Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers,...

24
Level Crossing UIC Euro-Interlocking Standard Version: 3.0 Total Number of Pages: 24 Copyright © 2008 UIC / Euro-Interlocking All Rights Reserved

Transcript of Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers,...

Page 1: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

Level Crossing

UIC Euro-Interlocking Standard Version: 3.0

Total Number of Pages: 24

Copyright © 2008 UIC / Euro-Interlocking All Rights Reserved

Page 2: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVEL CROSSING

Exported from DOORS-GENERIS: 26.05.2008 2:35 UIC / EURO-INTERLOCKING

Document Data Sheet Filing name

Document Type Last saved 26.05.08 16:55

Version: 3.0 Last saved by FL

Languages Title of Document Level Crossing Original

English Translations

Pages Figures Tables Subject 24

Price Author(s) Euro-Interlocking DOORS database Document

Right of Use

Performing Body EI Core team

Sponsoring Body

Approved by Performing Body Approved by Sponsoring Body Availability of Document

Application Used Microsoft Word

10.0

Template Name Generic

Requirements Baseline 2.0 template.dot

Last Printed

Date of Publication May 2008

Abstract This document contains a module exported from the GENERIS DOORS database. It contains all requirements of participating railways and is meant to be used as informative. The detailed requirements for each railway are available directly from the Euro-Interlocking database.

Page 3: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

3 o

f 24

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr1

-Com

1

Intr

oduc

tion

LCr2

-Com

1.

1 B

ackg

roun

d

LCr6

07-C

om

This

doc

umen

t pre

sent

s the

func

tiona

l req

uire

men

ts fo

r the

dep

ende

ncy

betw

een

inte

rlock

ing

syst

ems a

nd le

vel c

ross

ings

.

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r5-C

om

1.2

Purp

ose

LCr6

08-C

om

The

purp

ose

of th

is d

ocum

ent i

s to

desc

ribe

the

cond

ition

s req

uire

d fo

r ac

tivat

ing

and

deac

tivat

ing

leve

l cro

ssin

gs. L

evel

cro

ssin

gs c

an b

e ac

tivat

ed a

nd

deac

tivat

ed a

utom

atic

ally

, for

exa

mpl

e w

ith ro

utes

or v

ehic

le d

etec

tion

or

man

ually

with

sign

alle

r's re

ques

ts.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr8

-Com

1.

3 Sc

ope

LCr6

09-C

om

The

scop

e of

this

doc

umen

t is l

imite

d to

des

crib

e th

e co

nditi

ons g

ener

ated

in th

e in

terlo

ckin

g sy

stem

for t

he a

ctiv

atio

n an

d de

activ

atio

n of

leve

l cro

ssin

gs.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr6

10-C

om

This

doc

umen

t doe

s not

des

crib

e th

e fu

nctio

nalit

y of

the

leve

l cro

ssin

g sy

stem

. Th

e op

erat

ion

of le

vel c

ross

ing

equi

pmen

t (i.e

., w

arni

ng li

ghts

, bar

riers

, ac

tivat

ion

poin

ts, d

eact

ivat

ing

func

tions

) is n

ot in

the

scop

e of

this

doc

umen

t. Th

e op

erat

ion

of le

vel c

ross

ings

inde

pend

ent f

rom

the

inte

rlock

ing

syst

ems i

s no

t in

the

scop

e of

this

doc

umen

t.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

Page 4: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

4 o

f 24

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr1

1-C

om

1.4

Stru

ctur

e

LCr1

2-C

om

A d

iagr

am in

the

Hig

h-Le

vel R

equi

rem

ents

doc

umen

t sho

ws t

he c

urre

nt

stru

ctur

e of

the

docu

men

ts c

ompr

isin

g th

e Eu

ro-I

nter

lock

ing

Syst

em S

tand

ards

(E

IS).

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr1

3-C

om

1.5

Uni

que

iden

tific

atio

n of

eac

h st

atem

ent i

n th

e Eu

ro-In

terlo

ckin

g Sy

stem

Sta

ndar

d (E

IS)

LCr1

4-C

om

To a

llow

the

uniq

ue id

entif

icat

ion

of re

quire

men

ts w

ithin

the

EIS,

the

pref

ix

'LC

r' pr

eced

es th

e nu

mbe

r of e

ach

obje

ct in

this

doc

umen

t.

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r15-

Com

2

Gen

eral

LCr4

20-R

eq

The

inte

rlock

ing

syst

em sh

all b

e ab

le to

com

man

d an

d su

perv

ise

leve

l cro

ssin

gs.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr3

14-R

eq

The

inte

rlock

ing

syst

em sh

all r

ecei

ve th

e fo

llow

ing

stat

es fr

om th

e le

vel

cros

sing

:

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r319

-Req

'act

ivat

ed' w

hen

the

leve

l cro

ssin

g is

act

ivat

ed

Fi

nlan

d N

ethe

rland

s N

orw

ay

Portu

gal

Page 5: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

5 o

f 24

Iden

tifie

r

Com

men

t A

pplic

able

To

Switz

erla

nd

LCr3

15-R

eq

• 'se

cure

d' w

hen

the

leve

l cro

ssin

g is

secu

red

for t

he ro

ad tr

affic

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r316

-Req

'faile

d no

n-cr

itica

l' w

hen

a fa

ilure

is p

rese

nt th

at w

ould

not

en

dang

er th

e ro

ad tr

affic

Finl

and

Portu

gal

Switz

erla

nd

LCr3

17-R

eq

• 'fa

iled

criti

cal'

whe

n a

failu

re is

pre

sent

that

cou

ld e

ndan

ger t

he

road

traf

fic

Fi

nlan

d Po

land

Po

rtuga

l Sw

itzer

land

LC

r423

-Req

A

leve

l cro

ssin

g m

ay c

onta

in m

ultip

le tr

acks

.

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r600

-Req

A

leve

l cro

ssin

g m

ay c

onta

in m

ultip

le a

ctiv

atio

n zo

nes.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr4

21-R

eq

An

indi

vidu

al a

ctiv

atio

n zo

ne sh

all b

e co

nfig

urab

le.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr7

07-R

eq

An

activ

atio

n zo

ne sh

all b

e de

sign

ated

for a

rout

e ty

pe.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Page 6: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

6 o

f 24

Iden

tifie

r

Com

men

t A

pplic

able

To

Portu

gal

Switz

erla

nd

LCr4

30-R

eq

Veh

icle

s in

an a

ctiv

atio

n zo

ne sh

all b

e de

tect

ed.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr5

77-R

eq

The

inte

rlock

ing

syst

em sh

all d

etec

t and

indi

cate

to th

e si

gnal

ler:

Fi

nlan

d N

ethe

rland

s N

orw

ay

Portu

gal

Switz

erla

nd

LCr6

21-R

eq

• a

leve

l cro

ssin

g ac

tivat

ed lo

nger

than

a c

onfig

ured

tim

e

Finl

and

Net

herla

nds

Nor

way

Po

rtuga

l Sw

itzer

land

LC

r708

-Req

war

ning

ligh

ts o

f the

leve

l cro

ssin

g ac

tivat

ed

Fi

nlan

d LC

r622

-Req

war

ning

ligh

ts o

f the

leve

l cro

ssin

g di

stur

bed

Po

rtuga

l LC

r623

-Req

war

ning

ligh

ts o

f the

leve

l cro

ssin

g fa

iled

Fi

nlan

d Po

rtuga

l LC

r709

-Req

barr

iers

of t

he le

vel c

ross

ing

dete

cted

ope

n

Finl

and

Net

herla

nds

Nor

way

Sw

itzer

land

LC

r710

-Req

barr

iers

of t

he le

vel c

ross

ing

dete

cted

clo

sed

Fi

nlan

d N

ethe

rland

s N

orw

ay

Switz

erla

nd

LCr6

24-R

eq

• ba

rrie

rs o

f the

leve

l cro

ssin

g no

t det

ecte

d cl

osed

Portu

gal

LCr7

11-R

eq

• ba

rrie

rs o

f the

leve

l cro

ssin

g de

tect

ed fa

iled

Fi

nlan

d Sw

itzer

land

LC

r578

-Req

leve

l cro

ssin

g op

erat

ing

on b

acku

p po

wer

Finl

and

Portu

gal

LCr6

25-R

eq

• ba

ckup

pow

er o

f the

leve

l cro

ssin

g lo

w

Po

rtuga

l

Page 7: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

7 o

f 24

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr5

79-R

eq

• a

com

mun

icat

ion

failu

re w

ith th

e le

vel c

ross

ing

Fi

nlan

d Sw

itzer

land

LC

r712

-Req

leve

l cro

ssin

g de

tect

ed o

ut o

f use

Finl

and

LCr7

13-R

eq

• a

requ

est '

Requ

est a

ctiv

atio

n-al

l tra

cks'

from

the

leve

l cro

ssin

g op

erat

or is

pre

sent

Finl

and

LCr7

49-R

eq

• le

vel c

ross

ing

activ

ated

by

loca

l sw

itch

Fi

nlan

d LC

r750

-Req

leve

l cro

ssin

g no

t act

ivat

ed

LCr7

62-R

eq

• le

vel c

ross

ing

obst

ruct

ion

dete

ctor

faile

d

Switz

erla

nd

LCr2

92-R

eq

3 Le

vel C

ross

ing

Act

ivat

ion

LCr3

03-R

eq

The

inte

rlock

ing

syst

em sh

all b

e ab

le to

act

ivat

e le

vel c

ross

ings

.

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r304

-Req

A

leve

l cro

ssin

g sh

all b

e ac

tivat

ed w

hile

at l

east

one

of t

he fo

llow

ing

type

s of

activ

atio

n re

ques

ts is

pre

sent

:

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r326

-Req

a ro

ute

requ

est

N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

LCr3

29-R

eq

• ve

hicl

e de

tect

ion

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr3

28-R

eq

• a

man

ual r

eque

st

Fi

nlan

d N

ethe

rland

s N

orw

ay

Page 8: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

8 o

f 24

Iden

tifie

r

Com

men

t A

pplic

able

To

Pola

nd

Portu

gal

Switz

erla

nd

LCr3

74-R

eq

A le

vel c

ross

ing

may

be

activ

ated

by

a di

ffer

ent r

eque

st fr

om e

ach

activ

atio

n zo

ne.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr3

75-R

eq

Mul

tiple

act

ivat

ion

requ

ests

may

be

pres

ent a

t the

sam

e tim

e fo

r one

leve

l cr

ossi

ng.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr5

10-R

eq

Mul

tiple

act

ivat

ion

requ

ests

shal

l be

inde

pend

ent o

f eac

h ot

her.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr4

33-R

eq

The

appl

icab

le a

ctiv

atio

n re

ques

ts sh

all b

e co

nfig

ured

for e

ach

leve

l cro

ssin

g.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr2

96-C

om

3.1

Act

ivat

ion

by R

oute

Req

uest

LCr3

80-R

eq

Act

ivat

ion

by ro

ute

requ

est s

hall

be p

erm

itted

for:

N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

LCr3

05-R

eq

• a

leve

l cro

ssin

g in

the

rout

e bo

dy

N

ethe

rland

s N

orw

ay

Pola

nd

Page 9: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

9 o

f 24

Iden

tifie

r

Com

men

t A

pplic

able

To

Portu

gal

LCr3

06-R

eq

• a

leve

l cro

ssin

g in

the

over

lap

Po

land

Po

rtuga

l LC

r302

-Req

A

n ac

tivat

ion

requ

est s

hall

be g

ener

ated

for t

he le

vel c

ross

ing

whe

n:

N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

LCr3

07-R

eq

• th

e ro

ute

beco

mes

initi

ated

Nor

way

LC

r783

-Req

the

entir

e ro

ute

beco

mes

'loc

ked'

Net

herla

nds

Pola

nd

LCr6

26-R

eq

• th

e 'si

gnal

ling

cond

ition

s' fo

r the

rout

e en

try

sign

al b

ecom

e sa

tisfie

d se

e 'si

gnal

ling

cond

ition

s' in

mod

ule

Sign

al

Portu

gal

LCr7

05-R

eq

The

sign

al d

elay

tim

er sh

all b

e st

arte

d w

hen

the

leve

l cro

ssin

g be

com

es

activ

ated

.

Net

herla

nds

Pola

nd

Portu

gal

LCr7

06-R

eq

The

rout

e en

try si

gnal

shal

l be

mai

ntai

ned

at a

'sto

p' a

spec

t unt

il its

sign

al d

elay

tim

er e

xpire

s.

Net

herla

nds

Pola

nd

Portu

gal

LCr3

08-R

eq

The

leve

l cro

ssin

g sh

all s

atis

fy th

e m

onito

ring

cond

ition

s for

the

rout

e en

try

sign

al if

:

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l LC

r627

-Req

the

leve

l cro

ssin

g is

det

ecte

d as

'act

ivat

ed'

N

ethe

rland

s Po

rtuga

l LC

r320

-Req

the

leve

l cro

ssin

g is

det

ecte

d as

'sec

ured

'

Nor

way

Po

land

LC

r321

-Req

the

leve

l cro

ssin

g is

not

det

ecte

d as

'fai

led

criti

cal'

Po

land

LC

r297

-Com

3.

2 A

ctiv

atio

n by

Veh

icle

Det

ectio

n

LCr6

28-C

om

3.2.

1 A

ctiv

atio

n

LCr6

30-R

eq

An

occu

panc

y sh

all b

e co

nsid

ered

as '

valid

for a

ctiv

atio

n' if

it is

det

ecte

d in

the

activ

atio

n zo

ne b

etw

een

the

leve

l cro

ssin

g an

d th

e fir

st o

f the

follo

win

g el

emen

ts

in re

ar o

f the

leve

l cro

ssin

g:

Fi

nlan

d N

ethe

rland

s N

orw

ay

Page 10: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

10

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

Pola

nd

Portu

gal

Switz

erla

nd

LCr6

33-R

eq

• a

sign

al (o

f the

sam

e ty

pe a

s the

app

licab

le a

ctiv

atio

n zo

ne) i

n th

e di

rect

ion

tow

ards

the

leve

l cro

ssin

g th

at is

not

bei

ng u

sed

as a

rout

e en

try

sign

al

Po

land

Po

rtuga

l

LCr7

18-R

eq

• a

sign

al in

the

dire

ctio

n to

war

ds th

e le

vel c

ross

ing

that

is n

ot b

eing

us

ed a

s a ro

ute

entr

y si

gnal

Finl

and

Net

herla

nds

Nor

way

Sw

itzer

land

LC

r752

-Req

a si

gnal

in th

e di

rect

ion

tow

ards

the

leve

l cro

ssin

g th

at is

bei

ng u

sed

as a

rout

e en

try

sign

al o

f a ro

ute

that

is n

ot y

et 'l

ocke

d'

N

ethe

rland

s

LCr7

19-R

eq

• a

sign

al in

the

dire

ctio

n to

war

ds th

e le

vel c

ross

ing

that

is n

ot b

eing

us

ed a

s a su

b-ro

ute

sign

al

Fi

nlan

d

LCr6

34-R

eq

• a

sign

al (o

f the

sam

e ty

pe a

s the

app

licab

le a

ctiv

atio

n zo

ne) i

n th

e di

rect

ion

tow

ards

the

leve

l cro

ssin

g th

at is

bei

ng u

sed

as ro

ute

entr

y si

gnal

whi

ch h

as n

ot y

et sh

own

a 'p

roce

ed' a

spec

t with

in th

e cu

rren

t ro

ute

life

cycl

e

Po

rtuga

l

LCr6

62-R

eq

• a

bloc

k si

gnal

in th

e di

rect

ion

tow

ards

the

leve

l cro

ssin

g w

hose

'si

gnal

ling

cond

ition

s' ar

e no

t sat

isfie

d se

e 'si

gnal

ling

cond

ition

s' fo

r the

bl

ock

sign

al in

mod

ule

Sign

al

Finl

and

Nor

way

Sw

itzer

land

LCr6

97-R

eq

• a

bloc

k si

gnal

in th

e di

rect

ion

tow

ards

the

leve

l cro

ssin

g no

t co

nfig

ured

as a

per

mis

sive

sign

al w

hose

'sig

nalli

ng c

ondi

tions

' are

no

t sat

isfie

d

see

'sign

allin

g co

nditi

ons'

for t

he

bloc

k si

gnal

in m

odul

e Si

gnal

Portu

gal

LCr6

35-R

eq

• a

faci

ng p

oint

who

se re

ques

ted

posi

tion

is a

way

from

the

leve

l cr

ossi

ng

N

ethe

rland

s Po

rtuga

l LC

r720

-Req

a fa

cing

poi

nt w

hich

is d

etec

ted

in p

ositi

on a

way

from

the

leve

l cr

ossi

ng

Fi

nlan

d N

orw

ay

Switz

erla

nd

LCr7

21-R

eq

• a

faci

ng p

oint

whi

ch is

con

tinuo

usly

det

ecte

d in

pos

ition

aw

ay fr

om

the

leve

l cro

ssin

g w

hile

its a

ssoc

iate

d TV

P se

ctio

n is

'occ

upie

d'

Fi

nlan

d

LCr7

48-R

eq

• a

dera

iler w

hich

is d

etec

ted

in p

ositi

on 'o

n ra

il'

Fi

nlan

d N

ethe

rland

s Sw

itzer

land

Page 11: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

11

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr7

53-R

eq

• a

lock

able

dev

ice

whi

ch is

det

ecte

d no

t 'in

pos

ition

'

Finl

and

Net

herla

nds

Switz

erla

nd

LCr6

76-R

eq

• st

art o

f the

act

ivat

ion

zone

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r512

-Req

If

an

occu

panc

y in

an

activ

atio

n zo

ne is

det

ecte

d w

ithin

an

esta

blis

hed

loca

l sh

untin

g ar

ea, t

he o

ccup

ancy

shal

l not

bec

ome

cons

ider

ed a

s 'va

lid fo

r ac

tivat

ion'

, unl

ess t

he o

ccup

ancy

is o

n th

e TV

P se

ctio

n as

soci

ated

with

the

leve

l cr

ossi

ng.

Fi

nlan

d N

ethe

rland

s N

orw

ay

LCr6

74-R

eq

An

activ

atio

n re

ques

t sha

ll be

gen

erat

ed fo

r the

leve

l cro

ssin

g if:

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r675

-Req

an o

ccup

ancy

that

is c

onsi

dere

d 'v

alid

for a

ctiv

atio

n' is

det

ecte

d

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r677

-Req

and

N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr6

78-R

eq

• th

at o

ccup

ancy

is n

ot lo

cate

d w

ithin

any

rout

e bo

dy

Po

rtuga

l LC

r679

-Req

or

Po

rtuga

l LC

r680

-Req

that

occ

upan

cy is

loca

ted

with

in a

rout

e bo

dy (o

f the

sam

e ty

pe a

s th

e ap

plic

able

act

ivat

ion

zone

) tha

t is l

ocke

d in

the

dire

ctio

n to

war

ds th

e le

vel c

ross

ing

N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Page 12: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

12

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

Switz

erla

nd

LCr6

81-R

eq

• or

Net

herla

nds

Nor

way

Po

rtuga

l Sw

itzer

land

LC

r682

-Req

that

occ

upan

cy is

loca

ted

with

in a

blo

ck se

ctio

n w

ith b

lock

trav

el

dire

ctio

n to

war

ds th

e le

vel c

ross

ing

N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr7

65-R

eq

• or

Net

herla

nds

LCr7

55-R

eq

• an

y lo

ckab

le d

evic

e in

the

activ

atio

n zo

ne is

det

ecte

d no

t 'in

po

sitio

n' w

hile

the

prot

ectin

g si

gnal

is u

sed

as a

rout

e en

try

sign

al

of a

'loc

ked'

rout

e

N

ethe

rland

s

LCr6

83-R

eq

An

activ

atio

n re

ques

t sha

ll be

gen

erat

ed fo

r a le

vel c

ross

ing

loca

ted

in th

e ov

erla

p an

d no

t sim

ulta

neou

sly

in th

e ro

ute

body

if:

Po

rtuga

l

LCr6

41-R

eq

• th

e ov

erla

p is

initi

ated

LC

r642

-Req

the

entir

e ov

erla

p is

lock

ed

Po

rtuga

l LC

r687

-Req

and

Po

rtuga

l LC

r693

-Req

an o

ccup

ancy

is d

etec

ted

in th

e ov

erla

p in

rear

of t

he le

vel c

ross

ing

Po

rtuga

l LC

r694

-Req

or

Po

rtuga

l LC

r684

-Req

an o

ccup

ancy

that

is c

onsi

dere

d 'v

alid

for a

ctiv

atio

n' is

det

ecte

d in

re

ar o

f the

ove

rlap

Portu

gal

LCr6

85-R

eq

• an

d

Portu

gal

LCr6

88-R

eq

• th

e oc

cupa

ncy

is n

ot lo

cate

d w

ithin

any

rout

e bo

dy

Po

rtuga

l LC

r691

-Req

or

Po

rtuga

l LC

r689

-Req

the

occu

panc

y is

loca

ted

with

in a

rout

e bo

dy (o

f the

sam

e ty

pe

as th

e ap

plic

able

act

ivat

ion

zone

) tha

t is l

ocke

d in

the

dire

ctio

n to

war

ds th

e le

vel c

ross

ing

Po

rtuga

l

LCr6

92-R

eq

• or

Portu

gal

LCr6

90-R

eq

• th

e oc

cupa

ncy

is lo

cate

d w

ithin

a b

lock

sect

ion

with

blo

ck tr

avel

di

rect

ion

tow

ards

the

leve

l cro

ssin

g

Portu

gal

LCr6

31-C

om

3.2.

2 Si

gnal

Del

ay T

imer

Page 13: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

13

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr6

46-R

eq

Whi

le a

n ac

tivat

ion

requ

est i

s pre

sent

from

an

activ

atio

n zo

ne, a

del

ay ti

mer

for

a si

gnal

in th

at a

ctiv

atio

n zo

ne sh

all b

e ap

plie

d if

an o

ccup

ancy

is d

etec

ted

in

that

act

ivat

ion

zone

bet

wee

n th

e ap

plic

able

sign

al a

nd th

e fir

st o

f the

follo

win

g in

rear

:

Fi

nlan

d Po

rtuga

l

LCr6

47-R

eq

• a

sign

al (o

f the

sam

e ty

pe a

s the

app

licab

le a

ctiv

atio

n zo

ne) i

n th

e di

rect

ion

tow

ards

the

leve

l cro

ssin

g th

at is

not

bei

ng u

sed

as a

rout

e en

try

sign

al

Po

rtuga

l

LCr7

24-R

eq

• a

sign

al in

the

dire

ctio

n to

war

ds th

e le

vel c

ross

ing

that

is n

ot b

eing

us

ed a

s a ro

ute

entr

y si

gnal

Finl

and

LCr7

25-R

eq

• a

sign

al in

the

dire

ctio

n to

war

ds th

e le

vel c

ross

ing

that

is n

ot b

eing

us

ed a

s a su

b-ro

ute

sign

al

Fi

nlan

d

LCr6

48-R

eq

• a

sign

al (o

f the

sam

e ty

pe a

s the

app

licab

le a

ctiv

atio

n zo

ne) i

n th

e di

rect

ion

tow

ards

the

leve

l cro

ssin

g th

at is

bei

ng u

sed

as ro

ute

entr

y si

gnal

whi

ch h

as n

ot y

et sh

own

a 'p

roce

ed' a

spec

t with

in th

e cu

rren

t ro

ute

life

cycl

e

Po

rtuga

l

LCr6

96-R

eq

• a

bloc

k si

gnal

in th

e di

rect

ion

tow

ards

the

leve

l cro

ssin

g w

hose

'si

gnal

ling

cond

ition

s' ar

e no

t sat

isfie

d se

e 'si

gnal

ling

cond

ition

s' fo

r the

bl

ock

sign

al in

mod

ule

Sign

al

Finl

and

LCr6

98-R

eq

• a

bloc

k si

gnal

in th

e di

rect

ion

tow

ards

the

leve

l cro

ssin

g no

t co

nfig

ured

as a

per

mis

sive

sign

al w

hose

'sig

nalli

ng c

ondi

tions

' are

no

t sat

isfie

d

see

'sign

allin

g co

nditi

ons'

for t

he

bloc

k si

gnal

in m

odul

e Si

gnal

Portu

gal

LCr6

49-R

eq

• a

faci

ng p

oint

who

se re

ques

ted

posi

tion

is a

way

from

the

leve

l cr

ossi

ng

Po

rtuga

l

LCr7

22-R

eq

• a

faci

ng p

oint

whi

ch is

det

ecte

d in

pos

ition

aw

ay fr

om th

e le

vel

cros

sing

Finl

and

LCr7

23-R

eq

• a

faci

ng p

oint

whi

ch is

con

tinuo

usly

det

ecte

d in

pos

ition

aw

ay fr

om

the

leve

l cro

ssin

g w

hile

its a

ssoc

iate

d TV

P se

ctio

n is

'occ

upie

d'

Fi

nlan

d

LCr7

51-R

eq

• a

dera

iler w

hich

is d

etec

ted

in p

ositi

on 'o

n ra

il'

Fi

nlan

d LC

r757

-Req

a lo

ckab

le d

evic

e w

hich

is d

etec

ted

not '

in p

ositi

on'

Fi

nlan

d LC

r695

-Req

star

t of t

he a

ctiv

atio

n zo

ne

Fi

nlan

d Po

rtuga

l LC

r758

-Req

A

del

ay ti

mer

for t

he p

rote

ctin

g si

gnal

in a

n ac

tivat

ion

zone

shal

l be

appl

ied

if its

ro

ute

beco

mes

'loc

ked'

whi

le:

N

ethe

rland

s Po

land

Page 14: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

14

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr7

60-R

eq

• an

occ

upan

cy is

det

ecte

d in

the

activ

atio

n zo

ne

N

ethe

rland

s Po

land

LC

r779

-Req

or

N

ethe

rland

s LC

r780

-Req

a si

gnal

in th

e ac

tivat

ion

zone

is n

ot u

sed

as a

rout

e en

try

sign

al o

f a

rout

e th

at is

'loc

ked'

Net

herla

nds

LCr7

81-R

eq

• or

Net

herla

nds

LCr7

61-R

eq

• a

lock

able

dev

ice

in th

e ac

tivat

ion

zone

is d

etec

ted

not '

in p

ositi

on'

N

ethe

rland

s LC

r659

-Req

Si

gnal

del

ay ti

mer

s for

all

activ

atio

n zo

nes s

hall

be st

arte

d w

hen

the

leve

l cr

ossi

ng b

ecom

es a

ctiv

ated

by

the

first

act

ivat

ion

requ

est.

Fi

nlan

d N

ethe

rland

s Po

land

Po

rtuga

l LC

r658

-Req

A

sign

al sh

all b

e m

aint

aine

d at

a 's

top'

asp

ect u

ntil

its si

gnal

del

ay ti

mer

exp

ires.

Fi

nlan

d N

ethe

rland

s Po

land

Po

rtuga

l LC

r782

-Req

If

a si

gnal

del

ay ti

mer

is a

pplie

d on

a ro

ute

entry

sign

al, t

he su

b-ro

ute

sign

als o

f th

at ro

ute

shal

l be

mai

ntai

ned

at a

'sto

p' a

pect

unt

il th

e si

gnal

del

ay ti

mer

exp

ires.

LCr6

32-R

eq

3.2.

3 M

onito

ring

Con

ditio

ns

LCr3

95-R

eq

Whi

le th

e le

vel c

ross

ing

is n

ot a

ctiv

ated

, the

leve

l cro

ssin

g sh

all s

atis

fy th

e m

onito

ring

cond

ition

s for

its p

rote

ctin

g (r

oute

ent

ry o

r blo

ck) s

igna

l:

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l LC

r650

-Req

alw

ays

N

ethe

rland

s Po

rtuga

l LC

r795

-Req

neve

r

Nor

way

LC

r396

-Req

if th

e le

vel c

ross

ing

is n

ot d

etec

ted

as 'f

aile

d cr

itica

l'

Finl

and

Pola

nd

LCr6

51-R

eq

The

activ

ated

leve

l cro

ssin

g sh

all s

atis

fy th

e m

onito

ring

cond

ition

s for

its

prot

ectin

g (r

oute

ent

ry o

r blo

ck) s

igna

l if:

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

Page 15: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

15

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr6

52-R

eq

• th

e le

vel c

ross

ing

is d

etec

ted

as 'a

ctiv

ated

'

Finl

and

Net

herla

nds

Portu

gal

LCr6

53-R

eq

• or

Finl

and

Net

herla

nds

LCr7

26-R

eq

• th

e ba

rrie

rs o

f the

leve

l cro

ssin

g ar

e no

t det

ecte

d op

en

Fi

nlan

d LC

r727

-Req

or

Fi

nlan

d LC

r654

-Req

the

leve

l cro

ssin

g is

det

ecte

d as

'sec

ured

'

Finl

and

Net

herla

nds

Nor

way

Po

land

Sw

itzer

land

LC

r655

-Req

and

Fi

nlan

d Po

land

Sw

itzer

land

LC

r656

-Req

the

leve

l cro

ssin

g is

not

det

ecte

d as

'fai

led

criti

cal'

Fi

nlan

d Po

land

Sw

itzer

land

LC

r298

-Com

3.

3 A

ctiv

atio

n by

Man

ual R

eque

st

LCr5

31-C

om

3.3.

1 M

anua

l Req

uest

for a

n In

divi

dual

Tra

ck fr

om th

e Si

gnal

ler

LCr3

10-R

eq

An

activ

atio

n re

ques

t sha

ll be

gen

erat

ed fo

r the

leve

l cro

ssin

g fo

r an

indi

vidu

al

track

if:

Fi

nlan

d Po

land

Sw

itzer

land

LC

r311

-Req

a re

ques

t 'Re

ques

t act

ivat

ion-

indi

vidu

al tr

ack'

is re

ceiv

ed fr

om th

e si

gnal

ler

Fi

nlan

d Po

land

Sw

itzer

land

LC

r532

-Com

3.

3.2

Man

ual R

eque

st fo

r All

Trac

ks fr

om th

e Si

gnal

ler

LCr5

34-R

eq

An

activ

atio

n re

ques

t sha

ll be

gen

erat

ed fo

r the

leve

l cro

ssin

g fo

r all

track

s if:

Fi

nlan

d N

ethe

rland

s N

orw

ay

Portu

gal

Page 16: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

16

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr5

35-R

eq

• a

requ

est '

Requ

est a

ctiv

atio

n-al

l tra

cks'

is re

ceiv

ed fr

om th

e si

gnal

ler

Fi

nlan

d N

ethe

rland

s N

orw

ay

Portu

gal

LCr5

33-C

om

3.3.

3 M

anua

l Req

uest

for A

ll Tr

acks

from

the

Loca

l Lev

el

Cro

ssin

g O

pera

tor

LCr5

36-R

eq

An

activ

atio

n re

ques

t sha

ll be

gen

erat

ed fo

r the

leve

l cro

ssin

g fo

r all

track

s if:

Fi

nlan

d LC

r537

-Req

a re

ques

t 'Re

ques

t act

ivat

ion-

all t

rack

s' is

rece

ived

from

the

loca

l le

vel c

ross

ing

oper

ator

Finl

and

LCr2

95-C

om

4 Le

vel C

ross

ing

Dea

ctiv

atio

n

LCr3

25-R

eq

An

activ

ated

leve

l cro

ssin

g sh

all b

e de

activ

ated

if a

ll of

the

activ

atio

n re

ques

ts

for t

he le

vel c

ross

ing

have

bee

n re

mov

ed.

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr3

00-C

om

4.1

Dea

ctiv

atio

n by

Veh

icle

Det

ectio

n

LCr5

39-R

eq

The

follo

win

g ac

tivat

ion

requ

ests

are

per

mitt

ed to

be

rem

oved

by

vehi

cle

dete

ctio

n:

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr7

47-R

eq

• an

act

ivat

ion

requ

est b

y ro

ute

requ

est

N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

LCr5

40-R

eq

• an

act

ivat

ion

requ

est b

y ve

hicl

e de

tect

ion

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l

Page 17: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

17

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

Switz

erla

nd

LCr5

42-R

eq

• a

man

ual a

ctiv

atio

n re

ques

t for

an

indi

vidu

al tr

ack

Fi

nlan

d Po

land

Sw

itzer

land

LC

r428

-Req

A

n ac

tivat

ion

requ

est s

hall

be re

mov

ed b

y ve

hicl

e de

tect

ion

if:

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr4

29-R

eq

• th

e ve

hicl

e is

det

ecte

d as

leav

ing

the

leve

l cro

ssin

g fr

om th

e ac

tivat

ion

zone

on

the

appl

icab

le tr

ack

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr4

34-R

eq

• an

d

Finl

and

LCr4

32-R

eq

• th

e ro

ute

lock

ing

of th

e TV

P se

ctio

n as

soci

ated

with

the

leve

l cr

ossi

ng o

n th

e ap

plic

able

trac

k be

com

es re

leas

ed, i

f the

leve

l cr

ossi

ng is

with

in a

rout

e

Fi

nlan

d

LCr7

71-R

eq

• an

d

Switz

erla

nd

LCr7

72-R

eq

• a

requ

est '

Perm

it de

activ

atio

n by

veh

icle

det

ectio

n-in

divi

dual

trac

k'

was

rece

ived

from

the

sign

alle

r if t

he a

ctiv

atio

n re

ques

t was

a

man

ual a

ctiv

atio

n re

ques

t

Sw

itzer

land

LCr7

14-R

eq

A ti

mer

for r

eact

ivat

ion

shal

l be

star

ted

whe

n th

e ac

tivat

ion

requ

est i

s rem

oved

by

the

vehi

cle

leav

ing

the

leve

l cro

ssin

g.

Fi

nlan

d

LCr5

13-R

eq

Whi

le a

veh

icle

that

is le

avin

g th

e le

vel c

ross

ing

is in

an

activ

atio

n zo

ne o

n th

e op

posi

te si

de o

f the

leve

l cro

ssin

g, th

e le

vel c

ross

ing

shal

l not

bec

ome

activ

ated

by

that

veh

icle

unl

ess:

Fi

nlan

d N

ethe

rland

s N

orw

ay

Portu

gal

LCr5

14-R

eq

• an

unp

rote

cted

reve

rsin

g m

ovem

ent i

s det

ecte

d in

the

dire

ctio

n to

war

ds th

e le

vel c

ross

ing

Fi

nlan

d N

orw

ay

Portu

gal

LCr5

15-R

eq

• or

Finl

and

Nor

way

LC

r516

-Req

the

timer

for r

eact

ivat

ion

has e

xpir

ed

Fi

nlan

d

Page 18: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

18

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr7

15-R

eq

• or

Finl

and

LCr7

16-R

eq

• a

rout

e th

at re

sults

in a

ctiv

atio

n by

veh

icle

det

ectio

n is

initi

ated

w

hile

an

occu

panc

y is

det

ecte

d in

that

act

ivat

ion

zone

Finl

and

Net

herla

nds

Nor

way

LC

r717

-Req

Th

e tim

er fo

r rea

ctiv

atio

n sh

all b

e re

set w

hen

the

activ

atio

n zo

ne o

ccup

ied

with

th

e ve

hicl

e le

avin

g th

e le

vel c

ross

ing

beco

mes

not

occ

upie

d.

Fi

nlan

d

LCr3

01-C

om

4.2

Dea

ctiv

atio

n by

Man

ual R

eque

st

LCr5

45-C

om

4.2.

1 M

anua

l Req

uest

for a

n In

divi

dual

Tra

ck fr

om th

e Si

gnal

ler

LCr5

48-R

eq

The

follo

win

g ac

tivat

ion

requ

ests

are

per

mitt

ed to

be

rem

oved

by

a m

anua

l re

ques

t for

an

indi

vidu

al tr

ack:

Finl

and

Switz

erla

nd

LCr5

49-R

eq

• a

man

ual a

ctiv

atio

n re

ques

t for

an

indi

vidu

al tr

ack

Fi

nlan

d Sw

itzer

land

LC

r424

-Req

A

n ac

tivat

ion

requ

est s

hall

be re

mov

ed if

:

Finl

and

Switz

erla

nd

LCr4

25-R

eq

• a

requ

est '

Requ

est d

eact

ivat

ion-

indi

vidu

al tr

ack'

is re

ceiv

ed fr

om th

e si

gnal

ler f

or th

e ap

plic

able

trac

k

Fi

nlan

d Sw

itzer

land

LC

r546

-Com

4.

2.2

Man

ual R

eque

st fo

r All

Trac

ks fr

om th

e Si

gnal

ler

LCr5

50-R

eq

The

follo

win

g ac

tivat

ion

requ

ests

are

per

mitt

ed to

be

rem

oved

by

a m

anua

l re

ques

t for

all

track

s:

Fi

nlan

d N

ethe

rland

s N

orw

ay

Portu

gal

LCr5

51-R

eq

• a

man

ual a

ctiv

atio

n re

ques

t for

all

trac

ks fr

om th

e si

gnal

ler

Fi

nlan

d N

ethe

rland

s N

orw

ay

Portu

gal

LCr5

54-R

eq

• a

man

ual a

ctiv

atio

n re

ques

t for

all

trac

ks fr

om th

e lo

cal l

evel

cr

ossi

ng o

pera

tor

Fi

nlan

d

LCr5

52-R

eq

An

activ

atio

n re

ques

t sha

ll be

rem

oved

if:

Fi

nlan

d N

ethe

rland

s N

orw

ay

Portu

gal

Page 19: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

19

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr5

53-R

eq

• a

requ

est '

Requ

est d

eact

ivat

ion-

all t

rack

s' is

rece

ived

from

the

sign

alle

r

Finl

and

Net

herla

nds

Nor

way

Po

rtuga

l LC

r699

-Req

and

N

orw

ay

Portu

gal

LCr7

00-R

eq

• no

act

ivat

ion

requ

est b

y ve

hicl

e de

tect

ion

is p

rese

nt

N

orw

ay

Portu

gal

LCr5

47-C

om

4.2.

3 M

anua

l Req

uest

for A

ll Tr

acks

from

the

Loca

l Lev

el

Cro

ssin

g O

pera

tor

LCr5

55-R

eq

The

follo

win

g ac

tivat

ion

requ

est a

re p

erm

itted

to b

e re

mov

ed b

y a

man

ual

requ

est f

or a

ll tra

cks:

Finl

and

LCr5

57-R

eq

• a

man

ual a

ctiv

atio

n re

ques

t for

all

trac

ks fr

om th

e lo

cal l

evel

cr

ossi

ng o

pera

tor

Fi

nlan

d

LCr5

58-R

eq

An

activ

atio

n re

ques

t sha

ll be

rem

oved

if:

Fi

nlan

d LC

r559

-Req

a re

ques

t 'Re

ques

t dea

ctiv

atio

n-al

l tra

cks'

is re

ceiv

ed fr

om th

e le

vel

cros

sing

ope

rato

r

Finl

and

LCr4

27-C

om

4.2.

4 A

uxili

ary

Man

ual R

eque

st fo

r an

Indi

vidu

al T

rack

LCr5

60-R

eq

The

follo

win

g re

ques

ts a

re p

erm

itted

to b

e re

mov

ed b

y an

aux

iliar

y m

anua

l re

ques

t for

an

indi

vidu

al tr

ack:

Finl

and

Switz

erla

nd

LCr5

71-R

eq

• an

act

ivat

ion

requ

est b

y ve

hicl

e de

tect

ion

Fi

nlan

d Sw

itzer

land

LC

r572

-Req

a m

anua

l act

ivat

ion

requ

est f

or a

n in

divi

dual

trac

k

Finl

and

LCr5

63-R

eq

All

perm

itted

act

ivat

ion

requ

ests

on

the

appl

icab

le tr

ack

shal

l be

rem

oved

if:

Fi

nlan

d Sw

itzer

land

LC

r574

-Req

a re

ques

t 'Au

xilia

ry d

eact

ivat

ion-

indi

vidu

al tr

ack'

is re

ceiv

ed fr

om

the

sign

alle

r

Finl

and

Switz

erla

nd

LCr7

84-R

eq

4.2.

5 A

uxili

ary

Man

ual R

eque

st fo

r All

Trac

ks

LCr7

85-R

eq

The

follo

win

g re

ques

ts a

re p

erm

itted

to b

e re

mov

ed b

y an

aux

iliar

y m

anua

l re

ques

t for

all

track

s:

N

orw

ay

Pola

nd

LCr7

88-R

eq

• an

act

ivat

ion

requ

est b

y ro

ute

requ

est

N

orw

ay

Page 20: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

20

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

Pola

nd

LCr7

86-R

eq

• an

act

ivat

ion

requ

est b

y ve

hicl

e de

tect

ion

N

orw

ay

Pola

nd

LCr7

87-R

eq

• a

man

ual a

ctiv

atio

n re

ques

t for

an

indi

vidu

al tr

ack

N

orw

ay

Pola

nd

LCr7

89-R

eq

All

prot

ectin

g si

gnal

s of t

he le

vel c

ross

ing

shal

l be

set t

o di

spla

y a

'stop

' asp

ect i

f a

requ

est '

Aux

iliar

y de

activ

atio

n-al

l tra

cks'

is re

ceiv

ed fr

om th

e si

gnal

ler.

Po

land

LCr7

90-R

eq

All

perm

itted

act

ivat

ion

requ

ests

shal

l be

rem

oved

if a

ll th

e fo

llow

ing

cond

ition

s ar

e sa

tisfie

d:

N

orw

ay

Pola

nd

LCr7

91-R

eq

• a

requ

est '

Auxi

liary

dea

ctiv

atio

n-al

l tra

cks'

is re

ceiv

ed fr

om th

e si

gnal

ler

N

orw

ay

Pola

nd

LCr7

92-R

eq

• al

l pro

tect

ing

sign

als o

f the

leve

l cro

ssin

g di

spla

y a

'stop

' asp

ect

Po

land

LC

r796

-Req

all r

oute

s con

tain

ing

the

leve

l cro

ssin

g ar

e re

leas

ed

N

orw

ay

LCr7

99-R

eq

• al

l rou

te b

ody

TVP

sect

ions

in ro

utes

con

tain

ing

the

leve

l cro

ssin

g ar

e no

t 'oc

cupi

ed'

N

orw

ay

LCr7

97-R

eq

• no

act

ivat

ion

requ

est i

s pre

sent

Nor

way

LC

r798

-Req

an a

uxili

ary

rele

ase

timer

has

exp

ired

Nor

way

LC

r613

-Com

4.

3 D

eact

ivat

ion

by L

oss

of A

ctiv

atio

n C

ondi

tions

LCr6

14-R

eq

An

activ

atio

n re

ques

t for

the

leve

l cro

ssin

g sh

all b

e re

mov

ed if

the

cond

ition

s for

ge

nera

ting

the

activ

atio

n re

ques

t bec

ome

not s

atis

fied

befo

re th

e ve

hicl

e is

de

tect

ed a

s hav

ing

trave

rsed

the

leve

l cro

ssin

g.

Fi

nlan

d N

ethe

rland

s Po

land

Po

rtuga

l LC

r703

-Req

A

n ac

tivat

ion

requ

est f

or th

e le

vel c

ross

ing

shal

l rem

ain

pres

ent i

f the

con

ditio

ns

for g

ener

atin

g th

e ac

tivat

ion

requ

est b

ecom

e no

t sat

isfie

d be

fore

the

vehi

cle

is

dete

cted

as h

avin

g tra

vers

ed th

e le

vel c

ross

ing.

N

orw

ay

Switz

erla

nd

LCr6

15-R

eq

If a

rout

e th

at c

ause

d an

act

ivat

ion

requ

est b

ecom

es c

ance

lled,

the

corr

espo

ndin

g ac

tivat

ion

requ

est s

hall

be re

mov

ed:

Fi

nlan

d N

ethe

rland

s Po

land

Po

rtuga

l LC

r616

-Req

whe

n th

e ro

ute

beco

mes

rele

ased

Finl

and

Net

herla

nds

Pola

nd

Portu

gal

LCr7

28-R

eq

If a

n oc

cupa

ncy

that

cau

sed

an a

ctiv

atio

n re

ques

t bec

omes

not

'val

id fo

r

Finl

and

Page 21: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

21

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

activ

atio

n', t

he c

orre

spon

ding

act

ivat

ion

requ

est s

hall

be re

mov

ed:

Net

herla

nds

Pola

nd

Portu

gal

LCr7

29-R

eq

• im

med

iate

ly

N

ethe

rland

s Po

rtuga

l LC

r730

-Req

whe

n a

timer

for d

eact

ivat

ion

by lo

ss o

f act

ivat

ion

cond

ition

s ex

pire

s

Finl

and

LCr7

93-R

eq

• w

hen

a re

ques

t 'Au

xilia

ry d

eact

ivat

ion-

all t

rack

s' is

rece

ived

from

th

e si

gnal

ler

Po

land

LCr5

80-C

om

5 Sp

ecia

l Fun

ctio

ns

LCr5

81-C

om

5.1

Dis

ablin

g Le

vel C

ross

ing

Act

ivat

ion

LCr5

82-R

eq

The

activ

atio

n of

a le

vel c

ross

ing

shal

l be

disa

bled

if:

Fi

nlan

d LC

r583

-Req

a re

ques

t 'D

isab

le le

vel c

ross

ing'

is re

ceiv

ed fr

om th

e si

gnal

ler

Fi

nlan

d LC

r588

-Req

and

Fi

nlan

d LC

r589

-Req

no a

ctiv

atio

n re

ques

ts a

re p

rese

nt fo

r the

leve

l cro

ssin

g

Finl

and

LCr5

84-R

eq

If a

leve

l cro

ssin

g is

'dis

able

d':

Fi

nlan

d LC

r585

-Req

an a

ctiv

atio

n re

ques

t by

vehi

cle

dete

ctio

n sh

all n

ot a

ctiv

ate

the

leve

l cr

ossi

ng

Fi

nlan

d

LCr5

87-R

eq

• an

d

Finl

and

LCr5

86-R

eq

• th

e le

vel c

ross

ing

shal

l not

satis

fy th

e m

onito

ring

con

ditio

ns fo

r its

pr

otec

ting

sign

al

Fi

nlan

d

LCr5

90-R

eq

The

activ

atio

n of

a le

vel c

ross

ing

shal

l be

not '

disa

bled

' if:

Fi

nlan

d LC

r591

-Req

a re

ques

t 'En

able

leve

l cro

ssin

g' is

rece

ived

from

the

sign

alle

r

Finl

and

LCr7

31-C

om

5.2

Dis

ablin

g an

Act

ivat

ion

Req

uest

for a

n In

divi

dual

Tr

ack

LCr7

32-R

eq

An

activ

atio

n re

ques

t by

vehi

cle

dete

ctio

n fo

r an

indi

vidu

al tr

ack

shal

l be

'dis

able

d' if

:

Finl

and

LCr7

33-R

eq

• a

requ

est '

Auxi

liary

dea

ctiv

atio

n-in

divi

dual

trac

k' is

rece

ived

from

th

e si

gnal

ler

Fi

nlan

d

LCr7

34-R

eq

An

activ

atio

n re

ques

t by

vehi

cle

dete

ctio

n fo

r an

indi

vidu

al tr

ack

shal

l bec

ome

Fi

nlan

d

Page 22: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

22

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

not '

disa

bled

' if:

LCr7

35-R

eq

• a

requ

est ‘

Rem

ove

auxi

liary

dea

ctiv

atio

n-in

divi

dual

trac

k' is

re

ceiv

ed fr

om th

e si

gnal

ler

Fi

nlan

d

LCr7

36-R

eq

• or

Finl

and

LCr7

37-R

eq

• a

requ

est ‘

Requ

est a

ctiv

atio

n-in

divi

dual

trac

k' is

rece

ived

from

the

sign

alle

r

Finl

and

LCr7

38-R

eq

• or

Finl

and

LCr7

39-R

eq

• a

conf

igur

ed ti

mer

for r

e-en

ablin

g ac

tivat

ion

requ

ests

exp

ired

Finl

and

LCr7

40-R

eq

• or

Finl

and

LCr7

41-R

eq

• al

l act

ivat

ion

zone

s for

that

indi

vidu

al tr

ack

beco

me

not o

ccup

ied

Fi

nlan

d LC

r763

-Req

5.

3 D

isab

ling

Dea

ctiv

atio

n by

Veh

icle

Det

ectio

n

LCr7

66-R

eq

Dea

ctiv

atio

n by

veh

icle

det

ectio

n sh

all b

e di

sabl

ed o

n an

indi

vidu

al tr

ack

if:

N

orw

ay

Switz

erla

nd

LCr7

67-R

eq

• a

requ

est '

Mai

ntai

n ac

tivat

ion

afte

r fir

st tr

ain-

indi

vidu

al tr

ack'

is

rece

ived

from

the

sign

alle

r for

the

appl

icab

le tr

ack

Switz

erla

nd

LCr8

01-R

eq

• a

mai

n ro

ute

conf

igur

ed to

dis

able

dea

ctiv

atio

n by

veh

icle

det

ectio

n ha

s bee

n re

ques

ted

Nor

way

LCr7

68-R

eq

• an

d

Nor

way

Sw

itzer

land

LC

r769

-Req

an a

ctiv

atio

n re

ques

t by

vehi

cle

dete

ctio

n is

pre

sent

on

the

appl

icab

le tr

ack

N

orw

ay

Switz

erla

nd

LCr7

70-R

eq

The

activ

atio

n re

ques

t by

vehi

cle

dete

ctio

n sh

all n

ot b

ecom

e re

mov

ed b

y ve

hicl

e de

tect

ion

of th

e fir

st v

ehic

le le

avin

g th

e le

vel c

ross

ing

on th

e ap

plic

able

trac

k.

N

orw

ay

Switz

erla

nd

LCr8

02-R

eq

If th

e de

activ

atio

n by

veh

icle

det

ectio

n ha

s bee

n di

sabl

ed, t

he a

ctiv

atio

n re

ques

t by

veh

icle

det

ectio

n sh

all b

ecom

e re

mov

ed b

y:

N

orw

ay

Switz

erla

nd

LCr8

03-R

eq

• th

e se

cond

veh

icle

leav

ing

the

leve

l cro

ssin

g on

the

appl

icab

le tr

ack

N

orw

ay

Switz

erla

nd

LCr8

05-R

eq

• th

e se

cond

veh

icle

leav

ing

the

leve

l cro

ssin

g on

any

trac

k

Nor

way

Sw

itzer

land

LC

r617

-Com

5.

4 O

verr

idin

g Fa

iled

Crit

ical

Sta

te

LCr6

18-R

eq

A le

vel c

ross

ing

with

the

stat

e 'fa

iled

criti

cal'

shal

l sat

isfy

the

mon

itorin

g co

nditi

ons f

or it

s pro

tect

ing

sign

al if

:

Finl

and

Switz

erla

nd

Page 23: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

23

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

LCr6

19-R

eq

• a

requ

est '

Ove

rrid

e fa

iled

criti

cal s

tate

' is r

ecei

ved

from

the

sign

alle

r

Finl

and

Switz

erla

nd

LCr6

20-R

eq

The

over

ride

of th

e 'fa

iled

criti

cal'

stat

e sh

all s

atis

fy th

e m

onito

ring

cond

ition

s on

ly fo

r one

rout

e lif

e cy

cle.

Finl

and

Switz

erla

nd

LCr7

42-C

om

5.5

Leve

l Cro

ssin

g O

ut o

f Use

LCr7

43-R

eq

Whi

le a

leve

l cro

ssin

g is

det

ecte

d ou

t of u

se, t

he le

vel c

ross

ing

shal

l sat

isfy

the

mon

itorin

g co

nditi

ons f

or it

s pro

tect

ing

sign

al.

Fi

nlan

d

LCr5

92-R

eq

6 En

gine

erin

g C

onfig

urat

ion

Req

uire

men

ts

LCr5

93-R

eq

Con

figur

atio

n da

ta fo

r eac

h le

vel c

ross

ing

shal

l con

tain

:

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r594

-Req

all a

ctiv

atio

n zo

nes f

or e

ach

trac

k, d

irec

tion

and

rout

e ty

pe o

r sub

-ty

pe

Fi

nlan

d N

ethe

rland

s N

orw

ay

Pola

nd

Portu

gal

Switz

erla

nd

LCr5

95-R

eq

• al

l ava

ilabl

e ac

tivat

ion

requ

ests

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r596

-Req

all a

vaila

ble

deac

tivat

ion

requ

ests

Finl

and

Net

herla

nds

Nor

way

Po

land

Po

rtuga

l Sw

itzer

land

LC

r598

-Req

a tim

er fo

r lev

el c

ross

ing

reac

tivat

ion

see

LCr7

14-R

eq fo

r Fi

nlan

d

Page 24: Level Crossing - UIC · The operation of level crossing equipment (i.e., warning lights, barriers, activation points, deactivating functions) is not in the scope of this document.

LEVE

L C

RO

SSIN

G

Expo

rted

from

DO

OR

S-G

ENER

IS: 2

6.05

.200

8 2:

35

U

IC /

EU

RO

-IN

TE

RL

OC

KIN

G

Page

24

of 2

4

Iden

tifie

r

Com

men

t A

pplic

able

To

the

appl

icat

ion

of th

e tim

er

LCr5

99-R

eq

• a

sign

al d

elay

tim

er c

ompe

nsat

ing

for t

he sh

orte

r app

roac

h di

stan

ce

for e

ach

sign

al in

an

activ

atio

n zo

ne

see

LCr6

46-R

eq fo

r th

e ap

plic

atio

n of

the

timer

Finl

and

Portu

gal

LCr7

59-R

eq

• a

sign

al d

elay

tim

er c

ompe

nsat

ing

for t

he sh

orte

r app

roac

h di

stan

ce

for t

he p

rote

ctin

g si

gnal

in e

ach

activ

atio

n zo

ne

see

LCr7

58-R

eq fo

r th

e ap

plic

atio

n of

the

timer

Net

herla

nds

Pola

nd

LCr7

04-R

eq

• m

axim

um ti

me

of le

vel c

ross

ing

activ

atio

n w

ithou

t a w

arni

ng to

the

sign

alle

r

Finl

and

Net

herla

nds

Nor

way

Po

rtuga

l Sw

itzer

land

LC

r744

-Req

the

mon

itori

ng c

ondi

tions

app

lied

for t

he p

rote

ctin

g si

gnal

, if n

ot

appl

icab

le id

entic

ally

for a

ll si

gnal

s

Finl

and

LCr7

45-R

eq

• a

timer

for d

eact

ivat

ion

by lo

ss o

f act

ivat

ion

cond

ition

s due

to a

n oc

cupa

ncy

that

cau

sed

an a

ctiv

atio

n re

ques

t bec

omin

g no

t 'va

lid fo

r ac

tivat

ion'

see

LCr7

30-R

eq fo

r th

e ap

plic

atio

n of

the

timer

Finl

and

LCr7

46-R

eq

• a

timer

for r

e-en

ablin

g ac

tivat

ion

requ

ests

by

vehi

cle

dete

ctio

n fo

r an

indi

vidu

al tr

ack

see

LCr7

39-R

eq fo

r th

e ap

plic

atio

n of

the

timer

Finl

and

LCr8

00-R

eq

• an

aux

iliar

y re

leas

e tim

er fo

r rem

ovin

g al

l act

ivat

ion

requ

ests

Nor

way