Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration...

33
Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical Conference 21-22 March 2010 Ram White, Integrated Support Systems, Inc. 1

Transcript of Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration...

Page 1: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Life Cycle Baseline Reconciliation

A System Overview and Description of the

Basic Configuration Verification System (BCVS)

ACDM 15th Annual Technical Conference 21-22 March 2010

Ram White, Integrated Support Systems, Inc.

1

Page 2: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Life Cycle Baseline Reconciliation Basic Configuration Verification System (BCVS)

Presentation Agenda: • The Basics/Fundamentals

– Product Life Cycle, Bills of Material, Data/Documentation, Baselines and BL Comparisons, Audits and Reconciliation

• The BCVS Business Values• The System Environments

– Functional Systems Architectures– Communications (point-to-point or Standards)

• Data Object Modeling (The devil is in the detail)• Data Mapping Strategies

– XLS/CVS, XML, Standards & Direct Integration

• ISS/InSync Proposed Solution• Supporting the DD 250 Process• The Back Story: Boeing’s SI/BCA & P-8A

2

Page 3: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

CSCI CI

-1-3

CSC CSC

Unit PartPartUnitUnitUnit

Item Item Number

Product Structure(Bill of Material)

Item

Number

Drawing(s)/Doc(s)/Std(s)/Spec(s)HW/SW/Tooling/PlanningCosts/Schedule(s)/Personnel/

OrganizationsFiles/Records/Data/CAD Model(s)Associations/Attributes

(FN, NSN, MS, UM, Qty, etc.)3

As-Authorized(_________)

As-Designed(_________)

As-Committed(_________)

As-Planned(_________)

As-Delivered(_________)

As-Maintained(_________)

As-Built(_________)

As-Purchased(_________)

As-Tested(_________)

Cost EstimatingCapacity Planning & AssessmentSpecifications

Master ScheduleWork Breakdown StructureBudgetsSales OrdersCost AccountsEffectivity

Baseline ReleaseDocument ControlProduct Definition EBOM Bill of RoutingsEffectivity (Eng.)

MBOMEffectivity (Manf.)Bill of Routings/ResourcesMaster Production ScheduleProposed Capacity PlanningMRP/CRP/ProcurementWork Order Release

Receiving/InspectionReceiving InstructionsDock-to-StockInventory (WIP)Lot Code / Serial NumberingShop Floor ControlLabor CollectionWork MeasurementsProcess InstructionsTest ProceduresTest ResultsCM Status Accounting

As-Built SnapshotCM ReconciliationCM Status AccountingLot Code / Serial NumberingDeviations / Waivers

Field Return / RetrofitField ServiceCM ReconciliationLot Code / Serial No.CM Status AccountingAs-Built History

Product’s Life Cycle Management(Basic Life Cycle Process)

As-Disposed(_________)

Storage, SalvageTo-Become (Recycle) CM ReconciliationLot Code / Serial No.CM Status AccountingAs-Was/Is History

Page 4: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

ConceptDefinition

DetailedDevelopment

Pre-Production

ProductionDeployment/Operation

DesignUpgrades

Disposal As-Authorized

As-Committed

Product Life Cycle Management

As-Designed

As-Planned

As-Built

As-Disposed

As-Delivered

As-Maintained

4

Page 5: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

As-Authorized

Authorize Data

As-Committed

Schedule Data

As-Designed

DesignData

As-Planned

Plan Data

As-Built

Build Data

As-Supported

SupportData

Authorized Baseline

Scheduled Baseline

DesignBaseline

Planned Baseline

Built Baseline

SupportedBaseline

BaselineCompares

BaselineCompares

BaselineCompares

BaselineCompares

BaselineCompares

BaselineCompares

ComparisonReports

ComparisonReports

ComparisonReports

ComparisonReports

ComparisonReports

Traditional Life Cycle Reconciliation

5Multiple Manual Methods – The Usual

ConfigurationAudits

ConfigurationAudits

ConfigurationAudits

ConfigurationAudits

ConfigurationAudits

Page 6: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

ConceptDefinition

DetailedDevelopment

Pre-Production

ProductionDeployment/Operation

DesignUpgrades

Disposal Master DataRepository/Vault

(IDs, Baselines, Changes, CSA, Audits, Etc,)

As-Authorized

As-Committed

As-Designed

As-Built

As-Planned

As-Tested

As-Disposed

As-Supported

As-Delivered

As-Maintained

Product Life Cycle Management

6

Configuration(Audit)

Reconciliation

Page 7: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

As-Authorized

Authorize Data

As-Committed

Schedule Data

As-Designed

DesignData

As-Planned

Plan Data

As-Built

Build Data

As-Supported

SupportData

Configuration Reconciliation

Accounting and Audit Process

Authorized Baseline

Scheduled Baseline

DesignBaseline

Planned Baseline

Built Baseline

SupportedBaseline

BaselineCompares

BaselineCompares

BaselineCompares

BaselineCompares

BaselineCompares

BaselineCompares

ComparisonReports

ComparisonReports

ComparisonReports

ComparisonReports

ComparisonReports

Generic Life Cycle ReconciliationBills of Material (BOMs)

Configuration Reconciliation Accounting and Audit Process (CRAAP)

7

Page 8: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

As-Authorized(_________)

As-Designed(_________)

As-Planned_________)

As-Maintained(_________)

As-Built(_________)

EBOMStructure

MBOMStructure

OBOMStructure

RBOMStructure

RetrofitProcessesRoutingsResourcesToolingSerial NumberLot CodeQA/MRBAs-Built HistoryRepair/Refurbish Records

OperationalProcessesRoutingsResourcesToolingSerial NumberLot CodeQA/MRBService Records

ManufacturingMaterial CatalogProcessesRoutingsResourcesTooling

EngineeringMaterial CatalogProcesses

Marketing Contracts

WBSBudgets

Sales Orders

Computer-AidedEngineering

ConfigurationAudit(s)

ReconciliationEngineeringRelease

As-Disposed(_________)

DisposedProcessesResourcesSerial NumberLot CodeAs-Was/Is HistoryStorage, Salvage Disposal RecordsRecycling

DBOMStructure

Product’s Life Cycle Management(Basic Configuration Reconciliation Process)

As-Committed(_________)

8

Page 9: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Basic Configuration Verification System

Business Values:

• Ensure Released Drawing Defined Parts are in the As-Designed.

• Ensure the As-Designed Parts are in the Manufacturing Plans and Orders.

• Ensure the As-Designed Parts in the Manufacturing Orders and applicable serialization is identified.

• Ensure applicable Change information is related to the life cycle views of the product definition.

• Enable Part Restriction Documentation and Evolution to be managed and maintained.

• Provide a common infrastructure to report and review “Configuration Verification Action Items” in the various life cycle states.

9

Page 10: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Fielding

Life Cycle Generic System Architecture

CAD & PDMSystem

(__________)

CAEScheduleSystem

(________)ProgramMgmt.

System(________)

CLSSystem

(__________)

Part Test &Certification

System

CSAR

CSA Reports

Legend:CAPP - Computer-aided Process PlanningBOM - Bill of MaterialSFC - Shop Floor ControlNCM - Number Control MachineCA - Corrective ActionCAD-E - Computer-aided Design ElectricalCAD - Computer-aided DesignPDM – Product Data ManagementComputer-aided Engineering CLS - Contractor Logistic Support

Engineering

CAPPSystem

(__________)

BOMSystem

(__________) SFCSystem

(__________)

NCMSystem

(__________)

CASystem

(__________)

As-built(Orders)

As-planned(Planning)

Manufacturing

As-supported(Parts/Locations)

As-authorized (Contract

& Changes)

CAD-ESystem

(__________)

As-designed(Electrical)

As-designed(Parts & BOM)

As-committed(Schedules)

Page 11: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Fielding

Life Cycle Generic System Architecture

As-designed(Electrical)

As-committed(Schedules)

As-supported(Parts/Locations)

As-designed(Parts & BOM)

As-authorized (Contract

& Changes)

CAPPSystem

(__________)

BOMSystem

(__________)SFC

System(__________)

NCMSystem

(__________)

CASystem

(__________)

As-built(Orders)

As-planned(Planning)

CAD & PDMSystem

(__________)

CAD-ESystem

(__________)

CAEScheduleSystem

(________)

Manufacturing

ProgramMgmt.

System(________)

CLSSystem

(__________)

Part Test &Certification

System

CSAR

CSA Reports

Legend:CAPP - Computer-aided Process PlanningBOM - Bill of MaterialSFC - Shop Floor ControlNCM - Number Control MachineCA - Corrective ActionCAD-E - Computer-aided Design ElectricalCAD - Computer-aided DesignPDM – Product Data ManagementComputer-aided Engineering CLS - Contractor Logistic Support

Engineering

Point to P

oint

Data Exchange

Page 12: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Life Cycle Generic System Architecture

As-designed(Electrical)

As-committed(Schedules)

As-supported(Parts/Locations)

As-designed(Parts & BOM)

As-authorized (Contract

& Changes)

CAPPSystem

(__________)

BOMSystem

(__________)SFC

System(__________)

NCMSystem

(__________)

CASystem

(__________)

As-built(Orders)

As-planned(Planning)

CAD & PDMSystem

(__________)

CAD-ESystem

(__________)

CAEScheduleSystem

(________)

Manufacturing

ProgramMgmt.

System(________)

CLSSystem

(__________)

Part Test &Certification

System

CSAR

CSA Reports

Legend:CAPP - Computer-aided Process PlanningBOM - Bill of MaterialSFC - Shop Floor ControlNCM - Number Control MachineCA - Corrective ActionCAD-E - Computer-aided Design ElectricalCAD - Computer-aided DesignPDM – Product Data ManagementComputer-aided Engineering CLS - Contractor Logistic Support

Engineering

DataExchangeStandards

Data Management

Exchange Standard

s

Fielding

Page 13: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Functional Environment

(Program Management / Engineering / Manufacturing / Fielding)

Functional System(s)Architectures

13

System A System B System C System D

Fielding

Life Cycle Generic System Architecture

CAD & PDMSystem

(__________)

CAEScheduleSystem

(________)ProgramMgmt.

System(________)

CLSSystem

(__________)

Part Test &Certification

System

CSAR

CSA Reports

Legend:CAPP - Computer-aided Process PlanningBOM - Bill of MaterialSFC - Shop Floor ControlNCM - Number Control MachineCA - Corrective ActionCAD-E - Computer-aided Design ElectricalCAD - Computer-aided DesignPDM – Product Data ManagementComputer-aided Engineering CLS - Contractor Logistic Support

Engineering

CAPPSystem

(__________)

BOMSystem

(__________) SFCSystem

(__________)

NCMSystem

(__________)

CASystem

(__________)

As-built(Orders)

As-planned(Planning)

Manufacturing

As-supported(Parts/Locations)

As-authorized (Contract

& Changes)

CAD-ESystem

(__________)

As-designed(Electrical)

As-designed(Parts & BOM)

As-committed(Schedules)

Page 14: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Data Object Modeling

Objects:DrawingsDocuments• Specs/plans/orders

PartsSoftwareChanges (Effectivity)• Request/Orders/

events

Etc.

Object -1Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

14

The Devil’s in the Detail

Location / RepresentationMedia (format)Storage (located)Application (used by)Protocols (exchanged)Operating SystemDatabase (related)Meta-data (about)Characteristics,Attributes, & Features

One to OneOne to ManyMany to OneMany to Many

Fielding

Life Cycle Generic System Architecture

CAD & PDMSystem

(__________)

CAEScheduleSystem

(________)ProgramMgmt.

System(________)

CLSSystem

(__________)

Part Test &Certification

System

CSAR

CSA Reports

Legend:CAPP - Computer-aided Process PlanningBOM - Bill of MaterialSFC - Shop Floor ControlNCM - Number Control MachineCA - Corrective ActionCAD-E - Computer-aided Design ElectricalCAD - Computer-aided DesignPDM – Product Data ManagementComputer-aided Engineering CLS - Contractor Logistic Support

Engineering

CAPPSystem

(__________)

BOMSystem

(__________) SFCSystem

(__________)

NCMSystem

(__________)

CASystem

(__________)

As-built(Orders)

As-planned(Planning)

Manufacturing

As-supported(Parts/Locations)

As-authorized (Contract

& Changes)

CAD-ESystem

(__________)

As-designed(Electrical)

As-designed(Parts & BOM)

As-committed(Schedules)

Page 15: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Data Object Modeling Object -2Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -1Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -4Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -3Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -6Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -5Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

15

Fielding

Life Cycle Generic System Architecture

CAD & PDMSystem

(__________)

CAEScheduleSystem

(________)ProgramMgmt.

System(________)

CLSSystem

(__________)

Part Test &Certification

System

CSAR

CSA Reports

Legend:CAPP - Computer-aided Process PlanningBOM - Bill of MaterialSFC - Shop Floor ControlNCM - Number Control MachineCA - Corrective ActionCAD-E - Computer-aided Design ElectricalCAD - Computer-aided DesignPDM – Product Data ManagementComputer-aided Engineering CLS - Contractor Logistic Support

Engineering

CAPPSystem

(__________)

BOMSystem

(__________) SFCSystem

(__________)

NCMSystem

(__________)

CASystem

(__________)

As-built(Orders)

As-planned(Planning)

Manufacturing

As-supported(Parts/Locations)

As-authorized (Contract

& Changes)

CAD-ESystem

(__________)

As-designed(Electrical)

As-designed(Parts & BOM)

As-committed(Schedules)

Page 16: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Data Object Modeling Object -2Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -1Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -4Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -3Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -6Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -5Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

16

Fielding

Life Cycle Generic System Architecture

CAD & PDMSystem

(__________)

CAEScheduleSystem

(________)ProgramMgmt.

System(________)

CLSSystem

(__________)

Part Test &Certification

System

CSAR

CSA Reports

Legend:CAPP - Computer-aided Process PlanningBOM - Bill of MaterialSFC - Shop Floor ControlNCM - Number Control MachineCA - Corrective ActionCAD-E - Computer-aided Design ElectricalCAD - Computer-aided DesignPDM – Product Data ManagementComputer-aided Engineering CLS - Contractor Logistic Support

Engineering

CAPPSystem

(__________)

BOMSystem

(__________) SFCSystem

(__________)

NCMSystem

(__________)

CASystem

(__________)

As-built(Orders)

As-planned(Planning)

Manufacturing

As-supported(Parts/Locations)

As-authorized (Contract

& Changes)

CAD-ESystem

(__________)

As-designed(Electrical)

As-designed(Parts & BOM)

As-committed(Schedules)

Page 17: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Data Object ModelingObject -2Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -1Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -4Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -3Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -6Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Object -5Identification:• ID#/Name,/

OwnerAttributes:• Size• QtyRelationships:• To-From• Up-Down• Other Objects

Export/Import

XMLFiles

.XLS/.CVSFiles

StandardsFiles

Direct Integrate

17

Fielding

Life Cycle Generic System Architecture

CAD & PDMSystem

(__________)

CAEScheduleSystem

(________)ProgramMgmt.

System(________)

CLSSystem

(__________)

Part Test &Certification

System

CSAR

CSA Reports

Legend:CAPP - Computer-aided Process PlanningBOM - Bill of MaterialSFC - Shop Floor ControlNCM - Number Control MachineCA - Corrective ActionCAD-E - Computer-aided Design ElectricalCAD - Computer-aided DesignPDM – Product Data ManagementComputer-aided Engineering CLS - Contractor Logistic Support

Engineering

CAPPSystem

(__________)

BOMSystem

(__________) SFCSystem

(__________)

NCMSystem

(__________)

CASystem

(__________)

As-built(Orders)

As-planned(Planning)

Manufacturing

As-supported(Parts/Locations)

As-authorized (Contract

& Changes)

CAD-ESystem

(__________)

As-designed(Electrical)

As-designed(Parts & BOM)

As-committed(Schedules)

Page 18: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Export/Import

XMLFiles

.XLS/.CVSFiles

StandardsFiles

Direct Integrate

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Export/Import

XMLFiles

.XLS/.CVSFiles

StandardsFiles

Direct Integrate

Data Mapping Strategies

System A System B

MappingVerify/Certify

MappingVerify/Certify

MappingVerify/Certify

MappingVerify/Certify

18

Page 19: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Export/Import

XMLFiles

.XLS/.CVSFiles

StandardsFiles

Direct Integrate

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Export/Import

XMLFiles

.XLS/.CVSFiles

StandardsFiles

Direct Integrate

XMLFiles

.XLS/.CVSFiles

StandardsFiles

Direct Integrate

Data Mapping Strategies

19

System A System BMapping

Verify/Certify

MappingVerify/Certify

MappingVerify/Certify

MappingVerify/Certify

Page 20: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Export/Import

XMLFiles

.XLS/.CVSFiles

StandardsFiles

Direct Integrate

Object -2Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -1Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -4Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -3Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -6Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Object -5Identification:•ID#/Name,/OwnerAttributes:•Size•QtyRelationships:•To-From•Up-Down•Other Objects

Export/Import

XMLFiles

.XLS/.CVSFiles

StandardsFiles

Direct Integrate

XMLFiles

.XLS/.CVSFiles

StandardsFiles

Direct Integrate

Data Mapping Strategies

20

System A System BMapping

Verify/Certify

MappingVerify/Certify

MappingVerify/Certify

MappingVerify/Certify

Costs Costs CostsCosts

Page 21: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

As-Authorized

Authorize Data

As-Committed

Schedule Data

As-Designed

DesignData

As-Planned

Plan Data

As-Built

Build Data

As-Supported

SupportData

InSync®: A CM/PDM Functional Architecture

Business Management

Identification

AccountingControl

Bills of MaterialBOM

Contracts CI

Baseline Audits

As-DesignedAs-Built

As-PlannedAs-Maintained

PartsDocuments

SoftwareDrawings

Integrated Workflow

Vault/Launch Ad Hoc Export/Import SecurityITK

Change Control

CR CP

CO

InSync

Authorized Baseline

Scheduled Baseline

DesignBaseline

Planned Baseline

Built Baseline

SupportedBaseline

BaselineCompares

BaselineCompares

BaselineCompares

BaselineCompares

BaselineCompares

BaselineCompares

ComparisonReports

ComparisonReports

ComparisonReports

ComparisonReports

ComparisonReports

Basic Configuration Verification System Concept

21

STEP AP 232GEIA 836 GEIA 836

Page 22: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

ISS Use of Standards In Life Cycle Supportability

Engineering Data:

Drawing, Model, Metrics…

DESIGNENGINEERING

90021

DesignData/Structure

R & M Data Feedback

Product Structure Data, Specs and Parameters

Delive

red

Produ

ct

Data

Defini

tion

Initi

al P

rodu

ct/

Sup

port

Def

initi

on

MANUFACTURING/PRODUCTION

165837 ‘165443 ‘

DeliveredData/Structure

ERP Data

IN-SERVICE/ SUPPORT

Serialized Part Data: Maintenance

‘165837 ‘

165443 ‘

In-ServiceData/Structure

One-Two -Way Data Flow

Two-Way collaboration, reconciliation, coordination

Asset Management

Product/ Process/

Cost Im

provements

LSAR/LMI

Supportability Analysis

Supportability Data Feedback

IETMs, Condition-Based Maintenance, etc.

Tech Pub/ IETM

Data

TrainingData

IPB / IPC/ IPL

Data and Graphics

Spares Ordering, Inventory Mgmt, Obsolescence Planning, …

STEP AP 203 / 232 / pdm schema STEP AP 232*, pdm schema

1388-2B, 00-60

(STEP AP 239)

(STEP AP 239)ASD 2000M

(ST

EP

AP

239

)

(STEP AP

239)

STEP AP 232*: Not used in conjunction with Life Cycle Supportability, today,

Page 23: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

IP Plan/Fab Plans1 Assembly, PN

The Mechanisms & Processes(Basic Configuration Reconciliation Process)

As-Designed As-Planned As-Built

Parts Planned(IP Plans)

Parts Defined

(Dwgs/PLs)

Parts Ordered

(Fab. Orders)

End Item1 Assembly, PN 1 Sub Assy., PN 1 Component, PN 2 Component, PN 3 Component, PN 2 Sub Assy., PN 1 Component, PN 2 Component, PN 3 Component, PN2 Assembly, PN 1 Sub Assy., PN 1 Component, PN 2 Component, PN 3 Component, PN 2 Sub Assy., PN 1 Component, PN 2 Component, PN 3 Component, PN

1 Sub Assy., PN1 Component, PN2 Component, PN3 Component, PN

2 Sub Assy., PN1 Component, PN2 Component, PN3 Component, PN

IP Plan/Fab Plans2 Assembly, PN

1 Sub Assy., PN1 Component, PN2 Component, PN3 Component, PN

2 Sub Assy., PN1 Component, PN2 Component, PN3 Component, PN

Fab . Orders1 Assembly, PN

1 Sub Assy., PN1 Component, PN2 Component, PN3 Component, PN

2 Sub Assy., PN1 Component, PN2 Component, PN3 Component, PN

Fab. Orders2 Assembly, PN

1 Sub Assy., PN1 Component, PN2 Component, PN3 Component, PN

2 Sub Assy., PN1 Component, PN2 Component, PN3 Component, PN

23

As-Designed Baseline BOM for Parts & Assemblies

Manufacturing Planning for Parts & Assemblies

Fabrication Orders for Parts & Assemblies

Page 24: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Fielding

Life Cycle Generic System Architecture

CAD & PDMSystem

(__________)

CAEScheduleSystem

(________)ProgramMgmt.

System(________)

CLSSystem

(__________)

Part Test &Certification

System

CSA(InSync)

CSA Reports

Legend:CAPP - Computer-aided Process PlanningBOM - Bill of MaterialSFC - Shop Floor ControlNCM - Number Control MachineCA - Corrective ActionCAD-E - Computer-aided Design ElectricalCAD - Computer-aided DesignPDM – Product Data ManagementComputer-aided Engineering CLS - Contractor Logistic Support

Engineering

CAPPSystem

(__________)

BOMSystem

(__________)SFC

System(__________)

NCMSystem

(__________)

CASystem

(__________)

As-built(Orders)

As-planned(Planning)

Manufacturing

As-supported(Parts/Locations)

As-authorized (Contract

& Changes)

CAD-ESystem

(__________)

As-designed(Electrical)

As-designed(Parts & BOM)

As-committed(Schedules)

Validation & Verification Cycle(Configuration Verification Action Items)

24

CVAI:ConfigurationVerificationAction Item

Analysis

Cycle

AnalysisCycle

Plans

Orders

Parts List FinalReconciledReports

CVAI:ConfigurationVerificationAction Item

Page 25: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

25

As-Authorized(_________)

As-Designed(_________)

As-Planned(_________)

As-Built(_________)

Product’s Life Cycle Management(Basic Confirmation Process)

As-Committed(_________)

Installation Plan (IP)(Planning for final assembly) In Work Completed Approved Inspected Delivered

Make Parts – Fabrication/Assembly(Planning for Fabrication/Assembly) In Work Completed Approved Inspected Stocked to Inventory

Buy Parts - Purchase(Planning for Buy) Purchase Request Purchase Order Received Inspected Stocked to Inventory

Engineering Design(Perform engineering design) In Work Completed Approved Released

Commitment Scheduling(Commitment to schedule) In Work Completed Approved Released

Authoring Engineering(Authorizing parts design) In Work Completed Approved Released

DD 250 Reporting Audit Trail Was the installation right?Was the purchase right?Was the fabrication right?Was the design right?Was the commitment right?Was the authorization right?

All’sRight

Not RightWaiversDeviations

DD Form 250

CSA Reports

1 2 3

4 5

Page 26: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

As-Authorized(_________)

As-Designed(_________)

As-Planned(_________)

As-Maintained(_________)

As-Built(_________)

EBOMStructure

MBOMStructure

OBOMStructure

RBOMStructure

RetrofitProcessesRoutingsResourcesToolingSerial NumberLot CodeQA/MRBAs-Built HistoryRepair/Refurbish Records

OperationalProcessesRoutingsResourcesToolingSerial NumberLot CodeQA/MRBService Records

ManufacturingMaterial CatalogProcessesRoutingsResourcesTooling

EngineeringMaterial CatalogProcesses

Marketing Contracts

WBSBudgets

Sales Orders

Computer-AidedEngineering

Configuration Reconciliation

(InSync)EngineeringRelease

As-Disposed(_________)

DisposedProcessesResourcesSerial NumberLot CodeAs-Was/Is HistoryStorage, Salvage Disposal RecordsRecycling

DBOMStructure

Product’s Life Cycle Management(Basic Reconciliation Process)

As-Committed(_________)

DD250

26

Page 27: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

27

STEP Data Exchange(The Back Story – SI/BCA)

Enterprise Supplier

Page 28: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Type Design Data/Process Flow

Type Design Data PDM Output

STEPFiles

OS Vaults- Reports (XML, PDF)- STP- PS- PKG

VistaReporting

PKGFiles

PSFiles

OtherFiles

TranslatedFiles

GeneratedXML* Files

ImportedFiles

FormattedPDF* Files

InSync

InSync/SI Processing

InSyncScreens

Browser View- “Generated XML”- “Formatted PDF”- Formatted HTML - Multi-Level - XML File Compare

Non-Vaulted “Work”

ERPor otherSystems

* Interface / Integration with other data systems may be implemented as a “push or pull” transaction process or as a “web service.”

*

28

Page 29: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Email Notification of TDP Received

wwwwww

SupplierPDM System

Documents

Geometry

Supplier

Vault

Supplier Integration Software

Email Notification of TDP Ready

Data Collection andOutsourcing System

Documents

Geometry

ContentCollection

•Generate STEP File•Zip and/or encrypt TDP

Product Information (PDM System)

Engineering / ProcurementEngineering / Procurement

PDM Database

Enterprise

View Product Information, and related files

TDP Archive

Unzip and/or decrypt TDP

FTP/HTTP

ISS’s Integrated Support SystemSupplier Integration (SI/BCA)

29

Page 30: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

As-Authorized(ECCM)

As-Designed(DCAC)

As-Committed(DM2000)

As-Planned(MES)

As-Delivered(InSync)

As-Maintained(OOMA)

As-Tested(ALRMS)

As-Built(MES)

Cost EstimatingCapacity Planning & AssessmentSpecifications

Master ScheduleWork Breakdown StructureBudgetsSales OrdersCost AccountsEffectivity

Baseline ReleaseDocument ControlProduct Definition EBOM Bill of RoutingsEffectivity (Eng.)

MBOMEffectivity (Manf.)Bill of Routings/ResourcesMaster Production ScheduleProposed Capacity PlanningMRP/CRP/ProcurementWork Order Release

Receiving/InspectionReceiving InstructionsDock-to-StockInventory (WIP)Lot Code / Serial NumberingShop Floor ControlLabor CollectionWork MeasurementsProcess InstructionsTest ProceduresTest ResultsPart and System RestrictionsCM Status AccountingAs-Built Snapshot

CM ReconciliationCM Status AccountingLot Code / Serial NumberingDeviations / Waivers

Field Return / RetrofitField ServiceCM ReconciliationLot Code / Serial No.CM Status AccountingAs-Built History

As-Disposed(????)

Storage, SalvageTo-Become (Recycle) CM ReconciliationLot Code / Serial No.CM Status AccountingAs-Was/Is History

30

Product’s Life Cycle Management(Boeing MMA P-8A)

Page 31: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

As-Authorized(ECCM)

As-Designed(DCAC)

As-Planned(MES)

As-Maintained(OOMA)

As-Built(MES)

EBOMStructure

MBOMStructure

OBOMStructure

RBOMStructure

RetrofitProcessesRoutingsResourcesToolingSerial NumberLot CodeQA/MRBAs-Built HistoryRepair/Refurbish Records

OperationalProcessesRoutingsResourcesToolingSerial NumberLot CodeQA/MRBService Records

ManufacturingMaterial CatalogProcessesRoutingsResourcesTooling

EngineeringMaterial CatalogProcesses

Marketing Contracts

WBSBudgets

Sales Orders

Computer-AidedEngineering

Configuration Reconciliation

(InSync)EngineeringRelease

As-Disposed(????)

DisposedProcessesResourcesSerial NumberLot CodeAs-Was/Is HistoryStorage, Salvage Disposal RecordsRecycling

DBOMStructure

Product’s Life Cycle Management(Boeing MMA P-8A Reconciliation Process)

As-Committed(DM2000)

31

Page 32: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Life Cycle Baseline ReconciliationA System Overview and Description of the

Basic Configuration Verification System (BCVS)

ACDM 15th Annual Technical Conference 21-22 March 2010

Ram White, Integrated Support Systems, Inc.

32

Questions & Comments

Page 33: Life Cycle Baseline Reconciliation A System Overview and Description of the Basic Configuration Verification System (BCVS) ACDM 15 th Annual Technical.

Life Cycle Baseline Reconciliation

A System Overview and Description of the

Basic Configuration Verification System (BCVS)

ACDM 15th Annual Technical Conference 21-22 March 2010

Ram White, Integrated Support Systems, Inc.

33