LEVEL CROSSING PROJECT
as part of theRAILWAY SAFETY PROGRAMME
PRESENTED BY
CONOR MCGUINNESS
SENIOR PROJECTS MANAGER
![Page 2: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/2.jpg)
LEVEL CROSSING PROJECTLEVEL CROSSING PROJECT
1.1. INTRODUCTIONINTRODUCTION
2.2. DEVELOPMENT OF RISK ASSESSMENT MODELDEVELOPMENT OF RISK ASSESSMENT MODEL
3.3. COLLECTION OF DATA FOR MODELCOLLECTION OF DATA FOR MODEL
4.4. RISK ASSESSMENT RESULTSRISK ASSESSMENT RESULTS
5.5. STRATEGY FOR INVESTMENT PROGRAMME STRATEGY FOR INVESTMENT PROGRAMME
6.6. METHODOLOGYMETHODOLOGY
7.7. EXAMPLES OF COMPLETED PROJECTSEXAMPLES OF COMPLETED PROJECTS
8.8. PROGRESS TO DATEPROGRESS TO DATE
9.9. FUTURE DEVELOPMENTSFUTURE DEVELOPMENTS
![Page 3: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/3.jpg)
1. INTRODUCTION1. INTRODUCTION
• OVER 2500 CROSSINGS ON ALL LINES
INCLUDING CLOSED LINES
• OVER 2000 CROSSINGS ON USED LINES
• 1600 CROSSINGS ON PASSENGER LINES
• 85% OF CROSSINGS ARE USER WORKED
CROSSINGS
![Page 4: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/4.jpg)
TYPES OF CROSSINGSTYPES OF CROSSINGS
• USER WORKED – THE PERSON USING THE
CROSSING HAS TO OPEN AND CLOSE THE GATES
THEMSELVES EACH TIME THE CROSSING IS USED.
NO RAILWAY SIGNALS LINKED TO THESE
CROSSINGS
• RAILWAY WORKED – THESE CROSSINGS ARE
AUTOMATICALLY OPERATED BY THE PASSAGE OF
TRAINS OR MANNED BY RAILWAY STAFF WHO
OPEN AND CLOSE THE GATES FOR EACH
MOVEMENT
![Page 5: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/5.jpg)
Field Type CrossingField Type Crossing
![Page 6: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/6.jpg)
Occupation Type CrossingOccupation Type Crossing
![Page 7: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/7.jpg)
Occupation Type Crossing on Public roadOccupation Type Crossing on Public road
![Page 8: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/8.jpg)
Crossings manned by Railway staff Crossings manned by Railway staff ––C/CX/CNC/CX/CN
![Page 9: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/9.jpg)
Automated Crossings Automated Crossings –– Automatic Half Barrier Automatic Half Barrier (AHB(AHB))
![Page 10: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/10.jpg)
Automated Crossings Automated Crossings -- 4 Barrier monitored by 4 Barrier monitored by CCTV(CCTV)CCTV(CCTV)
![Page 11: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/11.jpg)
Automated Open Crossing Automated Open Crossing –– No BarriersNo Barriers
![Page 12: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/12.jpg)
2. DEVELOPMENT OF RISK ASSESSMENT MODEL2. DEVELOPMENT OF RISK ASSESSMENT MODEL
National averages for crossing type• Average vehicle /
train utilisation• Average historic
safety performance
National averages for crossing type• Average vehicle /
train utilisation• Average historic
safety performance
Crossing specific data• Utilisation• Risk factors
– condition– views– gates left open– train speed
Crossing specific data• Utilisation• Risk factors
– condition– views– gates left open– train speed
LEVEL CROSSING
MODEL
LEVEL CROSSING
MODEL
OUTPUTS PREDICTED
• Accident rate• Fatality rate• Individual risk
(regular user)
OUTPUTS PREDICTED
• Accident rate• Fatality rate• Individual risk
(regular user)
![Page 13: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/13.jpg)
• The basis of the model is Fault Tree whose Top
Event is “train - vehicle collision”, and an Event
Tree showing consequences of a collision event
Risk factors: Affecting chanceof user error
– Incentive to take risk– Insufficient information– Unable to correct error in time– Low familiarity with task
Risk factors: Affecting chanceof user error
– Incentive to take risk– Insufficient information– Unable to correct error in time– Low familiarity with task
Train - VehicleCollision
Train - VehicleCollision
VehicleUser
Consequences
VehicleUser
Consequences
PassengerConsequences
Severity
PassengerConsequences
Severity
FatalityFatality
No FatalityNo Fatality
HighHigh
MediumMedium
LowLow
ANDAND
Numberof UsersNumberof Users
ProbError by
User
ProbError by
User
ProbTrain
Approach
ProbTrain
Approach
Event Tree
Faul
t Tre
e
![Page 14: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/14.jpg)
3. MEASUREMENT OF THE PROBLEM3. MEASUREMENT OF THE PROBLEM
• Need to look at condition and use of
every crossing
• Site Visit Form developed to record
similar data for each type of crossing
• All crossings visited in 1998 and data
collected
![Page 15: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/15.jpg)
User Worked Crossings User Worked Crossings –– Data Data collectedcollected
• Type of users -familiar
• Type of usage- regular, seasonal
• Condition of crossing – views, surface,
gradients
• Types of vehicles using crossing
• Type of railway traffic- speeds etc.
![Page 16: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/16.jpg)
Railway worked crossingsRailway worked crossings-- Data collectedData collected
• Approach road – speed, width, view of
crossing
• Crossing location-bend, close to junction
• Visibility – sun dazzle, fog
• Ability to stop
• Road usage
• Railway usage
![Page 17: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/17.jpg)
![Page 18: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/18.jpg)
![Page 19: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/19.jpg)
Example of Risk Assessment Model
OP-- User Worked Crossing on Public Road
![Page 20: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/20.jpg)
1 User Characteristics
1.1 Describe the majority of road user types at the crossing.
1.2 Is there heavy seasonal use of the crossing ?
1.3 Are gates left open a known problem at the crossing ?
Regular / Familiar
Seasonal use
Yes, Frequent
![Page 21: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/21.jpg)
2 Crossing Characteristics
2.1 Are the crossing user's views of the railwayline poor ?
2.2 Is the crossing surface poor ?
2.3 Is there a gradient across the crossing ?
2.4 Are there additional factors which could worsen the effects of a train/vehicle collision?
2.5 Is fog a problem at the crossing?
No
Adequate
Adequate
i) e .g. o bs truc tio ns limiting view o f line o r views les s than '11' s eco nds ;ii) take tra in s peed into acco unt.
e .g. lo w leve l o f fill o r lo o s e fill.
P o tentia l fo r gro unding o r impeding vehic le mo vement.
Adequate
Up S ide Down S ide
e.g. embankment, co mplex track layo ut
No
Some problem
![Page 22: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/22.jpg)
3 Road Utilisation
3.1 Estimate the total average daily road vehicle utilisation (sum of both directions).
45.
3.2 Estimate the total average daily pedestrian utilisation (sum of both directions).
0.
3.3How many vehicles under 3.1 are laden buses?
3.4 Are tractors or farm machinery used on the crossing ?
3.5 Are tailbacks across the crossing a problem?
Yes
Take into acco unt va ria tio ns due to time o f day and s eas o ns .
i) Take into acco unt varia tio ns due to time o f day and s eas o ns .ii) Do no t inc lude c ro s s ings o n fo o t during vehic le c ro s s ings .
Take into acco unt va ria tio ns due to time o f day and s eas o ns .
e .g. if a ro ad junc tio n o r turning may res tric t the us er's exit fro m the c ro s s ing
(O,OP and OP* only)
No problem No problem
Up S ide Down S ide
![Page 23: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/23.jpg)
4 Railway Utilisation
4.1 Estimate the total average daily number of laden passenger trains through the crossing.
28.
4.2 Estimate the total average daily number of rail movements, other than laden passenger trains,
9.
through the crossing.
4.3 Estimate the highest train speed at the level crossing. > 50 mph
Take into acco unt varia tio ns due to time o f day and s eas o ns .
![Page 24: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/24.jpg)
Output from Risk Assessment Output from Risk Assessment ModelModel
OP ResultsOP Results
![Page 25: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/25.jpg)
1 Crossing Fatality Rates
Scientific Format
Standard Format
Vehicle User Fatalities (per year) 1.75E-03 0.00175
Pedestrian Fatalities (per year) 9.08E-05 0.0000908
Total Fatalities (per year) 1.84E-03 0.00184
![Page 26: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/26.jpg)
2 Individual Risk of Fatality
Scientific Format
Standard Format
Risk 1 in ...
Individual Risk of Fatality to a Regular Vehicle User (per year)
5.32E-05 0.0000532 18,800
Individual Risk of Fatality to a Regular Pedestrian User (per year)
6.91E-07 0.0000007 1,450,000
![Page 27: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/27.jpg)
3 Collision Frequency
Scientific format
Standard Format
Frequency of Train/Vehicle Collisions (per year)
4.55E-03 0.00455
Frequency of Laden Passenger Train/Vehicle Collisions (per year)
3.45E-03 0.00345
Severity Factor Medium
![Page 28: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/28.jpg)
4 Graph of Crossing Fatality Rates
Vehic le Us er P edes trian Us er To ta l
Average for crossingtypeThis crossing
1 in 100
1 in 1000
1 in 10
1 in 10,000,000
1 in 1,000,000
1 in 100,000
1 in 10,000
![Page 29: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/29.jpg)
5 Graph of Individual Risk of Fatality for a Regular User
Vehic le Us er P edes trian Us er
Average for crossing type
This Crossing
1 in 100
1 in 1000
1 in 10,000,000
1 in 1,000,000
1 in 100,000
1 in 10,000
![Page 30: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/30.jpg)
4. RISK ASSESSMENT RESULTS4. RISK ASSESSMENT RESULTS
• Risk Acceptability criteria established in
line with international norms
• Crossings to be prioritized based on
results
• High Risk crossings primarily user
worked.
![Page 31: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/31.jpg)
• 4
Results of Risk Assessment programme
Results of Risk Assessment programme
Crossings requiring priority
investment
Crossings requiring priority
investment
Crossings not requiring priority
investment
Crossings not requiring priority
investment
CRITERIA
RISK
ACCEPTABILITY
![Page 32: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/32.jpg)
• 4
Either Individual risk of fatality for regular users ≥ 1 in 10,000 per annum
Or Divisional Engineer identifies factors giving intolerable situation
Crossing requires mitigation – "BLACK AREA".
Either Individual risk of fatality for regular user < 1 in 10,000 but ≥ 1 in 20,000 per annum
Or Collision rate ≥ 1 in 100 years
Or Crossing is in poor maintenance condition
Crossings requiring further evaluation - "GREY AREA".
Both Individual risk of fatality for a regular user < 1 in 20,000 per annum
And Collision rate < 1 in 100 years
Crossing currently not requiring mitigation on risk grounds
![Page 33: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/33.jpg)
• 4
“Black Area”“Black Area”
“Grey Area”“Grey Area”
“Black Area”Require mitigation
on risk grounds
“Black Area”Require mitigation
on risk grounds
“White Area”Do not
currently require priority mitigation on risk grounds
“White Area”Do not
currently require priority mitigation on risk grounds
Evaluation FactorsEvaluation Factors
• small number of users with higher than average number traverses
•cattle•poor condition• long crossing time compared to view time
•peaky seasonal use•peaky daily use•vulnerable groups•UWC is a short cut• crossing difficult to operate• train speed >75mph•hazardous goods
•small number of users with higher than average number traverses
•cattle•poor condition• long crossing time compared to view time
•peaky seasonal use•peaky daily use•vulnerable groups•UWC is a short cut• crossing difficult to operate• train speed >75mph•hazardous goods
![Page 34: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/34.jpg)
Ranking the CrossingsRanking the Crossings
• Priority Rating given to all ‘black’ crossings
• Priorities range from 0 to 15
• Priorities based on combination of 2 factors
• Individual risk of fatality to a regular user
per annum
• Frequency of accidents per annum
![Page 35: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/35.jpg)
Priority Score 1 Priority Score 1 ––Individual RiskIndividual Risk
1-Below 1 in 100,000
2-1 in 100,000 to 1 in 20,000
3No1 in 20,000 to 1 in 10,000
4Yes1 in 20,000 to 1 in 10,000
9-1 in 10,000 to 1 in 2000
10-> 1 in 2,000
Priority Score 1Additional Factors
give rise for concern
Individual Risk of Fatality
for Individual User - Range
![Page 36: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/36.jpg)
Priority Score 2 Priority Score 2 ––Collision FrequencyCollision Frequency
1<0.005 per year
20.0005 to 0.001 per year
30.001 to 0.005 per year
40.005 to 0.01 per year
5>0.01 per year
Priority Score 2Predicted Collision
Frequency – Range
Priority Score = Priority Score 1 + Priority Score 2 ,
Max =15 Score of 10 or more indicates an intolerable risk
![Page 37: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/37.jpg)
Black Crossings by TypeBlack Crossings by Type
» Total 608
1141
131 FieldOccupationAttendedAutomatic
424
![Page 38: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/38.jpg)
5. 5. STRATEGY FOR INVESTMENT PROGRAMMESTRATEGY FOR INVESTMENT PROGRAMME
• AIM: To reduce risk to user at all
crossings to an acceptable level
• FOCUS ON: Highest Risk crossings
and busiest lines first
• METHOD: To eliminate as many
crossings as possible
![Page 39: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/39.jpg)
Additional requirementsAdditional requirements
• Close all unprotected crossings on double
track lines- Dublin-Cork, Dublin-Belfast,
DART
• Focus on other high speed, high traffic
density lines – Portarlington-Athlone,
Limerick – Limerick junction
• Avail of opportunities to close other
crossings
![Page 40: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/40.jpg)
ResourcesResources
• Project team – in house – Project
Manager, engineers, technician
• Design team – external for construction
works/ planning applications/site works
• Property Surveyors/negotiators
• Solicitor to draft legal agreements
• Part time financial & planning resources
![Page 41: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/41.jpg)
6 METHODOLOGY6 METHODOLOGY
• All crossing closures to be reached by agreement
as no compulsory powers to close crossings
• Where works involved –negotiations with users,
design of works and tender phase and planning
applications proceeding in parallel
• Programme needs to be flexible to substitute
other crossings if progress delayed or no
agreement possible
![Page 42: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/42.jpg)
Solutions consideredSolutions considered
• Land search to check if ownership is split
• Buy rights to crossing
• Buy cross-track property (resale)
• Provide alternative access
• Land swaps
• Protect crossing (gates, signals)
• Bridge or underpass
• Upgrade, where appropriate
![Page 43: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/43.jpg)
![Page 44: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/44.jpg)
Need to Follow the Paper trailNeed to Follow the Paper trail
• Legal Process to be completed by user
and IE and CIE Boards
• Legal Rights to be given up
• Paperwork flow to be managed
• Solicitor must be involved on both sides if
land is involved
• New rights of way need to be mapped and
registered
![Page 45: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/45.jpg)
How A Crossing is ClosedHow A Crossing is Closed
• Visit Crossing User –assess needs• Check folio in Land registry• Reach agreement on closing crossing• Send formal offer letter outlining terms• User agrees terms• Lodge planning application if required• Fast track approval where compensation/
land purchase/ works below certain level• High Cost closures must be approved by
the Board
![Page 46: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/46.jpg)
How A Crossing is Closed(2)How A Crossing is Closed(2)
• Brief Solicitor on terms agreed
• Solicitor drafts closure documents & sends to
Users Solicitor
• Cheque requisitioned –sent to Users Solicitor
• Solicitor checks title to land being purchased
• User signs closure documents
• If works required, works can now commence
• Crossing physically closed – money released
![Page 47: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/47.jpg)
Time for CompletionTime for Completion
• For Right of Way only < 2 months
• 6 months min if land involved
• 12-18months where works are involved as land
purchase and planning permission usually needed
• Up to 2 years or longer if probate has to be taken out
on land
• Taking out Probate always involves payment of Tax
• Timescale is completely dependent on Users Solicitor
looking at documents and contacting his client
![Page 48: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/48.jpg)
7. EXAMPLES OF COMPLETED PROJECTS7. EXAMPLES OF COMPLETED PROJECTS
• XC117-121 –overbridge & cattlepass
• XA21 – Land deal
• XB12 -5 span overbridge Belfast line
• XR 7 & 9- 2 underpasses on DART line
• XW132/4/5 -2 underpasses & 800m
access road
• XA72-3 Public road underpass
• Various others
![Page 49: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/49.jpg)
OB236a CORK to replace 6 Field crossings
![Page 50: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/50.jpg)
UB236b Cork line - Cattle pass at XC119
![Page 51: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/51.jpg)
XA21 –land purchased to close crossing 35a €317,000
![Page 52: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/52.jpg)
Construction of OB99a to replace XB12 Construction of OB99a to replace XB12 Reillys Belfast lineReillys Belfast line
• Location first visited in April 1999
• Survey carried out –single span designed
• Design tendered in Feb 2000 –cost €1.55m
• Scheme did not go ahead due to high cost
• Alternative Access sought – agreed in principle
with 2 landowners Nov 2000
• Unable to finalise agreement for this access
![Page 53: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/53.jpg)
XB12 Belfast –layout plan for OB 99a
![Page 54: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/54.jpg)
Construction of OB99a to replace XB12 Construction of OB99a to replace XB12 Reillys Belfast line (2)Reillys Belfast line (2)
• Agreement reached with different landowner for
access route from old N1
• Access route rejected by landowners
• Purchase of 175 acre farm and residences
rejected
• Bridge redesigned as 5 span bridge
• Scheme retendered October 2001-cost €1.46m
• Board deferred proposal Dec 2001-cheaper
options sought
![Page 55: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/55.jpg)
![Page 56: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/56.jpg)
Construction of OB99a to replace XB12 Construction of OB99a to replace XB12 Reillys Belfast line (3)Reillys Belfast line (3)
• Board paper prepared considering whole life cost of all options considered
• Options considered : - 3 different access routes, underbridge, overbridge, farm purchase, CCTV crossing
• Acceptability of options outlined in paper• Bridge cheapest acceptable solution
based on whole life cost• Board approved bridge proposal Feb 2002• Main Landowners signed up 19th April
2002
![Page 57: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/57.jpg)
![Page 58: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/58.jpg)
Construction of OB99a to replace XB12 Belfast line – completed May 2003
![Page 59: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/59.jpg)
Construction of OB99a Belfast line
![Page 60: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/60.jpg)
• Construction of OB 99a Belfast line
![Page 61: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/61.jpg)
OB99a Belfast line – XB12 Reillys in foreground
![Page 62: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/62.jpg)
Construction of OB99a to replace XB12 Construction of OB99a to replace XB12 Reillys Belfast line (4)Reillys Belfast line (4)
• Final clearance to go on site 4th June 2002
• Contract signed with SIAC 10th June 2002 at
€1.48m (1.5% increase)
• Works commenced on site 4th July 2002
• Bridge beams over track lifted in Oct 2002
• Bridge open 19th May 2003- crossing closed
• Works complete 27th May 2003- final cost €1.645
• Project Cost €1.902m -5.9% over budget
![Page 63: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/63.jpg)
OB99a Belfast line –Complete May 2003
![Page 64: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/64.jpg)
OB99a Why a 5 span bridge ?OB99a Why a 5 span bridge ?
• Poor Ground conditions
• Embankment would have taken 6 months to settle
or required ground improvement at additional
cost
• Too much land taken up by single span
embankment –user acceptance
• Potential Safety issue due to large volumes of fill
to be drawn across crossing
• 5 span €90k cheaper at tender than single span
![Page 65: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/65.jpg)
![Page 66: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/66.jpg)
XR7 & 9 Woodbrook Golf club DART lineXR7 & 9 Woodbrook Golf club DART line
• 2 underpasses to be constructed – one suitable for machinery(4.5m x 4.5m), one for golfers only
• Construction of 2 underpasses were o be let as one contract – actually let as 2 separate contracts
• 3 temporary crossings of Dart line to be constructed for construction traffic and to keep golf links in operation
• Overhead electrification to be dealt with – isolations required at night for certainworks
![Page 67: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/67.jpg)
XR7/9 Woodbrook Golf club DART line (2)XR7/9 Woodbrook Golf club DART line (2)
• Services to be exposed, protected and supported during construction – live38 kv, ESAT. Signalling cables
• 38kv power supply switched off for some works
• 300mm gas main to be diverted for construction and rediverted post construction
• DART services to be cancelled for installation of underpasses
• Pumped drainage system to be installed
![Page 68: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/68.jpg)
XR7/9 Woodbrook Golf club DART line (3)XR7/9 Woodbrook Golf club DART line (3)
• Construction works had to be screened off from golf club
• Golf club set up liaison committee to ‘approve’ design details
• Clerk of Works appointed by Golf club to supervise works
• Extra drainage works carried out post completion to divert track drainage away from pumped system
• Construction cost €1.438m against tender of €1.014 due to splitting of contracts and accommodation works carried out by contractor
![Page 69: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/69.jpg)
![Page 70: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/70.jpg)
![Page 71: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/71.jpg)
![Page 72: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/72.jpg)
![Page 73: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/73.jpg)
![Page 74: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/74.jpg)
![Page 75: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/75.jpg)
![Page 76: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/76.jpg)
![Page 77: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/77.jpg)
![Page 78: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/78.jpg)
XW132/4/5 Ryans & KnockwilliamXW132/4/5 Ryans & Knockwilliam
• Construction of 2 underpasses –one for cattle, one for machinery
• Construction of 800m of access roads parallel beside railway
• Access roads linked both underpasses and 4 landowners fields
• 3 Crossings closed• Drainage – major issue
![Page 79: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/79.jpg)
XW137 Knockwilliam – rockbreaking for cattlepass
![Page 80: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/80.jpg)
XW137 Knockwilliam –installation of cattlepass
![Page 81: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/81.jpg)
XW137 Knockwilliam –fitting units together
![Page 82: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/82.jpg)
XW132/4/5 –construction of access road beside track
![Page 83: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/83.jpg)
XW132/4/5 Access road parallel to track
![Page 84: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/84.jpg)
XW132/4/5 _flooding of lands at Ballyhale
![Page 85: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/85.jpg)
Construction of UB53a at Erry Construction of UB53a at Erry --Portarlington/Athlone linePortarlington/Athlone line
• Closure of 2 unattended public road crossings
• Largest underpass yet constructed 7.5m wide by 4.8m box
• New public road constructed to link to existing road network
• Separate access purchased for overheight vehicles
![Page 86: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/86.jpg)
![Page 87: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/87.jpg)
Construction of Underpass at Erry Portarlington/Athlone line October 2001
![Page 88: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/88.jpg)
Installation of underpass at Erry Portarlington/Athlone line October 2001
![Page 89: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/89.jpg)
![Page 90: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/90.jpg)
![Page 91: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/91.jpg)
![Page 92: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/92.jpg)
8. PROGRESS TO DATE8. PROGRESS TO DATE
• 473 Crossings closed out of 2000
• 130 + land purchases, 1,060 acres
purchased
• 20 - overbridges built
• 20 - underbridges built
• 38 access roads built or purchased– 3 for
public road crossings
![Page 93: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/93.jpg)
Cost of ProgrammeCost of Programme
• Programme costed in September 1998
• Total Cost of Programme €136m
• €112m to be spent in first 5 years 1999-
2003
• Expenditure at end of 2003 €71.8m spent
• €82.9 to be spent in second 5 years 2004-
2008 -€17.2 spent to end of 2005
![Page 94: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/94.jpg)
Crossings Closed to dateCrossings Closed to date-- Feb 2006Feb 2006
Total Closures 473
• Release 149
• Split Ownership 86
• Land deal 132
• Bridge 68
• Alternative Access 38
![Page 95: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/95.jpg)
Solutions to date Solutions to date -- Feb 2006Feb 2006
3831
37
132149
86
Access RoadsUnderbridgesOverbridgesLand DealsReleaseSplit
![Page 96: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/96.jpg)
High Speed /High Density routesHigh Speed /High Density routes
• Dublin/Cork 72 closed 40 left
• Dublin/Belfast 8 closed 2 left
• Portarlington/Athlone 62 closed 22 left
• DART lines – 2 closed, 1 unsignalled left
• Limerick/Limerick jn. 13 closed 38 left
![Page 97: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/97.jpg)
ProgrammeProgramme RisksRisks
• User can always change mind until legal agreement
signed & does.
• 3 pronged approach where works involved
- Progress negotiations, submit planning application,
develop design to tender at the same time
• Principle risk – user changes mind, effort wasted
• Be prepared to walk away if price gets too high
• Target extra crossings as many deals don’t get finished
• Land deals always take more time to complete
![Page 98: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/98.jpg)
Underpass at XR32 Kellys Wexford line –Completed 2000
![Page 99: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/99.jpg)
UB157b Galway line -Teagasc Athenry
![Page 100: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/100.jpg)
Overbridge at Bunnahinly to replace XA114/5/6
![Page 101: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/101.jpg)
Pouring concrete to foundations Clonshanny –XA74-77 Port/Athlone
![Page 102: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/102.jpg)
Construction of Reinforced Earth abutment at XA30-31 Port/Athlone
![Page 103: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/103.jpg)
Bridge nearing completion at XA30-31 Port/Athlone
![Page 104: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/104.jpg)
Overbridge at Stonepark 110 1/4mls Sligo line
![Page 105: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/105.jpg)
OB 347a Cork line to replace XC228 Hanlons
![Page 106: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/106.jpg)
9. Future Strategy9. Future Strategy
• Crossings getting harder to close – deals more expensive and more complicated
• Railway Safety Act 2005 gives powers to close crossings and acquire land compulsorily
• Implementation of ‘Draft Guidelines for the Design of Railway Infrastructure…’ may limit speed through user worked crossings to 130km/hr
• Consider use of Railway Works order if reopening closed lines
![Page 107: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/107.jpg)
![Page 108: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/108.jpg)
![Page 109: LEVEL CROSSING PROJECT - Engineers Ireland · level crossing project as part of the railway safety programme presented by conor mcguinness senior projects manager](https://reader031.fdocuments.us/reader031/viewer/2022022508/5ad1fcec7f8b9a86158c97bd/html5/thumbnails/109.jpg)