217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 237 237 237 80 119 27 252 174 .59 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation. U.S. Army Engineering and Support Center, Huntsville Prepared by Jeff Denton 09 August 2018 LIGHTNING PROTECTION REQUIREMENTS FOR DOD AMMUNITION AND EXPLOSIVES FACILITIES 1 Coulston_ ECM Assessment 2018 NDIA Symposium_09 Aug 2018_.pptx

Transcript of LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash...

Page 1: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

“The views, opinions and findings contained in this report are

those of the authors(s) and should not be construed as an

official Department of the Army position, policy or decision,

unless so designated by other official documentation.”

U.S. Army Engineering and Support Center, Huntsville

Prepared by Jeff Denton

09 August 2018

LIGHTNING PROTECTION

REQUIREMENTS FOR DOD

AMMUNITION AND

EXPLOSIVES FACILITIES

1

Coulston_ ECM Assessment 2018 NDIA

Symposium_09 Aug 2018_.pptx

Page 2: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

OVERVIEW OF PRESENTATION

Case for Lightning Protection System (LPS) on

Ammunition and Explosives (AE) Facilities

DOD Criteria for LPS on AE Facilities

Lightning Protection Principles

Distinctive AE Requirementso Lightning protection systems

o Inspection and testing

o Records and training

Common Deficiencies of LPS Installations

File Name

2

Page 3: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

CASE FOR LPSs ON DOD AE FACILITIES

July 10, 1926, Lake Denmark Naval Ammunition Storage Depoto 600,000+ tons explosives

o 21 people killed

o About 200 buildings destroyed

o DDESB established in 1928

Lightning Incidents to International Arsenals and Storage Depots

“Properly Maintained LPSs are required for AE Facilities.” DOD

6055.09-M, V2.E4.1. DOD Ammunition and Explosives Safety

Manual.

File Name

3

Page 4: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

DOD CRITERIA FOR LPS ON AE FACILITIES

DOD 6055.09-M, Ammunition and Explosives Safety Standardso Applicable to DOD Components

o Volume 2 contains electrical and LPS safety standards

o Selects NFPA 780 as the LPS criteria for AE facilities (V2.E4.1.)

NFPA 780, Standard for the Installation of Lightning Protection

Systemso Industry standard for lightning protection

o Chapter 4 – General requirements for ordinary facilities

o Chapter 8 – Protection of structures housing explosive materials

UFC 3-575-01, Lightning and Static Electricity Protection Systemso Not specific to AE facilities

o Applicable to DOD facilities, including AE

o Applies NFPA 780 as the LPS criteria

o Directs that a risk assessment per NFPA 780 be performed

o UL certificate required

o Air Force requires commercial third-party certificate

File Name

4

Page 5: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

DOD CRITERIA FOR LPS ON AE FACILITIES

DA PAM 385-64, Ammunition and Explosives Safety Standardso Applicable to Army Components

o Section IV of Chapter 17 has LPS requirements

o Implements safety requirements of DOD 6055.09-M

AFM 91-201, Explosives Safety Standardso Applicable to Air Force Components

o Implements in full DOD 6055.09-M

AFI 32-1065, Grounding Systemso Applicable to Air Force Components

o Not specific to AE facilities. Attachment 5 specific to explosive facilities

o Implements maintenance requirements of DOD 6055.09-M

File Name

5

Page 6: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

DOD CRITERIA FOR LPS ON AE FACILITIES

NAVSEA OP 5, Ammunition and Explosives Safety Ashoreo Applicable to Dept. of Navy Components

o Distribution to U.S. Government agencies and contractors

DDESB TP 22, Lightning Protection for Explosives Facilitieso Guidance for installation and maintenance of LPS

o Provides clarification to DOD 6055.09-M and NFPA 780

o Authored by DDESB (Dr. Josephine Covino)

o Distribution to U.S. Government agencies and contractors

Non-DOD LPS Standards for Explosives Facilitieso DOE Manual 440.1-1A, Explosive Safety Manual

o NASA Standard 8719.12, Safety Standard for Explosives, Propellants, and

Pyrotechnics

File Name

6

Page 7: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

LIGHTNING PROTECTION PRINCIPLES

File Name

7

No lightning protection system is 100% effective. It is an matter of

statistical probabilities and risk management.

Per NFPA 780, two design methods for protection against

lightning.o Roof types (cone of protection)

o Rolling Sphere Method (RSM)

RSM is widely used and required by:o DOD 6055.09-M, V2.E4.2

o NFPA 780, 8.2.1.

o DA PAM 385.64, 17-19.b.

o AFMAN 91-201. 5.23

o NAVSEA OP 5, 6-3.a.

Page 8: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

LIGHTNING PROTECTION PRINCIPLES

File Name

8

RSM Principle: The attractive effect of the lightning rod is a

function of a striking distance (ds) that is determined by the

amplitude of the lightning current.

Lightning Strike Magnitudes

• 99% exceed 3,000 A

• 90% exceed 8,000 A

• 50% exceed 28,000 A

• 10% exceed 80,000 A

• 1% exceed 200,000 A(Per DDESB TP22)

r Ip

20m 3kA

30m 5.4kA

45m 10kA

61m 16kA

Striking Distance (ds) r = 10 Ip0.65

Page 9: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

LIGHTNING PROTECTION PRINCIPLES

File Name

9

Four Protection Levels (IEC 62305-3)

Level Min. Ip % Eff. RSM

I 3kA 99% 66 ft.

II 5.4kA 97% 100 ft.

III 10kA 91% 150 ft.

IV 16kA 84% 197 ft.

Example: LPS designed to LPL II is expected to

intercept all strikes with an amplitude current of

5.4kA or greater. Lightning strikes below 5.4kA may

bypass the protection system. So, a minimum

current level is selected to achieve the maximum

protection. Thus the more stringent requirements to

protect against smaller amplitude lightning strikes

than larger amplitude strikes.

Page 10: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

DISTINCTIVE AE REQUIREMENTS

LPS

File Name

10

LPS Requirement Principle Criteria Reference

100 ft. radius zone of protection DOD 6055.09-M, V2.E4.2.

NFPA 780, 8.2.1

DA PAM 385-64, 17-19.b.

AFMAN 91-201, 5.23.

NAVSEA OP 5, 6-3.a.

Power / comm. installed in metallic conduit and run

underground 50 ft. before entering the facility

(Surge protection normally referenced within the

same section is very critical and a requirement for all

types of facilities with an LPS)

DOD 6055.09-M, V2.E3.6.2.

DA PAM 385-64, 17-26.b.

AFMAN 91-201, 5.23.5.

AFI 32-1065, 15.1.

NAVSEA OP 5, 6-7.2.

Above ground metallic utility lines bonded to the

structural steel of LPS at entrance to the facility

DOD 6055.09-M, V2.E3.6.

DA PAM 385-64, 17-26.d.

AFMAN 91-201, 5.23.5.

AFI 32-1065, 15.2.

NAVSEA OP 5, 6-6.3.3.

OH power line distances from AE facilities DOD 6055.09-M, V2.E3.5.

DA PAM 385-64, 8.13

Page 11: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

DISTINCTIVE AE REQUIREMENTS

LPS

File Name

11

LPS Requirement Principle Criteria Reference

Ground ring electrode NFPA 780, 8.4.1

DA PAM 385-64, 17-25.

AFI 32-1065, A4.1.15.

NAVSEA OP 5, 6-5.1.

Ground ring electrode must be sized to Class II

material requirements

NFPA 780, 8.4.3

DA PAM 382-64, 17-25.

AFI 32-1065, A4.1.15.

NAVSEA OP 5, 6-5.1.

Railroad tracks must be bonded to the LPS NFPA 780, 8.5.7

DA PAM 385-64, 17-22.f.

NAVSEA OP 5, 6-6.3.1.

Metallic access doors and doorframes shall be

bonded to the ground ring

NFPA 780, 8.5.5.1

NAVSEA OP 5, 6-6.3.4.

Metallic fences must be grounded or bonded to

the ground ring electrode

NFPA 780, 8.8.1

DA PAM 385-64, 17-22.e.

NAVSEA OP 5, 6-6.3.2.

Bonding techniques NFPA 780, 8.5.4

NAVSEA OP 5, 6-6.1.

LPS for earth covered magazines NFPA 780, 8.7.1

UFC 4-420-01, 3-8.6

DA PAM 385-64, 17-19.g.

NAVSEA OP 5, 6-8.2.

Page 12: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

DISTINCTIVE AE REQUIREMENTS

LPS

File Name

12

LPS Requirement Principle Criteria Reference

LPS for wharves and piers NFPA 780, 8.7.2

NAVSEA OP 5, 6-8.2.3.1.

LPS inspection certificate by UL or

another third-party

UFC 3-575-01, 3-1

Air Force facilities with perimeters larger

than 300 ft. and structural steel not used

for air terminals must use a mast or

catenary type LPS

AFI 32-1065, 14.5.

Naval facilities implement a primary and

secondary ground system that must be

bonded together at two locations

NAVSEA OP 5, 5-5; 6-5.

Page 13: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

DISTINCTIVE AE REQUIREMENTS

Inspection and Testing

File Name

13

Criteria LPS Inspection or Test Intervals

DOD 6055.09-M, V2.E4.3.1. Visual Inspection One year or per the DOD

Component and approved by

DDESB

D0D 6055.09-M, V2.E4.3.2. Electrical Tests Maximum every two years or

per the DOD Component and

approved by DDESB

NFPA 780, 8.10 Visual Inspection Seven months

NFPA 780, 8.10.6.3 Visual inspection of the

SPD

Seven months or after any

suspected lightning strike

NFPA 780, 8.10.7 Electrical tests 14 months

DA PAM 385-64, 17-28. Visual inspection 12 months

DA PAM 385-64, 17-28. Electrical tests Two years

Page 14: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

DISTINCTIVE AE REQUIREMENTS

Inspection and Testing

File Name

14

Criteria LPS Inspection or Tests Intervals

AFMAN 91-201

(per AFI 32-1065, Table 1)

Visual inspection 1-2 years as determined by

MAJCOM EE

AFMAN 91-201

(per AFI 32-1065, Table 1)

Visual inspection of SPD Six months and after a

lightning strike

AFMAN 91-201

(per AFI 32-1065, Table 1)

Electrical tests 24 months

NAVSEA OP 5, 6-9. Visual inspection 6 months

(100% of air terminal if

integral system)

NAVSEA OP 5, 6-9. Electrical tests 24 months

(20% of air terminals if

integral system)

Page 15: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

DISTINCTIVE AE REQUIREMENTS

Records and Training

File Name

15

Criteria Records and Training Duration

DOD 6055.09-M, V2.E4.3.3. Records and test

measurements

Kept on file for at least six

inspection cycles

DOD 6055.09-M, V2.E4.3.4. Establish training requirements

for LPS personnel

N/A

NFPA 780, 8.9 Develop maintenance and

inspection plan

N/A

NFPA 780, 8.10.7.7 Document records & test data

and available for inspection

Time period acceptable to

the AHJ

DA PAM 385-64, 17-29. Maintain inspection and test

reports

For the last six inspection

cycles

AFMAN 91-201, 5.24.3. Maintain records and test data For the last six inspection

cycles

NAVSEA OP 5, 6-9. Develop inspection and test

plan; training for personnel in

DOD LPS

N/A

Page 16: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

16

Common Deficiencies Principle Criteria Reference

SPDs not installed at the facility entrance and exit

of power, data and comm. conductors

DOD 6055.09-M, V2.E3.6.1; E4.2.3.

UFC 3-575-01, 3-4

NFPA 780, 8.6

DA PAM 385-64, 17-26.a, b.

AFMAN 91-201, 5.23.5.

AFI 32-1065, 15.

NAVSEA OP 5, 6-7.

Aboveground metallic utility lines and pipes not

bonded to the structural steel before entering the

facility, or run underground the last 50 ft.

DOD 6055.09-M, V2.E3.6.1.

DA PAM 385-64, 17-26.d.

AFMAN 91-201, 5.23.5.

AFI 32-1065, 15.2.

NAVSEA OP 5, 6-6.3.3.

Power, data and comm. lines not run underground

the last 50 ft. before entering the facility

DOD 6055.09-M, V2.E3.5.1; 6.2.

DA PAM 385.64, 17-26.b.

AFMAN 91-201, 5.23.5

AFI 32-1065, 15.

NAVSEA OP 5, 6-7.2.

Down conductors not secured every 3 ft. NFPA 780, 4.10

DA PAM 385-64, 17-19.e.

Down conductors not protected from physical

damage up to 6 ft. above grade

NFPA 780, 4.9.11

AFI 32-1065, A4.1.8.

Main conductors bends less than 90 degrees, or

have radius less than 8 in.

NFPA 780, 4.9.5

DA PAM 385-64, Table 17-4

AFI 32-1065, A4.1.5.

Page 17: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

17

Common Deficiencies Principle Criteria Reference

Metallic doors and doorframes not bonded to

the ground ring

NFPA 780, 8.5.5

DA PAM 385-64, 17-22.b.(2)

NAVSEA OP 5, 6-6.3.4.

Metallic masses within sideflash distance of an

LPS component not bonded to the LPS

NFPA 780, 8.5.2

DA PAM 385-64, 17-22.b.(1)

NAVSEA OP 5, 6-6.

Fences shall be grounded and bonded where

within 6 ft. of the AE facility, or within contact

distance

NFPA 780, 8.8.1

DA PAM 385-64, 17-22.e.

NAVSEA OP 5, 6-6.3.2.

Air terminals exceeding 24 in. in height not

supplied with additional support

NFPA 780, 4.6.2.2.2

Electrical testing and visual inspection not

performed or reports not available

DOD 6055.0-M, V2.E4.3.

NFPA 780, 8.10

DA PAM 385-64, 17-28.

NAVSEA OP 5, 6-9.

UL or third-party certificate does not exist UFC 3-575-01, 3-1

OH electrical power lines too close to the AE

facility

DOD 6055.09-M, V2.E3.5.2.

DA PAM 385-64, 8-13 (Table 8-5)

Page 18: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

18

Page 19: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

19

Page 20: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

20

Page 21: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

21

Page 22: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

22

Page 23: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

23

Page 24: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

24

Page 25: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

COMMON DEFICIENCIES

File Name

25

Page 26: LIGHTNING PROTECTION REQUIREMENTS FOR DOD … · 2018-10-23 · Metallic masses within sideflash distance of an LPS component not bonded to the LPS NFPA 780, 8.5.2 DA PAM 385-64,

Questions/Comments

26