Le péage Positif de Rotterdam › sites › default › files › 2018-09 › H_AVA… · Jeudi 22...
Transcript of Le péage Positif de Rotterdam › sites › default › files › 2018-09 › H_AVA… · Jeudi 22...
Jeudi 22 septembre 2016
Le péage Positif de Rotterdam
Source : France 2 – extrait du 20 h (06 juillet 2016)
Jeudi 22 septembre 2016
Peak traffic avoidance project in Rotterdam
De Verkeersonderneming (The Traffic Company)
Aernout van der Bend
Director of De Verkeersonderneming
Jeudi 22 septembre 2016
•De Verkeersonderneming & partners
•Program
•Peak traffic avoidance project
•Impact
Jeudi 22 septembre 2016
DE VERKEERSONDERNEMING
•For a better accessibility of the Rotterdam region
•A good accessibility is vital
•Better use of the current infrastructure
Jeudi 22 septembre 2016
PARTNERS OF DE VERKEERSONDERNEMING
Jeudi 22 septembre 2016
PROMOTING ACCESSIBILITY IN ROTTERDAM
The challenge •Up to 20% too much traffic during rush hours.
•In other words, 19 hours of excellent accessibility outside peak periods.
The result (2012-2014) > 15.000 peak traffic avoidances
Our job •Ensure that 7.000 more drivers moving in/to the afflicted areas avoid peak periods.
Jeudi 22 septembre 2016
THE PROGRAM
Jeudi 22 septembre 2016
WILD! VAN DE SPITS
Peak traffic avoidance project
•Project in the region of Rotterdam
•Drivers participate only for 6 months
•Drivers can only participate once
•Main goal: behavioural change
•Data gathering
Jeudi 22 septembre 2016
WILD! VAN DE SPITS
Peak traffic avoidance project
•Cameras registrate who drives frequently on the highway during peak traffic.
•Those drivers get an invitation to join the project.
•Participation is voluntarily.
•The maximum they can earn is
€ 120,- per month (based on the reference of the driver).
Jeudi 22 septembre 2016
WILD! VAN DE SPITS
Peak traffic avoidance project 2014
•Goal: daily 4300 peak traffic avoidances •11.000 participants
•Daily 6.000 peak traffic avoidances
2015
•Goal: daily 4100 peak traffic avoidances
•12.000 participants
•+/- daily 5.000 peak traffic avoidances
Jeudi 22 septembre 2016
WILD! VAN DE SPITS
Peak traffic avoidance project
2016
•Goal: daily 4100 peak traffic avoidances
•+ 10.000 participants
Jeudi 22 septembre 2016
WILD! VAN DE SPITS
Impact
•30.000 participants (in 3 years);
•Daily + 4.000 cars less during peak hour on the highway;
•Less delay in traffic (-5% up to -13%);
•More than 85% of the drivers after 3 months after the participation still avoids peak hour.
Jeudi 22 septembre 2016
•www.wildvandespits.nl
•www.verkeersonderneming.nl