Lessons learned in Delayed Coking units by the use of nuclear level technology. David Williams Senior Applications Engineer VEGA Americas [email protected] 1

Transcript of Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking...

Page 1: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Lessons learned in Delayed Coking units

by the use of nuclear level technology.

David Williams Senior Applications EngineerVEGA [email protected]

1

Page 2: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Coke Drum Level Measurement

Page 3: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

− Considerable difference between Neutron Back Scatter (NBS) and continuous

NBS is point level

− Measures difference in densities of hydrogen content

− High foam height and low hydrogen density will give the same output

as a low foam height and high hydrogen density.

Continuous measures anything that get between the source and detector

Differences

Page 4: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

NBS tracks the increase of the density of hydrogen presentCould be significant difference in readings between the NBS continuous level reading

‒ Due to the thickness of the foam layer which could be many feet thick at times and thin at other times

‒ Foam layers varies with many factors, such as

‒ Type of crude

‒ Fill rate (Charge rate, cycle time)

‒ Operational procedures

‒ Operating Temperature and Pressure

‒ Recirculation Ratio

‒ How anti-foam is injected and how long

Differences

Page 5: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

�Continuous level tracks top of foam layer

�NBS tracks level at some point where foam density increases

�Continuous Level vs. NBS

Page 6: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

�Continuous Level vs. NBS

Page 7: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Levels showing “Foam Dome”

�Fill with foam (dome surface) �Fill with water (flat surface)

Page 8: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

�COKE DRUM CYCLE USING GAMMA TRANSMISSION SENSORS

�Typical Coke Drum Cycle

�This graph shows a foam up after the switch and how the NBS responds vs how the continuous level responds. Switching of the drum occurs at Point 1. The NBSs (Purple, Red and Brown) starts a downward trend since the foam is increasing in height and not in hydrogen density. The same amount of hydrogen being spread over a larger area will decrease the overall hydrogen density in front of the NBSs.

�1

Page 9: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Catching a Foamover

Page 10: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point
Page 11: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

NBS output compared to Gamma Density

Page 12: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

�COKE DRUM CYCLE USING GAMMA TRANSMISSION SENSORS

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4 5 6 7 8 9 10

Vapor Density

�Vapor Density during the coking stays relatively constant except towards the end of the cycle when the level is at its highest. This is where it starts to measure how much particulate matter is being carried over. Gases velocities are high enough to entrain matter with them and overcome gravity. Switch out of the drum happens at Point 1.

�1

Page 13: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Repeatability from Cycle to Cycle

�DRUM 2

Page 14: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Repeatability from Cycle to Cycle

�DRUM 1

Page 15: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Buildup in vapor space

Page 16: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Buildup in vapor space

Page 17: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Level increase from Tangent to Tangent (not linear)

�All level gauges are 22’ long (all equal lengths)

Page 18: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Level increase from Tangent to Tangent (not linear)

�3 hrs �4 hrs

�All level gauges are 22’ long (all equal lengths)

Page 19: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Level increase from Tangent to Tangent (not linear)

�3 hrs �4 hrs

�All level gauges are 22’ long (all equal lengths)

�12 hrs

Page 20: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Caustic Overtreatment - Before

Page 21: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Caustic Overtreatment - During

Page 22: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Caustic Overtreatment - After

Page 23: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Gauge Arrangement

� Drum1 Drum 2 Drum 3 Drum 4

Page 24: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Drum 1

Page 25: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Drum 2

Page 26: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Drum 3

Page 27: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Drum 4

Page 28: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

Vapor Flow

Page 29: Lessons learned in Delayed Coking units by the use of ... · Lessons learned in Delayed Coking units by the use of nuclear level technology. ... Switching of the drum occurs at Point

We have learned many things about the internal dynamics of fluid levels inside coke drums by the use of nuclear level and density technology.

Some things appear to be a “gauge issue” when in fact it is the process itself.

Conclusion