Transcript of LGE/KU Substation SCADA Integration w/NMS Mike Sena · 2020. 4. 9. · Hardware & Software...

  • LGE/KU Substation SCADA Integration w/NMSMike Sena

  • Company Overview

    2

  • Hardware & Software

    • Oracle (OMS/DMS) NMS version 2.3.0.2.6

    — Upgraded to 2.3.0.0.7 on 1/13/2019

    — Tentative Upgrade scheduled April 20, 2020 – NMS 2.4.0.1.??

    • DSCADA System – NEW SYSTEM for ADMS

    — OSI (Open Systems International)

    • Monarch OpenViewNET version 4.9.52.0

    — Distribution Line Equipment

    — Distribution Substation Equipment (via DAN Interface to EMS)

    • Kubra (iFactor) Outage map

    3

  • Hardware & Software

    • Service Suite (Mobile Workforce Mgt) ABB version 9.6• Targeted Replacement w\OMA in Q3-2020

    • GIS Smallworld GE version 4.2

    • Fieldsmart View GE version 4.3.3 – Targeted Replacement w\MyWorld

    — Panasonic Toughbook MDT Devices CF19

    — Verizon Cell Modems built-in MDT’s

    — Net-motion used for VPN client

    4

  • ADMS System Overview

    — SCADA Adapter

    — Mobile Adapter

    — Stormman

    — Web Switching Request

    — OSI SCADA Integration

    • Line Reclosers only

    — DMS Modules

    • PowerFlow

    • Fault Location Analysis

    • Feeder Load Management

    5

    • Modules in Production:

    — Web Workspace

    — Web Switching/Safety Documents

    — Model Management

    — Configuration Assistant

    — Automated Model build Process

    — Schematic View

    — Aerial Maps Layer

    — Downtown Network Modeling

    — OMA (Operations Mobile App)

    • Damage Assessment only

  • ADMS System Overview

    6

    • Modules in scope for 2.4 upgrade:

    — OSI SCADA Integration

    • Substation SCADA control from NMS System

    • NMS One-Line display enhancements

    — FLISR (Fault Location Isolation & Restoration)

    — Suggested Switching

    — OMA (Operations Mobile Application)

    • Full Event/Crew Management

  • EMS Integration (EMS – DSCADA interface)Data Acquisition Nodes (DAN)

    7

    Transmission SCADAEMS System

    Distribution SCADADSCADA System

    Transmission Operators

    DistributionOperators

    Distribution Only RTUs/Devices

    Secure ICCP

    Transmission Only

    RTUs/Devices

    LegacyDistribution RTUs

    (Serial Comms Only)

    Transmission Only

    RTUs/Devices

    DMZ

    Protection Points

    (FW, IPS/IDS)

    T DDistribution

    Substation RTUs(IP Comms Only)

    DistributionLine Devices

    (IP Comms Only)

    DAN

    Shared Distribution/Transmission

    RTUs/Devices

  • Substation SCADA Integration Goals & Expectation's

    8

    • One Operating Model

    — Eliminate SCADA One-Line Displays

    — In addition to One Operator Console we wanted operators to have One Model to manage for Outages, Switching, Clearance Processes, & SCADA Control

    • Multiple Views of Substation

    — Needed the ability of seeing different views of substation for the different process (Outage mgt, SCADA Switching, Etc.)

    • Real-Time Display Editing

    — Needed the ability of editing SCADA Data in real-time so as to keep pace with business operations

  • Substation SCADA Integration Goals & Expectation's

    9

    • New Control Methods

    — Needed the ability of having new symbols that represent SCADA Commands – outside of normal control tool (right click feature)

    • Different Tags

    — Needed to have different method of representing Tags on equipment in Substations

    • Navigation Links

    — Requested the replacement of existing feature of “Sub Jump Buttons” from Legacy SCADA System

    — Required links to SCADA System’s Status Points & Alarm Summary’s

  • Substation SCADA Integration Goals & Expectation's

    10

    • General Cosmetic Adjustments

    — GIS Tweaks

    — Bigger and Smaller Symbols

    — Scaling in some stations

    — Layer Management

    — Operator Involvement

  • Substation SCADA Integration NMS Substation - Before View’s

    11

  • Substation SCADA Integration SCADA Substation - Before View’s

    12

  • Substation SCADA Integration NEW NMS Substation - AFTER View’s

    13

  • Substation SCADA Integration NEW NMS Substation - AFTER View’s

    14

    Hot Key “V” SCADA View OFF Hot Key “V” SCADA View ON

  • Substation SCADA Integration NEW NMS Substation - AFTER View’s

    15

    Editing Measurement's – Default placement Editing Measurement's – “Move” Feature

  • Substation SCADA Integration NEW NMS Substation - AFTER View’s

    16

    New Control Methods – “Right Click SCADA Control Commands”

  • Substation SCADA Integration NEW NMS Substation - AFTER View’s

    17

    Tags/Document’s/Notes – Before View Tags/Document’s/Notes – After View’s

  • Substation SCADA Integration NEW NMS Substation - AFTER View’s

    18

    Navigation Links – “Sub Jump Button” (takes user to adjacent substation)

  • Substation SCADA Integration NEW NMS Substation - AFTER View’s

    19

    Navigation Links – Links to SCADA Points & Alarm’s list

  • Substation SCADA Integration Lessons Learned

    20

    • OPEN MIND – Must be willing to change!!!

    — Struggled with combining SCADA and OMS display’s in general

    • Time to adjust Measurements

    — Allow plenty of time to have Operators adjust the stations

    • Retaining settings from Patch to Patch

    — Be sure to have solid process for keeping the settings when new patches are applied or copying to new environment’s

    • GIS/Substation Group Involvement

    — Must have GIS on board with dedicated help to make adjustments

    — Substations group may have to verify data or adjust mapping

    • PLENTY OF ORACLE INVOLEMENT!!!

    — Major Product Changes – SCADA Control, Digital Movement, Etc.

  • Wrap-up Discussion

    21