LIFT CORE

7
Caculation Sheet Date: Project No: Project Title: Designed by: MURII Checked by: JNK Sheet: of: Element: LIFT CORE File Ref: Rev: Item Output BUILDING DATA Building Length , L = 20.000 M 13.000 M No. of Stories 5.00 Floor to Floor Height 3.60 M (excluding basement and roof) Height, H = 23.00 M WALL DATA Length , L = 1800.000 mm l1= 2200 1800.000 mm w1= 1800 Wall thickness , D = 200.000 mm A1= 0.88 A2= 0.72 Height, H = 23.00 M A= 1.6 Minimum Overhang of base 500.000 mm from wall face (assumed) Materials Specifications Grade of Concrete 25.00 Grade of Steel 425.00 24.00 78.50 18.00 Bearing capacity of Soil 300.00 safety factor for Dead Load , = 1.40 safety factor for Live Load , = 1.60 Building Width , W = Width , W = N/mm 2 N/mm 2 Concrete kN/m 3 Steel kN/m 3 Soil kN/m 3 kN/m 2

Transcript of LIFT CORE

Page 1: LIFT CORE

Caculation SheetDate:

Project No:

Project Title: Designed by: MURII

Checked by: JNK Sheet: of:

Element: LIFT CORE File Ref: Rev:

Item Output

BUILDING DATA

Building Length , L = 20.000 M

13.000 M

No. of Stories 5.00

Floor to Floor Height 3.60 M

(excluding basement and roof)Height, H = 23.00 M

WALL DATA

Length , L = 1800.000 mm l1= 2200

1800.000 mm w1= 1800

Wall thickness , D = 200.000 mm A1= 0.88A2= 0.72

Height, H = 23.00 M A= 1.6

Minimum Overhang of base 500.000 mm

from wall face (assumed)

Materials Specifications

Grade of Concrete 25.00

Grade of Steel 425.00

24.00

78.50

18.00

Bearing capacity of Soil 300.00

safety factor for Dead Load , = 1.40

safety factor for Live Load , = 1.60

Building Width , W =

Width , W =

N/mm2

N/mm2

Concrete

kN/m3

Steel

kN/m3

Soil

kN/m3

kN/m2

Page 2: LIFT CORE

Caculation SheetDate:

Project No:

Project Title: Designed by: MURII

Checked by: JNK Sheet: of:

Element: LIFT CORE File Ref: Rev:

Item Output

LOADING

Operating Self Weight of lift 10 kNCarrying Capacity of lift 100 kN

WIND LOAD CONDITION

Basic Wind Speed, vb 65.840 M/S

1.000

0.970

1.000

63.86 M/S

q = 2.50

1.000

Calculation of operating LoadGravity Load

Depth of Wall Below GFL 1.50 mDepth of base 400.00 mmWeight of wall (neglecting openings) 940.80 KNWeight of Wall + Lift Car Accessories 1034.88 kN

(10% of wall weight assumed)Loading from slab 1137.93

Operating Load 2282.81 kNWind Load

250.03 kNWind moment 1437.64 kNm

Seismic LoadSeismic Moment 0.00 kNm

Shear at Base Due to Wind 250.03 kN

Gravity load from Roof 275.00 kN

Gravity load from slab 275.00 kN

s1 =

s2 =

s3 =

vs =

kN/m2

cf

Wind load= cf .q .Ae

Page 3: LIFT CORE

Caculation SheetDate:

Project No:

Project Title: Designed by: MURII

Checked by: JNK Sheet: of:

Element: LIFT CORE File Ref: Rev:

Item Output

KN

Ht. (m) (KN)

21.60 ROOF

KN

18.00

FR N

KN

14.40

FR 3

KN

10.80

FR 2

KN

7.20 FR 1

KN

3.60

GRD

KN

0.00 BASE

180.02

180.02

180.02

180.02

180.02

275.00

90.01

275.00

275.00

275.00

275.00

275.00

275.00

Page 4: LIFT CORE

Caculation SheetDate:

Project No:

Project Title: Designed by: MURII

Checked by: JNK Sheet: of:

Element: LIFT CORE File Ref: Rev:

Item Output

Ht. (m) V (KN) M (KNM) N (KN)

18.00 90.01 324.0 275.00

14.40 270.03 550.00

10.80 450.05 825.00

7.20 630.06 1100.00

3.60 810.08 1375.00

0.00 990.10 1650.00

Page 5: LIFT CORE

Caculation SheetDate:

Project No:

Project Title: Designed by: MURII

Checked by: JNK Sheet: of:

Element: LIFT CORE File Ref: Rev:

Item Output

Area of shell Wall 1.6Perimeter of shell wall 4.10

Check for Bearing Pressure

Area of Raft 7.61

2800 mm

2800 mm

Area of lift core base provided 7.84

Service Gravity Dead loads 1120.14 KN

Service Gravity Live loads 100 KNGravity factored loads 3378.2016 KN

= 823.95 KN/M

Design Moments

For the purpose of analysis of the lift base slab, it may be assumed to be supported onfictitious supports at the outer periphery and loaded with:

Ultimate uniform pressure, p 430.89

Aspect ratio 1Span Supports

moment Msx 33.51 43.28

Msy 33.51 44.67

M2

A = Dl / Po M2

Minimum Length of base=

Minimum Width of base=

M2

kN/M2

Page 6: LIFT CORE

Caculation SheetDate:

Project No:

Project Title: Designed by: MURII

Checked by: JNK Sheet: of:

Element: LIFT CORE File Ref: Rev:

Item Output

KN/M KN/M

KN.M

KN.M

Maximum Moments for Design

53.86 kNm

33.51 kNmCheck for Effective Depth

117.5 mm

340.0 mmReinforcement Calculation

Main Reinforcement

0.012Lever arm, Z = 323

Area of steel Required 257

Provided steel bar diameter 12.00 mm

Support moment at cantilever edge, Mc

Span moment of base, Mi

Required effective depth from flexure, d

Provided effective depth, dp

k=Mu/fcubd2 = N/mm2

mm2

823.95

823.95

430.8933.51

53.86

Page 7: LIFT CORE

Caculation SheetDate:

Project No:

Project Title: Designed by: isu

Checked by: jk Sheet: of:

Element: LIFT CORE File Ref: Rev:

Item Output

Spacing of Reinforcement Required 425 mmSecondary Reinforcement

Z 334

Area of steel Required 413

Min Area of Steel 520Provided steel bar diameter 12.00 mmSpacing of Reinforcement Required 200 mm

Provide 12mm diameter bars @200mm C/C B1 (main) 565.7

Provide 12mm diameter bars @200mm C/C B2 (distribution) 565.7

Check for shear

Footing acts as a wide beam, therefore critical section for shear is at a distance equalto the effective depth= 340 mm from the face of tank shell

or 160.0 mm from edge of footingMax shear per meter length

= 68.94 KN

Applied shear stress ν = 0.203

100As/bd= 0.166 vc= 3.043section ok for shear

Deflection and CrackingNo need to check deflection in foundations

cracks,no need to provide side reinforcement

mm2

mm2/ m width

N/mm2

Check Allowable Shear stress νc

N/mm2