Liquid Waste Organization John E. Owen Washington Savannah River Company NSNFP / HLW Strategy Meeting Washington, DC April 14 – 15, 2009 LWO-WSE-2009-00084

description

Liquid Waste Organization . John E. Owen Washington Savannah River Company NSNFP / HLW Strategy Meeting Washington, DC April 14 – 15, 2009 LWO-WSE-2009-00084 . Salt Supernate. Saltcake. Sludge. Interim Waste Disposition Projects (Salt Processing). Savannah River Site Liquid Waste. - PowerPoint PPT Presentation

Transcript of Liquid Waste Organization

Page 1: Liquid Waste Organization

Liquid Waste Organization

John E. OwenWashington Savannah River Company

NSNFP / HLW Strategy MeetingWashington, DC

April 14 – 15, 2009

LWO-WSE-2009-00084

Page 2: Liquid Waste Organization

22

Interim Waste Disposition

Projects(Salt Processing)

Savannah River Site Liquid Waste

Proposed Saltstone Feed Facility

Saltstone

Vaults (Grout)

Salt Supernate

Saltcake

Sludge

H Canyon (Waste Influent)

Defense Waste Processing

Facility

Glass Waste Storage Building

(Vitrified Canisters)

DWPF Recycle

Future Salt Waste Processing Facility

Tank 48 Recovery

Evaporator Operations

Tank Farms

FFA Closure

Sludge Processing

Space Management

Page 3: Liquid Waste Organization

3

SRS Composite InventorySalt Supernate

Saltcake

Sludge

Volume

37.7 MillionGallons (Mgal)

Curies

196 MCi(52%)

184 MCi(48%)

380 MillionCuries (MCi)

183 MCi(48%)

Sludge

34.4 Mgal(91%)

3.3 Mgal(9%)

18.1 Mgal(46%)

Inventory values as of 2008-12-31

Salt Supernate

12 MCi(3%)Saltcake16.3 Mgal

(45%)

Page 4: Liquid Waste Organization

44

MST Strike Tank

PRFT

ARP (HTF: 96-H)

ARP (DWPF: 512-S)

MCU (HTF: 278-H)

WTL (DWPF: 221-S)

InterimSalt Processing

Vault

Saltstone

VITRIFICATION

MST Strike Tank

TK 49 PrecipTank

Crossflow Filter

Filtrate HoldTank

ReceiptTank

FeedTank

ReceiptTank

Solvent Hold Tank

Contactors

DSSDecanter

DSS Hold TankTK 50SS

Receipt Tank

Strip EffluentHold Tank

SSMixing Tank

Strip EffluentDecanter

SEFTSRAT

Page 5: Liquid Waste Organization

5

Saltstone Processing

• Processed 3.7M gallons of salt solution total• Processed 1.4M gallons since start of current

campaign in March 2007• Processing Rate – 120K gallons / wk• Vault 2 Under Construction

Page 6: Liquid Waste Organization

6

Salt Waste Processing Facility

• 98M Gallons Salt Solution to be processed• Full Construction Authorization (CD-3)• Transition to Radioactive Operation - May 2013

Page 7: Liquid Waste Organization

7

Salt Disposition Integration Project

• Prepare initial macrobatch feed for SWPF• Ready to feed SWPF by a rate of:

– 3.75M gallons / yr – first year – 6M gallons / yr – normal rate

• Ready to process 220K gal/wk from SWPF to Saltstone• Ready to process Strip Effluent and MST Sludge Solids

from SWPF to DWPF

Page 8: Liquid Waste Organization

8

HLW Processing Overview

• 2696 Canisters Produced (thru March 31)• 2.82 M Gallons transferred from HTF • 97 Canisters – FY 09 (thru March 31)• Processing Sludge Batch 5 thru May 2010• Melter 2 – Operational Since March 2003• Melter 3 – Ready as Spare• Melter 4 - Vessel and Frame contract awarded

• K3 Refractory – Manufacturing In progress• Components – Under construction • Assembly completion date – November 2013

Page 9: Liquid Waste Organization

9

Issues and Challenges

• Tank Closure• Canister Fissile Loading – Processing limitations

– 897 g/m3 – Sludge Batch 5 limited to 33 wt % waste loading

• Construction and Startup of SWPF• Total Canister Production• Availability of Federal Repository