Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L...

22
LightLiquidSampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1)

Transcript of Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L...

Page 1: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

Light Liquid SamplerS Y S T E M S U P P O R T M A N U A L

PNR-2LM-0(1)

Page 2: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support
Page 3: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

Version 05202004

PNR-2LM-0(1)Light Liquid Sampler

System Support Manual

Page 4: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

4

Table Of Contents

Section 1System Introduction 4

Section 2Sample Pump and Balance Valve 8

Section 3System Installation and Start-up 16

Section 4DuraSite Vessel Instructions 22

Page 5: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

PNR-2lLM-0(1) Version 05202004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

5

About This Manual...

IntroductionThe purpose of this manual is to provided a step-by-step guide to the operation, installation andmaintenance of your YZ Light Liquid HydrocarbonSampling System. It should be read by both first-time and experienced measurement technicianswho want to learn about the components andoperation of the system. The manual has beenorganized into sections, which are summarized asfollows:

• Section 1 - System IntroductionIncludes an overview of the system components, a description of how the systemoperates, a schematic system diagram, anda system layout.

• Section 2 - Sample Pump and Balance Valve

• Section 3 - System Installation and Start upIncludes detailed instruction on the properway to install your YZ sampler. Likewise, astep-by-step start-up procedure is to guidethe commissioning of the unit.

• Section 4 - DuraSite Vessel InstructionsThese sections include details of theDuraSite portable constant pressuresample vessel., operation andmaintenance .

Page 6: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

6

Section 1 System Introduction

The PNR-2LM-0(1) is a sampling system designedto sample light liquid hydrocarbons.

Operation of the system centers around the PNR-2Sample Pump, and control functions that are totallycustomer supplied. The pump is mounted on astainless steel panel, with a support tray for aportable sample. The pump and panel are shown inthe diagram on the following page.

The purpose of the YZ light liquid hydrocarbonsampling system is to capture a representativeliquid sample of the pipeline product. In order forthe system to function properly, a pipeline productmust be single phase, liquid product. By properlyadjusting both the sample size and the samplefrequency, the sample vessel will fill to 80% capacityat the end of the sample period.

The system operates on a simple concept. Eachtime the sample pump is actuated a preset volumeof sample is gathered at pipeline pressure andcollected into a portable sample vessel for transferto a lab for analysis.

Page 7: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

PNR-2lLM-0(1) Version 05202004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

7

Section 1 System Introduction

PIPELINE

SOLENOID VALVE

PRESSURE REGULATOR

NORMALLY OPEN VALVE

NORMALLY CLOSED VALVE

RUPTURE DISC

ELECTRICAL

S

PRODUCT

PNEUMATIC

102

4

Pulse Input Module

Inpu t Adj.

PIM-100

1

3282 4

16

256

512

64

128

-SIG 2

1+SIG

3276

8

819

216

384

409

62

048

262

144

PO

WE

R

6553

61

3107

2

Red -1

Wh ite-3

Black-5

PI

F actory

SystemA ppr oved

Mutual

Z-65 CONTROLLER

AIR RELAY VALVE

PRESSURE GAUGE

PIM-100

SAMPLING

VALVEISOLATION

L E G E N D

CNR-2

PUMP

RELIEF VALVE

(BY CUSTOMER)

MAGNETIC PICKUP SIGNAL

(BY CUSTOMER)

(BY CUSTOMER)TO Z-65 CONTROLLER

DPS SIGNAL INDRY CONTACT OR

PULSED VOLTAGE OR

100 PSIINSTRUMENT AIR IN

ENCLOSURE

S

327

68

Factory

SystemApproved

Mutual

Input Adj.

32

Pulse Input Module

1 82 4

PIM-100

16

1024

256

51264

128

8192

163

84

2048

4096

+SIG

-SIG

1

2

262

144

PO

WE

R

655

361

3107

2

R ed-1

White-3

Black-5

CONTROLSYSTEM

PRODUCT LINE(BY CUSTOMER)

SAMPLE VESSELISOLATION VALVE

CNR-2 PROBE

ROB VALVE

PI

DURASITE

DURASITE

PRECHARGE IN(BY CUSTOMER)

PI

DURASITE

PI

Pneumatic Control Signal(By Customer)

(Sold Separate)

Page 8: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

8

19 7/8"

PSI

PIM-100

MODELZ-65 TIMER

15 3/8"

SystemApproved

FactoryMutual

CABLE ENTRY)(7/16" Max.

LIQUID TIGHTFITTING

FILTERREGULATOR

262

144

PO

WE

R

6553

632

768

8192

1638

4

131

072

2048

1024

409664 128168

32

1 2 4

256

512

Black-5

White-3

Red-1

Pulse Input ModulePIM-100

Input Adj.

2-SIG

1IG

(1/4" FNPT)

RELIEF VALVE

ROB VALVE

500

1000

1500

psi2000

AIR RELAYVALVE

SOLENOID VALVE

(BY CUSTOMER)

PRODUCT SAMPLEOUT TO DURASITE(1/8" TUBING)

VESSEL RACK

Section 1 System Introduction

ACTUATION GAS IN(BY CUSTOMER)(1/4" FNPT)

4 1/4"

DPS SIGNAL IN

(BY CUSTOMER)TO Z-65 CONTROLLER

PULSED VOLTAGE ORDRY CONTACT OR

2" NOM. PIPEU-BOLT ASSY. (2)

PRODUCT IN FROM PUMP(PORT B 1/4" FNPT)

ACTUATION GAS TO PUMP(PORT A 1/4" FNPT)

ISOLATION VALVE

FLOW

SUPPLY PROBE

(FROM SKID)PNEUMATIC SUPPLY

(TO SKID)PRODUCT OUT

Product InFrom Pump

5-Way Cross

Page 9: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

PNR-2lLM-0(1) Version 05202004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

9

Page 10: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

10

Section 2 PNR Sample Pump

The PNR-2P Sample Pump is a positive displacementplunger pump designed to be mounted directly on thepipeline. It has an adjustable displacement of 0.25 to1.8cc and achieves proportional-to-flow samplingthrough adjustment of the customer supplied, andcustomer controlled pneumatic signal.

As the plunger returns upward after completing astroke, the pump chamber fills with product throughthe inlet check valve. The inlet check valve is a darttype valve designed to seat on an o-ring. The inletcheck valve is spring loaded to ensure a positiveseating action after every stroke. When the pumpis actuated, the plunger moves downward, displacingproduct through the discharge check valve knownas the balance valve.

The balance valve automatically senses pipelinepressure and adjusts to ensure that product is notallowed to free-flow to the product vessel. Whenthe pipeline pressure is greater than the pre-chargepressure on the accumulator vessel, the balancevalve dart is pushed up against the seat and the tophead of the balance valve. As the pump strokes,the pressure created in the pump chamber forcesthe balance valve dart off the seat, allowing productto be pumped to the accumulator vessel. Once thepump completes its stroke, the pressure across thebalance valve equalizes and the dart is returned to asealing position by its spring.

In the event that the accumulator vessel pre-chargepressure is greater than the pipeline pressure, thebalance valve dart and seat are pushed apart by theproduct pressure in the accumulator vessel. In thissituation the check valve wafer located between thebalance valve and the sample pump acts as a backcheck to prevent the escape of product previouslycaptured in the accumulator vessel. As the pumpstrokes, the pressure created in the pump chamberforces the check valve wafer off the seat, allowingproduct to be pumped to the accumulator vessel.Once the pump completes its stroke, the pressureacross the check valve equalizes and the wafer isreturned to a sealing position by its spring.

Page 11: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

PNR-2lLM-0(1) Version 05202004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

11

Section 2 PNR Sample PumpPump Diagram

EXHAUST FILTER, 1/8" SS

LPR/PNR INLET CHECK DART

SEAL W/SS SPRING TFE/GLASS/MOLY 3/8" ID

1/8" ALLEN HEAD PLUG SS

PNR-2 UP/MID/CV BODY ASSY

PNR-2 UP/MID/CV BODY ASSY

PNR-2 PLUNGER BUSHING 3/8

PNR-2 UP/MID/CV BODY ASSY

B2-1106

A2-0177

6 FLAT WASHER SS

OR -210, NITRILE

OR -010, NITRILE

6-32 x 3/16 PAN HD SS

INLET CV SPRING PNR-2

A5-2210

C0-0157

C0-0080

C3-0027

A5-2010

B2-1017

A7-0011

A6-0040

B2-1106

C4-0028

B2-1106

PRODUCT IN

STROKE SCALE, 3/8" PD PUMP

PNR-2 ACTUATOR CYLINDER

PNR-2 STROKE SCREW ASSY

PNR-2 STROKE SCALE IND

B2-1003

ACTUATION SUPPLY

3/8-24 JAM NUT, SS

PNR-2 PNEU ACT PISTON

C0-0118

B2-1009

5/16 FLAT WASHER, SS

MCONN, 1/4T 1/8P, SS

5/16-18 x 5/8" HHCS SS

A1-0003

C0-0017

C0-0098

B2-1002

D5-0020

PRODUCT OUT

BV-200 ASSY (STD)

VALVE, PURGE, SS 1/8" NUPRO

MCONN, 1/8T 1/8P, SS

1/8" 316 SEAMLESS .035W

MCONN, 1/8T 1/8P, SS

PNR-2 CHECK VALVE FOR USE W/ BV-200

A1-0099

C7-0044

1/8" SS PLUG

A3-0161

B2-1520

B2-1529

A1-0099

1/4-28UNF x 1/2" BHCS SS

3/8 STAR WASHER (EXT) SS

PD PUMP PACKING

5/16-24 JAM NUT SS

PNR-2 PACKING GLAND NUT

PNR-2P PLUNGER RTN SPRING CAD PLATED

U-CUP WIPER SEAL (PNR-2 ACT PISTON)

PNR-2 3/8 CERAMIC PLUNGER

PNR-2 ACORN NUT

B2-1102

C3-0016

C0-0117

A6-0036

A6-0035

B2-1006

C0-0108

B2-1001

A2-0177

B2-1041

13377 (3)

Page 12: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

12

Section 2 PNR Sample PumpBalance Valve Diagram

P/N B2-1529

Page 13: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

PNR-2lLM-0(1) Version 05202004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

13

Page 14: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

14

Section 3 Installation/Start-up/Operation

Panel InstallationThe sampling system should be located as closeas possible to the pipeline. 2" U-bolt assembliesare provided to mount the panel to a 2" vertical pole.

Pneumatic SupplyA 1/4" connection on the Pump is provided for apulsed pneumatic supply (40 - 60 psi). The neces-sary regulators, solenoid valve, control functions,etc. are customer provided. The pneumatic pulse tooperate the sampler typically will require 2-3 seconddwell time to assure proper pump operation.

Pump InstallationThe PNR-2 sample pump is designed to bemounted directly to a threaded connection on thepipeline. The probe tubing should be cut such thatthe tip of the probe will be located in the center 1/3of the pipeline after installation. After the pipelinehas been depressurized, the threads on the probebody should be taped and doped and the pumpinstalled into the pipeline connection. Next youmust install 1/4" stainless steel tubing between theconnection top of the pump, to the source of thepulsed pneumatic actuation, upplied by the cus-tomer. Finally connect 1/4" stainless steel tubingfrom the discharge connection of the pump balancevalve to the connection for product in from pump onthe 5-way cross.

ACTUATION GAS IN(BY CUSTOMER)(1/4" FNPT)

4 1/4"

DPS SIGNAL IN

(BY CUSTOMER)TO Z-65 CONTROLLER

PULSED VOLTAGE ORDRY CONTACT OR

2" NOM. PIPEU-BOLT ASSY. (2)

PRODUCT IN FROM PUMP(PORT B 1/4" FNPT)

ACTUATION GAS TO PUMP(PORT A 1/4" FNPT)

ISOLATION VALVE

FLOW

SUPPLY PROBE

(FROM SKID)PNEUMATIC SUPPLY

(TO SKID)PRODUCT OUT

ACTUATION GAS TO PUMP

PRODUCT FROM PUMP

5-Way Cross

Pneumatic Supply(By Customer)

Page 15: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

PNR-2lLM-0(1) Version 05202004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

15

Section 3 Installation/Start-up/Operation

Pump Sample SizeThe sample size is adjustable from 0.25 to 1.8 cc/stroke. The sample size is adjusted by loosening thelock/seal nut on top of the pump and turning the volumeadjustment screw in to decrease the sample volume orout to increase the sample volume. Once the newsample size has been set, the lock/seal nut should beretightened.

Sample Pump PrimingBefore the pump begins normal operation after initialinstallation or maintenance, the sample pump must bepurged of all air in the sample chamber. The purgevalve on the sample pump is used to evacuate the airfrom the chamber and to make sure the pump is liquid-packed. If the pump is not purged before being placedinto operation, it will not function properly.

To purge the pump, open the purge valve located onthe left side of the sample pump balance valve. Theproduct supply valve can then be opened to allowpipeline product to purge the air within the pump. Onceproduct begins exiting the purge valve, close the purgevalve. The sample pump is now ready to begin opera-tion.

Page 16: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

16

Section 3 Installation/Start-up/Operation

= # of Pump Strokes Required/Sample Cycle

= Time in Minutes Between Strokes

= 1600 Pump Strokes Required/Sample Cycle

10,080 (Minutes in Week)1600 Pump Strokes Required/SampleCycle

= 6.3 Minutes Between Strokes (Round up to the next whole minute.)

Calculating Time-

Sample Volume DesiredPump Displacement

Number of Minutes/Sample Cycle#of Pump Strokes Required/Sample Cycle

Example400 cc(500cc DuraSite filled to 80% Volume).25cc Pump Displacement/Stroke

Z-65 Controller Set UpProportional To Time Mode

Page 17: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

PNR-2lLM-0(1) Version 05202004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

17

Sample Vessel Size x 80% = Grabs Required/Sample Cycle. Sample Grab Size

Pulse/Metered Volume x Monthly Average Flow = Pulses/Sample Cycle

Pulses/Sample Cycle = Pulses/Grab Grabs Required

Z-65 Controller Set UpProportional To Flow Mode

Section 3 Installation/Start-up/Operation

ie: 15,000 Pulses/Sample Cycle = 33.78 Pulses/Grab 444 Grabs Required

ie: 500cc Vessel x 80% = 400cc = 444 Grabs Required .9 cc/Grabie

ie: 1 Pulse/BBL x 15,000 BBL/Month = 15,000 Pulses/Sample Cycle

Page 18: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

18

Purpose: The DuraSite Portable Sample Vessel permits theuser to remove a liquid or gas hydrocarbon sample from apipeline or a sampling device. This is accomplished withoutchanging the pressure of the product or exposing it to a con-taminant fluid. If properly used and maintained the DuraSitewill provide many years of safe, accurate and clean sampling.

Use: The DuraSite is a very safe device to use. As with anyequipment dealing with flammable products, it is mandatorythat a good, thorough operator training procedure be establishedprior to use.

Typical use of the cylinder would be as follows:

Step 1: (In The Lab) Connect a regulated inert gas supply tothe pre-charge valve. The product valve should be open. Bycarefully controlling the pre-charge valve and the regulator, thecylinder can be slowly charged with pre-charge gas (NOTE:This should be done slowly to prevent slamming the pistondown to the opposite end). The pressure on the pre-chargepressure gauge should be brought to a reading of 10-50 psiabove the expected pressure of the product in the field . Closethe pre-charge valve and disconnect the gas supply. Checkthe pre-charge valve, relief device, and the pre-charge pressuregauge for leaks. Any leaks should be stopped before continuing.The vessel should be placed in a padded carrying case andmade ready for field use.Proceed to EITHER Step 2, or Step 3 as required for yourapplication.

STEP 2: FOR COLLECTION OF SAMPLE VIA SPOT SAMPLEOR FROM COMPOSITEACCUMULATOR VESSEL.

2a: Connect the product end of the pre-charged sample vessel tothe product supply. (Sampler product removal valve, or Pipelinesample probe)NOTE: the pre-charge pressure gauge reading should begreater than the product supply pressure reading. If not,repeat Step 1 above.

2b: Once the vessel is connected to the product supply, it isnecessary to vent a small amount of product prior to filling thevessel. This assures fresh product and removes any air orgas when dealing with liquids. This can be done by looseningthe product purge valve a very small amount until the product ispurged. After thorough purging, the product purge valve shouldbe tightened.

2c: The product pressure gauge reading should be 10-50 psibelow the pre-charge pressure gauge reading. By carefully openingthe pre-charge valve, the pressure becomes equalized, thenbegins to drop below the product pressure. The pre-chargevalve should be carefully controlled so as to not vent the pre-charge gas too fast.

2d: When the cylinder becomes a maximum of 80% full (seevolume indicator), all valves should be closed. The productconnection is slowly broken in order to vent any trapped product.After vessel removal, all connections should be checked forleaks and the pre-charge and product valve ports capped toprevent leakage.

2e: Pack the DuraSite in appropriate carrying case to meetD.O.T. guideline, with D.O.T.paperwork and transport to lab for analysis.

STEP 3: FOR DIRECT CONNECTION TO SAMPLER.

3a: Connect the sampler discharge port to the product inletport to the DuraSite using 1/8" stainless steel tubing.

3b: (Gas sampling) Connect the pre-charge port to theDuraSite to the pipeline for pre-charge pressure (Proceed tostep 3d), or configured like the liquid sample applicationbelow. (Step 3c)

3c: (Light sampling) Pre-charge the DuraSite as indicated inStep 1, then install a pressure relief valve to the pre-chargeport and open the pre-charge valve on the DuraSite. (The pressurerelief valve should have a relief pressure setting of approximately100 psi above line pressure.)

3d: Open the product inlet valve of the DuraSite and the purgevalve on the sampler. Next open the purge valve on the productend of the DuraSite and allow product to purge all lines andconnections out.

3e: Close purge valves and begin sample cycle.

3f: At the end of sample cycle, close product inlet valve on theDuraSite and remove the DuraSite. Pack the DuraSite in appropriatecarrying case to meet D.O.T. guideline, with D.O.T. paperwork andtransport to lab for analysis.

Step 4: (In The Lab) Prior to analysis, the product should bemixed. This is accomplished simply and efficiently by invertingthe cylinder end-over-end, causing the mixing ball to fallthrough the product. Approximately 10-12 trips of the mixingball through the product assures a homogenous solution.

Step 5: The regulated pre-charge gas should be reconnectedto the pre-charge side of the cylinder. The pre-charge gassupply should remain open during analysis.

Step 6: Purging a small amount of product from the vesselremoves unmixed product from the tee, relief device, gauge,etc. The unit can now be connected to a chromatograph andthe product analyzed.

Step 7: After analyzing, the remainder of the product shouldbe dumped and the vessel properly cleaned. Normal cleaningcan be accomplished by rinsing the product end with a petroleumsolvent and flushing with acetone. If a more thorough cleaningis required, the vessel should be disassembled.

WARNING: A portable sample vessel should never be filledto more than 80%. This allows a 20% pre-charge cushion toabsorb thermal expansion of the product.Shipping: Extreme care should be taken when preparing avessel for shipment. Both valves should be capped to preventpossible leakage. The vessel should be placed in asnug-fitting, well-padded and durable case. All applicableDOT regulations should be adhered to.

Section 4 DuraSite Portable Sample Vessel Instructions

Page 19: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

PNR-2lLM-0(1) Version 05202004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

19

DuraSite (illustrated)

P/N C6-1002 (Ser. #4088+)

Set ScrewP/N C0-0099

P/N A3-0155Knob

P/N C6-1003 (Ser. #4608+)

Magnet Assembly

Piston

P/N C6-1004Piston Washer

YZ UniValve

P/N A5-4222B

P/N A5-2222

Back-Up Washer

O-Ring

Product Head

Stainless Steel

P/N C6-1000

P/N C0-0048Hex Nuts

Valve SeatP/N A3-0063

Purge Valve NutP/N A3-0080

P/N A8-0013

Magnetic Volume IndicatorP/N C6-1203 (DS-150)P/N C6-1303 (DS-300)P/N C6-1403 (DS-500)P/N C6-1503 (DS-800)P/N C6-1603 (DS-1000)

Gauge

P/N A3-0083

Rupture DiscP/N A3-0084

YZ UniValve

P/N C6-1001Pre-Charge Head

P/N A3-0095Valve Stem AssemblyP/N A3-0062Seat Retaining WasherP/N A3-0063Valve Seat

P/N C6-1200 (DS-150)P/N C6-1300 (DS-300)P/N C6-1400 (DS-500)

P/N C6-1600 (DS-1000)

P/N C6-1301 (DS-300)P/N C6-1401 (DS-500)P/N C6-1501 (DS-800)P/N C6-1601 (DS-1000)

P/N C6-1201 (DS-150)

P/N C6-1500 (DS-800)

Cylinder

Rupture Disc Nut

Tie Rod

Mixing Ball

Snap RingP/N C3-0018

Piston Seal

P/N A5-2021

P/N A6-0023

O-Ring

P/N C6-1005

P/N 12-1008 (Ser. #0614 - #4087)P/N 12-1007 (Ser. #0322 - #0613)

P/N 12-1019 (Ser. #0614 - #4607)

P/N 12-1006 (Ser. #0321 and Prior)

P/N 12-1018 (Ser. #0613 and Prior)

Section 4 DuraSite Portable Sample Vessel Instructions

Page 20: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

20

Notes

Page 21: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

PNR-2lLM-0(1) Version 05202004 ATEX Rev.

YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720

21

Notes

Page 22: Light Liquid Sampler - Tri-Pacific 2LM.pdfLight Liquid Sampler S Y S T E M S U P P O R T M A N U A L PNR-2LM-0(1) Version 05202004 PNR-2LM-0(1) Light Liquid Sampler System Support

3101 Pollok Drive

Conroe, Texas 77303

P: 936.788.5593

F: 936.788.5720

Em: [email protected]

Web: www.yzsystems.com

YZ Systems, Inc. represents and warrants that for a period of 3 years from receipt of the product: (1) the product will be free from defects in materials andworkmanship; and (2) the product will perform substantially in accordance with product manuals, literature, or documentation. Any written or oral information or advicegiven by YZ representatives, agents, or employees will in no way increase the scope of this warranty. If the product fails to comply with the warranty set forthherein, YZ's entire liability and the customer's exclusive remedy will be replacement of the product(s) or, at YZ's option, YZ's reasonable effort to make the productmeet the warranty set forth herein. YZ disclaims all other warranties, either expressed or implied, including but not limited to, implied warranties ormerchantability and fitness for a particular purpose, with respect to the product. This limited warranty gives you specific legal rights. You may have others,which vary from state to state. These remedies are not available outside of the United States and Canada. In no event shall YZ or its suppliers be liable forany damages whatsoever (including, without limitation, damages for loss of profits, business interruption, loss of information, or other pecuniary loss) arising outof the use of or inability to use the product, even if YZ has been advised of the possibility of such damages. Information contained in this document is subjectto change without notice and does not represent a commitment on the part of YZ Systems, Inc. All prices quoted are in U.S. dollars, F.O.B. Snyder, Texas. NJEXis a trademark of YZ Systems, Inc. All other product names and/or registered trademarks are the property of their respective holders. YZ support services aresubject to YZ's then-current prices, terms, and conditions, which are subject to change without notice. All prices and specifications, if published, are subject tochange without notice.