-ALW

Disbursing Station Expenditure Operations, DOD Disbursing Station Number 5570 14-Feb-05

A-2005-0105-ALO

Followup Audit of Recommendation B-4 From Audit Report AA01-395 3-Feb-05

A-2005-0106-FFF

Followup Audit of the Use of Rail Cars for Transporting Equipment to Combat Training Centers, Deputy Chief of Staff, G-3/5/7 11-Feb-05

A-2005-0107-ALO

Audit of Reimbursables for Non-army Customers, Fort Bragg, North Carolina 4-Feb-05

A-2005-0108-ZBIIntelligence Contingency Funds, Summary Report 23-Feb-05

A-2005-0109-ALAMovement Tracking System, Fort Lee, Virginia 16-Feb-05

A-2005-0110-FFF

Followup Audit of Computer Based Training for Information Technology (e-Learning), Army Chief Information Officer/G-6 24-Feb-05

A-2005-0111-ZBI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Materiel Command 22-Feb-05

A-2005-0112-FFF

Followup of Army Modernization Training (New Equipment Training) 2-Mar-05

A-2005-0113-FFE Range Inventory 22-Feb-05

A-2005-0114-ALAArmy Transformation Team Terms of Reference 25-Feb-05

A-2005-0115-FFF

Revalidation of Material Weakness-Automated Mobilization System 4-Mar-05

A-2005-0116-FFC

Recreation Facility Financial and Contract Management, Headquarters, U.S. Army Corps of Engineers 9-Mar-05

A-2005-0117-FFC

Recreation Facility Financial and Contract Management, U.S. Army Corps of Engineers, Fort Worth District 2-Mar-05

Page 310: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0118-FFC

Recreation Facility Financial and Contract Management, U.S. Army Corps of Engineers, Kansas City District 8-Mar-05

A-2005-0119-FFC

Recreation Facility Financial and Contract Management, U.S. Army Corps of Engineers, Vicksburg District 10-Mar-05

A-2005-0120-ALAData-Mining Technicians for Purchase Card Oversight 24-Feb-05

A-2005-0121-ALS

Followup Audit of Global Combat Support System-Army Program Contract, Office of the Program Executive Officer, Enterprise Information Systems 28-Feb-05

A-2005-0122-ALT

Independent Review of the Updated Government Costs for the Directorate of Logistics Commercial Activities Study as Directed by the Administrative Appeals Board, Northeast Region, Fort Monroe, Virginia 24-Feb-05

A-2005-0123-ALW

Lead the Fleet Program, Office of the Deputy Chief of Staff, G-4 3-Mar-05

A-2005-0124-ALOPrivatization of Family Housing 4-Mar-05

A-2005-0125-ZBI

Attestation Review of Validation of Data for Base Realignment and Closure 2005, U.S. Army Intelligence Community 2-Mar-05

A-2005-0126-FFE

Management of Government-Furnished Property, U.S. Army Garrison, Fort Hood, Texas 4-Mar-05

A-2005-0127-ALW

Validation of the Army's Fund Balance With Treasury 10-Mar-05

Page 311: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0128-ALM

Army Diagnostic Improvement Program, Office of the Product Manager for Test, Measurement and Diagnostic Equipment, Redstone Arsenal, Alabama 24-Mar-05

A-2005-0129-FFG

Followup Audit of Stored Value Card (Joint Task Force-Bravo), Soto Cano Air base, Honduras 16-Mar-05

A-2005-0130-ALO

Followup Audit of Recommendations in Audit Report AA 01-466, Fort Benning, Georgia 10-Mar-05

A-2005-0131-FFF

Followup Review of Distance Learning Facilities and Hardware Acquisition Structure 9-Sep-05

A-2005-0132-ALT

Attestation Examination of The Army Basing Study Groups 2005 Quality Assurance Process 15-Mar-05

A-2005-0133-FFH

Cycle Memorandum, Total Army Analysis Process--Tactical Medical Requirements 16-Mar-05

A-2005-0134-FFG

Review of the Army Management Control Process FY 04, Office of the Chief of Chaplains, Headquarters, DA 4-Apr-05

A-2005-0135-FFG

Review of the Army Management Control Process FY 04, Headquarters, Installation Management Agency 21-Mar-05

A-2005-0136-ALW

Attestation Examination of Selected Army Chief Financial Officers Strategic Plan Tasks, Fund Balance With Treasury 18-Mar-05

A-2005-0137-FFF

Followup Audit of Delayed Entry Program Management, Deputy Chief of Staff, G-1 14-Apr-05

A-2005-0138-ALM

Time Sensitive Issue--Procurement of Axle Assemblies 18-Mar-05

A-2005-0139-ALTValidation of COMPARE Version 2.1 Software 21-Mar-05

Page 312: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0140-ALT

Areas of Concern--Validation of COMPARE Version 2.1 Software 21-Mar-05

A-2005-0141-FFP

Workload Survey, U.S. Army Commands in the Pacific 4-Apr-05

A-2005-0142-FFE

Chemical, Biological and Nuclear Survivability Testing for Army Systems 23-Dec-04

A-2005-0143-ALE

Implementation of the Bosnia Restructure Plan, U.S. Army, Europe and Seventh Army 4-Apr-05

A-2005-0144-FFH

Attestation Review of Morale, Welfare, and Recreation Financial Statements--Armed Forces Recreation Centers, U.S. Army Community and Family Support Center 23-Mar-05

A-2005-0145-ALT

Followup Audit of Recommendation 2 From Audit Report AA 01-48 25-Mar-05

A-2005-0146-ALW

Management of Consigned Inventory, Office of the Assistant Secretary of the Army (Financial Management and Comptroller) and Office of the Deputy Chief of Staff, G-4 8-Apr-05

A-2005-0147-ALO

Garrison Utilities and Energy Services, Fort Stewart and Hunter Army Airfield, Georgia 7-Apr-05

A-2005-0148-FFP

Final Memorandum Report: Accounting for Fisher House Funds 24-Mar-05

A-2005-0149-ALA

Earned Value Management, Program Executive Office, Ground Combat Systems and Program Manager Office, Unit of Action 6-Apr-05

A-2005-0150-FFEContracting for Installation Preparedness 13-Apr-05

A-2005-0151-FFG

Review of the Army Management Control Process FY 04, Office of the Judge Advocate General 8-Apr-05

Page 313: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0152-FFG

Review of the Army Management Control Process FY 04, U.S. Army Chemical Materials Agency, Aberdeen Proving Ground, Maryland 8-Apr-05

A-2005-0153-FFG

Review of the Army Management Control process Fy 04, U.S. Army Tank-automotive & Armaments Command, Warren, Michigan 8-Apr-05

A-2005-0154-FFG

Review of the Army Management Control Process FY 04, U.S. Army Materiel Command 12-Apr-05

A-2005-0155-FFG

Review of the Army Management Control Process FY 04, Office of the Deputy Chief of Staff for Logistics (G-4) 13-Apr-05

A-2005-0156-FFG

Review of the Army Management Control Process FY 04, Corpus Christi Army Depot 15-Apr-05

A-2005-0157-FFG

Review of the Army Management Control Process FY 04, McAlester Army Ammunition Plant, U.S. Army Field Support Command 15-Apr-05

A-2005-0158-ZBI

Information Technology Acquisition Management for Special Programs 1-Apr-05

A-2005-0159-ALA

Proposed Modifications to the Kalmar Rough Terrain Container Handler 12-Apr-05

A-2005-0160-ALA

Integrated System Control, Fort Monmouth, New Jersey 22-Apr-05

A-2005-0161-FFF

Followup Audit of Funding of Aviation Training, U.S. Army Aviation Center and Fort Rucker 26-May-05

A-2005-0162-FFF

Material Weakness Manpower Requirements Determination 27-Apr-05

A-2005-0163-ALS

Contract for Logistics Services, U.S. Army Reserve Command, Fort McPherson, Georgia 20-Apr-05

Page 314: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0164-ALTThe Army Basing Study 2005 Process 22-Apr-05

A-2005-0165-ALT

Reserve Component Process Action Team, The Army Basing Study 2005 29-Apr-05

A-2005-0166-FFG

Standard Procurement System, Financial Requirements 21-Apr-05

A-2005-0167-FFF

Followup Audit of Mobilization and Pay Record Discrepancies in the Reserve Components 6-May-05

A-2005-0168-ALE

Theater Distribution Capabilities--Operation Iraqi Freedom 26-Apr-05

A-2005-0169-ALT

Validation of Army Responses for Joint Cross-Service Group Questions 22-Apr-05

A-2005-0170-ALA

Primary (Non-rechargeable) Communications-Electronics Batteries, U.S. Army Communications-Electronics Life Cycle Management Command 2-May-05

A-2005-0171-FFP

Government Purchase Card, Army Commands in Korea 6-Jul-05

A-2005-0172-ALE

Functionality of Logistics Automated Systems--Operation Iraqi Freedom 27-Apr-05

A-2005-0173-ALE

Commanders Emergency Response Program and Quick Response Fund, Multi-National Security Transition Command - Iraq 2-May-05

A-2005-0174-ZBI

Coordinating Requirements for Special Access Programs, Site E 29-Apr-05

A-2005-0175-FFI

Centralizing Common User Support (Single Directorate of Information Management Concept), Dugway Proving Ground, White Sands Missile Range, and Yuma Proving Ground 14-Jun-05

Page 315: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0176-ALA

Contract Award Practices, U.S. Army Tank-automotive and Armaments Command - Rock Island, Rock Island Arsenal, Illinois 2-May-05

A-2005-0177-ALS

Internal Controls Over Cargo Container Payments, Military Surface Deployment and Distribution Command 12-May-05

A-2005-0178-PMO

Quality Assurance Post Audit Review of the Audit of Management Controls for Wholesale Munitions Inventories 29-Apr-05

A-2005-0179-FFG

Review of the Army Management Control Process FY 04, An Assessment for the Secretary of the Army 10-May-05

A-2005-0180-ALT

Financial and Accounting Operations, U.S. Property and Fiscal Office for Indiana 25-May-05

A-2005-0181-FFP

Followup on the Audit of Space Utilization of Storage and Warehouse Facilities, U.S. Army Garrison, Hawaii 10-May-05

A-2005-0182-ALS

Rapid Fielding Initiative Accountability Procedures, Program Executive Office, Soldier, Fort Belvoir, Virginia 12-May-05

A-2005-0183-FFF

Reserve Component Duty Military Occupational Specialty Qualification and Officer Basic Course Training Requirements 15-Jun-05

A-2005-0184-ALT

Equipment Maintenance, California Army National Guard 11-May-05

A-2005-0185-FFG

Followup Audit of U.S. Debit Card Pilot Program, U.S. Southern Command, Miami, Florida 21-Jun-05

A-2005-0186-ALE

Followup Audit of the General Support Maintenance Program, U.S. Army, Europe and Seventh Army 12-May-05

Page 316: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0187-ALS

Planning Survey of Single Stock Fund Implementation Issues 17-May-05

A-2005-0188-ALOMilitary Construction Process 19-May-05

A-2005-0189-FFE Contractor Aircrew Safety 17-May-05

A-2005-0190-ALT

Personnel Management and Training, California Army National Guard 19-May-05

A-2005-0191-FFF

Advanced Individual Training Courses, U.S. Army Intelligence Center, Fort Huachuca 9-Aug-05

A-2005-0192-ALO

Army Stationing and Installation Plan, Fort Hood, Texas 20-May-05

A-2005-0193-ZBI

Coordinating Requirements for Special Access Programs 16-Jun-05

A-2005-0194-ALA

Program Management in Support of Iraq Reconstruction, Project and Contracting Office, Washington, DC 26-May-05

A-2005-0195-ALSAttestation of Army Combat Uniform Business Case 1-Jun-05

A-2005-0196-FFH

Financial Controls Over Golf Course Operations, Fort Campbell, Kentucky 10-Jun-05

A-2005-0197-ALE

Asset Visibility and Container Management--Operation Iraqi Freedom 5-Jul-05

A-2005-0198-ALA

Attestation Examination of the Army's Standard Procurement System Interface to the Computerized Accounts Payment System 1-Jun-05

A-2005-0199-ALA

The Army's Purchase Card Program, Aviation Division, Fort Stewart/Hunter Army Airfield, Georgia 13-Jun-05

A-2005-0200-FFI

Headquarters, Department of the Army Information Technology Purchase Process 27-Jun-05

A-2005-0201-FFG

Sale and Exchange Program, U.S. Army Tank-automotive and Armaments Command 5-Aug-05

Page 317: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0202-ALM

Impact on Warranties on Weapon System Maintenance Costs, Program Executive Office, Command Control and Communications Tactical, Fort Monmouth, New Jersey 12-Jul-05

A-2005-0203-ZBI

Followup Audit of Recommendation B-02, AA 00-396, Secure Environment Contracting 8-Jun-05

A-2005-0204-FFC

Security of Civil Works Water Resources Infrastructure, U.S. Army Corps of Engineers 23-Jun-05

A-2005-0205-ZBI

Property Accountability in Special Operations Forces Reserve Units, U.S. Army Civil Affairs and Psychological Operations Command, Fort Bragg, North Carolina 17-Jun-05

A-2005-0206-FFG

Validation of the Statement of Accountability, Attestation of Disbursing Station Symbol Number 8551 29-Jun-05

A-2005-0207-FFF

Followup Audit of Military Training Service Support-Pilot Test, Fort Lee, Virginia 29-Jun-05

A-2005-0208-ALA

Earned Value Management, Program Executive Office, Command, Control and Communications Tactical 22-Jun-05

A-2005-0209-ALA

Followup Audit of the Army Transformation Experiment 2002 23-Jun-05

A-2005-0210-ALM

Followup Audit of the U.S. Army Aviation Hydraulic Contamination Control Program, Redstone Arsenal, Huntsville, Alabama 1-Jul-05

A-2005-0211-FFC

Attestation Review of Army Ideas for Excellence Program Idea Number CELP940157 23-Jun-05

Page 318: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0212-ALA

Followup Auditof the Joint Contingency Force Advanced Warfighting Experiment 22-Jun-05

A-2005-0213-ALM

Followup Audit of the Army Oil Analysis Program, Redstone Arsenal, Huntsville, Alabama 1-Jul-05

A-2005-0214-FFC

Non-Federal Sponser Survey Responses, Audit of Civil Works Cooperation Agreements 28-Jun-05

A-2005-0215-FFH

Financial Controls--Community Club Operations, Fort Buchanan, Puerto Rico 30-Jun-05

A-2005-0216-ALW

Followup of Audit Report AA 00-399 Compilation of Selected Army Working Capital Fund FY 99 Financial Statements 1-Jul-05

A-2005-0217-ALW

Followup Audit of Workers Compensation, Army Working Capital Fund, Office of the Deputy Assistant Chief of Staff, G-1 for Civilian Personnel Policy 1-Jul-05

A-2005-0218-FFI

Forces Command Network Support Contract, Headquarters, U.S. Army Forces Command 4-Aug-05

A-2005-0219-FFH

Total Army Analysis Process: Tactical Medical Requirements, U.S. Army Center for Army Analysis, Fort Belvoir, Virginia 30-Jun-05

A-2005-0220-ALE

Followup Audit of Controls Over Morale, Welfare, and Recreation Equipment Downrange (Bosnia and Kosovo), U.S. Army, Europe and Seventh Army 14-Jul-05

A-2005-0221-ALE

Surface Transportation Management--Balkans, U.S. Army, Europe and Seventh Army 4-Aug-05

A-2005-0222-ALS

Contract Offloading, U.S. Army Reserve Command, Fort McPherson, Georgia 30-Jun-05

Page 319: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0223-FFC

Insurance Reserve Account, U. S. Army Corps of Engineers 23-Aug-05

A-2005-0224-ZBI

Time Sensitive Issue - Audit of Contract Management/Administration for Special Access Programs, Intelligence and Sensitive Activities, U.S. Army Intelligence and Security Command 30-Jun-05

A-2005-0225-ZBI

Followup Audit of Recommendation E0-01, A-2002-0422-AML, Army Foreign Language Program 30-Jun-05

A-2005-0226-PMZPeer Review of Naval Audit Service - Opinion Report 12-Jul-05

A-2005-0227-PMZ

Peer Review of Naval Audit Service - Letter of Comments 12-Jul-05

A-2005-0228-ALW

Followup Audit of Internal Controls Over Inventory, Office of the Administrative Assistant to the Secretary of the Army 1-Jul-05

A-2005-0229-ALW

Followup on Recommendations 3 and 4 Audit Report A-2003-0450-AMW, Anniston Army Depot 15-Jul-05

A-2005-0230-FFPWar Reserve Stocks for Allies-Korea 29-Jul-05

A-2005-0231-FFE

Termination of Review of U.S. Army Suggestion Program Number SWIR04003M 13-Jul-05

A-2005-0232-ZBI

Property Accountability in Special Operations Forces Reserve Units, Office of the Secretary of the Army 18-Jul-05

A-2005-0233-ZBI

Military Interdepartmental Purchase Request Processes 15-Jul-05

A-2005-0234-ALT

Validation of Most Efficient Organization, Fort Detrick, Maryland 20-Jul-05

A-2005-0235-ALTCommercial Activities Preaward Process 21-Jul-05

Page 320: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0236-FFH

Attestation Review of Morale, Welfare, and Recreation Financial Statements--Army Nonappropriated Fund Employee Retirement and 401(k) Savings Plans, U.S. Army Community and Family Support Center 18-Jul-05

A-2005-0237-ALW

Project Manager Assets - Aviation, Office of the Program Executive Officer, Aviation, Apache Attack Helicopter 9-Aug-05

A-2005-0238-ALW

Project Manager Assets - Aviation, Office of the Program Executive Officer, Aviation, Scout Attack Helicopter 9-Aug-05

A-2005-0239-ALW

Project Manager Assets - Aviation, Office of the Program Executive Officer, Aviation, Cargo Helicopter 9-Aug-05

A-2005-0240-ALW

Project Manager Assets - Aviation, Office of the Program Executive Officer, Aviation 9-Aug-05

A-2005-0241-FFE

Review of Suggestion Award for Warehouse Modernization Upgrade, Army Suggestion Program Sugestion Number SWHD04028C 21-Jul-05

A-2005-0242-FFI

Human Resources Command Personnel Information Technology Systems 11-Aug-05

A-2005-0243-FFP

Observations of Annual Antiterrorism Exercise, Audit of Force Protection - Army Commands in Japan 1-Sep-05

A-2005-0244-ALA

Attestation Review of Army Ideas for Excellence Program Idea Number SWMC04090C 21-Jul-05

A-2005-0245-ALA Movement Tracking System 10-Aug-05

Page 321: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0246-ALE

Followup Audit of Living Quarters Allowance, U.S. Army, Europe and Seventh Army 29-Jul-05

A-2005-0247-FFE

Land Use Controls and Monitoring at Formerly Used Defense Sites, U.S. Army Corps of Engineers Louisville District 3-Aug-05

A-2005-0248-FFP

Followup Audit of Nonappropriated Fund Payroll for Local Nationals, Eighth U.S. Army, Seoul, Korea 18-Aug-05

A-2005-0249-ALO

Garrison Utilities and Energy Services, Fort Leonard Wood, Missouri 8-Aug-05

A-2005-0250-ALEClass IX Spare Parts--Operation Iraqi Freedom 15-Aug-05

A-2005-0251-FFE

Followup Audit of Disposal Actions at Formerly Utilized Sites, U.S. Army Corps of Engineers 8-Aug-05

A-2005-0252-ZBI Intelligence Funds 12-Aug-05

A-2005-0253-FFP

Audit of Nonappropriated Fund Financial Management Structure, Installation Management Agency, Pacific Region Office 12-Aug-05

A-2005-0254-FFP

Audit of Nonappropriated Fund Financial Management Structure, U.S. Army Garrison, Hawaii 10-Aug-05

A-2005-0255-FFP

Audit of Nonappropriated Fund Financial Management Structure, U.S. Army Garrison, Japan 10-Aug-05

A-2005-0256-FFE

Validation of Material Weakness for Unexploded Ordnance 19-Aug-05

A-2005-0257-FFE

Followup Audit of Chemical and Biological Support for Forward Stationed DA Civilians and Contractors 19-Aug-05

Page 322: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0258-FFF

Management Controls Over Civilian Payroll Funds, U.S. Military Entrance Processing Command 26-Aug-05

A-2005-0259-FFE

Followup Audit of Support for Nonmedical Chemical and Biological Defensive Equipment, Aberdeen Proving Ground, Maryland 19-Aug-05

A-2005-0260-FFE

Followup Audit of Transportation Motor Pool, Fort Hood, Texas 22-Aug-05

A-2005-0261-FFG

Defense Property Accountability System Material Weakness Closeout, Fort Belvoir, Virginia 19-Sep-05

A-2005-0262-FFEFollowup Audit of the Army Forestry Program 25-Aug-05

A-2005-0263-FFE

Followup Audit of Hazardous Waste Disposal Volumes and Costs 25-Aug-05

A-2005-0264-FFP

Audit of Military Pay in Support of Operation Enduring Freedom/Operation Iraqi Freedom (OEF/OIF) 23-Aug-05

A-2005-0265-FFI

Followup Audit of Selected Aspects of Information Assurance--Fort Knox, Kentucky 29-Aug-05

A-2005-0266-FFE

Followup Audit of Hazardous Materials Information System 26-Aug-05

A-2005-0267-ALA

Followup Audit of The Army's Purchase Card Program, Fort Eustis and Fort Monroe, Virginia 8-Sep-05

A-2005-0268-FFP

Audit of Nonappropriated Fund Financial Management Structure, Installation Management Agency, Korea Region Office 1-Sep-05

A-2005-0269-ALO

Barracks Sustainment, Restoration, and Modernization, U.S. Army Garrison Fort Eustis, Virginia 31-Aug-05

Page 323: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0270-FFG

Review of the Army Management Control Process FY 05, Great Plains Regional Medical Command 7-Sep-05

A-2005-0271-ALA

Followup Audit of High Mobility Artillery Rocket System Program, Office of the Product Manager 6-Sep-05

A-2005-0272-ALS

Followup Audit of the Recapitalization Program Efficiency, Office of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) and Office of the Deputy Chief of Staff, G-8 31-Aug-05

A-2005-0273-ALW

Audit of Product Manager Office, Heavy Expanded Mobility Tactical Truck 29-Aug-05

A-2005-0274-FFGSoldier Allowances for the Active Component 19-Sep-05

A-2005-0275-ALM

Maintenance Support to Combat Units, Fort Hood, Texas 1-Sep-05

A-2005-0276-ALM

Contracting Issues Related to the Audit of Maintenance Support to Combat Units 30-Aug-05

A-2005-0277-FFG

Defense Property Accountability System Material Weakness Closeout, Fort Stewart, Georgia 19-Sep-05

A-2005-0278-FFG

Warfighters' Simulation and Joint Simulation System Funding 20-Sep-05

A-2005-0279-FFP

Review of Purchasing and Property Accountability Procedures for U.S. Army Military Police Battalion - Fort Shafter, Audit of Force Protection - Army Commands in Hawaii 29-Sep-05

A-2005-0280-FFE

Followup Audit of Projected Supply and Use of Halon 1301 2-Sep-05

A-2005-0281-FFEFollowup Audit of Execution of Environmental Projects 2-Sep-05

Page 324: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0282-ALM

Impact of Warranties on Weapon System Maintenance Costs, Program Executive Office, Missiles and Space, Redstone Arsenal, Alabama 2-Sep-05

A-2005-0283-ALM

Impact of Warranties on Weapon System Maintenance Costs, Program Executive Office, Intelligence, Electronic Warfare, and Sensors, Fort Monmouth, New Jersey 6-Sep-05

A-2005-0284-FFC

Operation and Maintenance and Maintenance Backlog, U.S. Army Corps of Engineers, Rock Island District 20-Sep-05

A-2005-0285-FFF

Reserve Component Readiness Reporting, U.S. Army Reserve Command 27-Sep-05

A-2005-0286-FFG

Review of the Army Management Control Process FY 05, U.S. Army Veterinary Command, Fort Sam Houston 9-Sep-05

A-2005-0287-FFG

Review of the Army Management Control Process FY 05, Headquarters, North Atlantic Regional Medical Command 9-Sep-05

A-2005-0288-FFG

Review of the Army Management Control Process FY 05, U.S. Army Surface Deployment and Distribution Command 16-Sep-05

A-2005-0289-FFG

Review of the Army Management Control Process FY 05, Office of the Deputy Chief of Staff G-8 16-Sep-05

A-2005-0290-ALW

Followup of Audit Report A-2002-0491-AMW, Government Purchase Cards, Tobyhanna Army Depot 8-Sep-05

Page 325: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0291-ALA

Semi-Trailer Taillight Commonality, Office of the Product Manager, Trailers 15-Sep-05

A-2005-0292-FFG

Army Government Travel Card - Individual Pay, U.S. Army Training and Doctrine Command 20-Sep-05

A-2005-0293-ALM

Impact of Warranties on Weapon System Maintenance Costs, Program Executive Office, Combat Support and Combat Service Support, Warren, Michigan 9-Sep-05

A-2005-0294-ALM

Impact of Warranties on Weapon System Maintenance Costs, Program Executive Office, Aviation, Redstone Arsenal, Alabama 12-Sep-05

A-2005-0295-FFI

Followup Audit of Disbursements Without Obligations 13-Sep-05

A-2005-0296-ALT

Contract Administration for Contracts Resulting From A-76 Commercial Activities Study Decisions 15-Sep-05

A-2005-0297-FFE

Followup Audit of Overhead, and General and Administrative Costs on Environmental Subcontracts, U.S. Army Corps of Engineers Baltimore District 13-Sep-05

A-2005-0298-ZBI

Followup Audit of Recommendation A-05 and A-09, AA 00-32, Army Foreign Language Program Requirements 12-Sep-05

A-2005-0299-ZBI

Followup Audit of Recommendation A-02, A-2001-0122-AMI, Technology Transfers in Special Programs 29-Sep-05

A-2005-0300-ZBI

Followup Audit of Recommendation A-01 and B-01, A-2002-AMI-0211-AMI, Technology Transfers 29-Sep-05

Page 326: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0301-ZBI

Followup Audit of Recommendation B-02, A-2002-0600-AMI, Information Technology Acquisition Workload Management 29-Sep-05

A-2005-0302-ZBI

Followup Audit of Recommendation A-06, A-2000-0314-AMI, Information Systems Security for Classified and Sensitive Systems 29-Sep-05

A-2005-0303-ZBIAudit of Checking Account Procedures 29-Sep-05

A-2005-0304-ALM

Sustainment Systems Technical Support, U.S. Army Tank-automotive and Armaments Life Cycle Management Command 21-Sep-05

A-2005-0305-ALM

Sustainment Systems Technical Support, U.S. Army Aviation and Missile Life Cycle Management Command 26-Sep-05

A-2005-0306-ALM

Sustainment Systems Technical Support, Offices of the Assistant Secretary of the Army (Acquisition, Logistics and Technology, Deputy Chief of Staff, G-4, and U.S. Army Materiel Command 28-Sep-05

A-2005-0307-ALW

Army Workload and Performance System, Workload Forecast, U.S. Army Materiel Command 20-Sep-05

A-2005-0308-ALA

Army Government Purchase Card Program, Fort Stewart, Georgia 21-Sep-05

A-2005-0309-ALW

Followup of Audit Report AA 01-423 Compilation Process for the Fiscal Year 2000 Statement of Financing, Army Working Capital Fund 22-Sep-05

A-2005-0310-ALW

Followup Audit of Army Working Capital Fund Recommendations, Office of the Assistant Secretary of the Army (Financial Management and Comptroller) 21-Sep-05

Page 327: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0311-ALO

Followup Audit of Recommendations in Audit Report AA 02-098, U.S. Army Garrison, Fort Bragg; Fort Bragg, North Carolina 20-Sep-05

A-2005-0312-ALW

Followup of Audit Report A-2002-0365-AMW Compilation of Army Working Capital Fund Fiscal Year 2001 1307 Accounting Report 22-Sep-05

A-2005-0313-FFG

Army Government Travel Card-Individual Pay, U.S. Army Forces Command 28-Sep-05

A-2005-0314-ALE

Followup Audit of Child Care Operations, U.S. Army Installation Management Agency, Europe Region 22-Sep-05

A-2005-0315-ALE

Followup Audit of Allocation of Army Lodging Fund Common Overhead Support Costs, 26th Area Support Group, Heidelberg, Germany 22-Sep-05

A-2005-0316-ALE

Followup Audit of Nonappropriated Fund Payroll, U.S. Army Installation Management Agency, Europe Region 22-Sep-05

A-2005-0317-FFE

Followup Audit of Management of Chemical Stockpile Sites, U.S. Army Chemical Materials Agency 23-Sep-05

A-2005-0318-FFE

Followup Audit of Administering Service Contracts, III Corps and Fort Hood, Texas 23-Sep-05

A-2005-0319-FFE

Remediation Contract at Defense Supply Center Philadelphia, Defense Logistics Agency and Defense Energy Support Center 27-Sep-05

A-2005-0320-FFG

Integrated Facilities System Requirements Determination 27-Sep-05

A-2005-0321-ALT

Contract Administration for the Base Operations Support Contract, U.S. Army Garrison, Picatinny 27-Sep-05

Page 328: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0322-FFG

Audit of Financial Controls, Army National Guard - Selected Reserve Incentive Programs 23-Sep-05

A-2005-0324-FFC

Operations and Maintenance and Maintenance Backlog, U.S. Army Engineer District, Tulsa 29-Sep-05

A-2005-0325-FFG

Defense Property Accountability System Material Weakness Closeout, Fort Knox 28-Sep-05

A-2005-0326-FFG

Defense Property Accountability System Material Weakness Closeout, Corpus Christi, Texas 28-Sep-05

A-2005-0327-FFE

Workload Survey of the U.S. Army Chemical School, Fort Leonard Wood, Missouri 28-Sep-05

A-2005-0328-FFI

Followup Audit of the Discontinue Research Process, Office of the Assistant Secretary of the Army (Financial Management and Comptroller) 29-Sep-05

A-2005-0329-FFI

Followup Audit of Disbursements Without Obligations, U.S. Army Acquisition, Logistics, and Technology Enterprise Systems and Services 29-Sep-05

A-2005-0330-ZBI Intelligence Funds 29-Sep-05

A-2005-0331-FFI

Airtime Requirements for Fixed Commercial Satellite Bandwidth 30-Sep-05

A-2005-0332-ALE

Followup Audit of Commanders' Emergency Response Program and Quick Response Fund, Multi-National Security Transition Command - Iraq 30-Sep-05

A-2005-0333-ALO

Barracks Sustainment, Restoration, and Modernization, U.S. Army Garrison, Fort Leonard Wood, Missouri 30-Sep-05

Page 329: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2005-0334-FFE

Motor Vehicle and Occupational Health Safety Programs 30-Sep-05

A-2005-0335-ALO

Audit of Relocatable Buildings--Notification of Potential Antideficiency Act Violation 30-Sep-05

A-2005-0336-ALS

Training Resource Model Inputs Acquisition Contracting, U.S. Army Aviation and Missile Life Cycle Management Command, Redstone Arsenal, Alabama 30-Sep-05

A-2005-0337-FFI

Workload Survey of Tactical Information Technology Operations 30-Sep-05

A-2005-0338-ALM

Followup Audit on Specialized Repair Authority, U.S. Army Communications-Electronics Life Cycle Management Command, Fort Monmouth, New Jersey 30-Sep-05

A-2006-0001-FFIAudit Followup Tracking System 5-Jun-06

A-2006-0002-FFM

Review of the Army Management Control Process FY 05, Deputy Chief of Staff, G-2 3-Nov-05

A-2006-0003-FFMKuwait Defense Cooperative Agreement 16-Nov-05

A-2006-0004-FFI

Centralizing Common User Support (Single Directorate of Information Management Concept) 23-Dec-05

A-2006-0005-FFH

Audit of Contracts for Medical Goods and Services, Contract DADA09-03-P-0961, Neurosurgeon Services, William Beaumont Army Medical Center 20-Oct-05

A-2006-0006-FFP

Review of the Army Management Control Process FY 05, US Army Pacific, Fort Shafter, Hawaii 2-Nov-05

A-2006-0007-FFM

Independent Auditors Report for FY 05 American Red Cross Financial Statements 21-Oct-05

Page 330: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0008-ALO

Followup Audit of Privatization of Utility Distribution System, Fort Hamilton, New York 3-Nov-05

A-2006-0009-ALODOD Support to the 2005 Presidential Inaugural 10-Nov-05

A-2006-0010-FFF

Reserve Component Readiness Reporting, Army National Guard 9-Nov-05

A-2006-0011-FFM

Review of the Army Management Control Process FY 05, Office of the Surgeon General/U.S. Army Medical Command 3-Nov-05

A-2006-0012-FFM

Review of Army Management Control Process FY 05, Chief Information Officer/G-6 17-Nov-05

A-2006-0013-FFM

Defense Property Accountability System Material Weakness Closeout, Criminal Investigative Division Laboratory, Fort Gillem, Georgia 17-Nov-05

A-2006-0014-ALM

Depot-level Maintenance for Secondary Items, Phase I - Repair Versus Procurement Decisions, U.S. Army Tank-automotive and Armaments Life Cycle Management Command 14-Dec-05

A-2006-0015-ALA

Followup Audit of Common Hardware Systems Notebook Computers, Fort Monmouth, New Jersey 7-Nov-05

A-2006-0016-ALI

Contracting and Cooperative Agreements, U.S. Property and Fiscal Office, Indiana Army National Guard 18-Nov-05

A-2006-0017-ALE

Army Golf Operations in Europe, U.S. Army Installation Management Agency, Europe Region 10-Nov-05

Page 331: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0018-ALL

Logistics Civil Augmentation Program Support Unit Training, Logistics Civil Augmentation Program Support Unit Headquarters, Fort Belvoir, Virginia 17-Nov-05

A-2006-0019-ALE

Followup Audit of Laundry and Dry Cleaning Services, U.S. Army Installation Management Agency, Europe Region 2-Dec-05

A-2006-0020-FFM

Review of the Army Management Control Process FY 05, U.S. Army Network Enterprise Technology Command/9th Army Signal Command 23-Nov-05

A-2006-0021-ALO

Attestation Examination of the Certified Financial Statements for the Period Ended December 31, 2003 for the Philadelphia Authority for Industrial Development No-Cost Economic Development Conveyance 18-Nov-05

A-2006-0022-ALL

Logistics Civil Augmentation Program, U.S. Army Materiel Command 28-Nov-05

A-2006-0023-ALO

Attestation Examination of the Certified Financial Statements for the Period Ended June 30, 2004 for the Holabird Local Redevelopment Authority No-Cost Economic Development Conveyance 22-Nov-05

A-2006-0024-FFE

Followup Audit of Army Wastewater Systems, Office of the Assistant Chief of Staff for Installation Management 2-Dec-05

A-2006-0025-ALE

Followup Audit of Management of Ammunition in Support of Army Pre-Positioned Sets, 21st Theater Support Command and Army Field Support Brigade - Europe 2-Dec-05

Page 332: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0026-ALO

Barracks Sustainment, Restoration, and Modernization, U.S. Army Garrison, Fort Hood, Texas 9-Dec-05

A-2006-0027-FFF

Followup Audit of Military Training Service Support-Pilot Test, Fort Gordon, Georgia 16-Dec-05

A-2006-0028-ALM

Stryker Contract Logistics Support Costs, Office of the Project Manager, Stryker Brigade Combat Team 6-Dec-05

A-2006-0029-ALA

Funding Contract Security Guards at Army Ammunition Installations, Program Executive Officer, Ammunition and U.S. Army Joint Munitions Command 21-Dec-05

A-2006-0030-FFD

Civil Works Project Cooperation Agreements, Office of the Assistant Secretary of the Army (Civil Works) and U.S. Army Corps of Engineers 13-Dec-05

A-2006-0031-FFP

Followup Audit of Quartermaster Laundry Service - Korea, Eighth U.S. Army, Seoul, Korea 22-Dec-05

A-2006-0032-ALE

Followup Audit of Ammunition Accountability--Reserve Storage Activity, Miesau, U.S. Army, Europe and Seventh Army 14-Dec-05

A-2006-0033-FFE

Remediation at Aberdeen Proving Ground, Aberdeen Proving Ground, Maryland 10-Feb-06

A-2006-0034-FFE Environmental Liabilities 15-Feb-06

A-2006-0035-FFD

Workload Survey: Iraq Reconstruction, Corps of Engineers 20-Dec-05

A-2006-0036-ALA Earned Value Management 22-Dec-05

A-2006-0037-ALA

Contract Workload Survey, Fort Monmouth, New Jersey 22-Dec-05

A-2006-0038-FFM

Reserve Component Pay--Operations Iraqi and Enduring Freedom 25-May-06

Page 333: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0039-ZBI

Followup Review of Recommendation A-2 in U.S. Army Audit Agency Report: A-2002-0234-AMI, Technology Transfers of Classified and Sensitive Information, U.S. Army Special Operations Command 22-Dec-05

A-2006-0040-ZBI

Followup Review of Recommendation A-1 in Army Audit Agency Report: A-2002-0275-AMI, Technology Transfers of Classified and Sensitive Information, US Army John F. Kennedy Special Warfare Center/School 22-Dec-05

A-2006-0041-FFFManagement of Initial Entry Training Soldiers 14-Feb-06

A-2006-0042-ALI

Followup Audit of the A-76 Competition for Base Operation Support Services, Walter Reed Army Medical Center, Washington, DC 10-Jan-06

A-2006-0043-ALI

Contract Management of Equipment Transition Sites, U.S. Army Reserve Command, Fort McPherson, Georgia 10-Feb-06

A-2006-0044-FFM

Attestation of Standard Procurement System - Requirements Validation 23-Jan-06

A-2006-0045-ALL

Audit of Training Resource Model Inputs -- Acquisition Contracting, U.S. Army Tank-automotive and Armaments Life Cycle Management Command, Warren, Michigan, and Rock Island, Illinois 10-Jan-06

A-2006-0046-ALA

Fund Accountability for Fiscal Year 2004 Iraq Relief and Reconstruction Funds, Project and Contracting Office, Washington, DC 31-Jan-06

A-2006-0047-ALLBase Closure Process in the Iraq Area of Operations 11-Jan-06

Page 334: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0048-PMO

Quality Assurance Post Audit Review of the Audit of FY 01 and FY 02 Potential Anti-Deficiency Act Violations, Colorado Army National Guard 11-Jan-06

A-2006-0049-FFF

Followup Audit of Advanced Individual Training Courses, U.S. Army Air Defense Artillery School, Fort Bliss 7-Mar-06

A-2006-0050-FFF

Followup Audit of Training-Base and First-Term Soldier Attrition 3-Apr-06

A-2006-0051-FFF

Material Weakness Revalidation - Manpower Requirements Determination 10-Feb-06

A-2006-0052-ALR

Followup Audit of Aged Accounts, U.S. Army Aviation and Missile Command 26-Jan-06

A-2006-0053-ALR

Followup of Audit Report A-2002-0492-AMW, Government Purchase Cards, U.S. Army Materiel Command 27-Jan-06

A-2006-0054-ALR

Followup on Recommendations 1 and 2, Audit Report A-2003-0450-AMW, Anniston Army Depot 17-Jul-06

A-2006-0055-ALM

Impact of Warranties on Weapon System Maintenance Costs 13-Feb-06

A-2006-0056-ZBI

Audit of Technology Applications Office - Reimbursables 27-Jan-06

A-2006-0057-ZBI

Audit of Contract Procedures for DATM05-02-C-0005 27-Jan-06

A-2006-0058-FFP

Barracks Improvement Program, U.S. Army Garrison, Hawaii 24-Jan-06

A-2006-0059-FFM

Review of the Army Management Control Process FY 05, Assistant Secretary of the Army (Financial Management and Comptroller) 3-Mar-06

Page 335: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0060-FFM

Defense Property Accountability System Material Weakness Closeout, Fort Bragg, North Carolina 6-Mar-06

A-2006-0061-FFP

Followup Audit of Morale, Welfare, and Recreation Acquisition Practices, U.S. Army Installation Management Agency, Korea Region Office 7-Feb-06

A-2006-0062-FFH

Attestation Review of Army and Air Force Exchange Service External Contract Oversight 27-Jan-06

A-2006-0063-ALR

Increasing Safety Levels for Spare Parts, Office of the Deputy Chief of Staff, G-4 31-Jan-06

A-2006-0064-FFM

Defense Property Accountability System Material Weakness Closeout, Night Vision and Electronic Sensors Directorate, Fort Belvoir, Virginia 24-Feb-06

A-2006-0065-ALR

Followup of Audit Report AA 01-443, Compilation of Army Working Capital Fund Fiscal Year 2000 1307 Accounting Report 13-Feb-06

A-2006-0066-FFM

Integrated Facilities System, Requirements Validation 8-Mar-06

A-2006-0067-FFM

Military Pay for Operation Enduring Freedom/Operation Iraqi Freedom--Active Component 5-Apr-06

A-2006-0068-FFH

Contracts for Medical Goods and Services, Contract W81K00-04-D-0001 (Medical Processing Assistants) 23-Feb-06

A-2006-0069-ZBIAudit of Intelligence Commercial Activities 27-Feb-06

A-2006-0070-FFP

Followup Audit of Healthcare for DA Civilians Stationed Overseas, Eighth U.S. Army, Korea 28-Feb-06

Page 336: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0071-ALAJoint Network Node, Fort Monmouth, New Jersey 7-Mar-06

A-2006-0072-ZBI

Audit of Secure Environment Contracting, Site A 22-Feb-06

A-2006-0073-ALL

Management of Force Provider Modules, Logistics Civil Augmentation Program 20-Mar-06

A-2006-0074-ZBIAudit of Intelligence Funds Site B 8-Mar-06

A-2006-0075-ALE

Capital Purchases and Minor Construction in Europe, U.S. Army Installation Management Agency, Europe Region 9-Mar-06

A-2006-0076-ALEMilitary Construction Requirements in Europe 17-Mar-06

A-2006-0077-ALE

Reconstitution--General Support Maintenance Within U.S. Army, Europe and Seventh Army 2-Jun-06

A-2006-0078-FFH

Morale, Welfare, and Recreation and the Post Restaurant Funds, Red River Army Depot, Texarkana, Texas 8-Sep-06

A-2006-0079-FFM

Material Weaknesses Closeout on Line of Duty and Incapacitation Pay 8-Mar-06

A-2006-0080-ZBIAudit of Intelligence Funds Site A 10-Mar-06

A-2006-0081-ALL

Audit of Unliquidated Obligations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 17-Mar-06

A-2006-0082-FFI

Attestation Review of Investment and Cost Benefit Estimates for the Publication Content Management Program Initiative 14-Mar-06

A-2006-0083-ALL

Audit of Retrograde Operations (Task Order 87), Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 21-Mar-06

Page 337: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0084-FFF

Followup Audit of Institutional Training of Reserve Component Soldiers to Meet Qualification Goals 2-May-06

A-2006-0085-ALA

Funding and Fielding Training Software and Hardware for Army Battle Command System Components 10-Apr-06

A-2006-0086-ALM

Coordination Between Local and National Level Reset, Fort Hood, Texas 30-Mar-06

A-2006-0087-PMO

Quality Assurance Review of FY 05 Audit Reports Without Recommendations 24-Mar-06

A-2006-0088-FFIJoint Network Node Cost Estimate Spirals 2-4 13-Apr-06

A-2006-0089-ALE

Followup Audit of Requirements for Nontactical Vehicles, U.S. Army Installation Management Agency, Europe Region 30-Mar-06

A-2006-0090-ALE

Followup Audit II of the Commanders' Emergency Response Program and Quick Response Fund, Multi-National Security Transition Command - Iraq 31-Mar-06

A-2006-0091-ALL

Audit of Management of the Theater Transportation Mission (Task Order 88), Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 4-Apr-06

A-2006-0092-ALA

Followup on the Audit of Requirements for Models and Simulations, Future Combat Systems, Office of the Program Manager, Future Combat Systems, Brigade Combat Teams 6-Apr-06

A-2006-0093-ZBI

Followup Audit of Information Systems Security, 75th Ranger Regiment (Airborne), Recommendation C-01 in Audit Report: A-2003-0331-AMI 6-Apr-06

Page 338: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0094-ALA

Army Voyager Fleet Card Program, Saint Paul District, U.S. Army Corps of Engineers, Saint Paul, Minnesota 21-Apr-06

A-2006-0095-PMO

Quality Assurance Review of the Audit of the Commanders' Emergency Response Program and Quick Response Fund 7-Apr-06

A-2006-0096-FFD

Army Military Construction Program, U.S. Army Garrison, Fort Bragg and U.S. Army Corps of Engineers Savannah District 19-May-06

A-2006-0097-ZBI

Active Duty Military Payroll Adjustments, United States Property and Fiscal Office for California 17-Apr-06

A-2006-0098-ZBI

Audit of Contract Management/Administration for Special Access Programs, Intelligence and Sensitive Activities, U.S. Army Intelligence and Security Command 18-Apr-06

A-2006-0099-ALL

Audit of Program Management in the Iraq Area of Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 25-Apr-06

A-2006-0100-FFH

Attestation Review of Morale, Welfare, and Recreation Financial Statements--Hospitality Cash Management Fund, U.S. Army Community and Family Support Center 27-Apr-06

A-2006-0101-FFH

Attestation Review of Morale, Welfare, and Recreation Financial Statements--Army Morale, Welfare, and Recreation Fund, U.S. Army Community and Family Support Center 27-Apr-06

Page 339: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0102-FFH

Attestation Review of Morale, Welfare, and Recreation Financial Statements--Army Recreation Machine Program, U.S. Army Community and Family Support Center 27-Apr-06

A-2006-0103-FFH

Attestation Review of Morale, Welfare, and Recreation Financial Statements--Army Special Purpose Funds, U.S. Army Community and Family Support Center 27-Apr-06

A-2006-0104-ZBI

Followup Audit of Information Systems Security, 160th Special Operations Aviation Regiment (Airborne), Recommendation C-02 in Audit Report: A-2003-0402-AMI 28-Apr-06

A-2006-0105-FFH

Attestation Review of Morale, Welfare, and Recreation Financial Statements--Army Lodging Fund, U.S. Army Community and Family Support Center 27-Apr-06

A-2006-0106-ALO

Attestation Examination of the Certified Financial Statements for the Period Ended June 30, 2004 for the Fort Ord Authority for Economic Development Conveyance 24-Apr-06

A-2006-0107-ZBI

Special Operations Forces Resident Training, U.S. Army John F. Kennedy Special Warfare Center and School, Fort Bragg, North Carolina 4-May-06

A-2006-0108-ALAArmy Software Blocking Process 28-Apr-06

A-2006-0109-FFM

Defense Property Accountability System Material Weakness Closeout, Fort Gillem, Georgia 26-Apr-06

Page 340: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0110-ALE

Followup Audit of Dental Services Contracting in Europe, Europe Regional Dental Command 8-Jun-06

A-2006-0111-ZBI

Followup Audit of Reimbursable Processes for IT Support--Sensitive Program, Recommendation A-04 4-May-06

A-2006-0112-FFH

Selected Aspects of Medical Modeling for the Total Army Analysis Process, U.S. Army Medical Department Center and School, Fort Sam Houston, Texas 2-Jun-06

A-2006-0113-ALO

Family Housing Operations and Maintenance Funding, U.S. Army Garrison, Fort Bragg; Fort Bragg, North Carolina 11-May-06

A-2006-0114-ZBI Audit of DA Special Roster 4-May-06

A-2006-0115-FFP

CID Assist - Contract Award Practices for Selected Contracts 8-May-06

A-2006-0116-FFF

Contract Recruiting, U.S. Army Recruiting Command, Fort Knox, Kentucky 6-Jun-06

A-2006-0117-ALL

Humidity-Controlled Storage Facilities, U.S. Army Reserve Command, Fort McPherson, Georgia 16-May-06

A-2006-0118-ALM

Depot Level Maintenance for Secondary Items, Phase I - Repair Versus Procurement Decisions, U.S. Army Aviation and Missile Life Cycle Management Command 30-May-06

A-2006-0119-ALO

Family Housing Operations and Maintenance Funding, U.S. Army Garrison, Fort Sill; Fort Sill, Oklahoma 11-May-06

A-2006-0120-FFE

Followup Audit of Management of Active Army Reactor Facilities, U.S. Army Test and Evaluation Command 19-May-06

Page 341: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0121-ALC

Attestation Review of Army Ideas for Excellence Program Idea Number NEPA06004C 10-May-06

A-2006-0122-FFP

Followup Audit of Operational Project Stock Requirements, Fort Shafter, Hawaii 11-May-06

A-2006-0123-FFM

Defense Property Accountability System Material Weakness Closeout, Special Operations Command, Fort Bragg, North Carolina 30-May-06

A-2006-0124-ALE

Contracting for Reconstitution Maintenance Support, U.S. Army, Europe and Seventh Army 19-May-06

A-2006-0125-ALL

Management Controls Over Contracts for Logistics Services, U.S. Army Reserve Command, Fort McPherson, Georgia 19-May-06

A-2006-0126-FFP

Workload Survey, Maintenance Operations for Army Units in Korea 6-Jul-06

A-2006-0127-ALA

Army Voyager Fleet Card Program, 88th Regional Readiness Command, Fort Snelling, Minnesota 30-May-06

A-2006-0128-ALM

Depot Level Maintenance for Secondary Items, Phase I - Repair Versus Procurement Decisions 5-Jun-06

A-2006-0129-FFMThe Army's Recovery Audit Initiative 9-Jun-06

A-2006-0130-FFD

Corps Balance Sheet--Corrective Actions, Headquarters, U.S. Army Corps of Engineers 16-Jun-06

A-2006-0131-ALO

Review of Revenues and Expenses for the 2005 Army Birthday Ball 6-Jun-06

A-2006-0132-ALR

Followup on Selected Stock Funded Depot Level Reparable Requisitions, Office of the Project Manager, Apache Attack Helicopter 8-Jun-06

Page 342: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0133-FFP

Corps of Engineers Contracting, Far East District, Corps of Engineers, Seoul, Korea 7-Jun-06

A-2006-0134-ALO

Garrison Utilities and Energy Services, Fort McCoy, Wisconsin 19-Jun-06

A-2006-0135-ALR

Followup on Unliquidated Obligations, Office of the Project Manager, Cargo Helicopters 16-Jun-06

A-2006-0136-ALL

Management Controls Over Offline Purchases, Office of the Deputy Chief of Staff, G-4 13-Jun-06

A-2006-0137-FFM

Logistics Modernization Program System Federal Financial Management Improvement Act Compliance--Revalidation 20-Jun-06

A-2006-0138-ALM

Followup Audit of Staffing and Capacity of Tables of Distribution and Allowances Maintenance Activities 20-Jun-06

A-2006-0139-ALO

Programming, Administration, and Execution System DD Form 1391s, Assistant Chief of Staff for Installation Management 21-Jun-06

A-2006-0140-ALI

Contract Administration for the Directorate of Support Services Contract, Fort McCoy, Wisconsin 22-Jun-06

A-2006-0141-FFH

Financial Management Structure for the Army Morale, Welfare, and Recreation Program, U.S. Army Installation Management Agency 22-Jun-06

A-2006-0142-FFF

Trainees, Transients, Holdees, and Students Account Business Rules, U.S. Army Reserve 20-Jun-06

A-2006-0143-ALA

Army Voyager Fleet Card Program, 101st Airborne Division, Fort Campbell, Kentucky 27-Jun-06

A-2006-0144-FFP

Review of U.S. Forces Korea--Contract Requirements 27-Jun-06

Page 343: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0145-ALR

Followup on Unliquidated Obligations, Office of the Project Manager, Apache Attack Helicopter 27-Jun-06

A-2006-0146-PMO

Quality Assurance Post Audit Review of the Audit of LOGCAP Support Unit, Army Materiel Command 23-Jun-06

A-2006-0147-FFF

Human Resources Realignment Actions, Director of the Army Staff 21-Jun-06

A-2006-0148-FFFThe Army's Mobilization Station Process 28-Jun-06

A-2006-0149-ALE

Military Construction Projects Supporting Army Prepositioned Stocks in Europe 29-Jun-06

A-2006-0150-FFE

Financial Controls for Chemical Agents and Munitions Destruction and Chemical Stockpile Storage Funding, U.S. Army Chemical Materials Agency 29-Jun-06

A-2006-0151-ALA

Followup Audit of the Simulation Based Acquisition Program, Office of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) 30-Jun-06

A-2006-0152-FFH

Information Assurance for Medical Communications for Combat Casualty Care, Product Manager, Medical Communications for Combat Casualty Care, Fort Detrick, Maryland 30-Jun-06

A-2006-0153-ALO

Audit of Enterprise Resource Planning System, Picatinny Arsenal, New Jersey 5-Jul-06

A-2006-0154-ALR

Project Manager Assets - Tracked and Wheeled Vehicles, Office of the Project Manager, Combat Systems, Abrams Tank 18-Jul-06

Page 344: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0155-ALR

Project Manager Assets - Tracked and Wheeled Vehicles Office of the Project Manager, Combat Systems, Bradley Fighting Vehicles System 18-Jul-06

A-2006-0156-ALR

Procurement Lead Times, U.S. Army Aviation and Missile Life Cycle Management Command 17-Jul-06

A-2006-0157-FFF

Followup Audit of Reserve Component Duty Military Occupational Specialty Qualification and Officer Basic Course Training Requirements 26-Jul-06

A-2006-0158-ALL

Report on Class IX (Aviation) Warehouse Staffing, Camp Anaconda, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 11-Jul-06

A-2006-0159-ALL

Followup Audit of Selected Asset Holding Projects, U.S. Army Materiel Command 11-Jul-06

A-2006-0160-FFDBoiler Refurbishment--Picatinny Arsenal 27-Jul-06

A-2006-0161-ALOBarracks Improvement Program 19-Jul-06

A-2006-0162-ALC

Time-Sensitive Issue--Potential Antideficiency Act Violation 20-Jul-06

A-2006-0163-ALO

Attestation Examination of the Financial Statements for the Period August 7, 2003 to June 30, 2004 for the Oakland Base Reuse Authority for Economic Development Conveyance 25-Jul-06

A-2006-0164-ALL

Followup Audit of Use of Accommodation Checks, South Carolina Army National Guard 20-Jul-06

A-2006-0165-ALA

Risk Management Program -Future Combat System, Office of the Program Manager, Future Combat System, Brigade Combat Team 27-Jul-06

Page 345: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0166-FFM

Army Government Travel Card - Individual Pay, U.S. Army Reserve Command 1-Aug-06

A-2006-0167-FFP

Workload Survey Of Directorate of Logistics Operations, U.S. Army Installation Management Agency, Korea Region 28-Jul-06

A-2006-0168-ALL

Report on the Subsistence Prime Vendor Contract, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 4-Aug-06

A-2006-0169-ALAArmy Voyager Fleet Card Program 27-Jul-06

A-2006-0170-FFHArmed Forces Institute of Pathology 2-Aug-06

A-2006-0171-FFH

Contracting for Medical Goods and Services, Southeast Regional Medical Command 4-Aug-06

A-2006-0172-FFM

Defense Property Accountability System Material Weakness Closeout, U.S. Army Recruiting Command, Fort Knox, Kentucky 4-Aug-06

A-2006-0173-ALR

Project Manager Assets - Tracked and Wheeled Vehicles, Office of the Project Manager, Force Projection, M9 Armored Combat Earthmover 10-Aug-06

A-2006-0174-ALM

National Maintenance Program Certificate Process, U.S. Army Materiel Command and U.S. Army Tank-automotive and Armaments Life Cycle Management Command 11-Aug-06

A-2006-0175-FFM

Federal Financial Management Improvement Act Attestation of Funds Control Module, Colonial Heights, Virginia 3-Aug-06

Page 346: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0176-ZBI

Followup Audit of Reimbursable Processes for Information Technology Support--Sensitive Programs, Recommendation A-03 3-Aug-06

A-2006-0177-ALC

Time-Sensitive Issue - Potential Antideficiency Act Violation 4-Aug-06

A-2006-0178-ZBI

Audit of Secure Environment Contracting, Site B 16-Aug-06

A-2006-0179-FFI

Installation Campus Area Network Connectivity--Wireless Networks, U.S. Army Garrison, Fort Gordon, Georgia 15-Sep-06

A-2006-0180-FFI

Installation Campus Area Network Connectivity--Wireless Networks, U.S. Army Garrison, Fort Huachuca, Arizona 28-Sep-06

A-2006-0181-FFI

Installation Campus Area Network Connectivity--Wireless Networks, U.S. Army Garrison, Aberdeen Proving Ground, Maryland 28-Sep-06

A-2006-0182-PMO

Quality Assurance Post Audit Review of the Audit of Public Works Operations Camp Casey, U.S. Army Installation Management Agency, Korea Region Office 11-Aug-06

A-2006-0183-FFM

Joint Oil Analysis Program Technical Support Center, Pensacola, Florida 9-Aug-06

A-2006-0184-ZBI

Audit of Emergency and Extraordinary Expense Funds (Criminal Investigative Funds Limitation .0015) 10-Aug-06

A-2006-0185-ALR

Followup Audit of Validation of the Army's Fund Balance With Treasury, Accounting Services, Army 21-Aug-06

Page 347: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0186-ALR

Followup Audit of Disbursing Station Expenditure Operations, DOD Disbursing Station 5570, Accounting Services, Army 22-Aug-06

A-2006-0187-ALR

Followup Audit of Acquisition and Financial File Reconciliations, Office of the Program Executive Officer, Aviation 11-Aug-06

A-2006-0188-ALL

Asset Visibility in Support of Operation Iraqi Freedom and Operation Enduring Freedom, 10th Mountain Division (Light Infantry), Fort Drum, New York 11-Aug-06

A-2006-0189-FFEHazardous Waste Disposal Costs 15-Aug-06

A-2006-0190-ALO

Expenditures for the 2005 National Scout Jamboree, Phase I--FY's 02-04, Fort A.P. Hill, Virginia 16-Aug-06

A-2006-0191-ALO

Expenditures for the 2005 National Scout Jamboree, Phase II--FY 05, Fort A.P. Hill, Virginia 16-Aug-06

A-2006-0192-FFE

Environmental Performance Assessment System, U.S. Army Environmental Center 16-Aug-06

A-2006-0193-FFE

Followup Audit of Alternative Fuel Vehicle Program, Office of the Assistant Chief of Staff for Installation Management 17-Aug-06

A-2006-0194-FFP

Public Works Requirements Contracts-Area I, Installation Management Agency, Korea Region Office 24-Aug-06

A-2006-0195-ALACommon Gunnery Architecture 27-Sep-06

A-2006-0196-ALR

Project Manager Assets - Tracked and Wheeled Vehicles, Office of the Project Manager, Combat Systems, Paladin 21-Aug-06

A-2006-0197-ALEArmy Prepositioned Stocks in Europe 30-Aug-06

Page 348: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0198-FFD

Contracts for Hurricane Protection System in New Orleans, U.S. Army Corps of Engineers, New Orleans District--Task Force Guardian 22-Aug-06

A-2006-0199-FFI

Installation Campus Area Network Connectivity--Terrestrial-Based Connections 29-Sep-06

A-2006-0200-ALL

Management of Army Pre-positioned Stocks, U.S. Army Materiel Command 23-Aug-06

A-2006-0201-PMO

Quality Assurance Review of Select Attestation Standards 22-Aug-06

A-2006-0202-ZBI

Audit of Secure Environment Contracting, Site C 18-Aug-06

A-2006-0203-ALR

Tracking Administrative Lead Time, U.S. Army Aviation and Missile Life Cycle Management Command 23-Aug-06

A-2006-0204-ZBIAudit of Oversight of Secure Environment Contracting 6-Sep-06

A-2006-0205-ALL

Followup Audit of Small Purchases of Supplies and Equipment, South Carolina Army National Guard 29-Aug-06

A-2006-0206-ALO

Attestation Examination of Financial Statements for the Period Ended June 30, 2003, 2004, & 2005 for City of Sacramento Former Sacramento Army Depot Operations No-Cost Economic Development Conveyance 23-Aug-06

A-2006-0207-ALL

Offline Purchases, U.S. Army Special Operations Command, Fort Bragg, North Carolina 31-Aug-06

A-2006-0208-ZBI

Followup Audit of Army Cover Program, Recommendation A-02 7-Sep-06

A-2006-0209-ALR

Followup Audit of Aviation Tracked Components, U.S. Army Aviation and Missile Life Cycle Management Command 29-Aug-06

Page 349: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0210-FFEOversight for the Chemical Demilitarization Program 15-Sep-06

A-2006-0211-FFH

Controls Over Overtime, Red River Army Depot, Texarkana, Texas 8-Sep-06

A-2006-0212-ALR

Followup Audit of Accounts Receivable and Other Assets, U.S. Army Materiel Command 6-Sep-06

A-2006-0213-FFI

Information Assurance--Internal Control Management and Reporting Process, Chief Information Officer/G-6 29-Sep-06

A-2006-0214-FFH

Capital Purchases and Minor Construction Projects, Fort Benning, Georgia 19-Sep-06

A-2006-0215-ALE

Followup Audit of Third Party Collection Program, Europe Regional Medical Command 19-Sep-06

A-2006-0216-ALE

Followup Audit of the Army Communities of Excellence Program, U.S. Army Installation Management Agency, Europe Region 15-Sep-06

A-2006-0217-ALE

Followup Audit of Consolidation of Maintenance Activities, U.S. Army Installation Management Agency, Europe Region 20-Sep-06

A-2006-0218-ZBI

Audit of Contract Administration for Special Access Programs, Intelligence, and Sensitive Activities 7-Sep-06

A-2006-0220-ALA

Followup Audit of Force XXI Battle Command, Brigade and Below, Fort Monmouth, New Jersey 20-Sep-06

A-2006-0221-ALR

Followup Audit of Accounts Receivable and Other Assets, Accounting Services, Army 13-Sep-06

Page 350: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0222-FFM

Army Environmental Database - Restoration and Compliance Cleanup Federal Financial Management Improvement Act Compliance, Army Environmental Center, Aberdeen, Maryland 29-Sep-06

A-2006-0223-FFI

Information Technology Asset Authorizations for Tactical Units, Chief Information Officer/G-6 18-Sep-06

A-2006-0224-ALAArmy's Capabilities Determination Process 27-Sep-06

A-2006-0225-FFF

Followup Audit of Distance Learning Facilities and Hardware 19-Sep-06

A-2006-0226-FFM

Army Government Travel Card - Individual Pay, U.S. Army National Guard 26-Sep-06

A-2006-0227-ALM

Public-Private Partnerships and Compliance with Depot Workload Reporting, Deputy Chief of Staff, G-4 27-Sep-06

A-2006-0228-FFH

Community Club Operations, Fort Hamilton, New York 29-Sep-06

A-2006-0229-FFH

Capital Purchases and Minor Construction Projects, Fort Lewis, Washington 26-Sep-06

A-2006-0231-FFH

Followup Audit of Army Lodging Overhead Costs, Fort Bliss, Texas 28-Sep-06

A-2006-0232-ALA

Followup Audit of G-2 Foreign Intelligence Support to Acquisition 22-Sep-06

A-2006-0233-ALL

Clothing Issue Facilities, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 22-Sep-06

A-2006-0234-FFM

Attestation of Logistics Modernization Program, Federal Financial Management Improvement Act of 1996 - FY 06 Phase 1 Quality Assurance Environment Testing 21-Sep-06

Page 351: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0235-ZBI

Military Intelligence Units, 525th Military Intelligence Brigade, Fort Bragg, North Carolina 27-Sep-06

A-2006-0236-FFM

Review of the Army Management Control Process FY 06, U.S. Military Academy, West Point, New York 25-Sep-06

A-2006-0237-ALE

Funding Reset of Aviation Assets in Europe, U.S. Army Aviation and Missile Command 29-Sep-06

A-2006-0238-FFM

Review of the Army Management Control Process FY 06, U.S. Army Developmental Test Command 25-Sep-06

A-2006-0239-FFM

Review of the Army Management Control Process FY 06, U.S. Army Reserve Military Intelligence Readiness Command 26-Sep-06

A-2006-0240-FFM

Review of the Army Management Control Process FY 06, U.S. Army Reserve 99th Regional Readiness Command 26-Sep-06

A-2006-0241-FFM

Review of the Army Management Control Process FY 06, U.S. Army Operational Test Command 27-Sep-06

A-2006-0242-FFMManagerial Accounting DA Task Matrix 27-Sep-06

A-2006-0243-FFI

Enterprise Software Agreements: Using Unit Purchase Practices, Chief Information Officer/G-6 29-Sep-06

A-2006-0244-FFI

Information Technology Contracts With the U.S. General Services Administration--Contracting Process 29-Sep-06

A-2006-0245-ALL

Offline Purchases, XVIII Airborne Corps, Fort Bragg, North Carolina 28-Sep-06

Page 352: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0246-ALL

Cost-Effectiveness of Transitioning Task Order 66-Kuwait Naval Base Camp Support From Contingency to Sustainment Contracting, Audit of LOGCAP Operations in Support of Operation Iraqi Freedom-Phase II 27-Sep-06

A-2006-0247-FFF

Followup Audit of Individual Ready Reserve and Individual Mobilization Augmentee Soldiers 28-Sep-06

A-2006-0248-ALA

Warfighter Information Network - Tactical, Fort Monmouth, New Jersey 29-Sep-06

A-2006-0249-FFM

Defense Property Accountability System Material Weakness Closeout--Summary Report 28-Sep-06

A-2006-0250-FFM

Review of the Army Management Control Process FY 06, U.S. Army Test and Evaluation Command 28-Sep-06

A-2006-0251-FFM

Review of the Army Management Control Process FY 06, U.S. Army Reserve 87th Division (Training Support) 29-Sep-06

A-2006-0252-FFM

Review of the Army Management Control Process FY 06, Assistant Secretary of the Army for Acquisition, Logistics, and Technology 29-Sep-06

A-2006-0253-ALL

Cost Effectiveness of Transitioning the General Support Supply Support Activity (Task Order 87) from Contingency to Sustainment Contracting, Audit of LOGCAP Operations in Support of Iraqi Freedom 28-Sep-06

A-2006-0254-ALL

Report on Procedures for Transferring Property During the Base Closure Process in Support of Operation Iraqi Freedom 29-Sep-06

Page 353: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2006-0255-FFI

Followup Audit of Federal Oversight of the National Guard 29-Sep-06

A-2007-0001-ZBI

Audit of U.S. Army Central Personnel Security Clearance Facility 3-Oct-06

A-2007-0002-ALA Army Aviation Capabilities 16-Oct-06

A-2007-0003-FFD

Army Force Availability Response to a Weapons of Mass Destruction Event 11-Oct-06

A-2007-0004-ALM

Depot-Level Maintenance Workload Reporting - Fiscal Year 2004 12-Oct-06

A-2007-0005-FFP

Audit of Logistics Support for Operation Enduring Freedom - Philippines 12-Oct-06

A-2007-0006-ALL

Offline Purchases, Fort Bliss Training Activities, Fort Bliss, Texas 19-Oct-06

A-2007-0007-PMO

Quality Assurance Post Audit Review of the Audit of Sustainment Systems Technical Support, U.S. Army Tank-automotive and Armaments Life Cycle Management Command 13-Oct-06

A-2007-0008-PMO

Quality Assurance Post Audit Review of the Audit of Contracts for Medical Goods and Services, Contract W81K00-04-D-0001 (Medical Processing Assistants) 22-Dec-06

A-2007-0009-ALC

Time-Sensitive Issue--Potential Antideficiency Act Violation 10-Oct-06

A-2007-0010-ALC

Time-Sensitive Issue--Potential Antideficiency Act Violation 10-Oct-06

A-2007-0011-ALL

Audit of Nontactical Vehicle Usage in the Iraq Area of Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 16-Nov-06

A-2007-0012-ALR

Purchase of Modern Burner Units, Office of the Product Manager, Force Sustainment Systems 26-Oct-06

Page 354: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0013-ZBI

Emergency and Extraordinary Expense Funds (Intelligence Contingency Funds-Limitation .0017), Army Forces Central Command 26-Oct-06

A-2007-0014-ZBI

Emergency and Extraordinary Expense Funds (Intelligence Contingency Funds-Limitation .0017), Headquarters, U.S. Army Forces Command 6-Nov-06

A-2007-0015-ALE

Maintenance of Left Behind Equipment in U.S. Army, Europe and Seventh Army 31-Oct-06

A-2007-0016-FFD

Debris Removal Contracts, U.S. Army Corps of Engineers 9-Nov-06

A-2007-0017-ALA

U.S. Army Communications-Electronics Research, Development and Engineering Center and Project Manager Workload Survey 30-Nov-06

A-2007-0018-PMO

Quality Assurance Postaudit Review of the Audit of the Military Construction Process 7-Feb-07

A-2007-0019-ALL

Audit of Distribution Functions, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 21-Nov-06

A-2007-0020-ALA

Followup Audit of Generators, Office of the Project Manager, Mobile Electric Power, Fort Belvoir, Virginia 10-Jan-07

A-2007-0021-PMO

Quality Assurance Review of FY 05 Formal and Additional Potential Monetary Benefits 20-Feb-07

A-2007-0022-FFH

Contracts for Medical Goods and Services, Western Regional Medical Command 22-Nov-06

A-2007-0023-ZBI

Audit of Secure Environment Contracting, ODASA(P&P) 30-Nov-06

Page 355: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0024-FFH

Attestation Review of Army and Air Force Exchange Service Employee Benefits 29-Nov-06

A-2007-0025-ALO

Audit of Mission Requirements for U.S. Army Installation Management Command 22-Nov-06

A-2007-0026-FFD

Regional Overhead Rates, Headquarters, U.S. Army Corps of Engineers 30-Nov-06

A-2007-0027-FFE

Followup Audit of Installation Preparedness for Weapons of Mass Destruction 29-Nov-06

A-2007-0028-ALO

Common Levels of Support, U.S. Army Installation Management Command 7-Dec-06

A-2007-0029-FFE

Monitoring and Oversight of Formerly Used Defense Sites, U.S. Army Corps of Engineers 1-Dec-06

A-2007-0030-ZBI

Audit of Special Skills Personnel for the Military Intelligence Civilian Excepted Career Program 11-Dec-06

A-2007-0031-PMO

Quality Assurance Postaudit Review of the Audit of the Army Workload and Performance Systems, Workload Forecast, U.S. Army Materiel Command 26-Jan-07

A-2007-0032-ALIQuality Improvement Support System 7-Dec-06

A-2007-0033-FFH

Medical Funding for the Global War on Terrorism, U.S. Army Medical Command 7-Dec-06

A-2007-0034-ALL

Cost of Maintenance on Watercraft Equipment in Army Prepositioned Stocks, U.S. Army Sustainment Command, Rock Island, Illinois 5-Dec-06

Page 356: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0035-FFP

Logistics Support Contract-Maintenance of High Mobility Multipurpose Wheeled Vehicles and Heavy Expanded Mobility Tactical Trucks, Eighth U.S. Army, Korea 10-Jan-07

A-2007-0036-ZBI

Secure Environment Contracting, Office of the Secretary of the Army 12-Dec-06

A-2007-0037-FFP

Followup Audit of Government Purchase Card Management Controls, U.S. Army Contracting Command, Korea 14-Dec-06

A-2007-0038-FFP

Contract Modifications, Area III, U.S. Army Installation Management Agency, Korea Region Office 15-Dec-06

A-2007-0039-FFP

Global War on Terrorism Supplemental Funding, Tripler Army Medical Center 21-Dec-06

A-2007-0040-ALL

Audit of Procedures for Managing the Overaged Reparable Items List at the Tactical Wheeled Vehicle Refurbishment Center 16-Jan-07

A-2007-0041-FFH

Government Purchase Card, Red River Army Depot 20-Dec-06

A-2007-0042-ALR

Followup Audit of Materiel Returns, U.S. Army Materiel Command 20-Dec-06

A-2007-0043-FFH

Capital Purchases and Minor Construction, Fort Belvoir, Virginia 10-Jan-07

A-2007-0044-FFE

Workload Survey of the U.S. Army's Civil Works Program 21-Dec-06

A-2007-0045-FFM

Global Combat Support System--Army (Field Tactical) Financial Requirements 5-Jan-07

A-2007-0046-ALMSustainment Planning for Maintenance Support 2-Feb-07

Page 357: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0047-ALR

Tracked and Wheeled Vehicle Assets, U.S. Army TACOM Life Cycle Management Command 25-Jan-07

A-2007-0048-FFF

Reserve Component Soldier Mobilization Accountability- Material Weakness, Deputy Chief of Staff, G-3/5/7 9-Jan-07

A-2007-0049-FFF

Soldier Assignment Procedures for Lifecycle Management, Deputy Chief of Staff, G-1 17-Jan-07

A-2007-0050-FFM

Independent Auditors Report for FY 06 American Red Cross Financial Statements 19-Mar-07

A-2007-0051-FFH

Capital Purchases and Minor Construction Projects, Fort Bliss, Texas 11-Jan-07

A-2007-0052-ALE

Reconstitution--Direct Support and Below Maintenance in U.S. Army, Europe and Seventh Army 17-Jan-07

A-2007-0053-ALE

Reconstitution--Supply Management Operations in U.S. Army, Europe and Seventh Army 19-Jan-07

A-2007-0054-ALR

Followup Audit of Aviation Tracked Components, U.S. Army Aviation and Missile Life Cycle Management Command 16-Jan-07

A-2007-0055-ZBIAudit of Intelligence Funds - Site B 12-Jan-07

A-2007-0056-FFE

Management of the Army's Pollution Prevention Program 24-Jan-07

A-2007-0057-FFM

Time Sensitive Report, Audit of Centrally Managed Account, Initial Entry Training 19-Jan-07

A-2007-0058-ALM

Depot-Level Maintenance Workload Reporting--FY 05, Office of the Deputy Chief of Staff, G-4 8-Mar-07

A-2007-0059-ALC

U.S. Army Center of Military History Contract Management, Office of the Director of the Army Staff 31-Jan-07

Page 358: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0060-FFP

Review of the Army's Management Control Process FY 06, Eighth U.S. Army 24-Jan-07

A-2007-0061-ALL

Asset Visibility in Support of Operation Iraqi Freedom and Operation Enduring Freedom - Army Reserve Equipment, Fort McCoy and Fort Dix Mobilization Stations 30-Jan-07

A-2007-0062-ALO

Followup Audit of Funding Execution Task Force Sinai, XVIII Airborne Corps and Fort Bragg, North Carolina 25-Jan-07

A-2007-0063-FFE

Use of Performance-Based Contracting for Environmental Cleanup 26-Jan-07

A-2007-0064-FFF

Workload Survey - Force Rotation Policies and Procedures 24-Jan-07

A-2007-0065-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Fort Sill 5-Mar-07

A-2007-0066-ALCHRsolutions Program - Contract Procedures 31-Jan-07

A-2007-0067-FFI

Long-Haul Communication Requirements and Funding Process, U.S. Army Reserve Command 14-Feb-07

A-2007-0068-FFI

Long-Haul Communication Requirements and Funding Process, Army National Guard 15-Feb-07

A-2007-0069-ALM

Followup Audit of Depot Level Maintenance for Secondary Items Phase I--Repair Versus Procurement Decisions, U.S. Army Communications-Electronics Life Cycle Management Command 7-Mar-07

A-2007-0070-FFE

Followup Audit of Range Inventory, Deputy Chief of Staff, G-3/5/7 6-Feb-07

Page 359: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0071-ALE

Reconstitution of Secondary Items, U.S. Army, Europe and Seventh Army 12-Feb-07

A-2007-0072-ALM

Army's Process and Controls for Effectively Implementing Performance-Based Logistics, Office of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) 9-Feb-07

A-2007-0073-ALR

Followup Audit of Management of Consigned Inventory, Office of the Deputy Chief of Staff, G-4 7-Feb-07

A-2007-0074-PMO

Quality Assurance Postaudit Review of the Audit of Land Use Controls and Monitoring at Formerly Used Defense Sites, U.S. Army Corps of Engineers Louisville District 15-Mar-07

A-2007-0075-ALL

Asset Visibility in Support of Operation Iraqi Freedom and Operation Enduring Freedom, 3d Infantry Division, Fort Stewart, Georgia 15-Feb-07

A-2007-0076-FFS

Workload Survey: Contractors on the Battlefield 5-Mar-07

A-2007-0077-FFH

Capital Purchase and Minor Construction Projects for Category C Activities 21-Feb-07

A-2007-0078-FFI

Followup Audit of Potential Antideficiency Act Violations, Colorado Army National Guard 15-May-07

A-2007-0079-FFI

Followup Audit of the Army Management Control Process (FY 02) 4-May-07

A-2007-0080-ZBI

Audit of Contract Administration for Special Access Programs, Intelligence, and Sensitive Activities 13-Feb-07

A-2007-0081-FFFWorkload Survey - Combat Training Centers 7-Mar-07

Page 360: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0082-ALR

Procurement Lead Times - Missiles, U.S. Army Aviation and Missile Life Cycle Management Command 22-Feb-07

A-2007-0083-FFSStrategic Management System Contract 1-Mar-07

A-2007-0084-FFEReduction of Contaminated Waste at Army Depots 22-Feb-07

A-2007-0085-FFE

Workload Survey of Environmental Issues at Army Ammunition Plants, Aberdeen Proving Ground, Maryland 9-Mar-07

A-2007-0086-FFDWorkload Survey Report--Force Protection 5-Mar-07

A-2007-0087-ALE

Attestation Examination of Suggestion Number EUHD06017C Under the Army Suggestion Program 22-Feb-07

A-2007-0088-ALE

Reset of Aviation Assets, U.S. Army Aviation and Missile Life Cycle Management Command 8-Mar-07

A-2007-0089-ZBI

Followup Audit of Technology Applications Office - Reimbursables, TAO 26-Feb-07

A-2007-0090-ZBIAudit of Military Intelligence Units, 470th MI Brigade 2-Mar-07

A-2007-0091-FFP

CID Assist: Contract to Maintain Fire Detection and Suppression Systems 2-Mar-07

A-2007-0092-ZBI

Followup Audit of Technology Applications Office - Reimbursables, OCIO/G-6 28-Feb-07

A-2007-0093-ALL

Cost-Effectiveness of Transitioning Selected Functions Performed at the Theater Distribution Center (Task Order 87) from Contingency to Sustainment Contracting, LOGCAP in Support of Iraqi Freedom 9-Mar-07

Page 361: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0094-ZBI

Followup Audit of Information Technology Acquisition Management for Special Programs 1-Mar-07

A-2007-0095-FFH

FY 06 Supplemental Funding for the Global War on Terrorism, U.S. Army Medical Command 8-Mar-07

A-2007-0096-FFH

Proper Use of Non-DOD Contracts, U.S. Army Medical Command 22-Mar-07

A-2007-0097-ALM

Rotor Blades, U.S. Army Aviation and Missile Life Cycle Management Command 4-Jun-07

A-2007-0098-ALC

Followup Audit of Realignment Phase 2 Field Operating Agencies, U.S. Army Center of Military History 16-Mar-07

A-2007-0099-ALC

Time Sensitive Issue - Potential Antideficiency Act Violation, Audit of Contracting Operations, White Sands Missile Range 15-Mar-07

A-2007-0100-FFS

Workload Survey of the Global Defense Positioning Realignment 2-Apr-07

A-2007-0101-PMO

Quality Assurance Postaudit Review of the Audit of Secure Environment Contracting 5-Apr-07

A-2007-0102-FFM

Army Contract Pricing Process for Commercial Travel Office Fees 4-Apr-07

A-2007-0103-FFP Force Protection-Hawaii 27-Mar-07

A-2007-0104-ALL

Audit of Cost-Effectiveness of Transitioning Work Under the Logistics Civil Augmentation Program Contingency Contract to Sustainment Contracting, Audit of LOGCAP Operations in Support of Iraqi Freedom 23-Mar-07

Page 362: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0105-ZBI

Emergency and Extraordinary Expense Funds (Official Representation Funds-Limitation .0012), Headquarters, Third U.S. Army, Fort McPherson, Georgia 2-Apr-07

A-2007-0106-FFI

Information Technology Service Level Agreements, Chief Information Officer/G-6 and Assistant Chief of Staff for Information Management 27-Jun-07

A-2007-0107-ZBI

Emergency and Extraordinary Expense Funds (Intelligence Contingency Funds--Limitation .0017) at Headquarters, U.S. Army, Europe and 7th Army 2-Apr-07

A-2007-0108-ALO Installation Contract Guards 4-Apr-07

A-2007-0109-FFF

Recruiting for Lifecycle Management Units, Deputy Chief of Staff, G-1 3-Apr-07

A-2007-0110-ZBI

Emergency and Extraordinary Expense Funds (Intelligence Contingency Finds-Limitation .0017), 650th Military Intelligence Group 2-Apr-07

A-2007-0111-ALLOffline Purchases, Garrison Activities, Fort Bliss, Texas 19-Apr-07

A-2007-0112-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Seagoville, Texas 10-Jul-07

A-2007-0113-ALO

Followup Audit of Disposition Plans and Costs for the Old U.S. Disciplinary Barracks, Fort Leavenworth, Kansas 11-Apr-07

A-2007-0114-ALC

Proper Use of Non-DOD contracts, Program Executive Office, Aviation 17-Apr-07

Page 363: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0115-ALC

Proper Use of Non-DOD Contracts, Program Executive Office, Command, Control and Communications Tactical 23-Apr-07

A-2007-0116-ALC

Proper Use of Non-DOD Contracts, Program Executive Office, Intelligence, Electronic Warfare and Sensors 20-Apr-07

A-2007-0117-ZBIFollow Up - Intelligence Funds 13-Apr-07

A-2007-0118-FFPForce Protection-Alaska, U.S. Army Garrison, Alaska 25-Apr-07

A-2007-0119-ALA

Contracting Practices, National Automotive Center, U.S. Army Tank-automotive Research, Development and Engineering Center 18-Apr-07

A-2007-0120-ZBI

Military Intelligence Units, Office of the Secretary of the Army 18-Apr-07

A-2007-0121-ALC

Use of Non-DOD Contracts, Program Executive Office, Missiles and Space 4-May-07

A-2007-0122-FFF

Followup Audit of Operational Facility Requirements Rules 30-Apr-07

A-2007-0123-ZBI

Attestation Examination of Army Suggestion Proposal Number 001 - Detention Information Management System 26-Apr-07

A-2007-0124-FFM

Standard Procurement System Federal Financial Management Improvement Act of 1996 Compliance, Fairfax, Virginia 11-May-07

A-2007-0125-ZBI

Independent Report on Applying Agreed-Upon Procedures, Active Duty Military Payroll Adjustments, Defense Military Pay Office, Fort Bliss, Texas 2-May-07

Page 364: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0126-ALL

Asset Visibility in Support of Operation Iraqi Freedom and Operation Enduring Freedom - Army Reserve Equipment, 88th and 99th Regional Readiness Commands 9-May-07

A-2007-0127-ZBIAudit of Threat Systems Management Office 15-May-07

A-2007-0128-ALE

Followup Audit of Contracts for Chemical Agent Resistant Coating, U.S. Army, Europe and Seventh Army 16-May-07

A-2007-0129-FFE

Remediation of Rocky Mountain Arsenal, Rocky Mountain Arsenal, Colorado 17-May-07

A-2007-0130-ALM

Followup Audit on Process for Determining Source of Depot Level Maintenance 22-May-07

A-2007-0131-ALARapid Equipping Force Initiative 18-May-07

A-2007-0132-ALC

Subcontracting Procedures, Office of the Chief of Public Affairs 18-May-07

A-2007-0133-ALO

Attestation Examination of the Administrative Appeal Board's Assertions for the Keesler Air Force Base Operating Support A-76 Cost Comparison Study 23-May-07

A-2007-0134-ALE

Followup Audit of Contracts for Maintenance of Tactical Equipment in the Field, U.S. Army, Europe and Seventh Army 22-May-07

A-2007-0135-FFD

Army Fund Accountability for Hurricane Katrina Relief Efforts 12-Jun-07

A-2007-0136-ALO

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Fort Campbell, Kentucky 24-May-07

Page 365: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0138-FFH

Contracts for Medical Goods and Services During FYs 02-06, U.S. Army Medical Command Health Care Acquisition Activity 24-May-07

A-2007-0139-FFP

Funding for Army Modular Forces, Tripler Army Medical Center 31-May-07

A-2007-0140-ALL

Offline Purchases Unconfirmed Shipments of Parkas, Office of the Deputy Chief of Staff, G-4 25-Jun-07

A-2007-0141-FFM

Workload Survey Results-Defense Finance and Accounting Service Base Realignment and Closure 30-May-07

A-2007-0142-ALAFollowup Audit of the Movement Tracking System 1-Jun-07

A-2007-0143-ALE

Manning Requirements for Contract Security Guards in Europe, U.S. Army, Europe and Seventh Army 6-Jun-07

A-2007-0144-ZBI Intelligence Funds - Site A 4-Jun-07

A-2007-0145-ALR

Followup Audit of Stock Funded Depot Level Reparable Credit Policy, Office of the Assistant Secretary of the Army (Financial Management and Comptroller) 14-Jun-07

A-2007-0146-FFEFollowup Audit of Contractor Aircrew Safety 7-Jun-07

A-2007-0147-FFP

Followup Audit of Third Party Claims, Tripler Army Medical Center 8-Jun-07

A-2007-0148-FFP

Electronic Medical Records System, Tripler Army Medical Center 12-Jun-07

A-2007-0149-ALL

Audit of the Army's Theater Linguist Program in Afghanistan, Operation Enduring Freedom 23-Jul-07

A-2007-0150-ZBI

Emergency and Extraordinary Expense Funds (Official Representation Funds-Limitation .0012), Headquarters, U.S. Army Forces Command, Fort McPherson, Georgia 13-Jun-07

Page 366: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0151-ZBI

Followup Audit of Property Accountability in Special Operations Forces Reserve Units, 305th Psychological Operations Company, Fort Story, Virginia 18-Jun-07

A-2007-0152-ALR

Time-Sensitive Report, Audit of Container Detention Billing for Global War on Terrorism 14-Jun-07

A-2007-0153-FFD

Workload Survey of Improvised Explosive Device Countermeasures 13-Jul-07

A-2007-0154-ALR

Followup Audit of Aged Accounts, U.S. Army Communications-Electronics Life Cycle Management Command 2-Jul-07

A-2007-0155-FFH

Followup Audit of the Community Club Renovation Project, Fort Buchanan, Puerto Rico 19-Jun-07

A-2007-0156-ZBI

Followup Audit of Property Accountability in Special Operations Forces Reserve Units, U.S. Army Civil Affairs and Psychological Operations Command Fort Bragg, North Carolina 22-Jun-07

A-2007-0157-ALM

Developing Depot Workload Requirements for Major End Items, U.S. Army Aviation and Missile Life Cycle Management Command 28-Jun-07

A-2007-0158-ALE

Followup Audit of the Reserve Storage Activity, 21st Theater Support Command, Kaiserslautern, Germany 21-Jun-07

A-2007-0159-ALC

Audit of Army Purchase Card Program, Department of Emergency Services, Fort McCoy, Wisconsin 3-Jul-07

Page 367: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0160-ALE

Followup Audit of Overhead and Layering in Morale, Welfare, and Recreation Activities, U.S. Army Installation Management Command, Europe Region 28-Jun-07

A-2007-0161-FFM

Followup Audit of the Army Criminal and Civil Fraud Recovery Process 24-Jul-07

A-2007-0162-FFD

Contract Data Reporting for Hurricane Operations, U.S. Army Corps of Engineers, Washington, DC 28-Jun-07

A-2007-0163-FFM

FY 03 - FY 05 Obligations Recorded in Logistics Modernization Program 27-Jul-07

A-2007-0164-ZBI

Emergency and Extraordinary Expense Funds (Intelligence Contingency Funds--Limitation .0017 at 902d Military Intelligence Group) 27-Jun-07

A-2007-0165-FFI

Information Technology Contracts With U.S. General Services Administration, Selected Contract Reviews 31-Jul-07

A-2007-0166-ZBI

Audit of Special Skills Personnel for the Military Intelligence Excepted Career Program (Great Skill) 9-Jul-07

A-2007-0167-FFP

Followup Audit of Logistics Cost Sharing Program, U.S. Forces Korea and Eighth U.S. Army 23-Jul-07

A-2007-0168-ALR

Logistics Management Systems - Depots, Depot Workload Resource Management System, U.S. Army Aviation and Missile Life Cycle Management Command 11-Jul-07

A-2007-0169-ALR

Logistics Management Systems - Depots, U.S. Army TACOM Life Cycle Management Command, U.S. Army Watervliet Arsenal 13-Jul-07

Page 368: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0170-FFFWorkload Survey, Initial Entry Rotary Wing Training 26-Jul-07

A-2007-0171-ALR

Followup Audit of Selected Financial Management Issues, Pine Bluff Arsenal, Arkansas 6-Aug-07

A-2007-0172-FFP Force Protection, Japan 7-Sep-07

A-2007-0173-ALMFollowup Audit of Work Order Logistics File 6-Aug-07

A-2007-0174-ZBI

Audit of Contract Administration for Special Access Programs, Intelligence, and Sensitive Activities 25-Jul-07

A-2007-0175-FFD

Weapons of Mass Destruction--Elimination Operations, Deputy Chief of Staff, G-3/5/7 30-Aug-07

A-2007-0176-FFF

Accounting and Use of Derivative Unit Identification Codes 10-Sep-07

A-2007-0177-FFDRoles and Responsibilities for Force Protection 30-Jul-07

A-2007-0178-FFM

Review of the Army Management Control Process FY 06, U.S. Army Reserve Command 2-Aug-07

A-2007-0179-FFH

Third Party Collection Claims Single Interface System; U.S. Army Medical Command; Fort Sam Houston, Texas 31-Jul-07

A-2007-0180-FFH

Third Party Collection Program--Other Health Insurance, U.S. Army Medical Command, Fort Sam Houston, Texas 2-Aug-07

A-2007-0181-FFH

Implementation of AHLTA, U.S. Army Medical Command 8-Aug-07

A-2007-0182-ZBI

Followup Audit of Coordinating Requirements for Special Access Programs, U.S. Army Research, Development and Engineering Center 2-Aug-07

Page 369: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0183-ALO

Attestation Examination of Financial Statements for Period Ended September 30, 2006 for Camp Pedricktown Trust Fund, Township of Oldmans, County of Salem No-Cost Economic Development Conveyance 2-Aug-07

A-2007-0184-FFM

Civilian Pay in Support of Operation Enduring Freedom and Operation Iraqi freedom 15-Aug-07

A-2007-0185-ZBI

Agreed-Upon Procedures Review of the TSMO's Aviation Training Costs 6-Aug-07

A-2007-0186-ALR

Funding Distribution Process Owner Initiatives, United States Transportation Command 10-Aug-07

A-2007-0187-FFM

General Fund Enterprise Business System - Federal Financial Management Improvement Act Compliance, Examination of Release 1.1 Requirements 9-Aug-07

A-2007-0188-FFEWorkload Survey of the Army Safety Program 14-Aug-07

A-2007-0189-FFD

Followup Audit of Security of Civil Works Water Resources Infrastructure, U.S. Army Engineer District, Little Rock 29-Aug-07

A-2007-0190-ALM

Resource Requirements for Reset, Deputy Chief of Staff, G-4 8-Aug-07

A-2007-0191-FFM

Agreed-Upon Procedures Attestation of the Results of the 2007 National Defense Authorization Act Audit on Wounded in Action Soldier Pay Accounts 15-Aug-07

A-2007-0192-FFF

Material Weakness Validation Reserve Component Mobilization Accountability 29-Aug-07

Page 370: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0193-FFE

Followup Audit of Management of Installation Environmental Programs, U.S. Army Garrison, Fort Hood, Texas 14-Aug-07

A-2007-0194-FFE

Recreation Area Safety and Awareness, U.S. Army Corps of Engineers 21-Aug-07

A-2007-0195-FFS

Attestation of Army Business Transformation Financial Benefits 23-Aug-07

A-2007-0196-ZBI

Agreed-Upon Procedures Review of Reimbursements for Foreign Student Aviation Training, Threat Systems Management Office 23-Aug-07

A-2007-0197-ALO

Followup Audit of Privatization of Family Housing, Fort George G. Meade, Maryland 30-Aug-07

A-2007-0198-ALO

Followup Audit of Privatization of Family Housing--Reinvestment Strategy, Fort Carson, Colorado 30-Aug-07

A-2007-0199-FFP

Yama Sakura 51 Training Exercise, U.S. Army, Japan and I Corps 18-Sep-07

A-2007-0200-FFF

Management of U.S. Army Reserve Enlistment Bonuses 30-Aug-07

A-2007-0201-ZBI

Emergency and Extraordinary Expense Funds (Miscellaneous Funds-Limitation .0014) Office of the Administrative Assistant to the Secretary of the Army 19-Sep-07

A-2007-0202-ALAManagement of Army Card Programs 5-Sep-07

A-2007-0203-FFP

Army Suggestion Program (Suggestion PAHI06007C-Saddle Road Project), U.S. Army Garrison, Hawaii 30-Aug-07

Page 371: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0204-ALL

Audit of Defense Base Act Insurance for the Logistics Civil Augmentation Program, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 28-Sep-07

A-2007-0205-FFM

Logistics Modernization Program System Federal Financial Management Improvement Act of 1996 Compliance - First Deployment Functionality 7-Sep-07

A-2007-0206-FFI

Army Web Sites, Army Chief Information Officer/G-6 7-Sep-07

A-2007-0207-FFH

Contracts for Medical Goods and Services, North Atlantic Regional Medical Command 11-Sep-07

A-2007-0208-ALC

Followup Audit of Realignment Phase 2 Field Operating Agencies, U.S. Army Contracting Agency 13-Sep-07

A-2007-0210-FFS

Contractor Support at Mobilization Stations, Fort Carson, Colorado 10-Sep-07

A-2007-0211-ALR

Time-Sensitive Report, Audit of Logistics Management Systems - Manufacturing Execution System 7-Sep-07

A-2007-0213-FFM

Material Weakness Closure -Financial Reporting of Equipment In Transit 25-Sep-07

A-2007-0214-FFI

Funding and Contract Management Practices, Defense Biometrics Program 28-Sep-07

A-2007-0215-FFS

Contractor Support at Mobilization Stations, Fort Bragg, North Carolina 18-Sep-07

A-2007-0216-FFD

Contracts to Restore and Enhance the Southern Louisiana Hurricane Protection System, U.S. Army Corps of Engineers Mississippi Valley Division 11-Sep-07

Page 372: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0217-FFM

General Fund Enterprise Business System - Federal Financial Management Improvement Act Compliance, Examination of Release 1.2 Requirements 13-Sep-07

A-2007-0218-ALI

Base Realignment and Closure 2005 Construction Requirements, United States Military Academy Preparatory School, United States Military Academy, New York 7-Sep-07

A-2007-0219-ALO

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Camp Dodge, Iowa 14-Sep-07

A-2007-0220-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Moffett Field, California 18-Sep-07

A-2007-0221-ALI

Base Realignment and Closure 2005 Construction Requirements, Southwest Regional Readiness Command Headquarters, Moffett Field, California 21-Sep-07

A-2007-0222-ZBI

Followup Audit of Information Systems Security, U.S. Army Special Operations Command, Fort Bragg, North Carolina 17-Sep-07

A-2007-0223-FFI

Installation Campus Area Network Connectivity - Wireless Devices, Redstone Arsenal, Alabama 28-Sep-07

A-2007-0224-FFP

Followup Audit of Ammunition Pricing Practices, Office of the Program Executive Officer, Ammunition, Picatinny Arsenal, New Jersey 21-Sep-07

Page 373: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0225-FFI

Installation Campus Area Network Connectivity - Wireless Devices, Fort Knox, Kentucky 28-Sep-07

A-2007-0226-FFI

Information Technology Hardware Purchasing Practices, Fort Hood, Texas 21-Sep-07

A-2007-0227-ALA

System Development and Demonstration--Contract Restructuring, Future Combat Systems, Office of the Program Manager - Future Combat Systems, Brigade Combat Team 20-Sep-07

A-2007-0228-FFSWorkload Survey of the Army Reserve Component 20-Sep-07

A-2007-0229-FFI

Information Technology Hardware Purchasing Practices, Fort Lewis, Washington 24-Sep-07

A-2007-0230-ALM

Followup Audit of Army Oil Analysis Program - Restructure Plan, Redstone Arsenal, Alabama 24-Sep-07

A-2007-0231-FFP

Followup Audit of Lessons Learned, Energy Savings Performance Contract, U.S. Army Installation Management Command 24-Sep-07

A-2007-0232-ALE

Overseas Dependent Eligibility Processes for Third Country Nationals 25-Sep-07

A-2007-0233-ALM

Time-Sensitive Issue--Potential Antideficiency Act Violation, Audit of Reset Metrics¿-Sustainment Maintenance 27-Sep-07

A-2007-0234-ALM

Tactical Wheeled Vehicle Strategy, Deputy Chief of Staff, G-8 and Program Executive Office, Combat Support and Combat Service Support 26-Sep-07

A-2007-0235-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Fort Dix, New Jersey 26-Sep-07

Page 374: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2007-0236-FFH

Funding Models for Army Modular Forces, U.S. Army Medical Command 27-Sep-07

A-2007-0237-FFS

Housing for Mobilized Soldiers, Mississippi Army National Guard 27-Sep-07

A-2007-0238-FFF

Followup Audit of Management of the Reserve Component's Non-Participants, U.S. Army Reserve Command 28-Sep-07

A-2007-0239-FFF

Management of Army Well-Being, Office of the Deputy Chief of Staff, G-1 27-Sep-07

A-2007-0240-ALI

Base Realignment and Closure 2005 Construction Requirements, U.S. Army Training and Doctrine Command Headquarters, Fort Eustis, Virginia 28-Sep-07

A-2007-0241-ALO

Base Realignment and Closure 2005 Construction Requirements, Child Development Center, Fort Riley, Kansas 28-Sep-07

A-2007-0242-ALO

Base Realignment and Closure 2005 Construction Requirements, Battle Command Training Center, Fort Riley, Kansas 28-Sep-07

A-2007-0243-ALE

Environmental Planning for Army Rebasing and Restructuring in Europe 28-Sep-07

A-2007-0244-FFF

Workload Survey: National Guard Strength Maintenance Program 28-Sep-07

A-2007-0245-FFE

Civil Works Environmental Liabilities, U.S. Army Corps of Engineers 28-Sep-07

A-2007-0246-FFI

Implementation of the Single Directorate of Information Management (DOIM) 28-Sep-07

A-2008-0001-FFS

Contractor Support at Mobilization Stations, Fort McCoy, Wisconsin 10-Oct-07

Page 375: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0002-ALC

Proper Use of Non-DOD Contracts, Office the of Assistant Secretary of Army (Acquisition, Logistics & Technology) and Office of Assistant Secretary of the Army (Financial Management & Comptroller) 11-Oct-07

A-2008-0003-ALCContract Operations, White Sands Missile Range 8-Nov-07

A-2008-0004-FFP

Support Contract for Operation Enduring Freedom-Philippines, U.S. Army, Pacific 17-Oct-07

A-2008-0005-ZBI

Audit of Emergency & Extraordinary Expense Funds (Official Representation Funds - Limitation .0012), Office of the Administrative Assistant to the Secretary of the Army 23-Oct-07

A-2008-0006-FFE

Followup Audit of Remediation at Aberdeen Proving Ground 22-Oct-07

A-2008-0007-FFE Range Munitions Data 30-Oct-07

A-2008-0008-ALR

Logistics Management Systems - Deports, U.S. Army Corpus Christi Army Depot 19-Oct-07

A-2008-0009-FFH

Attestation Examination of Army Suggestion Number NWCN05004M Under the Army Suggestion Program 30-Oct-07

A-2008-0010-ALL

Followup Audit of Internal Controls Over Cargo Container Payments, Military Surface Deployment and Distribution Command 2-Nov-07

A-2008-0011-ALO

Notification of Noncompliance With Memorandum of Agreement, Bayonne Local Redevelopment Authority's 2004, 2005, and 2006 Yearend Financial Statements for the No-Cost Economic Development Conveyance 31-Oct-07

Page 376: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0012-ALO

Audit of Operations at Yardley and Hall Dining Facilities, Fort Huachuca, Arizona 25-Oct-07

A-2008-0013-ZBI

Emergency and Extraordinary Expense Funds (Intelligence Contingency Funds-Limitation .0017 at U.S. Army Intelligence and Security Command 26-Oct-07

A-2008-0014-ALA

Army's Operational Needs Statement Process, Office of the Deputy Chief of Staff, G-3/5/7 13-Nov-07

A-2008-0015-FFM

Independent Auditor's Report for FY 07 American Red Cross Financial Statements 31-Oct-07

A-2008-0016-FFH

External Contract Services, Army and Air Force Exchange Service 2-Nov-07

A-2008-0017-ALE

Administration for Guard Services Contracts in Europe 8-Nov-07

A-2008-0018-FFH

Reconciliation of Noncontrolled Drugs, Dunham U.S. Army Health Clinic 27-Nov-07

A-2008-0019-ALA

Accelerated Commercial Off-the-Shelf Acquisitions, U.S. Army Materiel Command, Fort Belvoir, Virginia 28-Nov-07

A-2008-0020-ALLAssessment of Contracting Operations in Kuwait 20-Nov-07

A-2008-0021-FFS

Army Operational Plans for Contractor Support on the Battlefield 28-Nov-07

A-2008-0022-FFPTraining Ammunition, U.S. Army, Pacific 30-Nov-07

A-2008-0023-ALO

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Red River Army Depot, Texas 5-Dec-07

Page 377: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0024-ALO

Base Realignment and Closure 2005 Construction Requirements, U.S. Army Reserve Northwest Regional Readiness Sustainment Command, Fort McCoy, Wisconsin 20-Dec-07

A-2008-0025-ALCCompetitive Acquisitions of Army Tactical Radios 13-Dec-07

A-2008-0026-ALA

Science and Technology, U.S. Army Aviation and Missile Research, Development and Engineering Center 13-Dec-07

A-2008-0027-ALA

Science and Technology, U.S. Army Armament Research, Development and Engineering Center 18-Dec-07

A-2008-0028-ALA

Science and Technology, U.S. Army Communications-Electronics Research, Development and Engineering Center 20-Dec-07

A-2008-0029-ALA

Science and Technology, U.S. Army Corps of Engineers, Engineer Research and Development Center 19-Dec-07

A-2008-0030-FFM

Followup of the Audit of the Kuwait Defense Cooperation Agreement 6-Dec-07

A-2008-0031-ALE

Attestation Examination of Suggestion Number EUHD-07002M-R, SINCGARS Radio Mount for M915 3-Dec-07

A-2008-0032-ALM

Followup Audit of Sustainment Systems Technical Support 11-Dec-07

A-2008-0033-FFD

Program Management to Restore and Enhance the Southern Louisiana Hurricane Protection System, U.S. Army Corps of Engineers, Mississippi Valley Division 17-Dec-07

A-2008-0034-FFF

Followup Audit of U.S. Army Reserve Readiness Reporting 20-Dec-07

Page 378: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0035-ALM

Depot-Level Maintenance Workload Reporting--FY06, Office of the Deputy Chief of Staff, G-4 7-Jan-08

A-2008-0036-ZBI

Official Representation Funds (Limitation .0012), Office of the Administrative Assistant to the Secretary of the Army 16-Jan-08

A-2008-0037-FFMMilitary Personnel, Army FY 05 Subsistence Charges 12-Feb-08

A-2008-0038-ALO

Base Realignment and Closure 2005 Construction Requirements, Army Reserve Southeast Regional Readiness Sustainment Command, Fort Jackson, South Carolina 9-Jan-08

A-2008-0039-ALO

Base Realignment and Closure 2005 Construction Requirements, Division Headquarters and Sustainment Brigade Headquarters, Fort Riley, Kansas 14-Jan-08

A-2008-0040-FFH

Reserve Component Medical Readiness Reporting, Army National Guard 16-Jan-08

A-2008-0041-ALL

Asset Visibility in Support of Operation Iraqi Freedom and Operation Enduring Freedom - Summary Report, Active Army and Army Reserve Returning and Left Behind Equipment 30-Jan-08

A-2008-0042-FFE

Followup Audit of Sponsor Contributions, Central and South Florida Projects, U.S. Army Corps of Engineers, Jacksonville District 17-Jan-08

A-2008-0043-ALE

U.S. Army, Europe and Seventh Army Restructuring Plans 31-Jan-08

Page 379: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0044-FFS

Housing for Mobilized Soldiers, Indiana Army National Guard 25-Jan-08

A-2008-0045-FFP

Followup Audit of Operational Project PEH (Bridging), Eighth U.S. Army, Korea 30-Jan-08

A-2008-0046-ALR

Logistics Management Systems - Depots, Anniston Army Depot 1-Feb-08

A-2008-0047-ALR

Logistics Management Systems - Depots, Rock Island Arsenal 1-Feb-08

A-2008-0048-FFE

Followup Audit of Permit Process for Central and South Florida 6-Feb-08

A-2008-0049-FFP

Agreed Upon Procedures Attestation - Inventory Reconciliation, Tripler Army Medical Center 24-Apr-08

A-2008-0050-ZBISurvey of Army Support to SOF Expansion 30-Jan-08

A-2008-0051-PMO

Quality Assurance Postaudit Review of the Audit of Semi-Trailer Taillight Commonality (Audit Report: A-2005-0291-ALA) 31-Jan-08

A-2008-0052-PMO

Quality Assurance Postaudit Review of the Audit of Contract Administration for Special Access Programs, Intelligence, and Sensitive Activities (Audit Report: A-2007-0080-ZBI) 31-Jan-08

A-2008-0053-FFSMobility Infrastructure Requirements 6-Feb-08

A-2008-0054-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Vancouver, Washington 4-Feb-08

A-2008-0055-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Fort Chaffee, Arkansas 4-Feb-08

Page 380: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0056-PMO

Quality Assurance Postaudit Review of the Audit of Boiler Refurbishment--Picatinny Arsenal (Audit Report: A-2006-0160-FFD) 4-Feb-08

A-2008-0057-PMO

Quality Assurance Postaudit Review of the Audit of Contract Management of Equipment Transition Sites, U.S. Army Reserve Command (Audit Report: A-2006-0043-ALI) 4-Feb-08

A-2008-0058-ALM

Benefits of Public-Private Partnerships, Deputy Chief of Staff, G-4 7-Feb-08

A-2008-0059-FFH

Medical Services Account, Brooke Army Medical Center, Fort Sam Houston, Texas 7-Feb-08

A-2008-0060-ALO

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Paducah, Kentucky 8-Feb-08

A-2008-0061-FFE

Disposal of Coastal Dredged Material, U.S. Army Corps of Engineers 13-Feb-08

A-2008-0062-FFH

Reserve Component Medical Readiness Reporting, U.S. Army Reserve Medical Command 26-Feb-08

A-2008-0063-ALI

Base Realignment and Closure 2005 Construction Requirements, U.S. Army Reserve Center, Fort Hunter Liggett, California 12-Feb-08

A-2008-0064-ALI

Base Realignment and Closure 2005 Construction Requirements, Brigade Combat Team, Fort Carson, Colorado 13-Feb-08

A-2008-0065-ALE

Use of Role-Players at the Joint Multinational Readiness Center, U.S. Army, Europe and Seventh Army 26-Feb-08

Page 381: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0066-ALI

Base Realignment and Closure 2005 Construction Requirements, Division Headquarters, Fort Carson, Colorado 13-Feb-08

A-2008-0067-ALEAudit of Use of Public Vouchers in Europe 14-Feb-08

A-2008-0068-ALO

Attestation Examination of the Financial Statements for the Periods Ended June 30, 2004, 2005, and 2006 for the Depot Redevelopment Corporation of Memphis and Shelby County for No-Cost Economic Development Conveyance 14-Feb-08

A-2008-0069-ALO

Attestation Examination of the Financial Statements for the Periods Ended September 30, 2003, 2004, 2005, and 2006 for the Anniston-Calhoun County Fort McClellan Joint Powers Authority No-Cost Economic Development Conveyance 14-Feb-08

A-2008-0070-ALL

Attestation of the Independent Agreed-Upon Procedures to Eliminate Respondent Personal Data in Medical Surveys Conducted in Iraq and Afghanistan 26-Feb-08

A-2008-0071-FFS

Workload Survey of Readiness of Army Modular Forces 14-Feb-08

A-2008-0072-ZBI Audit of Intelligence Funds 14-Feb-08

A-2008-0073-FFM

Final Report: Internal Audit of Agency Policy and Controls--Overtime for Deployed Auditors 23-Apr-08

A-2008-0074-ALM Reset Metrics--Procurement 27-Feb-08

A-2008-0075-ALL

Audit of Contractor-Acquired Property, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 12-Mar-08

Page 382: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0076-ZBI

Emergency and Extraordinary Expense Funds, Office of the Secretary of the Army 16-Apr-08

A-2008-0077-ALL

Contract Administration Over Contracted Dining Facility Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 20-Mar-08

A-2008-0078-ALO

Base Realignment and Closure 2005 Construction Requirements, Infantry Brigade Combat Team Complex, Fort Knox, Kentucky 3-Mar-08

A-2008-0079-FFI

Information Technology Purchasing Practices, Fort Sill 20-Mar-08

A-2008-0080-ALE

Military Construction Requirements in Europe, U.S. Army Garrison, Ansbach 10-Mar-08

A-2008-0081-FFD

Followup Audit of Security of Civil Works Water Resources Infrastructure, U.S. Army Corps of Engineers 19-Mar-08

A-2008-0082-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Camp Bullis, Texas 11-Mar-08

A-2008-0083-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Yakima Training Center, Washington 11-Mar-08

A-2008-0084-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Fort Lewis, Washington 11-Mar-08

Page 383: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0085-ALL

Audit of Class III (Bulk and Retail) Fuel Operations in the Iraq Area of Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 18-Mar-08

A-2008-0086-FFF

Training Ammunition Management, Deputy Chief of Staff, G-3/5/7 5-Aug-08

A-2008-0087-FFH

Nonappropriated Fund Fixed Asset Valuations, Sierra Army Depot, California 17-Mar-08

A-2008-0088-ALI

Base Realignment and Closure 2005 Construction Requirements, Dental Clinic, Fort Bliss, Texas 18-Mar-08

A-2008-0089-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center Addition, Kearney, Nebraska 18-Mar-08

A-2008-0090-ALL

Audit of Supply Activities (H Sites), Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 20-Mar-08

A-2008-0091-ALL

Audit of Internal Controls Over Contracted Dining Facility Operations, Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom 31-Mar-08

A-2008-0092-ALL

Agreed-Upon Procedures Attestation to Determine How Much the U.S. Army May Have Been Overcharged for Services Obtained Under Two Blanket Purchase Agreements 2-Apr-08

A-2008-0093-FFS

Housing for Mobilized Soldiers, Fort Lewis, Washington 2-Apr-08

Page 384: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0094-ALE

Roles and Responsibilities for Force Protection in Europe 21-Mar-08

A-2008-0095-ALO

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Cedar Rapids, Iowa 20-Mar-08

A-2008-0097-ALL

Agreed-upon Procedures Attestation of the Methodology and Approach the Army Internal Task Force on Contracting Used to Assess Contracts U.S. Army Contracting Command, Southwest Asia -Kuwait Contracting Office Awarded Between FY 03 and FY 06 31-Mar-08

A-2008-0098-ALL

Audit of Management of Shipping Containers in Southwest Asia - Iraq 3-Apr-08

A-2008-0099-ALO

Revenues and Expenses for the 2006 Army Birthday Ball 25-Mar-08

A-2008-0100-FFH

Attestation Examination of External Contract Services and Followup, Army and Air Force Exchange Service 26-Mar-08

A-2008-0101-ALM

Followup Audit of the Impact of Warranties on Weapon System Maintenance Costs, Program Executive Office, Combat Support and Combat Service Support 2-Apr-08

A-2008-0102-ALO

Followup Audit of Contract Management of Equipment Transition Sites, U.S. Army Reserve Command, Fort McPherson, Georgia 1-Apr-08

A-2008-0103-ZBI

Intelligence Contingency Funds (Limitation .0017), Office of the Deputy Chief of Staff, G-2 10-Apr-08

Page 385: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0104-ZBI

Army Research and Technology Protection Program, Program Executive Office, Ground Combat Support 8-Apr-08

A-2008-0105-FFIStandardizing Information Technology Equipment 3-Apr-08

A-2008-0106-FFS

Followup Audit of Controls Over Unit Morale, Welfare, and Recreation Funds, 396th Combat Support Hospital, Vancouver Barracks, Vancouver, Washington 22-Apr-08

A-2008-0107-ZBI

Followup Audit of U.S. Army Central Personnel Security Clearance Facility, Fort Meade, Maryland 18-Apr-08

A-2008-0108-FFMMiscellaneous Credits for Reserve Component Pay 29-Apr-08

A-2008-0109-FFM

Accounting for Seized Assets and Development Fund for Iraq Balances 22-May-08

A-2008-0110-ALO

Bayonne Local Redevelopment Authority's 2004, 2005, and 2006 No-Cost Economic Development Conveyance Financial Statements, Former Military Ocean Terminal - Bayonne, New Jersey 16-Apr-08

A-2008-0111-ALE

Attestation Examination of Suggestion Number EUHD07015M, FRAG 7 18-Apr-08

A-2008-0112-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Middletown, Connecticut 29-Apr-08

A-2008-0113-ALE

Management of Theater Excess, U.S. Army, Europe and Seventh Army 21-Apr-08

A-2008-0114-PMZ

Opinion Report on the Fiscal Year 2008 External Quality Control Peer Review of the Naval Audit Service 15-May-08

Page 386: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0115-PMZ

Letter of Comments on the Fiscal Year 2008 External Quality Control Peer Review of the Naval Audit Service 12-Jun-08

A-2008-0116-FFMAccounting for Internal Use Software 18-Apr-08

A-2008-0117-ALI

Base Realignment and Closure 2005 Construction Requirements: Armed Forces Reserve Center, Grand Prairie Reserve Complex, Texas 23-Apr-08

A-2008-0118-ZBI

Army Foreign Language Program Requirements, Office of the Deputy Chief of Staff, G-2 29-Apr-08

A-2008-0119-ALE

FY 08 Manning Requirements for Contract Security Guards in Europe, U.S. Army, Europe and Seventh Army 28-Apr-08

A-2008-0120-ALMReset Metrics--Field Level Reset 30-Apr-08

A-2008-0121-FFH

Readiness Reporting for Active Component Medical Units 30-Apr-08

A-2008-0122-ALI

Base Realignment and Closure 2005 Construction Requirements, First Brigade Combat Team Complex, Fort Bliss, Texas 5-May-08

A-2008-0123-ALI

Base Realignment and Closure 2005 Construction Requirements, Second Brigade Combat Team (Heavy), Fort Bliss, Texas 6-May-08

A-2008-0124-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Greenlief Training Site, Hastings, Nebraska 9-Jul-08

Page 387: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0125-ALI

Base Realignment and Closure 2005 Construction Requirements, Vehicle Maintenance Complex, Fort Bragg, North Carolina 31-Jul-08

A-2008-0126-ALI

Base Realignment and Closure 2005 Construction Requirements, 4th Brigade Combat Team, Fort Bragg, North Carolina 9-Jun-08

A-2008-0127-ALO

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Stewart Army Subpost, Newburgh, New York 6-May-08

A-2008-0128-ALO

Base Realignment and Closure 2005 Construction Requirements, Fort Totten Armed Forces Reserve Center, New York 12-May-08

A-2008-0129-ALO

Base Realignment and Closure 2005 Construction Requirements, Airfield Pavement Repair, Fort Riley, Kansas 13-May-08

A-2008-0130-ALO

Base Realignment and Closure 2005 Construction Requirements, Riley - Consolidated Health/Dental Clinic, Kansas 27-May-08

A-2008-0131-ALO

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, McAlester Army Ammunition Plant, Oklahoma 13-May-08

A-2008-0132-ALA

Followup Audit of Joint Network Node, Fort Monmouth, New Jersey 21-May-08

Page 388: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0133-ALI

Report for Attestation Examination of Selected Base Realignment and Closure 2005 Operation and Maintenance Requirements for U.S. Army Forces Command for FY's 08 - 11 FORSCOM 18-Sep-08

A-2008-0134-ALI

Report for Attestation Examination of Selected Base Realignment and Closure 2005 Operation and Maintenance Requirements, U.S. Army Materiel Command FY's 08 -11 18-Sep-08

A-2008-0135-ALI

Report for Attestation Examination of Selected Base Realignment and Closure 2005 Operation and Maintenance Requirements, U.S. Army Training and Doctrine Command FY's 08 - 11 18-Sep-08

A-2008-0136-ALI

Report for Attestation Examination at Army Commands of Selected Base Realignment and Closure 2005 Operation and Maintenance Requirements for FY's 08 - 11 18-Sep-08

A-2008-0137-ZBI

Army Research and Technology Protection Program, Program Executive Office, Aviation 7-May-08

A-2008-0138-FFP

Acquisition Management, U.S. Army Commands in Korea 15-May-08

A-2008-0139-ALE

Disposal of Property at Defense Reutilization and Marketing Service Sites in Germany 7-May-08

A-2008-0140-ALA Science and Technology 8-May-08

Page 389: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0141-ALO

Preliminary Review of Revised Bayonne Local Redevelopment Authority's 2001-2207 Supplemental Schedules, Audit of No-Cost Economic Development Conveyance Management and Compliance 8-May-08

A-2008-0142-ALMOperational Loss Requirements 12-May-08

A-2008-0143-FFP

Medical Services Account, 18th Medical Command, Eighth U.S. Army, Korea 16-May-08

A-2008-0144-FFD

Monitoring Security Guard Contracts, Office of the Provost Marshall General and U.S. Army Installation Management Command 15-May-08

A-2008-0145-ALL

Management of Shipping Containers in Southwest Asia, Continental United States 25-Jun-08

A-2008-0146-FFP

Pharmacy Inventory Management, Tripler Army Medical Center 27-May-08

A-2008-0147-FFF

Followup Audit of Family Support for Reserve Component Soldiers in Extended Deployments 5-Jun-08

A-2008-0148-FFH

Pharmacy Operations, Dunham U.S. Army Health Clinic 20-May-08

A-2008-0149-PMO

Quality Assurance Postaudit Review of the Audit of Recruiting for Lifecycle Management Units 27-May-08

A-2008-0150-FFE

Followup Audit of Remediation and Disposal Strategies for Inactive Reactors, U. S. Army Corps of Engineers 30-May-08

A-2008-0151-ALO

Audit of Logistics Support Contract, Fort Carson, Colorado 13-Jun-08

A-2008-0152-ALO

Audit of Management of Relocatable Facilities - Notification of Potential Antideficiency Act Violation 3-Jun-08

Page 390: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0153-FFP

Construction Site Preparation: Parcel 1, U.S. Army Corps of Engineers, Far East District, Seoul, Korea 5-Jun-08

A-2008-0154-ZBIProgram Management of Special Access Programs 9-Jun-08

A-2008-0155-FFE

Financial Oversight and Controls of Environmental Funds 10-Jun-08

A-2008-0156-FFI

Followup Audit of Information Technology Procurement Recommendations 10-Jun-08

A-2008-0157-ZBI

Army Research and Technology Protection Program, U.S. Army Aviation and Missile Research, Development and Engineering Center 27-Jun-08

A-2008-0158-FFSMobility Transportation Requirements 12-Jun-08

A-2008-0159-ALC

Contract Modification Process and Government Purchase Card Procedures, Walla Walla District, U.S. Army Corps of Engineers 10-Jun-08

A-2008-0160-ALMReset Metrics--Lessons Learned 17-Jun-08

A-2008-0161-FFP

Medical Readiness in Active Components, 18th Medical Command, Eighth U.S. Army, Korea 19-Jun-08

A-2008-0162-ALM

Followup Audit of Impact of Warranties on Weapon System Maintenance Costs, Program Executive Office, Missiles and Space, Redstone Arsenal, Alabama 18-Jun-08

A-2008-0163-ALM

Followup Audit of Impact of Warranties on Weapon System Maintenance Costs, Program Executive Office, Aviation, Redstone Arsenal, Alabama 17-Jun-08

A-2008-0164-ALO

Audit of Fire and Emergency Services, National Training Center and Fort Irwin, California 16-Jun-08

Page 391: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0165-FFH

FY 07 Supplemental Funding for the Global War on Terrorism, U.S. Army Medical Command 18-Jun-08

A-2008-0166-FFF

Military Training Service Support-Dining Facilities Accountability, Fort Sam Houston, Texas 23-Jun-08

A-2008-0167-ALR

U.S. Vehicle Registration Business Rules, U.S. Army Material Command Logistics Support Activity 25-Jun-08

A-2008-0168-ALC

Korea Build-to-Lease Housing Consulting Contract Administration 20-Jun-08

A-2008-0169-ALE Use of German Railways 23-Jun-08

A-2008-0170-FFF

Military Training Service Support--Dining Facilities Accountability, Fort Bliss, Texas 2-Jul-08

A-2008-0171-ALI

Base Realignment and Closure 2005 Construction Requirements: Combat Aviation Brigade Complex, Fort Bliss, Texas 23-Jun-08

A-2008-0172-ALM

Time Sensitive Issue--Automatic Reset Induction Overstatement of Field Reset Requirements 24-Jun-08

A-2008-0173-ALA

Followup of the Army's Capabilities Determination Process 27-Jun-08

A-2008-0174-FFF

Audit of Military Training Service Support - Dining Facilities Accountability, Fort Eustis, Virginia 23-Sep-08

A-2008-0175-FFE

Oversight and Enforcement Actions for Environmental Compliance 26-Jun-08

A-2008-0176-FFH

Nonappropriated Fund Fixed Asset Valuations, U.S. Army Garrison Presidio of Monterey, California 27-Jun-08

A-2008-0177-FFH

Nonappropriated Fund Fixed Asset Valuations, U.S. Army Garrison Yuma, Arizona 1-Jul-08

Page 392: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0178-FFI

Operational Purchases of Information Technology Equipment, Systems, and Services, U.S. Army Forces Command 1-Jul-08

A-2008-0179-FFI

Operational Purchases of Information Technology, Equipment, Systems, and Services, Iraq and Kuwait 25-Sep-08

A-2008-0181-ALI

Base Realignment and Closure 2005 Construction Requirements, Restationing Air Defense Artillery School, Fort Sill, Oklahoma 2-Jul-08

A-2008-0182-FFS

Temporary Change of Station Orders and Housing for Mobilized Soldiers 15-Jul-08

A-2008-0183-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Scranton, Pennsylvania 7-Jul-08

A-2008-0184-ALI

Base Realignment and Closure 2005 Construction Requirements: U.S. Army Materiel Command Headquarters, Redstone Arsenal, Alabama 23-Jul-08

A-2008-0185-FFH

Audit of Management of Federal Employees' Compensation Act Program, U.S. Army Medical Command, Fort Sam Houston, Texas 7-Jul-08

A-2008-0186-FFI

Installation Campus Area Network Connectivity - Wireless Networks and Devices 8-Jul-08

A-2008-0187-PMO

Quality Assurance Review of the Examination of Standard Procurement System--Federal Financial Management Improvement Act of 1996 Compliance (Attestation Report: A-2007-0124-FFM) 9-Jul-08

A-2008-0188-FFM Unused Airline Tickets 30-Jul-08

Page 393: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0189-FFF

Military Training Service Support - Dining Facilities Accountability, Fort Knox, Kentucky 25-Jul-08

A-2008-0190-ALMReset Metrics--Sustainment Maintenance 22-Jul-08

A-2008-0191-FFP

Monitoring Contract Security Guards, U.S. Army, Garrison, Alaska and U.S. Army Garrison, Fort Greely 29-Jul-08

A-2008-0192-FFDDemolition Contracts, U.S. Army Corps of Engineers 24-Jul-08

A-2008-0193-ZBI

Program Management of Special Access Programs, U.S. Army Intelligence and Security Command and Product Manager Information Warfare 24-Jul-08

A-2008-0194-ALI

Base Realignment and Closure 2005 Construction Requirements, Headquarters, 1st Armor Training Brigade, Fort Benning, Georgia 28-Jul-08

A-2008-0195-FFF

Attestation Examination of Army Ideas for Excellence Program Idea Number NEMR06046C 28-Jul-08

A-2008-0196-ALO

Audit of No-Cost Economic Development Conveyance Management and Compliance - Phase I 29-Jul-08

A-2008-0197-ALM

Followup Audit of Impact of Warranties on Weapon Systems Maintenance Costs, Program Executive Office Intelligence, Electronic Warfare, and Sensors, Fort Monmouth, New Jersey 31-Jul-08

A-2008-0198-ZBI

Followup Audit of Secure Environment Contracting, U.S. Army Aviation and Missile Life Cycle Management Command 30-Jul-08

A-2008-0199-ALM

Followup Audit of Interactive Electronic Technical Manuals 11-Aug-08

Page 394: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0200-ALC

Audit of Government Purchase Cards - Seattle District, U.S. Army Corps of Engineers 6-Aug-08

A-2008-0201-ALC

Army Travel Charge Card Program - Centrally Billed Accounts 18-Aug-08

A-2008-0202-FFM

The Army Manager's Internal Control Program for FY 07, U.S. Army Intelligence Command, 704th Military Intelligence Brigade 19-Aug-08

A-2008-0203-FFM

The Army Manager's Internal Control Program for FY 07, U.S. Army Intelligence Command, 902d Military Intelligence Group 18-Aug-08

A-2008-0204-FFM

General Fund Enterprise Business System - Federal Financial Management Improvement Act Compliance, Examination of Release 1.2 Business Process Designs 14-Aug-08

A-2008-0205-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Missoula, Montana 4-Aug-08

A-2008-0206-FFM

The Army Manager's Internal Control Program for FY 07, U.S. Army Space and Missile Defense Command 26-Aug-08

A-2008-0207-FFM

The Army Manager's Internal Control Program for FY 07, U.S. Army Intelligence and Security Command 27-Aug-08

A-2008-0208-ALR

U.S. Army Vehicle Registration, Sierra Army Depot 26-Sep-08

A-2008-0209-FFH

Supplemental Finding for the Global War on Terrorism Summary Report, U.S. Army Medical Command 6-Aug-08

Page 395: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0210-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, East Houston, Texas 6-Aug-08

A-2008-0211-FFM

Review of the Audit Readiness Validation Plan--Fund Balance with Treasury (FBWT) for the Army General Fund (AGF) 28-Aug-08

A-2008-0212-FFM

Reimbursement and Accounting Practices, U.S. Army Chemical Materials Agency 25-Aug-08

A-2008-0213-ALA

Rapid Fielding Initiative, Program Executive Office Soldier, Fort Belvoir, Virginia 5-Sep-08

A-2008-0214-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Fort Hamilton, New York 21-Aug-08

A-2008-0215-FFM

Audit and Preliminary Investigation of the Potential Antideficiency Act Violation at the Military Group in Bogota, Columbia, Case 04-02 15-Aug-08

A-2008-0216-ALR

Manufacturing Execution System, U.S. Army Materiel Command 25-Sep-08

A-2008-0217-FFPMaster Labor Agreement, U.S. Army, Japan 3-Sep-08

A-2008-0218-ZBI

Followup Audit of Contract Administration of Special Access Programs, Intelligence, and Sensitive Activities, U.S. Army Intelligence and Security Command 18-Aug-08

A-2008-0219-ALC

Corrective Actions for Administration of Service Contracts, Office of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) 3-Sep-08

A-2008-0220-FFI Thin Client Computing 28-Aug-08

A-2008-0221-FFP

Delayed Fielding of the Stryker Brigade Combat Team, U.S. Army, Pacific 4-Sep-08

Page 396: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0222-FFM

Examination of Federal Financial Management Improvement Act Compliance--Requirements Determination, Formerly Used Defense Sites Management Information System 10-Sep-08

A-2008-0223-FFE

Agent Accountability at Chemical Agent Disposal Facilities, U.S. Army Chemical Materials Agency 26-Aug-08

A-2008-0224-ALI

Base Realignment and Closure 2005 Construction Requirements, U.S. Forces Command (FORSCOM) and U.S. Army Reserve Command (USARC) Headquarters Building, Fort Bragg, North Carolina 21-Aug-08

A-2008-0225-FFF

Followup Audit of Reserve Component Duty Military Occupational Specialty Qualification and Officer Basic Course Training Requirements 22-Aug-08

A-2008-0226-FFFFollowup Audit of Station Missioning 22-Aug-08

A-2008-0227-FFD

Installation Preparedness for a Chemical, Biological, Radiological, or Nuclear Event, Deputy Chief of Staff G-3/5/7 and U.S. Army Installation Management Command 8-Sep-08

A-2008-0228-ALR

Property Accountability in the Army National Guard, Missouri Army National Guard 25-Sep-08

A-2008-0229-ALEManagement of Nontactical Vehicles in Europe 25-Aug-08

A-2008-0230-FFM

Review of the Audit Readiness Validation Plan--Fund Balance with Treasury (FBWT) for the Army Working Capital Fund (AWCF) 29-Aug-08

Page 397: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0231-FFH

Management Controls for Medical Services Account, Brooke Army Medical Center, Fort Sam Houston, Texas 26-Aug-08

A-2008-0232-FFP

Roles and Responsibilities for Managing Army Transformation, U.S. Forces Korea 16-Sep-08

A-2008-0233-FFF

Military Training Service Support - Dining Facilities Accountability, Office of the Deputy Chief of Staff, G-3/5/7 26-Sep-08

A-2008-0234-FFF

Use of Role Players for Training at Combat Training Centers 2-Sep-08

A-2008-0235-ALO

Management of Relocatable Facilities, Fort Riley, Kansas 2-Sep-08

A-2008-0236-ALO

Management of Relocatable Facilities, Fort Stewart and Hunter Army Airfield, Georgia 2-Sep-08

A-2008-0237-ALM

Followup Audit of Impact of Warranties on Weapon Systems Maintenance Costs, Program Executive Office, Command, Control and Communications Tactical, Fort Monmouth, New Jersey 8-Sep-08

A-2008-0238-FFF

Followup Audit of Advanced Individual Training Courses, U.S. Army Intelligence Center, Fort Huachuca, Arizona 10-Sep-08

A-2008-0239-ALEConstruction for Army Family Housing in Europe 18-Sep-08

A-2008-0240-FFS

Attestation of FY 07 Business Transformation Benefits 16-Sep-08

A-2008-0241-FFM

Review of the Army Management Control Process for FY 06, Office of the Assistant Secretary of the Army (Financial Management and Comptroller) 22-Sep-08

Page 398: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0242-ALA

Followup Audit of Primary (Non-rechargeable) Communications-Electronics Batteries, U.S. Army Communications-Electronics Life Cycle Command 9-Sep-08

A-2008-0243-FFI

Information Technology in the Systems Development Process, Offices of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) and the Chief Information Officer/G-6 16-Sep-08

A-2008-0244-FFE

Followup Audit of Overhead, and General and Administrative Costs on Environmental Subcontracts, U.S. Army Corps of Engineers, Baltimore District 8-Sep-08

A-2008-0245-ALR

Property Accountability in the Army National Guard, Michigan Army National Guard 24-Sep-08

A-2008-0246-ALM

Depot-Level Maintenance Workload Reporting--FY 07, Office of the Deputy Chief of Staff, G-4 16-Sep-08

A-2008-0247-ALA

Followup Audit of Environmental and Explosive Safety Requirements for Weapon Systems, Offices of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) and Assistant Secretary of the Army (Installations and Environment) 16-Sep-08

A-2008-0248-FFD

Force Protection Funds, Office of the Provost Marshall General and U.S. Army Installation Management Command 17-Sep-08

A-2008-0249-FFM

The Army Managers' Internal Control Program for FY 07, 3d Military Police Group 15-Sep-08

Page 399: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0250-FFF

Army National Guard Recruit Sustainment Program 10-Sep-08

A-2008-0251-ALO

Workload Survey of Installation Operations Programs 12-Sep-08

A-2008-0252-FFM

The Army Managers' Internal Control Program for FY 07, U.S. Army Corps of Engineers Fort Worth District 19-Sep-08

A-2008-0253-FFHMedical Unit Readiness Reporting Summary report 16-Sep-08

A-2008-0254-FFI

Enterprise Software Agreements: Microsoft License Management 18-Sep-08

A-2008-0255-FFS

Accountability of Contractors on the Battlefield 30-Sep-08

A-2008-0256-ALM

Overseeing Contract Requirements for Field-Level Reset, U.S. Army Sustainment Command 17-Sep-08

A-2008-0257-FFM

The Army Managers' Internal Control Program for FY 07, U.S. Army Corps of Engineers Pittsburgh District 23-Sep-08

A-2008-0258-FFH

Followup Audit of Contracting for Medical Goods and Services Contract DADA10-01-C-0007, U.S. Army Medical Command 18-Sep-08

A-2008-0259-ALA

Followup Audit of the Common Gunnery Architecture 18-Sep-08

A-2008-0260-PMO

Quality Assurance Postaudit Review of the U.S. Army Center of Military History Contract Management (Audit Report: A-2007-0059-ALC) 18-Sep-08

A-2008-0261-FFF Quality of Recruits 19-Sep-08

A-2008-0262-ALE

Requirements Validation Processes, Camp Bondsteel, Kosovo 19-Sep-08

Page 400: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0263-FFM

General Fund Enterprise Business System--Federal Financial Management Improvement Act Compliance Examination of Release 1.3 Requirements 29-Sep-08

A-2008-0264-ALRInventory Accountability, Tobyhanna Army Depot 23-Sep-08

A-2008-0265-ALRInventory Stockage Levels, Tobyhanna Army Depot 23-Sep-08

A-2008-0266-FFM

Agreed-Upon Procedures Attestation of the FY 08 Administrative Fees Collected by the HRsolutions Program Office 23-Sep-08

A-2008-0267-FFM Funds Control Module 24-Sep-08

A-2008-0268-ALO

Management of Relocatable Facilities, Fort Drum, New York 29-Sep-08

A-2008-0269-ALO

Management of Relocatable Facilities, Fort Huachuca, Arizona 29-Sep-08

A-2008-0270-ALA

System Training Plan Process, U.S. Army Training Support Center, Fort Eustis, Virginia 29-Sep-08

A-2008-0271-FFPFollowup - Force Protection Hawaii 26-Sep-08

A-2008-0272-FFI

Army Video Teleconferencing Facilities, Office of the Chief Information Officer/G-6 25-Sep-08

A-2008-0273-FFH

Audit of Reconciliation of Government Property, Fort Sam Houston, Texas 26-Sep-08

A-2008-0274-FFE

Time-Sensitive Report--Potential Antideficiency Act Violation, Business Enterprise Certification, Audit of Accident Investigations and Reporting 30-Sep-08

A-2008-0275-FFM

The Army Management Control Program for FY 06, Program Management 30-Sep-08

Page 401: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0276-FFI

Army Portfolio Management Solution-Army Information Technology Registry, Office of the Chief Information Officer/G-6 26-Sep-08

A-2008-0277-ALM

Workload Survey, U.S. Army Garrison Maintenance Operations 29-Sep-08

A-2008-0278-FFP

Followup: Operation and Maintenance of the Okinawa Pipeline, U.S. Army, Japan 30-Sep-08

A-2008-0279-ALR

Logistics Management Systems-Depots, Summary Report 29-Sep-08

A-2008-0280-FFFNoncommissioned Officer Education System 30-Sep-08

A-2008-0281-FFEWorkload Survey of the U.S. Army Energy Program 29-Sep-08

A-2008-0282-FFP

Resources for Managing Army Transformation, U.S. Forces Korea 30-Sep-08

A-2008-0283-ZBIAudit Research - Army Intelligence Operations 29-Sep-08

A-2008-0284-FFM

The Army Managers' Internal Control Program for FY 07, Deputy Chief of Staff, G-1 29-Sep-08

A-2008-0285-FFI

Summary of the Army's Information Technology Procurement Process 30-Sep-08

A-2008-0286-ALL

Audit of Management of Shipping Containers in Southwest Asia - Kuwait 30-Sep-08

A-2008-0287-ALL

Followup Audit of Asset Visibility and Container Management--Operation Iraqi Freedom, U. S. Central Command 30-Sep-08

A-2008-0288-FFI

Workload Survey for Enterprise Integration and Information Technology Transformation 30-Sep-08

Page 402: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2008-0289-FFE

Time Sensitive Report--Potential Antideficiency Act Violation, Inappropriate Use of Global War on Terrorism Supplemental Funding and Inappropriate Use of Operation and Maintenance Army Appropriation, Audit of Accident Investigations and Reporting 30-Sep-08

A-2008-0290-FFE

Workload Survey of the Army's Conventional Ammunition Demilitarization Program 30-Sep-08

A-2008-0291-FFF

Followup Audit of Courseware Development for Distance Learning, U.S. Army Training and Doctrine Command 30-Sep-08

A-2008-0292-ALO

Management of Relocatable Facilities, Fort Bragg, North Carolina 30-Sep-08

A-2008-0293-FFH

Nonappropriated Fund Fixed Asset Valuations, U.S. Army Garrison, Fort Hood, Texas 30-Sep-08

A-2008-0294-ALR

Property Accountability in the Army National Guard, Oregon Army National Guard 30-Sep-08

A-2008-0295-FFMVendor Payment Methods, Fort Campbell, Kentucky 30-Sep-08

A-2009-0001-FFM

The Army Managers' Internal Control Program for FY 07, Office of the Assistant Secretary of the Army for Manpower and Reserve Affairs 19-Dec-08

A-2009-0002-FFI

Training and Developing the Civilian Information Technology Management Workforce 14-Oct-08

A-2009-0003-ALE

Organizational Clothing and Individual Equipment, U.S. Army, Europe and Seventh Army 22-Oct-08

A-2009-0004-ALRSingle Army Logistics Enterprise Workload Survey 30-Sep-09

Page 403: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0005-ALA

Technology Readiness Assessments, Program Executive Office, Missiles and Space 22-Oct-08

A-2009-0006-FFD

Followup of Contracting for Installation Preparedness, Office of the Deputy Chief of Staff, G-3/5/7 and U.S. Army Training and Doctrine Command 30-Oct-08

A-2009-0007-FFH

Followup Audit of Contracts for Medical Goods and Services, Southeast Regional Medical Command 3-Nov-08

A-2009-0008-FFH

Trauma Services Cooperative Agreement, Brooke Army Medical Center, Fort Sam Houston, Texas 29-Oct-08

A-2009-0009-ALO

Military and Family Counseling Services Contract, Fort Hood, Texas 31-Oct-08

A-2009-0010-ZBI

Army Research and Technology Protection Program, U.S. Army Communications-Electronics Research, Development and Engineering Center 31-Oct-08

A-2009-0011-FFM

Independent Auditor's Report for FY 08 American Red Cross Financial Statements 31-Oct-08

A-2009-0012-PMO

Quality Assurance Postaudit Review of the Audit of Strategic Management System Contract 6-Nov-08

A-2009-0013-ALE

FY 09 Manning Requirements for Contract Security Guards in Europe, U.S. Army, Europe and Seventh Army 14-Nov-08

A-2009-0014-ZBI

Army Research and Technology Protection Program, Program Executive Office, Intelligence, Electronic Warfare and Sensors 14-Nov-08

Page 404: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0015-ALR

Followup Audit of the Ammunition Supply Point, U.S. Army Garrison, Fort Lewis, Washington 20-Nov-08

A-2009-0016-FFH

Acquisitions Made Using Military Interdepartmental Purchase Requests, U.S. Army Medical Command 17-Nov-08

A-2009-0017-ALE

Residual Value of Real Estate in Europe, U.S. Army Installation Management Command, Europe Region 20-Nov-08

A-2009-0018-ALR

Property Accountability in the Army National Guard, Oklahoma Army National Guard 4-Dec-08

A-2009-0019-FFD

Staffing for Installation Access Control Points, Office of the Provost Marshal General and U.S. Army Installation Management Command 6-Jan-09

A-2009-0020-ALO

Military and Family Counseling Services Contract, Fort Lewis, Washington 1-Dec-08

A-2009-0021-ALO

Audit of DOD Support to 2009 Presidential Inaugural -Notification of Potential Antideficiency Act Violation 2-Dec-08

A-2009-0022-ALC

Followup Audit of HRsolutions Program - Contract Procedures 12-Dec-08

A-2009-0023-ALM

Time Sensitive Issue--Excess Theater Provided Equipment Disposition Request Process 16-Dec-08

A-2009-0024-FFH

Attestation Examination-Army MWR External Contract Services 7-Jan-09

A-2009-0025-FFH

Nonappropriated Fund Capital Asset Valuations, U.S. Army Garrison, Fort Lewis, Washington 7-Jan-09

A-2009-0026-ALR

Container Detention Billing for the Global War on Terrorism, Military Surface Deployment and Distribution Command 15-Jan-09

Page 405: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0027-FFE

Followup Audit of Installation Preparedness for Weapons of Mass Destruction 17-Dec-08

A-2009-0028-FFI

Followup of Airtime Requirements for Fixed Commercial Satellite Communications Bandwidth, Office of the Chief Information Officer/G-6 5-Jan-09

A-2009-0029-ALA

After Action Review: Armed Reconnaissance Helicopter Termination 22-Jan-09

A-2009-0030-ALE

Military Construction Requirements at U.S. Army Garrison Vicenza 2-Feb-09

A-2009-0031-ALE

Execution of Force Protection Funding in Europe 23-Jan-09

A-2009-0032-ALO

No-Cost Economic Development Conveyance Management and Compliance - Phase II, Assistant Secretary of the Army (Installations and Environment ) 19-Dec-08

A-2009-0033-ALL

Audit of the Management of Shipping Containers Southwest Asia - Afghanistan 22-Jan-09

A-2009-0034-ALR

Administrative Fees for Direct Bookings, Military Surface Deployment and Distribution Command 15-Jan-09

A-2009-0035-ALR

Customer Billing Rates - Liner Business Shipments, United States Transportation Command 25-Mar-09

A-2009-0036-ZBI

Property Accountability for Controlled Cryptographic Items, 902nd Military Intelligence Group 28-Jan-09

A-2009-0037-FFI

Information Technology Contingency Plans, Chief Information Officer/G-6 26-Jan-09

A-2009-0038-ALM

Followup Audit of the Impact of Warranties on Weapon System Maintenance Costs 27-Jan-09

Page 406: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0039-FFM

Army's Transition Strategy for the Defense Integrated Military Human Resource System (DIMHRS) 17-Mar-09

A-2009-0040-ALA

Audit of Technology Readiness Assessments, Program Executive Office, Aviation 10-Feb-09

A-2009-0041-FFM

Agreed-Upon Procedures Attestation of the FY 04 Administrative Fees Collected by the HRsolutions Program Office 21-Jan-09

A-2009-0042-ALM

Contracts for Field Level Reset, U.S. Army Sustainment Command 27-Jan-09

A-2009-0043-ALL

Agreed-Upon Procedures Attestation to Determine the Accuracy of Financial Records of the 101st Financial Management Company, Contingency Operating Base Speicher, Iraq 2-Feb-09

A-2009-0044-FFH

Nonappropriated Fund Capital Asset Valuations, U.S. Army Garrison, Fort Drum, New York 2-Feb-09

A-2009-0045-FFH

Nonappropriated Fund Capital Asset Valuations, U.S. Army Garrison, Fort Lee, Virginia 2-Feb-09

A-2009-0046-ZBI

Emergency and Extraordinary Expense Funds (Intelligence Contingency Funds--Limitation .0017) Multi-National Corps - Iraq 4-Feb-09

A-2009-0047-ALC

Flat Fees for Contracting and Contract Management Services 23-Feb-09

A-2009-0048-FFM

Review of Business Process Plan--Reporting Accounts Receivable for the Army General Fund 10-Feb-09

A-2009-0049-FFS

U.S. Army Reserve Pre-Mobilization Training Requirements 20-Feb-09

A-2009-0050-FFP

Real Property Master Planning - Alaska, U.S. Army Garrisons-Alaska 10-Feb-09

Page 407: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0051-FFHWorkload Survey of Army Family Programs 9-Feb-09

A-2009-0052-FFM

Review of the Business Process Plan--Reporting Accounts Receivable for the Army Working Capital Fund 10-Feb-09

A-2009-0053-ALR

Followup Audit of Project Manager Assets - Aviation (Cargo Helicopter), Office of the Program Executive Officer, Aviation 4-Mar-09

A-2009-0054-ALI

Base Realignment and Closure 2005 Construction Requirements, 16th Cavalry Regiment Complex, Phase 1, Fort Benning, Georgia 18-Mar-09

A-2009-0055-ALI

Base Realignment and Closure 2005 Construction Requirements: 16th Cavalry Regiment Complex, Phase 2, Fort Benning, Georgia 18-Mar-09

A-2009-0056-FFH

Nonappropriated Fund Capital Asset Valuations, U.S. Army Garrison, Fort Stewart, Georgia 17-Feb-09

A-2009-0057-FFS

Army National Guard Pre-Mobilization Training Requirements 19-Feb-09

A-2009-0058-ALI

Base Realignment and Closure 2005 Construction Requirements, General Instruction Complex, Fort Benning, Georgia 18-Mar-09

A-2009-0059-ZBIAudit of Intelligence Funds - Site A 25-Feb-09

A-2009-0060-FFS

Potential Antideficiency Act Violations, Funds Executed for the Office of the Under Secretary of the Army (Business Transformation) 16-Mar-09

A-2009-0061-ALE

Billing Operations, U.S. Army Europe Regional Medical Command 31-Mar-09

Page 408: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0062-FFM

Assessing Future Base Budget Requirements, Manning Program Evaluation Group 3-Mar-09

A-2009-0064-ALEJob Order Contracting, U.S. Army Garrison Wiesbaden 5-Mar-09

A-2009-0065-ALOManagement of Relocatable Facilities 4-Mar-09

A-2009-0066-ALR

Property Book Unit Supply Enhanced System - Property Accountability and Management, 10th Mountain Division 30-Mar-09

A-2009-0067-FFP

Real Property Master Planning, U.S. Army Garrison, Hawaii 4-Mar-09

A-2009-0068-FFE Energy Consumption 12-Mar-09

A-2009-0069-ALL

Management of Shipping Containers in Southwest Asia, Kuwait, Iraq, Afghanistan, and CONUS, Summary Report 19-Mar-09

A-2009-0070-ALL

Applying Agreed-Upon Procedures to Review Invoices for Housing Maintenance Contracts, Camp Arifjan, Kuwait 10-Mar-09

A-2009-0071-ALM

Time Sensitive Issue - Automatic Reset Induction (ARI) Criteria 23-Mar-09

A-2009-0072-ALI

Base Realignment and Closure 2005 Construction Requirements, Addition/Alteration, Armed Forces Reserve Center, Lafayette, Indiana 18-Mar-09

A-2009-0073-ALA

Assessing Future Base Budget Requirements, Equipping Program Evaluation Group 26-Mar-09

A-2009-0074-ALM

Time Sensitive Issue--Automatic Reset Induction Transportation from Southwest Asia 23-Mar-09

A-2009-0075-FFM

Agreed-Upon Procedures Attestation of the FY 07 Administrative Fees Collected by the HRsolutions Program Office 16-Mar-09

Page 409: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0076-ALM

Reset Fly Away Team--Interdepot Transfer Request Process 31-Mar-09

A-2009-0077-ALM

Time-Sensitive Issue - M88A1 Recovery Vehicle FY 09 Reset Maintenance Requirements 23-Mar-09

A-2009-0078-ALE

Access Control Point Project at Patrick Henry Village, U. S. Army Garrison Baden-Wurttemberg 19-Mar-09

A-2009-0079-FFE

Civil Works Dam Management, U.S. Army Corps of Engineers 24-Mar-09

A-2009-0080-ALL

Retrograde Operations in Southwest Asia, Multi-class Retrograde - Iraq, Camp Victory, Iraq 31-Mar-09

A-2009-0081-FFH

Nonappropriated Fund Capital Asset Valuations, U.S. Army Garrison, Fort Jackson, South Carolina 24-Mar-09

A-2009-0082-ALM

Field Level Reset Requirements, U.S. Army National Guard 31-Mar-09

A-2009-0083-ALR

Overseas Shipping Rate for Privately Owned Vehicles, United States Transportation Command 26-Mar-09

A-2009-0084-ALI

Base Realignment and Closure 2005 Construction Requirements, Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance, Aberdeen Proving Ground, Maryland 8-Apr-09

A-2009-0085-ALL

Retrograde Operations in Southwest Asia, Class VII Theater Provided Equipment, Camp Victory, Iraq 26-Mar-09

A-2009-0086-ALA

Body Armor Testing, Program Executive Office, Soldier 30-Mar-09

Page 410: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0087-PMO

Quality Assurance Postaudit Review of the Audit of FY 08 Manning Requirements for Contract Security Guards in Europe (Audit Report A-2008-0119-ALE) 30-Mar-09

A-2009-0088-FFPFollowup Audit of Public Works Operations in Korea 7-Apr-09

A-2009-0089-ALA

Technology Readiness Assessments. Program Executive Office, Command, Control, and Communications Tactical 31-Mar-09

A-2009-0090-FFH

Morale, Welfare, and Recreation Funding Execution--Quick Wins, Office of the Assistant Chief of Staff for Installation Management 14-Apr-09

A-2009-0091-FFM

Review of the U.S. Army Aviation and Missile Life Cycle Management Command Conversion Process for Army Working Capital Fund Inventory Valuation 13-Apr-09

A-2009-0092-FFD

Contracts for Intrusion Detection Systems, Office of the Provost Marshall General 30-Apr-09

A-2009-0093-ZBI

Contracts for Acquisition Support, U.S. Army Intelligence and Security Command 29-Apr-09

A-2009-0094-ZBI

Army Research and Technology Protection Program, Office of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) 29-Apr-09

A-2009-0095-ALI

Base Realignment and Closure 2005 Construction Requirements, U.S. Army Armor School Maintenance Activity, Fort Benning, Georgia 30-Apr-09

Page 411: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0096-ALI

Base Realignment and Closure 2005 Construction Requirements, Infrastructure Support, Fort Benning, Georgia 30-Apr-09

A-2009-0097-FFDFollowup Audit of Debris Removal Contracts 12-May-09

A-2009-0098-ALO

Base Realignment and Closure 2005 Construction Requirements, Restation Air Defense Artillery Brigade, Fort Sill, Oklahoma 21-Apr-09

A-2009-0099-ALE

Audit of Requirements Validation for Mobilized Soldiers in Europe 24-Apr-09

A-2009-0100-FFMProliferation of the Wide Area Workflow System 5-Aug-09

A-2009-0101-ALO

Military and Family Counseling Services Contract, Fort Benning, Georgia 5-May-09

A-2009-0102-ALL

Agreed-Upon Procedures Attestation - Accountability of Postal Receipts at the Joint Military Postal Facility, Camp Patriot, Kuwait 21-May-09

A-2009-0103-ALA

Spin-Out 1 Critical Technologies, Office of the Program Manager, Future Combat Systems (Brigade Combat Team) 29-Apr-09

A-2009-0104-FFF

Unit Status Reporting Process, U.S. Army Reserve Command 14-May-09

A-2009-0105-ALI

Base Realignment and Closure 2005 Construction Requirements, Battle Command Training Center, Fort Bliss, Texas 26-May-09

A-2009-0106-ALL

Applying Agreed-Upon Procedures to Review and Compare Financial Records and Project Files for Five Commander's Emergency Response Program Projects Initiated in Combat Outpost Carver, Iraq 12-May-09

Page 412: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0107-ALMNational Maintenance Program Effects 18-May-09

A-2009-0108-ALI

Base Realignment and Closure 2005 Construction Requirements, U.S. Army Armor School Trainee Barracks, Fort Benning, Georgia 26-May-09

A-2009-0109-FFM

Initial Entry Training Centrally Managed Account, Army National Guard Readiness Center 12-May-09

A-2009-0110-PMO

Quality Assurance Postaudit Review of the Audit of Management of Installation Environmental Programs (Audit Report (A-2007-0193-FFE) 6-May-09

A-2009-0111-ALO

Followup Audit of Military Construction Process, National Guard Bureau 18-May-09

A-2009-0112-FFH

Attestation Examination of External Contract Services and Followup, Army and Air Force Exchange Service 11-May-09

A-2009-0113-FFM

The Army Managers' Internal Control Program for FY 07, U.S. Army Criminal Investigation Laboratory, Fort Gillem, Georgia 12-May-09

A-2009-0114-FFF

Support to Recruiters in the Field, U.S. Army Recruiting Command, Fort Knox, Kentucky 14-May-09

A-2009-0115-FFP

Impact of Host Nation Labor on Funding Requirements, U.S. Army Japan and U.S. Army Garrison, Japan 19-May-09

A-2009-0116-FFD

Force Protection Requirements for New Construction, Assistant Chief of Staff for Installation Management and U.S. Army Corps of Engineers 26-May-09

Page 413: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0117-ALA

Army Science Board Conflict of Interest Procedures, Office of the Assistant Secretary of the Army (Acquisition, Logistics and Technology) 22-May-09

A-2009-0118-FFF

Processes to Pay and Recoup Enlistment Bonuses for the Active Army, Office of the Deputy Chief of Staff, G-1 19-May-09

A-2009-0119-ALL

Audit of Commander's Emergency Response Program - Multi-National Division - Baghdad 8-Jun-09

A-2009-0120-FFD

Improvised Explosive Device Training for Explosive Ordnance Disposal Soldiers, Deputy Chief of Staff, G-3/5/7 and U.S. Army Training and Doctrine Command 17-Jun-09

A-2009-0121-ALA

Development and Management of Army Aviation Training Aids, Devices, Simulators, and Simulations 22-May-09

A-2009-0122-FFM

Agreed-Upon Procedures Attestation of the FY 06 Administrative Fees Collected by the HRsolutions Program Office 21-May-09

A-2009-0123-FFP

Attestation Examination of Funding Allocation and Reconciliation, Host Nation Labor-Japan 26-May-09

A-2009-0124-FFP

Contract to Operate the Korea Battle Simulation Center, U.S. Forces Korea 9-Jun-09

A-2009-0125-ALO

Assistant Chief of Staff for Installation Management - U.S. Army Reserve Division Contracts, Assistant Chief of Staff for Installation Management 26-May-09

Page 414: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0126-FFD

Followup Report of Program Management to Restore and Enhance the Southern Louisiana Hurricane Protection System, U.S. Army Corps of Engineers 4-Jun-09

A-2009-0127-ZBI

Army Research and Technology Protection Program, U.S. Army Materiel Command 4-Jun-09

A-2009-0128-ALO

Followup Audit of Garrison Utilities and Energy Services, Fort Stewart and Hunter Army Airfield, Georgia 3-Jun-09

A-2009-0129-ALI

Base Realignment and Closure 2005 Construction Requirements 14-Jul-09

A-2009-0130-FFD

Body Armor Requirements, Deputy Chief of Staff, G-3/5/7 8-Jun-09

A-2009-0131-ALI

Base Realignment and Closure 2005 Construction Requirements, Combined Arms Collective Training Facility, Fort Bliss, Texas 22-Jun-09

A-2009-0132-ALL

Contracting Operations, U.S. Army Contracting Command Southwest Asia - Kuwait 29-Sep-09

A-2009-0133-FFS

Deputy Under Secretary of the Army for Business Transformation Initiatives 18-Jun-09

A-2009-0134-ALI

Base Realignment and Closure 2005 Construction Requirements, Addition and Alteration, Evans Army Community Hospital, Fort Carson, Colorado 9-Jun-09

A-2009-0135-FFM

Training for the Army Managers' Internal Control Program 5-Jun-09

A-2009-0136-FFM

The Army Managers' Internal Control Program for FY 07, U.S. Army Corps of Engineers 18-Jun-09

A-2009-0137-ALATechnology Readiness Assessments 16-Jun-09

Page 415: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0138-ALI

Base Realignment and Closure 2005 Construction Requirements, Addition and Alteration, William Beaumont Army Medical Center, Fort Bliss, Texas 27-Jul-09

A-2009-0139-ALI

Base Realignment and Closure 2005 Construction Requirements, Joint Maintenance Facility and Equipment Concentration Site, Fort Chaffee Maneuver Training Center, Fort Smith, Arkansas 25-Jun-09

A-2009-0140-FFI

Managing "The Edge" of the Network: Enterprise Control Over User Operations on the LandWarNet 17-Jun-09

A-2009-0141-ALA

Intellectual Properties, Office of the Program Manager, Future Combat Systems (Brigade Combat Team) 24-Jun-09

A-2009-0142-FFF

Army Continuing Education System, Office of the Deputy Chief of Staff, G-1 17-Jun-09

A-2009-0143-ALC

Acquisition of Technical Data and Rights for Major Army Systems 6-Jul-09

A-2009-0144-ZBIArmy Foreign Language Program Contracting 23-Jul-09

A-2009-0145-FFISelected Thin Client Computing Implementations 23-Jun-09

A-2009-0146-ALM

Sustaining Left-Behind Equipment, U.S. Army Sustainment Command 22-Jun-09

A-2009-0147-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, El Paso, Texas 27-Jul-09

Page 416: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0148-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center-West Oklahoma City, Oklahoma 25-Jun-09

A-2009-0149-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Norman, Oklahoma 7-Jul-09

A-2009-0150-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Montgomery, Alabama 2-Jul-09

A-2009-0151-FFE

Agreed-Upon Procedures Attestation for Criminal Investigation Command Assist 26-Jun-09

A-2009-0152-FFM

The Army Managers' Internal Control Program for FY 07, U.S. Army Contracting Agency, Aberdeen Proving Ground 25-Jun-09

A-2009-0153-FFM

The Army Managers' Internal Control Program for FY 07, Office of the Provost Marshall General 26-Jun-09

A-2009-0154-ALR

Cash Subsidy Direct Payments for the Transportation Working Capital Fund, Military Surface Deployment and Distribution Command 6-Jul-09

A-2009-0155-ALE

Assessing Future Base Budget Requirements in Europe 7-Jul-09

A-2009-0156-ALM

Field Level Maintenance Operations, U.S. Army Sustainment Command and U.S. Army Garrison, Fort Hood, Texas 9-Jul-09

A-2009-0157-FFM

Independent Assessment of the Army's Compliance With the Federal Managers' Financial Integrity Act 2-Jul-09

Page 417: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0158-FFI

Information Assurance Vulnerability Management (IAVM) Process 9-Jul-09

A-2009-0159-ALM

Assessing Future Base Budget Requirements, Sustaining Program Evaluation Group 27-Jul-09

A-2009-0160-FFM

Agreed-Upon Procedures Attestation of the FY 05 Administrative Fees Collected by the HRsolutions Program Office 8-Jul-09

A-2009-0161-ALI

Base Realignment and Closure 2005 Construction Requirements, Single Drill Sergeant School, Fort Jackson, South Carolina 9-Jul-09

A-2009-0162-ALI

Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Northwest Houston, Texas 7-Jul-09

A-2009-0163-FFM

Examination of Federal Financial Management Improvement Act Compliance - Test Validation, Formerly Used Defense Sites Management Information System 10-Jul-09

A-2009-0164-FFS

Assessing Future Base Budget Requirements, Organizing Program Evaluation Group 1-Sep-09

A-2009-0165-ALL

Followup Audit of Management Controls Over Offline Purchases 16-Jul-09

A-2009-0166-FFS

Followup Audit of the Army's Mobilization Station Process 15-Jul-09

A-2009-0167-ALI

Base Realignment and Closure 2005 Construction Requirements, Physical Fitness Center, Fort Bliss, Texas 11-Aug-09

Page 418: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0168-ALC

Government Purchase Card Convenience Checks, U.S. Army Corps of Engineers, Tulsa District 3-Sep-09

A-2009-0169-ALL

Commander's Emergency Response Program Multi-National Division - North 28-Jul-09

A-2009-0170-ALE

Follow-Up Audit of Use of Role Players at the Joint Multinational Readiness Center, U.S. Army, Europe and Seventh Army 28-Jul-09

A-2009-0171-FFF

Processes to Pay and Recoup Enlistment Bonuses for the U.S. Army Reserves, U.S. Army Reserve Command 30-Sep-09

A-2009-0172-PMO

Quality Assurance Postaudit Review of the Followup Audit of Operational Project PEH (Bridging),(Audit Report: A-2008-0045-FFP) 27-Jul-09

A-2009-0173-ALL

Audit of Controls Over Vendor Payments - Kuwait (Phase I) - U.S. Army Contracting Command, Southwest Asia, Camp Arifjan 29-Jul-09

A-2009-0174-ALCBiometrics Task Force Contract Issues 31-Jul-09

A-2009-0175-FFP

Support for U.S. Army Criminal Investigation Command, Criminal Investigation 0004-2009-CID416-56281 5-Aug-09

A-2009-0176-ALO

Fort McPherson Transportation Office, Fort McPherson, Georgia 14-Aug-09

A-2009-0177-ALO

Military and Family Counseling Services Contract, U.S. Army Family and Morale, Welfare, and Recreation Command 7-Aug-09

Page 419: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0178-FFD

Followup Report of Army Fund Accountability for Hurricane Katrina Relief Efforts, Assistant Secretary of the Army (Financial Management and Comptroller) and U.S. Army Reserve Command 10-Aug-09

A-2009-0179-FFM

The Army Managers' Internal Control Program for FY 07, Mission and Installation Contracting Command Center - Fort Knox 13-Aug-09

A-2009-0180-FFM

Army Managers' Internal Control Program for FY 07, U.S. Army Contracting Agency 18-Aug-09

A-2009-0181-ALR

Property Accountability, 3rd Infantry Division, Rear Detachment, Fort Stewart, Georgia 18-Aug-09

A-2009-0182-ALL

Audit of Commander's Emergency Response Program Multi-National Force - West 18-Aug-09

A-2009-0183-ALL

Applying Agreed-Upon Procedures to Determine if There Was a Potential for Theft of Property and Loss of Funds to the Government Due to the Actions of a Government Property Administrator 14-Aug-09

A-2009-0184-FFP

Real Property Requirements, U.S. Army Garrison, Hawaii 18-Aug-09

A-2009-0185-ZBI

Army Research and Technology Protection Program, Office of the Secretary of the Army 27-Aug-09

A-2009-0186-ALO

Revenues and Expenses for the 2007 Army Birthday Ball 19-Aug-09

A-2009-0187-FFF

Pre-commissioning Training Basic Officer Leader Course I 20-Aug-09

A-2009-0188-FFMAssessing Army's Future Base Budget Requirements 1-Sep-09

Page 420: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0189-ALL

Applying Agreed-Upon Procedures to Review Payment Vouchers 247029 and 288091 for the Purchase of Air-Condition Units and Generators for Forward Operating Base - Falcon in Iraq 21-Aug-09

A-2009-0190-ALR

Time-Sensitive Report, Audit of Implementation of Logistics Bridging Systems 21-Aug-09

A-2009-0191-ZBI

Followup Audit of the Military Intelligence Civilian Excepted Career Program 24-Aug-09

A-2009-0192-FFF

Assessing Future Base Budget Requirements, Training Program Evaluation Group 25-Aug-09

A-2009-0193-ALM

Followup Audit of Procurement of Axle Assemblies, U.S. Army TACOM Life Cycle Management Command 8-Sep-09

A-2009-0194-FFI

The Army's Information Technology Sustainment Program, Chief Information Officer/G-6 1-Sep-09

A-2009-0195-FFI

Funding for Directorate of Information Management Information Assurance Requirements 1-Sep-09

A-2009-0196-ALO

Assessing Future Base Budget Requirements, Installation Program Evaluation Group 27-Aug-09

A-2009-0197-FFF

Attestation Examination of Army Ideas for Excellence Program Idea Number NEAP08023M 26-Aug-09

A-2009-0198-ALI

Base Realignment and Closure 2005 Construction Requirements: Consolidated Family Care and Troop Medical Clinic, Fort Bliss, Texas 16-Sep-09

A-2009-0199-ALM

Requirements for Business Case Analysis for Light Utility Helicopter 1-Sep-09

Page 421: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0200-FFP

Audit of Contract for Program Management Services, U.S. Army Corps of Engineers, Far East District, South Korea 3-Sep-09

A-2009-0201-ZBI

Followup Audit of Property Accountability for Controlled Cryptographic Items, 902d Military Intelligence Group 4-Sep-09

A-2009-0202-FFF

Use of Role-players for Training - Exclusive of Combat Training Centers 28-Aug-09

A-2009-0203-ALR

Property Accountability Problems Identified During Our Audit of U.S. Army Reserve Command's Maintenance Management Systems 1-Sep-09

A-2009-0204-FFI

Followup Audit of Information Technology Contracts with the U.S. General Services Administration--Selected Contract Reviews, Assistant Secretary of the Army (Financial Management and Comptroller) 1-Sep-09

A-2009-0205-ALMDepot-Level Maintenance Workload Reporting--FY 08 16-Sep-09

A-2009-0206-ALR

Followup Audit of Purchase of Modern Burner Units, Office of the Product Manager, Force Sustainment Systems 10-Sep-09

A-2009-0207-ALM

Followup Audit of Specialized Repair Authority 30-Sep-09

A-2009-0208-ALC

Contract Closeout Controls, U.S. Army Corps of Engineers, Baltimore District 15-Sep-09

A-2009-0209-FFE

Followup Audit of Management of the Army's Pollution Prevention Program 15-Sep-09

A-2009-0210-ZBI

Billing Validation Process for Personnel Security Investigations, Office of the Deputy Chief of Staff, G-2 16-Sep-09

Page 422: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0211-FFSReadiness of Modular Units, Army National Guard 11-Sep-09

A-2009-0212-FFSRequirements for Mobilized Soldiers 17-Sep-09

A-2009-0213-FFS

Workload Survey of Operationalizing the Reserve Component 15-Sep-09

A-2009-0214-ALM

Followup Report of Source-of-Repair Analyses, Assistant Secretary of the Army (Acquisition, Logistics and Technology) 30-Sep-09

A-2009-0215-ALC

Contract Closeout Controls, U.S. Army Corps of Engineers, Louisville District 23-Sep-09

A-2009-0216-FFM

Agreed-Upon Procedures Attestation of Project Funding, Yuma Proving Ground 18-Sep-09

A-2009-0217-FFIAudit of Expeditionary Video Teleconferencing 28-Sep-09

A-2009-0218-FFI

Followup Audit of Information Technology Contracts with the U.S. General Services Administration and Proper Use of Non-DOD Contracts, Assistant Secretary of the Army (Acquisition, Logistics and Technology and Assistant Secretary of the Army (Financial Management and Comptroller) 21-Sep-09

A-2009-0219-ALL

Sensitive Items Accountability and Control, Abu Ghraib Warehouse, Iraq 21-Sep-09

A-2009-0220-ALI

Base Realignment and Closure 2005 Construction Requirements, Consolidated Family Care and Troop Medical and Dental Clinic, Fort Carson, Colorado 28-Sep-09

Page 423: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0221-ALA

Effect of Mine Resistant Ambush Protected Vehicle Upon Tactical Vehicle System Requirements, Office of the Deputy Chief of Staff, G-3/6/7 21-Sep-09

A-2009-0222-ALM

Fleet Management of Firefinder Radars, CECOM Life Cycle Management Command 29-Sep-09

A-2009-0223-FFM

Examination of Supporting Documentation for Selected Army Environmental Liabilities 22-Sep-09

A-2009-0224-FFM

Examination of Federal Financial Management Improvement Act Compliance-Requirements, Global Combat Support System-Army Release 1.1 30-Sep-09

A-2009-0225-FFMInternal Controls in Army Regulations 28-Sep-09

A-2009-0226-FFM

Examination of Federal Financial Management Improvement Act Compliance--Test Validation, General Fund Enterprise Business System Release 1.2 30-Sep-09

A-2009-0227-ALI

Base Realignment and Closure 2005 Construction Requirements, U.S. Army Sustainment Center of Excellence, Fort Lee, Virginia 28-Sep-09

A-2009-0228-ALL

Retrograde Operations in Southwest Asia, Management of Automatic Return and Critical Items, Office of the Deputy Chief of Staff, G-4 30-Sep-09

A-2009-0229-ALEJob Order Contracting Processes in Europe 29-Sep-09

A-2009-0230-ALC

Contract Closeout Controls, U.S. Army Corps of Engineers, Mobile District 29-Sep-09

Page 424: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0231-FFM

General Fund Enterprise Business System--Federal Financial Management Improvement Act Compliance, Examination of Release 1.3 Functionality 30-Sep-09

A-2009-0232-FFM

General Fund Enterprise Business System--Federal Financial Management Improvement Act Compliance, Examination of Releases 1.4.1, 1.4.2, 1.4.3, and 1.4.4 Requirements 30-Sep-09

A-2009-0233-ALA

Army Acquisition Objective Process, Office of the Deputy Chief of Staff, G-3/5/7 25-Sep-09

A-2009-0234-ALC

Audit of Management of Ammunition Production Base Modernization 25-Sep-09

A-2009-0235-ALL

Audit of Commander's Emergency Response Program Multi-National Division - South 28-Sep-09

A-2009-0236-FFIData at Rest, U.S. Army Medical Command 29-Sep-09

A-2009-0237-FFDWorkload Survey - Expeditionary Forensics 29-Sep-09

A-2009-0238-FFDWorkload Survey - Biometrics 29-Sep-09

A-2009-0239-FFE

Allocation of Nonproduction Costs to Army Working Capital Fund Tenant Activities, U.S. Army Materiel Command 30-Sep-09

A-2009-0240-ALO

Reinvestment of Remaining $15 Million in Exchanged Proceeds by the Bayonne Local Redevelopment Authority 29-Sep-09

A-2009-0241-FFF

Reimbursements for Senior Reserve Officer Training Corps Cadet Uniforms, U.S. Army Cadet Command 30-Sep-09

A-2009-0242-ALR

Property Book Unit Supply Enhanced, I Corps and Fort Lewis 30-Sep-09

Page 425: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2009-0243-ALC

Ammunition Requirements, Authorizations, and Expenditures, Office of the Deputy Chief of Staff, G-8 30-Sep-09

A-2009-0244-ALL

U.S. Army Corps of Engineers Contract Functions in Iraq, Gulf region Division, Baghdad, Iraq 30-Sep-09

A-2009-0245-ALL

Audit of Logistics Civil Augmentation Program Operations in Support of Operation Iraqi Freedom - Power Generators 30-Sep-09

A-2009-0246-ALA

Followup Audit of Funding and Fielding Training Software and Hardware for Army Battle Command System Components 30-Sep-09

A-2010-0001-ALC

Contract Closeout Controls, U.S. Army Corps of Engineers, Huntington District 10-Nov-09

A-2010-0002-ALO

Bridges on Army Installations, Fort Knox, Kentucky 14-Oct-09

A-2010-0003-ALR

Dormant Stock, Office of the Project Manager, Heavy Brigade Combat Team 5-Nov-09

A-2010-0004-ALMWeapons Systems Sustainment Planning 16-Nov-09

A-2010-0005-ALC

Contract Closeout Controls, U.S. Army Corps of Engineers 10-Nov-09

A-2010-0006-FFM

Basic Allowance for Housing for Reserve Component Soldiers, Examination of Army Estimate for Additional Funding and Back Pay Amounts--FY08 Contingncy 22-Oct-09

A-2010-0007-FFM

Independent Auditor's Report for FY 09 American Red Cross Financial Statements 30-Oct-09

A-2010-0008-ALR

Property Accountability, Mark-19 40-Millimeter Grenade Machine Gun 5-Nov-09

Page 426: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0009-PMO

Quality Assurance Review of Working Paper Archiving Process 30-Oct-09

A-2010-0010-ALL

Housing Management, Area Support Group - Kuwait, Camp Arifjan, Kuwait 15-Jan-10

A-2010-0011-FFM

Basic Allowance for Housing for Reserve Component Soldiers, Examination of Army Estimate for Additional Funding and Back Pay Amounts--FY 08 Special Works Activations 9-Nov-09

A-2010-0012-ALL

Audit of Controls Over Vendor Payments - Southwest Asia (Phase II) 5-Jan-10

A-2010-0013-ALM

Automatic Reset Induction Retrograde and Depot Operations 16-Nov-09

A-2010-0014-ALA

Armed Aerial Reconnaissance Requirement 9-Nov-09

A-2010-0015-PMO

Quality Assurance Postaudit Review of the Audit of Thin Client Computing 9-Nov-09

A-2010-0016-FFF

Recruiting Waiver Program - Active Army and Army Reserve, Office of the Deputy Chief of Staff, G-1 9-Nov-09

A-2010-0017-PMO

Quality Assurance Postaudit Review of the Audit of Reset Metrics--Sustainment Maintenance 9-Nov-09

A-2010-0018-ALL

Audit of Management and Visibility of Government Property Provided to the Contractor Performing Bulk Fuel Operations in Kuwait 17-Dec-09

A-2010-0019-ALM

Time-Sensitive Issue - Nonstandard Equipment Sustainment of Terminated Items 8-Dec-09

A-2010-0020-FFH

Followup Audit of Contracts for Medical Goods and Services, North Atlantic Regional Medical Command 23-Feb-10

Page 427: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0021-ALL

Retrograde Operations in Southwest Asia - Kuwait, Class IX Aviation Warehouse, Camp Arifjan, Kuwait 8-Dec-09

A-2010-0022-ALL

Retrograde Operations Southwest Asia, Multi-Class Retrograde, Camp Arifjan, Kuwait 7-Dec-09

A-2010-0023-FFH

Small Business Contracts, U.S. Army Medical Command, Health Care Acquisition Activity 3-Dec-09

A-2010-0024-ALI

Excess, Vacant, and Not Utilizied Facilities and Land, U.S. QArmy Reserve 5-Jan-10

A-2010-0025-FFM

Basic Allowance for Housing for Reserve Component Soldiers, Examination of Army Estimate for Additional Funding and Back Pay Amounts--FY 07 Activations 7-Dec-09

A-2010-0026-ALC

Award Fee for Task Order 139--Logistics Civil Augmentation Program (LOGCAP) III Contract, U.S. Army Contracting Command 7-Jan-10

A-2010-0027-ALO

Bridges on Army Installations, Fort Drum, New York 11-Dec-09

A-2010-0028-FFM

Budgeting for the Military Personnel, Army Appropriation 6-Jan-10

A-2010-0029-ALM

Followup Report on the National Maintenance Program Certification Process, U.S. Army Materiel Command 15-Dec-09

A-2010-0030-ALL

Audit of Contracting Operations, Joint Contracting Command - Iraq/Afghanistan, Baghdad Regional Contracting Center and Theater-Wide Requirements Division, International Zone, Baghdad, Iraq 14-Dec-09

Page 428: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0031-ALL

Audit of Contracting Operations, Joint Contracting Command - Iraq/Afghanistan, Regional Contracting Center - Victory, Camp Victory, Iraq 16-Feb-10

A-2010-0032-ALRLogistics Domain Governance Process 7-Jan-10

A-2010-0033-FFEAccident Investigations and Reporting 22-Dec-09

A-2010-0034-ALO

Bridges on Army Installations, Fort Carson, Colorado 17-Dec-09

A-2010-0035-ALE

Staffing Requirements for the Army Substance Abuse Program in Europe, U.S. Army Installation Management Command, Europe Region 17-Dec-09

A-2010-0036-FFM

Basic Allowance for Housing for Reserve Component Soldiers, Examination of Army Estimate for Additional Funding and Back Pay Amounts--FY 06 Activations 21-Dec-09

A-2010-0037-FFDAudit of Antiterrorism Training 4-Jan-10

A-2010-0038-ALI

Followup Audit of Base Realignment and Closure 2005 Construction Requirements, Armed Forces Reserve Center, Fort Sill, Oklahoma 7-Jan-10

A-2010-0039-ZBI

Management of Classified Communications Security Materials, 902d Military Intelligence Group, Fort Meade, Maryland 1-Feb-10

A-2010-0040-ALM

Time Sensitive Issue--Javelin Command Launch Unit (CLU), Operational Readiness Float 14-Jan-10

A-2010-0041-ALR

Followup Audit of Property Accountability in the Army National Guard, Oregon Army National Guard 29-Jan-10

A-2010-0042-FFI

Cellular Telephone Management, U.S. Army Forces Command 14-Jan-10

Page 429: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0043-FFD

Audit of Defense Coordinating Officer Training and Oversight 2-Feb-10

A-2010-0044-ALL

Forward Operating Base Closures, Multi-National Force - Iraq 26-Jan-10

A-2010-0045-FFF

Followup Report of Management of Initial Entry Training Soldiers 20-Jan-10

A-2010-0046-FFI

Army Networthiness Certification Program, Chief Information Officer/G-6 2-Feb-10

A-2010-0047-FFP

Organizational Clothing and Individual Equipment, Eighth U.S. Army (Field Army) and Installation Management Command-Korea 22-Jan-10

A-2010-0048-FFFImprovised Explosive Device Defeat Unit Training 8-Feb-10

A-2010-0049-ALA

Use of Training Aids, Devices, Simulators, and Simulations by the Reserve Component, Fort Eustis, Virginia 2-Feb-10

A-2010-0050-ALE

Staffing Requirements for Army Continuing Education System in Europe, U.S. Army Installation Management Command, Europe Region 18-Feb-10

A-2010-0051-ALR

Army National Guard Property Accountability Summary Report for Fiscal Year 2007 and 2008 Audits 3-Mar-10

A-2010-0052-FFD

Physical Security of Privatized Base Operations Infrastructure, Offices of the Provost Marshall General and the Assistant Chief of Staff for Installation Management 25-Feb-10

A-2010-0053-ALE

Maintenance Float Program in Europe, U.S. Army, Europe and Seventh Army 17-Feb-10

Page 430: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0054-ALL

Agreed-Upon Procedures Attestation to Determine the Total Amount of Requisitions Under DODAACW91JKW Processed by Soldiers From the 18th Fires Brigade, Fort Bragg, North Carolina While Deployed to Iraq 24-Feb-10

A-2010-0055-ZBIProgram Management of Special Access Programs 19-Feb-10

A-2010-0056-FFM

Management Control Review of Mobile Payments Pilot Concept of Operations 25-Feb-10

A-2010-0057-ALL

Audit of Controls Over Vendor Payments - Southwest Asia (Phase II) 24-Feb-10

A-2010-0058-FFICopier Management, Fort Sam Houston, Texas 26-Apr-10

A-2010-0059-ALODOD Support to the 2009 Presidential Inaugural 1-Mar-10

A-2010-0060-ALA

Pricing and Funding Security Assistance to Iraq and Afghanistan, U.S. Army Security Assistance Command 3-Mar-10

A-2010-0061-FFM

Followup Audit of Army Contract Pricing Process for Commercial Travel Office Fees 4-Mar-10

A-2010-0062-ALL

Audit of Controls Over Vendor Payments - Southwest Asia (Phase II) 16-Mar-10

A-2010-0063-FFP

Agreed-Upon Procedures Attestation of Army Emergency Relief, U.S. Army Garrison Humphreys 12-Mar-10

A-2010-0064-FFS

The Army's CONUS Support Base Services Contract 11-Mar-10

A-2010-0065-FFM

Agreed-Upon Procedures Attestation of Statement of Budgetary Resources--Summary of Completed and Open Audits 16-Mar-10

A-2010-0066-ALRProperty Accountability, III Corps 30-Mar-10

A-2010-0067-ALOBridges on Army Installations 24-Mar-10

Page 431: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0068-ALO

Followup Auditof Garrison Utilities and Energy Services 19-Mar-10

A-2010-0069-ALEAntiterrorism Training in Europe 19-Mar-10

A-2010-0070-FFH

Child Development and Youth Center Space Requirements, Office of the Assistant Chief of Staff for Installation Management 16-Mar-10

A-2010-0071-FFP

Followup Audit of Controls Over Leave, Overtime, and Compensatory Time by Army Commands in Hawaii 6-May-10

A-2010-0072-ALO

American Recovery and Reinvestment Act of 2009, Fort Benning, Georgia 18-Mar-10

A-2010-0073-ALO

American Recovery and Reinvestment Act of 2009, Fort Bragg, North Caroina 5-Apr-10

A-2010-0074-ALA

Army's Development of Capabilities Documents, U.S. Army Training and Doctrine Command, Fort Monroe, Virginia 22-Mar-10

A-2010-0075-ALL

Audit of Defense Base Act Insurance, Audit of Contracting Operations, U.S. Army Contracting Command Southwest Asia - Kuwait 23-Mar-10

A-2010-0076-FFP

Agreed-Upon Procedures Attestation of Selected DA Personnel Assigned to U.S. Forces Korea, J-2 22-Mar-10

A-2010-0077-ALC

Agreed-Upon Procedure Attestation of the Joint Contracting Command - Iraq/Afghanistan Contract Closeout Task Force 25-Mar-10

A-2010-0078-ALE

Contracting Support Processes for Task Force - East, U.S. Army, Europe and Seventh Army 29-Mar-10

A-2010-0079-ALMMaintenance Float Program - U.S. Army National Guard 14-Apr-10

A-2010-0080-ALO

American Recovery and Reinvestment Act of 2009, South Carolina National Guard 31-Mar-10

Page 432: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0081-ZBI

Contract Closeout, Office of the Chief Information Officer/G-6 30-Mar-10

A-2010-0082-ALL

Audit of Multi-National Security Transition Command - Iraq Security Forces Fund 12-Apr-10

A-2010-0083-FFH

Pharmaceutical Operations, U.S. Army Medical Command 30-Mar-10

A-2010-0084-ALE

Army Strategy for Establishing, Sustaining, and Transitioning Non-Traditional Installations 20-May-10

A-2010-0085-ZBI

Infrastructure Requirements for Special Operations Forces, U.S. Army Special Operations Command 6-Apr-10

A-2010-0086-ALE

Implementation of Standard Garrison Organization in Europe, U.S. Army Installation Management Command, Europe Region 15-Apr-10

A-2010-0087-ALL

Followup Audit of Sensitive Items Accountability and Control, Abu Ghraib Warehouse, Iraq 12-Apr-10

A-2010-0088-ALL

Agreed-Upon Procedures Attestation to Evaluate Bulk Fuel Requests for Forward Operating Base Shank, Afghanistan 14-Apr-10

A-2010-0089-ALR

Dormant Stock, U.S. Army TACOM Life Cycle Management Command 20-Apr-10

A-2010-0090-FFD

Vulnerability Assessments and Risk Mitigation at Off-Installation Facilities, U.S. Army Reserve Command 28-Apr-10

A-2010-0091-FFI

Copier Management, Administrative Assistant to the Secretary of the Army 26-Apr-10

A-2010-0092-ALR

American Recovery and Reinvestment Act of 2009, Idaho Army National Guard 29-Apr-10

Page 433: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0093-ALR

Army Reserve Maintenance Management Systems, U.S. Army Reserve Command and 63D Regional Support Command 20-May-10

A-2010-0094-ALA

Foreign Military Sales Process for Iraq and Afghanistan, U.S. Army Security Assistance Command 3-May-10

A-2010-0095-FFF

Controls Over Basic Allowance for Subsistence and Dining Facility Charges 5-May-10

A-2010-0096-ALL

Controls Over Vendor Payments - Southwest Asia (Phase II - U.S. Army Contingency Operations, Southwest Asia, Kuwait, Qatar, Iraq, and Afghanistan) 7-May-10

A-2010-0097-ALL

Commander's Emergency Response Program, Multi-National Force - Iraq, Summary Report 4-May-10

A-2010-0098-ALL

Retrograde Operations in Southwest Asia, Donation and Transfer of Excess Materiel and Supplies, Office of the Deputy Chief of Staff, G-4 7-May-10

A-2010-0099-ALC

Workload Survey--U.S. Army Contracting Operations 7-May-10

A-2010-0100-FFP

Management of Military Construction Projects, Hawaii 20-May-10

A-2010-0101-FFFOfficer Career Incentive Program 28-May-10

A-2010-0102-ALR

American Recovery and Reinvestment Act of 2009, Joint Base Lewis-McChord 20-May-10

A-2010-0103-ALR

Army Reserve Maintenance Management Systems, U.S. Army Reserve Command and 88th Regional Support Command 20-May-10

Page 434: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0104-FFFArmy Waiver Program - Army National Guard 7-Jun-10

A-2010-0105-ALR

Implementation of the Logistics Domain Bridging Systems Initiatives, Office of the Deputy Chief of Staff, G-4 10-Jun-10

A-2010-0106-ZBI

Audit of Workload Requirements in U.S. Army Special Operations Command's Office of the Deputy Chief of Staff, G-3 3-Jun-10

A-2010-0107-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced System, Project Manager Stryker Brigade Combat Team 2-Jun-10

A-2010-0108-FFE

Time-Sensitive Report Potential Antideficiency Act Violation, Expenditure of Funds Without a Bona Fide Need, Audit of Army Conservation Reimbursable Programs 8-Jun-10

A-2010-0109-FFI

Attestation Examination of the Cost Benefit Analysis for the Enterprise Content Management System 3-Jun-10

A-2010-0110-FFS

Followup Audit of the Strategic Management System Contract 21-Jun-10

A-2010-0111-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced System, Project Manager, Electronic Warfare 10-Jun-10

A-2010-0112-ALA

Managing Modeling and Simulation Capabilities, Office of the Program Executive Officer, Integration 7-Jun-10

A-2010-0113-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced System, Project Manager, Joint Lightweight Howitzer 22-Jun-10

Page 435: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0114-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced System, Project Manager, Mine Resistant Ambush Protected 10-Jun-10

A-2010-0115-FFI

Synchronizing Installation Information Technology Requirements, Office of the Chief Information Officer/G-6 28-Jun-10

A-2010-0116-ALR

American Recovery and Reinvestment Act of 2009, Connecticut Army National Guard 17-Jun-10

A-2010-0117-ALC

Time Sensitive Issue - Defense Acquisition Workforce Development Fund 22-Jun-10

A-2010-0118-FFF

Followup Audit of the Use of Role-Players for Training at Combat Training Centers 21-Jun-10

A-2010-0119-ALLAudit of U.S. Equipment Transfer to Iraq

A-2010-0120-ALO

American Recovery and Reinvestment Act of 2009, Fort Stewart and Hunter Army Airfield, Georgia 23-Jun-10

A-2010-0121-ALO

Real Property Sustainment, Restoration, and Modernization 25-Jun-10

A-2010-0122-FFH

FY 08 Funding Execution for Army Family Programs, Office of the ACSIM

A-2010-0123-FFE

American Recovery and Reinvestment Act of 2009, Pine Bluff Arsenal, Arkansas 24-Jun-10

A-2010-0124-FFM

Review of Port Congestion and Security Surcharges on Personal Property Shipments 2-Jul-10

A-2010-0125-FFM

Review of the Army's Compliance With the Federal Managers' Financial Integrity Act 9-Jul-10

A-2010-0126-ALL

Audit of Controls Over Vendor Payments - Southwest Asia (Phase II) 8-Jul-10

Page 436: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0127-FFE

American Recovery and Reinvestment Act of 2009, Aberdeen Proving Ground, Maryland 1-Jul-10

A-2010-0128-FFI

Resources for the Global Network Enterprise Construct 14-Jul-10

A-2010-0129-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced System, Project Manager, Cruise Missile Defense System 7-Jul-10

A-2010-0130-FFI

Cellular Telephone Management, U.S. Army Installation Management Command 20-Jul-10

A-2010-0131-FFM

Agreed-Upon Procedures Attestation of Audit Readiness of Source Documentation to Support Federally Owned Real Property Assets of the Kentucky Army National Guard 12-Jul-10

A-2010-0132-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced System, Project Manager, Utility Helicopter 8-Jul-10

A-2010-0133-FFE

Time Sensitive Report--Accountability of Contractor-Acquired Property, Audit of Planning for Disposal of Chemical Demilitarization and Storage Facilities 13-Jul-10

A-2010-0134-FFE

Funding Requirements for the Conventional Ammunition Demilitarization Program 16-Jul-10

A-2010-0135-ALL

Audit of Contracting Operations, Joint Contracting Command - Iraq/Afghanistan, Kandahar Regional Contracting Center, Afghanistan 12-Jul-10

Page 437: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0136-ALR

U.S. Army Reserve Command's Maintenance Management System, U.S. Army Reserve 99th Regional Support Command 12-Jul-10

A-2010-0137-FFE

Time Sensitive Report - Accountability and Disposal of Relocatable Buildings, Facilities, and Excess Equipment, Audit of Planning for Disposal of Chemical Demilitarization and Storage Facilities 14-Jul-10

A-2010-0138-FFPDining facility Operations -- Korea 26-Jul-10

A-2010-0139-ALE

Installation Pass Procedures in Europe, U.S. Army Installation Management Command, Europe Region 26-Jul-10

A-2010-0140-ALO

American Recovery and Reinvestment Act of 2009, Dwight D. Eisenhower Army Medical Center, Fort Gordon, Georgia 21-Jul-10

A-2010-0141-ZBI

Foreign Language Program -Training and Proficiency, Offices of the Deputy Chief of Staff, G-2 and the Deputy Chief of Staff, G-1 22-Jul-10

A-2010-0142-ZBI

Management of Communications Security Materials, 66th Military Intelligence Brigade 22-Jul-10

A-2010-0143-FFMFollowup Audit of FY 05 Subsistence Charges 29-Jul-10

A-2010-0144-ALR

Followup Audit of Property Accountability, Oklahoma Army National Guard 28-Jul-10

A-2010-0145-ALCArmy Contracting Performance Metrics 28-Jul-10

A-2010-0146-ALR

Followup Audit of Inventory Accountability and Stockage Levels, Tobyhanna Army Depot 27-Aug-10

A-2010-0147-ALMArmy Management of Non-Army Managed Items 2-Aug-10

A-2010-0148-ALR

Aviation Maintenance Operations, U.S. Army Reserve Command 29-Jul-10

Page 438: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0149-FFS

Table of Distribution and Allowances Workforce - Institutional Training 4-Aug-10

A-2010-0150-ALA

Intelligence, Surveillance, Reconnaissance Aerial Sensor Capabilities 9-Aug-10

A-2010-0151-ALAFollowup Audit of Army Aviation Capabilities 18-Aug-10

A-2010-0152-ALL

Pilot Program for Defense Base Act Insurance, Headquarters, U.S. Army Corps of Engineers

A-2010-0153-ALL

Access Control Program, Area Support Group - Kuwait

A-2010-0154-ZBIManagement of Funds - Site A 3-Aug-10

A-2010-0155-ALI

Excess, Vacant, and Not Utilized Facilities and Land, Army National Guard 5-Aug-10

A-2010-0156-ALC

Compliance With Section 807 of the 2008 National Defense Authorization Act 24-Aug-10

A-2010-0157-FFPReadiness of Modular Units, U.S. Army Reserve 6-Aug-10

A-2010-0158-FFEWater Conservation Resources 18-Aug-10

A-2010-0159-ALE

Process to Acquire Information Technology in Europe 9-Aug-10

A-2010-0160-ALMSustainment of Nonstandard Equipment

A-2010-0161-ALEAudit of Contract Operations in Europe 11-Aug-10

A-2010-0162-FFIData at Rest, Fort Carson, Colorado 11-Aug-10

A-2010-0163-FFEArmy Compatible Use Buffer Program 12-Aug-10

A-2010-0164-FFM

Gains and Deficiencies on Exchange Transactions Account 18-Aug-10

A-2010-0165-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced system, Project Manager, Heavy Brigade Combat Team

A-2010-0166-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced System; PM, Aviation Systems

Page 439: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

A-2010-0167-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced System; PM, Close Combat Weapon Systems

A-2010-0168-ALR

Project Managers' Use of the Property Book Unit Supply Enhanced System; PM, Unmanned Aircraft Systems

A-2010-0169-ALL

Followup Audit of Forward Operating Base Closures, United States Forces - Iraq 19-Aug-10

A-2010-0170-ALA

Response to Inspector General Action Request DIG-09-90158 24-Aug-10

A-2010-0171-ALL

Disposal of Army Equipment and Material Into Defense Reutilization and Marketing Office Sites in Iraq 24-Aug-10

A-2010-0172-FFM

Audit of the Request for Validation of Army Material Weakness Closure--Financial Reporting of Equipment in Transit

A-2010-0173-ALMMainteance Expenditure limits

A-2010-0174-FFI Network Enterprise Staffing

A-2010-0175-FFSAttestation of FY 08 Lean Six Sigma Benefits

A-2010-0176-ALC

Audit of Contracting Activities in Iraq During and After Force Drawdown

A-2010-0177-FFM

Internal Controls Over Personal Property Shipments - Army

A-2010-0178-FFE

Army Conservation Reimbursable Programs, Office of the Assistant Chief of Staff for Installation Management

A-2010-0179-ZBI Suppoert Audit Request

A-2010-0180-ALA

Management and use of Ground Combat System Training Aids, Devices, Simulators, and Simulations

Page 440: List of all US Army Audit Agency Audit Reports, 1997-2010A-1998-0023-FAB Space Utilization 30-Oct-97 A-1998-0024-LAE Eliminating Hazardous Material in Weapon Systems 30-Oct-97 A-1998-0025-AFH

Army Use of and Controls Over the DoD AviationInto-Plane Reimbursement Card (D-2007-132)(6LD-0177) 28-Sep-07Best Practices: DOD Can Achieve Better Outcomes by Standardizing the Way Manufacturing Risks Are Managed 12-Mar-10DEPOT MAINTENANCE: Improved Strategic Planning Needed to Ensure That Army and Marine Corps Depots Can Meet Future Maintenance Requirements 22-Sep-09Department of State Contract to Study the Iraq Reconstruction Management System 26-Jan-10Terminated SIGIR 8038