Jun 20, 2022 1 LESSONS FROM THE IMPLEMENTATION OF LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF THE APRM NATIONAL PROGRAMMES OF ACTION ACTION Afeikhena Jerome Governance Assessment for Accountable Governance Assessment for Accountable Politics Politics Windhoek, Namibia Windhoek, Namibia 2 to 5 November 2009 2 to 5 November 2009

description

LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome Governance Assessment for Accountable Politics Windhoek, Namibia 2 to 5 November 2009. Overview of the APRM. - PowerPoint PPT Presentation

Transcript of LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

Page 1: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

Apr 21, 2023 1

LESSONS FROM THE IMPLEMENTATION LESSONS FROM THE IMPLEMENTATION

OF THE APRM NATIONAL OF THE APRM NATIONAL PROGRAMMES OF ACTIONPROGRAMMES OF ACTION

Afeikhena Jerome

Governance Assessment for Accountable Governance Assessment for Accountable PoliticsPolitics

Windhoek, NamibiaWindhoek, Namibia

2 to 5 November 20092 to 5 November 2009

Page 2: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

2

Overview of the APRM Africa entered the new millennium with optimism and a commonly derived and broadly supported roadmap of how to overcome the development challenges of the last decades that were exacerbated by a range of factors including conflict, institutional decay, leadership and managerial deficit, endemic corruption and economic mismanagement.

The Africa’s agenda for renewal and overcoming these development deficits includes advancing the basic values of democratization and good governance, which together constitute the key requirements for sustainable development.

The APRM which is turning out to be the most innovative aspect of NEPAD is a self-monitoring instrument voluntarily agreed to by member states of the African Union.

Overview

Page 3: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

3

Overview of the APRM

Its primary purpose is:“To foster the adoption of policies, standards and practices that lead to political stability, high economic growth, sustainable development and accelerated sub-regional and continental economic integration through sharing of experiences and reinforcement of successful and best practice, including identifying deficiencies and assessing the needs of capacity building.”

It is unprecedented in scope and mandate, even compared to the OECD that invented modern Peer Review. It covers four broad areas, namely; Democracy and Political Governance; Economic Governance and Management; Corporate Governance; and Socio-Economic Development.

Overview

Page 4: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

4

APRM Principles

National ownership and leadership by the participating country are essential factors underpinning the APRM process.

It is designed to be open and participatory. The core guiding principles are transparency, accountability, technical competence, credibility and it should be free from manipulation.

The APRM is not a score-card exercise, meant to exclude or punish countries. There is no conditionality attached to the mechanism.

Overview

Page 5: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

5

African Countries Participating in NEPAD and the APRM

HSGIC APR Forum

AlgeriaAngolaRepublic of CameroonCongoEgyptEthiopiaGhanaGabonKenya

MaliMauritiusNigeria MozambiqueRwandaSao Tome &PrincipeSenegalSouth Africa

Tunisia

Libya

Botswana

Burkina Faso

Benin

Djibouti

Lesotho

Malawi

Sierra Leone

Sudan

Tanzania

Uganda

Zambia

Page 6: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

6

The APR Processes Stage One comprises: the establishment of the national focal

point; sending out of the questionnaire by the APR Secretariat; the development of the country’s self assessment based on the questionnaire and preliminary Programme of Action; and the submission of these to the APR Secretariat. At this stage the Secretariat also prepares a Background Paper on the Country for comparison with the self assessment.

Stage Two the country review team visits the country to

undertake wide consultations with stakeholders.

Stage Three is the drafting of the report by the country review team.

Stage Four is the submission of the Country Review Team’s report to the APR Secretariat and the APR Panel and Review by the Forum

Stage Five which is the final stage of the APR process involves making public the country’s report and related actions.

Page 7: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

7

Stages of the APRM

4. APR Secretariat arranges for Partner Institutions to conduct Technical Assessments on specific issues identified in Issues Paper. Reports are submitted to the APR Secretariat and the country under review

5. The APR Secretariat updates Issues Paper taking into account the findings of the Technical Assessments

5C. Country submits (if necessary) an update of its draft PoA

COUNTRY

VISIT

COUNTRY

REPORT

Country submits final PoA adjusted on basis of CRV and draft Country Report

Country Support Mission

1. APR Secretariatsends a questionnaire to be country to be reviewed

Country establishes APR Focal Point

2C1. In response, the Country undertakes the self-assessmenton the basis of the Questionnaire

2C3.Country submits to the Secretariat the responses to the questionnaire and its PoA

2C2. Country formulates a draft Programme-of-Action (POA)

2. APR SecretariatDevelops a background paper on country

3. APR Secretariat develops an Issues Paper based on the background paper, the responses to the Questionnaire & the draft PoA. The issues paper may identify issues that require more in-depth analysis through Technical Assessments (TA)

If issues for TA:

If no issues for TA:

APR

PANEL

APR

FORUM

= Country level processes

Stage 1 Stage 2

Stage 3

Stage 4

Stage 5

6 to 9 Mths

Page 8: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

8

The overall responsibility of the APRM is vested in the Committee of Participating Heads of State and Government of the Member States of the APRM (APRM Forum].

A Panel of Eminent Persons [APRM Panel] appointed by the Heads of States oversees the conduct of the APRM process and ensures its integrity.

The APR Secretariat provides the secretarial, technical, coordinating and administrative support services for the APRM.

Operational Structure of the APRM

Page 9: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

9

Structures of the APRM

APR Forum

APR Panel

APR Secretariat

Continental LevelCountry Level

National APRM CommissionNational APRM Focal Point

National APRM Secretariat

TRIs

Strategic Partner Institutions

Page 10: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

10

A National Commission with broad stakeholder representation should ideally be in place to interact with the support mission team.

A trend seems to emerge that includes a Focal Point and Governing Council supported by a Secretariat as well as Technical Research Institutes.

While uniformity may not be easy to achieve based on the contexts of countries, national ownership and broad-based stakeholder representation are key features required for these institutions.

Structures to manage the process at country level

Page 11: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

11

APRM Master QuestionnaireDemocracy and Good

Political Governance (9 Objectives)

Economic Governance and Management (5

Objectives)

Corporate Governance(5 Objectives)

Socio-Economic Governance (6

Objectives)

30 International instruments and Standards/ 16 Regional instruments and Standards

15 Standards and codes 9 Standards and codes 10 Standards and codes

1. Prevent and reduce intra- and inter-country conflicts.

1. Promote macroeconomic policies that support sustainable development

1. Promote an enabling environment and effective regulatory framework for economic activities

1. Promote self-reliance in development and build capacity for self-sustaining development

2. Constitutional democracy, including periodic political competition and opportunity for choice, the rule of law, a Bill of Rights and supremacy of the Constitution.

2. Implement sound, transparent and predictable government economic policies

2. Ensure that corporations act as good corporate citizens with regards to human rights, social responsibility and environmental sustainability

2. Accelerate socio-economic development to achieve sustainable development and poverty eradication

3. Promotion and protection of economic, social and cultural rights, civil and political rights as enshrined in African and international human rights instruments

3. Promote sound public finance management

3. Promote adoption of codes of good business ethics in achieving the objectives of the corporation

3. Strengthen policies, delivery mechanisms and outcomes in key social areas including education and combating HIV/AIDS and other communicable diseases

4. Uphold the separation of powers, including the protection of the independence of the judiciary and of an effective parliament

4. Fight corruption and money laundering

4. Ensure that corporations treat all their stakeholders (Shareholders, employees, communities, suppliers and customers) in a fair and just manner

4. Ensuring affordable access to water, sanitation, energy, finance (including micro-finance), markets, ICT, shelter and land to all citizens, especially the rural poor

5. Ensure accountable, efficient and effective public office holders and civil servants

5. Accelerate regional integration by participating in the harmonization of monetary, trade and investment policies

5. Provide for accountability of corporations, directors and officers

5. Progress towards gender equality in all critical areas of concern, including equal access to education for girls at all levels

Page 12: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

12

APRM Master QuestionnaireDemocracy and Good

Political GovernanceEconomic

Governance and Management

Corporate Governance Socio-Economic Governance

6. Fighting corruption in the political sphere

6. Encourage broad-based participation in development by all stakeholders at all levels

7. Promotion and protection of the rights of women

8. Promotion and protection of the rights of children and young persons

9. Promotion and protection of the rights of vulnerable groups including internally displaced persons and refugees

Page 13: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

13

Status of Implementation of the APRM thus Far

Cape Verde’s accession in June 2009 brings to 30 the total number of AU member countries that have so far acceded.

Mauritania was suspension on 25 October 2008 for the unconstitutional change of government following the 6 August 2008 coup that ousted its democratically elected President

This represents about 76 per cent of the African population.

We look forward to the 23 other African countries joining the fold.

Green – Reviewed Countries

Orange –Other Participating Member Countries

Grey – Non-Participating Countries

Red- Suspended Countries

Page 14: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

14

APRM Member Countries by Region

Region Countries

Central Africa (5) Cameroon, Gabon, Republic of Congo, Rwanda and São Tomé and Principe

East Africa (5) Djibouti, Ethiopia, Kenya, Tanzania, Uganda

North Africa (3) Algeria, Egypt, Sudan

Southern Africa (7) Angola, Lesotho, Malawi, Mauritius, Mozambique,South Africa, Zambia

West Africa (9)10 Benin, Burkina Faso, Ghana, Mauritania, Mali, Nigeria, Senegal, Sierra Leone, Togo and Cape Verde

Page 15: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

15

STATUS OF IMPLEMENTATION

So far, 17 out of the 30 member countries have launched the process.

Twelve countries have been peer reviewed by the APR Forum. (Ghana, Rwanda, Kenya, South Africa, Algeria, Benin, Uganda, Nigeria and Burkina Faso, Mali and Mozambique and Lesotho)

Mauritius and Ethiopia has just completed their Country Review Missions. Kenya II is scheduled for November 2009.

Tanzania has submitted its CSAR and NPOA to the Secretariat. Zambia is also slated on the Work Plan for Peer Review this year.

Page 16: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

APRM Country Review Missions

16

Page 17: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

APRM Country Review Missions

17

Page 18: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

18

Examples from the Pioneer Countries- Ghana

6 Best Practices including:An oasis of peace and tranquility in a sub-region perpetually in turmoil.

Unique processes for fostering democracy such as the Annual Governance Forum and the People’s Assembly;

Main ChallengesLow representation of women in politics; corruption; decentralisation; and chieftaincy disputes which have been quite rife in recent year.

Others are – bloated cabinet - 88 ministers in all; weak internal capacity for economic policy making; weak oversight by Parliament; and heavy dependence on external aid.

Page 19: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

19

Rwanda Review Process

Best Practices including:The highest proportion of Women in Parliament (49%) in the in the world; efforts in providing social services especially free education; and using ICT strategy to transform the country into a service-based economy.

Main ChallengesAid dependence - about 90% of the capital expenditure funded externally; Relations with its neighbours in the Great Lakes region which has been a source of conflict; and the issue of legitimacy and trust in the Gacaca.

Page 20: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

20

Kenya Review Process

Overview

Progress So Far

Lessons Learnt

Challenges

9 Best Practices including:Kenya’s role in pacifying her neighbours; considerable degree of freedom in exercising political and civil rights; promotion of decentralisation; reduction in the prevalence rate of HIV/AIDS; and firing of 29 judges to clean up the Judiciary.

Main ChallengesDelay in adopting a new constitution to replace the colonial era charter; inability to redress the colonial legacies; ethnicity; endemic corruption; weak parliamentary oversight; poor representation of women in key positions; and high incidence of poverty.

Page 21: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

21

South Africa Review Process

Overview

Progress So Far

Lessons Learnt

Challenges

In addition to some remarkable feats by South Africans, the report identified 18 Best Practices including:Taking the parliament to the people; the budget formulation process, self-reliance in funding development; the JSE and triple bottom reporting; and gender empowerment (Women constitute about 45 % of Parliament).

Main ChallengesViolent crime, violence against women and children; capacity constraint and poor service delivery; Racism and Xenophobia.

Page 22: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

22

The National Programme of Action

A major deliverable of the Review Process is the NPOA

Real progress can only be guaranteed if NPOAs are implemented hence for the first time, Forum meeting in January 2009 was dedicated to progress in implementing NPOA .

Page 23: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

23

The National Programme of Action

Inter alia, the POA is expected to present among others: Clear, time-bound commitments on key governance and

socio-economic development priorities over the next three 3 years, including the identification of key stakeholders for implementation, and the estimated budgetary implications and allocations;

Description of the national consultations that have taken place in developing the National Programme of Action;

Outline the feedback mechanism established to keep local stakeholders involved in the process;

Description of the capacity building and resource mobilization requirements for undertaking the Programme of Action; and,

Outline the implementation, monitoring and evaluation mechanisms for the Programme of Action.

Page 24: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

Budget of the NPOA in Reviewed Countries

24

Democracy and Political Governance

Economic Governance and Management

Corporate Governance

Socio-Economic Development

TotalUSD

Ghana 118,982,083(2.4%)

235,305,000(4.7%)

2,684,361,693(54.7%)

1,867,150,000(37.3%)

5,000,000,000

Rwanda 2,235,000 (1.4%) 20,484,000 (13%) 107,750,000 (67%)

31,269,000 (19%) 161,738,000

Kenya 8,829,000(0.2%)

45,772,000(0.8%)

4,946,658,000(91.8. %)

387,145,000(7.2%)

5,388,404,000

South Africa R1.003 billion(7.2%)

R1.5335 billion(11.0%)

R 0.204 billion(1.5%)

R 11.161 billion(83.5%)

R13.9015 billion

Algeria 2,378,000,000(40.5%)

936,000,000(16.0%)

751,000,000(12.8%)

1,800’000,000(30.7%)

5,865,000,000

Benin 586,370,000(24.8%)

7,340,000(0.3%)

1,004,260,000(42.6%)

758,120,000(32.2%)

2,356,090,000

Uganda 101,930,205(2.1%)

388,506,686(8.0%)

324,369,895(6.7%)

4,035,295,788(83.1%)

4,857,102, 574

Nigeria 5 billion (40%)

4 billion (25%)

3 billion (20%)

8 billion (15%)

20 billion

Burkina Faso 413,705,000(10.5%)

160,060,000(3.3%)

2,750,390,000(56.0%)

1,583,060,000(32.3%)

4,907,215,000

Page 25: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

25

Experience in implementing the NPOAs

Demonstrable commitment by all countries that have gone through the review process. They are enthusiastically implementing the NPOA, in spite of several formidable challenges, some even before they were peer reviewed;

There are daunting challenges, including the establishment of appropriate national structures to monitor the NPOA, proper costing and ensuring that it is not a wish list (need for prioritization). No format until recently.

Capturing key findings and conclusions of the peer review processes (overarching issues);

Overlap between the NPOAs and other national initiatives sometimes, resulting in double costing of interventions. While NPOAs are not designed to be a substitute to other ongoing national initiatives such as the PRSPs or National Development Strategies (NDS), the comparative value added must be captured and disseminated.

Page 26: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

Key ChallengesRrequisite institutional mechanism are lacking in some countries to take forward the post-review process, since the Governing Council was disbanded immediately after the peer review exercise. In others, key stakeholders are not kept informed about the APRM process after the review process;

The monitoring and evaluation component needs a lot of development. (Country specific); and,

Perhaps the major challenge is the capacity and resource gaps which are pervasive; and there is need for additional resources to support the implementation of the NPOA.

26

Page 27: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

27

CONCLUSION

Conclusion

Key LessonsThe APRM is a unique African instrument that is trial-blazing and has great potential as a tool to promote and strengthen good governance. It is African in origin, African inspired and African-owned.

The experiences from the APRM implementation process are very encouraging.

The process has been empowering in ways that were not envisaged when it started. It has spawned and strengthening a culture of political dialogue in the countries.

Page 28: LESSONS FROM THE IMPLEMENTATION OF THE APRM NATIONAL PROGRAMMES OF ACTION Afeikhena Jerome

28

ConclusionThe APRM is making it possible for countries to benchmark good governance in Africa on shared African and international norms and standards as well as for citizens to participate in the evaluation of how they are governed.

It is show-casing African innovative thinking in governance.

An area where the rest of the world can learn useful lessons from Africa.