LEANA QUICK INTRO
![Page 2: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/2.jpg)
QUALITYRESPONSIBILITYSKILLS
PRICELABOUR DIVISION
STANDARDS
CRAFT PRODUCTION
MASS PRODUCTION
LEAN PRODUCTION
![Page 3: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/3.jpg)
MASS PRODUCTIONChanged the World
• Shifts, Time-Schedules• Keep the pipeline full• Large Inventories• Mass Consumption• Intelligence is how labour is divided• Limited and well-defined responsibilities• Quality Check at the end
![Page 4: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/4.jpg)
• Working Flexibility• Theory of Constraints• JIT• Kanban• Intelligence is on each workplace• Comprehensive & collective responsibilities• Quality Check in each step
LEAN PRODUCTIONis Changing the World
• Shifts, Time-Schedules
• Keep the pipeline full
• Large Inventories
• Mass Consumption
• Intelligence is how labour is divided
• Limited and well-defined responsibilities
• Quality Check at the end
![Page 5: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/5.jpg)
Theory of Constraints
This idle capacity is used to fix the actual bottleneck (in TPS it is called "stop the line")
![Page 6: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/6.jpg)
• Working Flexibility• Theory of Constraints• JIT• Kanban• Intelligence is on each workplace• Comprehensive & collective responsibilities• Quality Check in each step
LEAN PRODUCTIONis Changing the World
• Shifts, Time-Schedules
• Keep the pipeline full
• Large Inventories
• Mass Consumption
• Intelligence is how labour is divided
• Limited and well-defined responsibilities
• Quality Check at the end
![Page 7: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/7.jpg)
• Learn Constantly• Optimize the Whole• Deliver Quick & Often• Eliminate Waste• Keep Getting Better• Respect People & Engage Everyone• Build Quality In
LEAN PRODUCTIONapplied to SW is
LEAN Software LEAN Software DevelopmentDevelopment
• Intelligence is on each worker & TEAM
• Theory of Constraints
• JIT
• Mass Consumption / Kanban
• Working Flexibility
• Limited and well-defined responsibilities
• Quality Check at the end
![Page 8: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/8.jpg)
Some differences between both approacheswaterfall lean
![Page 9: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/9.jpg)
SCRUM Overview
1. Product Backlog as defined by BAs
2. Product Backlog as expected by Dev
3. Product Backlog using SCRUM
1 2 3
![Page 10: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/10.jpg)
![Page 11: LEAN A QUICK INTRO](https://reader033.fdocuments.us/reader033/viewer/2022051516/568134f1550346895d9c32a6/html5/thumbnails/11.jpg)
Agile and Related Methodologies - OVERVIEW
AGILEAGILEXPXPSCRUMSCRUM
LEANLEANYOUYOU
BLAMINGBLAMINGTESTINGTESTINGIMPLEMENTATIONIMPLEMENTATION
DESIGNDESIGNANALYSISANALYSIS