LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 -...

8
LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 - 31/12/2013 Project Budget 1.450.192€ - 50% EC Contribution

Transcript of LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 -...

Page 1: LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 - 31/12/2013 Project Budget 1.450.192€ - 50% EC Contribution.

LIFE08 ENV/IT/000428

SoilPro - “Monitoring for Soil Protection”

Project Duration 01/01/2010 - 31/12/2013Project Budget 1.450.192€ - 50% EC Contribution

Page 2: LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 - 31/12/2013 Project Budget 1.450.192€ - 50% EC Contribution.

Video Production for the Awareness Campaign in Peloponnese on soil protection

ACTION 8 - AWARENESS CAMPAIGN AGAINST SOIL DEGRADATION PROCESS TARGETING

SOIL USERS AND ALL STAKEHOLDERS – OUTREACH

Page 3: LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 - 31/12/2013 Project Budget 1.450.192€ - 50% EC Contribution.

Contents

• Purpose• Technical Specifications• Documentary Contents• Deliverables

Page 4: LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 - 31/12/2013 Project Budget 1.450.192€ - 50% EC Contribution.

Purpose

• Filming, editing and production of a 15 minute audiovisual material (documentary) of the region of Peloponnese "to promote and disseminate the actions of the European co-financed project LIFE/ENV/IT/000428 SoilPro: Monitoring for Soil Protection

Page 5: LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 - 31/12/2013 Project Budget 1.450.192€ - 50% EC Contribution.

Technical Specifications• Processing of the existing and new photographic

material (information campaigns, interviews, conferences, etc.).

• Provision of Greek, English and Italian subtitles.• The reception quality of the video footage will be

achieved through technical means that are capable of receiving video resolution 1920x1080 pixel (Full High Definition).

• High sound quality - Dolby ® Digital 5,1 ch.• The format of the final export will be in mpeg.

Format.

Page 6: LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 - 31/12/2013 Project Budget 1.450.192€ - 50% EC Contribution.

Documentary Contents 1/2

• Introductory prologue and an epilogue by a narrator. The narrator will have an active role during the film (image explanation, transition from one speaker to another, etc.).

• Interviews (audiovisual material) taken from:– the Peloponnesus Regional Representative.– the scientific responsible of the National and Kapodistrian

University of Athens (NKUA).– the scientific responsible of the lead partner (CRA-ABP).– 3 working staff members from the Region of

Peloponnesus.

Page 7: LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 - 31/12/2013 Project Budget 1.450.192€ - 50% EC Contribution.

Documentary Contents 2/2

• Production of audio-visual material from:– Peloponnese areas of particular interest for the

SoilPro project, recommended by EKPA’s scientific responsible and the Region’s Working Group.

– Events / presentations / conferences that are held in the Peloponnese region.

– The information campaign in schools, communities etc.

Page 8: LIFE08 ENV/IT/000428 SoilPro - “Monitoring for Soil Protection” Project Duration 01/01/2010 - 31/12/2013 Project Budget 1.450.192€ - 50% EC Contribution.

Deliverables

• A 15 minute documentary • The Cover page of the documentary.• A 45'‘ promotional clip.• Signed statements by the respondents,

allowing the publication of audiovisual footage.

• Photographs taken for the purpose of the documentary.