LCS ObjectivesLCS Objectives Provide a standard interface for lane closure Provide a standard interface for lane closure
operations, closure tracking, and data retrieval for operations, closure tracking, and data retrieval for WisDOT regional offices statewideWisDOT regional offices statewide
Facilitate data sharing with WisDOT applications that Facilitate data sharing with WisDOT applications that require lane closure data such as 511 Traveler require lane closure data such as 511 Traveler Information, the STOC Incident Management System Information, the STOC Incident Management System (IMS), Inconvenience Map production, and (IMS), Inconvenience Map production, and Oversize/Overweight (OSOW) permittingOversize/Overweight (OSOW) permitting
Improve the completeness, reliability, and timeliness of Improve the completeness, reliability, and timeliness of lane closure data on state highwayslane closure data on state highways
Archive LCS data in the WisTransPortal system for Archive LCS data in the WisTransPortal system for future analysis and integration with other WisDOT / future analysis and integration with other WisDOT / TOPS Lab traffic engineering applications and researchTOPS Lab traffic engineering applications and research
Integrate historical traffic flow data and capacity Integrate historical traffic flow data and capacity information to calculate available closure thresholdsinformation to calculate available closure thresholds
LCS BenefitsLCS Benefits Coordinates activities to reduce back-ups Coordinates activities to reduce back-ups
and potential conflictsand potential conflicts Multiple activities can utilize the same closure Multiple activities can utilize the same closure Avoid lane closures during a special eventAvoid lane closures during a special event Avoid right lane closure near a left lane closure Avoid right lane closure near a left lane closure
on the same roadwayon the same roadway
Eliminates duplications and inefficiencies Eliminates duplications and inefficiencies by streamlining information into one systemby streamlining information into one system
Provides link to historical data that can be Provides link to historical data that can be used to make informed decisions used to make informed decisions
LCS Data FlowsLCS Data Flows
LCS WisTransPortal
Data Archive
Construction Map
OSOW
STOC ATMS
511 Travel Info
Email List
LCS Users
Request / Accept
WisDOT
Contracts, STN,Traffic Data
WisDOT Website
Special Project Websites
System UseSystem Use
What closures should be tracked?What closures should be tracked? All let projects (information formerly entered All let projects (information formerly entered
into Traffic Impediment Module)into Traffic Impediment Module)
Any planned closure or restriction on Any planned closure or restriction on Corridors 2030 roadwaysCorridors 2030 roadways
All major special eventsAll major special events
When should closures be entered? When should closures be entered? 14 days - Project start or full roadway closure14 days - Project start or full roadway closure
7 days - System ramp closure7 days - System ramp closure
3 days - Lane and service ramp closure3 days - Lane and service ramp closure
System UseSystem Use
Closure / Restriction Types Closure / Restriction Types Construction Construction – Let projects– Let projects
MaintenanceMaintenance
Permit Permit – Utility work– Utility work
Special Event Special Event – Summerfest – Summerfest Fireworks, Harley Parade, Farm Fireworks, Harley Parade, Farm Progress DaysProgress Days
Emergency Emergency
Closure InformationClosure Information
General Section – includes attributes that General Section – includes attributes that pertain to the entire closure and once pertain to the entire closure and once entered cannot be changed (with limited entered cannot be changed (with limited exception)exception)
Facility Section – used to group closure Facility Section – used to group closure specific attributes within the same closure. specific attributes within the same closure. Facilities come in four types:Facilities come in four types: MainlineMainline RampRamp BridgesBridges System Interchanges System Interchanges
Closure Duration TypesClosure Duration Types
Daily/NightlyDaily/Nightly – Closures that will occur – Closures that will occur once on the day(s) or night(s) definedonce on the day(s) or night(s) defined
WeeklyWeekly – Closures that will occur on the – Closures that will occur on the same days of the week for a number of same days of the week for a number of weeksweeks
ContinuousContinuous – Closures that will last for – Closures that will last for longer than 24 hours, but less than two longer than 24 hours, but less than two weeksweeks
Long TermLong Term – Closures that will last for – Closures that will last for more than two weeks more than two weeks
System UsersSystem Users
System can be accessed via the Internet – System can be accessed via the Internet – therefore people outside of WisDOT can therefore people outside of WisDOT can log on with a username and passwordlog on with a username and password
LCS User Roles Supervisor Regional Traffic
Engineer (RTE) - Regional Coordinator
Statewide Traffic Operations Center (STOC)
Project Manager (PM)
Permit Coordinator (PC) Maintenance Coordinator
(MC) Project Leader (PL) Public Information (PUBLIC) Inspector (INSP) Requestor (REQ) Viewer (VIEWER)
Acceptance ProcessAcceptance Process
Closures that will typically be automatically Closures that will typically be automatically accepted include: accepted include: Let project information that was formally Let project information that was formally
entered into the Traffic Impediment Module of entered into the Traffic Impediment Module of FITFIT
Closures that meet requirements outlined in the Closures that meet requirements outlined in the TMPTMP
Closures that should follow the approval Closures that should follow the approval process include: process include: Maintenance workMaintenance work Short-term project closures – i.e. overnight workShort-term project closures – i.e. overnight work
LCS Work FlowLCS Work Flow
ACCEPT
REQUEST
FORWARD
Complete
Closure
Ret
urn
/ R
esc
hed
ule
Acceptance ProcessAcceptance Process
Special events will typically be entered by a Special events will typically be entered by a Traffic Engineer who has already approved Traffic Engineer who has already approved the closure and the closure will not go the closure and the closure will not go through the acceptance processthrough the acceptance process
Acceptance authority can be delegated to Acceptance authority can be delegated to anyone by their supervisor anyone by their supervisor
Users with acceptance authority are allowed Users with acceptance authority are allowed to, but not required to, immediately accept a to, but not required to, immediately accept a closure they have entered into the system closure they have entered into the system
System InterfacesSystem Interfaces
Request – Enter a closure into the systemRequest – Enter a closure into the system Accept – Edit, advance or accept a closureAccept – Edit, advance or accept a closure Modify – Modify or reschedule accepted closuresModify – Modify or reschedule accepted closures Search – Search for closuresSearch – Search for closures Reports – Run closure reportsReports – Run closure reports Capacity – Evaluate lane closureCapacity – Evaluate lane closure Calendar – View calendar of events (i.e. Packer Calendar – View calendar of events (i.e. Packer
Games)Games) E-mail – Add, edit or delete e-mail preferencesE-mail – Add, edit or delete e-mail preferences Preferences – Update user information Preferences – Update user information
LCS Key PointsLCS Key Points
April 1, 2008 - LCS go live dateApril 1, 2008 - LCS go live date
Does Does notnot replace person to person replace person to person communicationscommunications
Can be run from almost any web browser using any internet connection
Flexible, statewide system developed to accommodate a variety of business needs
http://transportal.cee.wisc.edu/clohttp://transportal.cee.wisc.edu/closuressures