Legal and General Modular Homes – Enfield House Type Enfield... · Legal and General Modular...
Transcript of Legal and General Modular Homes – Enfield House Type Enfield... · Legal and General Modular...
Photo/isometric drawing
provided by manufacturer
Legal and General Modular Homes – Enfield House Type
Description of Product
This is an assessment of factory made modules
consisting of ground and upper floor units
delivered to site and the four parts adjoined
vertically and horizontally and to the
foundations in accordance with the approved
structural engineer’s specification. Prefabricated
roof trusses and a masonry cladding are
provided in situ, in accordance with the
approved design. The units are connected on
site to form a 2 storey, 3 bedroom dwelling.
Key Factors Assessed
Mechanical Resistance & Stability
Safety in case of Fire
Health, Hygiene and Environmental
Safety in Use
Energy Economy and heat retention
Validity
This certificate was first issued on 29th June 2018 and is valid until 29th June 2022
Issue Dated 17th May 2019
Certificate No: EW1012B
This Registered Detail relates to the Legal & General Modular Homes Enfield House Type.
This is an assessment of factory made modules consisting of a ground and upper floor unit delivered to site and the two
parts adjoined vertically and to the foundations in accordance with the approved structural engineer’s specification.
Prefabricated roof trusses and a masonry cladding are provided in situ, in accordance with the approved design.
The Registered Detail does not take into account local issues.
AD A Foundation requirements to be determined by site specific assessment.
AD B Space separation requirements to be determined by site specific assessment.
Fire appliance access to be determined by site specific assessment.
AD C Sound testing requirements to be determined by site specific modular unit layout.
AD G Water efficiency requirements to be determined by Local Authority water usage policy.
AD H Foul and surface water disposal to be determined by site specific assessment.
Build over agreements or other H4 related issues to be determined by site specific assessment.
AD J Fuel type, storage and boiler requirements to be determined on a site specific basis.
AD M1 Level access or stepped access requirements to be determined using site specific topography assessment.
AD R To be determined on by site specific assessment of electronic infrastructure.
Local issues: Site specific local issues do not form part of this Registered Detail.
In the opinion of LABC, the Enfield House Type if used in accordance with the provisions of this
Certificate, will meet or contribute to meeting the relevant requirements of the following Building
Regulations in the form in which it is in force at the date of first issue of the certificate (unless
otherwise stated):
The Building Regulations 2010 (as amended) England & Wales
Regulation 7 Materials and workmanship
Note: The design is acceptable.
AD A Structure
Note: Subject to the limitations detailed in Conditions section.
AD B Fire Safety
Note: Subject to the limitations detailed in Conditions section.
AD C Resistance to Contaminants and Moisture
Note: The design meets this requirement.
AD E Resistance to Sound
Note: Subject to the limitations detailed in Conditions section.
AD F Ventilation
Note: The design meets this requirement.
AD G Sanitation, Hot Water Safety and Water Efficiency
Note: Subject to the limitations detailed in Conditions section.
AD H Drainage and Waste Disposal
Note: Subject to the limitations detailed in Conditions section.
AD J Heat Producing Appliances
Note: Subject to the limitations detailed in Conditions section.
AD K Protection from Falling, Collision and Impact
Note: The design meets this requirement.
AD L1A Conservation of Fuel and Power
Note: The design meets this requirement.
AD M Access to and Use of Buildings
Note: Subject to the limitations detailed in Conditions section.
AD P Electrical Safety - Dwellings
Note: The design meets this requirement.
AD Q Security
Note: The design meets this requirement.
AD R Physical infrastructure for high speed electronic communication networks
Note: Subject to the limitations detailed in Conditions section.
The Building Regulations 2010 (as amended) England
None presently.
The Building Regulations 2010 (as amended) Wales
None presently.
The Building (Scotland) Regulations 2004 (as amended)
If you would like to discuss a specific use of the product in Scotland it will require an additional
assessment under the Scottish Building Regulations and accordingly you should contact the LABSS
STAS Administrator at www.labss.org
LABC Warranty
The Enfield House Type has not been assessed to meet the requirements of the LABC Warranty
Technical Manual. If you would like to discuss a specific use please make an enquiry to
Enfield - Boxes A0, A1, B0 & B1 - Isometric Views
NPD1-ARUP-EN-A0-DR-S-0001 P01 Enfield - Ground Floor Box A0 - Building Isometric Views
NPD1-ARUP-EN-B0-DR-S-0002 P02 Enfield - Ground Floor Box B0 - Building Isometric Views
NPD1-ARUP-EN-A1-DR-S-0003 P01 Enfield - First Floor Box A1 - Building Isometric Views
NPD1-ARUP-EN-B1-DR-S-0004 P01 Enfield - First Floor Box B1 - Building Isometric Views
NPD1-ARUP-EN-A0-DR-S-0005 P01 Enfield - Ground Floor Box A0 - Ground Floor Buildup Isometric
NPD1-ARUP-EN-B0-DR-S-0006 P01 Enfield - Ground Floor Box B0 - Ground Floor Buildup Isometric
NPD1-ARUP-EN-XX-DR-S-0010 P01 Enfield - Boxes A0, A1, B0 & B1 - General Notes
NPD1-ARUP-EN-A0-DR-S-0100 P02 Enfield - Ground Floor Box A0 - Floor Layout
NPD1-ARUP-MA-B0-DR-S-0111 P01 Enfield – Ground Floor Box B0 – CLT Ceiling Layout
NPD1-ARUP-EN-B0-DR-S-0101 P02 Enfield - Ground Floor Box B0 - Floor Layout
NPD1-ARUP-EN-A1-DR-S-0102 P01 Enfield - First Floor Box A1 - CLT Floor Layout
NPD1-ARUP-EN-B1-DR-S-0103 P01 Enfield - First Floor Box B1 - CLT Floor Layout
NPD1-ARUP-EN-A0-DR-S-0110 P01 Enfield - Ground Floor Box A0 - CLT Ceiling Layout
NPD1-ARUP-EN-A1-DR-S-0112 P01 Enfield - First Floor Box A1 - CLT Ceiling Layout
NPD1-ARUP-EN-B1-DR-S-0113 P01 Enfield - First Floor Box B1 - CLT Ceiling Layout
NPD1-ARUP-EN-A0-DR-S-0120 P01 Enfield - Ground Floor Box A0 - OSB Lid Layout
NPD1-ARUP-EN-B0-DR-S-0121 P01 Enfield - Ground Floor Box B0 - OSB Lid Layout
NPD1-ARUP-EN-A1-DR-S-0122 P01 Enfield - First Floor Box A1 - OSB Lid Layout
NPD1-ARUP-EN-B1-DR-S-0123 P01 Enfield - First Floor Box B1 - OSB Lid Layout
NPD1-ARUP-EN-A0-DR-S-0200 P02 Enfield - Ground Floor Box A0 - North and South Elevations
NPD1-ARUP-EN-A0-DR-S-0201 P02 Enfield - Ground Floor Box A0 - East and West Elevations
NPD1-ARUP-EN-B0-DR-S-0202 P03 Enfield - Ground Floor Box B0 - North and South Elevations
NPD1-ARUP-EN-B0-DR-S-0203 P03 Enfield - Ground Floor Box B0 - East and West Elevations
NPD1-ARUP-EN-A1-DR-S-0204 P01 Enfield - First Floor Box A1 - North and South Elevations
NPD1-ARUP-EN-A1-DR-S-0205 P01 Enfield - First Floor Box A1 - East and West Elevations
NPD1-ARUP-EN-B1-DR-S-0206 P01 Enfield - First Floor Box B1 - North and South Elevations
NPD1-ARUP-EN-B1-DR-S-0207 P01 Enfield - First Floor Box B1 - East and West Elevations
NPD1-ARUP-EN-A0-DR-S-0210 P01 Enfield - Ground Floor Box A0 - Internal Wall Elevations - Sht 1
NPD1-ARUP-EN-A0-DR-S-0211 P01 Enfield - Ground Floor Box A0 - Internal Wall Elevations - Sht 2
NPD1-ARUP-EN-B0-DR-S-0212 P02 Enfield - Ground Floor Box B0 - Internal Wall Elevations - Sht 1
NPD1-ARUP-EN-B0-DR-S-0213 P02 Enfield - Ground Floor Box B0 - Internal Wall Elevations - Sht 2
NPD1-ARUP-EN-A1-DR-S-0220 P01 Enfield - First Floor Box A1 - Internal Wall Elevations - Sht 1 1
NPD1-ARUP-EN-A1-DR-S-0221 P01 Enfield - First Floor Box A1 - Internal Wall Elevations - Sht 2
NPD1-ARUP-EN-B1-DR-S-0222 P01 Enfield - First Floor Box B1 - Internal Wall Elevations - Sht 1
NPD1-ARUP-EN-A0-DR-S-0250 P01 Enfield - Ground Floor Box A0 - Building Sections
NPD1-ARUP-EN-B0-DR-S-0251 P01 Enfield - Ground Floor Box B0 - Building Sections
NPD1-ARUP-EN-A1-DR-S-0252 P01 Enfield - First Floor Box A1 - Building Sections
NPD1-ARUP-EN-B1-DR-S-0253 P01 Enfield - First Floor Box B1 - Building Sections
NPD1-ARUP-EN-XX-DR-S-0300 P02 Enfield - First Floor Boxes A1 & B1 - Floor Connection Details
NPD1-ARUP-EN-XX-DR-S-0301 P02 Enfield - Box Connections Sections and Details - Sht 1
NPD1-ARUP-EN-XX-DR-S-0302 P02 Enfield - Box Connections Sections and Details - Sht 2
NPD1-ARUP-EN-XX-DR-S-0303 P02 Enfield - Box Connections Sections and Details - Sht 3
NPD1-ARUP-EN-XX-DR-S-0304 P01 Enfield - Box A1 Balustrade Newel Post Connection Detail
NPD1-ARUP-EN-XX-DR-S-0306
P02 Enfield - Boxes A0, A1, B0 & B1 Face Plates Sections & Details -Sht 1
NPD1-ARUP-EN-XX-DR-S-0307 P02 Enfield - Boxes A0, A1, B0 & B1 Face Plates Sections & Details-Sht 3
NPD1-ARUP-EN-XX-DR-S-0310
P02 Enfield - Boxes A0, A1, B0 & B1 Ground & First Floor Box Ceiling
Sections & Details - Sht 1
NPD1-ARUP-EN-XX-DR-S-0311
P01 Enfield - Boxes A0, A1, B0 & B1 Ground & First Floor Box Ceiling
Sections & Details - Sht 2
NPD1-ARUP-EN-XX-DR-S-0320 P01 Enfield - Boxes A0, A1, B0 & B1 Lifting Bracket Sections & Details 14-94
NPD1-ARUP-EN-XX-DR-S-0330 P01 Enfield - Boxes A0, A1, B0 & B1 Doors and Window Supports
NPD1-ARUP-EN-XX-DR-S-0340 P01 Enfield - Boxes A0, A1, B0 & B1 Temporary Works Details - Sht 1
NPD1-ARUP-EN-A1-DR-S-0341 P01 Enfield - A1 Temporary Works Details - Sht 2
NPD1-ARUP-EN-XX-DR-S-0342 P01 Enfield - Boxes A0 & B0 Transportation Propping Details - Sht 1
NPD1-ARUP-EN-XX-DR-S-0343 P01 Enfield - Boxes A1 & B1 Transportation Propping Details - Sht 2
NPD1-ARUP-EN-XX-DR-S-0351 P01 Enfield - Boxes A0 & B0 Steelwork Tolerances 14-100
NPD1-ARUP-EN-A0-DR-S-0400 P01 Enfield - Ground Floor Box A0 - Structural Component Schedule 14-
NPD1-ARUP-EN-B0-DR-S-0401 P01 Enfield - Ground Floor Box B0 - Structural Component Schedule 14
NPD1-ARUP-EN-A1-DR-S-0402 P01 Enfield - First Floor Box A1 - Structural Component Schedule 14
NPD1-ARUP-EN-B1-DR-S-0403 P01 Enfield - First Floor Box B1 - Structural Component Schedule 14
NPD1-ARUP-EN-XX-DR-S-0500 P01 Enfield - Site Connection Sections and Details - Sht 1
NPD1-ARUP-EN-XX-DR-S-0501 P01 Enfield - Site Connection Sections and Details - Sht 2
NPD1-ARUP-EN-XX-DR-S-0502 P01 Enfield - Site Connection Sections and Details - Sht 3
NPD1-ARUP-EN-XX-DR-S-0503 P01 Enfield - Site Connection Sections and Details - Sht 4
NPD1-ARUP-EN-XX-DR-S-0550 P01 Enfield - Stability and Load Bearing Walls - Sht 1
NPD1-ARUP-EN-XX-DR-S-0551 P01 Enfield - Stability and Load Bearing Walls - Sht 2
NDP1-ARUP-EN-XX-DR-S-0552 P01 Enfield - Site Loadings and Tolerance Drawings
181112_Thermal assessments Thermal Performance
NPD1-ARUP-ZZ-XX-FN-M-00002 SAP Report SAP Calculations
NPD1-ARUP-MA-ZZ-SP-S-S010 Enfield - Project Steelwork Specification
NPD1-ARUP-MA-XX-SP-S-0004 Enfield - Project Specification for Structural Timber
NPD1-ARUP-ZZ-XX-RP-S-00003 Structural Basis of Design
Appendix A - Static Lateral Calculations
Appendix A - Static Lateral Calculations
Appendix B -Static Vertical Calculations
Appendix B -Static Vertical Calculations
Appendix C - Lifting Calculations
Appendix C - Lifting Calculations
NPD1-ARUP-EN-XX-CA-S-00003 Enfield System Calculation Pack
LGMH NPD01 Acoustics – NHBC Acoustic Report
NPD1-ARUP-ZZ-XX-SP-N-0001 Malden & Enfield MEP Outline Specification
The drawing list and reference numbers are taken from the arrangement listed below.
LABC System Documents
Appendix 1 -GA Drawings
Appendix 2 -Architectural Fabric
Appendix 3 -Architectural Fabric Junction
Appendix 4 -Opening Details
Appendix 5 -Penetration Details
Appendix 6 -Foundation Details
Appendix 7 -Site Details
Appendix 8 -Fire Protection Details
Appendix 9 -Accessibility
Appendix 10 -Window Door Details
Appendix 11 -Mechanical Services Drawings
Appendix 12 -Electrical Services Drawings
Appendix 13 -Combined Services Drawings
Appendix 14 -Structural Drawings
Appendix 15 -Reports
Appendix 16 -Module Installation Manual
Legal and General Modular Homes
Sherburn Enterprise Park
Hurricane Way South
Sherburn In Elmet
LS25 6PT
Tel: 03302020850 Email: [email protected]
Web: www.legalandgeneral.com/modular