LIFE Project Number
LIFE14 PRE/UK/002
Mid-term Report Covering the project activities from 01/04/2015 to 28/02/2017
Reporting Date
31/05/2017
LIFE PROJECT NAME or Acronym
Coordinated Efforts for International Species Recovery LIFE EuroSAP
Data Project
Project location: United Kingdom
Project start date: 01/04/2015
Project end date: 30/09/2018
Total budget: € 837,995
EU contribution: € 500,000
(%) of eligible costs: 59.67
Data Beneficiary
Name Beneficiary: BirdLife International
Contact person: Mr Iván Ramírez
Postal address: BirdLife International, The David Attenborough Building, Pembroke Street, Cambridge, CB2 3QZ, United Kingdom
Telephone: +44 1223 277318
E-mail: [email protected]
Project Website: http://www.birdlife.org/europe-and-central-asia/project/life-eurosap
2
Table of Contents
2. List of key-words and abbreviations ........................................................................................... 3
3. Executive summary ..................................................................................................................... 5
4. Introduction ................................................................................................................................. 6
5. Administrative part ..................................................................................................................... 7
6. Technical part............................................................................................................................ 10
6.1a. Progress of the project by group of Actions ......................................................................... 10
A Actions: Implementation Actions ............................................................................................. 10
B Actions: Actions for communication and dissemination of project lessons ............................. 14
C Actions: Project management and monitoring of the project progress ..................................... 17
6.1b. Progress of the project following species by species summaries ........................................ 21
White-headed Duck (Oxyura leucocephala) – led by SEO/BirdLife ........................................... 21
Velvet Scoter (Melanitta fusca) – led by LOD ............................................................................. 25
Dalmatian Pelican (Pelecanus crispus) – led by HOS.................................................................. 28
Cinereous Vulture (Aegypius monachus) led by VCF .................................................................. 31
Bearded Vulture (Gypaetus barbatus) – led by VCF and SEO/BirdLife ..................................... 34
European Turtle Dove (Streptopelia turtur) – led by RSPB......................................................... 37
Yelkouan Shearwater (Puffinus yelkouan) – led by LPO ............................................................. 41
Monteiro’s Storm Petrel (Hydrobates monteiroi) – led by SPEA ................................................ 44
European lowland grassland waders – led by NABU ................................................................... 47
6.2. Main deviations, problems and corrective actions implemented ............................. 49
6.3. Evaluation of Project Implementation ....................................................................... 51
6.4. Analysis of benefits ....................................................................................................... 52
8. Comments on the financial report ............................................................................................. 55
8.1. Summary of Costs Incurred ............................................................................................... 56
8.2. Accounting system ............................................................................................................. 57
8.3. Partnership agreements ...................................................................................................... 60
8.4. Certificate on the financial statement .................................................................................... 60
8.5. Summary of costs per action .................................................................................................. 60
9. Envisaged progress until next report ..................................................................................... 62
10. Annexes and Deliverables ....................................................................................................... 63
Annexes......................................................................................................................................... 63
Deliverables .................................................................................................................................. 66
3
2. List of key-words and abbreviations
AEWA Agreement on the Conservation of African-Eurasian Migratory Waterbirds
BLE BirdLife Europe
BLI BirdLife International
CAP Common Agricultural Policy
CFP Common Fisheries Policy
CMS Convention on the Conservation of Migratory Species of Wild Animals
DG ENV Directorate-General for Environment, European Commission
EBBA European Breeding Bird Atlas
EBCC
EC
European Bird Census Council
European Commission
ESWG
EVFAP
FACE
European Seaduck WG
Flyway Action Plan for the Conservation of the Balkan and Central Asian
Populations of the Egyptian Vulture
European Federation of Associations for Hunting and Conservation
GA Grant Agreement
HOS Hellenic Ornithological Society, BirdLife Partner in Greece
IBA
IUCN
LOD
Important Bird Area
International Union for the Conservation of Nature
Lithuanian Ornithological Society, BirdLife Partner in Lithuania
LPO Ligue pour la Protection des Oiseaux, BirdLife Partner in France
MAVA MAVA Foundation for Nature
MTR Mid-term Report
MME Magyar Madártani és Természetvédelmi Egyesület, BirdLife Partner in
Hungary
MP
MS
Management Plan
Member State
MSAP Multi-species Action Plan
NABU Nature And Biodiversity Conservation Union, BirdLife Partner in
Germany
NADEG Expert Group of the Member States on the Birds and Habitats Directives
NEEMO
NGO
Neemo EEIG – DAI, External Monitoring Team
Non-governmental Organisation
PA Partnership Agreement
PECMBS
RSPB
Pan European Common Bird Monitoring Scheme
Royal Society for the Protection of Birds, BirdLife Partner in the UK
SAP Species Action Plan
SAP TT Species Action Plan Tracking Tool
SC Steering Committee
SCC Scientific Committee
SEO/BirdLife BirdLife Partner in Spain
SOF Swedish Ornithological Society, BirdLife Partner in Sweden
SPEA Portuguese Society for the Study of Birds, BirdLife Partner in Portugal
SPP Society for the Protection of Prespa
SSR
ToR
Species Status Report
Terms of Reference
4
UNEP
VBN
United Nations Environment Programme
Vogelbescherming, BirdLife Partner in the Netherlands
VCF Vulture Conservation Foundation
WCS
WG
Wildlife Conservation Society
Working Group
WWT Wildfowl and Wetlands Trust
5
3. Executive summary
The LIFE EuroSAP project is focused on the delivery of new or revised Species Action Plans
(SAP) for some of Europe’s most important wild bird species. The project has also led to the
creation of an online tool (SAP Tracking Tool) which can be utilized by different stakeholders
well beyond the project’s expected duration. This tool lays the foundation for improved
cooperation and effective delivery of SAPs.
The overall project objective is to halt population declines and achieve measurable improvement
in the status of threatened bird species listed in Annex I and II of the Birds Directive through:
creation of conditions for effective coordination among the European Union, EU Member
States (MS), global conventions and Non-governmental Organisations (NGOs) involved in
international bird conservation;
evaluation of the implementation and revision of six existing SAPs and EU Management
Plans (MP): Gypaetus barbatus, Aegypius monachus, Pelecanus crispus, Streptopelia turtur,
Melanitta fusca and Oxyura leucocephala) and development of two new SAPs for species
requiring the greatest urgency (Puffinus yelkouan and Hydrobates monteiroi; and,
development of a pilot Multi-species Action Plan (MSAP) which focuses on priority needs
for 8 European wet grassland waders across their flyways: Haematopus ostralegus, Vanellus
vanellus, Calidris alpina, Calidris pugnax, Gallinago gallinago, Numenius arquata, Limosa
limosa and Tringa tetanus.
Although some of the deliverables were delayed by several months, all were prepared during the
reporting period. Terms of Reference (ToR) for each Coordinating Team, Species Status Reports
(SSR) and reviews of existing Action Plans (AP) were compiled and key documents uploaded on
the fully operational SAP TT. Consultations involving representatives from the EU and non-EU
governmental institutions, international conservation bodies, hunting associations, research
institutes, NGOs and independent experts were conducted. As part of the consultation process,
international Planning Workshops were held. Outputs from the workshops, including lists of
priority threats and conservation actions, will be incorporated into all First Draft SAPs and First
Draft MSAP. As foreseen in the Grant Agreement (GA), first drafts will be ready by end April
2017. No delays are expected for the delivery of project outcomes.
Due to changes in the geographic scope of several SAPs, deadlines for some implementation
actions were postponed. These delays were sanctioned by DG ENV as non-substantial in letter
ENV-E-3 SG/PR/ip, 26/05/2016. Despite delays, all teams achieved strong results in terms of
engagement with stakeholders for SAP and MSAP preparation, and networks of dedicated experts
to lead on the conservation of each species in respective range countries were created. Provisional
Working Groups (WG) were established for each species, for which official operation should be
coordinated with the DG ENV and relevant international conventions. Creating conditions
(including financial support) and a single standard for WGs to implement conservation APs while
involving national authorities in monitoring their implementation will be the most important but
also most challenging project outcome. Success will require strategic planning and close
collaboration between all involved organisations, especially DG ENV and international
conventions.
6
4. Introduction
Using BirdLife International’s (BLI) experience in building a strong multi-disciplinary partnership
as a foundation, the LIFE EuroSAP Project focuses on the delivery of new or revised SAPs for
Europe’s most important bird species. The project also aims to produce state-of-the-art tools which
can be used by European stakeholders well beyond the project’s expected duration, thereby
providing a solid framework for better cooperation and effective delivery of SAPs.
LIFE EuroSAP’s objectives are to undertake the most urgent update and revision of six APs for
birds requiring coordinated conservation efforts at international levels to halt ongoing population
declines. The overall aim is to develop new SAPs for two species of seabirds and one MSAP for
eight species of waders. They are ‘threatened’ according to IUCN’s Red List assessment. Among
the most important goals, but also the most significant challenge, is to establish a system which
allows for coordination among the main actors involved in the development and implementation
of the SAPs, and also a system that works successfully after the project closes.
During the reporting period, the LIFE EuroSAP was implemented smoothly, though delays
occurred in some actions for some species (Gantt chart, Annex 5). The Coordinating and
Associated Beneficiary Project Teams are established and effectively working on the delivery of
the projects objectives. Minor delays were mainly due to multilateral discussions, including with
the Agreement on the Conservation of African-Eurasian Migratory Waterbirds (AEWA) and the
Convention on Migratory Species (CMS), on the need to broaden the range covered by some of
the SAPs (eg. for M. fusca, O. leucocephala, and S. t. turtur). This led to an increase in the number
of countries and stakeholders involved, as well the number of participants in the planned
consultations, and therefore associated costs. The Associated Beneficiaries have made a significant
effort to advance implementation of the actions. The Coordinating Beneficiary secured additional
funding from AEWA and MAVA to support the involvement of a higher number of stakeholders
to achieve a true Flyway approach for most of the targeted species.
Altogether, ToRs have been written and adopted for each team (A.1, A.2). National focal points
were identified and feedback collected so that the implementation of existing SAPs could be
evaluated (A.3) and SSRs prepared (A.4 to A.6, and A.8 to A.10). All foreseen workshops were
successful (A.11). The SAP Tracking Tool (SAP TT) was developed (A.7) to serve as a web-based
platform for sharing information during SAP revision and development, a repository for key
documents, and a tool for monitoring SAP implementation. The project website was developed
(B.1) and is maintained and continuously updated with information provided by the project
partners. More than 170 publications have been published online within the current reporting
period (B.3). To ensure extensive dissemination of the project outputs, a communication plan was
prepared and sanctioned by the partners (B.3). Four Steering Committee (SC) meetings (C.1) and
one Scientific Committee (SCC) meeting (C.2) were organized and held. Project management and
implementation (C.3) are being executed without major problems, and the Leading Beneficiary
has been successfully coordinating the Associated Beneficiaries work on project action
implementation. The projects expected results are fully viable and it is foreseen that primary
deliverables and timelines (8 SAPs and MSAP) will be met without delay.
Gantt chart of the overall project progress attached
7
5. Administrative part
As the Coordinating Beneficiary, BLI is maintaining contact with all project partners and
stakeholders. Remote meetings via Skype or telephone occur regularly and email is used for
primary correspondence. When necessary, face-to-face meetings are held with key stakeholders.
A clear set of protocols was established internally to ensure adequate financial and administrative
monitoring of the project.
The BLI project team consists of a Project Coordinator, Project Assistant, Head of Conservation,
Financial Officer, and Communications Officer (the latter is subcontracted by BLE). The initial
Project Coordinator, Ms. Christina Ieronymidou, conducted overall project management between
April 2015 and January 2016. She maintained communication with project partners as well as DG
ENV and other relevant bodies; she organized and chaired the 1st and 2nd SC meetings; she
prepared and distributed meeting minutes, templates for the elaboration of project deliverables,
Partnership Agreements (PA) (Annex 4), and other relevant documents to partners. She
represented the project during the NADEG meeting in October 2015 and discussed project
reporting with Mr. John Houston, the External Monitor (NEEMO). On 15th January 2016, Ms.
Ieronymidou resigned from her position for professional motives. On 8th February 2016, she was
replaced by Ms. Anna Staneva. During this staff change, Mr. Ivan Ramirez, Head of Conservation
at BLI, fulfilled the role of Project Coordinator and ensured a smooth transition period.
On 8th February 2016, Ms. Sofia Capellan was hired by BLI to serve as Project Assistant. Both the
Coordinator and Assistant positions are based at BLI headquarters in Cambridge, UK. From this
time, they communicated with all project partners, organized the 3rd joint SC and 1st SCC meetings
(21-22nd April 2016 in Bonn) and also prepared and submitted the Progress Report. The latter was
completed following advice of the external monitoring team and after meeting with Mr. Houston
in Cambridge from 8th-9th March.
On 10th October 2016, after successfully coordinating the SAP TT development, Ms. Sofia
Capellan moved to a different position at BLI. Since this time, the project has remained without a
Project Assistant. Through financial support from MAVA, BLI hired an independent consultant to
assist the Project Coordinator with the preparation and submission of the MTR.
So far, the new Project Coordinator has also chaired a virtual 4th SC meeting on 3rd November
2016, participated in 4 of the 8 SAP Planning Workshops, presented project progress at the
NADEG meeting in November 2016, communicated relevant issues and ongoing changes in
project implementation, facilitated collaboration between project partners and other organizations,
and has actively been engaged in strategic planning and communication with DG ENV, FACE,
CMS, and AEWA.
Between August 2015 and July 2016, the project’s Financial Officer, Ms. Adriana Gawrysiak
(BLI), was replaced by Mr. Michael Lewis (BLI). Since June 2016, Ms. Colette Sotrines has been
fulfilling the role of Project Financial Officer.
BLI subcontracted BLE to implement communication actions for the project. As a result, 27,734€
was reallocated from Personnel costs to the External Assistance category. During initial stages of
the project, Ms. Elodie Cantaloube dedicated some of her time as Communications Officer. In
8
October 2015, Ms. Sanya Khetani Shah was appointed the LIFE EuroSAP Project
Communications Officer for BLE. On July 22nd, Ms. Khetani Shah left the organisation. Her
responsibilities were then split between Ms. Gui-Xi Young and Mr. Maxime Paquin from BLE’s
Communications team. They are maintaining the project website, social media pages (Twitter and
Facebook), and the Communications Plan. They also communicate with partners and produce
news stories to promote the project.
Although the following changes in staff have occurred during the reporting period, all Associated
Beneficiary Project Teams were established at early stages of the project:
HOS: On 7th April 2016, Ms. Danae Portolou replaced Mr. Fran Vargas, who left HOS on 23rd
March 2016, as the P. crispus SAP Species Coordinator.
RSPB: Ms. Tara Proud resigned from the role of S. t. turtur SAP Species Coordinator due to
medical reasons. She was replaced by Mr. Ian Fisher in early July 2016. Since September 2016,
he has been supported by Ms. Joscelyne Ashpol for the preparation of the S. t. turtur SAP. RSPB
subcontracted MME for 3,000€ to assist with the organization of the Planning Workshop in
Hungary.
LPO: Mr. Bernard Deceuninck, the P. yelkouan SAP Species Coordinator, moved to another
position in LPO. He was replaced by Ms. Helena Garcia on 1st August 2016. One month later (9th
September), Ms. Garcia left LPO. Mr. Thierry Micol fulfilled the role of Species Coordinator until
Ms. Clémence Gaudard joined the organization on November 21st 2016 and took over the position.
VCF: Since 16th August 2016, Ms. Alice Gama replaced Ms. Franziska Lörcher as Financial and
Administrative Assistant for the A. monachus and G. barbatus SAPs. Mr. Jovan Andevski was
appointed European Regional Coordinator for the Vulture MSAP. This enhanced his role in the
preparation of the A. monachus and G. barbatus SAPs, which will be prepared together with Mr.
José Tavares, the Species Coordinator. Mr. José Tavares was invited to facilitate the S. t. turtur
SAP Planning Workshop. As consequence, VCF will report a higher amount of staff time. The
changes in the budget will be reflected in the PA.
SEO: With financial support from MAVA, SEO subcontracted RDS Conservation (represented by
Mr. Sheldon) to produce the O. leucocephala First and Second Draft SAPs. Mr. Rob Sheldon also
facilitated the O. leucocephala Planning Workshop in Spain. SEO was appointed and received
3,000€ of RSPB’s budget to assist with the organization of the S. t. turtur Planning Workshop. An
amendment to the PA will be prepared to incorporate these changes in the project budget.
Since the project initiated, the Species Coordinators (Table 1) have led the technical,
administrative and financial coordination for the development of their respective SAPs.
Communication, administrative and financial support for each of the Associated Beneficiaries was
provided by additional or permanent staff. Although some project actions were delayed, all project
staff understand their roles and obligations.
9
Table 1. Team leaders responsible for SAP and MSAP delivery
Action Plan Organisation Species Team Coordinator
Pelecanus crispus HOS Danae Portolou
Melanitta fusca LOD Mindaugas Dagys
Puffinus yelkouan LPO Clémence Gaudard
Waders NABU Jutta Leyrer
Streptopelia turtur RSPB Ian Fisher
Oxyura leucocephala SEO Jorge Orueta
Hydrobates monteiroi SPEA Nuno Oliveira
Aegypius monachus VCF Jovan Andevski/José Tavares
Gypaetus barbatus VCF/SEO/BirdLife José Tavares/Jorge Orueta
Communication between the Project Coordinator and Ms. Marita Arvela, DG ENV, has mainly
been conducted via email correspondence, but face to face meetings were also held in 2016 and
early 2017. In her role as member of the SC, Ms. Arvela has actively participated in project
meetings (including Planning Workshops, A.11), communicated with both the project
Coordinating and Associated Beneficiaries, and also mediated important discussions, providing
useful support and advice.
Communication with the Monitoring Team has been regular and very constructive. Since the
project began, four meetings (one informal) with the Monitoring Team have taken place.
There have been no amendments to the GA since the project initiated. Changes in deadlines for
Actions A.1, A.3, and A.6 to A.10 (requested in letter ECA/016/050, accepted in DG ENV-3-
SG/PR/ip) have allowed for fulfillment of the first half of the project work plan.
Partnership Agreements attached
10
6. Technical part
6.1a. Progress of the project by group of Actions
A Actions: Implementation Actions
Overall progress of the implementation actions are summarized in Annex 2.
A.1 and A.2 Start-up phase for the preparation of SAPs and MSAP
Status of action: completed
These actions mainly involved contacting stakeholders in each range country, presenting the
project, and identifying members of the species WGs. These actions included desk-studies,
assessment of existing information, and preparation of ToRs for respective WGs. Each ToR
describes the function of the planning team and how different stakeholders will contribute to the
SAP development. The ToR also identifies roles and responsibilities, decision making processes,
objectives, timelines, methodologies, actions, deliverables, outputs, and required resources.
During the reporting period, team coordinators were appointed, species teams were established,
and key experts and stakeholders were identified and invited to join the species WGs. All nine
ToRs for the WGs were prepared (Annexes A1/1, A1/2, A1/3, A1/4, A1/5, A1/6, A1/7, A1/8 and
A2/1).
Problems and changes: the general deadline for Action A.1 was extended by six months. This
was considered a non-substantial change (letter ENV-E-3 SG/PR/ip).
ToR for O. leucocephala WG attached
ToR for the M. fusca WG attached
ToR for the P. crispus WG attached
ToR for the A. monachus WG attached
ToR for the G. barbatus WG attached
ToR for the S. t. turtur WG attached
ToR for the P. yelkouan WG attached
ToR for the H. monteiroi WG attached
ToR for the waders WG attached
A.3 Evaluation of the implementation of the existing SAPs
Status of action: completed
Under this action, SAPs for the species already having pre-existing plans underwent a full
evaluation. These species include: M. fusca and S. t. turtur EU MPs; O. leucocephala and P.
crispus SAPs (they do not cover the entire flyway of European populations); and G. barbatus
SAPs. The evaluation involved reviewing existing conservation work and addressing any
information gaps that would improve each SSR. Species specific questionnaires were used to
collect feedback from stakeholders. Evaluations of the implementation of the existing SAPs are
annexed in A3/1, A3/2, A3/3, A3/4, A3/5. A draft evaluation of the existing Action Plan for A.
monachus has been completed.
11
This action was completed by all project partners.
Problems and changes: the general deadline for Action A.3 was extended by five months. This
was considered a non-substantial change (letter ENV-E-3 SG/PR/ip).
Evaluation of the implementation of the existing SAP for O. leucocephala attached
Evaluation of the implementation of the existing MP for M. fusca attached
Evaluation of the implementation of the existing Action Plan for P. crispus attached
Draft evaluation of the implementation of the existing Action Plan for A. monachus attached
Evaluation of the implementation of the existing SAP for G. barbatus attached
Evaluation of the implementation of the existing MP for S. t. turtur attached
A.4 to A.6, A.8 and A.10 Update, preparation of First and Second Drafts, and finalization of
SSRs
Status of action: completed
The purpose was to create a single document containing a synopsis of available information,
current scientific evidence, and data gaps concerning the species status and population trends. A
species specific questionnaire was used to collect feedback from stakeholders. These actions
include elaboration of the SSRs (First, Second Drafts and final reports) for all target species - 9
total (First Drafts annexed in A4/1, A5/1, A6/1-7, Second Drafts annexed in A8/1-7, and final
SSRs annexed in A10/1-6). At each stage, draft reports were circulated for review amongst all
stakeholders. Efforts to collect feedback are presented per species (Annexes A9/1-4 and A9/6-9).
Problems and changes: the general deadline for Actions A.6, A.8, A.9 and A.10 were extended
by 3 to 5 months. This was considered a non-substantial change (letter ENV-E-3 SG/PR/ip).
Final SSR for M. fusca attached
Final SSR for P. crispus attached
Final SSR for S. t. turtur attached
Final SSR for P. yelkouan attached
Final SSR for H. monteiroi attached
Final SSR for the waders attached
Action A.7 Development of the web based “SAP TT” platform
Status of action: completed
Foreseen start date: 1st April 2015 Actual start date: 1st November 2015
Foreseen end date: 1st April 2016 Actual end date: 30th September 2016
The SAP TT is a web based platform for collecting and sharing information on Action Plans for
avian species. This tool was created to serve as an up-to-date information hub for following SAP
development and implementation.
The platform provides the following information:
List of SAPs available through the platform;
Timeline of the SAP development and implementation, with progress for each stage colour
coded and links to key documents provided;
12
Links to key documents and resources, e.g., online data bases, conservation projects, species
profiles and relevant Important Bird Areas (IBA);
Lists of contributors for the development of each SAP/MSAP;
Contact form to the Species Coordinator;
Reporting form for national focal points to share information on SAP implementation
(available upon login and during SAP implementation);
Administrative panel (available to the administrator upon login); and,
Visualisation of the implementation of each SAP according to conservation action (map
display) and country (pie chart display). Visible only during implementation phase of the SAP.
The timeline for each species follows the steps of the SAP elaboration and implementation process
(Annex 1) as described in the LIFE EuroSAP Project proposal.
A call for tenders to develop the SAP TT was launched in November 2015, with a deadline of 1st
December 2015. Two applications were received and interviews were conducted with each
candidate. After the interviews and the proposals were evaluated, the project team selected the bid
presented by Mr. Giorgio Zanetti of Wave Developments SPRL (contract was signed in January
2016). In March 2016, a draft document (Annex A7/1) providing an overview of the SAP TT and
its technical functionalities was prepared and distributed to the project partners, and SC and SCC
members. Comments and feedback were received April 2016 and then summarized and discussed
during the joint SC and SCC meeting on 21st April 2016, in Bonn, Germany. An important outcome
from this meeting was agreement on the main functionalities of the tool and that creation of a
discussion forum was not a required element. Between May and September 2016, the project team
worked in close collaboration with the developer to ensure recommendations from the two
committees were followed.
In early September 2016, the SAP TT was transferred from the working server of the developer to
an online cloud server. This was supported through a financial contribution from MAVA. The SAP
TT was then launched under the domain www.trackingactionplans.org. The month of September
was dedicated to testing and improving operation of the tool. Project partners, members of the
project SC and SCC’s, BLI partners and staff were asked to test the tool and provide feedback so
that any technical problems would be identified and corrected. The platform was officially
launched and promoted through BLI media channels (website, monthly newsletter, and Twitter
and Facebook accounts) in the beginning of October 2016.
The Project Coordinator presented the SAP TT at DG ENV on 19th October, then at the NADEG
meeting on 8th November 2016 in Brussels, and also the “Species Recovery Conference” in
Cambridge on 7th February 2017. The Project Team and Project Partners presented the SAP TT at
Planning Workshops (A.11) organized under the LIFE EuroSAP Project and during the regional
workshop for Europe for the Vulture MSAP.
In February 2017, as part of the collaboration with the CMS and to promote the SAP TT, the
Egyptian Vulture FAP was made available on the SAP TT platform. In March 2017, the Vultures
MSAP will also be uploaded on the tool.
The Project Coordination Team is strongly committed to promoting the SAP TT widely and
encouraging stakeholders involved in the SAP elaboration to use it to promote their work. The
13
SAP TT has the potential to not only fulfil its role on a EU and European scale, but on a Eurasian
and African level as well. It could also be used to stimulate collaboration between institutions from
different countries, bringing transparency to SAP development and implementation elsewhere.
Problems and changes: This action was delayed by 5 months. The Project Team preferred to
postpone the initial launch of the SAP TT to external audiences until all desired elements were
functional and the workflow was agreed. This delay did not affect the consultation process or
delivery of the SAPs because all key documents that have been produced so far were uploaded on
the tool without delay. When the SAP TT was launched, webinars and training sessions were
provided to project partners and at the Planning Workshops (A.11) so that experts and stakeholders
involved in the SAP elaboration would understand and actively use the tool.
Due to planned changes in the data management and storage services within BLI, the SAP TT was
placed on an external cloud server. This unforeseen cost was covered with co-funding from MAVA
and therefore did not cause changes in the original project budget. The use of the cloud server is
financially guaranteed for at 3 years.
Technical_description of the_SAP TT attached
A.11 Planning Workshops
Status of action: completed
Preparation for this action began in early 2016. A total of 8 Planning Workshops were successfully
organized between September 2016 and January 2017. An additional 3 meetings were held to
discuss the G. barbatus and A. monachus SAPs in relation to the CMS Vultures MSAP. Prior to
this, the G. barbatus Planning Workshop was organized by VCF and held in November 2015. The
date and location of each Planning Workshop are indicated below (Table 2).
Table 2. Location and date for SAP Planning Workshops organized under Action A.11
Workshop Organizer Date Location
Lowland Grassland
Breeding Waders
NABU 8-10 November 2016 Tönning, Germany
Puffinus yelkouan LPO 10-11 October 2016 Paris, France
Melanitta fusca LOD 4-6 October 2016 Vilnius, Lithuania
Oxyura
leucocephala
SEO/BirdLife 24-26 October 2016 Madrid, Spain
Hydrobates
monteiroi
SPEA 8-9 September 2016 Ilha Graciosa, Azores,
Portugal
Aegypius monachus VCF 25-29 October 2016
16-19 February 2017 Monfragüe NP, Spain
Toledo, Spain
Gypaetus barbatus VCF/SEO
BirdLife
23-24 November 2015
11-13 November 2016
Corsica, France
Mittersill, Hohe Tauern NP
(Austria)
Pelecanus crispus HOS 22-25 November 2016 Lithotopos, Greece
14
Streptopelia turtur RSPB 19-21 December 2016
16-18 January 2017
Segovia, Spain
Kiskunsag NP, Hungary
Agendas, invitation samples, participant lists, photos and other workshop outputs are annexed in
the ‘Progress by species’ section of this report.
Problems and changes: Two rather than three workshops were organized and held for the S. t.
turtur SAP. The first workshop was held in Spain and hosted by CENEAM (Ministry of
Agriculture of Spain). This resulted in a cost-effective event. The second workshop was held in
Hungary back-to-back with the European Roller conference (under LIFE). It was hosted by the
Hungarian National Parks unit. This kept costs down while encouraging a solid platform for
stakeholder participation and strong collaboration between the two projects.
The workshop organized for the Oxyura leucocephala was used to launch the AEWA White-
headed Duck International Working Group and subsequently served as the first meeting of the
Working Group, which is the inter-governmental body charged with coordinating the
implementation of the SAP.
Action A.12 and A.14 SAPs and MSAP First Drafts
Status of action: in progress
Foreseen start date: 1st January 2017 Actual start date: 1st January 2017
Foreseen end date: 30th April 2017 Anticipated end date: 30th April 2017
Once all workshops (Action A.11) are completed, an agreed First Draft document will be
compiled, published online and circulated for review and feedback from DG ENV, MSs, experts
and international stakeholders. The First Drafts will be developed by the coordinators, who will
also ensure all comments from the action planning teams are incorporated. The First Draft will
also elaborate in detail the threat analysis and conservation actions for each species.
No delay is expected in this action.
Note: Actions A.14 to A.18 have not yet begun, thus their description is not applicable for the
current reporting period.
Overall progress of the implementation actions attached
SAP elaboration workflow attached
B Actions: Actions for communication and dissemination of project lessons
Action B.1 Project website
Status of action: in progress
Foreseen start date: April 2015 Actual start date: May 2015
Foreseen end date: March 2018 Anticipated end date: March 2018
The projects’ aims and results are being promoted through on-line media, i.e., website and social
media (Facebook, Twitter). The project website http://www.birdlife.org/europe-and-central-
15
asia/project/life-eurosap (Annex B1/1) was launched on 18th August 2015 and is hosted on the BLI
website. This site is fully functional and regularly updated with partner news and events. Between
August 2015 and 28th February 2017, there were 5,021 page views from 3,327 individual visitors
on all LIFE EuroSAP pages (Google Analytics, Annex B1/2).
The action is being implemented without delay. Project partners are regularly requested to
contribute news and materials for the website. The website will be kept active and continue
promoting the SAP TT for at least 5 years after the project close (in accordance with Article II.7.1
of the General Conditions).
Print screen of the LIFE EuroSAP website attached
Google Analytics reports attached
Action B.2 International cooperation
Status of action: in progress
Foreseen start date: April 2015 Actual start date: April 2015
Foreseen end date: March 2018 Anticipated end date: March 2018
This action was implemented without any major delays or problems. BLI and its partners have
actively used international links to promote LIFE EuroSAP within national and international fora.
This has resulted in wide promotion of the project and its expected outputs. Being a wide
consortium which includes the most suitable species-experts, the project team reached out to other
bodies actively working on one or more of the target species. Specific meetings and species-related
discussions were held with PECMBS (Pan European Common Bird Monitoring Scheme), the
EBCC (European Bird Census Council), IUCN (International Union for the Conservation of
Nature), Wetlands International, WCS (Wildlife Conservation Society), and the Convention on
Migratory Species (CMS). During these meetings, specific references to the SAP TT were made,
as well as calls for relevant experts to participate in the WGs, planning workshops and other events
foreseen within the project.
Mr. Iván Ramírez participated in the “BirdNumbers 2016” conference, celebrated in Halle,
Germany on 5th-7th September, and co-organised by the EBCC (Annex B2/1). This is one of
Europe’s largest ornithological meetings. During the 3-day conference, Mr. Ramírez chaired one
session on “Biodiversity Indicators” and LIFE EURO SAP received special attention during
EBCC’s board meeting. In particular, dates for the planned species workshops for SAPs were
discussed and synergies in between EBCC members and BLI partners and project partners seeked.
LIFE EuroSAP was also discussed within the framework of the threats affecting migratory species
and within the new European Breeding Bird Atlas (EBBA2) project, as some of the species tackled
under this project are currently being mapped within EBBA2.
Preparation of the M. fusca SAP was discussed during the ICES/OSPAR/HELCOM JWG Bird
and ESWG (European Seaduck WG) meetings. Potential collaboration with other LIFE projects
was briefly discussed during the two LIFE EuroSAP SC Meetings (C.1) in 2016, but a more
detailed plan will be presented at the 5th SC meeting in May 2017.
Agenda for the “BirdsNumbers 2016” Conference attached
16
Action B.3 Communication plan and dissemination of activities
Status of action: in progress
Foreseen start date: April 2015 Actual start date: August 2015
Foreseen end date: March 2018 Anticipated end date: March 2018
The communication plan (Annex B3/1) for the project was developed by BirdLife Europe’s (BLE)
communications department in the frame of a consultancy agreement (see below). The plan is
regularly updated by the project team. During the reporting period, 14 web articles were published
on the LIFE EuroSAP website (with total of 12,994 views), while more than 160 news items were
published on the official websites of partner organisations (some in their national languages) and
shared on LIFE EuroSAP website (Annex B3/2 and B3/3).
The action is being implemented with no delays.
Problems and changes: The staff time budget foreseen in the GA for implementing the
communications actions under ‘personnel costs’ category was reallocated to ‘external assistance
costs’. This is because BLI is subcontracting BLE whose staff are performing the communications
work, or B actions, in particular Actions B.1, B.3, B.4 and B.5. Costs are justified with an invoice
at the end of each calendar year, based on the amount of staff time.
The role of Project Communications Officer was initially assigned to Ms. Sanya Ketanhi Sah who
left the organisation in July 2016. Her responsibilities were transferred to other communications
staff; Ms. Guy-Xi Young and Mr. Maxime Paquin. They are supported by the Head of
Communications at BLE and other members of the communications team.
Communication plan attached
Media dissemination attached
Evidence of media dissemination attached
Action B.6 Networking with other LIFE projects
Status of action: in progress
Foreseen start date: April 2015 Actual start date: April 2015
Foreseen end date: March 2018 Anticipated end date: March 2018
This action is being implemented without any major delays or problems. Both the core project
team and partners conduct regular meetings with relevant LIFE projects to address conservation
issues for one or more of the targeted species. Projects where direct links were made include:
Bright Future for Black Vulture, LIFE14 /NAT/BG/000649; Egyptian Vulture and Bonelli’s Eagle
Conservation in Douro/Duero Canyon, LIFE14/NAT/PT/000855; Conservation of Black and
Griffon Vultures in the cross-border Rhodope mountains, LIFE14 NAT/NL/000901; LIFE
Arcipelagu Garnija – Securing the Maltese islands for the Yelkouan Shearwater (Puffinus
yelkouan), LIFE14 NAT/MT/000991 (where BirdLife Malta is the coordinating beneficiary);
LIFE LIMOSA – Stabilisation of the core population of the Black-tailed Godwit and protection of
Dunlin and Ruff, LIFE11 NAT/DE/000353; LIFE GypHelp – Bearded Vulture in the French Alps,
LIFE13/NAT/FR/000093; GypConnect – connecting Bearded Vultures in the Alps and the
Pyrenees, LIFE14 NAT/FR/000050; LIFE Under Griffon wings – Implementation of best practices
to rescue Griffon Vultures in Sardinia, LIFE14/NAT/IT/000484.
17
The EBCC/BLI meeting was held in November 2016 in Brussels, Belgium. LIFE EuroSAP
linkages with EBCC relevant projects were discussed, including the new Euro Bird Portal LIFE
preparatory project. It is envisaged that such synergies will benefit both projects.
To date, members of the LIFE EuroSAP have been maintaining contact with other LIFE projects
primarily via telephone or Skype, or through bilateral meetings during other workshops. VCF
frequently visits partners and countries which coordinate other LIFE projects targeted at vulture
conservation.
On 28th February 2017, the Project Coordinator took part and gave a presentation (Annex B6/1)
on the LIFE EuroSAP Project at the “Achieving Sustainable Recovery” Conference (Annex B6/2)
organized by RSPB under the LIFE11 INF/UK/000418 Project (Securing the Stone-curlew -
Securing the future of the Stone-curlew (Burhinus oedicnemus) throughout its range in the UK).
The conference was held in Cambridge, UK. More than 90 participants, including representatives
from NGOs, governmental organisations, corporates, as well as farmers and volunteers, attended
the event (Annex B6/3 and B6/4).
The LIFE EuroSAP Project Coordinator presented the SAP TT and the 9 SAPs being developed.
The aim was to encourage all relevant stakeholders to share experiences and best practices in
species conservation and ensure these considerations are taken into account in the future
SAPs/MSAP.
Collaboration with CMS was achieved when the Draft FAP for the Conservation of the Balkan
and Central Asian Populations of the Egyptian Vulture (EVFAP) was uploaded on the SAP TT.
The EVFAP was developed by BSPB/BirdLife Bulgaria and partners under the framework of the
LIFE+ project "The Return of the Neophron" (LIFE10 NAT/BG/000152 "Urgent measures to
secure the survival of the Egyptian vulture (Neophron percnopterus) in Bulgaria and Greece")
together with CMS’s Central Unit of the Raptors MoU. News of the collaboration was published
on the LIFE+ project and BSPB/BirdLife Bulgaria websites and promoted through social media
(Annex B6/5). In collaboration with the CMS, the Vultures MSAP will be uploaded on the SAP
TT upon submission of this report.
Presentation, Agenda, Participants List and photo for the Species Recovery Conference attached
Print screens of media publication on EVFAP attached
Expected results:
o Meetings with relevant LIFE projects
o At least two site visits to LIFE teams
C Actions: Project management and monitoring of the project progress
Action C.1 Project SC
Status: in progress
Foreseen start date: April 2015 Actual start date: August 2015
Foreseen end date: March 2018 Anticipated end date: March 2018
18
The 1st SC meeting took place in Brussels on 4th September 2015, with 16 participants representing
13 partners (Minutes, Annex C1/1). During the meeting several deadlines were amended, however,
DG ENV noted these as non-substantial changes in its letter of 29/10/15. A tender for the SAP TT
was prepared. A number of partners raised the need to expand the geographical scope of the SAPs.
As a result, it was agreed that meetings would be held between the AEWA Secretariat and SAP
leaders from SEO/BirdLife, LOD and HOS to discuss additional funding for workshops. BLI
circulated template documents amongst partners to evaluate the implementation of existing plans,
SSRs, planning workshop essentials and SAP format. Factsheets containing background
information on each of the target species were also circulated. In terms of project management, it
was confirmed that financial reporting is not required from the co-funders.
The 2nd SC meeting was held over Skype on 19th November 2015 with 15 participants representing
10 partners (Minutes Annex C1/2). The purpose and composition of the SCC was discussed. The
AEWA representative proposed to facilitate the three SAP Planning Workshops. A draft
communication plan and summary of results from the first meeting with the External Monitor were
presented. At the meeting close, the replacement Project Coordinator was announced.
The 3rd SC meeting was held back to back with the 1st SCC meeting from 21-22nd April 2016 at
the AEWA Secretariat hosted at the UN Campus in Bonn, Germany. 22 participants from 16
partner and collaborating organizations attended (Minutes Annex C1/3). Overall project progress
and financial status, as well as updates for each SAP were presented. The SAP TT structure and
functions were discussed in detail as a continuation of a prior online discussion with participants.
Other main topics discussed included; engagement with national authorities in SAP
implementation, monitoring SAP implementation, and who and how to coordinate the work on
SAPs internationally following project close.
The 4th SC meeting was held as a Skype conference call on 3rd November 2016 with 13 participants
representing 12 partners (Minutes Annex C1/4). Overall project progress and financial status,
progress of each SAP, SAP TT and 2017 workplan were presented. Project partners shared their
experiences working on the SAPs and organizing the Planning Workshops. They expressed some
concerns and also agreed on the reporting period to be covered by the MTR.
Minutes covering key points from each meeting were distributed amongst all partners and
participants by the Project Coordinator following each meeting.
Minutes from the 1st, 2nd, 3rd and 4th SC meetings attached
Action C.2 Project SCC
Status of action: in progress
Foreseen start date: April 2015 Actual start date: August 2015
Foreseen end date: March 2018 Anticipated end date: March 2018
A list of 12 potential SCC members was agreed during the 2nd SCC meeting in November 2015.
Each individual was invited by e-mail in December 2015. Once an invitation was accepted, the
SCC member (Annex C2/1) was informed about the date and location of the 1st SCC meeting.
19
Dates for the 2nd and 3rd SCC meetings were proposed and agreed with partners via e-mail for 23rd
May 2017 and autumn 2017 respectively (Table 3, Agenda Annex C2/2).
The first SCC meeting took place on 22nd April 2016 in Bonn, Germany, back-to-back with the 3rd
SC meeting and CMS meeting (refer to description above, C.1).
20
Table 3. Date and Location of SC and SCC meetings
Date and Location Steering Committee Scientific Committee
4th Sep 2015, Brussels 1st meeting
19th Nov 2015, on-line 2nd meeting
21st-22nd Apr 2016, Bonn 3rd meeting 1st meeting
3rd Nov 2016, on-line 4th meeting
23rd May 2017, Brussels 5th meeting 2nd meeting
7th Nov 2017, on-line 6th meeting
Autumn 2017, in person 3rd meeting
SCC members attached
Agenda for the 3rd joint SC and SCC meeting attached
Action C.3 Project implementation, management and monitoring
Status of action: in progress
Foreseen start date: April 2015 Actual start date: August 2015
Foreseen end date: June 2018 Anticipated end date: June 2018
All project staff, both coordinating beneficiary project team (Project Coordinator, Head of
Conservation, Financial Manager, Financial Assistant and Communications Assistant) and
associated beneficiary project teams have been appointed and are aware of their roles and
obligations. Management of the project is running smoothly; the coordinating beneficiary
effectively coordinates the work of the partnering beneficiaries. Major progress was made in terms
of project implementation during 2016 and all project partners have established strong
collaborative networks related to their assigned SAPs.
Problems and changes: As mentioned above, the original Project Coordinator, Ms. Christina
Ieronymidou left the project on 15th January and was replaced by Ms. Anna Staneva on 8th
February. Ms. Sofia Capellán was hired as a part-time Project Assistant (Species Conservation
Assistant) by BLI. Together with the new Project Coordinator, the new half-time assistant position
is based in Cambridge. The Head of Conservation at BLI, Mr. Ivan Ramirez, ensured a successful
transition and maintained contact with project partners and DG ENV.
Since October 2016, Ms. Sofia Capellan left the project and the Project Coordinator has been
successfully coordinating the work. For the purposes of the MTR preparation, an external
consultant was hired to support the work of the Project Coordinator.
Action C.6 Indicators
Project specific indicators are listed in Annex C6/1.
Project Specific Indicators attached
21
6.1b. Progress of the project following species by species summaries
Note: Actions A.14 to A.18 have not yet begun, thus their description is not applicable for the
current reporting period. Nevertheless, we do not envisage any changes in the implementation
of these actions at this stage.
White-headed Duck (Oxyura leucocephala) – led by SEO/BirdLife
The White-headed Duck (Oxyura leucocephala) is listed as
Endangered on the global IUCN Red List with an estimated
population of about 20,000 mature individuals (according to recent
counts in Kazakhstan). There are four known sub-populations:
Central Asia (c. 5,000–10,000 birds), Pakistan (near extinct), North
Africa (400–600 birds), and Spain (c. 2,500 birds). Under the LIFE
EuroSAP Project the existing International SAP (Hughes et al. 2006)
will be updated.
Action A.1 Start-up phase for SAPs
Status of action: completed Foreseen start date: 1st April 2015 Actual start date: 1st June 2015
Foreseen end date: 31st May 2016 Actual end date: 26th September 2016
A Team Coordinator was appointed and the core Species WG, made up of SEO/BirdLife staff and
AEWA Secretariat representatives, was established. Following the standard action-planning
practice under AEWA, national government representatives as well as experts were designated by
AEWA MSs. A ToR (Annex A1/1) was prepared, and other experts and stakeholders were
identified (note that the preparation of a ToR is not part of the AEWA process, which is already
well-established and transparent and was thus produced solely for the purposes of the LIFE
project). In December 2015, the LIFE EuroSAP project was discussed during the expert meeting
for the implementation of the Action Plan for the eradication of Ruddy Duck in Europe. This
meeting was attended by representatives from Spain, France, the Netherlands, Belgium and the
UK. Representatives from Morocco also met with SEO/BirdLife in January 2016.
Problems and changes: The original scope of the project only included the AEWA range of O.
leucocephala, but following the decision of the AEWA Technical Committee, it was then
expanded to follow the scope of the current EU/AEWA/CMS SAP, which is global and thus
includes all Principal Range States hosting significant numbers of the species as well as other
countries that could contribute to its preservation, e.g., via Ruddy Duck control (UK, France,
Netherlands, and Belgium). As a result, the number of stakeholders increased which led to a
proportional increase in funds required for the project.
Both SEO/BirdLife and AEWA identified a number of data gaps in some parts of the species range.
Attention was focused on addressing these gaps during the consultation phases.
ToR for O. leucocephala WG attached
22
Action A.3 Evaluation of the implementation of the existing APs
Status of action: completed Foreseen start date: 30th November 2015 Actual start date: 1st October 2015
Foreseen end date: 31st August 2016 Actual end date: 28th February 2017
The methodology adopted for the evaluation of the implementation of the existing SAP for O.
leucocephala was based on a template proposed by AEWA. The evaluation was completed for
Spain, and a questionnaire was sent to stakeholders from the most significant range countries to
collect further information. All responses were summarized in the evaluation review (Annex
A3/1).
Problems and changes: This action was delayed due to the expanded scope of the SAP, and longer
time required to collate the feedback from the questionnaires. However, the Planning Workshop
provided an opportunity to collect further information from range country representatives and the
review document was finalized.
Evaluation of the implementation of the existing SAP for O. leucocephala attached
Action A.6 Update of the SSR
Status of action: completed Foreseen start date: 1st April 2016 Actual start date: 1st October 2015
Foreseen end date: 31st August 2016 Actual end date: 12th October 2016
The First Draft SSR for O. leucocephala (Annex A6/1) was prepared based on current literature
and information collected from the questionnaire distributed to stakeholders from the range
countries. The Draft SSR was sent to the Planning Workshop participants (Action A.11). The
report was uploaded on the SAP TT and dedicated AEWA webpage (http://www.unep-
aewa.org/en/meeting/1st-meeting-aewa-white-headed-duck-international-working-group) for
consultation.
Problems and changes: This action was delayed because the scope of the SAP was expanded to
include the entire species range. Lack of complete data concerning the species distribution and
insufficient or delayed feedback from some of the range countries caused difficulties in the
elaboration of the SSR. To overcome this, the species leader dedicated additional time to contact
all stakeholders who could contribute to a proper species status assessment.
First Draft SSR for O. leucocephala attached
Action A.8 Elaboration of the SSR and consultation with stakeholders
Status of action: completed
Foreseen start date: 1st April 2016 Actual start date: 15th January 2016
Foreseen end date: 30th September 2016 Actual end date: 28th February 2017
The Second Draft SSR for O. leucocephala (Annex A8/1), based on feedback from the
participants, was prepared following the Planning Workshop (Action A.11). The document was
uploaded on the SAP TT for consultation.
23
Problems and changes: Same as above (Action A.6).
Second Draft SSR for O. leucocephala attached
Action A.9 Providing feedback from the consultation of the Draft SSR
Status of action: completed
Foreseen start date: 1st May 2016 Actual start date: 28th Feb 2017
Foreseen end date: 31st October 2016 Anticipated end date: 31st March 2017
The Second Draft SSR was uploaded on the SAP TT for consultation.
Action A.10 Finalisation, publication and dissemination of the SSR
Status of action: in progress
Foreseen start date: 31st July 2016 Actual start date: 31st July 2016
Foreseen end date: 31st November 2016 Anticipated end date: April 2017
The SSR for O. leucocephala will be finalized and published on the SAP TT in April 2017. The
action will be completed when all comments from the second consultations are incorporated.
Action A.11 Planning Workshop
Status of action: completed
Foreseen start date: 1st July 2016 Actual start date: 1st October 2015
Foreseen end date: 31st December 2016 Actual end date: 26th October 2016
The O. leucocephala SAP Planning Workshop (Agenda Annex A11/1), also considered the 1st
Meeting of the AEWA O. leucocephala International WG, took place from 24-26th October 2016,
in Madrid, Spain. The event was hosted by the Spanish Ministry of Agriculture, Food and
Environment and facilitated by Mr. Rob Sheldon (RDS Conservation). Official invitations were
sent by the AEWA Secretariat to one national government focal point and one expert per range
country. International conservation and hunting organizations that are members of the AEWA
Technical Committee and that are involved in the conservation of the species were also invited to
designate representatives to join the Working Group as observers. A total of 30 participants from
19 countries attended the workshop (Participants list Annex A11/2, Group photo Annex A11/3).
Problems and changes: Due to engagement in other projects, Mr. Peter Cranswick (WWT) who
initially offered to facilitate the Planning Workshop, resigned one month before the workshop.
Following recommendations of AEWA, SEO appointed Mr. Rob Sheldon to facilitate the
workshop. With financial support from MAVA, SEO subcontracted RDS Conservation
(represented by Mr. Sheldon) to produce the First and Second Draft SAPs.
Agenda, Participants List and group photo for the O. leucocephala Planning Workshop attached
Action A.12 SAP First Draft
Status of action: in progress
Foreseen start date: 1st July 2016 Actual start date: 1st November 2016
Foreseen end date: 30th April 2017 Anticipated end date: 30th April 2017
24
The First Draft SAP for O. leucocephala is in preparation. The review of the progress against the
Action Plan for eradication of Oxyura jamaicensis in the Western Palearctic (Annex A12/1) will
be considered when preparing the SAP.
No delays are expected.
Problems and changes: Production of the First Draft SAP was subcontracted to RDS
Conservation. There were no changes in the coordinating role of SEO.
Review of the progress against the Action Plan for eradication of Oxyura jamaicensis in the
Western Palearctic (2011-2015) attached
25
Velvet Scoter (Melanitta fusca) – led by LOD
The Velvet Scoter (Melanitta fusca) is listed as Vulnerable on the
global IUCN Red List with an estimated population of 300,000
mature individuals. The species has experienced a rapid decline in
number (30-49%) over the last three generations. Under the LIFE
EuroSAP project, the existing MP (2007-2009) will be used as a
basis for the development of an International SAP.
Action A.1 Start-up phase for SAPs
Status of action: completed Foreseen start date: April 2015 Actual start date: 1st September 2015
Foreseen end date: 30th November 2015 Actual end date: 30th November 2015
The initial steps for the SAP revision were carried out by Mr. Liutauras Raudonikis, CEO, and Mr.
Mindaugas Dagys, Species Officer. Consultations with potential representatives from the species
key range states were conducted to ensure their participation in the SAP WG. Following the
standard action-planning practice under AEWA, national government representatives as well as
experts were designated by AEWA MSs. A ToR for the WG (Annex A1/2) was developed (note
that the preparation of a ToR is not part of the AEWA process, which is already well-established
and transparent and was thus produced solely for the purposes of the LIFE project). It incorporates
detailed information on the SAP elaboration process, objectives and scope, primary contributors
and stakeholders, consecutive steps and timeline for development, and consultation and
communication mechanisms.
The action was completed with no delay.
ToR for the M. fusca WG attached
Action A.3 Evaluation of the implementation of the existing AP
Status of action: completed Foreseen start date: 30th November 2015 Actual start date: 1st December 2015
Foreseen end date: 31st March 2016 Actual end date: 28th February 2017
In 2007, a MP for M. fusca was prepared and adapted to relevant MSs. The plan defines a number
of objectives that are needed to restore the species population to a favourable conservation status
in the EU. An evaluation of the plan (Annex A3/2) was performed to assess how successfully it
was being implemented in the different MS and whether its objectives have been achieved. A
questionnaire addressing the objectives and actions foreseen in the existing MP, as well as other
issues related to the conservation of M. fusca, was distributed amongst country representatives. A
report on the evaluation of the implementation of M. fusca MP was then prepared.
The action was completed with delay due to a low response rate to the questionnaire. The Planning
Workshop was used to collect additional information.
Evaluation of the implementation of the MP for M. fusca attached
26
Action A.6 Update of the SSR
Status of action: completed Foreseen start date: 1st April 2016 Actual start date: 1st October 2016
Foreseen end date: 1st May 2016 Actual end date: 28th September 2016
The SAP preparation activities have been closely coordinated with the AEWA Secretariat because
the M. fusca SAP is also being developed as an AEWA plan. Following AEWA "Guidance on
defining the Action Plan spatial scope for species with a wide geographical range", countries to be
involved and/or consulted during the process were identified. Altogether, 12 countries were
defined as principal range states and an additional 15 countries were identified as survey or
consultation range states. The world population of the M. fusca consists of two biogeographically
distinct populations; the main population in Western Siberia and Northern Europe/North West
Europe and a small number in the Black and Caspian Seas (a few hundred to 1,500 individuals)
for which little is known. The AEWA Technical Committee decided that the M. fusca SAP will
only cover the Western Siberia and Northern Europe/North West European range. However,
available information and conservation needs for the Black and Caspian Seas population are
mentioned in the SAP.
A questionnaire to evaluate the status of M. fusca was prepared and distributed to representatives
from the range states to collect current information on the status across its breeding, migration and
wintering ranges. The First Draft SSR for M. fusca (Annex A6/2) was prepared in September 2016
following a five-month delay.
First Draft SSR for M. fusca attached
Action A.8 Elaboration of the SSR and consultation with stakeholders
Status of action: completed
Foreseen start date: 1st April 2016 Actual start date: 1st October 2016
Foreseen end date: 1st May 2016 Actual end date: 15th February 2017
The Second Draft SSR for M. fusca (Annex A8/2) incorporates feedback from stakeholders
identified in the ToR, invitees from the Planning Workshop, and other experts. This report was
published on the SAP TT (Action A.7).
Although the action was completed with delay, there were no significant impacts on the SAP
elaboration.
Second Draft SSR for M. fusca attached
Action A.9 Providing feedback from the consultation of the Draft SSR
Status of action: in progress
Foreseen start date: 1st May 2016 Actual start date: 15th February 2017
Foreseen end date: 31st July 2016 Anticipated end date: 31st March 2017
Efforts to engage M. fusca SAP stakeholders are summarized in Annex A9/1.
Stakeholder engagement table for M. fusca attached
27
Action A.10 Finalisation, publication and dissemination of the SSR
Status of action: in progress
Foreseen start date: 31st July 2016 Actual start date: 1st March 2017
Foreseen end date: 31st August 2016 Actual end date: April 2017
The Final SSR for M. fusca (Annex 10/1) was completed following the second consultation, and
is now being incorporated into the Draft SAP (Action A.12).
Final SSR for M. fusca attached
Action A.11 Planning Workshop
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 15st January 2016
Foreseen end date: 31st December 2016 Actual end date: 6th October 2016
The preliminary date for the Planning Workshop was discussed with the AEWA Secretariat in
early 2016. It was held from 4-6th October 2016 in Vilnius, Lithuania. More than 30 representatives
from governmental and non-governmental institutions from the range countries, research
institutes, DG ENV, AEWA, FACE, WWT and BLI attended (Annexes: Invitation A11/4, Agenda
A11/5, Participants List A11/6, photos A11/7). The workshop was facilitated by Mr. Sergey
Dereliev, Technical Officer, UNEP/AEWA Secretariat. During the workshop, a threat analysis and
prioritization exercise was conducted (Problem Tree, Annex A11/8) and conservation actions were
defined (Objectives Tree, Annex A11/9).
Invitation (sample), Agenda, Participants List and photos for the Planning Workshop attached
Problem Tree for M. fusca attached
Objectives Tree for M. fusca attached
Action A.12 SAP First Draft
Status of action: in progress Foreseen start date: 1st January 2017 Actual start date: 1st January 2017
Foreseen end date: 30th April 2017 Anticipated end date: 30th April 2017
The First Draft SAP for M. fusca is currently being drafted based on conservation actions defined
during the Planning Workshop (A.11).
No delays are expected at this stage.
28
Dalmatian Pelican (Pelecanus crispus) – led by HOS
The Dalmatian Pelican (Pelecanus crispus) is listed as Near
Threatened on the global IUCN Red List with an estimated
population of 6,700-9,300 mature individuals. Under the LIFE
EuroSAP Project, the existing Action Plan for P. crispus in Europe
(1997) will be revised. The new SAP will take a flyway approach,
following AEWA recommendations.
Action A.1 Start-up phase for SAPs
Status of action: completed
Foreseen start date: 1st April 2015 Actual start date: 8th January 2016
Foreseen end date: 30th November 2015 Actual end date: 28th February 2017
The core species team was established and a Team Coordinator appointed. Potential members of
the P. crispus WG were identified. The P. crispus WG includes; Ms. Danae Portolou, HOS, Mr.
Giorgos Catsadorakis, Chair of the IUCN Pelican Specialist Group, and Mr. Thanos Kastritis and
Ms. Olga Alexandrou from the Society for the Protection of Prespa (SPP). An internal agreement
was made with SPP for their participation in Actions A.3, A.6, A.8, A.9, A.10, A.12, A.14, A.16
and A.18. A contact list comprising 48 stakeholders from 21 countries was created. Weekly Skype
meetings were held between HOS and SPP, and a common Dropbox folder was created to share
working documents.
Following the standard action-planning practice under AEWA, national government
representatives as well as experts were designated by AEWA MSs. The ToR (Annex A1/3) was
finalized when positive replies from all invited WG members were received (note that the
preparation of a ToR is not part of the AEWA process, which is already well-established and
transparent and was thus produced solely for the purposes of the LIFE project). Mrs. E. Giakoumi
from the Ministry of Environment was identified as the national focal point to work in
collaboration with AEWA. In addition, Mr. Giorgos Cadtsadorakis, the Chair of the IUCN Pelican
Specialist Group, was invited to collaborate (see above).
Problems and changes: Changes in the actual start date of the action are mainly due to changes
in the coordinating staff of HOS.
ToR for P. crispus WG attached
Action A.3 Evaluation of the implementation of the existing AP
Status of action: completed
Foreseen start date: 30th November 2015 Actual start date: 1st May 2016
Foreseen end date: 31st March 2016 Actual end date: 30th September 2016
Evaluation of the existing P. crispus European SAP (Annex A3/3) was conducted in collaboration
with SPP. This involved adaptation and improvement of the existing questionnaire and creation of
an online format in Survey Monkey. A link to the online survey together with an explanatory letter
was then sent to 27 contacts from the 9 countries involved in the previous SAP. The online platform
was open from 10th June 2016 – 15th August 2016 and 17 responses were received. The 2011
29
method used for SAP implementation evaluation was followed, including calculation of National
Implementation Scores and Average Implementation Scores. The report concluded that progress
for implementation of the SAP has been very good.
Problems and changes: The action start date was shifted due to changes in the coordinating staff
of HOS. The online questionnaire likely delayed rather than facilitated the process because some
stakeholders did not respond and one country completed it on a regional rather than national scale.
Evaluation of the implementation of the existing SAP for P. crispus attached
Action A.6 Update of the SSR
Status of action: completed
Foreseen start date: 1st April 2016 Actual start date: 1st May 2016
Foreseen end date: 1st May 2016 Actual end date: 11th November 2016
The First Draft SSR (Annex A6/3) is based on current literature and information collected in a
questionnaire distributed to selected experts and relevant stakeholders. This involved modifying
and improving the existing questionnaire and subsequent creation of an online format in Survey
Monkey. A link to the online survey, together with an explanatory letter, was then sent to 37
contacts in 20 countries. The online platform was available from 27th June 2016 – 26th September
2016 and a total of 24 responses were received from 18 countries. The First Draft SSR was
finalized in September 2016 and sent to AEWA and BLI for review in early November 2016. The
First Draft SSR was uploaded on the SAP TT on 16th November 2016.
Problems and changes: The action start date was postponed due to changes in the coordinating
staff of HOS. Also, the online questionnaire likely delayed rather than facilitated the process
because a number of stakeholders did not complete the questionnaire and repeated invitations were
sent.
First Draft SSR for P. crispus attached
Action A.8 Elaboration of the SSR and consultation with stakeholders
Status of action: completed
Foreseen start date: 1st April 2016 Actual start date: 11th November 2016
Foreseen end date: 1st May 2016 Actual end date: 20th November 2016
The First Draft SSR was circulated to all stakeholders who contributed to the draft (A.6) and
comments were received and incorporated. The Second Draft SSR for P. crispus was completed
on 20th November 2016 and uploaded on the SAP TT.
Action A.9 Providing feedback from the consultation of the Draft SSR
Status of action: completed
Foreseen start date: 1st May 2016 Actual start date: 21st November 2016
Foreseen end date: 31st July 2016 Actual end date: 25th November 2016
Efforts to engage the P. crispus SAP stakeholders are summarized in Annex A9/2. The Planning
Workshop (A.11) may be considered the final consultation of the Second Draft SSR; this version
was circulated to 31 participants from 12 countries and no additional comments were received.
30
Stakeholder engagement table for P. crispus attached
Action A.10 Finalisation, publication and dissemination of the SSR
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 25th November 2016
Foreseen end date: 31st August 2016 Actual end date: March 2017
The Final SSR (Annex 10/2) was completed and is now being incorporated into the Draft SAP
(Action A.12).
Final SSR for P. crispus attached
Action A.11 Planning Workshop
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 31st July 2016
Foreseen end date: 31st December 2016 Actual end date: 25th November 2016
The P. crispus Planning Workshop date was confirmed with AEWA. This workshop was held
from 21st-25th November 2016, in Lithotopos, Kerkini, Greece, and 31 out of 38 invited
stakeholders (scientists, experts, governmental and non-governmental nature protection
organizations from the range countries, as well as representatives of BLI) from 15 countries
attended (Annexes: Agenda A11/10, Participants List A11/11, group photo A11/12). The
workshop was facilitated by Mr. Sergey Dereliev, Technical Officer at the UNEP/AEWA
Secretariat. Representatives from each national delegation were asked to give presentations
concerning the species status (population, distribution, migration, status, trends, biology, ecology,
and status of knowledge, scientific and monitoring efforts). During the workshop, a threat analysis
and prioritization exercise was conducted and conservation actions were defined according to
AEWA methodology.
Agenda, Participants List and group photo for the Planning Workshop attached
Action A.12 First Draft SAP
Status of action: in progress Foreseen start date: 1st January 2017 Actual start date: 1st January 2017
Foreseen end date: 30th April 2017 Anticipated end date: 30th April 2017
The First Draft SAP for P. crispus is now being drafted. The conservation actions formulated
during the Planning Workshop were used by the Species Coordinator to prepare the “framework
for action” section in the SAP.
No delays are expected at this stage.
31
Cinereous Vulture (Aegypius monachus) led by VCF
The Cinereous Vulture (Aegypius monachus) is listed as Near Threatened on the
global IUCN Red List with an estimated populuation of 14,000-20,000 mature
individuals; 1,700-1,900 pairs in Europe (BLI 2004, Anon. 2004) and 5,500-
8,000 pairs in Asia (Anon. 2004). Under LIFE EuroSAP, the existing Action
Plan for A. monachus in Europe (1996) will be revised following the same
methodology used during the review process in 2000 (Gallo-Orsi, 2001), 2004
(Nagy & Crockford, 2004) and 2010 (BirdLife International).
Action A.1 Start-up phase for SAPs
Status of action: completed
Foreseen start date: 1st April 2015 Actual start date: 1st April 2015
Foreseen end date: 31st May 2016 Actual end date: 23rd February 2017
The Team Leader, Mr. Jovan Andevski, was appointed. The SAP WG and respective ToR (Annex
A1/4) were established.
Problems and changes: During the 1st SC, VCF made a request to postpone actions for the A.
monachus SAP until 2016 (Annex C1/1) to first concentrate efforts during 2015-2016 to complete
the G. barbatus SAP (see below) and then in 2016-2017 the A. monachus SAP.
In 2016, CMS proposed to expand the scope of the A. monachus SAP from European to global
coverage to create a Flyway Action Plan (FAP). During this process, CMS began the development
of a Vulture MSAP. The A. monachus SAP and FAP became part of the MSAP and some deadlines
were postponed (letter ECA/016/050). Since the initial budget did not include meetings for A.
monachus, and the MSAP gathered most vulture experts in Europe, joining the SAP and FAP to
the MSAP maximised discussions. After consultation with DG ENV, it was decided that the A.
monachus SAP would be an independent document outside the FAP.
ToR for the A. monachus WG attached
Action A.3 Evaluation of the implementation of the existing AP
Status of action: in progress
Foreseen start date: 30th November 2015 Actual start date: 1st July 2016
Foreseen end date: 31st August 2016 Anticipated end date: 31st March 2017
A draft evaluation of the implementation of the existing A. monachus SAP has been completed
(Annex A3/4).
Draft evaluation of the implementation of the existing Action Plan for A. monachus attached
Action A.6 Update of the SSR
Status of action: completed
Foreseen start date: 1st April 2015 Actual start date: 1st November 2016
Foreseen end date: 31st August 2016 Actual end date: 24th February 2017
32
The First Draft SSR for A. monachus (Annex A6/4) was prepared and uploaded on the SAP TT.
The SSR was sent to NADEG members for consultation on 27th February 2017.
First Draft SSR for A. monachus attached
Action A.8 Elaboration of the SSR and consultation with stakeholders
Status of action: in progress
Foreseen start date: 1st April 2015 Anticipated start date: 10th March 2017
Foreseen end date: 30th September 2016 Anticipated end date: 7th April 2017
The Second Draft SSR for A. monachus is in preparation. The document will incorporate
comments from the one-month consultation process with Member States and other stakeholders.
Action A.9 Providing feedback from the consultation of the Draft SSR
Status of action: not started
Foreseen start date: 1st May 2015 Anticipated start date: 7th April 2017
Foreseen end date: 31st October 2016 Anticipated end date: 30th April 2017
The Second Draft SSR will be sent to NADEG members for consultation. Efforts to engage A.
monachus SAP stakeholders are summarized in Annex A9/3.
Stakeholder engagement table for A. monachus attached
Action A.10 Finalisation, publication and dissemination of the SSR
Status of action: not started
Foreseen start date: 31st July 2015 Anticipated start date: 1st May 2017
Foreseen end date: 30th November 2016 Anticipated end date: 30th June 2017
The A. monachus SSR will be finalized upon completion of Action A.9.
Action A.11 Planning Workshop
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 1st July 2016
Foreseen end date: 31st December 2016 Actual end date: 30th October 2016
Although not initially planned, the A. monachus Planning Workshop became part of the Vultures
MSAP. It was organized by CMS and VCF, and held in Spain in October 2016. It was attended by
79 vulture experts from 25 countries and 52 organizations; 20 national governments and 32 NGOs
(Annexes: Agenda A11/13, Report A11/14). Threat maps (Annex A11/15) used for discussion
were created based on information collected in a questionnaire (69 responses from 30 countries).
Agenda and Workshop Summary Report attached
Threat maps for A. monachus produced for the Vultures MSAP European Workshop attached
Action A.12 SAP First Draft
Status of action: in progress
Foreseen start date: 31st December 2016 Actual start date: November 2016
33
Foreseen end date: 30th April 2017 Anticipated end date: 30th April 2017
The First Draft SAP is in preparation. No delays are expected.
34
Bearded Vulture (Gypaetus barbatus) – led by VCF and SEO/BirdLife
The Bearded Vulture is listed as Near Threatened on the global IUCN
Red List with an estimated population of 1,300-6,700 mature
individuals. Under the LIFE EuroSAP Project, the existing SAP for the
Lammergeier (Gypaetus barbatus) (1997) will be revised following the
same methodology used during the revision conducted in 2010 by BLI.
Action A.1 Start-up phase for SAPs
Status of action: completed
Foreseen start date: 1st April 2015 Actual start date: 1st April 2015
Foreseen end date: 30th November 2015 Actual end date: 30th November 2015
The team leaders were appointed; Mr. Alex Llopis and Ms. Franziska Lörcher from VCF, and Mr.
Jorge Orueta from SEO/BirdLife. A work plan was developed and a ToR written (Annex A1/5).
The action was completed on time.
ToR for the G. barbatus WG attached
Action A.3 Evaluation of the implementation of the existing AP
Status of action: completed
Foreseen start date: 30th November 2015 Actual start date: 1st July 2015
Foreseen end date: 31st March 2016 Actual end date: 30th April 2016
A questionnaire was created and sent to relevant stakeholders across the species range. Based on
responses, an evaluation of the implementation of the existing SAP (Annex A3/5) was performed.
Evaluation of the implementation of the existing SAP for G. barbatus attached
Action A.6 Update of the SSR
Status of action: completed
Foreseen start date: 1st April 2016 Actual start date: 1st October 2015
Foreseen end date: 1st May 2016 Actual end date: 30th November 2015
A questionnaire aimed at assessing the status of G. barbatus was distributed amongst experts.
Based on collected information, a First Draft SSR (Annex A6/5) was prepared. This draft was sent
to relevant stakeholders before attending the Planning Workshop (Action A.11).
Problems and changes: Data from some countries, particularly those along the margins of the
species range in the EU (Turkey and the Caucausus), is poor and incomplete.
First Draft SSR for G. barbatus attached
Action A.8 Elaboration of the SSR and consultation with stakeholders
Status of action: completed
35
Foreseen start date: 1st April 2016 Actual start date: 30th November 2015
Foreseen end date: 1st May 2016 Actual end date: 15th March 2016
The Second Draft SSR (Annex A8/3) was prepared following the Planning Workshop (Action
A.11).
Second Draft SSR for G. barbatus attached
Action A.9 Providing feedback from the consultation of the Draft SSR
Status of action: completed
Foreseen start date: 1st May 2016 Actual start date: 15th March 2016
Foreseen end date: 31st July 2016 Actual end date: 28th February 2017
Efforts to engage the G. barbatus SAP stakeholders are summarized in Annex A9/4.
Problems and changes: The delay in finalizing the consultation of the Draft SSR was due to VCF
becoming involved in the Vultures MSAP in September 2016. VCF was commissioned by the
Raptors MoU within the CMS to organize a European Regional Workshop and draft the European
component of the MSAP. The workshop was held from 23-25th October 2016 in Extremadura,
Spain, and was attended by 90 vulture experts from Europe and Central Asia. Since the G. barbatus
is one of the species within the MSAP, the workshop was an opportunity to ask experts to
contribute their knowledge and validate information within the Draft SSR. The G. barbatus threat
maps produced and used for discussion can be found in Annex A9/5. A Vultures MSAP workshop
was held in Toledo, Spain, 16th-18th February 2017, to compile information and draft the MSAP.
Stakeholder engagement table for G. barbatus attached
Threat maps for G. barbatus in Eurasia for the Vulture MSAP attached
Action A.10 Finalisation, publication and dissemination of the SSR
Status of action: in progress
Foreseen start date: 31st July 2016 Actual start date: 1st June 2016
Foreseen end date: 31st August 2016 Anticipated end date: 30th April 2017
Feedback was collected from the Annual G. barbatus meeting participants and NADEG members.
Comments will be incorporated into the Final SSR (Annex A10/2) which will be published on the
SAP TT.
Problems and changes: See above. The SSR was circulated to NADEG members after data and
information from the Vultures MSAP were incorporated. A one-month consultation is foreseen
and final document expected by late April 2017.
Action A.11 Planning Workshop
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 15th May 2015
Foreseen end date: 31st December 2016 Actual end date: 30th November 2015
36
The SAP Planning Workshop was held back to back with the Annual G. barbatus meeting from
23rd-24th November 2015 in Corsica (Annexes: Agenda A11/16, Participants List A11/17,
Conclusions A11/18, photos A11/19). Both were organized by VCF. The meetings gave European
experts a chance to discuss project progress and conservation priorities. From a total of 80
participants attending the annual meeting, 31 experts from 10 countries remained for the SAP
workshop (see http://www.4vultures.org/2015/11/29/working-together-to-update-the-
international-species-action-plan-for-the-bearded-vulture-life-eurosap/). Representatives
(government and NGOs) from Greece and Turkey did not participate but will be sent the First
Draft SAP when it is completed (Action A.12).
In 2016, the Annual G. barbatus Meeting was held at the Hohe Tauern National Park headquarters
in Mittersill, Austria, from 11th-13th November (Annex A11/20). The Draft G. barbatus SAP was
presented, and threats and actions were discussed with the 80+ participants.
Agenda, Participants List, Conclusions and photos for the Planning Workshop attached
Agenda for the 2016 Annual G. barbatus meeting attached
Action A.12 SAP First Draft
Status of action: in progress
Foreseen start date: 31st December 2016 Actual start date: November 2015
Foreseen end date: 30th April 2017 Anticipated end date: 30th April 2017
The First Draft SAP is being prepared and will be ready late April 2017.
Problems and changes: As described above, preparation of the First Draft SAP was delayed and
began after the Vultures MSAP initiated. The APs should be synchronized in terms of content.
Action A.14 Follow-up consultation on the First Draft SAP
Status of action: not started
Foreseen start date: 30th April 2017 Anticipated start date: 30th April 2017
Foreseen end date: 30th September 2017 Anticipated end date: 30th September 2017
Consultation on the First Draft SAP with stakeholders – both those present at the workshop and
others – will begin May 2017 following completion of Action A.12.
Action A.16 SAPs Second Draft
Status of action: not started
Foreseen start date: 30th September 2017 Anticipated start date: 30th September 2017
Foreseen end date: 30th October 2017 Anticipated end date: 30th October 2017
The Second Draft SAP will be completed in October 2017 and circulated to all participants
attending the 2017 Annual G. barbatus meeting to be held in November 2017 in France.
37
European Turtle Dove (Streptopelia turtur) – led by RSPB
The European Turtle Dove (Streptopelia turtur) is listed as
Vulnerable on the global IUCN Red List with an estimated
population of 13,000,000-48,000,000 mature individuals. The
species is experiencing significant and continuous decline in number.
Under the LIFE EuroSAP Project the existing MP for S. t. turtur
(2007-2009) will be updated and expanded in scope from the EU to
global distribution.
Action A.1 Start-up phase for SAPs
Status of action: completed Foreseen start date: 1st April 2015 Actual start date: 15th August 2015
Foreseen end date: 30th November 2015 Actual end date: 30th April 2016
The SAP WG (core planning team plus experts and stakeholder representatives) was established
and a Team Coordinator, Ms. Tara Proud (RSPB), was appointed. The core planning team includes
eight experts and practitioners representing eight partners from the species range. Team members
were involved in the development of the initial SSR as well as workshop agendas. A ToR for the
WG (Annex A1/6) was defined. Meetings have been taking place since August 2015.
Due to the large geographic range of S. t. turtur, criteria were defined to select the principle range
countries to be included. The criteria yielded 27 countries (ten in Africa, the remainder in Europe).
Stakeholders from each country were identified, however, this list is constantly being updated.
Problems and changes: A new Species Coordinator, Mr. Ian Fisher, was appointed and replaced
Ms. Proud (who left due to health reasons) in early July 2016. In September 2016, Ms. Joscelyne
Ashpole joined RSPB. Her first task was to assist with the SSR finalisation. The new team made
significant progress with the SAP development and compensated for initial delays.
ToR for the S. t. turtur WG attached
Action A.3 Evaluation of the implementation of the existing MP
Status of action: completed Foreseen start date: 30th November 2015 Actual start date: 4th January 2016
Foreseen end date: 31st March 2016 Actual end date: 10th December 2016
Since a review of the existing MP for the species had already been conducted in 2013, it was then
agreed, following the suggestion of FACE and RSPB, that only progress towards implementation
of the plan from this date onwards would be evaluated.
A questionnaire to evaluate the existing MP was distributed amongst experts and stakeholders. On
3rd February, consultation with NADEG was initiated and BirdLife partners were also contacted.
Responses were collected in August 2016 and a First Draft was produced early September.
In December 2016, the evaluation of the existing MP (Annex A3/6) was finalized. It was then
circulated, together with the SSR, to all stakeholders (including NADEG members).
38
Evaluation of the implementation of the existing MP for S. t. turtur attached
Action A.6 Update of the SSR
Status of action: completed Foreseen start date: 1st April 2016 Actual start date: 2nd February 2016
Foreseen end date: 1st May 2016 Actual end date: 9th September 2016
Preliminary ‘fact finding’ to gather information for the SSR began in early 2016. Due to delays
caused by changes in the coordination team (see above), the questionnaire was re-sent to
stakeholders and collected in summer. The First Draft SSR (Annex A6/6) was compiled in early
September and circulated amongst participants of the two Planning Workshops (Action A.11).
First Draft SSR for S. t. turtur attached
Action A.8 Elaboration of the SSR and consultation with stakeholders
Status of action: completed
Foreseen start date: 1st April 2016 Actual start date: 10th September 2016
Foreseen end date: 1st May 2016 Actual end date: 14th November 2016
The Second Draft SSR for S. t. turtur (Annex A8/4) was finalized when all comments received
during the consultations were incorporated.
Second Draft SSR for S. t. turtur attached
Action A.9 Providing feedback from the consultation of the Draft SSR
Status of action: completed
Foreseen start date: 1st May 2016 Actual start date: 16th November 2016
Foreseen end date: 31st July 2016 Actual end date: 9th December 2016
Efforts made to engage the S. t. turtur SAP stakeholders are summarized in Annex A9/6.
Stakeholder engagement table for S. t. turtur attached
Action A.10 Finalisation, publication and dissemination of the SSR
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 9th December 2016
Foreseen end date: 31st August 2016 Actual end date: 16th December 2016
Comments were collected from stakeholders and NADEG members, and then incorporated in the
Final SSR (Annex A10/3). The document was published on the SAP TT.
Final SSR for S. t. turtur attached
Action A.11 Planning Workshop
Status of action: completed Foreseen start date: 1st July 2016 Actual start date: 11th January 2016
39
Foreseen end date: 31st December 2016 Actual end date: 18th January 2017
Workshop planning began in early 2016. A preliminary list of two representatives from each of
the 27 priority countries was created. The list was reviewed by relevant experts, representatives of
EC, FACE, BLI and other BirdLife partner organisations. Invitations were then sent to potential
participants in October and November 2016.
Two Planning Workshops were organized. The first was held at the CENEAM centre in Segovia,
Spain, 19-21st December 2016. The second was postponed and then held in Hungary, 16-18th
January 2017. It was hosted by the Kiskunsag National Park in Kecskemét. Both events were
attended by more than 35 experts and facilitated by Mr. Jose Tavares, VCF and Mr. Ian Fisher,
RSPB (Annexes: Agendas A11/21, Participant Lists A11/22, Minutes A11/23, photos A11/24).
Threats and actions were identified (Annex A11/25).
During the two Planning Workshops, the participants have agreed that a statistical modelling is
required in order to identify different scenarios and solutions in order to decrease hunting pressure
on the species population. Consequesntly, a group of experts has voluntarily done the modelling
exercise using a demographic Invariant method for S.t. turtur (Annex 11/26), which will be
annexed to the First Draft SAP.
Problems and changes: In the original GA, three workshops were planned due to the projects
large geographic scope. After considering alternative options, estimated costs and logistics, it was
agreed that two workshops sufficed. Representatives from the species range countries were split
according its two main flyways; the Western and Central and Eastern flyways.
SEO was appointed and received 3,000€ of RSPB’s budget to assist with the organization of the
Planning Workshop held in Spain. Amendments to the PA will be prepared to incorporate these
changes in the project budget. Similarly, MME was subcontracted by RSPB to assist with the
organization of the Planning Workshop in Hungary. MME has invoiced RSPB for 3,000€.
Due to increased engagement in the S. t. turtur Planning Workshops, VCF will report a higher
amount of staff time. Changes in the budget will be reflected in the PA.
Agendas, Participants Lists and photos for the Planning Workshops attached
Threats and actions for S.t. turtur attached
Demographic Invariant method for S.t. turtur attached
Action A.12 SAP First Draft
Status of action: in progress Foreseen start date: 1st January 2017 Actual start date: 1st January 2017
Foreseen end date: 30th April 2017 Anticipated end date: 5th April 2017
The First Draft SAP for S. t. turtur is now being drafted based on the recently agreed AEWA
format for SAPs and MPs. The conservation actions formulated during the Planning Workshop
were used by the Species Coordinating Team to prepare the “framework for action” section in the
40
SAP. The draft document was circulated amongst participants of the two Planning Workshops
(Action A.11) for comments. A 17th March 2017 deadline was set for submitting feedback.
At a meeting held on 2nd February 2016, RSPB, BLI and DG ENV agreed that the First Draft SAP
will be completed by 5th April and sent for consultation to NADEG members prior to the Expert
Group meeting in May 2017. The document will then be circulated to all other stakeholders.
Circulation list EU LIFE TD - Species Status and Management Plan (Annex 12/2)
41
Yelkouan Shearwater (Puffinus yelkouan) – led by LPO
The Yelkouan Shearwater (Puffinus yelkouan) is listed as Vulnerable
on the global IUCN Red List, with an estimated population of
46,000-92,000 individuals. Under the LIFE EuroSAP Project an
International Single SAP for the species will be produced.
Action A.1 Start-up phase for SAPs
Status of action: completed Foreseen start date: 1st April 2015 Actual start date: 24th August 2015
Foreseen end date: 30th November 2015 Actual end date: 30th November 2015
The core WG Team for P. yelkouan SAP elaboration was established and a Team Coordinator,
Mr. Bernard Deceuninck, was appointed. The ToR for the WG (Annex A1/7) was written and
adopted, and a timeline for the planning process was confirmed with selected key experts and
stakeholder representatives. A list of national focal points was also prepared.
Some WG members met in Malta 23-25th November 2015 as participants of a workshop organised
by BLI on “Protecting Seabirds in the Mediterranean: advancing the Marine Protected Area
Network”. During this event, Mr. Thierry Micol (LPO) presented the P. yelkouan work that would
be conducted under the LIFE EuroSAP project.
The action was completed on time.
Problems and changes: Due to time that was reallocated to the delayed LIFE project (“LIFE +
CAP DOM – Conserving French overseas threatened bird species and their habitats using
demonstrative conservation tools” LIFE09 NAT/FR/000582) which ended in September 2015, the
start-up phase for the P. yelkouan SAP began three months later than scheduled (late August 2015).
Another issue causing delay was identifying species experts in some of the partner countries.
Thanks to better time allocation, these delays did not alter the deadline for the production of the
P. yelkouan ToR which was finalized as anticipated by the end of November 2015.
ToR for the P. yelkouan WG attached
Action A.6 Update of the SSR
Status of action: completed Foreseen start date: 1st April 2016 Actual start date: 28th January 2016
Foreseen end date: 31st August 2016 Actual end date: 9th September 2016
The First Draft SSR (Annex A6/7) describing the status of P. yelkouan is based on current available
literature and from information collected in a questionnaire distributed to and completed by
selected experts and relevant stakeholders.
Problems and changes: A new Team Coordinator, Ms. Helena Garcia Robles, was appointed
(following a change of role of Mr. Bernard Deceuninck) on 9th September 2016. However, after
42
one month she left the project and was replaced by Ms. Clemence Gaudard on 21st November
2016. These personnel changes caused minor delays in the completion of the action.
First Draft SSR for P. yelkouan attached
Action A.8 Elaboration of the species SSR and consultation with stakeholders
Status of action: completed Foreseen start date: 1st May 2016 Actual start date: 1st May 2016
Foreseen end date: 30th September 2016 Actual end date: 30th September 2016
The Second Draft SSR (Annex A8/5) incorporates feedback from the stakeholders identified in the
ToR, the invitees from the Planning Workshop and other interested parties including members of
NADEG.
Second Draft SSR for P. yelkouan attached
Action A.9 Providing feedback from the consultation of the Draft SSR
Status of action: completed Foreseen start date: 1st July 2016 Actual start date: 30th September 2016
Foreseen end date: 31st October 2016 Actual end date: 15th January 2017
The Second Draft SSR was used as a baseline document during the Planning Workshop (Action
A.11). As the discussion proceeded, all relevant input provided by the workshop participants was
added to the Second Draft. The report was then circulated among NADEG members (consultations
took place between 12th December 2016 and 15th January 2017). Efforts made to engage the P.
yelkouan SAP stakeholders are summarized in Annex A9/7.
Problems and changes: Ms. Helena Garcia Robles (recruited 1st August 2016) wrote the First
Draft SSR from August-September 2016. Before she left her position, this document was sent for
review to the P. yelkouan WG. Mr. Thierry Micol and Ms. Isabelle Chesnot integrated corrections
made by the WG upon receipt. The replacement Team Coordinator, Ms. Clemence Gaudard,
incorporated other corrections into the Second Draft SSR. Depending on their availability,
communication with the P. yelkouan WG members concerning further revisions to the SSR
continued until mid-December.
Stakeholder engagement table for P. yelkouan attached
Action A.10 Finalisation, publication and dissemination of the SSR
Status of action: completed Foreseen start date: 1st July 2016 Actual start date: 1st July 2016
Foreseen end date: 30th November 2016 Actual end date: 23th January 2017
After incorporating comments from the P. yelkouan WG and NADEG members, the Final SSR
(Annex A10/4) was published in January 2017 on the SAP TT platform.
Problems and changes: the delay in Action A.9 caused a delay in Action A.10.
Final SSR for P. yelkouan attached
43
Action A.11 Planning workshop
Status of action: completed Foreseen start date: 31st July 2016 Actual start date: 1st February 2016
Foreseen end date: 31st December 2016 Actual end date: 11th October 2016
Planning for the P. yelkouan workshop was initiated in early 2016. The event took place in Paris,
France from 10-11th October 2016. Twenty-four (out of 31 invited) stakeholders (scientists,
experts, governmental and non-governmental nature protection organizations from the range
countries, as well as representatives of BLI) from 13 different countries attended (Annexes:
Agenda A11/27, Participants List A11/28, photos A11/29). The workshop was facilitated by Mr.
Thierry Micol, Conservation Director of LPO. During the 2-day workshop, a threat analysis and
prioritization exercise was conducted (Threat prioritization table, Annex A11/30) and conservation
actions were defined (Draft list of conservation actions, Annex A11/31). A core group of experts
was designated during the workshop to assist the Species Coordinator. They will facilitate
exchanges with the entire group, provide assistance in drafting the SAP and contribute to the
completion of the threat analysis and prioritization.
Agenda, Participants List and photos from the Planning Workshop attached
Threat prioritization table attached
Draft list of conservation actions attached
Action A.12 SAP First Draft
Status of action: in progress Foreseen start date: 1st January 2017 Actual start date: 6th December 2016
Foreseen end date: 30th April 2017 Anticipated end date: 30th April 2017
A First Draft SAP for the P. yelkouan is now being drafted. During the Planning Workshop, the
core group of experts made some technical corrections and modifications to the actions/objectives
and targets/population effects. This table was used by the Species Coordinator to prepare the
“framework for action” section in the SAP. This framework was then reviewed by the WG before
being incorporated into the First Draft AP. This draft was circulated amongst the entire WG and
they have until the end of February to make corrections and suggest revisions. During February,
the Species Coordinator coordinated and incorporated feedback from reviewers into the draft. The
Final First Draft should be ready by the end of April.
No delays are expected at this stage.
44
Monteiro’s Storm Petrel (Hydrobates monteiroi) – led by SPEA
The Monteiro’s Storm Petrel (Hydrobates monteiroi) is listed as
Vulnerable on the global IUCN Red List with an estimated
population of 250-1,000 mature individuals. The species is
endemic to the Azores Islands, Portugal. Under LIFE EuroSAP a
SAP will be produced.
Action A.1 Start-up phase for SAPs
Status of action: completed Foreseen start date: 1st April 2015 Actual start date: 1st April 2015
Foreseen end date: 30th November 2015 Actual end date: 30th November 2015
The H. monteiroi WG was established and a Team Coordinator, Mr. Nuno Oliveira, was appointed.
Relevant stakeholders and other experts were identified and invited to participate. These
individuals constitute the “Monteiroi Task-force” (Annex A1/8). The ToR for the WG (Annex
A1/8) was written and adopted, and a timeline for the planning process was confirmed. From early
stages of the project, SPEA involved all relevant stakeholders to ensure a solid and strong project
outcome. All "Monteiroi Task-force" members have been playing a fundamental role since the
project began. Skype and e-mail were the main tools used to communicate, collate data and
produce the first results. A kick-off meeting (Annexes: Agenda A1/9, Participants List A1/10,
Minutes A1/11, photos A1/12) took place in the Azores from 20-22nd April 2015, including a visit
to Praia Islet, where one of the species main breeding colonies is found. This meeting was crucial
as it led to agreement on some conservation and methodological aspects related to the ToR for the
SAP and guaranteed full involvement of all participants. A public presentation was given to inform
the local community about the LIFE EuroSAP project and to present the H. monteiroi SAP process.
No delays or problems occurred during this phase of the project and the action ran as expected.
ToR for the H. monteiroi WG attached
Agenda, Participants List, Minutes, and photos from the H. monteiroi Kick-off meeting attached
Action A.4 Draft SSR for H. monteiroi
Status of action: completed Foreseen start date: 31st March 2015 Actual start date: 1st July 2015
Foreseen end date: 1st April 2016 Actual end date: 15th March 2016
As stated in the project proposal, due to the fact that H. monteiroi is a recent taxonomic split, this
species did not have any previous Action Plan or draft documents that could be evaluated under
Action A.4. Consequently, this action was used to prepare the First Draft SSR for the species
(Annex A4/1). The kick-off meeting in April 2015 (Action A.1) was used as an opportunity to
collect information from the WG members and stakeholders. Further face to face meetings took
place on Graciosa, Flores and Corvo Islands to present the project to stakeholders and collect other
relevant information. An e-mail group was created to share information, and discuss and clarify
any concerns or doubts. Because of the restricted range of H. monteiroi to the Azores Islands,
45
SPEA aimed to involve more local stakeholders than is normally expected during a regular SAP
process.
The draft document was uploaded on the SAP TT and circulated amongst stakeholders. The action
was completed on time.
First Draft SSR for H. monteiroi attached
Action A.8 Elaboration of the Species SSR and consultation with stakeholders
Status of action: completed
Foreseen start date: 1st April 2016 Actual start date: 1st April 2016
Foreseen end date: 1st May 2016 Actual end date: June 2016
The Second Draft H. monteiroi SSR includes feedback from the consultations (Annex A8/6). The
document was uploaded on the SAP TT for a second round of consultations.
Second Draft SSR for H. monteiroi attached
Action A.9 Providing feedback from the consultation of the Draft SSR
Status of action: completed
Foreseen start date: 1st May 2016 Actual start date: June 2016
Foreseen end date: 31st July 2016 Actual end date: 31st August 2016
The consultation process involved 19 collaborators from 7 different organizations. Skype and e-
mail discussions were the main tools for participants to provide feedback. The Final Draft was
presented during the Planning Workshop (A.11) between 8-9th September 2016, on Graciosa Island
(Azores). Results were presented and final comments collected. Efforts made to engage
stakeholders are summarized in the stakeholder engagement table (Annex A9/8).
Stakeholder engagement table for H. monteiroi attached
Action A.10 Finalisation, publication and dissemination of the SSR
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 31st July 2016
Foreseen end date: 31st August 2016 Actual end date: 1st October 2016
Once stakeholders were consulted, the Final SSR (Annex A10/5) was prepared and published on
the SAP TT. The Draft SSR and all other documents will be translated and available in Portuguese
to encourage strong involvement of relevant stakeholders (namely local organizations, e.g.,
tourism operators and fishing associations).
Final SSR for H. monteiroi attached
Action A.11 Planning Workshop
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 31st January 2016
Foreseen end date: 31st December 2016 Actual end date: 9th September 2016
46
The Planning Workshop for H. monteiroi took place from 8-9th September 2016 on Graciosa Island
(Azores), Portugal. Sixteen representatives from 8 organizations attended the workshop including;
local and regional governments, universities, NGOs and public institutions (Annexes: Agenda
A11/32, Participants List A11/33, Minutes A11/34, photo A11/35). One participant followed the
workshop via Skype.
Agenda, Participants List, Minutes and photo for the Planning Workshop attached
Action A.12 SAP First Draft
Status of action: in progress
Foreseen start date: 31st July 2016 Actual start date: 31st October 2016
Foreseen end date: 30th April 2017 Actual end date: 30th April 2017
The First Draft SAP for H. monteiroi is in preparation.
No delay is expected.
47
European lowland grassland waders – led by NABU
Under the LIFE EuroSAP, an International MSAP which considers
the breeding populations of eight species of wet grassland waders
will be produced. These species are: Haematopus ostralegus (NT),
Vanellus vanellus (NT), Calidris alpina schinzii (LC), Calidris
pugnax (LC), Gallinago gallinago (LC), Numenius arquata (NT),
Limosa limosa limosa (NT) and Tringa totanus (LC).
Action A.2 Start-up phase for MSAP
Status of action: completed
Foreseen start date: 1st April 2015 Actual start date: 15th May 2015
Foreseen end date: 30th November 2015 Actual end date: 30th November 2015
A Team Coordinator was appointed and the team, consisting of members from NABU, RSPB,
VBN and SOF, was established. Regular meetings have taken place predominately by phone, email
and Skype. The Annual Conference of the International Wader Study Group held in Iceland in
October 2015 allowed for face-to-face discussions amongst some team members. The ToR for the
waders WG (Annex A2/1) was written and adopted. Key experts were contacted and key
representatives from the various stakeholders were appointed (refer to the ToR for details).
The action was completed on time.
ToR for the waders WG attached
Action A.5 Eurasian lowland wet meadow breeding waders Draft SSR
Status of action: completed
Foreseen start date: 1st April 2015 Actual start date: 1st October 2015
Foreseen end date: 1st April 2016 Actual end date: 29th July 2016
Information concerning the species status was gathered through review of current literature and
consultation with experts. A questionnaire to collect and update range-state-specific data on the
eight wader species was distributed electronically to the experts and stakeholders listed in the ToR
appendices (Annex A2/1). The First Draft SSR was completed (Annex A5/1) at the end of July
2016 and distributed amongst relevant stakeholders.
First Draft SSR for the waders attached
Action A.8 Elaboration of the species SSRs and consultations
Status of action: completed
Foreseen start date: 1st April 2016 Actual start date: 31st July 2016
Foreseen end date: 30th September 2016 Actual end date: 1st Oct 2016
The Second Draft SSR was prepared in early October 2016 (Annex A8/7). It was published on
the SAP TT and sent to stakeholders for consultation.
Second Draft SSR for the waders attached
48
Action A.9 Providing feedback from the consultation of the Draft SSRs
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 24th October 2016
Foreseen end date: 31st October 2016 Actual end date: 31st December 2016
The consultation process for the Second Draft SSR involved stakeholders from research
institutions, non-governmental organizations, and managers of protected areas and other LIFE
projects, as well as national authorities from the range countries (Annex A9/9).
Stakeholder engagement table for the waders attached
Action A.10 Finalisation, publication and dissemination of the SSRs
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: January 2017
Foreseen end date: 30th November 2016 Anticipated end date: 28th February 2017
The Final SSR (Annex A10/6) was completed and published on the SAP TT in February 2017.
The document, which includes a study conducted by an external consultant on the effectiveness of
conservation measures, was sent to NADEG members and relevant stakeholders.
Final SSR for the waders attached
Action A.11 Planning Workshop
Status of action: completed
Foreseen start date: 31st July 2016 Actual start date: 1st December 2015
Foreseen end date: 31st December 2016 Actual end date: 31st December 2016
The International Wet Grasslands Waders Workshop for the MSAP elaboration took place from
8th-10th November 2016, in Tönning, Germany. It was held at the Multimar Wattforum visitor
centre, Schleswig-Holstein Wadden Sea National Park. It was attended by 16 representatives
(Annexes: Agenda A11/36, Participants List A11/37, Minutes A11/38 and photos A11/39) from
local and national research institutions, NGOs, local authorities and DG ENV. Workshop outputs
(Annexes A11/40, A11/41, and A11/42) will provide the basis for the Draft MSAP (Action A.13).
Agenda, Participants List and photos for the Planning Workshop attached
MSAP threat assessment table attached
MSAP objective tree attached
Framework of actions for the MSAP attached
Action A.13 MSAP First Draft
Status of action: started
Foreseen start date: 31st July 2016 Actual start date: February 2017
Foreseen end date: 31st December 2016 Anticipated end date: 30th April 2017
The First Draft MSAP is in preparation. No delays are expected.
49
6.2. Main deviations, problems and corrective actions implemented
The projects objectives are viable and the work plan has followed the process described in the GA
with a number of non-substantial delays. Minor adjustments were typically related to modifications
in timelines or the expansion in the geographical coverage of the SAPs (mainly from an EU to
Flyway approach). Several project partners have been more responsive than others in the timely
delivery of expected actions. The Project Management Team remains proactive when any major
concerns arise. Overall, it is expected that the project will deliver planned outputs on time and in
top quality.
Delays in the initial stages of some of the species related actions are described below. However,
we do not expect any changes in the deadlines or quality of the deliverables:
Oxyura leucocephala: Following recommendations of the Project SC and AEWA, the entire
global species range will be covered in the revised SAP (initially, only the AEWA range was
included). To accommodate extra costs linked to the greater number of stakeholders involved
in the consultation process, SEO/BirdLife was granted additional funds from MAVA (4,560€).
These funds were mostly used to cover travel and subsistence costs of additional participants
and to support a workshop facilitator (Mr. Rob Sheldon). SEO subcontracted RDS
Conservation (represented by Mr. Sheldon) to produce the First and Second Draft SAPs.
Melanitta fusca: It was agreed with AEWA that the small Black Sea population of the species
will not be included in the SAP. Supplementary funds were provided by AEWA (10,000€) to
conduct the consultation process (including organization of the Planning Workshop).
Pelecanus crispus: Additional co-funding was secured from AEWA (10,000€) for the
consultation process (including organization of the Planning Workshop). Staff changes at HOS
during the initial phase of this project caused delays in implementation of some actions but,
following recommendations from the IUCN Pelican Specialist Group, HOS subcontracted SPP
to contribute to all compilation and editing of reports (A3, A6 and A12) and support the
stakeholder consultation process and the elaboration of project deliverables. Due to this, 5,000€
was reallocated from Personnel to External Assistance costs.
Aegypius monachus: In 2016, and as part of a global process sponsored by CMS to produce a
MSAP to conserve African-Eurasian Vultures, the scope of the A. monachus SAP was changed
to a flyway approach. Negotiations that followed the agreement to produce this Vulture MSAP
implied the need to postpone the implementation of LIFE EURO SAP into the 2016-2017
period. Additional funds facilitated by CMS and BirdLife supported larger meetiongs, so
international stakeholders could be invited to provide input concerning the species global
status. In terms of the outputs produced for both LIFE EuroSAP and CMS Vulture MSAP, and
after consultation with DG ENV, it was decided that the A. monachus SAP would be an
independent document. In a parallel process, the Vulture MSAP will be submitted to the 12th
Meeting of the Conference of the Parties (COP12) to the Convention on the Conservation of
Migratory Species of Wild Animals (CMS) in October 2017 in Manila, Philippines.
Gypaetus barbatus: This species followed a similar process to that explained for Aegypius
monachus. In this particular case, VCF was commissioned by CMS to draft the European
component of the Vultures MSAP. After consultation with DG ENV it was decided that the G.
barbatus SAP would also be an independent document outside the Vultures MSAP.
Nevertheless, the European workshop organized under the Vultures MSAP was used by VCF
as an opportunity to collect information for the G. barbatus SAP, thus optimizing the
consultation process and ensuring that conservation actions for both APs are synchronised.
50
Streptopelia turtur: Two, rather than three Planning Workshops were held to increase the
effectiveness of the consultation process and bring together a larger number of experts from
the species Western and Eastern Flyways. RSPB agreed to reallocate 3,000€ personnel costs
to SEO/BirdLife and to subcontract MME for another 3,000€ to assist with the organization of
the Planning Workshops (Spain and Hungary respectively). Workshop facilitation was
supported by VCF. Budget reallocation between the beneficiaries will be reflected in the PAs.
Puffinus yelkouan: Due to LPO’s involvement in a separate LIFE project, there was some delay
in the initiation of required actions during the early stages of the LIFE EuroSAP project. The
LPO Coordination Team also experienced some staff changes which caused additional delay.
Nevertheless, since September 2016 the team has progressed significantly and caught up with
the project work plan. Additional funding of 5,880€ was secured by MAVA to support the
organization of the Planning Workshop.
An overall problem experienced by all project partners is that the budgeted amounts for staff time
do not reflect true personnel costs. All nine teams coordinating the work on the SAP and MSAP
elaboration have dedicated much more time than expected to the consultation process. Collecting
feedback from stakeholders and incorporating all comments (when received) in key documents,
logistical and technical support to organize international planning workshops (including visa
permits, transportation arrangements and official correspondence with national authorities to
guarantee the participation of experts in the workshops) requires significant staff time that is
underestimated in the project budget.
Despite considerable effort, there was also not a high level of participation by MS representatives
during the Planning Workshops. Strong support from DG ENV is needed to fully engage MS in
the process of development and further implementation of the SAPs and MSAP. BLI and its
partners are currently preparing a plan to approach national governments more effectively through
different channels. Amongst suggested actions are the creation of a European Species Coordination
Group which should play a vital role in monitoring and pushing for MS buy-in of the new or
updated SAPs. This and other actions will be discussed with DG ENV during a meeting on 11th
of May, as well as during the project SC meeting on 23rd May 2017. Setting up the ESCG and
continuation of the project actions will also be discussed during both meetings.
51
6.3. Evaluation of Project Implementation
The projects objectives are fully viable and the actions that have been implemented have
contributed towards achievement of these objectives. Thanks to a very demanding, yet rewarding
project coordination, we believe all partners are ready to roll-out the second half of this project on
time.
The consultation process for key SAP documents has led to the creation of a network of experts
and decision-makers actively involved in the SAP development. Effective communication through
the workshops and document preparation, as well as follow-up, was successfully achieved. It is
anticipated that, especially through the establishment of the ESCG, the network will continue
implementing the SAPs after the project closes.
Dissemination activities, especially in relation to the SAP TT, resulted in active collaboration
between the SAP development teams outside the LIFE EuroSAP Project. The Egyptian Vulture
FAP was uploaded on the SAP TT and the Vultures MSAP will also be made available. Strong
interest in using the SAP TT was provoked among SAP WGs and it is expected that the effect of
dissemination and further collaboration will be more visible towards the project end.
Close collaboration with AEWA has led to knowledge sharing with the species coordination teams
(BirdLife partners), especially in terms of identification of national focal points and working with
national authorities. Such collaboration is necessary for continued synchronisation in the SAP
development process (consultation, preparation of key documents and workshop organisation).
A revised format for the development of International SAPs and MPs was prepared with
contributions from BLI, WWT, Rubicon Foundation, Wetlands International, the Waterbird
Harvest Specialist Group and DG ENV. In March 2016, the AEWA Standing Committee approved
this new format. It will be formally adopted at MOP7 in November 2018 and be used for all nine
SAPs being prepared under LIFE EuroSAP. Promoting the new format through the LIFE EuroSAP
Project will be an added value for the EU and all future APs. It is strongly endorsed that all relevant
parties adopt this format as a standard for all new SAPs. This would harmonize the SAP process,
decrease confusion during preparatory phases, and allow for better comparison of results during
implementation. This will also aid in future SAP evaluations and revisions.
It is expected that this project will have inmediate impact in the way both the EU and its MS deal
with SAPs. Already during these first two years, the EU’s NADEG group has been informed and
benefitted from the reports and coordination work delivered by LIFE EuroSAP. Once the SAPs
are finalised, we expect MSs to duly implement the recommended actions, including establishing
new objectives and monitoring under site specific management plans or while reporting under
Article 12 of the Birds Directive.
At an international level, FAPs sanctioned by AEWA should stimulate coordinated action to
protect migratory species at key sites, together with the monitoring, education and capacity-
building actions described in AEWA’s AP.
Looking ahead, it is expected that LIFE EuroSAP contributes to verifying and updating the
conclusions found in the three previous reviews of SAP implementation (2004, 2010 and 2013). It
52
is also expected that recommendations are made to improve the way the EU selects and prioritises
the species requiring revision or new SAPs, and the ESCG should play a fundamental role.
However, LIFE EuroSAP impacts should be broader and include recommendations for future EU-
funds (such as LIFE or INTERREG) when dealing with SAPs or when targetting species for which
a SAP exists.
Other indirects impacts could include advising on the priority list as defined by LIFE regulation,
agri-environmental measures as defined by the Common Agricultural Policy (CAP) or threat
mitigation measures to be applied under the European Common Fisheries Policy (CFP).
Consultations with NADEG members and MSs, coordinated by DG ENV took place. Materials
presenting the LIFE EuroSAP project were promoted during Expert Group meetings. During these
consultations and through further collaboration, it is expected that the LIFE EuroSAP project will
lead to an effective and smooth process for SAP elaboration, help identify ways in which MS can
participate in the consultation process, engage in the approval, and contribute to the
implementation and revision of future SAPs after the project end.
It is expected that active collaboration with MSs will also benefit CMS and AEWA because action
plans developed or endorsed under international environmental agreements require
implementation by all contracting parties.
6.4. Analysis of benefits
The main objective of a SAP is to outline the conservation status and conservation priorities for a
species. To date, the steps taken towards the publication of the SAPs have had no impact on the
targeted species populations, nor on other/species/habitats present where the species occurs.
However, once the SAPs are finalized in early 2018, international implementation is expected to
have a significantly positive impact on the targeted species and their conservation.
It is expected that individual SAPs will define measures needed to ensure a particular species
protection, this means adding clarity and suggesting cost-effective measures ready to implement
by both the public and private sectors. Such measures will include conservation, communication,
policy and capacity-building actions, which should result in the creation of jobs or, at the very
least, maintaining and refining already existing ones.
By targetting a group of species through a MSAP, costs of development and implementation will
be reduced. At the same time, defined actions can be species or habitat-specific when necessary
to ensure an appropriate level of detail which allows for effective monitoring and reporting as
well as improved conservation impact for a particular species within the MSAP.
Many of the actions defined in SAPs need to be applied directly on the ground, at breeding,
wintering or migratory stop-over sites used by the target species. This is a great opportunity for
local communities to become engaged with nature by becoming leaders in nature protection. A
number of capacity-building and eductional activities should be identified, which again should
53
lead to an economic boost for such communities, together with a positive contribution to their
well being.
The replicability of LIFE EuroSAP is crucial and also one of the main objectives of the project.
This project should create a new standard for both identifying, reporting and monitoring species
in conservation need, and it should do it in an inclusive way, so all key stakeholders, from EU to
local communities, have equal access to information and a proportial share in applying the
identified actions. The SAP TT and ESCG should be maintained and supported financially once
LIFE EuroSAP has completed.
These two tools, the online platform and the expert panel, are fundamental game-changers which
should be supported at the highest level by both the EU and its MS. Once LIFE EuroSAP has
completed recommendations will be provided in the final report. It will include:
Budgeting and agreement on the running costs of maintaining the SAP TT;
Budgeting and agreement on the running costs of maintaining the ESCG;
Agreement of ToR for ESCG and liaisons with the NADEG Group;
That all new SAPs follow same format and use SAP TT;
That monitoring of SAP implementation is displayed on the SAP TT through regular
reporting by MSs.
54
7. Project Specific Indicators
The Project Specific Indicators (Annex C6/1) remain unchanged. A more detailed description on
how the Indicators are met will be provided in the Project Final Report.
55
8. Comments on the financial report
A summary of the incurred costs for the reporting period by cost category are presented in the
summary table below.
We should admit that the new financial reporting template has resulted in many questions and
doubts to be raised among the LIFE EuroSAP Beneficiaries. We have made an effort to report
costs as clearly and reasonably possible, although further clarification may be required. We are
able to provide justification and explanation for any reported cost, while below we mention some
of the concerns related to the cost reporting in the new template.
We have forecast a 2nd instalment from the EC in the funding tab where the expenditure has been
incurred and is therefore due. For the 3 partners that have spent less than the first instalment
received, we have not forecast any second receipt in the funding tab.
For the two UK entities (BirdLife and RSPB) where costs are in GBP (others are in Euro), we have
selected the most appropriate exchange rate option of ‘Date when cost incurred’.
In the Employees tab we elected to report monthly for the staff time and used the monthly exchange
rates from the Commission website as specified.
In order to maintain accuracy of staff rates, for the total number of hours worked per year, we have
taken the average days worked per year (eg. for BirdLife 220 days, excludes holidays and
weekends) by the contracted hours for each employee, and used the annual gross salary per the
contract to give the most relevant figures. These reconcile directly to the organisational payroll
figures and full audit trails have been maintained.
For staff involved in the project we have each individual contract and any further documentation
for contract amendment’s (including salary changes).
While completing the reports we found that when additional rows are added that the formula in
the total column E8 doesn’t work so have changed the formula to sum it correctly.
Bank charges have been allocated to “other direct costs”, as these are direct compulsory charges
that are specific to the project and should be recognised.
The base currency of BLI’s own contribution is Euro, therefore we have recognised this
contribution at the rate the funds were actually received.
The AEWA additional financial support (apart from the stated in the GA co-financing) for
organizing the O. Leucocephala, P. crispus and M. fusca workshops was transferred to the
Coordinating Beneficiary’s accont and then distributed among the corresponding associated
beneficiaries’ accounts.
List of staff involved in the project attached
56
8.1. Summary of Costs Incurred
The total incurred costs of 509,076.49€ represent 60.75% of the total project budget. The
threshold of expenditures of at least 100% of the first pre-financing payment (€150,000.00) was
achieved. The incurred costs reflect the project workplan with no majour changes.
External assistance costs have increased compared to the GA due to subcontacting between
BirdLife International and Stichting BirdLife Europe, for staff time of Communications Officer.
For more details please see above. The over expenditure does not exceed the 20% limit, being
thus a non-substantial change in the budget.
Consumables costs are underspent. Two Planning Workshops for S. t. turtur SAP were organized
instead of three (as explainded earlier in the Technical Part of the Report). On the other hand, the
costs for the two Workshops were significantly lower as the events were hosted by the national
authorieties (in Spain and Hungary) at a very good value-for-money.
PROJECT COSTS INCURRED
Cost category Budget according to the
GA in €*
Costs incurred within
the reporting period in
€
%**
1. Personnel 493,702.00 297,903.93 60.34
2. Travel and
subsistence
158,765.00 78,843.04 49.66
3. External assistance 84,560.00 91,204.23 107.86
4. Durables goods: total
non-depreciated cost
- Infrastructure sub-
tot.
- Equipment sub-tot. 1,200.00 720.15 60.01
- Prototype sub-tot.
5. Consumables 34,760.00 8,690.22 25.00
6. Other costs 12,000.00 1,224.13 10.20
7. Overheads 53,007.66 30,490.82 57.52
TOTAL 837,994.66 509,076.49 60.75
57
8.2. Accounting system
BLI, the Coordinating Beneficiary of the project, uses the accounting system Microsoft Dynamics
to record project expenditures and income. Each project is allocated its own coding structure. For
example, the code for this project is Life EuroSAP 2785. In addition to the unique project code,
individual costs and income are also broken down by cost type such as travel, staff costs,
equipment, etc. Costs are approved by the assigned Project Manager and costs over £20,000 are
approved by the respective Director. Expenditures are also approved by the relevant Finance
Manager to ensure costs are in line with contract requirements and available budgets.
BLI has a Finance Handbook which is available internally so that standard procedures are followed
by staff. This handbook is available upon request. Timesheets are completed electronically by
project staff and are then approved by the Project Coordinator. In addition to applying the coding
structure mentioned above, all relevant expenditure documents are stamped with a Life Stamp
project reference.
Each Associated Beneficiary has assigned a code for the LIFE EuroSAP project in their accounting
systems. LIFE timesheets are completed on a regular basis and approved by relevant staff. All
invoices are stamped or include a project reference. Expenses are approved by the responsible staff
of each partner. The information is summarized in Table 4.
58
Table 4. Summarized information on accounting system of LIFE EuroSAP Project partners
PARTNER
Accounting System
Project Code Expenditure
Approval Timesheet
Information
Registration/Submission/Approval of
staff time
LIFE Project Reference
Information
FACE Winbooks 15PLIFSAP Secretary General
Electronic: Excel
Daily timesheets signed and approved monthly by line manager and administration
All invoices stamped or include project reference
HOS Accounting program which has a separate account for projects expenses
6789 Project Coordinator, Financial Director, Chief Executive
Manual: LIFE
timesheets
Timesheets signed and approved monthly by the Scientific person responsible
All invoices stamped or include project reference
LOD Analytical 79; staff costs 611116; other costs 3422264
Director approval at the beginning of the project
LIFE time-sheets + organization’s working time record statement (monthly)
Daily timesheets signed and approved monthly by Director
All invoices include project number and project acronym
LPO SAGE LI01P2894000 Head of Department
Electronic:
LIFE
timesheets
(Excel)
Daily timesheets signed and approved monthly by second person in command
All invoices stamped or include project name and number. Address also includes project reference
NABU From 01.01.2017 UNIT4
Until 31.12.2016 staff costs (T 93811/T 93820/T 93823); other costs (T 93823/T 93829) From 01.01.2017 staff costs (DN102610/ DN102611/ DN102612); other costs (DN102614/DN102617)
<1000,00€ – 2 eyes principle; 1000-3000,00€ – 4 eyes principle; >3000,00€ – 6 eyes principle
Electronic: Timetools
Monthly timesheet signed and approved Head of Institute
All invoices include project name and number
RSPB OPENAccounts
9LI-G-ESAP Approved by senior staff, Section Heads, Heads of Department, Directors, Chief Executive depending on amount
Manual Monthly timesheets approved by line managers
Project reference on invoices and in billing address. Invoices without project reference are stamped
59
PARTNER
Accounting System
Project Code Expenditure
Approval Timesheet
Information
Registration/Submission/Approval of
staff time
LIFE Project Reference
Information
SEO Analytical Accounting
171504, Section 99 Project Technical Coordinator
Manual Monthly timesheets approved by Project Coordinator
Project number/code included or stamped on all invoices
SOF Visma Spcs 428 and type of cost/revenue
Project Leader Manual Monthly timesheets approved by Project Leader
All invoices include project number, project name and project leader
SPEA SAGE LEURO Project Coordinator
Electronic: LIFE timesheets (Excel)
Monthly timesheets approved by Project Coordinator
All invoices stamped with project name and reference
VBN Microsoft Dynamics NAV 2015
P0366 Bookkeeping department and project manager according to approved budget
Electronic: Corpex
Staff time and costs are monitored in Project card (SUBSIDIEKAART)
All documents and invoices include project code
VCF Professional accounting office (Seres Accountants & Belastingsadv.)
1910 Approved by Director (>15000€ approved by Director and one management board member)
Electronic: Excel
Monthly time sheets approved by Director
All invoices and expense claims include project code. All documents stamped with project reference
8.3. Partnership agreements
Financial transactions between the coordinating beneficiary and associated beneficiaries
were completed following the first financial installment of the GA. Following the PAs, 30%
of the EU’s financial contribution towards each beneficiary’s budget was deposited in
August 2015. Additional co-funding from AEWA and MAVA was regulated through
separate funding agreements signed between the donor and the Coordinating Beneficiary,
and between the Coordinating Beneficiary and each of the Associated Beneficiaries. All
payments under each agreement were divided in half – first payment (50%) upon signature
of the agreement and second payment (50%) upon receipt of financial and substantial report
from the partner.
Associated Beneficiaries keep financial records (evidence of expenses occurred on the
project, e.g. timesheets, invoices, etc.) and provide these to the coordinating beneficiary on
a tri-monthly basis following the schedule provided in the PAs.
The consolidated cost statement was prepared by the Project Coordinator and the
Coordinating Beneficiary’s Financial Officer, based on financial reports submitted by each
of the associated beneficiaries.
8.4. Certificate on the financial statement BLI has identified an Auditor for the implementation of Action C.5 of the GA. The details
of the Auditor are provided below:
Crowe Clark Whitehill LLP
St Bride's House
10 Salisbury Square
London EC4Y 8EH, UK
8.5. Summary of costs per action
Although both the Coordinating Beneficiary and the Associated Beneficiaries report costs
by action, we find this type of reporting not very suitable for the current project. The project
actions form part of one single process of elaboration of SAPs, thus any attempt of clearly
splitting the reported costs (especially personnel costs) will not fully reflect the real
situation. We therefore think that presenting the costs per SAP would better serve the needs
of reporting.
In table 5, costs per SAP are presented, comparing budgeted costs (dark blue) with incurred
costs till end of February 2017 (light blue). Incurred costs of the Coordinating Beneficiary
and FACE are not included in the table, as they are related mainly to the coordination of all
A actions, project management and communication actions.
Mid-term Report LIFE14 PRE/UK/002 61
Table 5. Costs per Action Plan (budgeted (dark blue) vs. inclurred costs (light blue)
SAP Personnel Travel External assistance Equipment Consumables Other costs TOTAL
MSAP 79,872.00 28,800.00 32,560.00 0.00 960.00 0.00 142,192.00
34,831.69 7,407.81 25,370.28 0.00 300.00 0.00 67,909.78
Dalmatian Pelican 13,096.00 8,820.00 0.00 0.00 1,300.00 0.00 23,216.00
8,348.00 12,301.00 0.00 0.00 2,918.30 70.00 23,637.30
Velvet Scoter 11,520.00 10,000.00 0.00 0.00 0.00 0.00 21,520.00
5,284.03 6,974.40 3,689.73 0.00 56.30 0.00 16,004.46
Yelkouan Shearwater 14,151.00 4,800.00 0.00 0.00 1,200.00 0.00 20,151.00
11,479.90 2,856.70 3,065.00 0.00 0.00 0.00 17,401.60
Turtle Dove 43,945.00 33,760.00 0.00 0.00 0.00 0.00 77,705.00
47,822.04 16,299.96 3,517.00 0.00 4,933.56 404.41 72,976.97
Bearded Vulture 12,886.00 7,200.00 0.00 0.00 0.00 0.00 20,086.00
13,811.92 7,517.21 0.00 0.00 0.00 0.00 21,329.13
White-headed Duck 17,980.00 4,500.00 0.00 0.00 0.00 0.00 22,480.00
20,115.69 8,010.08 1,741.35 0.00 0.00 0.00 29,867.12
Monteiro's Storm Petrel 8,385.00 11,245.00 0.00 0.00 1,000.00 0.00 20,630.00
3,599.27 7,529.37 0.00 0.00 15.90 0.00 11,144.54
Cinereous Vulture 15,623.00 3,200.00 0.00 0.00 0.00 0.00 18,823.00
20045.53 595.27 0.00 0.00 0.00 0.00 20,640.80
Mid-term Report LIFE14 PRE/UK/002 62
9. Envisaged progress until next report
Considering that all nine SAPs and MSAP are currently in preparation and no delays in
delivering the Draft APs are expected, we foresee full implementation of actions by the project
end (30th September 2018). First Drafts of the 8 SAPs and one MSAP will be completed by late
April 2017 (A.12 and A.13). As requested by DG ENV, the First Draft SAP for S. t. turtur will
be ready on 5th April. A six-month period will be allowed for consultation of the draft
documents amongst a wide group of stakeholders (A.14 and A.15). Completion of the Second
Draft SAPs and MSAP is expected by late October 2017 (A.16 and A.17). Through
collaboration between DG ENV, CMS, AEWA, FACE, and the BLI partnership, national
governments will be encouraged to participate in all stages of SAP and MSAP preparation. The
aim is to create a feeling of ownership and responsibility for their future implementation. The
SAPs and MSAP will be finalized and ready for adoption by late February 2018 (A.18).
Dissemination and promotion of the project actions will continue via the project website (B.1),
partner organization websites, and social media (B.3). International cooperation (B.2) is
foreseen through participation of project staff in the EBCC board meeting in Copenhagen, in
April 2017, where the major outcomes from the planning workshops and SAP preparation will
be presented. An update will be provided at BLI’s European Partnership Meeting, planned for
autumn 2017 in Brussels (dates to be confirmed) and held back-to-back with the 2nd Central
Asia and Caucasus Meeting. Networking with relevant LIFE Projects (B.6) will continue as
outlined in the project proposal.
In the first half of 2018, project results will be promoted through the publication of a Layman’s
Report (B.5) and the organization of a Final Conference (B.4).
Project management will be implemented according to an agreed work plan (C.3). Two SC
meetings (C.1) and two SCC meetings (C.2) will be organized to support successful
implementation of the project. Among the main topics to be discussed during the meetings are:
establishment of the European Species Coordination Group (ESCG) (C.4) and future
coordination, implementation and monitoring of the SAPs and MSAP. Prior to the Committee
meetings, a meeting will be held with DG ENV in Brussels in May 2017 to discuss the above
ESCG work and organization of the Final Conference. Achievement of the project indicators
will be updated (C.6) and summarized in the Final Project Report. For purposes of the latter, an
external audit (C.5) of the projects financial report will be commissioned during the last three
months of the project.
Mid-term Report LIFE14 PRE/UK/002 63
10. Annexes and Deliverables
Annexes
Annex 1 SAP elaboration workflow
Annex 2 Overall progress of the implementation actions
Annex 4 Partnership Agreements
Annex 5 Gantt chart of the overall project progress
Annex A1/1 ToR for the O. leucocephala WG
Annex A1/2 ToR for the M. fusca WG
Annex A1/3 ToR for the P. crispus WG
Annex A1/4 ToR for the A. monachus WG
Annex A1/5 ToR for the G. barbatus WG
Annex A1/6 ToR for the S. t. turtur WG
Annex A1/7 ToR for the P. yelkouan WG
Annex A1/8 ToR for the H. monteiroi WG
Annex A1/9 Kick-off Meeting Agenda for H. monteiroi
Annex A1/10 Kick-off Meeting Participants List for H. monteiroi
Annex A1/11 Kick-off Meeting Minutes for H. monteiroi
Annex A1/12 Kick-off Meeting photos for H. monteiroi
Annex A2/1 ToR for the waders WG
Annex A3/1 Evaluation of the implementation of the existing SAP for O. leucocephala
Annex A3/2 Evaluation of the implementation of the existing MP for M. fusca
Annex A3/3 Evaluation of the implementation of the existing AP for P. crispus
Annex A3/4 Draft evaluation of the implementation of the existing Action Plan for A. monachus
Annex A3/5 Evaluation of the implementation of the existing SAP for G. barbatus
Annex A3/6 Evaluation of the implementation of the existing MP for S. t. turtur
Annex A4/1 First Draft SSR for H. monteiroi
Annex A5/1 First Draft SSR for the waders
Annex A6/1 First Draft SSR for O. leucocephala
Annex A6/2 First Draft SSR for M. fusca
Annex A6/3 First Draft SSR for P. crispus
Annex A6/4 First Draft SSR for A. monachus
Annex A6/5 First Draft SSR for G. barbatus
Annex A6/6 First Draft SSR for S. t. turtur
Annex A6/7 First Draft SSR for P. yelkouan
Annex A7/1 Technical description of the SAP Tracking Tool
Annex A8/1 Second Draft SSR for O. leucocephala
Annex A8/2 Second Draft SSR for M. fusca
Annex A8/3 Second Draft SSR for G. barbatus
Annex A8/4 Second Draft SSR for S. t. turtur
Annex A8/5 Second Draft SSR for P. yelkouan
Annex A8/6 Second Draft SSR for H. monteiroi
Annex A8/7 Second Draft SSR for the waders
Annex A9/1 Stakeholder engagement table for M. fusca
Mid-term Report LIFE14 PRE/UK/002 64
Annex A9/2 Stakeholder engagement table for P. crispus
Annex A9/3 Stakeholder engagement table for A. monachus
Annex A9/4 Stakeholder engagement table for G. barbatus
Annex A9/5 Threat maps for G. barbatus in Eurasia
Annex A9/6 Stakeholder engagement table for S. t. turtur
Annex A9/7 Stakeholder engagement table for P. yelkouan
Annex A9/8 Stakeholder engagement table for H. monteiroi
Annex A9/9 Stakeholder engagement table for the waders
Annex A10/1 Final SSR for M. fusca
Annex A10/2 Final SSR for P. crispus
Annex A10/3 Final SSR for S. t. turtur
Annex A10/4 Final SSR for P. yelkouan
Annex A10/5 Final SSR for H. monteiroi
Annex A10/6 Final SSR for the waders
Annex A11/1 Planning Workshop Agenda for O. leucocephala
Annex A11/2 Planning Workshop Participants List for O. leucocephala
Annex A11/3 Planning Workshop group photo for O. leucocephala
Annex A11/4 Planning Workshop Invitation (sample) for M. fusca
Annex A11/5 Planning Workshop Agenda for M. fusca
Annex A11/6 Planning Workshop Participants List for M. fusca
Annex A11/7 Planning Workshop photos for M. fusca
Annex A11/8 Problem Tree for M. fusca
Annex A11/9 Objectives Tree for M. fusca
Annex A11/10 Planning Workshop Agenda for P. crispus
Annex A11/11 Planning Workshop Participants List for P. crispus
Annex A11/12 Planning Workshop group photo for P. crispus
Annex A11/13 European Vultures MSAP Workshop Agenda
Annex A11/14 European Vultures MSAP Workshop Summary Report
Annex A11/15 European Vultures MSAP Workshop Threat maps for A. monachus
Annex A11/16 Planning Workshop Agenda for G. barbatus
Annex A11/17 Planning Workshop Participants List for G. barbatus
Annex A11/18 Planning Workshop Conclusions for G. barbatus
Annex A11/19 Planning Workshop photos for G. barbatus
Annex A11/20 Agenda for the 2016 Annual G. barbatus meeting
Annex A11/21 Planning Workshop Agendas (Spain and Hungary) for S. t. turtur
Annex A11/22 Planning Workshop Participant Lists (Spain and Hungary) for S. t. turtur
Annex A11/23 Planning Workshop Minutes (Spain and Hungary) for S. t. turtur
Annex A11/24 Planning Workshop photos (Spain and Hungary) for S. t. turtur
Annex A11/25 Threats and actions for S.t. turtur
Annex A11/26 Demographic invariant method for S.t.turtur
Annex A11/27 Planning Workshop Agenda for P. yelkouan
Annex A11/28 Planning Workshop Participants List for P. yelkouan
Annex A11/29 Planning Workshop photos for P. yelkouan
Annex A11/30 Threat prioritization table for P. yelkouan
Annex A11/31 Draft list of conservation actions for P. yelkouan
Annex A11/32 Planning Workshop Agenda for H. monteiroi
Mid-term Report LIFE14 PRE/UK/002 65
Annex A11/33 Planning Workshop Participants List for H. monteiroi
Annex A11/34 Planning Workshop Minutes for H. monteiroi
Annex A11/35 Planning Workshop group photo for H. monteiroi
Annex A11/36 Planning Workshop Agenda for the waders
Annex A11/37 Planning Workshop Participants List for the waders
Annex A11/38 Planning Workshop Minutes for the waders
Annex A11/39 Planning Workshop photos for the waders
Annex A11/40 Threat Assessment table for the waders
Annex A11/41 Objectives Tree for the waders
Annex A11/42 Framework of Actions for the waders
Annex A12/1 Review of the progress against the AP for eradication of Oxyura jamaicensis
in the Western Palearctic (2011-2015)
Annex A12/2 Circulation list for the Species Status and MP for S.t. turtur
Annex B1/1 Print screens of the LIFE EuroSAP website and social media promotion
Annex B1/2 Google analytics reports
Annex B2/1 Agenda for the Birds Numbers 2016 Conference
Annex B3/1 Communication Plan
Annex B3/2 Media dissemination
Annex B6/1 Species Recovery Conference Presentation
Annex B6/2 Species Recovery Conference Agenda
Annex B6/3 Species Recovery Conference Participants List
Annex B6/4 Species Recovery Conference Participants photo
Annex B6/5 Print screens of media publication on EVFAP
Annex C1/1 Minutes from the First SC meeting
Annex C1/2 Minutes from the Second SC meeting
Annex C1/3 Minutes from the Third SC meeting
Annex C1/4 Minutes from the Fourth SC meeting
Annex C2/1 SCC members
Annex C2/2 Third joint SC and SCC Meeting Agenda
Annex C6/1 Project Specific Indicators
Mid-term Report LIFE14 PRE/UK/002 66
Deliverables
Annex A1/1 ToR for the O. leucocephala WG
Annex A1/2 ToR for the M. fusca WG
Annex A1/3 ToR for the P. crispus WG
Annex A1/4 ToR for the A. monachus WG
Annex A1/5 ToR for the G. barbatus WG
Annex A1/6 ToR for the S. t. turtur WG
Annex A1/7 ToR for the P. yelkouan WG
Annex A1/8 ToR for the H. monteiroi WG
Annex A2/1 ToR for the waders WG
Annex A3/1 Evaluation of the implementation of the existing SAP for O. leucocephala
Annex A3/2 Evaluation of the implementation of the existing MP for M. fusca
Annex A3/3 Evaluation of the implementation of the existing AP for P. crispus
Annex A3/4 Draft evaluation of the implementation of the existing Action Plan for A. monachus
Annex A3/5 Evaluation of the implementation of the existing SAP for G. barbatus
Annex A3/6 Evaluation of the implementation of the existing MP for S. t. turtur
Annex A4/1 First Draft SSR for H. monteiroi
Annex A5/1 First Draft SSR for the waders
Annex A6/1 First Draft SSR for O. leucocephala
Annex A6/2 First Draft SSR for M. fusca
Annex A6/3 First Draft SSR for P. crispus
Annex A6/4 First Draft SSR for A. monachus
Annex A6/5 First Draft SSR for G. barbatus
Annex A6/6 First Draft SSR for S. t. turtur
Annex A6/7 First Draft SSR for P. yelkouan
Annex A10/1 Final SSR for M. fusca
Annex A10/2 Final SSR for P. crispus
Annex A10/3 Final SSR for S. t. turtur
Annex A10/4 Final SSR for P. yelkouan
Annex A10/5 Final SSR for H. monteiroi
Annex A10/6 Final SSR for the waders
Annex 6 List of staff involved in the project