![Page 1: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/1.jpg)
Link Union Station (LINK US)
Jeanet Owens, PESenior Executive Officer
Program Management / Regional Rail
Presentation for LAUS Master Commercial Developer Industry Forum October 13th 2017
![Page 2: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/2.jpg)
Project Overview
1. A new expanded passenger concourse with passenger amenities, retail and potential mixed use development
2. Reconfiguration of the “throat” (station entry tracks), elevation of the rail yard, new run-through tracks and new loop track
3. Accommodation of California HSR and Metro’s West Santa Ana Branch LRT
4. New environmental process (DEIS/DEIR)
![Page 3: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/3.jpg)
Project Need - Why Do We Need Link US?
1. LA Union Station (LAUS) is approaching operational capacity2. Ridership to grow from 110,000 to 200,000 daily passenger trips by
20403. Current “stub-end” (dead end) tracks limit efficiency and station capacity4. Critical transportation needs due to increase in forecasted ridership
![Page 4: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/4.jpg)
Project Benefits – What Will Link US Provide?
![Page 5: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/5.jpg)
Board Approved – Alternative 2: 6 RR + 2 HSR Integrated Design, HSR & WSAB Phased Accommodation
ALTERNATIVE 2 OVERVIEW6 Regional Rail Run-Through Tracks2 HSR Run-Through Tracks(Integrated Design and Phased Construction)7 Platforms (1 Gold Line, 1 WSAB Line, 1 HSR, 4 Regional Rail)
Other Alternatives with 6+4 and 6+0 are being studied in the CEQA and NEPA environmental processes.
![Page 6: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/6.jpg)
New Expanded Passenger Concourse
At Grade Passenger Concourse Concept
![Page 7: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/7.jpg)
World Class Transit Station
At Grade Passenger Concourse Concept
![Page 8: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/8.jpg)
New Expanded Passenger Concourse
Way FindingRestroomEscalatorElevator
Sample Images
![Page 9: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/9.jpg)
New Expanded Passenger Concourse
Waiting AreaBaggage Handing
Security
Sample Images
![Page 10: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/10.jpg)
Link US- Potential Development
At Grade Passenger Concourse Concept
View from Alameda Street
![Page 11: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/11.jpg)
Link US- Potential Development
At Grade Passenger Concourse ConceptView from West Plaza
![Page 12: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/12.jpg)
Link US- Potential Development
At Grade Passenger Concourse ConceptView from West Plaza
![Page 13: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/13.jpg)
New Expanded Passenger Concourse
Metro Life at Union StationSample Images
![Page 14: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/14.jpg)
New Expanded Passenger Concourse
Retail Districts
Circulation Diagram
At Grade Passenger Concourse Concept
![Page 15: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/15.jpg)
New Expanded Passenger Concourse
At Grade Passenger Concourse Concept
Passenger Waiting/Arrival Areas Sample Images
![Page 16: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/16.jpg)
New Expanded Passenger Concourse
At Grade Passenger Concourse Concept
Chef ’s Corner Sample Images
![Page 17: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/17.jpg)
New Expanded Passenger Concourse
At Grade Passenger Concourse Concept
Grab-n-Go Sample Images
![Page 18: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/18.jpg)
Link US- Potential Development
At Grade Passenger Concourse Concept
View from Patsaouras Bus Plaza
![Page 19: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/19.jpg)
New Expanded Passenger Concourse
Above Grade Passenger Concourse Concept
![Page 20: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/20.jpg)
New Expanded Passenger Concourse
Above Grade Passenger Concourse Concept
![Page 21: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/21.jpg)
New Expanded Passenger Concourse
Above Grade Passenger Concourse Concept
![Page 22: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/22.jpg)
Commercial Street Corridor
![Page 23: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/23.jpg)
Commercial Street CorridorPotential Urban Design Opportunities
![Page 24: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/24.jpg)
Commercial Street CorridorPotential Active Transportation Opportunities
![Page 25: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/25.jpg)
Commercial Street CorridorPotential Urban Design Opportunities
Sample Images
![Page 26: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/26.jpg)
Commercial Street CorridorPotential Urban Design Opportunities
Sample Images
![Page 27: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/27.jpg)
Planned Circulation & Active Transportation
Sample Images
![Page 28: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/28.jpg)
Potential River Access
Sample Images
![Page 29: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/29.jpg)
Project Phasing
![Page 30: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/30.jpg)
Project Schedule
Public Involvement
Stage I
Notice of Intent/ Notice of
Preparation Comment Period
and Scoping Meeting
Summer 2016
Stage II
Alternatives Analysis
Summer 2016 to Winter 2017
Stage III
Draft EIR Comment Period
Spring 2018
Draft EIS Comment Period
Summer 2018
Stage IV
Final EIRWinter 2018
Final EIS and Record of Decision
Spring 2019
We Are Here
Tentative – Subject to Change
![Page 31: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/31.jpg)
Project Cost and Funding Sources
Preliminary Estimate Project Cost range from $1.7 to $2.5 Billion1. Refining alternatives that reduce project costs including
Integrated Design or Phased Construction and Above or Below Grade New Expanded Passenger Concourse.
2. Estimated Project Cost does not include potential mixed use development on the east portal and west plaza.
Status of Funding1. Environmental and Preliminary Engineering – Funded 2. Design and Construction – Actively Pursuing Funding
![Page 32: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional](https://reader034.fdocuments.us/reader034/viewer/2022050508/5f9961549cf7684dfd361156/html5/thumbnails/32.jpg)