LINE PIPE PRODUCT CATALOGUE - · PDF fileLINE PIPE PRODUCT CATALOGUE. Borusan Group at a...
Transcript of LINE PIPE PRODUCT CATALOGUE - · PDF fileLINE PIPE PRODUCT CATALOGUE. Borusan Group at a...
LINE PIPE PRODUCT CATALOGUE
Borusan Group at a Glance
Borusan Mannesmann in Brief
Borusan Mannesmann Line Pipe Production Facilities
Production Flow
Production Range
Production Standards
Quality System Certificates
Protective OD & ID Coating Systems
Pipe Joint Systems
Integrated Logistics Experiences
References
1
3
5
7
9
11
12
13
15
17
25
Contents
1
Borusan Group at a Glance
Steel
The PipeGroup
The Flat SteelGroup
Borusan Mannesmann
Borusan StainlessSteel Pipe
Borusan Engineering
Borusan ‹stikbal Trading
Borçelik
Kerim Çelik
Distributorship
The Earth MovingEquipments Group
The AutomotiveGroup
Borusan Makina veGüç Sistemleri
Borusan Otomotiv &Borusan Oto
Supsan Engine Valves
Manheim Turkey
Partners
Distributed Brands
Logistics
Borusan Logistics
Borusan International
2
In 4 major business areaswith 5.000 employees...
Energy
Borusan EnBW Energy
Borusan Mannesmann in Brief
Flagship of Borusan Group with 54 years of pipe manufacturing experience.
Operates with 5 plants, 3 in Turkey (1 HSAW, 2 ERW), 1 in Italy (ERW),1 in USA (ERW)
Total annual capacity of 1 mn tons.
Workforce of 1.250 people.
20 years of Contract Management competency
Has its own port (Borusan Port) which brings operational flexibilityin terms of logistics inbound and outbound.
Together with Borusan Group's integrated logistic company Borusan Logistics;provides logistic services for every international pipeline project.
Sole 24.5 m single seam API/ISO/EN large diameter line pipe producer in Europe
Corporate Structure:Borusan Group and one of Europe's leading steel and technology companies;Salzgitter Mannesmann GMBH, merged their welded steel pipe investmentsin Turkey and named that partnership; “Borusan Mannesmann Boru YatırımHolding” in 1998. The company has 73% shares of Borusan MannesmannBoru San. ve Tic. A.Ş.
3
U.S
CANADA
UNITED STATES
73%
16%
11%
77% 23%
Borusan MannesmannInvestment Company
Free Float
Others
4
“Our mission is to provide products and services thatenhance the quality of life with our expertise in steelpipe industry and to promote the process of economicand social progress of our community...”
Location of Borusan Mannesmann Plants
Halkalı PlantGemlik ERW Pipe PlantGemlik HSAW Pipe PlantVobarno Plant
TURKEY
Workforce of 1.250committed people...
ISRAEL
DENMARK
NETH.
BELGIUM
CYPRUS
LEB.
PORTUGAL
SERBIA
SWITZ.
IRELAND
UNITEDKINGDOM
ITALY BULGARI
AZERBAIJAN
GEORGIA
TUNISIA
SLOVAKIA
CZECHREP.
AUSTRIA
GREECE
ALB.
BOS.&HERZ
SLOVENIACROATIA
EST.
LAT.
LITH.
REIGNONISLAND
QUEEN ELIZABETHISLANDS
ICELAND
FINLAND
SWEDEN
POLAND
GAMBIA
SENEGAL
SICILY
FRENCHGUIANA
ROMANIAFRANCE
SPAIN
ALGERIA
EGYPT
TANZANIA
ANGOLA
SOUTHAFRICA
QATAR
GABON
CAMEROON
SAUDIARABIA
YEMEN
OMAN
IRAQ
UZBEKISTAN
KAZAKHSTAN
JORDAN
GERMANY
NORWAY
UKRAINE
HUNGARY
PAKISTAN
U.A.E
CHAD
NIGERIA
BOTSWANA
CONGO
LIBYA
Current Export Countries of Borusan Mannesmann
Houston Plant
5
Borusan Mannesmann Line Pipe Production Facilities
Gemlik HSAW Pipe PlantProcess Helically Two Step SAWOD 20” - 64”Wall Thickness Up to 25.4 mmLength 24.5 mGrade including X80Coating PE, PP, FBE, FCE, SFE
Dual Layer FBE (ARO)
Gemlik ERW Pipe PlantProcess HFI - ERWOD 1/2” - 13 3/8”Wall Thickness Up to 12,7 mmLength 18.3 mGrade including X70Coating PE, PP, FCE, SFE
HSAWPipe Plant
ERWPipe Plant
Cold RollingPlant
Borusan Port
Gemlik Conventional Spiral Pipe PlantProcess ConventionalOD 28” - 120”Wall Thickness Up to 25.4 mmLength 18.3 mGrade including X80
6
Over 10,000 KmLarge Diameter Oil/Gas Line Pipe
Over 15,000 KmERW/HFI
Oil/Gas Line
7
Production Flow
Beveling ofPipe Ends
Hydrostatic Test
X-Ray Inspection
Offline UltrasonicInspection Final Inspection
and Marking Stockpiling
Inside Welding
Cutting to Length
Ultrasonic Test
Outside Welding
Spiral Forming
Edge Preparing
UncoilingCoil Identityand Analysis
Conventional Helical Submerged Arc Welded Pipe
Beveling ofPipe Ends
Hydrostatic Test
Final Inspectionand Marking
Cutting to Length
Ultrasonic Test
Welding
Forming
Edge Preparing
Uncoiling
Coil Identityand Analysis
Ultrasonic Test
Cooling
Annealing
Sizing and Straightening
Beat Cutting(inner/outer)
Pre-forming
Electric Resistance Welded Pipe
Stockpiling
Uncoiling 100% Strip Lamination ControlStraightening
Inside Cleaning - 2 Off - line Ultrasonic - 1 Manuel Ultrasonic andMagnetic Particle Inspection
Grinding & Beveling of Pipe Ends
Hydrostatic TestingOff - line Ultrasonic - 2Digital Filmless
RadiographySampling and
Destructive TestingFinal Inspection of Surfaces
and Pipe Geometry
Weighing and Final Marking
SAW Station
Stockpiling
4.500
BORUSAN MANNESMANNAPI 5L PSL2 X80
Edge Preparing Crimping
Forming & Tack WeldingTack WeldingVisual Control
Inside Cleaning-1Pipe Length Cutting &
Pipe Identification Tab Plate Installation
8
Two Step Helical Submerged Arc Welded Pipe
Quality Steps
Production Flow
Production Steps
9
Production Range - HSAW Line Pipes
Wal
l Thi
ckne
ss (m
m &
inch
)O
D
mm
mm
inch
508
559
610
660
711.
276
281
2.8
863.
691
496
5.2
1016
1067
1118
1168
1219
1270
1321
1372
1422
1524
1626
1676
1727
1829
2032
2083
2235
2540
2794
3048
20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 60 64 66 68 72 80 82 88 100
110
120
4.78
0.18
84.
370.
172
3.
960.
156
3.
180.
125
5.
160.
203
5.
560.
219
6.
350.
250
7.
140.
281
7.
920.
312
8.
740.
344
9.
520.
375
10.3
10.
406
11.1
30.
438
11.9
10.
469
12.7
00.
500
13.4
90.
531
14.2
70.
562
15.0
00.
591
16.6
60.
656
17.4
80.
688
18.2
60.
719
19.0
50.
750
20.6
20.
812
22.2
30.
875
23.8
30.
938
25.4
01
up to
18,
3 m
eter
up to
24,
5 m
eter
Min
. len
gth
8 m
eter
s
10
Production Range - ERW Line Pipes
21.3
26.9
33.7
42.4
48.3
60.3
73 88.9
114.
3
141.
3
168.
3
219.
1
273
323.
9
339.
7
mm
mm
inch
OD
1.28
1.66
2.13
2.73
3.14
3.97
4.85
1.32
1.72
2.20
2.82
3.25
4.10
5.01
6.15
7.97
1.50
1.97
2.54
3.27
3.76
4.77
5.84
7.17
9.30
11.5
6
1.56
2.05
2.65
3.41
3.93
4.98
6.10
7.49
9.72
12.0
9
1.60
2.11
2.72
3.51
4.05
5.14
6.29
7.73
10.0
4
12.4
9
14.9
4
19.5
5
1.61
2.12
2.74
3.53
4.07
5.16
6.32
7.77
10.0
9
12.5
5
15.0
2
19.6
5
1.67
2.21
2.87
3.70
4.27
5.42
6.65
8.17
10.6
2
13.2
1
15.8
1
20.7
0
25.8
8
2.49
3.24
4.21
4.86
6.19
7.60
9.37
12.1
8
15.1
8
18.1
8
23.8
1
29.8
0
35.4
4
3.60
4.69
5.43
6.94
8.54
10.5
4
13.7
3
17.1
3
20.5
3
26.9
1
33.6
9
40.0
9
42.0
8
4.77
5.53
7.07
8.69
10.7
3
13.9
9
17.4
5
20.9
1
27.4
3
34.3
4
40.8
7
42.8
9
9.91
12.2
7
16.0
2
20.0
2
24.0
1
31.5
3
39.5
1
47.0
4
49.3
7
17.5
3
21.9
2
26.3
2
34.5
9
43.3
6
51.6
4
54.2
1
18.5
2
23.1
8
27.8
4
36.6
1
45.9
2
54.7
0
57.4
3
18.7
7
23.5
0
28.2
2
37.1
2
46.5
6
55.4
7
58.2
3
21.2
1
26.6
1
32.0
0
42.1
5
52.9
1
63.0
8
66.2
3
21.9
4
27.5
3
33.1
2
43.6
5
54.8
1
65.3
5
68.6
3
22.4
2
28.1
4
33.8
7
44.6
4
56.0
7
66.8
7
70.2
2
24.0
8
30.2
7
36.4
6
48.1
2
60.4
8
72.1
5
75.7
7
30.8
8
37.2
0
49.1
0
61.7
3
73.6
5
77.3
5
35.3
5
42.6
7
56.4
5
71.0
7
84.8
8
89.1
6
46.2
5
61.2
9
77.2
4
92.3
0
96.9
7
Wal
l Th
ickn
ess
(mm
& in
ch)
5.2
2.8
3.4
3.68
3.7
3.9
4.5
2.9
3.56
5.1
66.
67
7.1
8.4
8.1
8.6
9.3
9.5
1211
12.7
0.10
90.
133
0.14
50.
147
0.15
40.
179
0.20
00.
203
0.23
70.
258
0.27
70.
331
0.28
00.
318
0.33
70.
365
0.37
50.
432
0.47
20.
113
0.14
00.
492
48.0
3
63.6
8
80.3
0
95.9
9
102.
41
X 52
X 60
X 65
X 70
We
can
mee
t all
X 42
req
uire
men
ts in
our
pro
duct
ion
rang
e.
1/2
3/4
1 1 1
/4
1 1
/2
2 3
/8
2 7
/8
3 1
/2
4 1
/2
5 9
/16
6 5
/8
8 5
/8
10 3
/4
12 3
/4
13 3
/8
11
Petroleum and Gas Line PipesAPI 5L/ISO 3183 : Requirements of PSL 1 & PSL 2 (HSAW & ERW)
Annex G : Resistance to ductile fracture propagationAnnex H : For Sour Service
EN 10208 : Requirements of Part 1 & Part 2 (HSAW & ERW)GOST 20295 : Requirements of Type 1, 2 and 3 (HSAW)
Water Line PipesWith protective OD and/or ID coating, plain (beveled) or sleeve welded joints.EN 10217-1 : HSAW & ERWEN 10224 : HSAW & ERWAWWA C 200 : HSAW & ERWBS 534 : HSAW & ERW
General Purpose PipesEN 10217-3 : HSAW - Alloy, fine grain Service condition: max 400°C, min -50°CEN 10217-5 : HSAW - Alloy or non-alloy,
Service condition: max 400°C,EN 10217-6 : HSAW - Non-alloy,
Service condition: - 40°CASTM A139 : HSAW
Piling & Construction PipesASTM A 252 : HSAWEN 10219 : HSAW & ERWEN 10210 : HSAW & ERW
Pipe Lengths: any desired lengths between 8 - 24,5 m
These are our general production standards and specifications.We can meet other production standards and specifications upon request.
Production Standards
12
Quality System Certificates
ISO 9001ISO 14001ISO 10002ISO 29001ISO 31000EN ISO/IEC 17025OHSAS 18001
PED 97/23 ECB-MARKNSF CertifiedFM CertifiedUL/CUL ListedCE CertifiedDNV Certified
DVGW 7101-2DIN 30670EN 10208-2EN 10217-1EN ISO 3834-2
API 5LAPI 5CTAPI QRAPI Q1AD 2000HP0AD 2000 W0ÜHPUNE
13
Protective OD & ID Coating Systems
Maximum Operating Temperature of Coating
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
HDPE
FBE DRY CONDITION
FBE WET CONDITION
PP NORMAL
PP SPECIAL
MDPE
LDPE
Temperature (0C)
Borusan Mannesmann offers wide range of anti-corrosive and protective OD & ID coatings in itsfully integrated coating facilities. The below table illustrates the type of coatings applied externally andinternally according to standards and special customer requirements.
Type of Coating
Dual-Layer FBE (ARO)
FBE
Epoxy (liquid)
Polyethylene (PE)
Polypropylene (PP)
Cement Mortar
Gas & Oil Line Pipe
General Application AreaOD ID
Water Line Pipe
Other OD&ID coating processes can also be designed for each specific application i.e. PU, coal tar,glass flake reinforced epoxy etc. which all above processes are within Borusan Mannesmann’sbroad experience.
DUAL-LAYER FBE
14
General Application Standards
Dual Layer Abrasion Resistant FBE OD Coating: Dual layer fusion bonded epoxy provides aperfect abrasion and impact resistance, also maintains an excellent protection for oil - gas linepipes.(API 5L7, CSA Z 245-20, NACE RP 0394, AWWA C213)
FBE (Fusion Bonded Epoxy) OD Coating: Fusion bonded powder epoxy coating provides highprotection of oil and gas pipe lines.(API 5L7, CSA Z 245-20, NACE RP 0394, AWWA C213)
Polyethylene OD Coating: Excellent protection of buried line pipes. High mechanical strength andcorrosion resistance are achieved by 3-layer coating method.(DIN 30670, TS 5139, NF A 49-710, UNI 9099, EN ISO 21809-1)
Polypropylene OD Coating: Excellent protection of buried line pipes. High mechanical strengthand corrosion resistance are achieved by 3-layer coating method.(DIN 30678, NF A 49-711, EN ISO 21809-1)
Flow Efficiency ID Coating: For gas transmission lines, flow-coat ID epoxy coating is applied inorder to reduce pipe wall roughness thus increasing throughput.(API RP 5L2)
Solvent Free Epoxy ID Coating: Various epoxy coatings applied internally are enabling hygienicinner surface for potable water transportation.(AWWA C 210)
Cement Mortar ID Coating: Specifically for potable water pipe lines cement mortar ID coatingprovides hygienic and excellent corrosion resistance and protection. On demand regular cementmortar ID coating or synthetic dispersion added special cement mortar ID coating can be applied.(AWWA C 205, DIN 2614, BS 534, TS 8590)
Pipe Joint Systems
Spherical endButt WeldJoint Preparation
30˚ (+5˚/-0˚)
1,6 mm ± 0,8mm
Cylindrical end ZAP-LOK®
*Double Joint Operation
* For high pressure gas & oil pipelines up to 12”* For water pipelines
* For all types of applications* For water pipelines
Other types of joints may be available upon request.
15
Rubber Ring
PE
Cement
a
a
l
Just in timeon-site deliveryJust in timeon-site delivery
16
Integrated Logistics Experiences
The care devoted to proper storage and shipment of products is part of Borusan Mannesmann’scommitment to customer satisfaction.
Borusan Mannesmann plants are located on the eastern coast of Marmara Sea in the vicinity ofmany piers that are expert in pipe loading equipped with mobile cranes, forklifts and other machinerynecessary for international shipment.
Borusan Mannesmann, together with Group’s integrated logistic company Borusan Logistics, isable to deliver with high versatility for every international project from Saharan desert to Rockymountains.
We deliver• By railway• By barge transportation• By IACS class vessels (sous-palan unloading)• By truck and trailers• Even by containers
In many of our projects we have been in charge of custom clearance, sous-palan operations,leasing and management of stockyards, on-site delivery; providing complete integrated logisticssolutions to meet even the most stringent client delivery terms.
17
Project:In SalahGas Southern Fields Development
18
Operational Highlights
Project DetailsSize: 24"-32"Total Length: 133 kmStandard & Material: API 5L 44th Edition PSL2, X70M and Customer SpecificationsOD Coating: 3 layers of High Density PolyethyleneID Coating Flow Coat EpoxyContractor: Petrofac Engineering and Construction - SharjahProject Owner: BP - Statoil - Sonatrach (JV)
Scope of Logistics: Delivery of line pipes with minimum 12.7 meters of average pipe lengthand bends to Djen Djen Port in Algeria as unloaded to the trucks in the port.
Logistic Partners: Borusan Logistics - a Borusan Holding companyBorusan Logistics International Algeria
Project:Capacity Expansion Ellund - Egtved Pipeline- Line Pipes and Bends
Operational Highlights
Project DetailsSize: From DN600 to DN1000 line pipes and bendsTotal Length: 95 kmStandard & Material: EN10208-2 and ENDK Specifications - L485 MBOD Coating: 3 layers of High Density PolyethyleneID Coating Flow Coat EpoxyProject Owner: Energinet.dk - Denmark
Scope of Logistics: Delivery of line pipes with minimum 16.5 meters of average pipe length andbends to 40 pipe yards along the route of the pipeline as unloaded and stockpiled in Denmark.
Logistic Partners: Borusan Logistics - a Borusan Holding company
19
20
Operational Highlights
Project DetailsSize: DN500Total Length: 48.5 kmStandard & Material: EN10208-2 and C4Gas / Fluxys Specifications - L415 MBOD Coating: 3 layers of High Density PolyethyleneID Coating BareProject Owner: Fluxys - Belgium
Scope of Logistics: Delivery of line pipes with minimum 15.8 meters of average pipe length to Fluxys pipe yard via train in Belgium.
Logistic Partners: Borusan Logistics - a Borusan Holding company
Project:Ben Ahin Bras Pipeline Project
Operational Highlights
Project DetailsSize: DN800Total Length: 57 kmStandard & Material: EN10208-2 and EVN Specifications - L485 MB
OD Coating: 3 layers of High Density PolyethyleneID Coating Flow Coat EpoxyProject Owner: EVN Netz GmbH - Austria
Scope of Logistics: Delivery of line pipes with minimum 17.2 meters of average pipe length to EVN pipe yard via train as unloaded and stockpiled in Austria.
Logistic Partners: Borusan Logistics - a Borusan Holding company
Project:West 4 Westrail DN800 High PressureGas Pipeline
21
22
Operational Highlights
Project DetailsSize: 36"-42"Total Length: 313 kmStandard & Material: API 5L PSL2, X70MOD Coating: FBE
Project Owner: Southern Natural Gas Pipeline Group
Scope of Logistics: DDP basis delivery to 5 pipe yards. The logistics scope includes unloading,double jointing, girth weld coating, sand berms preparations and stacking.
- 22 shipments via A class vessels.- On site double-joint operation- Management of 6 different pipe yards.
Logistic Partners: Borusan Logistics (Transportation to USA) Borusan Logistics International (USA operations)
On this prestigious project Borusan Mannesmann produced FBE coated 36"-42" pipes accordingto the client’s requirements. The pipes were double jointed to 80 ft (24 m) pipe length. 80 ft pipeswere transported with special trucks to 4 other designated pipe yards.
Project:Elba Express Expansion Gas Pipeline/ USA - 2008
Operational Highlights
Project DetailsSize: 40"Total Length: 205 kmStandard & Material: EN 10208-2, L485 MBOD Coating: 3 Layer PE acc. to DIN 30670ID Coating: Flow Coat Epoxy acc. to API RP5 L2
Project Owner: MOL-Hungary
Scope of Logistics: DDP transportation to 14 different pipe yards along the pipeline route in Hungary. The logistics scope includes unloading, stockpiling and safe guarding during entire delivery operation
Logistic Partners: Borusan Logistics (Transportation to Hungary) Borusan Logistics International (Hungary operations)
The following transportation methods have been used simultaneously because of the tight deliveryschedule1- Transportation by vessel & barges (45 % of the total quantity)2- Transportation by train (55 % of the total quantity)
Complete handover of the project to the Client was realized in 10 months.
Project:MOL Natural Gas Transmission Project/ HUNGARY-2007
23
24
Operational Highlights
Project DetailsSize: 34"-42"Total Length: 194 kmStandard & Material: API 5L - PSL 2, X65MSOutside Coating: 3 Layer PE acc. To DIN 30670
Project Owner: BOTAŞ, BTC DIRECTORATE
Scope of Logistics: Delivery to the pipe yards located at 4 different locations (Kars, Erzincan,Ceyhan and Terminal), including unloading and stockpiling of the pipes.
The following transportation methods have been used simultaneously because of the tight deliveryschedule:
- Transportation by trucks (15 % of the total quantity)- Transportation by train & trucks (85 % of the total quantity)
The project has been completed within a period of 12 months.This project was one of the most important pipeline projects of its time. Global energy conglomerates,along with the world’s top engineering groups took part in this major infrastructure investment,where highest technical, operational and HSE standards were applied.
Project:Baku - Tbilisi - CeyhanCrude Oil Pipeline / TURKEY- 2005
COUNTRY PROJECT OWNER USAGE PROJECT DESCRIPTION QUANTITY YEAR
MEXICO
USA
USA
USA
USA
USA
AUSTRIA
BELGIUM
DENMARK
FRANCE
FRANCE
FRANCE
HUNGARY
HUNGARY
HUNGARY
HUNGARY
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
TAMAZUNCHALE EXTENSION PIPELINE36'' X70M OD FBE COATED
NORTHEAST UPGRADE PROJECT30'' X 70M OD FBE COATED, ID EPOXY COATED
NORTHEAST SUPPLY DIVERSIFICATION30'' X 70M OD FBE COATED, ID EPOXY COATED
300 LINES PIPELINE PROJECT30'' X70M OD FBE COATED, ID EPOXY COATED
ELBA EXPRESS PIPELINE PROJECT36'' - 42'' X70M OD FBE COATED
MLV 20 GAS PIPELINE PROJECT36'' X65 M OD FBE COATED
EVN WESTRAIL PROJECT32'' L485MB OD PE COATED, ID EPOXY COATE
BEN AHIN BRAS PIPELINE PROJECT20'' L415MB OD PE COATED, ID EPOXY COATED
ELLUND EGTVED PROJECT32'' L485MB OD PE & PP COATED,
ID EPOXY COATED
ARC DE DIERREY GAS PIPELINE PROJECT48''L485MB OD PE COATED, ID EPOXY COATED
HAUTS DE FRANCE II GAS PIPELINE PROJECT48" L485MB OD PE COATED, ID EPOXY COATED
F72 LE MANS PIPELINE PROJECT36'' L485MB OD PE COATED, ID EPOXY COATED
CROATIAN TRANSIT PIPELINE32'' L485MB OD PE COATED, ID EPOXY COATED
FGSZ PIPELINE PROJECT28'' L450MB OD PE COATED, ID EPOXY COATED
GAS PIPELINE PROJECT40'' L485MB OD PE COATED, ID EPOXY COATED
GAS PIPELINE PROJECT32'' L485MB OD PE COATED, ID EPOXY COATED
12 KM
77 KM
12 KM
212 KM
313 KM
13 KM
57 KM
49KM
95 KM
61 KM
17 KM
2 KM
209 KM
49 KM
205 KM
55 KM
2013
2012
2011
2009
2007
2007
2011
2011
2011
2012
2012
2009
2009
2008
2007
2007
TRANSCANADALLC
KINDER MORGAN
ELPASO GROUP -TENNESSEE
GAS PIPELINE
ELPASO GROUP -TENNESSEE
GAS PIPELINE
SOUTHERN NATURAL GASPIPELINE GROUP
ELPASO GROUP -TENNESSEE
GAS PIPELINE
EVN AUSTRIA
FLUXYS - BELGIUM
ENERGGINET.DK
GRTGAZ
GRTGAZ
GRTGAZ
MOL GROUP
FGSZ
MOL GROUP
MOL GROUP
25
Major Large-Diameter HSAW Reference List for the Last Seven Years
COUNTRY PROJECT OWNER USAGE PROJECT DESCRIPTION QUANTITY YEAR
POLAND
SLOVAKIA
TURKEY
TURKEY
TURKEY
TURKEY
TURKEY
ALGERIA
ALGERIA
ALGERIA
ALGERIA
ALGERIA
ALGERIA
ALGERIA
VARIOUS GAS PIPELINE PROJECTS28" & 32" L485MB & L555MB OD PE & PP COATED
ID EPOXY COATED
SLOVAKIA - HUNGARY INTERCONNECTOR GASPIPELINE PROJECT
32" L485MB OD PE COATED, ID EPOXY COATED
KESAN GAS PIPELINE PROJECT36'' X65M OD PE COATED
BOTAS SALT LAKE UNDERGROUND GASSTORAGE
36"' X65M OD PE COATED, ID EPOXY COATED
OMV SAMSUN GAS PIPELINE PROJECT24'' X65M OD PE COATED, ID EPOXY COATED
TURKEY GREECE PIPELINE36'' X65M OD PE COATED
BAKU - TBILISI - CEYHAN PIPELINE34'' - 42'' X65MS OD PE COATED
GAS PIPELINE PROJECT28'' X70M OD PE COATED, ID EPOXY COATED
IN-SALAH GAS SOUTHERN FIELDDEVELOPMENT PROJECT
24'' - 32'' X70 OD PE COATED, ID EPOXY COATED
GR4 PIPELINE PROJECT48'' X70 OD PE COATED, ID EPOXY COATED
GAS PIPELINE PROJECTS20'' - 28'' X70M OD PE COATED,
ID EPOXY COATED
LZ2 HASSI R'MEL - ARZEW PIPELINE24'' X60M OD PE COATED
GZ1 HASSI R'MEL - MEDAREG PIPELINE40''X60M OD PE COATED, ID EPOXY COATED
NK1 PIPELINE PROJECT30'' X60M OD PE COATED
262 KM
26 KM
100 KM
24 KM
53 KM
180 KM
193 KM
97 KM
134 KM
305 KM
171 KM
476 KM
234 KM
665 KM
20112012
2012
2012
2010
2010
2005
20052004
2013
2011
2009
20092008
2007
2006
2005
GAZ-SYSTEM S.A.
EUSTREAM SLOVAKIA
BOTAŞ
CHINA TIANCHENENGINEERING CORP.
OMV
BOTAŞ
BOTAŞ, BTCDIRECTORATE
CAMEG
PETROFACBP-STATOILSONATRACH
(JV) (END USER)
SONATRACH
CAMEG
SNAMPROGETTI
SONATRACH
SONATRACH
GAS
GAS
GAS
GAS
GAS
GAS
OIL
GAS
GAS
GAS
GAS
GAS
GAS
CRUDE
26
COUNTRY PROJECT OWNER USAGE PROJECT DESCRIPTION QUANTITY YEAR
COLOMBIACONGO,GABONCAMEROON
TURKEY
TUNISIA
IRAQ
ROMANIA
LIBYA
CAMEROON
EGYPT
CROATIA
SWEDEN
NIGERIA
AZERBAIJAN
OIL &GAS
OIL &GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
3" 12" LONGITUDINALLY WELDED (ERW) STEELPIPES
GRB - X52M, PE COATED, ZAPLOK END
2" - 12" LONGITUDINALLY WELDED (ERW) STEELPIPES
GRB - X42M - X52M, PE COATED, API 5L, BEVELEDEND
4" - 8" LONGITUDINALLY WELDED (ERW) STEELPIPES
X42M - X60M, PE COATED, BEVELED END
10" LONGITUDINALLY WELDED (ERW) STEEL PIPESX52M - X60M, PE COATED, BEVELED END
3" - 4" LONGITUDINALLY WELDED (ERW) STEELPIPES
L245NB, PE COATED, BEVELED END
12" LONGITUDINALLY WELDED (ERW) STEEL PIPESGRB, PE COATED, BEVELED END
12" LONGITUDINALLY WELDED (ERW) STEEL PIPESX60M, PE COATED, BEVELED END
6" - 12'' LONGITUDINALLY WELDED (ERW) STEELPIPES
X52M, PE COATED, BEVELED END
8" - 12" LONGITUDINALLY WELDED (ERW) STEELPIPES
L290NB-L360NB, PE COATED, BEVELED END
2" - 5" LONGITUDINALLY WELDED (ERW) STEELPIPES
S460MH, BARE, BEVELED END
12" LONGITUDINALLY WELDED (ERW) STEEL PIPESX65M, PE COATED, ZAPLOK END
8" LONGITUDINALLY WELDED (ERW) STEEL PIPESX42M, PE COATED, API 5L, BEVELED END
865 KM
796 KM
125 KM
32 KM
125 KM
25 KM
19 KM
75 KM
26 KM
320 KM
28 KM
10 KM
20132008
20122009
2012
2012
2012
2012
2012
2012
2012
20112012
2011
2009
PERENCO
TPAO, BOTAŞ, AKSA
STEG
TOVI COMPANY
OMV-PETROM
ENKA
SNH CAMEROON
WASCO, FAYUM. TAQAGROUP
EVN CROATIA
PALAB
OILSERVE LTD
BP
Major ERW Reference List for the Last Five Years
27
BORUSAN MANNESMANN Head Office:Meclisi Mebusan Caddesi 35, Salıpazarı 34427 İstanbul / TURKEY
Phone : +90 212 393 59 59 Fax : +90 212 293 69 60
June
201
3
Borusan Mannesmann Call Center www.borusanmannesmann.com+90 212 393 58 58 E-Mail: [email protected]