LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

25
LEAD: A ‘Whole Life’ issue Tristan Olivier Tony Putsman 5 th March, 2013

Transcript of LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Page 1: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

LEAD: A ‘Whole Life’ issue

Tristan OlivierTony Putsman 5th March, 2013

Page 2: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Introduction: Gary Mann

Vice-ChairmanLondon Health & Safety Networks Committee

Page 3: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Tristan Olivier

Founder, LiPSALead Survey Specialist (XRF-i)Risk AssessorTechnical Author

Page 4: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Tony Putsman

CDM SpecialistTeam-based Risk ManagementMember of ICE Expert Panel for H&SAuthor

Page 5: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

A ‘Whole Life’ issue for buildings AND people:At Home…

at School…at Play…

AND at Work!

Page 6: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

How we take in Asbestos:INHALATION

Delayed Effects

Page 7: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

How we take in Lead:

INGESTION

INHALATION

Delayed Effects

Immediate EffectsIrreversible EffectsLife-long Effects

Page 8: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Blood Lead Levels (BLLs)

1,000micrograms(µg) of Lead

ONECrystal of

Sugar

“Enough to harm 50 two year-olds”

Page 9: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Adapted from Lanphear BP, et al. Public Health Reports 2000;115:521-529

Page 10: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Level of ‘concern’: ? µg/dl

CHILD40-50µg/dl

MAN2

µg/dl

“Enough to put a 2yr-old in hospital”

10µg/dl

Page 11: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Sources of Lead Exposure

Disturbance of lead containing materials(LCMs) arising from:

Damage, deteriorationFriction of adjacent surfacesMaintenance, refurbishment, demolition

Page 12: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Occupancy ConsiderationsHHSRS Worked Example for Lead:

“The old paint should be stripped by a competent person using proper protection. The occupants should be temporarily rehousing (sic) during the stripping and re-painting.”

Page 13: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Lead Management OptionsRemoval of LCMs or components using wet methods and/or dust extraction.

Encapsulation of LCMs ORWet sanding & over-painting.

Monitoring & in-place management.

Page 14: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Lead Survey: XRF-i

Paint: 33,800µg/cm 2 Substrate: 6,200 µg/cm2

Page 15: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Case Study

Worst lead hazards: windows/doorsLead exposure risks: immediateLead exposure risks: project specificOccupant considerations: SEN childrenLead management options…

Victorian care home for < 21yr-olds

Page 16: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Enveras Excellence ModelLowest Total ‘WHOLE LIFE’ Cost

CLIENT

LeadDesigner

PrincipalContractor

‘PALS’ - Priority Assessment for Lead Strategy

Operation Demolition

Page 17: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Priority Assessmentfor Lead Strategy

‘PALS’

Page 18: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Key Elements of a‘PALS’ Strategy…

People & Portfolio ProfilingLead Register & Risk ReviewPolicy, Practices & ProceduresContractor Selection & InsurabilityHazardous Waste Management

Page 19: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

People Profiling

Children (Safeguarding; SEN & ADHD)Women/mothers (pregnant & nursing)Young peopleMen

Occupancy. Occupational. Occasional.

Page 20: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Portfolio Profiling

TypeOccupancyAgeCondition

Page 21: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Risk Review

What’s coming up next in your construction and refurbishment programmes?

How many of your authorities have current projects for which a lead survey has been carried out?

Page 22: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Work Projects:Priority Schools Building ProgrammeDecent Homes refurbishmentRoutine repair & maintenance

Home Projects:If you have to expect it of others…

Page 23: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Make sure you are prepared to:

Do it Yourself!

Page 24: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Close: Gary Mann

Vice-ChairmanLondon Health & Safety Networks Committee

Page 25: LEAD: A Whole Life issue Tristan Olivier Tony Putsman5 th March, 2013.

Tristan Olivier

Mobile: 07904 689514Email: [email protected]