    Introduction : What is line balancing?

    Where do we use line balancing?

    Example

    Line Balance A simple example

    Pre-requisites for line balancing

    The benefits of the pre-requisites

    Method

    Visual management

    Summary - flowchart

  • 7/31/2019 Line Balance 059

    3/39

    Introduction : What is line balancing?

    What is Linebalancing?

    Everyone is doing the sameamount of work

    Doing the same amount of work tocustomer requirement

    No one overburdened

    No one waiting

    Everyone working together in aBALANCED fashion

    Variation is smoothed

  • 7/31/2019 Line Balance 059

    4/39

    Introduction : What is line balancing?

  • 7/31/2019 Line Balance 059

    5/39

    Introduction : What is line balancing?

  • 7/31/2019 Line Balance 059

    6/39

    This is a VISUAL production tool that enables the planning and

    organisation of individual, TIMED items of work to create thefoundation for a balanced production line.

    It is used as a tool to continuously drive out waste from operationsand processes and it is also a valuable tool in implementingchanges in customer demand,

  • 7/31/2019 Line Balance 059

    7/39

    Line Balance : Simple Example

    1 2 3 4

    25 mins5 mins 15 mins 10 mins

    ConstraintOverburden

    This operatormust WAIT for

    operator 2

    Overproduction which

    causes the other 6wastes

    Waiting

    Over-processing

    Inventory

    Rework

    Transportation Motion

    This operatormust WAIT for

    operator 3

    5

    10

    15

    20

    25

    1 2 3 4

    mins

  • 7/31/2019 Line Balance 059

    8/39

    Line Balance : Simple Example

    5

    10

    15

    20

    25

    Redistribute the work

    1 2 3 4

    15 mins15 mins 15 mins 10 mins

    Promotes one-piece FLOW

    Avoidsoverburden

    Minimises the 7wastes

    ReducesVariation

  • 7/31/2019 Line Balance 059

    9/39

    Pre-requisites to line balancing

    Standardise

    Calculate Takt

    Achieve CONSISTENCY inoperations

    Enabling us to achieve ourcustomers requirements bymanaging our production effectively

    Variation in our operations demandsmore human intervention which,increases the risk of HUMAN ERROR

    Understand the drumbeatof theCUSTOMER

  • 7/31/2019 Line Balance 059

    10/39

    Takt Time

    Takt is a German word

    It is the principal that all activity within a business is

    synchronised by a pulse, set by the customer

    demand

    It describes the metronome

    Takt = total time available*total customer demand

  • 7/31/2019 Line Balance 059

    11/39

    Customer demand = 10 units / monthTotal time available = 20 days

    Drumbeat = 1 part every 2 days

    Each process needs to complete one unit every 2 days

    Process 1 Process 2 Process 3 Customer

    Every 2days

    Process 4 Process 5

    Takt time

    Takt = total time availabletotal customer demand

    Every 2days

    Every 2days

    Every 2days

    Every 2days

  • 7/31/2019 Line Balance 059

    12/39

    Standardise

    Highlight keyinformation

    Operationsequence

    From:

    To:

    Cell/ Area

    Description: Part No.

    Quality check Safety precaution Std in process stockQty of SIPS Takt Time Cycle time

    Standard work layout

    Name / position Date Name / position Date Name / position Date

    Scale:

    stores

    Workstation 1

    Workstation 2

    Toolcabinet

    PPE MUST BEWORN AT ALLTIMES

    6

    Workstation 3

    Capture the layout

    Indicate how the

    work flows

  • 7/31/2019 Line Balance 059

    13/39

    StandardiseNO REVISION DATE LOCATION: SHEET..OF

    DEPT: DATE:

    PREPARED BY:

    AUTHORISATION:

    WORK INSTRUCTION SHEETOPERATION NO. OPERATION DESCRIPTION

    NO MAIN STEPS Q S E KEY POINTS EXPLANATION/ EXAMPLES/ DIAGRAMS

    P.P.E. JIGS/ TOOLS REQUIRED CHECKS TRAINING COMMENTS

    TIME

    MEPUM

    WP HRS

    PEGS REF:

    TL TL TL PUM ME

    OPERATING DESCRIPTIONNO

    As per PEGS requirement

  • 7/31/2019 Line Balance 059

    14/39

    The benefits of the pre-requisites

    Takt time

    Standard Operations

    What do you thinkare the benefits?

  • 7/31/2019 Line Balance 059

    15/39

    Takt time maximises the productivity due to:

    Easily managed processes

    Output of each process matches customer demandStandard Operations provide:

    Capable and repeatable processes

    Process control at source Improves accuracy of planning Better adherence to plans A platform from which continuous improvement can be made Reduced costs Improved quality Basis for training

    The benefits of the pre-requisites

  • 7/31/2019 Line Balance 059

    16/39

    Method - capture current state

    Customer demand = 19 units a month

    Time available = 20 days a month

    TAKT = Available timeCustomer demand

    TAKT = 25 hrs

    TAKT = 20 days19 units

    ( x 24 hrs in a day)

    TAKT

    Total workcontent

    Line BalanceRatio

    Line BalanceEfficiency

    25hrs

    Current State

    Ops 3

    Calculate TAKT

  • 7/31/2019 Line Balance 059

    17/39

    Method - capture current state

    Why video?- Used to visually record activity- Accurate method of recording- Irrefutable and unambiguous

    - Modern approach to establishing method

    4. Identify which of the elements are Value-addedand which are non-value added

    1. Capture a representative sample of the process

    2. Review the video with the operators present

    3. Break down the elements of workand record a time for each one

    Calculate TAKT

    Time the process

  • 7/31/2019 Line Balance 059

    18/39

    Method capture current state

    Calculate Takt time

    Time the process

    Break down thework elements

    g

    The operators cycle is broken down into elementsThese elements are put into three main categories, these being :

    1. Working (man or machine)2. Walking3. Waiting

    COMPANY DATE ORIGINATOR CHECKED

    PART NAME SECTION

    PART NUMBER VOLUME

    PROCESS TAKT TIME SEC

    WORKING

    SEQUENCE MANUAL AUTO WAIT WALK

    KEY:

    Manual Walk

    ISSUER COORDINATOR MGR ISSUER Auto Waiting

    TIME OPERATION TIMEOPERATION NAME

    STANDARDISED WORKCOMBINATION TABLE

    TOTAL

    10 3 41

    10 4 2

    152

    0 0 0

    1 Fit bracket A

    Walk to bench

    Inspect

    1

    Machine 2 10 5

    TAKT

    18 of 43

  • 7/31/2019 Line Balance 059

    19/39

    Method - capture current state

    Calculate total workcontent (stacked time) : 15 + 30 + 17 = 62 hrs

    Takt

    Line BalanceRatio

    Line BalanceEfficiency

    25 hrs

    62 hrs

    Current State

    Ops 3

    Total workcontent

    Constraint customerdemand not being met

    30

    25

    20

    15

    10

    1 2 3

    5

    Takt (25 hrs)

    15

    30

    17

    Draw current stateLine Balance

    Calculate Takt time

    Time the process

    Break down thework elements

  • 7/31/2019 Line Balance 059

    20/39

    Method - capture current stateOr alternatively ..

    1. Identify the business area to be balanced

    Machining Treatments Assembly

    4. Agree estimated time for each job andnumber of operators involved

    i. Estimate a time for each sub elementii. Add up all the elements

    iii. Write on the main post it the total time and total operators

    Is it 1, 5 or 10 hours(use a rough guide)

    Total estimated time

    Number of operators

    1

    5 hrs

    2

    2

    5hrs

    1

    3

    1

    5 hrs

    2

    2

    5hrs

    1

    1

    5 hrs

    2

    2

    10hrs

    1

    1

    5 hrs

    2

    21hr

    1

    3. Break down each process by task

    i. Use post it notesii. Write on the process nameiii. Place on a board in sequence

    Op1

    Op 2

    Subelementsof work

    Mainprocesssteps

    2. Form small group with team leaders/operators

  • 7/31/2019 Line Balance 059

    21/39

    Method - capture current state

    1

    5 hrs

    2

    2

    5hrs

    1

    3

    1

    5 hrs

    2

    2

    5hrs

    1

    1

    5 hrs

    2

    2

    10hrs

    1

    1

    5 hrs

    2

    21hr

    1

    Lay all the post its out insequence so that all of theprocesses are visible

    Draw on the TAKT line (or usestring)

    TAKT

    Calculate TAKT

    Time the process

    Draw current stateLine Balance

    Break down thework elements

    2

    5hrs

    1

  • 7/31/2019 Line Balance 059

    22/39

    Method - capture current state

    Target Manpower = Total Work ContentTakt time

    = 2.48

    = 3 operators

    Takt time = 25 hrs

    Total work content = 62 hrs

    30

    25

    20

    15

    10

    1 2 3

    5

    Takt (25 hrs)

    15

    30

    17

    Calculate Takt time

    Time the process

    Draw current stateLine Balance

    Calculate targetmanpower

    Break down thework elements

    Takt

    Line BalanceRatio

    Line BalanceEfficiency

    25 hrs

    62 hrs

    Current State

    Ops 3

    Total workcontent

  • 7/31/2019 Line Balance 059

    23/39

    Method capture current state

    Line balance ratio = Total work content

    No. of stations x longest operation

    Line balance Efficiency = Total work content

    Target manpower x Takt

    Line Balance Ratio = 62 hrs(3 x 30)

    X 100 = 69%

    Line Balance Efficiency = 62 hrs

    (3 x 25)

    X 100 = 83%

    Takt

    Stackedtime

    Line BalanceRatio

    Line BalanceEfficiency

    25 hrs

    62 hrs

    Current State

    Targetmanpower 3

    69%

    83%

    What could be achieved withoutreducing waste and still meetingTAKT simply REBALANCING!!

    30

    25

    20

    15

    10

    1 2 3

    5

    Takt (25 hrs)

    15

    30

    17

    Calculate Takt time

    Time the process

    Draw current stateLine Balance

    Calculate LineBalance Ratio &

    Efficiency

    Calculate targetmanpower

    Break down thework elements

  • 7/31/2019 Line Balance 059

    24/39

    Method balance to TAKT

    example

    Target 83%Efficiency

    30

    25

    20

    15

    10

    1 2 3

    5

    Takt (25 hrs)

    15

    30

    17

    1 2 3

    25 25

    12

    Takt (25 hrs)30

    25

    20

    15

    10

    5

  • 7/31/2019 Line Balance 059

    25/39

    Method balance to TAKT

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &

    re-balance

    Can thisbeimproved?

    No

    Yes

    Complete workinstruction

    (standardise) &implement

    No

    30

    25

    20

    15

    10

    1 2 3

    5

    Takt (25 hrs)

    15

    30

    17

    1. Identify the elements of work that exceed TAKT

    2. Refer to Standard Work Combination table

    3. Identify where work can be re-allocated

    COMPANY DATE ORIGINATORCHECKEDPART NAME SECTIONPART NUMBER VOLUMEPROCESS TAKT TIMESECWORKINGSEQUENCE MANUALAUTOWAITWALK

    KEY:Manual WalkISSUER COORDINATOR MGR ISSUER Auto Waiting

    TIME OPERATION TIMEOPERATION NAME

    STANDARDISED WORKCOMBINATION TABLE

    TOTAL

    10 3 4 1

    10 4 2

    152

    0 0 01 Fit bracket A

    Walk to benchInspect

    1Machine

    2 10 5

    TAKT

  • 7/31/2019 Line Balance 059

    26/39

    Method balance to TAKT

    Or alternatively

    1. Refer to the post itnotes on the wall

    3. Using the experience of the teamleaders/ operators, invite them torebalance the work to below TAKT

    2. Use magnetic strips to signify the post

    it notes (elements of time)

    1

    5 hrs

    2

    2

    5hrs

    1

    3

    1

    5 hrs

    2

    2

    5hrs

    1

    1

    5 hrs

    2

    2

    10hrs

    1

    1

    5 hrs

    2

    2

    1hr

    1

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &

    re-balance

    Can thisbe

    improved?

    No

    Yes

    Complete workinstruction

    (standardise) &implement

    No

    Method Identify value added and non value added

  • 7/31/2019 Line Balance 059

    27/39

    MethodIdentify value added and non-value addedtime

    What is Value added and non-valueadded time?Value Adding:Any process that changes thenature, shape or characteristicsof the product, in line withcustomer requirements e.gmachining, assembly

    Non-Value Adding,but unavoidablewith current technology or methods.Any work carried out that does not increaseproduct value e.g inspection, part movement,tool changing, maintenance

    WasteAll other meaningless, non-essentialactivities that do not add value to theproduct you can eliminate immediately e.g.looking for tools, waiting time

    And dont forget !!

    Method Identify value added and non value added

  • 7/31/2019 Line Balance 059

    28/39

    MethodIdentify value added and non-value addedtime

    ValueAdded

    Waste

    Traditional Focus

    Work Longer-Harder-Faster

    Add People or Equipment

    Lean Manufacturing

    Improve the Value

    Stream to EliminateWaste

    LEAD TIME

    Method reduce non value added time and eliminate

  • 7/31/2019 Line Balance 059

    29/39

    Methodreduce non-value added time and eliminatewaste

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &

    re-balance

    Can thisbe

    improved?

    No

    Yes

    Complete workinstruction

    (standardise) &implement

    No

    COMPANY DATE ORIGINATOR CHECKED

    PART NAME SECTION

    PART NUMBER VOLUME

    PROCESS TAKT TIME SEC

    WORKING

    SEQUENCE MANUAL AUTO WAIT WALK

    KEY:

    Manual Walk

    ISSUER COORDINATOR MGR ISSUER Auto Waiting

    TIMEOPERATION TIMEOPERATION NAME

    STANDARDISED WORKCOMBINATION TABLE

    TOTAL

    10 3 41

    10 4 2

    152

    0 0 0

    1 Fit bracket A

    Walk to bench

    Inspect

    1

    Machine 2 10 5

    TAKT

    So, identify the category of work on thestandard work combination table

    29 of 43

  • 7/31/2019 Line Balance 059

    30/39

    Method balance to TAKT

    Detail each process step (on format above)Indicate whether the work is :

    Wait

    Walk Work

    Now you can split the operations on

    the board into elements of Value added

    and non value added work

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &

    re-balance

    Can thisbe

    improved?

    No

    Yes

    Complete workinstruction

    (standardise) &implement

    No

    Or alternatively

    Method reduce non value added time and eliminate

  • 7/31/2019 Line Balance 059

    31/39

    Methodreduce non-value added time and eliminatewaste

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &

    re-balance

    Can thisbe

    improved?No

    Yes

    Complete workinstruction

    (standardise) &implement

    No

    Highlight the Value added and the non-valueadded work elements on the line balance board

    Non value added activity

    Value added activity

    Takt (25 hrs)

    1 2 3

    5

    30

    25

    20

    15

    10

    Use red strips tosignify non-valueadded work

    Method reduce non value added time and eliminate

  • 7/31/2019 Line Balance 059

    32/39

    Method - reduce non-value added time and eliminatewaste

    Takt

    Stackedtime

    Line BalanceRatio

    Line BalanceEfficiency

    27 hrs

    57 hrs

    Future State

    Ops 2

    Non value added activity

    Value added activity

    Reduce the NVA activity by applyingwaste removal tools (changeoverreduction, 5C, process mapping etc)

    Attack thered,

    redistributethe green !!

    1 2 3

    5

    30

    25

    20

    15

    10

    Takt (25 hrs)

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &

    re-balance

    Can thisbe

    improved?No

    Yes

    Complete workinstruction

    (standardise) &implement

    No

  • 7/31/2019 Line Balance 059

    33/39

    Method re-allocate & re-balance

    1 2 3

    5

    30

    25

    20

    15

    10

    Takt (25 hrs)

    1 2 3

    5

    30

    25

    20

    15

    10

    Takt (25 hrs)

    Operator freedup for other

    process orimprovement

    team

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &re-balance

    Can thisbe

    improved?No

    Yes

    Complete workinstruction

    (standardise) &implement

    No

  • 7/31/2019 Line Balance 059

    34/39

    Method - update the calculations

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &re-balance

    Can thisbe

    improved?No

    Yes

    Complete workinstruction

    (standardise) &implement

    No

    Line balance ratio = Total work content

    No. of stations x longest operation

    Line balance Efficiency = Total work content

    Target manpower x Takt

    Line Balance Ratio = 44 hrs(2 x 24)

    X 100 = 92%

    1 2

    5

    30

    25

    20

    15

    10

    Takt (25 hrs)

    Line Balance Efficiency = 44 hrs(2 x 25)

    X 100 = 88%Previous balance ratio = 69%Improvement of 23%

    Takt

    Total workcontent

    Line BalanceRatio

    Line BalanceEfficiency

    25 hrs

    44 hrs

    Future State

    Ops 2

    92%

    88%

  • 7/31/2019 Line Balance 059

    35/39

    Method - Continuous Improvement

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &re-balance

    Can thisbe

    improved?

    Yes

    Complete workinstruction

    (standardise) &implement

    No ValueAdded Waste

    LEAD TIME

    Continuously usewaste elimination tools

    P

    DC

    A

    Plan

    DoCheck

    Act

  • 7/31/2019 Line Balance 059

    36/39

    Method - standardise

    Highlight keyinformation

    Operationsequence

    From:

    To:

    Cell/ Area

    Description: Part No.

    Quality check Safety precaution Std in process stockQty of SIPS Takt Time Cycle time

    Standard work layout

    Name / position Date Name / position Date Name / position Date

    Scale:

    stores

    Workstation 1

    Workstation 2

    Tool

    cabinet

    PPE MUST BEWORN AT ALLTIMES

    6

    Capture the NEWlayout

    Indicate how thework flows

    Scale:

    storesToolcabinet

    Workstation 3

  • 7/31/2019 Line Balance 059

    37/39

    Method - standardiseNO REVISION DATE LOCATION: SHEET..OF

    DEPT: DATE:

    PREPARED BY:

    AUTHORISATION:

    WORK INSTRUCTION SHEETOPERATION NO. OPERATION DESCRIPTION

    NO MAIN STEPS Q S E KEY POINTS EXPLANATION/ EXAMPLES/ DIAGRAMS

    P.P.E. JIGS/ TOOLS REQUIRED CHECKS TRAINING COMMENTS

    TIME

    MEMgr

    WP HRS

    PEGS REF:

    TL TL TL PUM ME

    OPERATING DESCRIPTIONNO

  • 7/31/2019 Line Balance 059

    38/39

    Visual Management

    The new line balance chart should bedisplayed on the cell

    The impact of changes in resource orTakt on operator cycle times can be

    seen instantly

    Opportunities for Kaizen activities canbe easily identified

    S

  • 7/31/2019 Line Balance 059

    39/39

    Summary

    Capture the current state Balance to TAKT & eliminate waste

    Update calculations

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &re-balance

    Can thisbeimproved?

    Yes

    Complete workinstruction

    (standardise) &implement

    No

    Balance to TAKT

    Reduce Non ValueAdded and

    eliminate waste

    Re-allocate work &re-balance

    Update calculations

    Can thisbeimproved?

    Complete workinstruction

    (standardise) &implement

    Takt

    Total workcontent

    Line BalanceRatio

    Line BalanceEfficiency

    25 hrs

    44 hrs

    Ops 2

    92%

    88%

    Future State

    Takt

    Total workcontent

    Line BalanceEfficiency

    Line Balance

    Ratio

    25 hrs

    62 hrs

    Current State

    Operators 3

    69%

    83%

    Calculate Takt time

    Time the process

    Draw current stateLine Balance

    Calculate LineBalance Ratio &

    Efficiency

    Calculate target

    manpower

    Break down the

    work elements

    Calculate Takt time

    Calculate LineBalance Ratio &

    Efficiency

    Time the process

    Break down the

    work elements

    Draw current stateLine Balance

    Calculate target

    manpower

    2

    5hrs

    1