Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong Kong International Airport Airport Authority Hong Kong 23 April 2018

Transcript of Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on...

Page 1: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Legislative Council Panel on Economic Development

Update on the Development of the

Three-Runway System at the

Hong Kong International Airport

Airport Authority Hong Kong

23 April 2018

Page 2: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Three-Runway System

2

Page 3: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

3

Construction works of 3RS commenced on 1 August 2016

Page 4: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

4

Overall 3RS project is progressing on track to meet timeline

2016 2017 2018 2019 2020 2021 2022 2023 2024

Commencement of

works in Aug 2016

Commissioning of

the new North

Runway in 2022Completion of 3RS

Page 5: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

5

Page 6: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Aviation Fuel Pipeline Diversion Works Substantially Completed

6

Permanent Aviation

Fuel Facility (PAFF)

Airport

West QuayOn-Airport

Tank Farm

Sha Chau

Aviation Fuel

Receiving

Facility (AFRF)

Legend :

Existing Aviation Fuel

Pipelines

Diverted Aviation Fuel

Pipelines by Horizontal

Directional Drilling (HDD)

Existing Aviation Fuel

Pipelines to be

decommissioned

Sha Chau

and Lung

Kwu Chau

Marine

Park

Plan

Rock

Alluvium / Decomposed Rock

3RS Reclamation Area

Marine Deposit

FillSeawall

HDD Launching SiteDaylighting Location

at Sheung Sha ChauTai Sha Chau

Existing

HKIA

-20mPD

-40mPD

-60mPD

-80mPD

-100mPD

-120mPD

-140mPD

+0mPD

+10mPD+6mPD

Remark: N.T.S.

0m 1000m 2000m 3000m 4000m 5000m 5190m

Length

Section

Page 7: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

DCM for Seawall Area is Substantially Completed Seawall Rock Core Placing Commenced

7

Page 8: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Reclamation Works in Progress

8

Page 9: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Reclamation Works in Progress

9

Page 10: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Terminal 2 Expansion Foundations and Substructure Site Works Commenced

10

Page 11: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Detailed Designs of Airfield Infrastructure and Third Runway Passenger Building are Progressing According to Plan

11

Page 12: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Automated People Mover System and High-speed Baggage Handling System Design and Build Contracts Commenced on Programme

12

Page 13: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Robust Environmental Monitoring & Audit Arrangement in Place

13

EPD

Independent

Environmental

Checker (IEC)

Environmental

Team (ET)Contractors

AAHK

(EP Holder)

Notes :

Communication Pathway

Employment + Communication Pathway

Dedicated

Complaint

Hotline and

Email Channel

Professional Liaison

Group (PLG)

Community Liaison

Group (CLG)

Page 14: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

3RS Dedicated Website Easily Accessible by Public

14

http://env.threerunwaysystem.com/en/index.html

Page 15: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Octocoral Guaiagorgia reproductive

biology study by The Chinese University

of Hong Kong

Environmental DNA project by

The Education University of

Hong Kong

Lingding Bay CWD population

dynamics study by South China Sea

Fisheries Research Institute, Chinese

Academy of Fishery Sciences

Year 2017-18 MEEF – Project Progress

15

Page 16: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Pearl farming pilot project

by Aberdeen Fisherwomen

Association

Study on strategy towards sustainable

fisheries development by Hong Kong

Fishery Alliance

Radar reflector installation

project for fishing vessels

by Aberdeen

Fisherwomen Association

Year 2017-18 FEF – Project Progress

16

Page 17: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Proposed Marine Ecology and Fisheries Enhancement Measures Directly Funded by AAHK

17

Eco-enhancement Seawall Design Fish fry release

Artificial reef deployment

Page 18: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

Continuous Engagement of Key Stakeholders

18

CLG (Jan 2017) LegCo 3RS Sub-Com(May 2017)

ACE (Apr 2017) PLG (May 2017)

Media (May 2017)

Notes :

CLG = Community Liaison Group; ACE = Advisory Council on the Environment; PLG = Professional Liaison Group

Page 19: Legislative Council Panel on Economic Development Update ... · Legislative Council Panel on Economic Development Update on the Development of the Three-Runway System at the Hong

19