Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge approach
Settlement
Nathan Johnson, PhD, PE, Kleinfelder, San Diego, CAMoises Arzamendi, RCE, GE, Kleinfelder, San Diego, CA
WBES 2015 – Practical Solutions to Bridge Engineering Challenges
![Page 2: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/2.jpg)
Outline
Project BackgroundProject ChallengesBackground of LCCFDesign ApproachStakeholder InvolvementLessons Learned
![Page 3: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/3.jpg)
Project PurposeConstruct 0.9-mile segment of second main track to connect existing double track segments at each end of the project limits Results in a continuous 7-mile stretch of double track within LOSSAN Corridor to downtown San Diego
![Page 4: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/4.jpg)
Major Project Components
Replacement of existing single track bridge over San Diego River with a 900-foot-long double track bridgeRuns parallel to proposed Mid-Coast LRTDesign Components:– Bridge– Track Alignment– Railroad Systems & Signals– Collision & Retaining Walls– Drainage– Lowering of Ocean Beach Bike Path– Utilities– ROW
Construction late 2015
CP Tecolote
CP Friar
Legend:SDRDT LimitsExisting LOSSANFuture Mid-Coast LRT
![Page 5: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/5.jpg)
San Diego River Bridge
200 ft
Proposed Mid-Coast LRT Bridge
Existing LOSSAN BR 263.8
Existing LRT Bridge
N
Proposed LOSSAN Bridge Double Track
Ocean Beach Bike Path
![Page 6: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/6.jpg)
Major Stakeholders
SANDAG – Project DeliveryNCTD – Rail Operator and MaintainerMTS – Right-of-Way owner
Adjacent Mid-Coast Corridor LRT Project
Contractor (Skanska / Stacey& Witbeck / Herzog)
![Page 7: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/7.jpg)
![Page 8: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/8.jpg)
River Soil Conditions During Earthquake
Survivability Event – Approximately 80 feet deepScour is up to 20 feetSlope Stability and Lateral Spreading
![Page 9: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/9.jpg)
Mission Valley West
![Page 10: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/10.jpg)
San Diego River
Permanent Casings 65 feet deepUsed for Strength and StiffnessApprox. $4M Cost Savings
![Page 11: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/11.jpg)
![Page 12: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/12.jpg)
Traditional Wall (Preliminary Design)
209+60
213+60
217+60
400’ 400’
221+60
400’ 400’
225+60
224+60
![Page 13: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/13.jpg)
Compressible Soils
CPT 001 – Directly under fill
![Page 14: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/14.jpg)
Estimated Building Settlements
Typically Desire < 0.25 in
1.4 in 1.1 in 0.52 in 0.64 in 1.22 in 0.83 in 0.28 in 0.59 in 1.14 in 0.64 in
1600’
![Page 15: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/15.jpg)
Sample Traditional Fill
3.6 in0.9 in
![Page 16: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/16.jpg)
Issues and Solutions
Potential Issues– Building Settlements – Track Settlements order of 5 inch– Utility Settlements (similar to track)
Solutions– Sheet Pile Wall utilities, building risk, cost, track settlement
– Lower Profile cannot lower profile enough
– Ground Improvement Only expensive, building and utility risks
– Surcharge building and utility risks
– Bridge Structure expensive and maintenance
Lightweight Fill with Ground Improvement
![Page 17: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/17.jpg)
Preferred SolutionLightweight FillUse light material and over-excavate to balance load
SOIL LCCFLCCFLCCF
SOIL EPSEPSEPSEPSEPSEPS
EPSEPSEPSEPSEPSEPS
EPSEPSEPSEPSEPSEPS
EPSEPS
EPSEPS
EPSEPS
![Page 18: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/18.jpg)
209+60 217+60
![Page 19: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/19.jpg)
Geo-foam Considerations
Benefits over proposed– Lighter weight– EPS first used for roadway
embankments in 1972
Drawbacks– Less “heavy rail” precedent– Must be sealed from solvents, etc.– Can be susceptible to rodents,
fire, insects– Not monolithic or pourable– Connectivity to facing– Agency approval
![Page 20: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/20.jpg)
Bridge ConsiderationsBenefits over proposed– More familiar for the corridor– Drainage
Drawbacks– Capital Cost (estimate $18M vs. $2.5M) – Maintenance (assume concrete - regular inspections)– Constructability (pile construction, slow orders, slope stability)
![Page 21: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/21.jpg)
Lightweight Cellular Concrete FillSite mixed with foaming agent2-3 foot liftsApprox. $40-50/cuyd (typical)Demonstrated past useSpecial Provisions and TransLab tests
![Page 22: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/22.jpg)
Lightweight Fill ConsiderationsAgency ApprovalProof of UseConstructabilityDurabilityMaintenance Drainage
Global Stability Seismic DisplacementsSeismic StabilitySettlementsVibrationFlotation
![Page 23: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/23.jpg)
LCCF Projects with MSE Facing
Project City CompletionDate
Volume (CY)
Agency
Cypress Replacement Oakland 1997 110,000 Caltrans
12th Street Lake Merrit Oakland 2011 75,000 Oakland / FHWA
SW Moody Avenue Reconstruction Portland 2011 39,000 Portland
San Bruno Railroad Grade Separation San Bruno 2012 200,000 CalTrain
UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF
Exposition Light Rail - Phase II Los Angeles
2014 43,000 LA Metro
405/22 Separation Caltrans Contract 12-071624
Garden Grove
In Progress 66,000 Caltrans/ OCTA
![Page 24: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/24.jpg)
Cypress Viaduct1989 collapse 42 deaths3.5 mile freeway reconstructionUsed beneath roadway– Poor underlying bay mud with low strength– Compressible and liquefiable
![Page 25: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/25.jpg)
Maintenance Record
AADT = 121000 vehiclesMacArthur Maze estimated cost of $6M/day closure17-year Maintenance Record from District 4 Chief of Maintenance - Cypress lightweight fill section is holding up well- No rehab project in this section, nor any significant maintenance repair work involving the structural section
![Page 26: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/26.jpg)
Example: San Bruno Grade Separation
Caltrain Heavy Commuter Rail Directly over Bart tunnel to SFONet zero requirement for projectCellular Concrete Fill 40 ft high10 ft additional load balance
![Page 27: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/27.jpg)
Colton Crossing
SDRDT
BNSF MSE Style overpass up to 40 ft highFill to reduce settlement concerns>100 Trains/Day (BNSF, UP, Metrolink, Amtrak)
![Page 28: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/28.jpg)
I-405/SR22 Grade SeparationCaltrans/OCTA highway embankmentLoad balancing (similar quantity to SDRDT)
![Page 29: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/29.jpg)
Concept Section at 30% DesignPHASE 2PHASE 1
EXISTING GROUND =CELLULAR CONCRETE =
PHASE 2PHASE 1
EXISTING GROUND =CELLULAR CONCRETE =
Cross Section of Lightweight Fill below MT1 and MT2 at South End of Wall
Cross Section of Lightweight Fill below MT1 and MT2 at North End of Wall
![Page 30: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/30.jpg)
Stage 1: Remove Existing FillStage 2: Add LCCF
Stage 3: Build MT2Stage 4: Remove Existing MT1 FillStage 5: Place
MCCTP Fill
Stage 6: Build MT1
Reduce ShoringSample Analysis of Staged Construction
60% Design LCCF Configuration
![Page 31: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/31.jpg)
Normal Fill vs. LCCF
Max Settlement = 4.8”; ROW = 1.2”
Max Settlement = 1.9”; ROW = 0.7”
![Page 32: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/32.jpg)
Compaction Grouting
Max Settlement = 1.4”; ROW = 0.25”
Max Settlement = 0.5”; ROW = 0.12”
![Page 33: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/33.jpg)
Live Loading
Existing Condition = 0.13 ft
SDRDT Design = 0.01 ft
![Page 34: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/34.jpg)
Final Solution2-Phase ConstructionTargeted Ground ImprovementLess Surcharge + More ResistanceApprox. $8M Cost Savings Compared to bridge
![Page 35: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/35.jpg)
Lightweight Fill Transitions
![Page 36: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/36.jpg)
Stakeholder Involvement – OperatorMajor Concerns – Maintenance and Safety– Began communicating 4/2014– 90% design 5/2015– Approved 8/2015
Several meetings and documentsCapital costs not a concern
Justification of UseService Life AnalysisMaintenance Life Cycle Costs
Case Approval Based on Necessity
![Page 37: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/37.jpg)
Stakeholder Involvement – Adjacent Project
200 ft
Proposed Mid-Coast LRT Bridge
Existing LOSSAN BR 263.8
Existing LRT Bridge
N
Proposed LOSSAN Bridge Double Track
Ocean Beach Bike Path
![Page 38: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/38.jpg)
Stakeholder Involvement – CMGC60% Design – Reduce Need for ShoringGMP (bid process)– Excessively long straps for CMGC subs
![Page 39: Lightweight Cellular Concrete Fill to Mitigate Railroad Bridge ......UPRR Flyover Project (Colton Crossing) Colton 2013 220,000 UP/BNSF Exposition Light Rail - Phase II Los Angeles](https://reader031.fdocuments.us/reader031/viewer/2022013022/5f87621c7a96cd105702d39e/html5/thumbnails/39.jpg)
Lessons Learned
Lightweight fill is useful and proven solution for transportationInnovative materials can take significant effort to approvePersistency is importantDelivering agency needs to be on board
CMGC– Early involvement is helpful, but subs may not be on-board– Engineer involvement during ICE process is very valuable
Practical Innovative Solutions