Lean Project Delivery Fundamentals Workshop
Become certified by LCI-Canada in Lean Project Delivery Fundamentals
[email protected] or more info www.leanlab.ca
![Page 2: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/2.jpg)
Traditional Lean Project Delivery
Over Budget, Late NetZero, Early Completion
![Page 3: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/3.jpg)
Can we learn from Toyota?
How much success?
![Page 4: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/4.jpg)
05/03/2023 LCI-C Overview 4
Is there a LEAN for Construction?
Greg Howell
Glen Ballard
2002
![Page 5: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/5.jpg)
LCI-C Certification Program
WHY not provide Training in 3 levels? 1. Lean Fundamentals (Beginner)
– Make the Business Case for LPD– Understand the Basics– Exam for Certification
2. Lean Coordinator (Learning to Swim)– Competency in Lean Systems and Practices– Experience implementing LPD on projects– Exam/Document Experience/References
3. Lean Facilitator (Leading Others)– Competency to lead teams in the implementation of LPD Systems– Experience implementing LPD systems on three projects– Exam/Document Experience/References
![Page 6: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/6.jpg)
Ok, Lets start with ...
Business Caseo Why Lean?o What is Possible ? o Show me the Money (Case Studies)
![Page 7: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/7.jpg)
A way of THINKING?... Culture? … System?
![Page 8: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/8.jpg)
Build a Good Foundation
Principles and Practiceso Valueo Flowo Efficiency
![Page 9: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/9.jpg)
Moneyball
What does Beane know about Lean?
Billy Beane Keynote at LCI San Francisco
![Page 10: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/10.jpg)
![Page 11: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/11.jpg)
We also need to understand Lean works for all Projects
• Design/Bid/Build Least potential for value success
• Design/Build Fair opportunity for value success
• Construction Manager Fair opportunity for value success
• P3 High potential
• Lean/Integrated Project Delivery Greatest potentialCharles Pankow Foundation and Construction Industry Institute USA Report
Design-Tender-Bid Developer/CM
![Page 12: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/12.jpg)
After Lean: LEED Gold On Budget• Save $1.6M plus used $600k of contingency
• Key: Wood to concrete structure
• Amazing results: Still delivering LEED Gold 50% less energy
with a $100k contingency
It takes a TEAM Effort
Before Lean: $2.2M Over
![Page 13: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/13.jpg)
![Page 14: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/14.jpg)
Next … Send the TEAM to BOOT CAMP
![Page 15: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/15.jpg)
![Page 16: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/16.jpg)
How does Variability affect work flow?
Next … Dice Game Simulation
![Page 17: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/17.jpg)
We need to lean how to SEE the Seven + 1 Wastes
+ under utilized human capital
![Page 18: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/18.jpg)
LPD 101: Lean Project Delivery Fundamentals
• Business Caseo Why Lean?o What is Lean? o Does it work for the Building Industry ?
• Hands on Simulationso Airplane Game Simulation 1 & 2o Dice Game o Lean Fundamentals
• Lean Project Delivery Systems Overviewo Last Planner Systemo Target Value Designo Pull Planning
![Page 19: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/19.jpg)
Next Workshop Jan 27th SaskatoonLast Planner System BOOT CAMP
![Page 20: Level 1Lean Project Delivery Fundamentals Workshop](https://reader036.fdocuments.us/reader036/viewer/2022062522/5877358e1a28ab342e8b4785/html5/thumbnails/20.jpg)
Overview [www.lcicanada.ca]