Lecture04 AASHTO girder bridge ( Highway Engineering )
34
The Design of Pre-stressed Composite Concrete AASHTO Girders Lecture 11
-
Upload
hossam-ronaldo-civil-engineering -
Category
Engineering
-
view
116 -
download
7
Transcript of Lecture04 AASHTO girder bridge ( Highway Engineering )
The Design of Pre-stressed Composite Concrete AASHTO Girders
Lecture 11
Jacking up AASHTO precast-concrete girders to replace the bearing pads and seating.
Repairing new overpass at LeJeune Road and Okeechobee with a vertical post-tensioning cable.February 2005
Repairing a vertically cracked pier at LeJeune Road, due to insufficient reinforcement.February 2005
Horizontal post-tensioning to close vertical cracking of pier in median of LeJeune Road.February 2005.