2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
Leading PCI coal producer with significant reserves and ... · •Mining dump trucks BELAZ–7555B...
Transcript of Leading PCI coal producer with significant reserves and ... · •Mining dump trucks BELAZ–7555B...
1
Leading PCI coal producer with significant reserves and resources
Leading PCI coal producer with
significant reserves and resources
2
Leading PCI coal producer with significant reserves and resources
Overview
• The deposit was founded in 2009 for miningand export of high quality PCI coal that goesinto coking mix
• It owns 224 hectares of land (covers miningand waste sites) and a license for coalmining in Prokopievsky District of KemerovoRegion valid until 30 October 2027
• T he reserves of high quality Low VM PCI coalamount to 28 mln. tons, while the resourcesof 212 mln. tons show further growth potential
• T he company has sufficient fleet of newvehicles and equipment in place for annualproduction of 1. 5 mln. tons, while theextension is underway to reach 3 mln. tons
• T he producer owns railway loading stationthat provides significant competitive advant-age in terms of logistics
3
Leading PCI coal producer with significant reserves and resources
Favorable location in the heart of the major coal region
Russian Federation Kemerovo region
• Coal deposit is located in Kemerovo Region, which is the heart of Russian coal mining
industry, with abundant materials, technology and labor supply
• The location allows the company to export coal both to Asia and to Europe depending on the
market conditions in these regions
• The nearest railway stations Trudarmeiskaya (1 km) and Tyrgan (3 km) are situated in close
proximity to the deposit
4
Leading PCI coal producer with signi�cant reserves and resources
State approved reserves with substantial growth potential
• The table below shows the reserves approved by the State Commission of Reserves as well as the resources
• The reserves of high quality T -grade coal amount to 28 mln. tons
• The resources of 212 mln. tons show further potential . The drilling program of $2 mln. is planned to convert these resources into reserves
Categories Reserves and resources, ‘000 tons
State approved reserves 28 010
State approved resources 212 000
State approved reserves and resources
240 010
Moisture, %
Ash, %
Volatile matter, %
Sulphur , %
Net calori�c value, kcal/kg
5.5 9.3 12.2 0.34 7069
5
Leading PCI coal producer with significant reserves and resources
Own mining equipment allows to work independently
The Company has its own mining equipment and infrastructure, allowing it to work
independently from other companies:
• There are two coal storage areas with two rail sidings 0.9 km and 2.7 km with capacities of
150,000 tons and 80,000 tons
• Production buildings with floor space of 442.2 m2
• Site roads of over 27.0 km
• Four waste stockpile sites with total capacity of 200 million m3
• Power lines over 10 km of 2.5 MW
• Pumping infrastructure providing drainage for the deposit
• Crushing and sorting complexes
• Two fuel storages
• Loading site of 1 hectare, weighing equipment with scales for auto and rail transport
• 224 hectares of land in ownership (mining operations and waste sites)
• Maintenance shed – 500 m2 with equipment for repairs
6
Leading PCI coal producer with significant reserves and resources
Considerable fleet of vehicles in ownership
The Company has its own fleet of mining vehicles:
• Mining dump trucks BELAZ–7547 – 8 units
• Grader DZ-98 - 1 unit
• Loader M-4026 - 1 unit
• Loader Caterpillar-970 - 1 unit
• Loader Shantui SL50W – 1 unit
• Loader Komatsu WA 420-3 - 1 unit
• Bulldozer T-25 - 1 unit
• Bulldozer T-170 - 1 unit
• Bulldozer Komatsu D65E-12 - 2 units
• Roller-bit drilling rig SBSh-200-36 - 1 unit
• Excavator Liebherr R-962 - 1 unit
• Excavator Komatsu PC-1250-7 – 1 unit
• Excavator Hitachi ZX330LC-3 – 1 unit
• Excavator EK-400-03 - 1 unit
• Excavator EKG-4Y - 2 units
• Excavator EKG-5A - 2 units
• Excavator Caterpillar 330 CL – 1 unit
• Excavator Caterpillar 365 BLME – 1 unit
7
Leading PCI coal producer with significant reserves and resources
Vehicles in leasing allow to further increase production
The Company also has mining vehicles in leasing:
• Mining dump trucks BELAZ–7555B – 18 units
• Roller-bit drilling rig Atlas Copco DML+ - 1 unit
• Excavator Volvo EC 700 B - 2 units
• Roller-bit drilling rig Atlas Copco - 1 unit
• Grader DZ-98B - 1 unit
• Bulldozer CAT В 9-R - 1 unit
• Loader CAT 980H – 3 unit
• Tip-truck CAT 740 – 3 unit
8
Leading PCI coal producer with significant reserves and resources
Open pit deposit is favorable for further expansion
• The deposit is an open pit
• The first step of mining consists
of site preparation, drilling and
blasting operations
• The second step of mining involves
excavation of the overburden and
its storage in the stockpiles that
are owned by the company
• The third step of mining includes
excavation of coal and its storage
in storage areas that are owned by
the company
• The fourth step consists of coal
sorting and wagon loading at the
railway station that is owned by
the company
First step
Second step
Third step
Fourth step
9
Leading PCI coal producer with significant reserves and resources
PCI coal market and production growth
• Our low volatile PCI coal provides further carbon (over that derived solely from the coke)
for iron-making. As a result of the extra carbon introduced by PCI coal, steel makers can
reduce the amount of coke necessary for steel making
• This low volatile PCI (LV PCI) coal is increasingly sought by steel mills in preference to
higher volatile coal because it provides superior performance in the blast furnace due to
its higher carbon and energy content
• The replacement ratio of LV PCI coal to coke varies according to the requirements of
each blast furnace. Typically, 1.0 ton of LV PCI coal can replace 1.3 tons of more
expensive coking coal
• Consequently, LV PCI coal has proven to be effective in lowering the cost of steel
making and has established a niche in the market for metallurgical coal
The producer implements two-stage development plan of the deposit
First stage (currently underway):
• Reaching of production level of 125,000 tons of coal per month by the first half of 2014
Second stage (gradually starts in 2014):
• Purchase/leasing of new equipment (mining dump trucks, graders, bulldozers, loaders)
• Reaching of production level of 250,000 tons of coal per month by the end of 2014