LEA Associates South Asia Pvt. Ltd. Independent...

8
LEA Associates South Asia Pvt. Ltd. A LEA Group Company Consulting Engineers & Planners Independent EnBlneer tor Mahua-Jalp!.!r 05M ProJKt Office: "l a)(lTll Puram-, Collector Cha uraha, Main NH-ll, Oausa (Rajas tha n) Tel:"" 91-1427·224923, Fil K: - +91-1427-223841 E-milil : la sadausa@l lasaindla.com LASAlHighway/O&MI73398/Mahua-Jaipur/2014/1455 Dated: 24.09.2014 The Project Director, National Highway Authority of India, Project Implementation Unit, Dausa A-2. Indra Colony. (Opposite Roadways Bus Depot) Dausa (Raj.) - 303303 Subject:-Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2-Lane Road and Widening to 4-lane of Divided Highway of Mahua- Jaipur Section of National Highway - 11 from Km . 120.000 to 228.000 in the State of Rajasthan on Bu i ld , Operate and Transfer (BOT) Basis Under NHDP PHASE-IIIA:- Penn iss ion for issuing NOe overhead crossing of NH-11 between mile stone no. 200-201 Village Kanota by 400 KV D/C Sikar - Bassi Transmission line -reg. Reference: - 1. PGCIL letter no. NR-l /SikarlTfU1983 dated 08.08.2014 2. PIU letter no. 23011114/PIUIDAU/NOC/2946 dated 13.08.2014 Dear Sir, Th is is in reference to your above mentioned letter regarding proposal for overhead crossing of NH-ll by 400 KV D/C Sikar-Bassi transmission line between km. stone no. 200 to 201 (New Chainage 200+155 as per Km. Stones fixed at Site) at Village Kanota. Dis!. Jaipur by Power Grid Corporation of India Ltd .• a Gov!. of India epterprise. The proposal has been examined in light of provisions contained in MORTH circular no. NH-III/P/20/77 dated 08.04.1982. IRC 32-1969 and IS 5613 (Part-3/Sec.2) 1989. The proposal has been found in order and is recommended for permission after doing the following corrections in the check list by the applicant. S. No. As per check list Correction 1.6 Mile Stone between 200+888 Metres Km . 200+155 and 201.112 Metres 1.8 48M 60.10 M 1.8 (a) 155 M 31 .10 M 1.8 (b) 845M 29 .00 M HO (a) 155 M ROW length not to be considered 1.10 (b) 84M ROW length not to be considered 1.11 Yes To mention that the proposal is crossing the National Highway Corporate Office: 8- 1/ E·27, Mohan Co-operat ive Industrial Estate. Mat hur.! R Nd, N ew 110 044 India Te l: +91 ·11·2697 3950-52,. 4167 8150 (8 Unesl, Fall : +9 1·11· 4167 8659, 2697 1062 E-mail:lasa@lasa india.co m, Website: www.lasal nd ia.com /www.lea.ca .. '. LEA dershi p in Engilll!ering .e Plannlno Solutions

Transcript of LEA Associates South Asia Pvt. Ltd. Independent...

Page 1: LEA Associates South Asia Pvt. Ltd. Independent …nhai.org.in/spw/CorrespondenceIssues/1455-24.09.2014...LEA Associates South Asia Pvt, ltd, ,2, 1.19(b) (ii) 84M&155M 'Distance of

LEA Associates South Asia Pvt. Ltd. A LEA Group Company Consulting Engineers & Planners

Independent EnBlneer tor Mahua-Jalp!.!r 05M ProJKt Office:

"l a)(lTll Puram-, Collector Chauraha, Main NH-ll, Oausa (Rajasthan) Tel:"" 91-1427·224923, FilK:- +91-1427-223841

E-milil: [email protected]

LASAlHighway/O&MI73398/Mahua-Jaipur/2014/1455 Dated: 24.09.2014

The Project Director,

National Highway Authority of India,

Project Implementation Unit, Dausa

A-2. Indra Colony. (Opposite Roadways Bus Depot)

Dausa (Raj.) - 303303

Subject:-Improvement , Operation and Maintenance, Rehabilitation and Strengthening of Existing 2-Lane Road and Widening to 4-lane of Divided Highway of Mahua­Jaipur Section of National Highway - 11 from Km. 120.000 to 228.000 in the State of Rajasthan on Build, Operate and Transfer (BOT) Basis Under NHDP PHASE-IIIA:- Penn iss ion for issuing NOe overhead crossing of NH-11 between mile stone no. 200-201 Village Kanota by 400 KV D/C Sikar -Bassi Transmission line -reg.

Reference: - 1. PGCIL letter no. NR-l /SikarlTfU1983 dated 08.08.2014

2. PIU letter no. 23011114/PIUIDAU/NOC/2946 dated 13.08.2014

Dear Sir,

Th is is in reference to your above mentioned letter regarding proposal for overhead

crossing of NH-ll by 400 KV D/C Sikar-Bassi transmission line between km. stone

no. 200 to 201 (New Chainage 200+155 as per Km. Stones fixed at Site) at Village

Kanota. Dis!. Jaipur by Power Grid Corporation of India Ltd .• a Gov!. of India

epterprise.

The proposal has been examined in light of provisions contained in MORTH circular

no. NH-III/P/20/77 dated 08.04.1982. IRC 32-1969 and IS 5613 (Part-3/Sec.2) 1989.

The proposal has been found in order and is recommended for permission after doing

the following corrections in the check list by the applicant.

S. No. As per check list Correction 1.6 Mile Stone between 200+888 Metres Km. 200+155

and 201.112 Metres 1.8 48M 60.10 M 1.8 (a) 155 M 31 .10 M 1.8 (b) 845M 29.00 M HO (a) 155 M ROW length not to be considered 1.10 (b) 84M ROW length not to be considered 1.11 Yes To mention that the proposal is

crossing the National Highway

Corporate Office: 8-1/ E·27, Mohan Co-operative Industrial Estate. Mathur.! RNd, New ~Ih l- 110 044 India Te l: +91·11·2697 3950-52,. 4167 8150 (8 Unesl, Fall : +91·11·4167 8659, 2697 1062 E-mail:lasa@lasa india.com, Website: www.lasalnd ia.com /www.lea.ca

.. '.

LEA dership in Engilll!ering

.e Plannlno Solutions

Page 2: LEA Associates South Asia Pvt. Ltd. Independent …nhai.org.in/spw/CorrespondenceIssues/1455-24.09.2014...LEA Associates South Asia Pvt, ltd, ,2, 1.19(b) (ii) 84M&155M 'Distance of

LEA Associates South Asia Pvt, ltd, ,2,

1.19(b) (ii) 84M&155M 'Distance of Tower pole from the existing structure of NH to be given

1.19(e) LOC No. 433 65M Distance from the extreme road LOC No. 434 -132 M boundary is not correct

8' PGCIL NHAI Item No.6 LOC No. 433 DD+06 LOC No. 433 DD+06 of Section (13' 26'21' RT) (89' 53' 01 ' ) location LOC No. 434 DD+06 LOC No. 434 DD+06 No. 433 to (31'14'10' LT) (89' 53' 01 ' ) 434 sheet

Submitted for information and further needful action please.

Thanking you,

Yours faithfully,

for LEA Associates South Asia Pvt. Ltd.

~ (Rajendra Mathur) Team Leader

Enel. - 1 No. Proposal

CC 1, Mr. A.K. Sharma, LASA H.O New Delhi 2. Authorised Signatory JMTPL-Dausa

Corporate Office: IH/E~27, Moh~n Co-operative Industrial Estate, Mathura Road, New Deihl- 110044 India Tel: +91·11-26973950-52. 4167 8150 (8 Unu), Fax: +91·11-4167 8659, 26971062

E·mall:[email protected], Web5ite:www.laS<l india.comj www.lea.g

OVerseas Registered Offi ces: & planning solutions

r

Page 3: LEA Associates South Asia Pvt. Ltd. Independent …nhai.org.in/spw/CorrespondenceIssues/1455-24.09.2014...LEA Associates South Asia Pvt, ltd, ,2, 1.19(b) (ii) 84M&155M 'Distance of

CHECK. LIST.

Guidelines for project Directon for processing the proposal of laying Over Head Electrical Line crossing National Highways

Relevant circulars/codes

1) Ministry Circulat No. NH-III /P /20/77 dated 08.04.1982

2) Indian Electdcity Act -1910

3) Indian Electricity Rules 1956

4) RCz32-79695) IS: 5613-1976?art-I to fV

Check list for getting approval for laying of overhead Electdcal Line cossing National Highways vested with NI{AI

sl

tgq

S.

No.

ltemInfomration/ Status

Remarks

I Geneml Infonnation100 KV D/C Sikar-@assi) T/L

1.1 Name andAddrcss of the Applicantwith Full address

l-he Chief Manager,)ower Grid Corporation 01

.ndia Ltd,+00/220 KV Sub-Station,3hadadar, Sikar-332001,laiasthan.

1.2 National Highway N umber SH-11

1.3 Sate Raiasthan.1.4 Location aiput - Dausa

1:5Type of electric line including c,arr,ving volt€e. Details and 400 KV D/C Sikar-@assf T/L

1.6 (Chain-age i" k-) Milestone between 20(}1 888 mtrmAtArc arul )O1-11) meters

1.7 t€nsth in Meter 239 M

1.8 Width of available ROW 48U*-''-l-'-(a) Left side from center line towatds increasing chain-ase/ km direction

W"-jq\-tu-._.g

" "-"--- *i\

@) Right side from center line towards increasing chain-aeel kin direction

t'*ru,iU,o'1.9 Ptooosal to lav Over Head

-

(a) Left side ftorn ceflter line towards increasing chain-

ase/ km direction

155 M

F) nbnt side ftom center line towards inceasingchun-aEe/ km direction

84M

(c) cossins of NH NH.11

1.10 lProposal to acquite land(a) Left side ftom center line 155M ?(b) Risht side ftom centet line 84M 2

1.1L !?hether proposal is

(") in the same side whete land is not to be acquired

0r) Crossing the National HlghwayYES?,

If not then whete to lay the Over Head Electrical Line From Sikar - Bassi Y1.12 | Details of aheady laid services(overhead Telecommunicatior

6 H::;*::'*:ln,"J;J::'.u',:ffJ;)' ir anY' ""* :1

N/A

'l{ttFl tfififies (2/4 / 6/3 lanes) existins 4 lanessl

ii$dfr&SU.t of lanes (2 lane with paved shoulders/4/6/8;l Eltetlri,:";\;rii \1i.: .

NA

il Konr/r:tilllifi I

n w)/{0ti. ,t\. q

ilr$'*)1'dtes\:

{fi!qRS({r€rlD lnn!'ll

Page 4: LEA Associates South Asia Pvt. Ltd. Independent …nhai.org.in/spw/CorrespondenceIssues/1455-24.09.2014...LEA Associates South Asia Pvt, ltd, ,2, 1.19(b) (ii) 84M&155M 'Distance of

\{/

1.75 Service road eiistino or not N/Af yes then rrhich side(a) Left side &om ceater line(b) Risht side ftom center line

t.t6 Proposed Seirice road N/A .(a) Left side from ceoter line

6)Risht side from center line1.17 Mhether proposal to lay overhead Electric line is after the service road or

)etq/ee! the service road aod maio. cartiagevray, ot CrossingtheNational{ighvay

N.H Y

1.18 fhe pernission for l"ytog Over Head Electrical Line shall be coasidered forrpproval / rejection based on the Miaistry Circulars and relevant codes mentioned as

rbove

YES ?

l.l9 f crossings of the road involvedYES

(a) Is it oa a line oo'mal to NH and orovide lenct! of Crcssins Soan 239 m

S) Structure (Iower, Pole aod for IIT line ooly Tension Towers ) for Crossings shallrot be too near to the existing structures on the National Highway, the tninimumlistance geing 15 metef.(i) Type of Existnrg/proposed structure for natiooal Highway.ii) What is the distaace of Towet, Pole and Tension Towers lioe ftom tle:xisti'g /proposed structure for oatioaal Highway

433-DD+6,434-DD+6,

84M& {155M b

I Th. overhead lines aod their supporting poles/towersihould ordin261t be placed at the extreme edge of ttre road land boundary. In ao;:ase, these shall be at least 10 meters away from the edge of the existing shoulder:rf the extreme traffic lane. Where the existing roadway is aar:rower than th<ninimurn required according to standards or where the widening is proposecior any reasoo, the lateral clearance shall be reckooed witi respect to ultimate road way.

What is the horizontal clearaoce ftom the extreme edge of the road lrad boundary?

I

Loc No: 433 -65M

Loc No: 434 -732}l

?

?

.d) The ovethead lines and their supporting poles / towers should ordi.arily berlaced at a minimum distance of 5.0 m from tle nearest line of avenue trees.Vhat is the hodzoatal clearance from the nearest line of avenue trees?

N/A ?

..) In srouatainous/ billy terrain tle overhead lines should be erected preferably on:he valley side as fat asray as practicable. In hilly region, level ofgrouad at aiuitable distaoce below the outer:onductor oa either side ftom the centre line is also to be noted aad marked inrrofile so as to ensrue required ground clearancernderneath coaductor and side clearances in swung conditioos. Is the proposaln hilly area?

Plain Terraio

I'l

The horizontal cleatances in respect of poles etected for the pu4)ose of street

fuhting in urban situation shall be as underN/A0 For rcads with

raised kerbsMinimum 300mm from the edge of the nearest ketbpteferably 600-*

Page 5: LEA Associates South Asia Pvt. Ltd. Independent …nhai.org.in/spw/CorrespondenceIssues/1455-24.09.2014...LEA Associates South Asia Pvt, ltd, ,2, 1.19(b) (ii) 84M&155M 'Distance of

(4 lrot roads withI raised kerbs \t least 1.5m from the edge of dreca:riagoway,

;ulriecto minimum of 5.0m ftom the centre line of the:arriasewav.

YES IN&

(g) Th. pylons of H.T. lines along crossing the road shall be located outside the N.H.land. YES

(h) For crossing the line of same vokage or lourer voltage,

suspension / tension towet with suiable extensions shall be used. YES

(i) The vertical clearance of the overhead lines crossing the road shall be reckoned

ftom the top of the crown of the road taking into account the anticipated final top

level due to future raising of toad levd stengthening of Pavement, etc. The actua

gound clearance of high tension lines for voltage above 650 Volts vades depending

upon the Voltage transmitted and these are stipulated in Indian Standard Codes is

5673-7g76Part Ito fV and Indian Electdcity Rules 1956 as under:

8.84 M

Tower isDesigned for75oTempetatue andConductor has

been consideredin 85"

IemperatureI

I

| +oo kY / 21.6

I mtrs

I ------ tr^.-

Yoltage Yettical Clearance

For ordinary wites and lines carying low volageup to and including 110 Volts

5500 mm

For electric power lines carrying voltage uP toand in"cluding 650 Volts

6000 mm

For electdc power lines carying voltage exceeding650Vol*

6500 mm

I2O KV 7015 mm

400 Kv 8840 mm

765 KV 15M

Note: These are minimum requirement. Where ever local Authotity rcquirement is

highet, the same shall be provided.In case of HT line, Road crossing, the gtound clearance at the roads under maximumcenperature and in still air shall be such that even with conductor bundle btoken iradjacent span, the ground clearance of the conductot from the road surface shall nor

be less than 8.84 meters. I

What is the voltage of proposed line and clearance undet maximum sag conditiorhersrcen lnrvect cnndrrefor oF the ntonosed line & existino NH /futute develooed NH.

2 \ffidavit/Under taking to be obtained from (to be furnished by) thelpplicant.

YES

lI* rlgrzto Damage to other utility, if damaged then to pay the losses eithet to NI{AIFdqgsWfai$hdfltrryancy

N/A ?ffir{f'/tz,Elt

. qf. iFIFi:. sitisusGiHfid+fiNft

Elartricitrr R

ral ot lJank buafantee 1r fequfecl

ndard conditions as laid down in Ministry Circular Minis

iJ lP l2O /77 dated 08.04. 1982, Indian Electricity Act -1 91 0, IndiQ5/r IRC: 72-19(t9 IS: 561 7-197(t Pat-I to IV and NHAlcc

f1

YES

Page 6: LEA Associates South Asia Pvt. Ltd. Independent …nhai.org.in/spw/CorrespondenceIssues/1455-24.09.2014...LEA Associates South Asia Pvt, ltd, ,2, 1.19(b) (ii) 84M&155M 'Distance of

(*

tf

YES

2.4 Shifting of Ovet Head Electrical Line at their own cost as and when required

bvNFIAI2.5 Shifting of Over Head Electrical Line at thefu own cost if requfued due to

4lanning / widening of NHYES

2.6 Indemnity against all damages and claims what so ever kind that maybe to NHAI or to any third party in the ROW dudng installation,operation and maintenance.

YES

2J Traffic movemeot dutine l"Fog of Over Head Electrical Line to bemanaged by the applicant

YES

2.8 If any claim is raised by the Concessionaire then the same has to be paidby the applicant

YES

2.9 Prior apptoval of the NHAI shall be obtained before undertaking any workof installation, shifting or repairs, or altentions to the- Over HeadBlsqtrisal Tine located in the National highuay Right of Way.

YES

2.10Expenditure, if any, incuued by NHAI for repairins any dzmage causedto the National Highway by the laying, maintenance or shifting of theOver Head Electrical Line vdll be bome by the agency o*irg the line.

YES

hLLIf the NHAI considers it necessary in future to move the utility line forany work of improvemeflt or repairs to the road it will be carried out as-desfued by the NHAI at the cost of the agency owning the utility linewithh a reasonable time (not exceeding 60 day$ of the intimation grven.

YES

2.t2

Certificate from the applicant in the following format

'0 Laying of Over Head Electrical Line will not hsve any deleteriow effectstn any of the bridge components and roadway safety "for traffic.(if for 4 -anning "We do undertake that I will relocate service road/approach'oad/utilities at my own cost notwitltstanding the permission granted withinuch time as will be stipulated by NIIAI" for future six- lanning or anyther development."

YES

2.t3 lhe transmission line installation shall be carried out by trained and:xpedenced penonnel and supervised by technically qualified persons:ompetent to undertake such work"

YES

2.14lhe applicant ensures the safety of the highway traffic against the hazadsrf the high voltage lines during installation, operation and maintenance.

YES

2.ls Jndertaking for Compliance vdth Indian Electricity Rules and Other Authorities'Regulations - All overhead lines shall comply with the requirements of thelndian Electricity Act and Rules made thete undet and the regulations:r specificatiorls as laid down by nilways or tailway electrificationruthodties, post and telegaphs depatrneng roadways or navigation orrviation authodties, local3oveming bodies, defense authorities and pov/er and,elecornrnunications coordination committee, wherever applicable.

YES

lfT"*jr1*$Fiu&cqments and drawing! to be tumished by the Applicanr YES

ffeibl}tH.SEryJOf laying of Over Head Electrical Line YES i":,

09 / 22tJsryir D$$q4sErai$freement YES r-.'

qiip

{qn-t409 J

4,0itz2e $v *rls+vtiir,v, ::,i*i fil,j,,

Page 7: LEA Associates South Asia Pvt. Ltd. Independent …nhai.org.in/spw/CorrespondenceIssues/1455-24.09.2014...LEA Associates South Asia Pvt, ltd, ,2, 1.19(b) (ii) 84M&155M 'Distance of

3.3

Performarice Bank Guarantee io favor of NFIAI has to be obtairred @ Rs. 50/per runoing meter (parallel to NtI) aad Rs1, 00,000/- pet crossiag of NH, for r

period of one year initially (extendable if requited till satisfactoqcornpletion of work) as a security for ensudng/making good the areadearing debrislloose earth etc produced in the right of way. No paymenshall be payable by the NFTAI to rhe licensee for clea'i'q debtis/loose earth.

YES Shall besubmittedafterNOC.

3.4

Sttip plao/ Route Plao sho.ring Over Head Blg6trigal T.ins,Chain age, width of ROW, distance of proposed, structure (Iower,Pole and for HT line only Teosioo Towers ) from the edge of ROW, importantmile stone, intersections, cross &ainage works any other structure existing orproposed etc.

YES

4 Certificate ftom the Proiect Director

4.1

Certificate for confi::ning that the proposal has been examiaed vdth tespect to thestnrctures and devdopmental work consideted at this location and complianceof all staodard condition issued vide Ministry Circrnar No. No. NH-fr./P/20/77 dated 08.04.1982, Indian Electricity Act -1910, Indian ElectricityRules 1.956, IRC: 32-1969, IS: 5613-1976Pan-i to fV and NHAI's guideline

YES

4.2

Certificate from PD in the following fomrat

(r) 'tlt is certified that any other location of the Etectfic line would betrtremely dfficult and anreasonable costly and the installation of Electric'ine within ROll/ will not adversely affect the design, stabitity & trafficwfety of the highway nor the likelyfuture improvement such as widening ofhe carriageway, easing of came etc".

(ii) fot 6 -L2nning.

b) where feasibility is available "I do certify that there will be no hindrance toroposed sixJaning based on thefeasibility report considering proposed structurest the said location".

/b) In casefeasibility report is not available "I do certify that sfficient Roils available at site for accommodating proposed six laning,,.

5

If NH section ptoposed to be taken up by NFIAI oa Bor basis - a clause is t<re inserted in the ageement. I'The permitted Highway on which Licensee hat)een granted the right to lay over Head Electrical line has also beeryanted as a right of way to the concessionaire under the concessiottgr e ement for up- gradation ofpaipar-Dausa seclionfrom Km 200 to Km 201 NH No.- IIm Baild' operate and rransfer BasisJ and therefore, the licensee shal,bonout the sama"

6 ffho will superwise the work of laying of Over Head Electrigal Tins PGCIL

7 Jitho will sign the agreement on behalf of over Head Electrical Line agencyPGCIL-)

8

vho will ensure that the defects in road portion after laying of over Heacllectrical Line are corrected aad if not iortected then what action ndll be:aken.

PGCIL

?,nr !is{Tts ryfi-iygarnan: $ingh iriieena

- - -T-T"o.5/ DY' fd a n a! er

qi{llg6i{,,'iFi'i t"rF[ tVrz nn+s$ddJS gfpCh li,{.

itrfl iIGn 0r rdr)/{iioyt. of ladir irhrr,::::,!qqlto. q. dl. ec.d,=, clu* 1i,.ii{00J220 HV $U&$TAilulir, *;;l*ii ii;rj,,

Page 8: LEA Associates South Asia Pvt. Ltd. Independent …nhai.org.in/spw/CorrespondenceIssues/1455-24.09.2014...LEA Associates South Asia Pvt, ltd, ,2, 1.19(b) (ii) 84M&155M 'Distance of

:.ra.l :i::-i:

a."':a.;\

: :;=:rt';

1.,r':l::, t: !11. :,:."i::

;: ::,.' : r-=)!;i,,::.

$

:i, .,:.. .,t,t,