8 LOS ANGELES BUSINESS JOURNAL SEPTEMBER 23, 2019
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
1Los Angeles Stadium EntertainmentDistrict at Hollywood Park898 S. Prairie Ave.Inglewood 90301
$5,000.0 football stadium for the Los Angeles Rams andLos Angeles Chargers; 6,000-seat performing artsvenue; 300 hotel rooms; retail and office space
November 2016Summer 202013,068,000
Kroenke Sports & Entertainment/Hollywood Park Land Co.HKS Inc.
Turner Construction/AECOM(213) 891-3000/(213) 593-8000
2Lucas Museum of Narrative Art inExposition ParkExposition ParkLos Angeles 90007
1,200.01 four-story exhibition space for George Lucas March 20182021300,000
George LucasMAD Architects
Hathaway DinwiddieConstruction Co.(213) 236-0500
3Jordan Downs Redevelopment9901 S. Alameda St.Los Angeles 90002
1,000.02 new mixed-use development that will include1,400 residential units, a 50,000-square-footcommunity center and 115,000 square feet ofretail space
June 20172022415,000
Housing Authority of the City of LosAngelesSVA Architects
Cannon Constructors Inc.(818) 906-6200
4The Grand100 S. Grand Ave.Los Angeles 90012
950.02 39-story apartment tower with 436 units: 323luxury apartments and 113 ultra premiumapartments, connected hotel tower on a three-acre site
February 20192022NA
SBE Entertainment Group/DakotaDevelopmentFrank Gehry
AECOM(213) 593-8000
5Century Plaza Development2025 Avenue of the StarsCentury City 90067
900.0 Century Plaza Hotel renovation; two new 46-storytowers with 363 condominiums
December 2016December 20211,937,712
Next Century PartnersGensler/Harley Ellis Deveraux/MarmolRadziner & Associates
Webcor Construction(213) 239-2800
6Oceanwide Plaza11th Street and Figueroa StreetLos Angeles 90015
814.0 mixed-use project comprised of high-riseresidential towers, hotel, retail, LED signage,parking
March 201520202,600,000
Oceanwide Holdings Co. Ltd.CallisonRTKL
Lendlease(213) 430-4660
7Providence Tarzana Medical CenterReimagined Project18321 Clark St.Tarzana 91356
542.01 redevelopment of medical center, including newpatient care wing and emergency department
Summer 20182022256,000
Providence Health & ServicesPerkins + Will
McCarthy Building Cos.(949) 851-8383
8Vista CanyonSouthwest intersection of Sand CanyonRoad and State Route 14Santa Clarita 91310
500.02 mixed-use development including 1,100 single-family and multifamily homes, commercial/officespace, hotel, water reclamation plant, parkinggarage, Metrolink station
December 2017Late 2022250,000
JSB DevelopmentJohnson Fain/Gensler
JPI/TDI and KB Home JV(858) 369-5670/(310) 231-4000
The Groves in Whittier11850 Whittier Blvd.Whittier 90601
500.02 redevelopment of the 74-acre Fred C. Nelles YouthAuthority site including 561 homes and 189apartments, commercial, office and retail space
April 2018Spring 2020400,000
Brookfield Residential Inc./Lennar Corp.SMS Architects
Brookfield Residential(310) 822-0074
10Academy on Vine1341 Vine St.Los Angeles 90028
450.01 20-story apartment building with 200 units;commercial buildings
June 2018Spring 2020545,000
Kilroy RealtyHouse and Robertson/Shimoda DesignGroup
Hathaway DinwiddieConstruction Co./WebcorConstruction(213) 694-3630/(213) 239-2800
11Metropolis Phase 2B ResidentialTower 31000 W. 8th StreetLos Angeles 90017
408.0 56-story mixed-use residential tower comprisedof 685 condominiums, parking structure, retailspace
July 2015November 2019845,000
Greenland USAHarley Ellis Devereaux
Pankow/Penta Builders GroupJV(626) 304-1190/(213) 784-0040
12960 W. 7th StreetNALos Angeles 90017
390.0 mixed-use project with 785 apartment units, retailspace, rooftop deck and podium-level pool deck
June 2019June 20221,364,436
Maguire Properties - 775 South FigueroaLARGE Architecture
Webcor Builders(213) 239-2800
13Woodland Hills Medical Center5601 De Soto Ave.Woodland Hills 91364
342.0 multiple projects addressing operational,infrastructure and annual improvements
January 2015February 2021841,000
Kaiser PermanenteHMC Architects
McCarthy Building Cos. Inc.(949) 851-8383
14UCLA Warren Residence Hall900 Weyburn PlaceLos Angeles 90024
303.02 construction of three mid-rise buildings with2,279 beds
July 2019August 2022NA
UCLAMithun Partners Inc.
PCL Construction Services Inc.(818) 246-3481
15Perla on Broadway359 S. BroadwayLos Angeles 90013
300.02 35-story luxury condo tower with 450 units April 2018Fall 2020457,000
Shanghai Construction GroupCallisonRTKL
Swinerton Inc.(213) 568-6666
Cal Poly Pomona New StudentHousingKellogg Drive and Eucalyptus LanePomona 91768
300.02 1,645-bed student housing complex with a diningfacility
September 20172020300,000
Cal Poly PomonaHMC Architects/Ehrlich Architects
Sundt Construction Inc.(949) 468-5309
17Hollywood Presbyterian MedicalCenter Acute Care Replacement1300 N. Vermont Ave.Los Angeles 90027
291.02 51-bed replacement acute care services building April 2018Fall 2020174,954
Hollywood Presbyterian Medical CenterKMD Architects
Skanska USA Building Inc.(213) 694-3630
1 Business Journal estimate.2 Information from BuildCentral Inc.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractors,architects and BuildCentral Inc. Projects must be under construction as of August 2019. To the best of our knowledge,this information is accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the
list, omissions and typographical errors sometimes occur. Please send corrections or additions on company letterheadto the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025.©2019 Los Angeles Business Journal. This list may not be reprinted in whole or in part without prior written permissionfrom the editor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Ranked by construction cost; excludes infrastructure projectsGENERAL CONSTRUCTION PROJECTS NEXT WEEK
Chambers of CommerceTHE LIST
Rosendin fosters a culture of shared ownership as the largest employee-owned company in our industry. Because your success is our success.
CA Contractors License #142881
008-14_construction_infra_lists.indd 8 9/19/19 1:14 PM
SEPTEMBER 23, 2019 THE LIST LOS ANGELES BUSINESS JOURNAL 9
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
18Vermont Corridor LA County DMHHeadquarters510-532 S. Vermont Ave.Los Angeles 90020
$270.01 21-story building including 1,900-car parkinggarage and ground floor retail space
October 2018Late 2021468,000
Los Angeles CountyY&M Architects/Steinberg Architects
Hathaway DinwiddieConstruction Co.(213) 236-0500
19Ferrante1000 W. Temple St.Los Angeles 90012
255.01 seven-story building with 1,437 apartments,commercial space and parking for 2,606 cars and1,680 bicycles
February 2019Winter 20201,286,091
G.H. Palmer AssociatesNelson/Boivin Architecture and Planning
G.H. Palmer Associates(310) 207-3100
20Cumulus Apartment Tower3323 S. La Cienega Blvd.Los Angeles 90048
242.01 seven-story 910-unit luxury apartment tower withretail space
Fall 2018Late 2019NA
Carmel PartnersTCA Architects
Carmel Partners(424) 291-8604
21Pendry West Hollywood Hotel &Residences8430 Sunset Blvd.West Hollywood 90069
240.0 two mid-rise buildings totaling 149 hotel roomsand 40 condominiums
May 20172020467,000
Combined Properties/AECOM CapitalCuningham Group
AECOM(213) 593-8100
Ivy Station8824 National Blvd.Culver City 90232
240.0 mixed-use complex featuring 148-room hotel,office space and 200 apartments
June 2017April 2020500,000
Lowe EnterprisesEhrlich Yanai Rhee Chaney Architects
Bernards(818) 898-1521
23Academy Museum of Motion Pictures6067 Wilshire Blvd.Los Angeles 90670
221.0 1,000-seat Geffen Theater and renovation ofhistoric May Co. building
April 20172020290,000
Academy of Motion Picture Arts andSciencesRenzo Piano Building Workshop/Gensler
Matt Construction(562) 903-2277
24Dignity Health Hospital MedicalCenter Emergency Department &Women's Services Building1401 S. Grand Ave.Los Angeles 90015
215.01 four-story 345-bed tower addition andrenovations to the California Hospital MedicalCenter
January 2019Late 2020150,460
CommonSpirit HealthDevenney Group/Stantec Inc.
Swinerton Inc.(213) 896-3400
25Landmark II11750 Wilshire Blvd.Los Angeles 90670
203.0 34-story building totaling 376 apartments March 2018April 2021415,000
Douglas Emmett Inc.Gensler
Matt Construction(562) 903-2277
26NoHo West6150 Laurel Canyon Blvd.North Hollywood 91606
200.02 mixed-use complex with 742 apartments April 2017Spring 2020570,000
Merlone Geier Partners/GPI Cos.STIR Architecture
W.E. O'Neil Construction Co.(310) 643-7900
Caltech Chen Neuroscience ResearchBuildingDel Mar Boulevard and Wilson AvenuePasadena 91106
200.01 three-story neuroscience research and classroombuilding with 15 research labs
January 2018October 2020155,000
CaltechSmithGroup
Hensel Phelps ConstructionCo.(949) 852-0111
28Hollywood Presbyterian MedicalCenter1300 N. Vermont Ave.Los Angeles 90027
188.32 acute care services replacement hospital building September 20172020174,954
Hollywood Presbyterian Medical CenterKMD Architects
Skanska USA Inc.(213) 694-3630
29UCLA Lot 15 Residence HallWest of De Neve Drive and south of theHitch SuitesLos Angeles 90024
181.01 residence hall featuring two mid-rise buildingshousing up to 1,800 undergraduate beds
July 2019Fall 2021353,000
UCLAMithun Partners Inc.
PCL Construction Services Inc.(818) 246-3481
30Manhattan Village Expansion3200 Sepulveda Ave.Manhattan Beach 90266
180.01 Phase I construction of two parking decks,additional stores and restaurants; Phase IIdemolishing an adjacent movie theater and retailstores; Phase III two-story parking garage, retailand restaurant space
June 20182020200,000
RREEF Real EstateCallisonRTKL
W.E. O'Neil Construction Co.(310) 643-7900
31Cal State Los Angeles StudentHousing East5151 State University DriveLos Angeles 90032
165.3 new student housing facility June 2018August 2021380,000
Cal State Los AngelesHarley Ellis Devereaux
McCarthy Building Cos. Inc.(949) 851-8383
32Cumulus Apartment Tower3311-3321 La CienegaLos Angeles 90016
157.01 30-story apartment tower with 300 units and retailand restaurant space
May 20182020NA
Carmel PartnersTCA Architects
Carmel Partners(424) 291-8604
33Four Seasons Private Residences atLos Angeles9000 W. 3rd St.Los Angeles 90048
155.0 59 luxury condominiums June 2017Winter 2019372,000
Genton Property GroupCallisonRTKL
Webcor Construction(213) 239-2800
34Rise Koreatown750 S. Oxford Ave.Los Angeles 90005
153.71 seven-story mixed-use development will include367 residential units above commercial space
Fall 20192020NA
Rescore Property Corp./Cal CoastDevelopmentNadel Architects Inc.
Bernards(818) 898-1521
1 Information from BuildCentral Inc.2 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractors,architects and BuildCentral Inc. Projects must be under construction as of August 2019. To the best of our knowledge,this information is accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the
list, omissions and typographical errors sometimes occur. Please send corrections or additions on company letterheadto the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025.©2019 Los Angeles Business Journal. This list may not be reprinted in whole or in part without prior written permissionfrom the editor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
GENERAL CONSTRUCTION PROJECTS
Continued on page 10
008-14_construction_infra_lists.indd 9 9/19/19 1:14 PM
10 LOS ANGELES BUSINESS JOURNAL THE LIST SEPTEMBER 23, 2019
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
35Linea2441 S. Sepulveda Blvd.Los Angeles 90064
$150.01 mixed-use apartment building with 595 units April 20172020430,000
Carmel PartnersVTBS Architects/Bennitt Design
Carmel Partners(424) 291-8604
36Goodman Logistics Center El Monte4300 Shirley Ave.El Monte 91731
131.02 two-building distribution center Late 20182019NA
Goodman BirtcherHill Pinckert Architects
Oltmans Construction Co.(562) 948-4242
37VA Long Beach Mental HealthInpatient and Outpatient Clinics5901 E. 7th St.Long Beach 90822
130.02 Mental Health Inpatient building and new MentalHealth Outpatient clinic
February 20192020NA
U.S. Department of Veterans AffairsHOK Architects Inc.
Walsh Group(312) 563-5400
38Catherine Santa Monica1601 LincolnSanta Monica 90404
124.0 four-story mixed-use rental building with 282units
January 2018March 2021300,000
Century West PartnersMichael Folonis Architects and KilleferFlammang Architects
Milender White Construction(949) 724-9531
39Kaiser Permanente Downey MedicalCenter Tower Expansion9333 Imperial HighwayDowney 90242
118.52 six-story 96-bed tower expansion July 2018December 2020NA
Kaiser PermanenteHMC Architects
Hensel Phelps ConstructionCo.(949) 852-0111
40Residences at Wilshire Curson620 S. Curson Ave.Los Angeles 90036
110.01 20-story apartment complex with 285 units August 2018Late 2020NA
J.H. Snyder Co.MVE+Partners
J.H. Snyder Co.(323) 857-5546
Rise Hollywood1311 N. Cahuenga Blvd.Los Angeles 90028
110.02 seven-story apartment complex with 360 units April 2017Late 2019240,000
Cal-Coast Development and RescoreNadel Architects
Bernards(818) 898-1521
42Cal State Long Beach Parkside NorthHousingEarl Warren Drive and Atherton StreetLong Beach 90840
104.02 210-unit dormitory with 476 beds September 20192021NA
Cal State Long BeachGensler
McCarthy Building Co. Inc.(949) 851-8383
1 Business Journal estimate.2 Information from BuildCentral Inc.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractors,architects and BuildCentral Inc. Projects must be under construction as of August 2019. To the best of our knowledge,this information is accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the
list, omissions and typographical errors sometimes occur. Please send corrections or additions on company letterheadto the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025.©2019 Los Angeles Business Journal. This list may not be reprinted in whole or in part without prior written permissionfrom the editor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
BUILD BETTERBUILD SAFERBUILD w
ith
Build Better with LIUNA and its contractors, who have created industry-specific agreements and provided valuable support to projects before elected officials, regulators, and public forums.
Build Safer with LIUNA and its contractors, who committed more than 590,000 hours of training to 37,722 craftspeople and graduated 1,368 apprentices in 2018.
Build with LIUNA and its contractors, who have raised industry standards, promoted quality, and most importantly, protected the bottom line.
Jon P. PreciadoSouthern California
District Council(626) 350-6900
www.SCDCL.org
SAFE | ON-TIME | UNDER BUDGET
Sergio RasconLIUNA Local 300
- Los Angeles -(213) 385-3550
www.Local300.com
Peter SantillanLIUNA Local 1309
- Long Beach -(562) 421-9346
www.Local1309.com
Laborers’InternationalUnion ofNorth America
GENERAL CONSTRUCTION PROJECTS Continued from page 9
Continued on page 12
008-14_construction_infra_lists.indd 10 9/19/19 1:14 PM
12 LOS ANGELES BUSINESS JOURNAL THE LIST SEPTEMBER 23, 2019
GENERAL CONSTRUCTION PROJECTS Continued from page 10
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
43G8 Apartments13448 W. Beach Ave.Los Angeles 90292
$100.01 seven-story mixed-use building with 230apartments and commercial office space
October 2017Late 2020NA
California Landmark DevelopmentRios Clementi Hale Studios
Hy-Max Building Corp.(818) 330-9342
1133 S. Hope St.1133 S. Hope St.Los Angeles 90015
100.0 mixed-use building March 2017July 2019330,215
Full Star PropertiesChris Dikeakos Architects
Lendlease(213) 430-4660
45Cal State Los Angeles - PhysicalSciences Building 12 Seismic Retrofitand Renovation5151 State University DriveLos Angeles 90032
99.0 eight-story high-rise tower with two levels ofbasement, lecture halls, classrooms, offices,laboratories, lab support spaces and storage
June 2017Fall 2021218,000
Cal State Los AngelesZGF Architects
Rudolph and Sletten Inc.(213) 430-2330
46Sherman Oaks Center for EnrichedStudies Modernization Project18605 Erwin St.Tarzana 91335
88.02 school renovation Fall 20182020NA
Sherman Oaks Center for Enriched StudiesNA
Sinanian Development Inc.(818) 996-9666
47Water's Edge III5533 EA WayPlaya Del Ray 90094
78.7 four-story office building April 20182020407,276
Wedge OfficeSPF:architect
McCarthy Building Cos. Inc.(949) 851-8383
48Archer School for Girls CampusPreservation and Improvement Plan11725 W. Sunset Blvd.Los Angeles 90670
74.0 multipurpose facility, performing arts center,visual arts center and aquatics center
May 2017April 202073,500
Archer School For Girls Inc.Parallax Associates Inc.
Matt Construction(562) 903-2277
49Center for Early Education563 N. Alfred St.West Hollywood 90670
66.0 childhood and elementary education building May 2016December 201985,000
Center for Early EducationJohnson Favaro
Matt Construction(562) 903-2277
50Los Angeles LGBT Center’s Anita MayRosenstein Campus6725 Santa Monica Blvd.Los Angeles 90028
60.02 new campus including 224 units for seniors,homeless youth and young people
March 2017Mid 2020NA
Los Angeles LGBT CenterLeong Leong/Killefer Flamman
Swinerton Inc.(213) 896-3400
1 Information from BuildCentral Inc.2 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractors,architects and BuildCentral Inc. Projects must be under construction as of August 2019. To the best of our knowledge,this information is accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the
list, omissions and typographical errors sometimes occur. Please send corrections or additions on company letterheadto the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025.©2019 Los Angeles Business Journal. This list may not be reprinted in whole or in part without prior written permissionfrom the editor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated
completion date
Planners• owner
• architect
General Contractor• name
• phone
1LAX - Delta Sky Way ProjectLos Angeles International AirportLos Angeles 90045
$1,900.01 upgrade and connect Terminals 2, 3, andthe Tom Bradley International Terminal
September20182023
Delta Air Lines Inc.Gensler/Arup
Hensel Phelps Construction Co.(949) 852-0111
2LAX - American Airlines Remodeling ProjectLos Angeles International AirportLos Angeles 90045
1,600.0 renovation of all of Terminal 4 and part ofTerminal 5
October 20182023
American Airlines Inc.Gensler/Pierce Goodwin Alexander& Linville Inc./AvAirPros Inc.
Hensel Phelps Construction Co.(949) 852-0111
3Purple Line Extension Section 15055 S. Wilshire Blvd., Suite 700Los Angeles 90036
1,582.0 3.9-mile subway extension to Beverly Hills,from three new stations at Wilshire/La Brea,Wilshire/Fairfax and Wilshire/La Cienega
January 2015June 2023
Los Angeles County MetropolitanTransportation AuthorityParson Transportation Group Inc.
Skanska/Traylor/Shea JV(323) 852-4220
4Port of Long Beach Middle HarborPort of Long BeachLong Beach 90802
1,493.0 upgrade terminals and rehabilitate MiddleHarbor Piers D, E and F
Spring 20112020
City of Long BeachMoffatt and Nichol Inc.
Manson Construction Co./Connolly-Pacific Co. JV(562) 437-2831/(562) 437-2831
5Purple Line Extension Section 2Wilshire/Rodeo to Century City/ConstellationLos Angeles
1,370.0 2.6 miles of additional tracks to Metro’s railsystem and two new stations at Wilshire/Rodeo and Century City/Constellation
February 20182025
Los Angeles County MetropolitanTransportation AuthoritySTV Inc.
Tutor Perini Corp./O&G Industries Inc.JV(818) 362-8391/(860) 489-9261
6Alamitos Energy Center690 N. Studebaker RoadLong Beach 90802
1,300.0 natural gas power plant and 100-megawattbattery energy storage system
July 20172019
AES Alamitos Energy / AES Corp.AES Southland
Kiewit Corp.(310) 846-2400
LAX Midfield Satellite Concourse NorthLos Angeles International AirportLos Angeles 90045
1,300.0 multilevel concourse holding 11 new gates,tunnels, parking aprons, service roads,taxiways
January 2015December2019
Los Angeles World AirportsCorgan Associates/Gensler
Turner Construction Co./PCLConstruction Services Inc. JV(213) 891-3000/(818) 246-3481
1 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners and generalcontractors. Projects must be under construction as of September 2019. To the best of our knowledge, this informationis accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the list, omissions
and typographical errors sometimes occur. Please send corrections or additions on company letterhead to the ResearchDepartment, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025. ©2019 LosAngeles Business Journal. This list may not be reprinted in whole or in part without prior written permission from theeditor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Ranked by construction costINFRASTRUCTURE CONSTRUCTION PROJECTS
Continued on page 14
THE LIST
008-14_construction_infra_lists.indd 12 9/19/19 1:15 PM