Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average...

22
Liddell Coal - Monthly Environmental Summary June 2020 1. Dust Gauges Table 1: Dust Deposition Results 7 May 2020 to 9 June 2020 (33 Days*) Notes: * Dust gauges were exposed for 33 days for the June monitoring period due to a scheduling mix up. ** Gauges D55 and D62 are located on privately owned land and are the only gauges that have consent criteria. Insoluble Solids results marked with a ‘c’ indicate an excessively contaminated gauge and are not included in the project average. Contamination can include bird droppings, vegetation (such as plant matter, algae, pollen and seeds) and insects. The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble Solids (g/m 2 .month) Monthly Ash Residue (g/m 2 .month) Monthly Combustible Matter (g/m 2 .month) Monthly Ash Residue/ Insoluble Solids (%) 12 Month Rolling Average Insoluble Solids (g/m 2 .month) D55** 1.1 0.8 0.3 73 2.2 D62** 0.9 0.7 0.2 78 2.7

Transcript of Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average...

Page 1: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

Liddell Coal - Monthly Environmental Summary – June 2020

1. Dust Gauges

Table 1: Dust Deposition Results – 7 May 2020 to 9 June 2020 (33 Days*)

Notes: * Dust gauges were exposed for 33 days for the June monitoring period due to a scheduling mix up. ** Gauges D55 and D62 are located on privately owned land and are the only gauges that have consent criteria. Insoluble Solids results marked with a ‘c’ indicate an excessively contaminated gauge and are not included in the project average. Contamination can include bird droppings, vegetation (such as plant matter, algae, pollen and seeds) and insects. The twelve-month rolling annual average is calculated from July 2019 to June 2020.

.

Site

Monthly Insoluble

Solids (g/m

2.month)

Monthly Ash Residue (g/m

2.month)

Monthly Combustible

Matter (g/m

2.month)

Monthly Ash Residue/

Insoluble Solids

(%)

12 Month Rolling Average Insoluble

Solids (g/m

2.month)

D55** 1.1 0.8 0.3 73 2.2

D62** 0.9 0.7 0.2 78 2.7

Page 2: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

0

1

2

3

4

5

6

7

8

9

10

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Inso

lub

le S

olid

s g/

m2 /

mo

nth

Depositional Dust D55Insoluble Solids

Insoluble Solids

Rolling 12 monthAverage

0123456789

1011121314151617

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Inso

lub

le S

olid

s g/

m2 /

mo

nth

Depositional Dust D62Insoluble Solids

Insoluble Solids

Rolling 12 monthAverage

Figure 1.1: Depositional dust sites D55 and D62 (Privately-owned land) – Monthly and annual average insoluble solids

Page 3: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

2. High Volume Air Samplers

Table 2: High Volume Air Sampling Results – June 2020

PM10 TSP PM10 TSP

1-Jun-20 16 42 10 33

7-Jun-20 13 24 20 43

13-Jun-20 14 25 17 32

19-Jun-20 13 30 14 35

25-Jun-20 3 10 6 18

24-hour

maximum

criteria

≤ 50 N/A ≤ 50 N/A

Rolling Annual

Average *17 45 20 53

Annual

Average

Criteria

≤ 30 ≤ 90 ≤ 30 ≤ 90

Scrivens** Antienne**Date

Notes: *Monitoring periods determined to be impacted by extraordinary regional conditions under Note D of Schedule 3 Condition 16 by DPIE. Results are excluded from rolling annual average. TSP =Total Suspended Particulates. PM10 = fine particulates with a mean aerodynamic diameter of <10µm N/A = Not Available. Particulates are the total recorded, not specifically project generated. Results shaded yellow indicate non-conformance with impact criteria. ** Scrivens and Antienne units are located on privately owned land.

Page 4: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

0

50

100

150

200

250

01-J

ul-19

15-J

ul-19

29-J

ul-19

12-A

ug-1

9

26-A

ug-1

9

09-S

ep-1

9

23-S

ep-1

9

07-O

ct-

19

21-O

ct-

19

04-N

ov-1

9

18-N

ov-1

9

02-D

ec-1

9

16-D

ec-1

9

30-D

ec-1

9

13-J

an-2

0

27-J

an-2

0

10-F

eb-2

0

24-F

eb-2

0

09-M

ar-

20

23-M

ar-

20

06-A

pr-

20

20-A

pr-

20

04-M

ay-2

0

18-M

ay-2

0

01-J

un-2

0

15-J

un-2

0

TS

P (

µg

/m3)

Sampling Date

TSP Monitoring Results - Scrivens Property HVAS 11

TSP Rolling Average TSP Annual Average Criterion

0

20

40

60

80

100

01-J

ul-19

15-J

ul-19

29-J

ul-19

12-A

ug-1

9

26-A

ug-1

9

09-S

ep-1

9

23-S

ep-1

9

07-O

ct-

19

21-O

ct-

19

04-N

ov-1

9

18-N

ov-1

9

02-D

ec-1

9

16-D

ec-1

9

30-D

ec-1

9

13-J

an-2

0

27-J

an-2

0

10-F

eb-2

0

24-F

eb-2

0

09

-Ma

r-2

0

23

-Ma

r-2

0

06-A

pr-

20

20-A

pr-

20

04-M

ay-2

0

18-M

ay-2

0

01-J

un-2

0

15-J

un-2

0

PM

10

(µg

/m3)

Sampling Date

PM10 Monitoring Results - Scrivens Property HVAS 12

PM10 RollingAverage PM10 Individual Event Criterion PM10 Annual Average Criterion

0

50

100

150

200

250

01-J

ul-19

15-J

ul-19

29-J

ul-19

12-A

ug-1

9

26-A

ug-1

9

09-S

ep-1

9

23-S

ep-1

9

07-O

ct-

19

21-O

ct-

19

04-N

ov-1

9

18-N

ov-1

9

02-D

ec-1

9

16-D

ec-1

9

30-D

ec-1

9

13

-Ja

n-2

0

27

-Ja

n-2

0

10-F

eb-2

0

24-F

eb-2

0

09-M

ar-

20

23-M

ar-

20

06-A

pr-

20

20-A

pr-

20

04-M

ay-2

0

18-M

ay-2

0

01

-Ju

n-2

0

15

-Ju

n-2

0

TS

P (

µg

/m3)

Sampling Date

TSP Monitoring Results - Antienne HVAS 20

TSP Rolling Average TSP Annual Average Criterion

0

20

40

60

80

01-J

ul-19

15-J

ul-19

29-J

ul-19

12-A

ug-1

9

26-A

ug-1

9

09-S

ep-1

9

23-S

ep-1

9

07-O

ct-

19

21-O

ct-

19

04-N

ov-1

9

18-N

ov-1

9

02-D

ec-1

9

16-D

ec-1

9

30-D

ec-1

9

13-J

an-2

0

27-J

an-2

0

10-F

eb-2

0

24-F

eb-2

0

09-M

ar-

20

23-M

ar-

20

06-A

pr-

20

20-A

pr-

20

04-M

ay-2

0

18-M

ay-2

0

01-J

un-2

0

15-J

un-2

0

PM

10

(µg

/m3)

Sampling Date

PM10 Monitoring Results - Antienne HVAS 21

PM10 Rolling Average PM10 Individual Event Criterion PM10 Annual Average Criterion

Figure 2.1: TSP and PM10 results and annual average for Scriven and Antienne monitors.

Page 5: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

3. Continuous TEOM PM10

Table 3: TEOM PM10 Monitoring Results – June 2020

Notes: *Monitoring periods determined to be impacted by extraordinary regional conditions under Note D of Schedule 3 Condition 16 by DPIE. Results excluded from rolling annual average. Results shaded yellow indicate non-conformance with impact criteria. Cells which are shaded grey have missing data.1 to 11 May 2020 – D2, Data invalidated as inlet seal broken due to install of AC

Date

SX38-D1 SX38-D2

PM10 24hr

Average Criteria

PM10 Rolling Annual Average Criteria

PM10 24hr

Average

PM10 Rolling Annual

Average

PM10 24hr

Average

PM10 Rolling Annual

Average

1/06/2020 23.2 19.1 18.2 23.1 50 30

2/06/2020 8.6 19.1 9.5 23.0 50 30

3/06/2020 8.3 19.0 10.3 23.0 50 30

4/06/2020 10.6 19.0 17.1 23.0 50 30

5/06/2020 7.7 19.0 15.7 23.0 50 30

6/06/2020 10.4 19.0 13.9 23.0 50 30

7/06/2020 16.9 19.0 24.5 22.9 50 30

8/06/2020 17.2 19.0 22.3 23.0 50 30

9/06/2020 10.6 19.0 10.6 23.0 50 30

10/06/2020 7.1 19.0 7.5 22.9 50 30

11/06/2020 8.7 19.0 11.4 22.9 50 30

12/06/2020 16.6 19.1 18.8 22.9 50 30

13/06/2020 12.7 19.1 19.2 22.9 50 30

14/06/2020 7.5 19.1 12.0 22.9 50 30

15/06/2020 9.3 19.1 14.7 22.8 50 30

16/06/2020 10.6 19.1 26.3 22.9 50 30

17/06/2020 11.9 19.0 15.3 22.9 50 30

18/06/2020 10.9 19.1 12.8 22.9 50 30

19/06/2020 12.1 19.1 18.6 22.9 50 30

20/06/2020 14.1 19.1 16.1 22.8 50 30

21/06/2020 7.0 19.0 9.9 22.8 50 30

22/06/2020 6.5 19.0 8.4 22.8 50 30

23/06/2020 5.4 19.0 6.2 22.8 50 30

24/06/2020 5.8 19.0 6.8 22.8 50 30

25/06/2020 6.4 19.0 9.8 22.8 50 30

26/06/2020 9.5 19.0 12.5 22.8 50 30

27/06/2020 14.9 19.0 20.9 22.8 50 30

28/06/2020 11.0 19.0 13.9 22.8 50 30

29/06/2020 8.0 19.0 15.4 22.8 50 30

30/06/2020 8.4 19.0 14.8 22.8 50 30

Page 6: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

Table 4: TEOM PM10 Monitoring Results – June 2020

Sampling Point

Pollutant

Monitoring Frequency Required

by Licence

Days Measured

During the

Month

Min Value

(µg/m3)

Mean Value

(µg/m3)

Max Value

(µg/m3)

SX38-D1 PM10 Continuous 30 5.4 10.6 23.2

SX38-D2 PM10 Continuous 30 6.2 14.4 26.3

Page 7: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

4. Surface Water

Table 5: Monthly Surface Water Monitoring – Bowmans Creek – 15 June 2020

Site Flow Rate

pH EC

(S/cm)

TDS (mg/L)

TSS (mg/L)

Odour Colour / Turbidity

BCK1 (Bowmans Creek Up)

Slow 7.36 1270 754 7 Nil Colourless,

Clear

BCK1A Trickle 7.81 2300 1180 <5 Nil Colourless,

Clear

BCK2 Dry

BCK2A Dry

BCK3 Still 7.63 1790 1110 6 Nil Colourless,

Clear

BCK4 Still 7.31 1720 1060 12 Nil Colourless,

Clear

BCK5 Dry

BCK6 (Bowmans Creek Down) Dry

TRIGGER – FLOWING 1 6.5-8.3 2020 1210 50 N/A N/A

TRIGGER – NO FLOW 2

6.5-8.8 4570 3460 97 N/A N/A Notes: 1 Liddell Coal Water Management Plan 90

th %tile trigger levels

2 Liddell Coal Water Management Plan Max trigger levels

Results shaded yellow indicate non-conformance to trigger levels

Table 6: Monthly Surface Water Monitoring – Bayswater Creek – 15 June 2020

Site Flow Rate

pH EC

(S/cm)

TDS (mg/L)

TSS (mg/L)

Odour Colour / Turbidity

BWKU (Bayswater Creek Up) Trickle 7.67 2980 1910 8 Nil Colourless,

Clear

BWKM (Bayswater Creek Mid) Still 8.04 3620 2420 <5 Nil Colourless,

Clear

BWKD (Bayswater Creek Down) Dry

TRIGGER – FLOWING 1 6.5-8.3 5130 3230 50 N/A N/A

TRIGGER – NO FLOW 2

6.5-8.5 7300 5180 302 N/A N/A Notes: 1 Liddell Coal Water Management Plan 90

th %tile trigger levels

2 Liddell Coal Water Management Plan Max trigger levels

Results shaded yellow indicate non-conformance to trigger levels

Page 8: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

Table 7: Monthly Surface Water Monitoring – Onsite Dams – 15 June 2020

Site Flow Rate

pH EC

(S/cm)

TDS (mg/L)

TSS (mg/L)

Faecal Coliforms

(CFU/100mL) Odour

Colour/ Turbidity

Dam 1 Dam 8.34 2060 1290 <5 Nil Colourless,

Clear

Dam 3 Dam 9.33 8260 6520 14 Nil Colourless,

Clear

Dam 4 Dam 8.86 3260 1910 16 Nil Colourless,

Slightly turbid

Dam 6 Dam 8.07 5970 4430 5 Nil Colourless,

Clear

Dam 17 Dam 8.72 5160 3410 69 Nil Brown, Slightly

turbid

Reservoir Tailings Dam Dam No safe access

Reservoir Dam North Dam 8.61 7220 4850 <5 9 est. Nil

Colourless, Clear

Durham Tailings Dam Dam 8.29 763 588 144 Nil

Brown, Slightly turbid

Page 9: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Bowmans Creek pH

BCK1 (Bowmans CreekUpstream)BCK 1A

BCK2

BCK2A

BCK3

BCK4

BCK5

BCK6 (Bowmans CkDownstream)Max pH trigger - Not flowing

0

1000

2000

3000

4000

5000

6000

7000

8000

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Bowmans Creek Electrical Conductivity BCK1 (Bowmans Creek

Upstream)BCK 1A

BCK2

BCK2A

BCK3

BCK4

BCK5

BCK6 (Bowmans CkDownstream)Max Conductivity trigger -not flowing (µS/cm)

0

20

40

60

80

100

120

140

160

180

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Bowmans Creek Total Suspended Solids

BCK1 (Bowmans CreekUpstream)BCK 1A

BCK2

BCK2A

BCK3

BCK4

BCK5

BCK6 (Bowmans CkDownstream)Max TSS trigger - notflowing (mg/L)

Figure 4.1: pH, Electrical Conductivity and Total Suspended Solids results for Bowmans Creek

monitoring sites.

Page 10: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.00

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Bayswater CreekpH

BWKU (Bayswater CkUpstream)

BWKM (Bayswater CkMidstream)

BWKD (Bayswater CkDownstream)

Max pH trigger - Notflowing

1000

2000

3000

4000

5000

6000

7000

8000

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Bayswater CreekElectrical Conductivity

BWKU (Bayswater Ck Upstream)

BWKM (Bayswater CkMidstream)

BWKD (Bayswater CkDownstream)

Max Conductivity trigger - notflowing (µS/cm)

0

50

100

150

200

250

300

350

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Bayswater CreekTotal Suspended Solids

BWKU (Bayswater Ck Upstream)

BWKM (Bayswater CkMidstream)

BWKD (Bayswater CkDownstream)

Max TSS trigger - not flowing(mg/L)

Figure 4.2: pH, Electrical Conductivity and Total Suspended Solids results for Bayswater Creek

monitoring sites.

Page 11: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

5.0

5.5

6.0

6.5

7.0

7.5

8.0

8.5

9.0

9.5

10.0

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Onsite DamspH

Dam 1

Dam 4

Dam 6

Dam 17

Dam 3

Reservoir Dam North

Durham Tailings Dam

0100020003000400050006000700080009000

10000110001200013000140001500016000

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Onsite DamsElectrical Conductivity

Dam 1

Dam 4

Dam 6

Dam 17

Dam 3

Reservoir Dam North

Durham Tailings Dam

0

50

100

150

200

250

300

350

Jul-

19

Au

g-1

9

Sep

-19

Oct

-19

No

v-1

9

De

c-1

9

Jan

-20

Feb

-20

Mar

-20

Ap

r-2

0

May

-20

Jun

-20

Onsite DamsTotal Suspended Solids

Dam 1

Dam 4

Dam 6

Dam 17

Dam 3

Reservoir Dam North

Durham Tailings Dam

Figure 4.3: pH, Electrical Conductivity and Total Suspended Solids results for on-site dam monitoring sites.

Page 12: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

5. Sewage Treatment Plants

Table 8: Laboratory STP Water Quality Results: 1 June 2020

Notes: ** Too turbid to sample for free chlorine. Cells which are shaded grey are not required to be tested.

Table 9: Laboratory STP Water Quality Results: 1 June 2020

Site

To

tal K

jeld

ah

l

Nit

rog

en

as

N

(mg/L

)

To

tal N

itro

gen

as N

(mg/L

)

To

tal P

ho

sp

ho

rus

as P

(m

g/L

)

Reacti

ve P

ho

s.

(mg/L

)

BO

D (

mg/L

)

E.c

oli (

CF

U/1

00m

L)

Th

erm

oto

lera

nt

Co

lifo

rms

(CF

U/1

00

mL)

O/C Dirty Water Transfer Tank (DWTT)

6.5 8 3.54 1.93 8 <910 est. <910 est.

O/C Chlorine Contact Tank (CCT)

No access – broken lock

O/C Tank 1

O/C Final Discharge (FD)

28.1 40 13.7 13.2 <2 <6 <6

CHPP Chlorine Contact Tank (CCT)

29 76.7 22.7 21.8 1,000 1,000

Notes: Cells which are shaded grey are not required to be tested.

Site

Lab

pH

Lab

EC

S/c

m)

TS

S (

mg/L

)

Tu

rbid

ity (

NT

U)

Am

mo

nia

(m

g/L

)

Nit

rite

(m

g/L

)

Nit

rate

(m

g/L

)

Nit

rite

+ N

itra

te a

s

N (

mg/L

)

O/C Dirty Water Transfer Tank (DWTT)

8.16 7900 58 78.7 2.80 <0.01 1.54 1.54

O/C Chlorine Contact Tank (CCT)

No access – broken lock

O/C Tank 1

O/C Final Discharge (FD)

7.78 4100 10 3.4 19.00 1.88 10 11.9

CHPP Chlorine Contact Tank (CCT)

6.27 1190 12 8.4 13.40 0.51 47.2 47.7

Page 13: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

Table 10: Laboratory STP Water Quality Results: 15 June 2020

Site

Lab

pH

Lab

EC

S/c

m)

TS

S (

mg/L

)

Tu

rbid

ity (

NT

U)

Am

mo

nia

(m

g/L

)

Nit

rite

(m

g/L

)

Nit

rate

(m

g/L

)

Nit

rite

+ N

itra

te a

s

N (

mg/L

)

O/C Dirty Water Transfer Tank (DWTT)

8.15 5800 ** 9140 1.98 <0.01 2.8 2.8

O/C Chlorine Contact Tank (CCT)

No access – broken lock

O/C Tank 1

O/C Final Discharge (FD)

7.86 3290 10 3.3 8.54 2.35 18.8 21.1

CHPP Chlorine Contact Tank (CCT)

5.86 1130 10 8.9 14.80 0.24 44.6 44.8

Notes: ** Too turbid for result Cells which are shaded grey are not required to be tested.

Table 11: Laboratory STP Water Quality Results: 15 June 2020

Site

To

tal K

jeld

ah

l

Nit

rog

en

as

N

(mg/L

)

To

tal N

itro

gen

as N

(mg/L

)

To

tal P

ho

sp

ho

rus

as P

(m

g/L

)

Reacti

ve P

ho

s.

(mg/L

)

BO

D (

mg/L

)

E.c

oli

(C

FU

/10

0m

L)

Th

erm

oto

lera

nt

Co

lifo

rms

(CF

U/1

00

mL)

O/C Dirty Water Transfer Tank (DWTT)

180 183 162 1.69 197 <10000

est. <10000

est.

O/C Chlorine Contact Tank (CCT)

No access – broken lock

O/C Tank 1

O/C Final Discharge (FD)

11.3 32.4 12 14.2 2 13 est 13 est

CHPP Chlorine Contact Tank (CCT)

21.1 65.9 20.1 23.1 4,500 4,500

Notes: Cells which are shaded grey are not required to be tested.

Page 14: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

Table 12: Laboratory STP Water Quality Results: 30 June 2020

Site

Lab

pH

Lab

EC

S/c

m)

TS

S (

mg/L

)

Tu

rbid

ity (

NT

U)

Am

mo

nia

(m

g/L

)

Nit

rite

(m

g/L

)

Nit

rate

(m

g/L

)

Nit

rite

+ N

itra

te a

s

N (

mg/L

)

O/C Dirty Water Transfer Tank (DWTT)

8.22 6380 470 772.0 0.57 <0.01 3.11 3.11

O/C Chlorine Contact Tank (CCT)

7.62 2940 6 2.3 3.60 2.46 13.8 16.3

O/C Tank 1

O/C Final Discharge (FD)

7.70 2920 7 1.6 3.40 2.42 14 16.4

CHPP Chlorine Contact Tank (CCT)

6.69 1130 22 28.2 24.30 1.15 49.8 51

Notes: Cells which are shaded grey are not required to be tested.

Table 12: Laboratory STP Water Quality Results: 30 June 2020

Site

To

tal K

jeld

ah

l

Nit

rog

en

as

N

(mg/L

)

To

tal N

itro

gen

as N

(mg/L

)

To

tal P

ho

sp

ho

rus

as P

(m

g/L

)

Reacti

ve P

ho

s.

(mg/L

)

BO

D (

mg/L

)

E.c

oli (

CF

U/1

00m

L)

Th

erm

oto

lera

nt

Co

lifo

rms

(CF

U/1

00

mL)

O/C Dirty Water Transfer Tank (DWTT)

2 5.1 4.8 2.66 15 <910 est. <910 est.

O/C Chlorine Contact Tank (CCT)

10.4 26.7 17.6 14.3 <6 <6

O/C Tank 1

O/C Final Discharge (FD)

9.4 25.8 16 14.3 10 <6 <6

CHPP Chlorine Contact Tank (CCT)

32.2 83.2 20.6 18.2 52,000 52,000

Notes: Cells which are shaded grey are not required to be tested.

Page 15: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

6. Groundwaters Table 14: Monthly Groundwater monitoring – 15 June 2020

SiteDepth TOC

to Water (m)Field pH

Field EC

(µS/cm)

Yield

(ML)

ALV1 Large 4.55 6.71 1439

ALV1 Small 4.23 7.52 1373

ALV2 Large 4.68 6.72 3710ALV2 Small 4.68 7.47 3110

ALV3 Large 5.56 6.88 1351

ALV3 Small 5.90 7.31 1793

ALV4 Large 5.41 6.53 1403

ALV4 Small 6.19 7.09 5380

PGW5 Large 12.31 6.99 5930

PGW5 Small

ALV7 Large 7.96 7.16 1628

ALV7 Small 16.84 7.32 3190

ALV8 Large

ALV8 Small

ALV9 Large 4.68 6.64 3310

LBH 4.79 6.56 1362

Haz 4 67.66

Haz 6 61.78 7.92 4130

Mt. Owen 2 139.07

M49 128.45 0

Haz 1/2 72.03 0

Middle Liddell Bore (MLB) 186.3 0

Coffey Dam Borehole 44.77

Dry

Dry

Dry

Notes: Site Specific investigation trigger limits are detailed in the Liddell Coal Operations Water Management Plan 2018 which is available on the Liddell Coal Website.

Results highlighted yellow identify a monitoring result applicable to an investigation trigger limit.

Sites with yield not applicable are for groundwater monitoring purposes only.

Page 16: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

0

1

2

3

4

5

6

7

8

9

ALV 1 Large

pH

Conductivity(mS.cm-1)

Depth to Water(m)

0

1

2

3

4

5

6

7

8

9

10

ALV 1 Small

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

1

2

3

4

5

6

7

8

9

10

ALV 2 Large

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

2

4

6

8

10

12

ALV 2 Small

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

1

2

3

4

5

6

7

8

9

10

ALV3 Large

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

1

2

3

4

5

6

7

8

9

10

ALV 3 Small

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

1

2

3

4

5

6

7

8

9

10

ALV 4 Large

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

1

2

3

4

5

6

7

8

9

ALV 4 Small

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

5

10

15

20

25

PGW 5 Large

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

2

4

6

8

10

12

14

PGW 5 Small

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

1

2

3

4

5

6

7

8

9

ALV 7 Large

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

5

10

15

20

25

ALV 7 Small

pH

Conductivity(mS.cm-1)

Depth toWater (m)

Figure 6.1: Depth to water, pH and Electrical Conductivity results for ALV 1, ALV 2, ALV 3, ALV 4,

PGW 5 and ALV 7.

Page 17: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

0

1

2

3

4

5

6

7

8

9

ALV 8 Large

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

2

4

6

8

10

12

14

16

18

20

ALV 8 Small

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

10

20

30

40

50

60

70

80

HAZ 3/4

Depth toWater (m)

0

10

20

30

40

50

60

70

80

HAZ 6

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

1

2

3

4

5

6

7

8

9

LBH

pH

Conductivity(mS.cm-1)

Depth toWater (m)

0

1

2

3

4

5

6

7

8

ALV 9 Large

pH

Conductivity(mS.cm-1)

Depth toWater (m)

Figure 6.2: Depth to water, pH and Electrical Conductivity results for ALV 8, ALV 9, HAZ 6 and Depth

to water results for HAZ 6 and LBH.

40.00

40.50

41.00

41.50

42.00

42.50

43.00

43.50

44.00

44.50

45.00

45.50

Coffey Dam Borehole

Depth to Water(m)

115

120

125

130

135

140

145

150

155

Mt. Owen 2

Depth toWater (m)

100

105

110

115

120

125

130

135

140

M49

Depth toWater (m)

20

30

40

50

60

70

80

Haz1/2

Depth toWater (m)

140

150

160

170

180

190

200

Middle Liddell Bore

Depth to Water(m)

Figure 6.3: Depth to water results for Mt. Owen 2, M49, HAZ 1/2, Middle Liddell Bore and Coffey

Dam Borehole.

Page 18: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

7. Meteorological

Table 15: Monthly Meteorological data summary (daily averages) – June 2020

1/06/2020 17.0 16.5 55.1 1002 5.8 281.2 0 0 -0.5 16.5 104.3

2/06/2020 11.0 10.1 61.3 1008 7.5 310.8 0 0 -0.9 12.6 101.2

3/06/2020 13.7 13.1 56.5 1015 3.3 219.4 0 0 -0.6 16.4 109.8

4/06/2020 12.2 11.9 64.3 1022 1.7 122.2 0 0 -0.4 11.8 93.0

5/06/2020 12.7 12.1 68.8 1019 2.2 286.0 0 0 -0.6 15.4 105.7

6/06/2020 12.4 12.0 67.5 1015 1.9 234.3 0 0 -0.4 14.3 105.4

7/06/2020 11.8 11.4 76.2 1013 1.9 203.0 0 0 -0.4 13.0 93.1

8/06/2020 13.5 13.1 69.1 1018 1.7 120.6 0 0 -0.4 15.0 85.7

9/06/2020 14.1 13.3 92.7 1022 2.4 131.1 3 3 -0.8 10.1 31.5

10/06/2020 15.5 14.7 95.0 1018 1.2 174.2 2.6 5.6 -0.8 15.1 41.3

11/06/2020 16.3 15.6 82.0 1014 1.9 196.9 0.2 5.8 -0.7 13.1 87.6

12/06/2020 15.3 14.7 82.1 1015 2.3 125.3 0 5.8 -0.7 10.6 58.9

13/06/2020 15.3 14.7 87.6 1012 1.1 132.0 0 5.8 -0.6 16.6 65.2

14/06/2020 16.0 15.3 73.8 1008 3.7 260.1 21.8 27.6 -0.7 15.1 97.3

15/06/2020 14.2 13.5 61.2 1015 3.3 305.9 0 27.6 -0.7 15.0 110.7

16/06/2020 14.5 13.7 66.7 1016 3.5 304.8 0 27.6 -0.8 13.1 109.2

17/06/2020 14.2 13.3 78.4 1022 3.0 204.5 4.2 31.8 -0.8 12.4 92.3

18/06/2020 14.2 13.6 77.5 1026 2.9 121.8 0.2 32 -0.6 7.9 91.2

19/06/2020 12.0 11.8 82.1 1021 1.3 198.4 0.2 32.2 -0.2 15.7 105.8

20/06/2020 13.2 12.8 78.6 1014 1.6 199.7 0.2 32.4 -0.4 17.0 104.5

21/06/2020 13.5 13.1 76.7 1004 2.2 234.3 7.4 39.8 -0.4 16.6 53.0

22/06/2020 12.6 11.9 63.1 1003 4.8 300.7 0 39.8 -0.8 13.7 80.0

23/06/2020 11.9 11.1 66.6 1005 5.2 305.3 0 39.8 -0.8 14.2 78.0

24/06/2020 12.9 12.1 64.6 1007 6.2 309.7 0 39.8 -0.8 13.8 109.3

25/06/2020 13.2 12.3 66.2 1011 4.4 314.1 0 39.8 -0.9 14.0 100.7

26/06/2020 12.6 12.0 64.9 1014 1.9 202.4 0 39.8 -0.6 13.3 110.6

27/06/2020 12.2 11.5 77.4 1017 2.3 163.2 0 39.8 -0.7 13.8 102.0

28/06/2020 12.7 12.1 74.1 1018 2.4 126.4 0 39.8 -0.6 8.9 99.5

29/06/2020 11.2 10.9 79.9 1018 1.8 164.4 0 39.8 -0.3 12.8 88.8

30/06/2020 11.4 11.3 71.5 1015 1.6 230.2 0 39.8 -0.1 14.9 107.7

Monthly 13.4 12.9 72.7 1014 2.9 216.1 39.8 39.8 -0.6 13.7 90.8

Solar Rad Avg

Wind

Direction

Ave

Sigma

Theta Ave

Daily

Rain

(mm)

Cumulative

Rain

(mm)

Delta

Temp

Ave

Wind Speed

Ave (m/s)Date

2m Temp

Ave

10m Temp

Ave

Humidity

Ave

Barometer

Ave

Page 19: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

Figure 7.1: Windrose

00:00, 1 June 2020 - 23:55, 30 June 2020

Page 20: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

-3.0

-2.0

-1.0

0.0

1.0

2.0

3.0

Tem

pe

ratu

re D

iffe

ren

ce (

2m

, 10

m)

°C

LIDDELL COAL MET STATION - June 2020 Delta Temperature

Delta Temp Max Delta Temp Ave Delta Temp Min

0

5

10

15

20

25

Tem

pe

ratu

re °

C

LIDDELL COAL MET STATION - June 2020 10m Temperature

10m Temp Max 10m Temp Ave 10m Temp Min

0

5

10

15

20

25Te

mp

era

ture

°C

LIDDELL COAL MET STATION - June 2020 2m Temperature

2m Temp Max 2m Temp Ave 2m Temp Min

Figure 7.2: Daily minimum, average and maximum 2-metre, 10-metre and Delta Temperature

Page 21: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

0

5

10

15

20W

ind

Sp

ee

d m

/s

LIDDELL COAL MET STATION - June 2020 Wind Speed

Wind Speed Max Wind Speed Ave Wind Speed Min (m/s)

0.05.010.015.020.025.030.035.040.045.0

0.0

5.0

10.0

15.0

20.0

25.0

Cu

mu

lati

ve R

ain

fall

mm

Dai

ly R

ain

fall

mm

LIDDELL COAL MET STATION - June 2020 Rainfall

Daily Rain (mm) Cumulative Rain (mm)

980985990995

10001005101010151020102510301035

Atm

osp

he

re P

ress

ure

hP

a

LIDDELL COAL MET STATION - June 2020 Atmospheric Pressure

Barometer Max Barometer Ave Barometer Min

Figure 7.3: Daily minimum, average and maximum Wind Speed, Atmospheric Pressure and Rainfall

Page 22: Liddell Coal - Monthly Environmental Summary June 2020 · The twelve-month rolling annual average is calculated from July 2019 to June 2020. . Site Monthly Insoluble ... PM 10 TSP

0.0

20.0

40.0

60.0

80.0

100.0

120.0

Sigm

a Th

eta

de

gre

es

LIDDELL COAL MET STATION - June 2020 Sigma Theta

Sigma Theta Max Sigma Theta Ave Sigma Theta Min

0.010.020.030.040.050.060.070.080.090.0

100.0

Hu

mid

ity

%R

H

LIDDELL COAL MET STATION - June 2020 Relative Humidity

Humidity Max Humidity Ave Humidity Min

0

200

400

600

800

1000

1200

1400

Sola

r R

adia

tio

n (

W/m

2 )LIDDELL COAL MET STATION - June 2020

Solar Radiation

Solar Rad Max Solar Rad Avg Solar Rad Min

Figure 7.4: Daily minimum, average and maximum Solar Radiation, Humidity and Sigma Theta