LINEMAN AND FIELD EMPLOYEE TRAINING

39
LINEMAN AND FIELD EMPLOYEE TRAINING CHRISTY DRAY Bundled Safety Training Distribution Services Training Calendar Field Leader Development Training Apprentice Training Programs

Transcript of LINEMAN AND FIELD EMPLOYEE TRAINING

Page 1: LINEMAN AND FIELD EMPLOYEE TRAINING

LINEMAN AND FIELD EMPLOYEE TRAININGCHRISTY DRAY

• Bundled Safety Training

•Distribution Services Training Calendar

• Field Leader Development Training

•Apprentice Training Programs

Page 2: LINEMAN AND FIELD EMPLOYEE TRAINING

Bundled Safety Training

Page 3: LINEMAN AND FIELD EMPLOYEE TRAINING
Page 4: LINEMAN AND FIELD EMPLOYEE TRAINING

• Leadership Certificate Portfolio

– Leadership Behavior Models

– Leadership Development Series

– Online Leadership Series

– External Opportunities

Field Leader Development TrainingPast Initiatives

Page 5: LINEMAN AND FIELD EMPLOYEE TRAINING
Page 6: LINEMAN AND FIELD EMPLOYEE TRAINING

• Field Leadership Development Program (Phase I)

– Needs Assessment

– NWPPA Foreman Leadership Training

– DDI Materials

– Customized Approach

Past Initiatives (con’t.)

Page 7: LINEMAN AND FIELD EMPLOYEE TRAINING

• Defining Our Business Unit

• Foreman Safety Interviews

• Motivational Speaker

• Field Leader Committee

• Field Leader Development Trng.- Phase II

Current Initiatives

Page 8: LINEMAN AND FIELD EMPLOYEE TRAINING

Apprentice Training Programs48 Month Apprenticeship

• Line

• Substation Electrician

• Elec-Tech (Advanced App.)

• Meter Technician

54 Month Apprenticeship

• Network Cable Splicer/ Elec.

Page 9: LINEMAN AND FIELD EMPLOYEE TRAINING

LIVE LINE WORK OVERVIEW & STRATEGYTOM MULLALLY

• Apprenticeship Training Program

• Hot Stick Training- Step 3 of Apprenticeship

• Rubber Glove Training- Step 5 of Apprenticeship

Page 10: LINEMAN AND FIELD EMPLOYEE TRAINING

Cutting in Deadends in # 6 Copper, Energized

Page 11: LINEMAN AND FIELD EMPLOYEE TRAINING

Lay Out for Cutting in Deadends

Page 12: LINEMAN AND FIELD EMPLOYEE TRAINING

Rigging Laid Out in the Air

Page 13: LINEMAN AND FIELD EMPLOYEE TRAINING

Mechanical Jumper installed and pulling Slack in the Conductor

Page 14: LINEMAN AND FIELD EMPLOYEE TRAINING

Securing and Cutting the Conductor

Page 15: LINEMAN AND FIELD EMPLOYEE TRAINING

Inserting the #6 Copper

into the automatic Deadend

Page 16: LINEMAN AND FIELD EMPLOYEE TRAINING

Remove Old Insulator and Install New with Jumper Tied In

Page 17: LINEMAN AND FIELD EMPLOYEE TRAINING

Installing New Permanent Jumper

Page 18: LINEMAN AND FIELD EMPLOYEE TRAINING

Removing Mechanical Jumper

Page 19: LINEMAN AND FIELD EMPLOYEE TRAINING

Permanent Jumper Installed -Job Completed

Page 20: LINEMAN AND FIELD EMPLOYEE TRAINING

Rubber Glove TrainingSectionalizers

SMUD Distribution Services

2007

Page 21: LINEMAN AND FIELD EMPLOYEE TRAINING

Sectionalizers

Project 1

Using all of the required tools and materials, with minimal assistance from the instructor,

install sectionalizers for the purpose of sectionalizing or fusing line conductors.

Page 22: LINEMAN AND FIELD EMPLOYEE TRAINING

Prerequisites

Minimum Fifth Step Hot Apprentice

Page 23: LINEMAN AND FIELD EMPLOYEE TRAINING

Prerequisites (con’t.)

Rubber goods have current test date stamped

Page 24: LINEMAN AND FIELD EMPLOYEE TRAINING

Prerequisites (con’t.)

Aerial lift and bucket liner have current inspection date sticker

Page 25: LINEMAN AND FIELD EMPLOYEE TRAINING

Tailboard

• Hazards

• Methods

• Roles

• Tools and Materials

• Worksite Protection

Page 26: LINEMAN AND FIELD EMPLOYEE TRAINING

Lay out all equipment and tools as you plan to use them

Sectionalizers

Line Hoses

Blankets

Strap Hoist

Page 27: LINEMAN AND FIELD EMPLOYEE TRAINING

Inspect, Air/ Water Test Rubber Gloves

Page 28: LINEMAN AND FIELD EMPLOYEE TRAINING

Clean all protective rubber gear, hot lines and rigging

Page 29: LINEMAN AND FIELD EMPLOYEE TRAINING

Apply powder as needed to help ease the application of rubber goods

Page 30: LINEMAN AND FIELD EMPLOYEE TRAINING

Clean aerial lift

Set up truck and barricade

Page 31: LINEMAN AND FIELD EMPLOYEE TRAINING

Check upper and lower controls

Page 32: LINEMAN AND FIELD EMPLOYEE TRAINING

Identify, cover or isolate any possible first and second point of contact

Common Neutral

Page 33: LINEMAN AND FIELD EMPLOYEE TRAINING

View of all three phases covered and starting work

Page 34: LINEMAN AND FIELD EMPLOYEE TRAINING

Install Sectionalizer

Minimum Exposure

Page 35: LINEMAN AND FIELD EMPLOYEE TRAINING

Attach Strap Hoist and GripHoist is now energized

Page 36: LINEMAN AND FIELD EMPLOYEE TRAINING

Tension Sectionalizer

Page 37: LINEMAN AND FIELD EMPLOYEE TRAINING

Tighten Dead End Shoe

Handle Away from BodyElbows Close to Body

Page 38: LINEMAN AND FIELD EMPLOYEE TRAINING

Remove Strap Hoist and Wire Grip

Page 39: LINEMAN AND FIELD EMPLOYEE TRAINING

Cover Sectionalizer with Blankets